Loading...
HomeMy WebLinkAboutCarolina Asbestos _ Davidson Depot Inspection - Sept1_20231 WEEKLY INSPECTION FORM Inspection Team:Inspection Site:IHSB: Carolina Asbestos Corporation NONCD0003035 Name:Contact Information:BFP: Davidson Depot 25019-21-060 Todd Elliott, Property Manager te.lindenmillsllc@gmail.com Inspection Date:September 1, 2023 Miguel Alvalle, NCDEQ - IHSB miguel.alvalle@ncdenr.gov Carolyn Minnich, NCDEQ - BFP carolyn.minnich@ncdenr.gov Note: S = Satisfactory A = Action Required Outdoor Inspection Areas S A N/A Comments Slope x Parking x Building Perimeter x Landscape x Potential ACM 301/305 concrete culvert pipe. Material wetted, placed in garbage bag, duct taped closed and disposed of. Pics p 2. Walkways x Security S A N/A Comments Lighting x Doors and Windows x Access Restriction Devices x Signage x Photos and Comments 301/305 concrete culvert pipe: looks as though the last few heavy rain storms caused some material to wash out from under the culvert pipe. 2 301/305 concrete culvert pipe 301/305 concrete culvert pipe