Loading...
HomeMy WebLinkAbout25008_North Hills Expansion_VIMWP_20230525 May 25, 2023 Claire Sorrell Brownfields Redevelopment Section NC Department of Environmental Quality Division of Waste Management Mail Service Center 1646 Raleigh, North Carolina 27699-1646 Subject: ADDENDUM 1 VAPOR INTRUSION MITIGATION SYSTEM DESIGN SUBMITTAL NORTH HILLS EXPANSION - NHX LASSITER MILL ROAD RALEIGH, NORTH CAROLINA BROWNFIELDS PROJECT NO.: 25008-21-092 MID-ATLANTIC PE LICENSE: F-0967 REVISION NO.: 3 MID-ATLANTIC JOB NO. 000R3746.02 Dear Ms. Sorrell: On behalf of North Hills Owner, LP, Mid-Atlantic Associates, Inc. (Mid-Atlantic) has prepared this addendum to the Design Submittal for the Vapor Intrusion Mitigation System Revision 3 (VIMS Plan). The VIMS Plan is associated with the Brownfields Redevelopment of North Hills Mall located on Lassiter Mill Road in Raleigh, North Carolina. This addendum outlines the procedures by which indoor air sampling will be conducted. INTRODUCTION A Vapor Intrusion Mitigation System (VIMS) is under construction at the subject site in conjunction with redevelopment of the subject site. The VIMS is being constructed in accordance with the Vapor Intrusion Mitigation System Design Submittal, Revision 3 dated Addendum 1 VIMS Design Submittal May 25, 2023 NHX Page 2 Raleigh, North Carolina December 21, 2021. This VIMS Plan was approved by the Brownfields Program (now known as Brownfields Redevelopment Section (BRS)) on December 29, 2021. Section 4 of the VIMS Plan outlines the Post-Construction/Pre-Occupation System Effectiveness Testing requirements. The VIMS Plan outlines a sequential sampling approach where the initial sampling is limited to sampling the 20 sub-slab monitoring points included in the VIMS design (there are 21 monitoring points, but the DEQ-approved VIMS Plans does not require sampling of MP-14 located in the fire service access elevators (FSAE) room). Under this BRS-approved VIMS Plan, indoor air sampling would only be conducted if/where the sub-slab soil gas testing results indicated it was warranted. Subsequent to the approval of the VIMS Plan, and in consultation with the BRS, the Prospective Developer has elected to include indoor air sampling to the initial pre-occupancy testing regime. As construction has progressed, design changes to the buildings have resulted in changes to the monitoring point network. The following changes have occurred: Monitoring Point Location Change Reason MP-3 North-Central Stair Eliminated Stair is on a 5-foot-thick mat footing with slab floor placed directly on the footing MP-4 Central Elevator Eliminated Elevator removed from building MP-6 West-Central Elevator Eliminated Elevator removed from building MP-7 Eastern Storage Room Eliminated Storage removed from building MP-8 East-Central Stair Eliminated Stair is an outdoor stair In addition, occupancy for the northeastern portion of the development, primarily Building W, is scheduled approximately 12 months after occupancy of Buildings, T, U and Y (which is scheduled for August 2023). Therefore, sampling associated with Monitoring Points MP- 1, 2, 19, 20, 21 and 22 will be conducted in 2024. Currently, pre-occupancy sampling associated Monitoring Points MP-5, 9, 10, 11, 12, 13, 15, 16, 17 and 18 is scheduled for June 2023. Although sub-slab sampling procedures were detailed in the VIMS Plan, indoor air sampling procedures were not included in the VIMS Plan. This addendum was developed to detail the sampling procedures for the collection of indoor air samples. INDOOR AIR SAMPLING PLAN There are 16 sub-slab monitoring points located at the subject site at locations illustrated in the attached figure (adjusted from the VIMS Plan based on changes in construction). Addendum 1 VIMS Design Submittal May 25, 2023 NHX Page 3 Raleigh, North Carolina Indoor air samples will be collected at each monitoring point, except MP-14, creating ‘paired’ samples with the sub-slab soil gas samples collected at each monitoring point. The indoor air samples will be collected initially with the fans for the VIMS operational. Once indoor air sample collection is completed, the VIMS fans will be deactivated. In accordance with the approved VIMS Plan, the sub-slab soil gas samples will be collected no sooner than 48 hours after the VIMS fans have been deactivated. Aside from the 16 paired indoor air samples, one outdoor air and one duplicate sample will be collected for each sampling event (one conducted in June 2023 and the other in 2024). Pre-occupancy sampling will take place, to the extent feasible, under conditions representative of when the building will be occupied. Where present, active VIMS will be operational, concrete slab floors will be in place and the building envelope will be complete. All windows and doors will be closed during indoor air sampling. Since building construction is not complete, temporary surrogate doors and windows constructed of tape- sealed sheet plastic may need to be installed to simulate closed doors and windows. If operational, the HVAC system will be set to maintain ‘as occupied’ temperature and humidity conditions in the space being tested. At least four days before each sampling event, a chemical survey of the building will be conducted to check for potential interference compounds. An Indoor Air Survey and Sampling Form (taken from the Vapor Intrusion Guidance) will be used to log the results of the survey in the building. Potential interference compounds will be removed from the space a minimum of three days before the sampling event. The condition of the HVAC system in the space will be recorded during the chemical inventory and will remain consistent through the sampling event. Since this sampling will be conducted prior to building occupancy, access to the building during sampling will be controlled. INDOOR AIR SAMPLING PROCEDURES Each indoor air sample will be collected from approximately 3-5 feet above the floor in the lowest level of the building. One ambient outdoor air sample will also be collected at an upwind location during each indoor air sampling event. The 24-hour indoor air samples will be collected using individually certified, 6-liter, stainless steel Summa canisters at a maximum pre-determined flow rate of 8-10 milliliters per minute (ml/min) by using the laboratory-provided flow regulator. The initial vacuum displayed on the laboratory-provided vacuum gauge on the Summa/flow regulator will be recorded. Mid-Atlantic will fill the laboratory-provided Summa canister such that the final vacuum in the canister is at least 5 inches of mercury and the final reading will be recorded on the chain of custody. The FIGURE UPUP5(7A,/ 101 S7A,5 1 S101 1/4"A7.021).&.&. A102 101AA101A100S101A10246'-4 3/8"10101D/(AS,1* A100 2)),&( 21( A103 2)),&( 7:2 A104 5(S,D(17 (175< A101 D5< &/(A1 /2&.(5SA113A0( A11 A101BA103A104A108A1060(&+. A106 A/9 A10A107 A113BPA5.,1* 113 75A,1,1* 100 B5(A. 112 /AU1D5< / S725A*( 101 D,SPA7&+ 110 )SA((/(9A725SA1D/2BB<:20(1'S/2&.(55220 0(1'S/2&.(55220 (/(&75,&A/D2&. 2)),&(JIE TABLE Monitoring Point ID Indoor Air Sample Location Sample Date Depressurization Area? Building P North Elevators and Lobby MP-1 IA-1 2024 N North Elevator Pit MP-2 IA-2 2024 N North-Central Stair MP-3 IA-3 None N Central Elevator MP-4 IA-4 None N Building U/T Elevators & Lobby MP-5 IA-5 June 2023 N West-Central Elevator MP-6 IA-6 None N Eastern Storage MP-7 IA-7 None N East-central Stair MP-8 IA-8 None N Electrical Room MP-9 IA-9 June 2023 N Southern Storage MP-10 IA-10 June 2023 N Sprinkler Riser MP-11 IA-11 June 2023 N Building Y Maintenance Shop MP-12 IA-12 June 2023 Y East Stair MP-13 IA-13 June 2023 N FSAE MP-14 IA-14 Not Required* Y Women's Locker Room MP-15 IA-15 June 2023 Y Training Room MP-16 IA-16 June 2023 Y West Stair MP-17 IA-17 June 2023 N Dock Office MP-18 IA-18 June 2023 Y Building W, slab-on-grade portion Retail MP-19 IA-19 2024 Y Retail MP-20 IA-20 2024 Y Retail Stair MP-21 IA-21 2024 Y Leasing MP-22 IA-22 2024 Y Outdoor Air --- OA-1 June 2023 --- Outdoor Air --- OA-2 2024 --- Note: Monitoring Points MP-3, 4, 6, 7 and 8 were not constructed due to building design changes *DEQ-Approved VIMS Plan does not requires sampling at MP-14 (Fire Service Access Elevators) BROWNFIELD PROJECT NO. 25008-21-92 MID-ATLANTIC JOB NO. 000R3746.02 Location TABLE SUB-SLAB SOIL GAS MONITORING POINT AND INDOOR AIR SAMPLE LOCATIONS NORTH HILLS EXPANSION - NHX LASSITER MILL ROAD RALEIGH, NORTH CAROLINA