HomeMy WebLinkAbout23076_RalMGP2_PhIIAWP_20230614DATA GAP ASSESSMENT WORK PLAN FORMER RALEIGH MGP NO. 2 PHASE II REDEVELOPMENT 400 SOUTH WEST STREET RALEIGH, NORTH CAROLINA BROWNFIELDS PROJECT NO.: 23076-19-092 MID -ATLANTIC PE LICENSE: F-0967 REVISION NO.: 1 MID -ATLANTIC JOB NO. R3746.15 June 14, 2023 Prospective Developer: Cabarrus, LLC KL West End Phase II, LLC Allen McCollum 4321 Lassiter at North Hills Avenue Suite 250 Raleigh, North Carolina 27609-5782 Phone: 919-710-3572 Email: amccollum(a)_kanerealtycorp.cpm Consultant: Mid -Atlantic Associates, Inc. Daniel H. Nielsen, PE 409 Rogers View Court Raleigh, North Carolina, 27610 Phone: 919-250-9918 Email: dnielsen(a-maaonline. com Brownfields Project Manager: Sharon Eckard, PG North Carolina Department of Environmental Quality Mail Service Center 1646 Raleigh, North Carolina 27699 Phone: 919-707-8379 Email: Sharon.eckard(cD-ncdenr.gov Ar ft Mid Atlantic 409 Rogers View Court Mid Atlanti c Raleigh. NC 276 9918 office 914.250.991 Engineering & Environmental Solutions Facsimile 919.250.99SO MAAONLINE.COM SECTION 1 INTRODUCTION The subject site consists of two parcels, totaling 2.08 acres, located at 400 and 430 South West Street in Raleigh, North Carolina (Figure 1). The subject site is the eastern portion of the Former Raleigh MGP No. 2 Brownfields Property and is the location of Phase II Redevelopment (the western portion of the site is Phase II Redevelopment). This Work Plan has been developed and formatted in accordance with the Minimum Requirements Checklist for Site Assessments Work Plans and Reports, February 2022 developed by the North Carolina Department of Environmental Quality (DEQ) Brownfields Program (Attachment A). The subject site has been used for various industrial purposes, including as a lumber yard and a manufactured gas plant, since the late 1800s. More recently the site was home to Clancy & Theys' office and maintenance operations and an Amtrak office. Environmental assessment activities conducted at the subject site have identified the presence of volatile organic compounds (VOCs) in the soil and groundwater at the site (Attachment B). Both chlorinated and petroleum -related VOCs have been identified in the groundwater at the site. The objective of the assessment is limited and aimed solely to characterize soil (in cut areas and stockpiled on site) to determine appropriate disposal options. A vapor intrusion mitigation system (VIMS) will be installed in the new improvements made at the site; therefore, no further VI assessment activities are planned. Similarly, no further groundwater assessment will be conducted. This assessment is not being conducted for use by any other North Carolina Department of Environmental Quality (DEQ) programs. SECTION 2 SCOPE OF WORK The site will be redeveloped for multi -family use. One building will be constructed with the bottom two levels used primarily for parking (one retail space is on the second level). Levels three thru seven will be residential (see Attachment C). The assessment includes the collection of 15 composite/grab soil samples from soils located in soil cuts required during construction. Cut depths range from approximately 2 feet in the northern portion of the site to 21 feet near the southeast corner of the site. There are currently no plans to use these cut soils for beneficial fill. These soils will be disposed at a permitted disposal facility. EXPERIENCED CUSTOMER FOCUSED INNOVATIVE — Data Gap Assessment Work Plan Raleigh MGP No 2 — Phase 11 Redevelopment Raleigh, North Carolina June 14, 2023 Page 2 The soil samples will be collected at the locations illustrated in Figures 2, 3 and 4, and summarized (including sample depths and analytical tests) in Table 1. The sampling regime is designed to assess approximately 700 to 3,900 cubic yard soil blocks throughout the soil cuts planned at the site. The total soil cut is anticipated to be approximately 28,000 cubic yards. Additionally, there are two soil stockpiles on the Phase II Redevelopment portion of the site. These stockpiles, totaling approximately 4,000 cubic yards, were generated during the construction activities on the Phase I Redevelopment portion of the site. These stockpiled soils will be assessed to determine appropriate off -site disposal options. SECTION 3 SAMPLING METHODOLOGY Assessment activities will be performed in general accordance with the following documents. Deviations from methods outlined in these documents are noted below or will be noted in the final report. • Brownfields Program Minimum Requirements Checklist for Site Assessment Work Plans and Reports (February 2022) • Inactive Hazardous Sites Program Guidelines for Assessment and Cleanup of Contaminated Sites (July 2021) Soils collected for the soil cut assessment will be collected from five Blocks (Block A thru Block E) illustrated in Figure 3. Within each Block there are three to five soil borings. Soil samples will be collected using a GeoProbe macrocore sampler and direct push technology (DPT). Soil samples will be collected from the sampling device (acetate sleeves from the macrocore sampler) at up to five-foot intervals to final depth of the boring. Soil types in the macrocore sampler will be characterized and used to develop soil boring logs. Grab soil samples will be collected at depths shown in Table 1 unless field observations and screening (e.g., readings from an organic vapor analyzer) indicate an alternative sampling depth should be used. Equal sized aliquots will be collected at each boring within a Block at a given elevation (eg, 290 feet, 295 feet, etc). All composite samples will be created by mixing the aliquots in the field in a dedicated and new Ziploc bag prior to placing in the laboratory supplied sample jars. For each elevation within a Block, one separate undisturbed aliquot will be selected for analysis of VOCs based on field observations and screening of the samples from each boring and elevation within a given Block. Per BRS request, one `below cut' sample will be collected from each block in order to characterize soil quality that will be remaining on site (elevation 290 for blocks A thru D and elevation 295 for Block E). Mid Atlantic Data Gap Assessment Work Plan Raleigh MGP No 2 — Phase 11 Redevelopment Raleigh, North Carolina June 14, 2023 Page 3 Soil samples will also be collected from the stockpiles. The soil samples will be selected for testing based on the following logic: • Each stockpile will be divided into equal segments based on the stockpile's long axis. Each segment will be comprised of approximately 1,000 cubic yards. Three aliquots will be collected from each segment: one from each side of the stockpile and one from the center of the stockpile, each at a depth at least 12 inches beneath the surface of the stockpile. Access to the sampling points may require the use of on -site earth -moving equipment. The aliquots will then be composited in the field. • One sample for every 1,000 cubic yards will be submitted for analysis of the presence of volatile organic compounds (VOCs). o A photoionization detector (PID) will be used to determine which of the three aliquot locations will be selected for VOC analysis. If the PID does not identify evidence of VOCs in any of the aliquot samples, the VOC sample location will be selected at random and noted in the field. o The VOC sample will be collected directly from the soil at a minimum depth of 12 inches beneath the surface of the stockpile. • One composite sample comprised of three aliquots for every 1,000 cubic yards will be created. The composited sample will be analyzed for semi -volatile organic compounds (SVOCs) and eight RCRA metals. o The SVOC and RCRA metal sample will be collected from a composited sample of three aliquots collected using a decontaminated hand auger bucket. o Composites will be created by mixing the aliquots in the field. o The hand auger bucket will be decontaminated with water and Iiquinox, or similar, between each sample location. All selected soil samples will be placed in laboratory -supplied cooler(s) which contain ice as a preservative. Soil sample analysis will be conducted as described in Section 4. SECTION 4 LABORATORY ANALYSIS Soil samples will be submitted to Waypoint Analytical Laboratory of Charlotte, North Carolina (NC Certification Number 402). Composite soil samples will be analyzed for SVOCs by EPA Method 8270E and RCRA 8 metals by 6020B and 7471 B as shown in Table 1. The soil sample exhibiting the greatest concentration of total chromium will be analyzed for hexavalent chromium by EPA Method 7199. Soil grab samples will be tested for VOCs by EPA Method 8260D. Standard hold times for these analyses are not expected to cause scheduling, shipping or quality control issues. Reporting limits and method detection limits will meet applicable screening criteria including the reporting of estimated concentrations as "J" flags. Laboratory Level II QA/QC will be provided. There will not be limitations on which soil constituents are reported by the laboratory. Mid Atlantic Data Gap Assessment Work Plan June 14, 2023 Raleigh MGP No 2 — Phase 11 Redevelopment Page 4 Raleigh, North Carolina SECTION 5 QA/QC One duplicate soil sample will be collected in the field per day of soil sampling (two days are anticipated) and will be analyzed by EPA Methods 8270E and 6020B/7471 B (composite sample) and 8260D (grab sample) as shown on Table 1. Filled sample jars will be placed in ice -filled coolers. Care will be taken to ensure that sample locations exhibiting evidence of impacts will be used to collect duplicates, if applicable. Mid -Atlantic will fill the soil sample jars so that the laboratory will have sufficient sample volume for matrix spike (MS)/matrix spike duplicate (MSD) analysis. The chain -of -custody will be completed in the field and packed with the samples. The Mid -Atlantic field technician will return to the office with the packed cooler which will be collected by a laboratory -provided courier and delivered to the laboratory. SECTION 6 INVESTIGATION DERIVED WASTE MANAGEMENT Investigation derived waste (IDW) generated during this assessment will consist of soil cuttings from borings advanced for soil sample collection and will be managed in general accordance with 15A NCAC 02T.1503 and 15A NCAC 02H.0106. Prior assessment conducted at the site has not identified evidence of soils meeting hazardous waste criterion. Therefore, soil displaced for the soil borings will be placed back into the boring from which the soils were generated. Excess soil will be spread at land surface at the boring site. If visual or olfactory evidence indicates significant impacts, the IDW will be contained in 55-gallon drums pending analytical results. SECTION 7 REPORTING Following completion of assessment field activities and receipt of laboratory analytical data, Mid -Atlantic will prepare a Soil Cut Assessment Report to document field activities and provide analysis of the data collected. Soil analytical data will be compared to Preliminary Soil Remedial Goals (PSRGs). As appropriate, the analytical data will be evaluated using the NCDEQ risk calculator for cumulative risk evaluation(s). The report will include: • Reporting/summary of site work conducted as outlined above; • Summary of findings and possible recommendations; • All applicable tables including tabulated sample depths, analytical data with comparison to the PSRGs, cumulative risk evaluations; • All applicable figures which will depict actual sample locations (with scale and north arrow); • Boring logs; • Mid -Atlantic's PE/PG License Number; and • The Professional Engineer's or Licensed Geologist's individual PE/LG seal and signature. Mid Atlantic Data Gap Assessment Work Plan Raleigh MGP No 2 — Phase 11 Redevelopment Raleigh, North Carolina June 14, 2023 Page 5 Note: The objective of this assessment is to evaluate soil cuts and stockpiled soil for the purpose of evaluating disposal options. Therefore, groundwater and soil gas sampling is not included and consequently potentiometric and plume maps listed in the Assessment Checklist will not be generated. Mid Atlantic TABLE 0 Mid Atlantic TABLE 1 Cut Soil Sampling Summary Former Raleigh MGP No. 2 Phase II Redevelopment Raleigh, North Carolina Block Approximate Volume yd s Cut Elevation (feet) Boring Name Sample Depth (ft bls)* Soil Sample Name VOCs SVOCs RCRA Metals*** A-1 3 A-2 2 3,900 290 A-290 G C C A-3 3 A A-4 3 A-5 8 --------------------- 1,100 --------------------- 295 --------------------- A-5 ---------------------- 5 --------------------- A-295 --------------- G -------------- G -------------- G B-1 5 B-2 5 3,200 290 B-290 G C C B-3 6 B B-4 11 --------------------- •------------------- --------------------- B-3 •--------------------- 1 --------------------- •-------------- •------------- •------------- 1,600 295 B-295 G C C B-4 6 --------------------- 800 •------------------- 300 --------------------- B-4 •--------------------- 1 --------------------- B-300 •-------------- G •------------- G •------------- G C-1 8 3,200 290 C-2 6 C-290 G C C C-3 8 C-4 12 C --------------------- --------------------- --------------------- C-1 ---------------------- 3 --------------------- --------------- -------------- --------------- C-2 1 3,200 295 C-295 G C C C-3 3 C-4 7 --------------------- 800 -------------------- 300 --------------------- C-4 ---------------------- 2 --------------------- C-300 --------------- G -------------- G -------------- G D-1 9 2,700 290 D-290 G C C D-2 9 D-3 19 --------------------- -------------------- --------------------- D-1 ---------------------- 4 --------------------- --------------- -------------- -------------- D D-2 4 2,700 295 D-295 G C C D-3 14 --------------------- 700 •------------------- 300 --------------------- D-3 •--------------------- 9 --------------------- D-300 •-------------- G •------------- G •-------------- G --------------------- 700 -------------------- 305 --------------------- D-3 ---------------------- 4 --------------------- D-305 --------------- G -------------- G --------------- G 295 E-1 10 E-295 G C C E-2 10 E 3,400 --------------------- 300 --------------------- E-1 •--------------------- 5 --------------------- E-300 •-------------- G •------------- C ------------- C E-2 5 -------------------- 305 --------------------- E-3 •--------------------- 1 --------------------- E-305 •-------------- G •------------- G -------------- G Duplicate Sample** 2 2 2 Totals 28,000 19 17 17 17 Objective: The objective for all samples is the same; to assess soil quality in soil cuts to determine approriate disposal options. Notes: VOCs: Volatile Organic Compound by EPA Method 8260D. SVOCs: Semi -Volatile Organic Compounds by EPA Method 8270E. RCRA: Resource Conservation and Recovery Act by Methods 6020B and 7471 B. *Depth Below Land Surface. **Duplicates to be collected from samples that appear contaminated, if identifiable in the field. One sample per day. ***Hexavalent Chromium: Soil sample with highest total chromium concentration will also be analyzed for hexavalent chromium by Method 7199. Default sample depth used if field evidence does not suggest and alternative sample depth FIGURES 0 Mid Atlantic a N REFERENCES: 1. RALEIGH WEST, NC DIGITAL RASTER GRAPHICS, USGS. SCANNED FROM 1:24,000-SCALE WAKE, NC TOPOGRAPHIC MAPS, PUBLISHED 2019, USGS. SCALE: 1:9,000 2. INSET MAP DIGITAL DATA FROM 2002 NATIONAL TRANSPORTATION ATLAS, Feet BUREAU OF TRANSPORTATION STATISTICS, WASHINGTON, D.C. 6OO ,200 3. PROPERTY BOUNDARY DATA FROM WAKE COUNTY GIS. DRAWN DATE: TOPOGRAPHIC SITE MAP BY: KRC FEBRUARY 2023 FORMER RALEIGH MGP SITE NO. 2 DRAFT JOB NO: Mid Atlantic 600 W CABARRUS STREET CHECK: DHN R3746.00 Engineering & Environmental Solutions ENG. GIS NO: RALEIGH, NORTH CAROLINA CHECK: DHN 3G-R3746.00-1 APPROVAL: DHN DWG NO: 1 -IMF Ilk ■ :. ior N rf ■� t, Y s .� � 1 1 Ilk a * 40 Ilk jot* • BJ Former MGP 'z-2# E r • Legend DE-3 Proposed Beneficial Fill Soil Aliquot Location Phase II Redevelopment B-4 A C►�4 D=3 � Cut Area - � � Historic Monitoring Well Location FSLMOturesCem olished 1 inch = 50 feet"`" r•*--- ❑ Historic Soil Sample Location 0 25 50 100 150 200 - 4 Existing Building Feet SITE MAP DRAWN BY: KRC DATE: JUNE 2023 • FORMER RALEIGH MGP NO.2 DRAFT CHECK JOB NO.: R3746.00 Mid Atlantic BY: DHN PHASE II REDEVELOPMENT ENGINEER CHECK Engineering & Environmental Solutions 600 CABARRUS STREET BY: GIS NO.: 3G-R3746.00-2 RALEIGH, NORTH CAROLINA APPROVED DRAWING NO.: 2 BY: DHN REFERENCE: DATA FROM WAKE COUNTY GIS, NC ONEMAP. �@ f., _ ,_-� -198❑ EA.LREINIi�`\\` o' sTVREn N i ^uL4ERF MG W299-7 ` \ \ (r �� MG EA'240.50 ��\ —TIE WALL FD l\\\ \ C \ \ �� ► * h. • ngSTINO \\\ \ \ Ir �' -TAINING WALL ly / EXISTING Fd {T.\�\ OF WAY \\\\ \\ \ I+I .t S-LITTER ..FLUSH Lr'. �-) ..-RETyyINI✓`OIV 7a J' % f lrr 2S1.Eo 9?89 \\ PA"-100 - r DBA, 4 �� J� FIRE qJ,!g, , r . `� D-1 } ► • IklOEN `� 7 ; -Fn 07 B-1 2 5 4 J/ -41VEti S FARI NG 3E[AC f F 1 TCN 4 SIN � >• 1 �/ !� r � �r�e.�y:dq tcm'/ C-1 ;� II � I I i S__L Lr W�SA_ ,::1... 291.7 i TW31 .00 III co -,ova• I � i I A-2 - III iL Ui-F30 II I I PR ° I , I f A-3 Vim. rns1.a9 A Ci2 TV 3, RO S -9NG ^ ROFCRTI' ENE K, ■ ` 4 a' I W296.5 V 7 �, D\� RE INING WALL F: AF{E+ IN - - - _ _ jl d/` I I� (D CA5ENEF' ICN By OTHERS) TORM I i � - Bl1ILUiN� Ir LE'�EL FF - p 14 9 11 I a d I f-SN.� r`� - ♦3 -I I I FT' ,r "" fIN TW .00 LE A-4 VEL3--310.67/312.00 30.- T III L Env 0131 I ' LEVEL 2-238.0a'j300.1i =!DE S R T , lI VEi 1=ti291.00%291,QC ° ^ B-3 AEC�--3 a - 3 , Legend EXISTING 4-,� S. WEST STREET IJ' (ORO SED73'PUBLIC A Proposed Beneficial Fill Soil Aliquot Location MAIN REET PARALLEL PAR I ! Historic Monitoring Well Location + - 1 E-3 RET iL I ! ❑ �.., s I \ r+. fF=799.IG' I• 'L[VnFEc cou RRC ' I ii.t-- , - _ - -- I +� I Y {see seEEr L7. Historic Soil Sample Location ' _________ - --`-- - ' 29b r• f(CR•.�I I r _) I I 297.64_K0. A-5 !i °- �__VERARS____StIUFN+�CCC'TuI4�2lCQ"^G1�.3'P 07�\I`E.CEO CT nWD _ {4 "I Phase II Redevelopment EB-4 emoliSflIructurE'Dn WALL /�� D 3 I I -CE ,❑EeiG _iE{{ -=-�- - BY OTHERS� f r 1 Y �� —� Cut Area 'j _,p / _)E31Ll Existing Building yq �y • w 9�•,i' Dia GAL / �' \ —� awaaa. G lewaq L — w�_'L�__.r-�w `�Jt� } @�. � � �_ - � • W ._� � - i �306.50 8W30$50 • �a o N- - � � j.- - � , - W -� — Proposed Building b � r- PROPOSED REDEVELOPMENT MAP DRAWN BY: KRC DATE: JUNE 2023 FORMER RALEIGH MGP NO.2 DRAFT CHECK JOB NO.: R3746.00 Mid Atlantic BY: DHN PHASE II REDEVELOPMENT ENGINEER CHECK GIS NO.: 3G-R3746.00-3 Engineering & Environmental Solutions 600 CABARRUS STREET BY: RALEIGH, NORTH CAROLINA APPROVED DRAWING NO.: 3 BY: DHN REFERENCE: DATA FROM WAKE COUNTY GIS, INC ONEMAP, SUB -SLAB SOIL GAS ASSESSMENT REPORT BY MID -ATLANTIC ASSOCIATES, INC. DATED MAY 28, 2021. BROWNFIELDS PROPERTY -SURVEY PLAT DATED MARCH 28, 2011 N - Irk ♦i� ♦ w� Cut; -Fill rft� `NIL �;�:,\ �• ' � \` 1 A 21.571 �•t�\. K:ti� •• •y. 20.a4 18.52 sib 4 •,� 10-99 r , II j• � \ � 47 611 j F� 1` .IAl 13.94 Q �' ,y' `� + 'r 12.41 Y v r ti- 1 -11 9-38 Ci \ 1 7.83 ! 8.31 1 _ rA-2----------- = k ' 4.78 �;— - E-1 3.25 ! I k B-2 1.73 ' A-3 0 Ad'2 I 1 i .20 .� e 1_7$ T 11 A B- --C L 1 3.25 E A-4 4.7E -Q 1■ 8.31 -�. '3o OC-3I1]III r ' 1 1-` Ifl Jr 1 7.83 9.38 12.f 1 all E-3 w � rr 1394 � ti -j f 3- , Le end 13.47 1 A-5 B-40 � ' _ g -C-4 ------ rp;�3 10.99 Proposed Beneficial Fill Soil 12. L ___--_ ter; ,r J +' y 0 Aliquot Location --------------- 20,04 Cut Area 21.57 5_ Brownfields Property Boundary Cutr- S ( Mid Atlantic Engineering & Environmental Solutions PROPOSED BENEFICIAL FILL SAMPLE LOCATION MAP FORMER RALIEGH MGP NO.2 600 CABARRUS STREET RALEIGH, NORTH CAROLINA DRAWN BY: KRC DATE: JUNE 2023 DRAFT CHECK BY: DHN JOB NO.: R3746.00 ENGINEER CHECK BY: DHN GIS NO.: 3G-R3746.00-4 APPROVED BY: DHN DRAWING NO.: 4 I REFERENCE: DATA FROM WAKE COUNTY GIS, NC ONEMAP I ATTACHMENT A COMPLETED VAPOR INTRUSION ASSESSMENT WORK PLAN & REPORT CHECKLIST Mid Atlantic Work Plan and Report Checklist Version 2 February 2022 Minimum Requirements Checklist for Site Assessment Work Plans and Reports NCDEQ Brownfields Program — February 2022 Instructional Page All references to Prospective Developers includes follow-on owners who may be conducting work in accordance with the Brownfields Property Management Unit. To increase predictability and most efficiently assess Brownfields Properties and the redevelopment timing requirements of Prospective Developers or follow-on owners, the Brownfields Program has standardized the format for Site Assessments. This format has been generated in the form of a checklist to allow for ease in submission by the prospective developer's consultant and for the Brownfields Program's completeness review. This checklist outlines the minimum requirements and submittal format under the Brownfields Program for Assessment Requirements and Reporting. All Assessment Work Plans and Reporting submissions to the Brownfields Program must include this completed checklist in the outlined format. These requirements allow DEQ to reduce review time for the Assessment Work Plan and Report and increase process predictability for prospective developers. This checklist will also provide reliable data for risk -based decisions and further expedite the project timeline. Any divergence from these requirements will lengthen the process of assessing risks on the site, may necessitate reprioritization of a project manager's queue towards projects that meet these requirements. Therefore, delaying production of the brownfields agreement and/or environmental management plan. Any alterations to the checklist on a site- specific basis must be reviewed and approved by the Program prior to implementation. However, in order to respect the schedule of all projects in house and keep the program's entire project pipeline moving, we strongly recommend against seeking changes to the checklist. Based on a review of environmental and risk data from our project inventory, please note there are some new points of emphasis that are included herein: 1. For ALL residential reuses; sub -slab vapor assessment (full list EPA TO-15) is required, regardless if existing structures will be removed. If no structures or slabs exist on the Brownfields Property, exterior soil gas assessment is required within all proposed structure footprints. 2. ALL properties require groundwater data (VOCs, SVOCs and RCRA Metals) from a minimum of three sample locations, depth to groundwater and a resulting potentiometric map. 3. Soil shall be assessed based on areas of concern and redevelopment plans and across the depth interval of the cut/grading. Work Plan and Report Checklist Version 2 February 2022 Environmental Site Assessment Work Plan Checklist Reviewed and checked by (Name): .Ala C �� vs Title Page The title page should include the following information. Letter style reports are acceptable, as long as this information is somewhere on the first page. ✓ Title of Work Plan •� Brownfields Project Name (not the development name) Brownfields Project Number ✓ Date (updated with each revision) ./ Revision Number .! Firm PE/PG License Number Individual PE/PG seal & signature Contact information for Developer, Consultant, and Project Manager Section 1— Introduction Provide the site location, address, and acreage. �— Provide a BRIEF summary of the history of the property and its history in the program. For example: reiterate RECs from a Phase I ESA, indicate if the scope of work was negotiated during a Data Gap Meeting, etc. fC 3 f Briefly list and describe the data gaps the assessment is attempting to fill f Indicate if the assessment data is for the use of any other DEQ programs in addition to the Brownfields Program (i.e. the site is a regulated UST, IHSB, etc. property) Section 2 — Scope of Work ✓ Provide a general description of proposed scope of work covered in this plan (i.e. 2 new monitoring wells, six groundwater samples, 5 exterior soil gas sampling points and 6 soil borings) Discuss samples to be collected by media and source area/location. Generally, the reasoning for the sample locations selected. ✓ Describe depths of samples to be collected (Reference Table 1) or how that decision will be made fin the field, if needed. I/ State for what each sample will be analyzed (briefly). Reference Table 1. For all residential reuses, sub slab vapor is required, if no slabs exist, exterior soil gas is required within all proposed footprints. Section 3 — Sampling Methodology Reference the guidance documents you intend to use. IHSB, EPA SESD, VI Guidance, Well Construction Rules (NCAC 2C). Note deviations or methodology planned that is not covered by such guidance (e.g., multi -increment sampling, passive air samplers, mobile labs, Hapsite, simultaneous indoor/outdoor radon, high -volume subslab vapor testing, PFAS sampling). f Describe what will be installed (soil boring, temporary well, permanent well, sub slab vapor, exterior soil gas, etc.). Include construction details. % Discuss installation methodology (Hand Auger, DPT, etc.) l- �— Discuss sample collection procedures. Include the following, at a minimum: • Equipment to be used • Purging methods and volumes Work Plan and Report Checklist Version 2 February 2022 ® Stabilization parameters for groundwater sampling ® Field screening methods • Leak check procedures for sub -slab vapor and exterior soil gas samples (Note this is required) Discuss how and when vacuum readings will be collected (for summa cans) Discuss sample point abandonment Section 4 — Laboratory Analyses Discuss the proposed analyses (include method number, preparation method, if there are concerns with short hold times, etc). Discuss any proposed limitations on the contaminants of concern, if any, and the reason for such limitation (sufficient previous data, indoor air interferences, etc). f Discuss laboratory certifications. Please note, NC does not certify labs for air samples. Please specify what certification the proposed air lab holds. Indicate that the Reporting Limits/Method Detection Limits will meet applicable screening criteria ✓ (to the extent feasible). Include Reporting of J-Flags to meet criteria. Indicate what Level QA/QC will be reported by the laboratory. Level II QA/QC is typically acceptable. Section 5 — QA/QC ✓ Specify the duplicate sample frequency. Minimum requirement: 1 duplicate per 20 samples, per media, per method. NfPr Discuss Trip Blank. 1 Trip Blank per cooler/shipment of groundwater VOC analyses is required. .l Discuss how the lab will have sufficient sample volume for MS/MSD analyses. ✓ Discuss chain of custody and shipping. Section 6 — Investigation Derived Waste (IDW) Management ✓ Discuss what IDW will be generated and how it is proposed to be managed. Management recommendations should be in accordance with 15A NCAC 02T.1503 and 15A NCAC 02H. 0106. Generally, if the Brownfields Property has not previously been assessed, then all IDW must be containerized and characterized prior to management. Previous assessment data that indicate no Hazardous Waste (listed or characteristic) is likely to be encountered in the area of proposed assessment will be required before thin spreading of IDW on -site is permitted. Section 7 — Reporting This section should discuss the components of the assessment report which will be prepared as a result of the above sample collection. At a minimum, the report shall include: -f Reporting/summary of site work conducted for all sections outlined above in this checklist; -- Summary of findings and possible recommendations; �— All applicable tables and figures outlined below with the addition of: ✓ Tables for tabulated analytical data per media sampled and analyzed, compared against applicable screening levels, sample depths and depth to groundwater; .i Figure depicting actual sample locations collected, with each media depicted in the legend, graphic scale and north arrow; and /A Groundwater potentiometric map, with graphic scale and north arrow. - Boring logs for all soil borings, newly constructed monitoring wells, and exterior soil gas locations - Well construction and abandonment records, if applicable Work Plan and Report Checklist Version 2 February 2022 Firm PE/PG License Number Individual PE/PG seal & signature Work Plan and Report Checklist Version 2 February 2022 Attachments f Table 1 — Proposed Sample Locations and Analyses on a Summary Table that includes: ,/ Sample ID Sample Objective IVA�-f Proposed Depth(s) Analytical Method(s) 1 QA/QC Samples Background Samples ✓ Figure 1 — Site Location Map 1 Site location on a topographic map base 7 Graphic scale and north arrow f Figure 2 — Site Map should include the following ✓Buildings ✓ Historical sample locations -7RECs or other areas of concern 7 Proposed sample locations 7 Sample identification labels 1I4 Background samples r V QA/QC samples stc. rwb►c 4 - 100,{;sK fro Ee tlt�c• is t� L�tc.i .., �a/1 abcv� �...4 -7 Graphic scale and north arrow J High quality aerial suggested as the base map Figure 3 — Site Potentiometric Map - Buildings -Groundwater sample identification labels -Graphic scale and north arrow Figure 4 — Site Plume Maps (groundwater, soil vapor, etc.) 3 _ Figurer Proposed Development (if available) f Overlay of historical and proposed sample locations ✓ Graphic scale and north arrow `� Appendix — Summary of Historical Analytical Data (if needed) — to include tables and figures only. ATTACHMENT B HISTORICAL ASSESSMENT TABLES AND FIGURES Mid Atlantic BK014637PG00391 The Brownfields Agreement between Prospective Developer and DENR is attached hereto as Exhibit A. It sets forth the use that may be made of the Brownfields Property and the measures to be taken to protect public health and the environment, and is required by NCGS § 130A-31032. Attached hereto as Exhibit B is a reduction, to 8 1 /2" x 11 ", of the survey plat required by NCGS § 130A- 310.35(a). It is a plat of areas designated by DENR that has been prepared and certified by a professional land surveyor and that meets the requirements of NCGS § 47-30. That plat contains the following information required by NCGS § 130A-310.35(a): (1) The location and dimensions of the areas of potential environmental concern with respect to permanently surveyed benchmarks. (2) The type, location and quantity of regulated substances and contaminants known to exist on the Brownfields Property. The following tables also set forth the type and quantity of such substances: Table A Groundwater contaminants (in micrograms per liter (µg/L.), the equivalent of parts per billion), the standards for which are in Title 15A of the North Carolina Administrative Code, Subchapter 2L, Rule .0202 (January 1, 2010 version with December 1, 2010 Interim Maximum Allowable Concentration update): Groundwater Contaminant Sample Location Date of Maximum Cone. Sampling Maximum Cone. (µme) Date of Most Recent Sampling Most Recent Cone. above Std. Standard (µme ) (µ91L) TRC-5 9/23/2004 6,600 6/14/2005 5,300 TRC-5R 3/25/10 5,000 9/15/2010 2,300 TRC-7 6/14/2005 640 6/14/2005 640 T-GP3 7/14/2000 17 7/14/2000 17 Benzene 1.0 T-GP23 7/17/2000 4.4 7/17/2000 4.4 C-GP6 7/17/2000 20 7/17/2000 20 C-GPI1 7/17/2000 58 7/17/2000 58 PB-1 2002 47 2002 47 PB-2 2002 43J 2002 43J PB-3 2002 6.3J 2002 6.3J I,1-Dichloraethene TRC-I 12/16/2002 30 12/16/2002 30 7 TRC-8 12/13/2002 44 12/13/2002 44 1,2-Dichloroethane TRC-6D 9/19/2003 1.7 9/19/2003 1.7 0.4 NSB-I 9/16/2003 1.1 9/16/2003 1.1 8KO14637PGO0392 Groundwater Contaminant Sample Location Date of Maximum �° lin Sampling Maximum Maximum (µ9/0 Date of Most SamRecpling Sam Im Most Recent Conc. above Std. WIL) Standard IµgrL) NSB-2 9/16/2003 2.4 9/16/2003 2.4 S B-3 5 10/29/2002 14 10/29/2002 14 Ethylbenzene TRC-5 6/14/2005 4,100 6/14/2005 4,100 600 TRC-5R 3/25/2010 4,400 9/15/2010 2,500 TRC-7 6/14/2005 1,900 6/14/2005 1,900 Isopropylbenzene gaup) 5 9/23/2004 150 9/23/2004 150 70 Manganese TRC-5R 12/11/07 9,700 3/25/10 6,600 50 1-Methylnaphthalene TRC-5 6/14/2005 550 6/14/2005 550 PQL TRC-5R 3/25/2010 300 9/15/2010 230 TRC-7 6/14/2005 300 6/14/2005 300 2-Methylnaphthalene TRC-5 6/14/2005 640 6/14/2005 640 30 TRC-5R 3/25/2010 360 9/15/2010 260 TRC-7 6/14/2005 120 6/14/2005 120 T-GP3 7/14/2000 54 7/14/2000 54 C-GPI1 7/17/2000 130 7/17/2000 130 Naphthalene SB-14 10/31 /2002 100 10/31 /2002 100 6.0 SB-35 10/29/2002 1,500 10/29/2002 1,500 NSB-1 9/16/2003 130 1 9/16/2003 130 TRC-5 6/15/2005 9,400 6/15/2005 9,400 TRC-5R 6/11/2008 4,200 9/15/2010 3,200 TRC-7 6/14/2005 1,400 6/14/2005 1,400 TRC-8 12/13/2002 46 6/15/2005 <10 MW-2 12/23/2002 100 12/23/2002 100 MW-3 12/16/2002 210 12/16/2002 210 T-GP3 7/14/2000 560 7/14/2000 560 T-GP23 7/17/2000 270 7/17/2000 270 C-GP6 7/17/2000 110 7/17/2000 110 C-GP11 7/17/2000 630 7/17/2000 630 PB-2 2002 92 2002 92 PB-3 2002 1,000 2002 1,000 BK0HNNG00393 Groundwater Contaminant Sample P Location Date of Maximum Conc. Sampling Maximum Conc. (µme) Date of Most Recent Sampling Most Recent Cone. above Std. Standard 6191L) W/L) Styrene TRC-5 9/23/2004 300 9/23/2004 300 70 M W-2 12/23/2002 180 12/23/2002 180 TRC-6 12/23/2002 66 12/23/2002 66 Tetrachloroethene 0.7 TRC-6D 9/19/2003 2.2 9/19/2003 2.2 MW-3 12/16/2002 53 12/16/2002 53 NSB-9 9/2004 51E 9/2004 51E Toluene TRC-5 9/23/2004 5,100 6/14/2005 4,700 600 TRC-5R 9/23/2008 1,000 9/15/2010 730 TRC-1 12/16/2002 32 12/16/2002 32 Trichloroethene 3 TRC-8 2002 38 2002 38 T-GP3 7/14/2000 120 7/14/2000 120 T-GP23 7/17/2000 25 7/17/2000 25 1RC-5 9/23/2004 31700 6/14/2005 3,500 Xylenes (total) 500 TRC-5R 3/25/2010 1,750 9/15/2010 1,300 TRC-7 6/14/2005 790 6/14/2005 790 Conc. = Concentration; Std.= Standard E=Estimated Concentration *Samples extracted outside of EPA -recommended holding time. Note: certain concentrations of benzene, 1, 1-dichloroethene, naphthalene, tetrachloroethene, toluene, trichloroethene, and xylenes in groundwater also exceed industrial and residential screening levels for vapor intrusion (IHSB, October 2010). PQL=Practical Quantitation Limit (which is the standard for non -naturally occurring groundwater contaminants with no established standard) J=Estimated Value Table B Soil contaminants (in milligrams per kilogram (mg/kg), the equivalent of parts per million), the standards for which are derived using the Guidelines of the Inactive Hazardous Sites Branch of DENR's Superfund Section (October 2010 version): 4 BK014537PG00394 Soil Contaminant Sample Location Approx Depth (ft) Date of Max. Concentration Sampling Maximum Concentration above Std. m Standard (mglkg) Acenaphthylene A2-SW-1 VC 03/06/07 1.3 PQL A2-SW-6 VC 3/13/07 IAJ A2-SW-7 VC 3/13/07 1.01 A2-BASE-I 4 03/09/07 2.6 A2-BASE-2 18 03/13/07 0.55J C-SW-I VC 03/20/07 1.7J C-CULSW-I VC 04/24/07 2.1J SB-13 11 10/28/02 1.8 NSB-1 10.5-11 9/3/03 0.41 A-1 6 2003 0.22J A-3 9 2003 3.3J B-2 10 1 2003 1.2 MWH-SW-01 2-3 2/23/11 3.1 MWH-SW-02 2-3 2/23/11 10 Benzene AI-SW-1 VC 03/12/07 3.6 1.1 A3-SW-3 VC 04/17/07 26 SB-11 BExc. 10/28/02 2.113 A-3 9 2003 11 Benzo(a)anthracene Al-SW-2 VC 03/13/07 0.72 0.15 A2-SW-1 VC 03/06/07 5.5 A2-SW-5 VC 03/09/07 0.16J A2-SW-6 VC 03/13/07 15 A2-SW-7 VC 03/13/07 11 A2-SW-11 VC 04/23/07 3.7J A2-SW-12 VC 04/23/07 4.1 A2-BASE-I 4 03/09/07 4.8 A2-BASE-2 18 03/13/07 6.9 A2-BASE-3 3 03/13/07 0.12J A3-SW-2 VC 04/17/07 10 A3-SW-3 VC 04/17/07 43 B-GHSW-9 VC 04/17/07 18 C-SW-1 VC 03/20/07 28 C-SW-14 VC 04/19/07 3.6J C-CULSW-I VC 04/10/07 25 8KO14637PGO0396 Soil Contaminant Sample Location Approx Depth (ft} Date of Max. Concentration Sampling Maximum Concentration above Std. m Standard (mg/kg) C-CULSW-2 VC 04/10/07 10 SB-I 3-5 10/30/02 1.7 SB-2 2-4 10/30/02 1.7 SB-3 4-6 Il/l/02 0.74 SB-8 12-14 10/28/02 22 SB-13 11 10/28/02 0.78 SB-22 0-2 10/30/02 1.7 SB-23 1-3 1 10/30/02 0.99 SB-37 0-2 10/29/02 2.0 SB-41 4-6 11/1/02 2.3 NSB-I 10.5-11 9/3/03 1.3 A-1 6 2003 3.6 A-4 20 2003 0.61 B-1 I 2003 1.1 B-2 10 2003 4.0 B-3 10 2003 1.4 MWH-SW-01 2-3 2/23/11 10 MWH-SW-02 2-3 2/23/11 100 Benzo(a}pyrene AI-SW-2 VC 03/13/07 0.89 0.015 A2-SW-1 VC 03/06/07 7.1 A2-SW-5 VC 03/09/07 0.24 A2-SW-6 VC 03/13/07 23 A2-SW-7 VC 03/13/07 16 A2-SW-11 VC 04/23/07 4.8 A2-SW-12 VC 04/23/07 5.7 A2-BASE-1 4 03/09/07 4.8 A2-BASE-2 18 03/13/07 11 A2-BASE-3 3 03/13/07 0.151 A3-SW-2 VC 04/17/07 8.01 A3-SW-3 VC 04/17/07 40 B-GHSW-9 VC 04/17/07 14 C-SW-I VC 03/20/07 9.2 C-SW-I4 VC 04/19/07 4.8 C-CULSW-1 VC 1 04/10/07 19 8KC14637PGO0396 Soil Contaminant Sample Location Approx Depth (fl) Date of Max. Concentration Sampling Maximum Concentration above Std. m Standard (mg&g) C-CULSW-2 VC 04/10/07 9.5 SB-1 3-5 10/30/02 0.87 SB-2 2-4 10/30/02 1.9 SB-3 4-6 ll/l/02 0.56 SB-8 12-14 10/28/02 20 SB-13 11 10/28/02 0.63 SB-22 0-2 10/30/02 1.4 SB-23 1-3 10/30/02 0.95 SB-37 0-2 10/29/02 1.9 SB-41 4-6 11/1/02 1.4 NSB-1 10.5-11 9/3/03 0.97 A-1 6 2003 5.8 A-4 20 2003 0.9 B-1 11 2003 1.4 B-2 10 2003 6.8 B-3 10 2003 2.2 MWH-SW-01 2-3 2/23/11 6.0 MWH-SW-02 2-3 2/23/11 97 Benzo(b) fluoranthene AI-SW-2 VC 03/13/07 1.1 0.15 A2-SW-1 VC 03/06/07 7.1 A2-SW-5 VC 03/09/07 0.2 A2-SW-6 VC 03/13/07 30 A2-SW-7 VC 03/13/07 14 A2-SW-12 VC 04/23/07 6.5 A2-BASE-1 4 03/09/07 3.4 A2-BASE-2 18 03/13/07 11 A3-SW-2 VC 04/17/07 11 A3-SW-3 VC 04/17/07 37 B-GHSW-9 VC 04/17/07 18 C-SW-1 VC 03/20/07 3.7J C-SW-14 VC 04/19/07 4.2 C-CULSW-1 VC 04/10/07 22 C-CULSW-2 VC 04/10/07 8.4 SB-1 3-5 10/30/02 1 1.2 8KO14537PGO0397 Soil Contaminant Sample Location Approx Depth eft) Date of Max. Concentration Sampling Maximum Concentration above Std. m Standard (mg/kg) SB-3 4-6 10/30/02 0.72 SB-8 12-14 10/28/02 15 SB-13 11 10/28/02 0.39 SB-22 0-2 10/30/02 1.2 SB-23 1-3 10/30/02 1.7 SB-37 0-2 10/29/02 2.2 SB-41 4-6 11/l/02 1.8 NSB-1 10.5-11 1 9/3/03 0.92 A-1 6 2003 2.5 A-4 20 2003 0.46 B-1 I 2003 0.87 B-2 10 2003 4.3 B-3 10 2003 1.2 MWH-SW-01 2-3 2/23/11 19 MWH-SW-02 2-3 2/23/11 88 Benry,i) ene perylene AI-SW-2 VC 03/13/07 0.46 PQL A2-SW-1 VC 03/06/07 4.4 A2-SW-5 VC 03/09/07 0.151 A2-SW-6 VC 03/13/07 16 A2-SW-7 VC 03/13/07 12 A2-SW-12 VC 04/23/07 4.1 A2-BASE-1 4 03/09/07 1.8 A2-BASE-2 18 03/13/07 7.4 A3-SW-2 VC 04/17/07 5.01 A3-SW-3 VC 04/17/07 20 B-GHSW-9 VC 04/17/07 9.5 C-SW-1 VC 03/20/07 2.5J C-CULSW-1 VC 04/10/07 ]5 C-CULSW-2 VC 04/10/07 6.9J SB-3 4-6 11/1/02 0.55 SB-8 12-14 10/28/02 9.6 SB-23 1-3 10/30/02 1.7 SB-37 1 0-2 10/29/02 1.3 SB-41 1 4-6 11/1/02 1.1 BKO14537PGO0398 Soil Contaminant Sample Location Approx Depth (ft) Date of Max. Concentration Sampling Maximum Concentration above Std. m Standard (mg/kg) NSB-1 10.5-11 9/3/03 0.64 A-1 6 2003 6.0 A-4 20 2003 0.54 B-1 11 2003 1.2 B-2 10 2003 5.7 B-3 10 2003 1.9 MWH-SW-01 2-3 2/23/11 7.0 MWH-SW-02 2-3 2/23/11 29 Benzo(k) fluoranthene A2-SW-1 VC 03/06/07 4.2 1.5 A2-SW-6 VC 03/13/07 28 A2-SW-7 VC 03/13/07 15 A2-SW-12 VC 04/23/07 5.4 A2-BASE-1 4 03/09/07 3A A2-BASE-2 18 03/13/07 9.9 A3-SW-2 VC 04/17/07 9.01 A3-SW-3 VC 04/17/07 28 B-GHSW-9 VC 04/17/07 17 C-SW-1 VC 03/20/07 4.OJ C-SW-14 VC 04/19/07 3.8J C-CULSW-I VC 04/10/07 18 C-CULSW-2 VC 04/10/07 7.8J SB-2 24 10/30/02 3.0 SB-8 12-14 10/28/02 14 SB-37 0-2 10/29/02 1.8 SB-41 4-6 11 /1 /02 1.5 A-1 6 2003 5.8 B-2 10 2003 6.8 B-3 10 2003 2.2 MWH-SW-01 2-3 2/23111 5.0 MWH-SW-02 2-3 2/23/11 36 Chrysene A3-SW-3 VC 04/17/07 36 15 B-GHSW-9 VC 04/17/07 17 C-SW-1 VC 03/20/07 24 C-CULSW-I VC 04/10/07 26 9 8KC14537PGO0399 Soil Contaminant Sample Location Approx Depth (ft) Date of Max. Concentration Sampling Maximum Concentration above Std. m Standard (mg/kg) SB-8 12-14 10/28/02 20 MWH-SW-02 2-3 1 2/23/11 93 Dibenzo(a,h) anthracene Al-SW-2 VC 03/13/07 0.16J 0.015 A2-SW-1 VC 03/06/07 1.8 A2-SW-6 VC 03/13/07 4.8 A2-SW-7 VC 03/13/07 4.0 A2-BASE-1 4 03/09/07 0.69J A2-BASE-2 18 03/13/07 2.5 C-CULSW-1 VC 04/10/07 3.8J A-1 6 2003 1.8 B-1 11 2003 0.54 B-2 10 2003 1.5 B-3 10 2003 0.66 MWH-SW-01 2-3 2/23/11 1.9 MWH-SW-02 2-3 2/23/11 11 Dibenzofuran A3-SW-3 VC 04/17/07 65 16 C-SW-1 VC 03/20/07 17 3'3' Dichlorobenzidine AI-SW-2 VC 03/13/07 1.7 1.1 Ethylbenzene A3-SW-3 VC 04/18/07 23 5.4 C-SW-1 VC 03/20/07 7.7 SB-12 16-17 10/28/02 8.2 A-3 9 2003 48 Indeno(1,2,3- cd)pyrene Al-SW-2 VC 03/13/07 0.52 0.15 A2-SW-1 VC 03/06/07 5.1 A2-SW-5 VC 03/09/07 0.16J A2-SW-6 VC 03/13/07 18 A2-SW-7 VC 03/13/07 14 A2-SW-12 VC 04/23/07 5.1 A2-BASE-I 4 03/09/07 1.9 A2-BASE-2 18 03/13/07 8.8 A3-SW-2 VC 04/17/07 6.8J A3-SW-3 VC 04/17/07 24 B-GHSW-9 VC 04/17/07 12 10 8KO14537PG00400 Soil Contaminant Sample Location Approx Depth ift) Date of Max. Concentration Sampling Maximum Concentration above Std. m Standard (m&9) C-SW-I VC 03/20/07 3.3.1 C-CULSW-I VC 04/10/07 19 C-CULSW-2 VC 04/10/07 7.8 SB-3 4-6 ll/l/02 0.6 SB-8 12-14 10/28/02 9.4 SB-41 4-6 l l/l/02 1.2 NSB-1 10.5-11 9/3/03 0.69 A-1 6 2003 6.3 A-4 20 2003 0.71 B-1 11 2003 1.4 B-2 10 2003 6.7 B-3 10 2003 2.1 MWH-SW-01 2-3 2/23/11 7.0 MWH-SW-02 2-3 2/23/11 28 1 Methyinaphthalene A2-BASE-1 4 03/09/07 65 22 A3-SW-3 VC 04/17/07 59 C-SW-I VC 03/20l07 170 2- Methylnaphthalene A2-BASE-1 4 03/09/07 65 63 A3-SW-3 VC 1 04/17/07 79 C-SW-1 VC 03/20/07 240 A-3 9 2003 110 Naphthalene A2-BASE-1 4 03/09/07 73 3.6 A3-SW-2 VC 04/17/07 41 A3-SW-3 VC 04/17/07 430 C-SW-I VC 03/20/07 200 C-CULSW-I VC 04/10/07 6.2 C-CULSW-2 VC 04/10/07 11 SB-8 12-14 10/29/02 25 A-3 9 2003 550 A-4 20 2003 20 B-2 10 2003 27 MWH-SW-02 2-3 2/23/11 5.2 Phenanthrene Al-SW-1 VC 03/12/07 0.13J PQL AI-SW-2 VC 03/13/07 1.1 11 BKO14637PGO0401 Soil Contaminant Sample Location Approx Depth (ft) Date of Max. Concentration Sampling Maximum Concentration above Std. m Standard (mg/kg) A2-SW-1 VC 03/06/07 0.34J A2-SW-5 VC 03/09/07 0.38J A2-SW-6 VC 03/13/07 13 A2-SW-7 VC 03/13/07 16 A2-SW-11 VC 04/23/07 6.1 A2-SW-12 VC 04/23/07 2.2J A2-BASE-1 4 03/09/07 47 A2-BASE-2 18 03/13/07 7.9 A2-BASE-3 3 03/13/07 0.15 A3-SW-2 VC 04/17/07 7.6J A3-SW-3 VC 04/17/07 320 B-GHSW-9 VC 04/17/07 4AJ C-SW-1 VC 03/20/07 170 C-SW-14 VC 04/19/07 )AJ C-CULSW-I VC 04/10/07 31 C-CULSW-2 VC 04/10/07 13 SB-2 24 10/30/02 1.4 SB-8 12-14 10/28/02 62 SB-13 11 10/28/02 6.2 NSB-I 10.5-11 1 9/3/03 2.3 A-1 6 2003 5.4 A-3 9 2003 9.0 A4 20 2003 8.4 B-1 11 2003 2.2 B-2 10 2003 17 B-3 10 2003 3.8 B-5 12 2003 0.95 MWH-SW-01 2-3 2/23/I1 6.0 [VWH-SW-02 2-3 2/23/11 310 VC=Vertical composite from ground surface to top of water table BExc.=Sample obtained below excavation at unspecified depth PQL=Practical Quantitation Limit (which is the standard for non -naturally occurring contaminants with no established standard) J= Estimated Value D=Lab duplicate run after dilution 12 8KO14537PGO0402 Table C Sediment contaminants (in milligrams per kilogram (µg/L), the equivalent of parts per million), the standards for which are derived using the Guidelines of the Inactive Hazardous Sites Branch of DENR's Superfund Section (October 2010 version): Approx. Date of Max. Maximum Sediment Sample Depth Concentration Concentration Standard Contaminant Location (ft} above Std. (mg/k (mg/kg) m Benzo(a)pyrene SD-2 Surface 12/3/2002 0.44 0.015 Benzo(g,h,i) perylene SD-2 Surface 12/3/2002 0.44 PQL PQL=Practical Quantitation Limit (which is the standard for non -naturally occurring contaminants with no established standard) Table D Surface water contaminants (in micrograms per liter (µg/L), the equivalent of parts per billion), the standards for which are derived using the NCAC 15A 2B standards (February 15, 2010): Approx. Date of Max. Maximum Surface Water Sample Depth Concentration Concentration Standard Contaminant Location lin Sampg above Std. (µg/L) (11) (992) Tetrachloroethene SW-4 Surface 12/3/2002 15 3.3 Attached hereto as Exhibit C is a legal description of the Brownfields Property that would be sufficient as a description of the property in an instrument of conveyance. LAND USE RESTRICTIONS NCGS 130A-310.35(a) also requires that the Notice identify any restrictions on the current and future use of the Brownfields Property that are necessary or useful to maintain the level of protection appropriate for the designated current or future use of the Brownfields Property and that are designated in the Brownfields Agreement. The restrictions shall remain in force in perpetuity unless canceled by the Secretary of DENR (or its successor in function), or his/her designee, after the hazards have been eliminated, pursuant to NCGS § 130A-31035(e). All references to DENR shall be understood to include any successor in function. The restrictions are hereby imposed on the Brownfields Property, and are as follows: 1. No use may be made of the Brownfields Property other than for light industrial (including without limitation construction comnany offices and warehouses), other office and retail purposes, as well as for parking areas, service drives, a city street extension, high -density residential and gymnasium purposes, as well as any additional commercial uses DENR approves in writing in advance. Within the meaning of this restriction, the following definitions apply: 13 BKBM2011PG01133 - DOWNTOWN � Q SITE---- RALEIGH S � y zt Z, _ W DAVI S T T 9<b _S o W � ARRIJ $T _ +CFA NCGS SOUTHERN" N 737,906.65-GRID WAKE COUNTY, MC 156 E 2,104,251.26-GRID LAURA M R I DD ICK PUBLISHED NA V9188 ELEV-314.39' REGISTER OF DEEDS LA T 35 46 37.17457"(N) LONG 783854.71526"(W) PRESENTED & RECORDED OM SOIL DATA s fir, 11/14/2011 AT 11:6S:37 SOIL BOUNDARY LINE PROVIDED BYAMEC �O , JOINT DRIVEWAY ACCESS AGREEMENT AREA OF CLEAN FILL 2.066 ACRES(TRACTI) a' ul (DB 931, PG 531) �- CONTROL CORNER BOOK : B M2011 PAGE : 01133 0.601 ACRES(TRACT2) ��+ N 737,649.06 SEE SHEET 3 OF 3 FOR CONTAMINATION TABLES AT cJ c1\ E 2,104, 417.30 SAMPLE POINTS MAX BANES PROPERTY / (BM 1920, PG 040) N/F W.J. HINES SR. & INEZ R. HINES / PIN # 1703473624 �� L DISCS SURVEYORS CERTIFICATE I, RICHARD T. WIECZOREK, AS A PROFESSIONAL LAND SURVEYOR IN THE STATE OF NORTH CAROLINA, DO HEREBY CERTIFY THAT THIS PLAT WAS DRAWN UNDER MY SUPERVISION FROM ANACTUAL SURVEY MADE UNDER MY SUPERVISION AND COMPLETED ON 0312812011, USING THE REFERENCES SOWN HEREON; THAT THE BOUNDARIES NOT SURVEYED ARE CLEARLY INDICATED AS DRAWN FROM INFORMATION FOUND IN THE REFERENCES SHOWN HEREON; THAT THE RATIO OF PRECISION AS CALCULATED IS 1: 63,000 +; THAT THIS MAP WAS PREPARED IN ACCORDANCE WITH NORTH CAROLINA GENERAL STATUTES 47-30, AS AMENDED, WITNESS MY ORIGINAL SIGNATURE, AND SEAL THIS 26TH DAY OFOCTOBER, A.D., 2011, TYPE OF PLAT I, RICHARD T. WIECZOREK, AS A PROFESSIONAL LAND SURVEYOR No. L-4846, CERTIFY TO ONE OR MORE OF THE FOLLOWING; i) THAT THIS SURVEY IS OF AN EXISTING PARCEL OR PARCELS OF LAND AND THAT THIS SURVEY IS OF ANOTHER CATEGORY. 2) THAT THIS SURVEY IS OF AN EXISTING PARCEL OR PARCELS OF LAND AMD DOES NOT CREATE A NEW STREET OR 0 CHANGE AN EXISTING STREET. w 3 THAT THE PLANIMETRIC AND TOPOGRAPHIC INFORMATION DEPICTED ON TMe MAP COMPLIES WITH NATIONAL MAP a fe,r �., - _ - - - -_ -- DB 3825 PG 653 p STOT BM 1920 PG 40 ? � ACCURACY STANDARDS AND THE REQUIREMENTS OF THE STANDARDS 0= PRACTICE FOR LAND SURVEYING IN NORTH - RIM ELEV=295.20 ? \ CAROLINA (21 NCAC 56.1600). oD ( ) ZONED = IND 2 ? �� \ %� ti Al_ INV OUT SW=293.50 _� o k G � � NORFOLK AND SOUTHERN RR COMPANY N N Ci \ Off^ 0� �a�h 4p` PARCEL /S 20C - .O P L LINE SCALED FROM VAL MAP V 24 v7 - / ///J ������►rli J H U \ - --- - / 0 �j DATED 4 FEB 1929 (SEE NOTE 4) �i % Ly ��� cA Z G� 4 ' -VICINITY MAP (1'•=1/2MILE) I' - l�� " G� ' / t �� � ��.0 p<j' N Q w +Y RICHARD T. WIECZOREK LICENSE NO. L-4846 ` OF - %O,, U Z U m ,�' ` 1`, ***SEE SHEET 2 OF 3 FOR SURVEY NOTES*** Y LINE LEGEND a�G 1 %PF ry �� ,�.� `\ �.�s 1 �C`� VA _• _ � �. Z ( ) O ; �' �\��� � RAVfZ� - - ''� i L-48 ` U) W W Z PROPERTY LINE PL \ g5�� 1 %PF i 1 w C 1 .r O/ l 0 }J ~ STOT 2O .��1��y�Q ;'�,�✓> Q O W - PL NOT SURVEYED \`� ` \` , ` \, \ ` 1 ` �l'RVF ,• ' RIM ELEV=294.95 � � i / i � 11 ` � '• � W `� U RAIL ROAD BOUNDARY LINE INV OUT (SE)=291.95 cn i� ? S�jO `� `\ Pl` f�A ` \ , 'p- 0 �'A f) C���; W w Q O J --------------------- EDGE OF GRAVEL INV IN NE =293.25 " ` V ,� ` \ \ \ '►' LV W E U) � 4 EDGE OF RIPRAP o a - \ Cii Tq ♦ LG 92 r r I e o _ U 0') Z SSMH Q GAS TEST `�O �Q2� �o I 91- O� �. 65 - - - - - - - - - - -EDGE OF LANDSCAPING - 2 \ k } 48 CIP O O Cn RIM ELEV-29385 U PIPES o� G' I ti �. Q '� J CURB & GUTTER PT 5000 INV CL=286.15 \� GATE V�-POWERWERNEL ti + \ ` 1i N INV ELEV=283.25 �q 2,y t� S LE- W Q (PT OF LOCALIZA nON) , PL DISC \ , ` \ ` ` ` \ t �ji O Lu 0 z W U - 0 0 o CHAIN -LINK FENCE IlPF BOX 48'RCP L 'A } NAIL SET ` 1 i `5/8/RS ti I Z 2 `L ��GA7E ►:i RAVEL ` 11 INV ELEV=284.55 Z V) t. N 737,508.89-GRID SB-37 ,�• �� a N C Grid - NAD 83 _J W O �•••••••••••••� WALL 5691430"E SENSORS ��� ti��� CONCRETE WALLED a-, v (NSRS2007) i IZ W OVERHEAD UTILITY WIRES E 2,104,34518-GRID 10.24'(T/E) r_ Q ELEV 291.08 STOT' 29a� s'`-_-_ ` 1 \` �. sr, \ 3 Q O z RIM ELEV=290.15 AFT' --------_ " ;B-8 ` �s� (PEN AIR STORAGE BUNKERS 8 Z �-- CD CD STORM DRAINAGE PIPE LONG 78'38'S359253"(W) IN OUT (S)=287.65 r� ql�C _ 515 `UL V£l` , ` 1 _ \ 1 ` ` B \ \ `\ TYP/CAL) O I -SS-SS-SS-GRAVITY SEWER /NV /N NW =28785 ' - ` ` ` \ - w ch 5P ARI r ;� M CONTOUR MAJOR � � l V L V=�8.1. 5 � - I � � �� Z > ttl CONTROL CORNER mod" �� W-2 i t�D CONTOUR MINOR N 737,505.28 AlN SB-11 - �&AJ-S NSB-1� LE N \ o ---Ts-----,r-----n ----- � --TOP OF BANK E 2,104,354.78 z � \W-3 1%29 ILL.O I om ---es-----as------ee--- BOTTOM OF BANK STGI \ SB-35` 1 �. .t �� ;!♦ �\� \ p J LLLI ---- - ---- _ Rio �`` ,�,\` 1\ h f .. a -��-�{-�♦---RAILROAD CENTERLINE GRATE �E� 286.35 SB-1 A3-SW-2►ii1 �` , `\ \,1ry ` d' �� \`\�♦ V`,� Q vOj 4 I NV OUT SE 285 05 T ,V/ S¢} -1 s o �, -- -- CLEAN SOIL BOUNDARY .�,�� SD 2 SB-22 't'A2 ��W� 21 �/�y, ,\ ` ` , 1 A2-S S,'L1 1\ ' ♦♦ ��\``' J Q I sror P 1` ` `` C s F I� 0 SYMBOLLEGEND • PROPERTY CORNER FOUND O PROPERTY CORNER SET DATUM CONTROL POINT • BOLLARD - - SIGN RIM ELEV=288.20 Q -= Lu INV OUT (S)=285.30 � Pl,PERACi� STGI / ` `` , �' x � �`� � m Q MWN-SW-02 ► INV /N (N)=285.50 Cj GRATE ELEV=286.00 /^ ` �'� 1 1 1 ` A?-BASE-1 ` - ,♦ ��`�� a I w INV OUT (sE)=282.70EL �, r,` INV /N NW _283.80 M -SW-Of , \ ` ``` 1 A2 `SW-1 , ,�`� Lu s 177 -8 ( )- NSB-2 ` ` 9 , ` ` A AS -2 ♦ ♦� I a INV /N (W)-282.70 \ ` , 1 NSB-9 ` A2-SW-6 , \ \, ' METAL ` N/F \, ` +�'; ` \\\ A ySE-3 ♦��`. CLANCY AND THEYS , \ \ ` 1 1, m se-2 ELEC CONSTRUCTION COMPANY�sB-23 ao IB JIuN�i3Ok T- �P23 �♦ PIN # 1703 47-5257 /C SW-14 (�� e_� \ \ 1 \ .` ^�� D Z O G DB 14387 PG 1279 1 , \ 1 1 1` 1 ` �' ` 1 , ` I ` \ 1, PB-1 _ 1` �s� . .� n D" Q STORM DRAINAGE MANHOLE ABBREVIATIONS ZONED = IND-2 ` ` , ,�\ ,?'y ` �` \ \ RAVE4 \ \ C `` ` ` k'A , �\ O a. = 0 GRATED INLET BM BOOK OF MAPS 3 (TRACT 1 •4.08 ACRES) 1 " � RA•V L `\ , \ `, ` \ ` \ , `1 1 , V , . , LL }- U x Q CED CEDAR SPEE (/(\ i� � PB- Is, P -3 \ OPEN THROAT CURB INLET CIP CAST IRON PIPE V ? B! I 1 \ h ` ` , V, \ ` ,` 1^,.` \,`, ++ _ \� }�J//'�r� \ ; 2ocEo J INLET \ \ \, \ \ ` ` \ , \ ` ` T, ` ` ` ` \ ` \ LtJ 1 /PF�� 0 O O Z CL CENTERLINE V STQR 8MAP rRCSR B_g T _ `I g 2 �X LIGHT POLE CLF CHAIN -LINK FENCE STOT Q WATER BRICK i� CMF CONCRETE MONUMENT FOUND R/M ELEV=286. 15 HH �(fILO/f)!{* s.} I ASPHALT , 1, ` \ ` ` , r \` ` 11 `\ ` ` ` ` k \\, o \ 1 ` I�h °y U V O UTILITY POLE CPP CORRUGATED PLASTIC PIPE INV OUT (S)=283.25 CD �7� c ` \ 1 ` A-4 ` \ 1 - ` 3 I 0 = U ELEC ELECTRIC O t\ , ®-60 / \ \ ` ` 1 \ \ ` `\ ` , - - �- i 1R,-5 �`a`; C 1 �� , ` \ K \ ,\ \ �n f 1 %PF V /af W = UTILITY POLE WITH DROP ELEV ELEVATION Z /RR,., oMAP , \ 1 1 ` , j/2 R �_,,� � DB DEED BOOK INV /N N =283.45 c� ` ` ` \ Al SW 2 l.ri.\�,� A A-1 0.25E,r51V (A I-- �o "� CTRL; k. I i \ \ \ F �� - -_2s5 8T°35'00"W -=2-- I 6CL- _ -'f�S 14 � ;; of CORNER) Z rLL UTILITY POLE WITH LIGHT FFE FINISHED FLOOR ELEVATION 0 RAM ..ELEC , �: - - 2gg -- - 5 8 IRS z N 0 HH HAND HOLE - - o R UTILITY POLE LIGHT & DROP HOL HOLLY 8MAP �, IOMAP C-CULS� 2� \ \C� 1-1/2"IRF - 1 `� Z I "IRF C _ - ' - /� , ` \ ` `a 1, / I A l -SW-1 I ( POSSIBLE W w } W _ INV INVERT `` 2-STORY W = GUY WIRE ANCHOR IPF IRON PIPE FOUND ,. - _ `1 ` ` IIi METAL = W O N� _ - - ` ` \ j �` I I I 2-STORY ✓UNC77ON BOX M IY IRF IRON ROD FOUND ? ` ?sr �1 2"IRS y BU/LD/N 0 = O W 2PEAR / + \ ` \ `� / G I METAL I COCA nON I - ti U J 0 ELECTRIC CONTROL BOX IRR IRRIGATION STOT ' ELEC SB-3 /(`� \ ` , 1 ` �' ` S , I CONC PAD FFE=296. 10 I .� L ( BUILDING ���, p r IRS IRON ROD SET RIM ELEV=284.55 PANEL ASPHAL T C-CULS'W-1 1 1 , 1 �Sw-4 ENCROACHES 2.85'. - _ - - - - p O O O (n Ftl ELECTRIC TRANSFORMER MAP MAPLE INV OUT (S)=281.35 SrG/ \ 1 \ i o '►Ill 1 , •6ZLF` ' - - - J I I 24 RCP c� Z ELEC g 80 14'52' ' MW MONITORING WELL INV IN (N)=281.55 GRA TE ELEV-282 70 /NV-2 3.4P \ I I lNV=298.40 Q Z p ELECTRIC METER MYR MYRTLE CONDUIT INV CL=270.70 , 1 \ \ `` 1 37- o s I I N/F NOW OR FORMERLY , t LIMIT LINE) ® HVAC UNIT PEC PECAN T-\` ^ ' ,� gRpWNFIELDS PLA / h �� F I I �. (/) z m PG PAGE 2 5 B-GHSW- / 0 INV= 84 70 I i GAS VALVE PL PROPERTY LINE e w<a r / / / STGI I U P.O.B. POINT OF BEGINNING V p \ \ / / / / �� / i I J U © GAS METER PKF PK NAIL FOUND ? o � .j�SB-41 �� / �/ / / / // / / I GRA7t= ELEV-309.25 LL �' // la i I STGI I W LL (n W SSMH \ �� / / / / / / GRATE ELEV=290.50 INV CL=302.25 ( I� _ O W Y GAS TEST STATION RCP REINFORCED CONCFETE PIPE POINTPT RlM T (S)=281, 90 ,p © ` \ / / / N b �'� �` r / / / / / / l ., INV OUT (NW)=287, 10 I I 'L X U- Q INV OUT (S)-281. f0 OGAS GA 7E , / EXCLUDED FROM THE % h ' W N R/W RIGHT-OF-WAY INV /N N 281.20 `� 4 RISERS ` / O. I ( Z S SEWER MANHOLE I O= Q CTRL ` p. / / / / "' CONC_ � (0 L11 W' O O SEW STRAND BARBED WIPE l44 GA7E , ` 1 r�//QV BROWNF/ELDS PROPERTY / /; oa _ 1 I • SEWER CLEANOUT SD SEDIMENT STOT �0 / / / M 2 ' N/F RIM ELEV=281.60 4 � 'zMYR BOX A (TRACT2-0.68ACRES) / / " ;90 srGi I I co d SF SQUARE FEET 4+ _ _ ` �' Q ASPHALT / GRATE ELEV=2873o CLANCY PROPERTIES, LLC I I O O INV CL=279.50 �" LATE ` "� / / / TELEPHONE PEDESTAL SSMH SANITARY MANHOLE �4, ' I /3SBW TRC-� GA C7RL �� ���� / / �/ / /�� 3> :. PIN #1703477144 I I n/ STGI STORM GRATE C9�-___. i !L. FIRE HYDRANT 2 4 1 CAMERA ` `1� �� / /, / / // / / / / /� - % DB 8440 PG 1968 � D. STMH STORM MANHOLE BRICKLu I C��' BM 1999 PG 2218 ��- STOT OPEN THROAT INLET �- p 24MAP \ COLUMN ,) �� / / // / / / ® WATER METER 571UH �� � ® GAS FARM " / / // ELEC � / � � / / / // / / � - � �i ZONED =IND-2 RIM ELEV=282.65 h - h �/ / /// // //---------_ • 1/2 IRF'- � � - - - -- - ._ - V REVISIONS: HATCH LEGEND CONCRETE BUILDING AREA OF CLEAN FILL(TRACT 1) AREA OF CLEAN FILL(TRACT 2) - Q - - �� SHUTOFF - - e WATER VALVE INV OUT (E)=279.80 I � DECIDUOUS TREE _INV /N (N)=279.90� GAS RISER BHOt 240AK BHo��BHoO1/ //. / /J ELEC 1-STORY I j p `' 117.66' 5/8%RS/l t �`� 7sHOL _y - PANEL BRICK ( J IL 7.. I ET . BHOL 240AK •I - - - BUILDING I p o I$ SPOT ELEVATION B�cq GALE INLET Er N87 1637'tN---334..3 ' 240AK 216.66 � 5/8"IRS FFE=296.70 ( co `o (a MONITORING WELL SURVEY REFERENCES 514%RF /8'RCP - -_- - - - SS - 6CLF w/3SBW i --� FILED FOR REGISTRATION - i DESTINATION UNKNOWN DEED BOOK 38 PAGE 794 3_ S P.O B ---- SS S , 1 OVER PL) © 52L 0WRSPL) 1VfP (0.35' SOUTH OF CORNER) DATE OF DEED BOOK 220 PAGE 376 S � ►j� SOIL SAMPLE DEED BOOK 276 PAGE 173 �S 85� SS S W E S T C A B A R R U S STREET 03/28/2011 DEED BOOK 581 PAGE 423 - - _ 8 _ DATE SURVEY: SEDIMENT SAMPLE DEED BOOK 900 PAGE 711 MJ t,. 60' PUBLIC R/W - BM 1999 PG 2218 SCALE: V = 50• RIM ELEV=283.15 13I_NI : j31 ' . �� a LAURA M. RIDDICK BOOK OF MAPS 1918 PAGE 050 IN our E 277.25 SSM 9s 0 SURFACE WATER SAMPLE < 1= ' ' • � • � REGISTER OF DEEDS DRAWN BY: MAL BOOK OF MAPS 1920 PAGE 040 INV IN (W)=277.35 RIM ELEV=282. f0 3/4"IPF -T-- WAKE COUNTY BOOK OF MAPS 1970 PAGE 108 INV /N (N)=277.95 INV OUT (5)=270.30 / STOT � GRAPHIC SCALE CHECKED BY: RTW, PLS BOOK OF MAPS 1999 PAGE 2218 PT 5001 INV IN (N)=270.40 / RIM ELEV=280.85 SSMH I1 /PF+ 0 25 SCALE 50 200 a 2 PROPERTY DATA BOOK OF MAPS 2003 PAGE 1826 NAIL SET INV /N (E)=274.60 INV OUT (NE)=267.25 RIM ELEV=289.20 BY: PROJECT: 0 339 600 00 INV /N (W)=274.40 / INV /N (W)-275.45 I i 1 I I CURRENT OWNER: CLANCY AND THEYS N 10424 .31 STOT INV OUT (W)=283.30 ASST/DEPUTY SHEET: CONSTRUCTION COMPANY E 2104240 31 STOT INV /N S -283 50 " _ SITE ADDRESS: 600 CABARRUS ST, RALEIGH, NC R/M ELEV=280.55 STOT / M OUT (E)=275.80 / () 1 50 TIME: PARCEL ID: 1703-47-5257 l /M ELEV=280.f0 INV /N (W)=277.60 I QQ 1/3 BROWNFIELD PARCEL AREA: 4.08 ACRES(TRACT 1) RECORDED IN BOOK OF MAPS 61 PAGE v� ZONED: IND-2(NO MINIMUM SETBACKS) TABLE 1 SUMMARY OF CHEMICAL CONSTITUENTS DETECTED IN SOIL GAS AND RISK CALCULATIONS 600 CABARRUS STREET RALEIGH, NORTH CAROLINA MID -ATLANTIC JOB NO. R3746.00 Sample ID Exposure Unit 1 (Clancy Shop) Exposure Unit 2 (Amtrak Building) NCDEQ DWM Residential Soil Gas Screening Levels January 2021 (ug/m3) NCDEQ DWM Non -Residential Soil Gas Screening Levels January 2021 (ug/m3) SG-1 SG-2 Duplicate (SG-2) SG-3 SG-4 SG-5 SG-6 Sampling Date 4/30/2021 4/30/2021 4/30/2021 4/30/2021 4/30/2021 4/30/2021 4/30/2021 Acetone 151 69.9 82.2 39.9 59.6 103 197 220000 2700000 Benzene 3.19 2.49 1.41 0.709 0.533 J 0.917 1.24 12 160 2-Butanone (MEK) 5.63 7.43 7.61 6.66 6.31 21.4 47.8 35000 440000 Bromoform <0.757 <0.757 <0.757 <0.757 <0.757 <0.757 1.70 J 85 1100 1,3-Butadiene <0.230 <0.230 <0.230 <0.230 <0.230 <0.230 0.626 J 3.1 41 Carbon Disulfide <0.317 0.327 J 0.383 J 0.336 J <0.317 0.626 0.380 J 4900 61000 Carbon Tetrachloride <0.461 0.482 J <0.461 <0.461 <0.461 <0.461 <0.461 16 200 Chloroform <0.349 <0.349 <0.349 1.16 <0.349 <0.349 <0.349 4.1 53 Chloromethane <0.213 <0.213 <0.213 <0.213 0.644 0.938 0.837 630 7900 Cyclohexane 2.01 2.18 <0.259 <0.259 <0.259 <0.259 <0.259 42000 530000 Dichlorodifluoromethane 247 58.4 2.20 366 1.99 2.30 6.73 700 8800 1,2-Dibromoethane 0.554* 0.554* 0.554* 0.554* 0.554* 0.554* 0.554* 0.16 2 1,3-Dichlorobenzene <1.09 <1.09 3.48 <1.09 2.87 3.18 5.42 NE NE 1,4-Dioxane <0.300 <0.300 <0.300 <0.300 0.681 J <0.300 1.11 19 250 Ethanol 711 178 296 E 434 171 166 304 E NE NE Ethylbenzene 39.2 8.63 10.1 3.39 1.32 1.20 1.3 37 490 4-Ethyltoluene 2.26 1.72 1.50 1.29 1.25 3.39 2.16 NE NE Heptane 9.16 4.74 1.71 3.13 0.777 J 1.03 0.524 J 2800 35000 Hexane <0.726 <0.726 10.8 <0.726 3.63 2.44 2.43 4900 61000 Isopropylbenzene 0.787 J <0.382 <0.382 <0.382 <0.382 <0.382 <0.382 2800 35000 Methyl Butyl Ketone <0.544 13.8 18.6 <0.544 <0.544 3.18 J 13.0 210 2600 4-Methyl-2-pentanone (MIBK) <0.313 <0.313 2.80 J 2.62 J 1.93 J 3.28 J 18.7 21000 260000 Methylene Chloride 0.635 J 0.618 J <0.340 <0.340 0.448 J 0.646 J <0.340 3400 53000 Naphthalene <1.83 <1.83 <1.83 <1.83 <1.83 <1.83 5.39 2.8 36 2-Propanol 22.4 21.3 29.7 20.5 20.3 15.4 43.3 1400 18000 Propene 1.60 J <0.160 2.01 B J 1.07 J 2.63 B <0.160 6.85 21000 260000 Styrene 1.19 1.82 <0.335 2.84 <0.335 <0.335 <0.335 7000 88000 Tetrachloroethylene 5.18 5.34 6.59 7.20 1.19 J <0.553 1.29 J 280 3500 Toluene 29.4 16.6 14.0 9.38 3.16 5.65 4.14 35000 440000 1,1,1-Trichloroethane <0.400 <0.400 <0.400 0.493 J 2.79 13.8 0.849 J 35000 440000 Trichlorofluoromethane 2.48 2.84 3.01 3.00 1.31 1.33 4.28 NE NE 1,2,4-Trimethylbenzene 7.71 6.48 6.82 4.20 1.59 4.34 2.83 420 5300 1,3,5-Trimethylbenzene 2.17 1.62 1.71 1.16 0.471 J 1.33 0.937 J 420 5300 2,2,4-Trimethylpentane 4.34 3.17 0.668 J 0.677 J <0.621 0.752 J <0.621 NE NE Total Xylenes 200.7 38.05 1 65.6 14.93 1 10.85 10.25 10.49 700 8800 RESIDENTIAL RISK CALCULATIONS SUMMARY Acceptable Carcinogenic Sum Risk Range and Maximum Non -Cancer Hazard Index Calculated Sample Sum Cancer Risk 5.2E-06 5.9E-06 1.0 E-04 Calculated Sample Non- Carcinogenic Hazard Index 2.0E-01 9.4E-02 HI=1 NON-RESIDENTIAL RISK CALCULATIONS SUMMARY Acceptable Carcinogenic Sum Risk Range and Maximum Non -Cancer Hazard Index Calculated Sample Sum Cancer Risk 4.0E-07 4.5E-07 1.0 E-04 Calculated Sample Non- Carcinogenic Hazard Index 1.6E-02 7.4E-03 HI=1 Notes: Concentration units; ug/m3 All samples analyzed by EPA Method TO-15 B = The same analyte is found in the associated blank E = The analyte concentration exceeds the upper limit of the calibration range of the instrument established by the initial calibration J = Estimated Concentration NC = Not Calculated NE = Not Established = 1,2-Dibromoethane was not detected, but had a lab method detection limit over the Residential SGSL. For the purpose of risk evaluation, a concentration of 0.554 ug/nr was assumed Bolded concentrations exceed the Residential Soil Gas Screening Level <0.34 = Not detected above the lab method detection limit SG-1 O �� �� 1 i 9 �SG-Duplicate-1 SG-,' f Legend O Sub -Slab Soil Gas Locations Subject Property Property Boundaries REFERENCES: 1. MID -ATLANTIC FIELD NOTES. 2. NCONE MAP LATEST ORTHOIMAGERY 3. PROPERTY BOUNDARY AND ROAD SHAPEFILES PROVIDED BY WAKE COUNTY GIS Mid Atlantic Engineering & Environmental Solutions O All OSG-6 !� SAMPLE LOCATION MAP FORMER RALEIGH MGP NO. 2 600 W CABARRUS STREET RALEIGH, NORTH CAROLINA e W DAVIE L& W SCALE:1 inch equals 100 feet Feet 0 100 200 DRAWN DATE: BY: KRC MAY 2021 DRAFT JOB NO: CHECK: DHN OOOR3746.00 ENG. GIS NO: CHECK: DHN 3G-R3746.00-2 APPROVAL:DHN DWG NO: 2 ATTACHMENT C BUILDING PLANS Mid Atlantic SITE PLAN LEGEND d N W q) E ARCHITECTURAL SITE PLAN 1 /16" = 1'-0" S 0' 8' 16' 32' ELECTRICAL TRANSFORMER ON CONCRETE SLAB. PROVIDE ' UNDERGROUND SERVICE TO BUILDING FROM TRANSFORMER. FIRE HYDRANT F. D. C. yBUILDING MOUNTED FIRE DEPARTMENT CONNECTION ISTANDPIPE A. REFER TO CIVIL FOR GRADING INFORMATION B. TOTAL # OF TYPE A -ACCESSIBLE UNITS PER NORTH CAROLINA STATE BUILDING CODE 2018 T1107.6.1.1 = 10 PARKING COUNT BY LEVEL SPACE TYPE WIDTH LENGTH QUANTITY LEVEL 1 - PRKG ADA 9'-0" 18'-0" 5 COMPACT 8'-0" 15'-0" 5 STND 8'-6" 18'-0" 135 VAN 11'-0" 18'-0" 1 146 LEVEL 2 - PRKG ADA 9'-0" 18'-0" 3 STND 8'-6" 18'-0" 121 VAN 11'-0" 18'-0" 1 125 TOTAL PARKING PROVIDED 271 PARKING COUNT BY TYPE LEVEL QUANTITY ADA LEVEL 1 - PRKG 5 LEVEL 2 - PRKG 3 8 COMPACT LEVEL 1 - PRKG 5 5 STND LEVEL 1 - PRKG 135 LEVEL 2 - PRKG 121 256 VAN LEVEL 1 - PRKG 1 LEVEL 2 - PRKG 1 2 271 PARKING MAXIMUMS - UDO 7.1.2.0 - VEHICLE UDO PRKG BEDS TOTAL UNITS RATIO MAX PRKG STUDIO 73 1.5 109.5 1 BEDRMS 108 1.5 162 2 BEDRMS 3 BEDRMS TOTAL 55 2.25 5 3 241 123.75 15 410.25 TOTAL MAXIMUM PARKING ALLOWED: 411 TOTAL PARKING PROVIDED: 294 PARKING MINIMUMS - UDO 7.1.2.0 - SHORT TERM BICYCLE TOTAL UNITS UDO RATIO MIN PRKG 226 20 11.3 TOTAL REQUIRED: 13 TOTAL PROVIDED: SEE CIVIL PARKING MINIMUMS - UDO 7.1.2.0 - LONG TERM BICYCLE # OF BEDS UDO RATIO MIN PRKG 306 7 43.71 TOTAL REQUIRED: 44 TOTAL PROVIDED: TBD PARKING EFFICIENCY CALC TTL PARKING COUNT UNIT COUNT PERCENTAGE 271.00 241 1.12 =L�1 1 • 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com CV ui U) Zw w w z Q C/)_ cn _ z LUw J W C� O O lqT W 3�: OPMENT FOR: KANE I(ANE REALTY CORPORATION ISSUE DATE DESCRIPTION INCLUDED 08/26/2022 ADMINISTRATIVE SITE REVIEW 09/07/2022 SCHEMATIC DESIGN SET X 11/22/2022 DESIGN DEVELOPMENT SET X REVISION DATE DESCRIPTION REV SEAL: DISCLAIMER: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x42 INCHES. SHEET NAME: ARCHITECTURAL SITE PLAN DESIGN DEVELOPMENT JOB NUMBER: 2200301 DRAWN BY CHECKED BY Author Checker O A00.11 i i ■■ ■■ MEN ■■ ■■ ■■ ■■ -===� ■■ ■■ ■■ ■■ _==_; NONE ■■ ■■ _-■■ ■■ ■ ■ ■ ■■ ■■ ■■ �milm .■ ■■ ■■■■ ■■ ■■ II■=■ IIIIIIIII 11111111 IIIIIIIII ■■ ■■ ■■ iilMllllll 1'171111ll;ll: • 1,IIIIII ,, IIIIIIIII 11111111 IIIIIIIII ■■ ■■ ■■ iil"IIIIIIIIIIIIIIIII;ii. !! 011010m:::::: ISM...... ILIL Et IIIIIIIII 11111111 IIIIIIIII '1 .. .. .. li�,'.IIIIIII'llllllll�jl■• ...Illlllllllllllllllli IIIIIIIIIIIIIIIIIIIIIiII= _ � � � � � ■■ ■■ ■■ II■III.; _ ■ 111111111 11111111 111111111 ■■ ■■ ■■ " ".IlllllKIIIIIIII iA ........„ ��— !HHHHHHH111 m— IIIIIIIIIIII�1111111.No ONE an ■! C! I� Ec-1�m ME ME ME■■ ■■ ■■ '-It■■-- !- -- IIIIIIIII 11111111 IIIIIIIII ■■ ■■ ■■ IIIIIIII = I I'lll'lllllllllllllll- -_..""'••""'...""'••""'...�"'••""'_I-� ` _� � 114, 'ill ;.iii �a,iillliiiiil �� ilIIIIIIIIIIIIIIIII�IIIIIIIIIIIIIIIIIIIIII No No No WIN ■■EN: ■■ Im I m ■■ No No .. I�Illlllllljlllllllll� -. -111�1111 1111�111 1111�1111 � .. .. .. III No No No ■■ ■■ ■■ ■_ ■_ ■_ ■■ i ■■ ■■ ■■ ■■ ■■ (IIIIIIII 1111111E IIIIIIIII I no ■■ ■■ no ■■ ■■ no ■■ ■■ no ■■ ■■ no ■■ ■■ no ■■ ■■ no ■■ ■■ no ■■ ■■ D, 11 IIIIIIII'llillillllllllllllllllll'I"I"IIII'llllll :u Il IIIIIIII IIIIIIIII 11111111 SW a 01 No III■ 1MINNINIMINN111 MENNEN MEMO - so 00 - so ME No ■ _� ■■ ■■ ■■ ON No 001 ■■-==_:.... 11111111 '•'I'1'1'1'1'1'1'1'I'�� -= — ■ ■ _= ■ ■ = ■■ ■■ ■■ IIIIIIII 11111111 11111111 �_____-■■ ■■ = ■■ ■■ IIIIIIIIIIIIIIIIIIII IIIIIIIIIIIII:�:�II= - _ ____________________________ �I _ __________________ _=_=========___________ _ __ ___- ------- - =---r __ ■ _ _ ❑■ ❑■ == ■■ ■■ ■■ ON so :� ===== ■■ ■■ _==- ■■ ■■ ■■ ■■ ■■ ■■ ■■ ■■ ■■ ■■ _ == ■■ ■■ ■ ��INMIIIFFIIIM■■■■■■ ...■■■ =____ ■■ ■■=___' ■■ ■■ 11111111I11111111 .� ■ ■ ■ ■■ m1m ■ no .■ 11111111 IIIIIIII 11111111_____- ■■ ■■ = ■■ ■■ iilllllllllllllllllll:l ������ II=�====================== ===== I nnrommommomT=______ __ ■■ ■■ ■■ NONE _.... -- _-.... ■ ■ •� = _� ■■ ■■ ■■ ■■=_____-■■ ■■ -___:■■ ■■ 11111111 IIIIIIIII I�■ ■ �� ■■ ■■ ■■ 11111111 IIIIIIII 11111111 ______■■ ■■ 'NONE ■■ ■■ ■■ ■■ ■. ■. I. ■ ■ ❑■ ❑■ _� ❑■ ❑■ i ■■ ■■ ■■ ■■ ■■ ■■ ______ ■■ ■■ -=_ ■■ ■■ ■ill■Illlull■ ■ ■I`_m MO ■■ ■■ ■■ ■■ ■■ ■■ -=_-■■ ■■ ■■ ■■ 11111111 IIIIIIIII I — — ■ ICI __ ■ • _ ■■ ■■ ■■ � IIIIIIIIIII 11111111 1111111111=_____= ■■ ■■ ___ _ ■■ ■■ .........: IIIIIIIIIIIIIIIIII_ --=____________=_==_=_=_______- -- -------------- IIIIIIIIIIIIIII�IIIIIII =_______________=___________- =------_ _ _-============-==========_ ------------ =======================_____- _ === MO =======----■ .-G■■I■•I-..II•�I ===�1��I� 1 . _ I�I��I. =======--1��I��I! �=� ®III ---- ---- -- ---- ■ ■ 111 ■■ ■■ IIIC ■ ❑■ ❑■ ■ ❑■ ❑■ ...... ...... _____.... ■■ ■■ ■■IMM ■■ ■■ ■■ __ ____ ■■ ■■ ---_: IIIIMENNEN IIIIIIIIIIIIIIIII Illllll IIIIIIII �- _■ ■ 11111111 IIIIIIII 11111111 _________------------------- - ---------------- ■ ■ _ _ WON __ ❑■ ❑■ : ■■ ■■ ■■ ■■ ■■ ■■ _ _____: ■■ ■■ _: ■■ ■■ ■ ■ _ _ ■ ■ _: ■ ■ : ■■ ■■ ■■ ■■ ■■ ■■ _____ ■■ ■■ ■■ ■■ _ _ _ ___ __ _ MENNEN ________ 11111111 I11111111 _ __ _ ■■ ■■ ■■ 11111111 11111111 1111111E -__ -� ■■ ■■ ---_: ■■ ■■ IIIIIIIIIIIIIIIIIIIIIIIIIIIIIIIII IIIIII IIIIII� - ' _� ____________________- -- - ■■ ■■ ■■ ON OEM M===_=_= ■■MENNEN fflffl__ - 0 0 ■■ �__= ■■ ■■ ME MENNEN ON No No fflfflfflffl__. 0 0 0 mlfflBi 0 0 IN 0 11111111I��������III •— - _� 0 0 ME ME .■ lilniu anon 1111111E -■■ ■ ----------- ___•.... IIIIIIIIIIIIIIIIIIIIIIIIIII. IIIIII..II _ = �= _= =_=__=_= ____= ___ _=__ _=-_� _�___- i�__-_-_-_-_-__ ________.---___- . -mum: II=== .... __________-•-i� _-__-.—:.--_i--_- __ MAIMICUM11 MM _mrmmrmmrmmrmm2_ MENNEN MENNEN fflfflfflffl__. 0 0 ME ME ME ■■■■■■ ■■■■■■■■ ■■ _==_■■ ■■ MEE .... F07 7FE_ 11I■■ ■■ No ■■■■ === - -----_=--- __________--_ �_____ -., . III = _ • - _ ■■■■■ ::iui _==== _■■ ■ E ■N�=_= n m 1 01-121 ABOVE GROUND FLOOR TRANSPARENCY CALCULATION LtVtL J - AMtNI I Y ERALL REQUIRED TRANSPARENCY CALCULATIONS lit =10'-0" OVERALL REQUIRED TRANSPARENCY CALCULATIC R UDO 3.2.6 MIXED USE BUILDING PER UDO 3.2.6 MIXED USE BUILDING 73Cr-%l IIrCI-1 Tr3 A AIC%M A r3CAI�\/ 0/ — Gr10/ �Crll II�CI-1 Tr3A AIC%M A rCAI�X/ 0/ — Cr10/ 0 PROVIDED WALL LENGTH = 56'-3" PROVIDED WALL LENGTH = 159'-6 :)ROVI DED WALL AREA @ 0'-12' = 675 SF (561-311 x 12'-011 ) PROVIDED WALL AREA @ 0'-12' = 17914 :REQUIRED TRANSPARENCY @ 0'-12' = 337.5 SF (675 x 50%) REQUIRED TRANSPARENCY @ 0'-12' = 957 S PROVIDED TRANSPARENCY @ 0'-12' = 67.7% (456.7 . 337.5) PROVIDED TRANSPARENCY @ 0'-12' = 52.8°/a :REQUIRED TRANSPARENCY @ 3'-8' = 168.75 SF (337.5 x 50%) REQUIRED TRANSPARENCY @ 3'-8' = 478.5 PROVIDED TRANSPARENCY ani 3'-8' = 57.5% (194 = 168.75) PROVIDED TRANSPARENCY a) 3'-8' = 50.50/c N dwell rdesi gn studio :iIIIsY1: 217'-8" OVERALL WEST STREET LENGTH 137'-8" OVERALL LEVEL 2 WEST ST LENGTH Cl) IT 7t co IT Z0 TRUSS BEARING F.F.E. = 364'-8 1/8" LEVEL 7 F. F. E. = 355-7 3/411 LEVEL 6 F.F.E. = 344'-11 7/8" LEVEL 5 F.F.E. = 334'-4" LA LEVEL 4 �F F.F.E. = 323'-8 1/8" - ___---- ===- ---- ---- -- ----- am - - .. - -- i __ --1�1 I --__ _ I =_ ___ __ _ I _ �I:. ___===�■I_ ICI -- Loll -=-: =lCiiu uuuul!ili __ ___---_-=--_-_ =_=_=_I,__■ =_==I= =___________ - LA WEST ST F.F.E. = 301'-1 1/4" LEVEL 2 - PRKG F.F.E. = 300'-2" LEVEL 1 - PRKG F.F.E. = 291'-0" �� 270 SF TOTAL TRANSPARENCY 801-011 AMENITIES FROM SETBACK 14' - 3 5/8" MAX. BLDG ENCROACHMENT T jk TRUSS BEARING F.F.E. = 364'-8 1/8" LEVEL 7 F.F.E. = 355-7 3/4" LEVEL 6 F. F. E. = 344'-11 7/8" LEVEL 5 F.F.E. = 334'-4" LEVEL 4 i z F.F.E. = 323'-8 1/8" o U) a LVL 3 - RESIDENTIAL q ]80 F.F.E. = 312'-11 1/2" 0 0 J U) LVL 3 - AMENITIES — — ' F.F.E. = 310'-8" 0 HIGH POI 310'-1 AVERAGE GRADE WEST ST F.F.E. = 301'-1 1/4" LEVEL 1 - PRKG F.F.E. = 291'-0" • 20'-811 ACTIVE USE - _ Illli, illllii 1111111111����= -_ 0 ---_______ ' ! :�i■� �i■GiIl■ I INIi■ I mmmmmmII � III .� 17'-3" 492 SF TOTAL TRANSPARENCY 26'-011 22'-21' 12'-011 GARAGE ENTRY ACTIVE USE STAIR 41_911 51-911 PED ACCESS PED ACCESS 217'-8" OVERALL WEST STREET LENGTH 137'-8" OVERALL LEVEL 2 TRUSS BEARING I1 F.F.E. = 364'-8 1/8" 00 M O b) LEVEL 7 4L F.F.E. = 355'-7 3/4" 00 0 LEVEL 6 F.F.E. = 344'-11 7/8CID 0 _ LEVEL 5 n F.F.E. = 334'-4" 00 0 LEVEL 4 n F.F.E. = 323'-8 1/8" 00 1 � I_I ■ � ■ � 11 11 11 11 - -- -- -I -IIII - - --I17 11„1,1 I,1„11 II 11 I_ - -- - - I�IIII IIIIII.. __ _ - IIII IIIIIIIIIIIIIIIIIII_ IIII IIIIIIIIIIIIIIIIIII_ III: IIII____III[::[]IIIC', IIIIIIIIIIIII._- IIIIIIIIIIIII ■ IIIIIIIIIIIII ■ ■ ■� ■■I■ 1111111111111111 II II ■■ ■■I■■I■■ IICE ■■ _ [ 1111111111111111 - - wI■■ I_ — — —1111111111111111 — II II II■ ■■ __ I■ ■ �■ ■■ ■ __ ■■I _ I 1 • in �� �.11_IILII Ai =_ 11 11 11 f f rt. >it KKiyy�� i�fr7i�Y� f t t' o - • III —IIII • • 1 • 46'-411 ACTIVE USE BUILDING HEIGHT ELEVATIONS DIAGRAM (WEST ST.) � 3'-8' ABOVE GROUND FLOOR TRANSPARENCY CALCULATION 2 1. = 10'-0" WEST ST LENGTH LOW POINT 291'-8 1/2" PRIVATE ROAD ANGLED ELEVATION BEYOND ► AMENITIES ACTIVE USE ' GARAGE ENTRY ACTIVE USE STAIR ACTIVE USE LEVEL 3 - AMENITIES 4'-911 5'-911 LEVEL 2 - PARKING OVERALL REQUIRED TRANSPARENCY CALCULATIONS PED ACCESS PED ACCESS OVERALL REQUIRED TRANSPARENCY CALCULATIONS PER UDO 3.2.6 MIXED USE BUILDING PER UDO 3.2.6 MIXED USE BUILDING REQUIRED TRANSPARENCY % = 50% REQUIRED TRANSPARENCY % = 50% TRANSPARENCY AREA PER UDO 1.5.9.B.1 TRANSPARENCY AREA PER UDO 1.5.9.B.1 PROVIDED WALL LENGTH = 80'-0" BUILDING HEIGHT ELEVATIONS DIAGRAM (WEST ST.) PROVIDED WALL LENGTH = 137'-8" PROVIDED WALL AREA 0'-12' = 960 SF(80'-0" x 12'-0" ) 0'-12'ABOVE GROUND FLOOR TRANSPARENCY CALCULATION PROVIDED WALL AREA 0'-12' = 11652 SF REQUIRED TRANSPARENCY @ 0'-12' = 480 SF (960 x 50%) 11 _ 1 11 1 - 10-0 REQUIRED TRANSPARENCY @ 0'-12' = 826 SF PROVIDED TRANSPARENCY @ 0'-12' = 56.3% (540 = 960) PROVIDED TRANSPARENCY @ 0'-12' = 52.8% REQUIRED TRANSPARENCY @ 3'-8' = 240 SF (480 x 50%) REQUIRED TRANSPARENCY @ 3'-8' = 413 SF PROVIDED TRANSPARENCY @ 3'-8' = 56.3% (270- 480) PROVIDED TRANSPARENCY @ 3'-8' = 59.6% TRUSS BEARING LEVEL 7 F.F.E. = 355'-7 3/4" 00 O LEVEL 6 n F. F. E. = 344'-11 7/8" 00 0 LEVEL 5 n F.F.E. = 334'-4" 00 0 LEVEL 4 n STORY HEIGHT CALCULATION PER UDO 1.5.7.C.2 TOTAL ACTIVE USE LENGTH ON WEST ST 80'-0" +8'-6" + 22'-2" + 46'-4" = 157'-0" PORTION OF WEST ST FRONTAGE AT 13' FLOOR TO FLOOR = 80'-0" 80'-0" / 157'-0" = 51.0% OF WEST ST ELEVATION AT 13' FLOOR TO FLOOR HEIGHT F.F.E. = 323'-8 1/8" GENERAL NOTES: A. PER UDO 1.5.9.B.3 - IN A MIXED USE z' - BUILDING, OR GENERAL BUILDING LVL 3 - RESIDENTIAL o WHERE AN URBAN FRONTAGE IS F.F.E. = 312'-11 1/2" M N APPLIED, A MINIMUM OF 60% OF THE STREET -FACING, STREET -LEVEL LVL 3 -AMENITIES Z WINDOW PANE SURFACE AREA MUST = 310-8 0 (1)F.F.E. w ALLOW VIEWS INTO THE GROUND AVERAGE GRADE M STORY USE FOR A DEPTH OF AT WEST ST f° LEAST 8 FEET. WINDOWS SHALL NOT F.F.E. = 301'-1 1/4" �' N o BE MADE OPAQUE BY NON -OPERABLE cn WINDOW TREATMENTS (EXCEPT LEVEL 2 - PRKG n CURTAINS, BLINDS OR SHADES F.F.E. = 300'-22 N WITHIN THE CONDITIONED SPACE). B. PER UDO 1.5.9.13.4 - GLASS SHALL BE CONSIDERED TRANSPARENT WHERE LEVEL 1 - PRKG IT HAS A TRANSPARENCY HIGHER F.F.E. = 291'-0" SHEET SPECIFIC NOTES: 1. THE RETAINING WALL WILL HAVE PLANTERS WITH LANDSCAPING IN FRONT OF THE WALL TO ACHIEVE THE REQUIREMENT OF NO MORE THAN 8' OF BLANK WALL PER UDO 7.2.8.E.4.a, 1.5.10, AND 3.2.6.F1 2. BLUE LINES, NOTES, AND DIMENSIONS DELINIATE GROUND STORY. (1371-81' x 12'-0") (1,652 x 50%) (872.8 = 11652) (826 x 50%) (492 = 826 ) BUILDING KEY PLAN N /�4 W�E O er adia 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio. com CV �W V ) w W W c/)2 z LUw J W C� O O V ) LU A DEVELOPMENT FOR: KANE NE REALTY CORPORATION ISSUE DATE DESCRIPTION INCLUDED 08/26/2022 ADMINISTRATIVE SITE REVIEW 09/07/2022 SCHEMATIC DESIGN SET 11/22/2022 DESIGN DEVELOPMENT SET X REVISION DATE DESCRIPTION REV 11/02/2022 ASR RESUBMITTAL 1 1 ASR SEAL: DISCLAIMER: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x42 INCHES. SHEET NAME: ZONING ELEVATIONS WEST ST DESIGN DEVELOPMENT JOB NUMBER: 2200301 DRAWN BY CHECKED BY Author Checker AOO. 1 2B a BUILDING CODE DATA - BUILDING BUILDING IDENTIFICATION: RETAIL BUILDING OCCUPANCY CLASSIFICATION: M AREA ALLOWED PER FLOOR (PER 506.2): AREA PROVIDED GROSS BUILDING AREA - RETAIL LEVEL AND NAME AREA RETAIL GROSS AREA 4,832 SF TOTAL: 4,832 SF TYPE OF CONSTRUCTION: IA BUILDING HEIGHT ALLOWANCE (PER 504.3): UNLIMITED BUILDING HEIGHT PROVIDED: 2 TIERS NUMBER OF STORIES ALLOWED (PER 504.4): NUMBER OF STORIES PROVIDED: FIRE RATING: WALLS AND PARTITIONS OPENING PROTECTION FIRE BARRIER (PER 706.4): 2 HOUR 90 MIN SHAFT ENCLOSURES GREATER THAN 3 STORIES (PER 713.4): 2 HOUR 90 MIN MIXED OCCUPANCY SEPARATION (PER 508.4): 1 HOUR 45 MIN INTERIOR BEARING WALLS (PER 601): 1 HOUR 45 MIN INTERIOR NON -BEARING WALLS (PER 601): 0 HOUR 0 EXT. BEARING WALLS (PER 601): 2 HOUR 45 MIN EXT. NON -BEARING WALLS: GREATER THAN 30' SEPARATION (PER 602): 1 HOUR 45 MINS EXT. NON -BEARING WALLS: LESS THAN 30' SEPARATION (PER 602): 1 HOUR 45 MIN CORRIDOR WALLS (PER 1020.1): 1 HOUR ELEVATOR SHAFT WALLS (PER 713.4): 2 HOUR 90 MIN REFUSE CHUTE SHAFT WALLS AND TERMINATION ROOM (PER 713.13): 2 HOUR 90 MIN REFUSE ACCESS AND ROOMS (PER 713.13): 1 HOUR 45 MIN FLOOR / CEILING CONSTRUCTION (PER 601): 1 HOUR 45 MIN ROOF CEILING CONSTRUCTION (PER 601): 1 HOUR 45 MIN PRIMARY STRUCTURAL FRAME (PER 601): 1 HOUR N/A STAIRS: STAIR WIDTH (PER 1009.1): MIN. REQUIRED: 44" MIN. PROVIDED 44" ELEVATOR LOBBIES OR SMOKE CURTAIN REQUIRED ELEVATOR DOOR OPENING TO BE PROTECTED WITH A SMOKE CURTAIN FLOOR LOCATIONS: REFER TO PLANS FIRE PROTECTION SYSTEM SPRINKLER SYSTEM PROVIDED (PER 903.3.1.1): NFPA 13 YES - WET AUTOMATIC STANDPIPES REQUIRED (PER 905): FIRE EXTINGUISHERS (PER 906): PROVIDED ALONG CORRIDOR AT 75' MAX. TRAVEL DISTANCE EXITS REQUIRED BUILDING EXITS (PER 1021.1): PER FLOOR: PER FLOOR: 2 MIN WITHING ALLOWED TRAVEL DISTANCE HORIZONTAL EXITS (PER 1025): REFER TO FLOOR PLANS FOR LOCATION TRAVEL DISTANCE (PER 1016.2): 250'-0" DEAD END CORRIDOR (PER 1018.4 EXCEPTION 2): 50'-0" ALLOWED ALLOWED REFER TO PLANS PROVIDED UNITS OF EGRESS (PER 1005.1): CORRIDOR WIDTH = .20 PER OCCUPANT REFER TO PLANS STAIR WIDTH = .30 PER OCCUPANT ROOF ACCESS ROOF ACCESS PROVIDED: ATTIC VENTILATION YES- VIA ALTERNATING TREAD DEVICE AND ROOF HATCH ATTIC VENTILATION REQUIRED (PER 1203.2): FULLY FILLED INSULATION HAS BEEN PROVIDED IN THE ROOF ASSEMBLY ATTIC VENTILATION TYPE: N/A GROSS AREA 51,285 SF BUILDING CODE DATA BUILDING IDENTIFICATION: ENCLOSED PARKING DECK BUILDING OCCUPANCY CLASSIFICATION (PER 302) : S-2 AREA ALLOWED PER FLOOR: UNLIMITED SQ. FT. GROSS BUILDING AREA - PARKING LEVEL AND NAME AREA LEVEL 1 - GROSS AREA 64,191 SF LEVEL 2 - GROSS AREA 59,271 SF TOTAL: 123,462 SF TYPE OF CONSTRUCTION: BUILDING HEIGHT ALLOWANCE (PER 504.4): BUILDING HEIGHT PROVIDED: FIRE RATING: FIRE BARRIER (PER 706.4): IA UNLIMITED 2 TIERS SHAFT ENCLOSURES GREATER THAN 3 STORIES (PER 713.4): MIXED OCCUPANCY SEPARATION (PER 508.4): INTERIOR BEARING WALLS (PER 601): INTERIOR NON -BEARING WALLS (PER 601): EXT. BEARING WALLS (PER 601): EXT. NON -BEARING WALLS: GREATER THAN 30' SEPARATION (PER 602): EXT. NON -BEARING WALLS: LESS THAN 30' SEPARATION (PER 602): CORRIDOR WALLS (PER 1020.1): ELEVATOR SHAFT WALLS (PER 713.4): REFUSE CHUTE SHAFT WALLS AND TERMINATION ROOM (PER 713.4): REFUSE ACCESS AND ROOMS (PER 713.13.3): FLOOR / CEILING CONSTRUCTION (PER 601): ROOF CEILING CONSTRUCTION (PER 601): PRIMARY STRUCTURAL FRAME (PER 601): WALLS AND PARTITIONS 2 HOUR 2 HOUR 2 HOUR 2 HOUR 0 HOUR 2 HOUR 0 HOUR 1 HOUR 1 HOUR 2 HOUR 2 HOUR 1 HOUR 2 HOUR 1 HOUR 2 HOUR STAIRS: STAIR WIDTH (PER 1011.2): MIN. REQUIRED: 44" NUMBER OF FLOORS CONNECTED: OPENING PROTECTION 90 MIN. 90 MIN. 90 MIN. 90 MIN. 90 MIN. 45 MIN. MIN. PROVIDED 48" SHAFT OPENING PROTECTIVES SMOKE BARRIER REQUIRED (PER 3006.2): ELEVATOR DOOR OPENING TO BE PROTECTED WITH A SMOKE CURTAIN FLOOR LOCATIONS: REFER TO PLANS FIRE PROTECTION SYSTEM SPRINKLER SYSTEM PROVIDED (PER 406.5): YES, NFPA 13 STANDPIPES REQUIRED (PER 406.5.8): YES FIRE EXTINGUISHERS (PER 906.3): YES, 75' MAX. TRAVEL DISTANCE EXITS REQUIRED BUILDING EXITS (PER 1006.3.1): PER FLOOR: PER FLOOR: 2 EXITS MIN. WITHIN ALLOWED TRAVEL DISTANCE HORIZONTAL EXITS (PER 1026): REFER TO FLOOR PLANS FOR LOCATIONS TRAVEL DISTANCE (PER 1017.2): AT S-2 SPRINK.: 300' ALLOWED / SPRINK.: 400' ALLOWED DEAD END CORRIDOR (PER 1020.4): 50'-0" MAX. ALLOWED ALLOWED UNITS OF EGRESS (PER 1005.1): CORRIDOR WIDTH = .20 PER OCCUPANT DOOR WIDTH = 36" (PER 406.5.7) STAIR WIDTH = .30 PER OCCUPANT GROSS BUILDING AREA - OVERALL PROJECT LEVEL AND NAME AREA LEVEL 1 - GROSS AREA 64,191 SF LEVEL 2 - GROSS AREA RETAIL GROSS AREA 59,271 SF 4,832 SF LEVEL 3 - GROSS AREA 51,474 SF GROSS POOL COURTYARD AREA 9,992 SF GROSS SOUTH COURTYARD AREA 3,335 SF LEVEL 4 - GROSS AREA 51,125 SF LEVEL 5 - GROSS AREA 51,125 SF LEVEL 6 - GROSS AREA 51,125 SF LEVEL 7 - GROSS AREA 51,285 SF TOTAL: 397,756 SF GROSS AREA 51,125 SF GROSS AREA LEGEND �] AMENITIES -EXTERIOR PARKING RESIDENTIAL RETAIL COURTYARD AREA GROSS 1,832 SF BUILDING CODE DATA - BUILDING BUILDING IDENTIFICATION: RESIDENTIAL BUILDING OCCUPANCY CLASSIFICATION: R-2, A-3 AREA ALLOWED PER FLOOR (PER 506.2): 72000 SQ.FT. AREA PROVIDED GROSS BUILDING AREA - RESIDENTIAL LEVEL AND NAME AREA LEVEL 3 - GROSS AREA 51,474 SF GROSS POOL COURTYARD AREA 9,992 SF GROSS SOUTH COURTYARD AREA 3,335 SF LEVEL 4 - GROSS AREA 51,125 SF LEVEL 5 - GROSS AREA 51,125 SF LEVEL 6 - GROSS AREA 51,125 SF LEVEL 7 - GROSS AREA 51,285 SF TOTAL: 269,461 SF TYPE OF CONSTRUCTION: IIIA BUILDING HEIGHT ALLOWANCE (PER 504.3): 85'-0" BUILDING HEIGHT PROVIDED: 66'-7" NUMBER OF STORIES ALLOWED (PER 504.4): 5 NUMBER OF STORIES PROVIDED: 5 FIRE RATING: WALLS AND PARTITIONS OPENING PROTECTION FIRE BARRIER (PER 706.4): 2 HOUR 90 MIN SHAFT ENCLOSURES GREATER THAN 3 STORIES (PER 713.4): 2 HOUR 90 MIN MIXED OCCUPANCY SEPARATION (PER 508.4): 1 HOUR 45 MIN INTERIOR BEARING WALLS (PER 601): 1 HOUR 45 MIN INTERIOR NON -BEARING WALLS (PER 601): 0 HOUR 0 MIN EXT. BEARING WALLS (PER 601): 2 HOUR N/A EXT. NON -BEARING WALLS: GREATER THAN 30' SEPARATION (PER 602): 0 HOUR 0 MIN EXT. NON -BEARING WALLS: LESS THAN 30' SEPARATION (PER 602): 1 HOUR 45 MIN CORRIDOR WALLS (PER 1020.1): 1 HOUR 20 MIN ELEVATOR SHAFT WALLS (PER 713.4): 2 HOUR 90 MIN REFUSE CHUTE SHAFT WALLS AND TERMINATION ROOM (PER 713.13): 2 HOUR 90 MIN REFUSE ACCESS AND ROOMS (PER 713.13): 1 HOUR 45 MIN FLOOR / CEILING CONSTRUCTION (PER 601): 1 HOUR 45 MIN ROOF CEILING CONSTRUCTION (PER 601): 1 HOUR 45 MIN PRIMARY STRUCTURAL FRAME (PER 601): 1 HOUR N/A STAIRS: STAIR WIDTH (PER 1009.1): MIN. REQUIRED: 44" MIN. PROVIDED 48" ELEVATOR LOBBIES OR SMOKE CURTAIN REQUIRED ELEVATOR DOOR OPENING TO BE PROTECTED WITH A SMOKE CURTAIN FLOOR LOCATIONS: REFER TO PLANS FIRE PROTECTION SYSTEM SPRINKLER SYSTEM PROVIDED (PER 903.3.1.1): NFPA 13, ALL BALCONIES TO BE SPRINKLERED STANDPIPES REQUIRED (PER 905): YES - WET AUTOMATIC AT STAIRWELLS FIRE EXTINGUISHERS (PER 906): PROVIDED ALONG CORRIDOR AT 75'-0" MAXIMUM TRAVEL DISTANCE EXITS REQUIRED BUILDING EXITS (PER 1021.1): PER FLOOR: 2 EXITS MIN. WITHIN ALLOWED TRAVEL DISTANCE HORIZONTAL EXITS (PER 1025): REFER TO FLOOR PLANS FOR LOCATIONS TRAVEL DISTANCE (PER 1016.2): 250' - 0" DEAD END CORRIDOR (PER 1018.4 EXCEPTION 2): 50' - 0" ALLOWED REFER TO PLANS PROVIDED UNITS OF EGRESS (PER 1005.1): CORRIDOR WIDTH = .20 PER OCCUPANT REFER TO PLANS STAIR WIDTH = .30 PER OCCUPANT ROOF ACCESS ROOF ACCESS PROVIDED: YES - VIA ALTERNATING TREAD DEVICE AND ROOF HATCH ATTIC VENTILATION ATTIC VENTILATION REQUIRED (PER 1203.2): FULL FILLED INSULATION HAS BEEN PROVIDED IN THE ROOF ASSEMBLY ATTIC VENTILATION TYPE: N/A k GROSS AREA 64,191 SF F. D. C. �L�l i • 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com CV ui v W W C Z Q I-_ _ C z �W J w 0 0 V J ui A DEVELOPMENT FOR: KANE KANE REALTY CORPORATION ISSUE DATE DESCRIPTION INCLUDED 08/26/2022 ADMINISTRATIVE SITE REVIEW 09/07/2022 SCHEMATIC DESIGN SET X 11/22/2022 DESIGN DEVELOPMENT SET X REVISION DATE DESCRIPTION REV 11/02/2022 ASR RESUBMITTAL 1 1 ASR SEAL: DISCLAIMER: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x42 INCHES. SHEET NAME: BUILDING CODE DATA DESIGN DEVELOPMENT JOB NUMBER: 2200301 DRAWN BY CHECKED BY Author Checker GROSS AREA PLAN - LEVEL 7 1 " = 60'-0" GROSS AREA PLAN - LEVELS 4-6 1 If = 60'-011 3,335 SF GROSS AREA PLAN - LEVEL 3 1 It = 60'-011 GROSS AREA PLAN - LEVEL 2 1 " = 60'-0" GROSS AREA PLAN - LEVEL 1 1 It = 60'-011 O AOO. 15 d r- N N O N N O N N N LIFE SAFETY LEGEND LIFE SAFETY NOTES TEMPORARY 2-HR RATED WALL A. FOR CLARITY, PRINT ALL CODE DATA SHEETS IN COLOR. (TO BE REMOVED UPON B. OCCUPANT LOADS FOR FUTURE BUILDINGS ARE SHOWN TO COMPLETION OF ADJACENT PHASE) ILLUSTRATE COMPLIANCE FOR EGRESS WIDTHS IN THE STAIRS. 0 1- HOUR RATED WALL C. COURTYARD ACCESS DOOR FROM POOL COURTYARD WITH KEY CARD ACCESS AT 45" A.F.F. AND MAGNETIC LOCK TO DISENGAGE UPON FIRE ALARM ACTIVATION PER NFPA 2- HOUR RATED WALL 101.7.2.1.6.2. D. PROVIDE 48" HIGH PATIO GUARDRAILS WITH VERTICAL PICKETS FOR ALL UNITS FACING POOL/POOL DECK AT THIRD FLOOR — 3- HOUR RATED WALL ONLY. E. WINDOWS AT DWELLING UNITS THAT ARE PART OF THE POOL FENCE WILL BE PINNED SO AS NOT TO OPEN MORE THAN 4" AT ARROW INDICATES EGRESS POINT THIRD FLOOR ONLY. FROM BUILDING / \\ FEC FIRE EXTINGUISHER CABINET WITH 20 MINUTE RATED EGRESS DOOR (PER IBC TABLE 716.5) / 75' MAX 75' MAX TRAVEL DISTANCE \ \ \ 45 MINUTE RATED EGRESS DOOR EGRESS EXIT SIGNAGE - WITH DIRECTIONAL ARROW AS NEEDED. 90 MINUTE RATED EGRESS DOOR MAX VIEWING DISTANCE = 100 FEET TRA SFORM S > / 180 MINUTE RATED EGRESS DOOR TRAVEL DISTANCE = 107' - 2" \ / MAXIMUM ALLOWED = 400' - 0" MAIN ELEC ROOM TRASH TERMINATION ROOM \ L] \ \ �° A ° 4 �� \ ELEV LOADING I \ MANTE ANCE TILIT ' I 1 ° TILIT \ UTILI41 TY I \ — L \ �� — I I TRAVEL DISTANCE = 105' - 11" I \ i�� ` I i I MAXIMUM ALLOWED = 400' - 0" TRAVEL DISTANCE = 239' - 2" MAXIMUM ALLOWED = 400' - 0" 1 LIFE SAFTY PLAN — LEVEL 1 16 II PARKING LEVEL 1 - PRKG AREA: OCCUPANCY TYPE: 56,849 SF S-2 OCC CALC: TOTAL # OCCUPANTS: 300 SF / OCC 190 OCC TRAVEL DISTANCE = 251' - 3" MAXIMUM ALLOWED = 400' - 0" O er ts I lig adia 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com CV ui v W W W Z Q I-_ _ w2 z LUw J W C� O 0 lqT Cn W 3�: A DEVELOPMENT FOR: KANE N E REALTY CORPORATION ISSUE DATE DESCRIPTION INCLUDED 08/26/2022 ADMINISTRATIVE SITE REVIEW 09/07/2022 SCHEMATIC DESIGN SET 11/22/2022 DESIGN DEVELOPMENT SET X REVISION DATE DESCRIPTION REV SEAL: DISCLAIMER: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x42 INCHES. SHEET NAME: LIFE SAFETY PLAN — LEVEL 1 DESIGN DEVELOPMENT JOB NUMBER: 2200301 DRAWN BY CHECKED BY Author Checker AOO.21 I RETAIL LEVEL 2 - PRKG AREA: OCCUPANCY TYPE: 3,523 SF M OCC CALC: TOTAL # OCCUPANTS: 60 SF / OCC 59 OCC TRAVEL DISTANCE = 131' - 3" MAXIMUM ALLOWED = 400' - 0" PARKING LEVEL 2 - PRKG AREA: OCCUPANCY TYPE: 51,591 SF $-2 OCC CALC: TOTAL # OCCUPANTS: 300 SF / OCC 172 OCC TRAVEL DISTANCE = 63' - 7" li ' ° o MAXIMUM ALLOWED = 250' - 0" � TRAVEL DISTANCE = 217' - 4" Fu MAXIMUM ALLOWED = 400' - 0" I TRAVEL DISTANCE = 61' - 10" I MAXIMUM ALLOWED = 250' - 0" _ I _ I F C a III IPUMP ROOM LIFE SAFTY PLAN - LEVEL 2 1 /16" = 1'-0" 7 TRAVEL DISTANCE = 209' - 1" MAXIMUM ALLOWED = 400' - 0" LIFE SAFETY LEGEND LIFE SAFETY NOTES TEMPORARY 2-HR RATED WALL A. FOR CLARITY, PRINT ALL CODE DATA SHEETS IN COLOR. (TO BE REMOVED UPON B. OCCUPANT LOADS FOR FUTURE BUILDINGS ARE SHOWN TO COMPLETION OF ADJACENT PHASE) ILLUSTRATE COMPLIANCE FOR EGRESS WIDTHS IN THE STAIRS. 0 1- HOUR RATED WALL C. COURTYARD ACCESS DOOR FROM POOL COURTYARD WITH KEY CARD ACCESS AT 45" A.F.F. AND MAGNETIC LOCK TO DISENGAGE UPON FIRE ALARM ACTIVATION PER NFPA 2- HOUR RATED WALL 101.7.2.1.6.2. D. PROVIDE 48" HIGH PATIO GUARDRAILS WITH VERTICAL PICKETS FOR ALL UNITS FACING POOL/POOL DECK AT THIRD FLOOR - 3- HOUR RATED WALL ONLY. E. WINDOWS AT DWELLING UNITS THAT ARE PART OF THE POOL ARROW INDICATES EGRESS POINT FENCE WILL BE PINNED SO AS NOT TO OPEN MORE THAN 4" AT THIRD FLOOR ONLY. FROM BUILDING I i F"75'MAX FIRE EXTINGUISHER CABINET WITH 20 MINUTE RATED EGRESS DOOR (PER IBC TABLE 716.5) 75' MAX TRAVEL DISTANCE 45 MINUTE RATED EGRESS DOOR EGRESS EXIT SIGNAGE - WITH DIRECTIONAL ARROW AS NEEDED. 90 MINUTE RATED EGRESS DOOR MAX VIEWING DISTANCE = 100 FEET 180 MINUTE RATED EGRESS DOOR 0 LU W LU W 2 IY J J Q O c O !y O er ts I lig adia 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com CV ui U) Q w n w �z z LUw J W C� O O lqT LU A DEVELOPMENT FOR: KANE I(ANE REALTY CORPORATION ISSUE DATE DESCRIPTION INCLUDED 08/26/2022 ADMINISTRATIVE SITE REVIEW 09/07/2022 SCHEMATIC DESIGN SET 11/22/2022 DESIGN DEVELOPMENT SET X REVISION DATE DESCRIPTION REV SEAL: DISCLAIMER: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x42 INCHES. SHEET NAME: LIFE SAFETY PLAN - LEVEL 2 DESIGN DEVELOPMENT JOB NUMBER: 2200301 DRAWN BY CHECKED BY Author Checker AOO.22 TRAVEL DISTANCE = 202' - 9" MAXIMUM ALLOWED = 250' - 0" POOL LVL 3 - RESIDENTIAL AREA: OCCUPANCY TYF 823 SF A-4 OCC CALC: TOTAL # OCCUP/ 50 SF / OCC 17 OC POOL DECK LVL 3 - RESIDENTIAL AREA: OCCUPANCY TYF 4,623 SF A-5 OCC CALC: TOTAL # OCCUP/ 15 SF / OCC 309 O( POOL DECK LVL 3 - RESIDENTIAL AREA: OCCUPANCY TYF 1,428 SF R-2 OCC CALC: TOTAL # OCCUP) 200 SF / OCC 8 OCI TRAVEL DISTANCE = 114' - 9" MAXIMUM ALLOWED = 250' - 0" TRAVEL DISTANCE = 101' - 10" MAXIMUM ALLOWED = 125'- 0" COMMON PATH OF TRAVEL d (V 77 0) (N O CV CV O N N N PLUMBING FIXTURE COUNTS - LEVEL 3 INTERIOR AMENITIES MINIMUM FIXTURES PER CODE TOTALS NAME USE GROUP WATER CLOSETS LAVATORIES DRINKING FOUNTAIN-1 PER SERVICE SINK OCC TOTAL OCC TOTAL HALF WATER CLOSETS LAVATORIES DRINKING FOUNTAINS SERVICE SINKS MALE FEMALE MALE FEMALE MALE FEMALE MALE FEMALE INITIAL 1 PER INITIAL 1 PER INITIAL 1 PER INITIAL 1 PER 1 PER QTY 1 PER QTY 1 PER QTY 1 PER QTY CLUBHOUSE A-3 0 0 125 0 0 65 0 0 200 0 0 200 500 1 118 59 0.47 0.91 0.3 0.3 0.24 1 CO -WORKING A-3 0 0 125 0 0 65 0 0 200 0 0 200 500 1 51 25.5 0.2 0.39 0.13 0.13 0.1 1 FITNESS A-3 0 0 125 0 0 65 0 0 200 0 0 200 500 1 122 61 0.49 0.94 0.31 0.31 0.24 1 LEASING B 25 50 50 25 50 50 40 80 80 40 80 80 100 1 27 13.5 0.27 0.27 0.17 0.17 0.27 1 TOTALS 318 1.43 2.51 0.9 0.9 0.85 REQUIRED 2 3 1 1 1 1 PROVIDED 3 3 1 1 1 1 l.U-VVUKI`xlN%j LVL 3 - RESIDENTIAL AREA: OCCUPANCY TYPE: 765 SF A-3 OCC CALC: TOTAL # OCCUPANTS: 15 SF / OCC 52 OCC rI I IVCJ0 LVL 3 - RESIDENTIAL AREA: OCCUPANCY TYPE: 1,826 SF A-3 OCC CALC: TOTAL # OCCUPANTS: 15 SF / OCC 122 OCC LIFE SAFTY PLAN - LEVEL 3 1 /16" = 1'-0" I.LUbNUU*')t LVL 3 - RESIDENTIAL AREA: OCCUPANCY TYPE: 1,774 SF A-3 OCC CALC: TOTAL # OCCUPANTS: 15 SF / OCC 119 OCC LtAZ) INlj LVL 3 - RESIDENTIAL AREA: OCCUPANCY TYPE: 2,695 SF B OCC CALC: TOTAL # OCCUPANTS: 100 SF / OCC 27 OCC TRAVEL DISTANCE = 186' - 9" MAXIMUM ALLOWED = 250' - 0" RESIDENTIAL NORTH LVL 3 - RESIDENTIAL OCCUPANCY TYPE: a SF R LC: TOTAL # OCCUPANTS: F / OCC 126 OCC TRAVEL DISTANCE = 90' - 4" MAXIMUM ALLOWED = 250' - 0" TRAVEL DISTANCE = 93' - 8" MAXIMUM ALLOWED = 250' - 0" TRAVEL DISTANCE = 185' - 7" MAXIMUM ALLOWED = 250' - 0" RESIDENTIAL SOUTH LVL 3 - RESIDENTIAL OCCUPANCY TYPE: i SF R LC: TOTAL # OCCUPANTS: F / OCC 77 OCC LIFE SAFETY LEGEND LIFE SAFETY NOTES TEMPORARY 2-HR RATED WALL A. FOR CLARITY, PRINT ALL CODE DATA SHEETS IN COLOR. (TO BE REMOVED UPON B. OCCUPANT LOADS FOR FUTURE BUILDINGS ARE SHOWN TO COMPLETION OF ADJACENT PHASE) ILLUSTRATE COMPLIANCE FOR EGRESS WIDTHS IN THE STAIRS. IMMMMM= 1- HOUR RATED WALL C. COURTYARD ACCESS DOOR FROM POOL COURTYARD WITH KEY CARD ACCESS AT 45" A.F.F. AND MAGNETIC LOCK TO DISENGAGE UPON FIRE ALARM ACTIVATION PER NFPA NONE= 2- HOUR RATED WALL 101.7.2.1.6.2. D. PROVIDE 48" HIGH PATIO GUARDRAILS WITH VERTICAL PICKETS FOR ALL UNITS FACING POOL/POOL DECK AT THIRD FLOOR - 3- HOUR RATED WALL ONLY. E. WINDOWS AT DWELLING UNITS THAT ARE PART OF THE POOL ARROW INDICATES EGRESS POINT FENCE WILL BE PINNED SO AS NOT TO OPEN MORE THAN 4" AT THIRD FLOOR ONLY. FROM BUILDING i FEC I FIRE EXTINGUISHER CABINET WITH 20 MINUTE RATED EGRESS DOOR (PER IBC TABLE 716.5) 75' MAX 75' MAX TRAVEL DISTANCE 45 MINUTE RATED EGRESS DOOR EGRESS EXIT SIGNAGE - WITH DIRECTIONAL ARROW AS NEEDED. 90 MINUTE RATED EGRESS DOOR MAX VIEWING DISTANCE = 100 FEET 180 MINUTE RATED EGRESS DOOR PER 2018 INTERNATIONAL SWIMMING POOL AND SPA CODE (ISPSC) 609 THE REQUIRED NUMBER OF PLUMBING FIXTURES SHALL BE AS FOLLOWS: MALE WC: 1 FEMALE WC: 1 MALE URINAL: 1 MALE LAV: 1 FEMAILE LAV: 1 MALE SHOWER: 1 FEMALE SHOWER: 1 0 LU W LU ry W H 2 _U J J Q I O_ O a� N =L�l 1 • 1280 HIGHTOWER TRAIL ATLANTA, GA 30350 PHONE: 770.864.1035 dwelldesignstudio.com CV ui U) Q w n w �z z LUw J W C� O O lqT LU 3�: OPMENT FOR: KANE I(ANE REALTY CORPORATION ISSUE DATE DESCRIPTION INCLUDED 08/26/2022 ADMINISTRATIVE SITE REVIEW 09/07/2022 SCHEMATIC DESIGN SET 11/22/2022 DESIGN DEVELOPMENT SET X REVISION DATE DESCRIPTION REV SEAL: DISCLAIMER: THIS DRAWING AND ASSOCIATED DOCUMENTS ARE THE EXCLUSIVE PROPERTY OF DWELL DESIGN STUDIO, AND ARE NOT TO BE REPRODUCED OR COPIED IN WHOLE OR IN PART, EXCEPT AS REQUIRED FOR THE STATED PROJECT. THEY ARE ONLY TO BE USED FOR THIS PROJECT AND SITE SPECIFICALLY IDENTIFIED HEREIN AND ARE NOT TO BE USED ON ANY OTHER PROJECT WITHOUT WRITTEN CONSENT OF DWELL DESIGN STUDIO. SCALES AS NOTED ON THIS DRAWING ARE VALID ON THE ORIGINAL DRAWING ONLY, THE DIMENSIONS OF WHICH ARE 30 x42 INCHES. SHEET NAME: LIFE SAFETY PLAN - LEVEL 3 DESIGN DEVELOPMENT JOB NUMBER: 2200301 DRAWN BY CHECKED BY Author Checker AOO.23 O