Loading...
HomeMy WebLinkAbout09005_Canac Kitchens_EMP Addendum No 3 Rev1_2023Jun22 2701 Westport Road Charlotte, NC 28208 P (704) 509-1777 F (704) 509-1888 Terracon.com June 22, 2023 North Carolina Department of Environmental Quality Brownfields Redevelopment Section 1646 Mail Service Center Raleigh, NC 27699-1646 Attn: Mr. David Peacock E: David.peacock@ncdenr.gov Re: Environmental Management Plan Addendum No. 3_rev1 Canac Kitchens Brownfields Site Brownfields ID: 09005-05-049 607 Meacham Road Statesville, NC 28677 Dear Mr. Peacock: Terracon Consultants, Inc. (Terracon) is pleased to submit this Environmental Management Plan (EMP) Addendum for the above referenced site (see Figure 1 for the site layout) on behalf of Dura Supreme Cabinets (Dura). Dura is in the process of upfitting the existing on-site warehouse building to suit its manufacturing operations. Dura’s proposed upfits have included the removal and replacement of portions of the concrete foundation slab of the warehouse building along with soil excavation that was necessary to accommodate thicker sections of replacement concrete foundation slab. Terracon completed an EMP outlining protocols for the management of potential environmental impacts that might be encountered during construction activities. The EMP was submitted by Terracon and approved by the North Carolina Brownfields Redevelopment Section (BRS) on April 14, 2023. Terracon submitted EMP Addenda No. 1 and No. 2 to the BRS on May 25, 2023 and June 7, 2023, respectively. These addenda summarized additional soil disturbance associated with modifications to the northwestern parking area at the site. As mentioned in EMP Addendum No. 1, Dura also proposes to install a fiberoptic cable line at the site but had not finalized the project plans at the time of the Addendum submittal. This EMP Addendum No. 3 documents the proposed ground disturbance that will be associated with the fiberoptic cable line installation and the procedures to effectively manage environmental media that will be encountered during the work. EMP Addendum No. 3_rev1 Canac Kitchens Brownfields Site Statesville, North Carolina June 22, 2023 2 The fiberoptic cable line installation will be completed by a subcontractor of Charter Communications/Spectrum. The cable line will be installed via directional boring to connect an existing fiber pedestal located off-site on the northern edge of Speedball Road with a proposed pedestal to be installed outside Dura’s offices in the southeastern portion of the on-site building. The borehole will be approximately 532 feet in length with an anticipated depth of approximately 3 to 4 feet below land surface (bls). From the newly installed pedestal, the fiberoptic cable line will be routed above-ground to the building. The directional boring route and the fiber connection points at the pedestals are showing on Figure 2. According to the subcontractor, drilling fluid consisting of municipally sourced water will be utilized during the boring. Based on their experience working in the Statesville area, they anticipate that nearly all the drilling fluid will be lost to the subsurface soil formation and that typically only a small quantity (approximately 5 gallons) of cuttings consisting of soil/water slurry will be recovered from the top of the borehole. The subcontractor will containerize slurry recovered during drilling operations in 55-gallon drums that will be staged on site for characterization prior to disposal. The boring equipment will be staged on the site so that any soil cuttings will be recovered on the Brownfields property. At any location where different sections of borehole, fiberoptic cable line, and associated conduit must be connected, the subcontractor will excavate a small pit, approximately 3-feet by 3-feet by 4 feet bls, to achieve the connection. It is anticipated that one utility access vault will be installed as part of the project. If additional vaults are installed as part of the project, soils will be managed in the same way at each location. A similarly sized excavation as described above will be required at the location of the utility vault(s). For any location at which a utility access vault is installed, excess soils that cannot be replaced into the excavation will be generated. Based on the anticipated excavation size, approximately 1 to 2 cubic yards of excess soils will be generated at the utility vault location(s). These soils will be stockpiled in accordance with Figure 1 of the EMP. At excavation locations where no vault is installed, the soils will be replaced back into the excavation using “first out, last in” principles. Terracon will be present on site during the fiber line installation work to provide oversight utilizing the protocols in the approved EMP. Once the boring and excavation work has been completed, Terracon will collect a soil sample from the excess soils generated during the installation work (i.e. from the soil/water slurry containerized within a 55-gallon drum(s) and any temporarily stockpiled soils). Terracon will collect one composite soil sample from these materials. The soil sampling and associated laboratory analyses will be conducted in accordance with the procedures outlined in Section 1.A.4 of the approved EMP. One duplicate soil sample and one equipment blank will also be collected for quality assurance/quality control purposes. EMP Addendum No. 3_rev1 Canac Kitchens Brownfields Site Statesville, North Carolina June 22, 2023 3 The soil data will be utilized to determine whether the soils may be spread on site in the proposed soil re-use area shown outlined in red on Figure 1 or must be disposed off-site to an appropriately permitted facility. Terracon requests BRS-approval to proceed with the above-described work. Sincerely, Terracon Consultants, Inc. William O. Frazier, PG M. Neal McElveen, P.E. Project Geologist Principal/Senior Engineer Attachments: Figure 1 – Site Plan Figure 2 – Proposed Fiberoptic Cable Line Installation Site Plan FIGURENO. @A @A @A@A Meacham RoadSpeedball Road Proposed SoilRe-Use Area(see Approved EMP) Slab Modification Area(see Approved-EMP) MW-4 MW-6 MW-7MW-8 Existing FiberPedestal Proposed FiberPedestal Boring EquipmentStaging Area(Exact Location TBD) NC Center for Geographic Information & Analysis Legend @A Monitoring WellsProposed Fiberoptic Cable LineProposed Concrete Apron ExcavationContaminated Area (per NBP)Site BoundaryTax Parcels Environmental Management Plan Addendum No. 3Canac Kitchens Brownfields SiteDura Supreme Slab ModificationsNCBP ID# 09005-05-049607 Meacham Road Statesville, Iredell County, North Carolina2701 Westport Road Charlotte, North Carolina 28208Phone: (704) 509-1777 Fax: (704) 509-1888 ³ 0 250 500125Feet PM: Drawn By: Checked By: Approved By: WOF WOF MNM MNM Project No: Scale: Filename: Date:June 2023 71227537_EMP_3 1 inch = 250 feet 71237109 1 2 FigureDIAGRAM PROVIDED BY CHARTER COMMUNICATIONS/SPECTURM AND IS FOR GENERAL LOCATION ONLY, AND IS NOT INTENDED FOR CONSTRUCTION PURPOSES VAULT LOCATION(S) MAY VARY FROM WHERE SHOWN DEPENDTING ON DIRECTIONAL BORE EQUIPMENT STAGING LOCATION (TBD)2701 Westport Road Charlotte, NC Proposed Fiber Optic Cable Line InstallationProject Manager: Drawn by: Checked by: Approved by: WOF Project No. File Name: Date: Scale: 71237109 WOF June 2023MNM MNM 71237109.2 Environmental Management Plan Addendum No. 3 CanacKitchens Brownfields SiteDura Supreme Property Modifications Brownfields ID #09005-05-049 607 Meacham Road Statseville, Iredell County, North Carolina As Shown 0 feet 450 feet225feet