HomeMy WebLinkAboutWS-9450_44657_CA_O_20230424_TableCAoptionsItem No.Pilot $Capital $ 1 9,600.00$ 2 9,000.00$ 3 16,000.00$ 4 10,000.00$ 5 331,128.00$ 375,728.00$ Estimated Remdiation Operation Time 3 years Estimated Annual Operation and Maintenance Costs 10,000.00$ Estimated Total Operation and Maintenance Costs 30,000.00$ Estimated Annual Monitoring Costs 25,000.00$ Estimated Toal Monitoring Costs 75,000.00$ Subtotal Pump and Haul Remediation Costs 515,728.00$ Contingency (10%)55,212.00$ TOTAL PUM AND HAUL REMEDIATION COSTS 570,940.00$ Item No.Pilot $Capital $ 1 16,000.00$ 2 5,000.00$ 3 8,000.00$ 4 10,000.00$ 5 6,000.00$ 6 3,000.00$ 7 20,000.00$ 68,000.00$ Estimated Remdiation Operation Time 10 years Estimated Annual Operation and Maintenance Costs 20,000.00$ Estimated Total Operation and Maintenance Costs 200,000.00$ Estimated Annual Monitoring Costs 30,000.00$ Estimated Toal Monitoring Costs 250,000.00$ Subtotal Air Sparging/Soil Vapor Extraction Remediation Costs 568,000.00$ Contingency (10%)56,300.00$ TOTOAL AIR SPARGING/SOIL VAPOR EXTRACTION REMEDIATION COSTS 624,300.00$ Item No.Pilot $Capital $ 1 16,000.00$ 2 8,000.00$ 3 10,000.00$ 4 60,000.00$ 5 3,000.00$ 6 20,000.00$ 117,000.00$ Estimated Remdiation Operation Time (Air Sparging)3 YEARS Estimated Annual Operation and Maintenance Costs (Air Sparging)20,000.00$ Estimated Total Operation and Maintenance Costs (Air Sparging)60,000.00$ Estimated Annual Monitoring Costs (Air Sparing)25,000.00$ Estimated Toal Monitoring Costs (Air Sparging)75,000.00$ Natural Bioremediation 10 YEARS Estimated Annual Monitoring Costs (Natural Bioremediation)25,000.00$ Estimated Toal Monitoring Costs (Natural Bioremediation)250,000.00$ 572,000.00$ Contingency (10%)57,200.00$ TOTAL AIR SPARGING/ENHANCED BIOREMEDIATION COSTS 629,200.00$ Item No.Pilot $Capital $ 1 Pilot Testing 35,000.00$ 2 10,000 3 Two injections 300,000.00$ 345,000.00$ Estimated Remdiation Operation Time 1 YEAR Estimated Annual Operation and Maintenance Costs -$ Estimated Total Operation and Maintenance Costs -$ Estimated Annual Monitoring Costs 25,000.00$ Estimated Toal Monitoring Costs 25,000.00$ Subtotal Chemical Injection 395,000.00$ Contingency (10%)39,500.00$ TOTAL CHEMICAL INJECTION 434,500.00$ FIVE POINTS TEXACO CORRECTIVE ACTION OPTIONS SCOPE AND COST COMPARISIONS Description Three (3) 80 foot deep six (6) inch diameter recovery wells OPTION 1: PUMP AND HAUL Haul and dispose of contaminated water* SUBTOTAL *1.5 gpm x 1440 minutes per day x 365 days per year x 3 years Description OPTION 2: AIR SPARGING AND SOIL VAPOR EXTRACTION Three (3) well pumps and drop pipes Trenches and lines Eight (8) 2" dia. soil vapor extraction wells (30 feet deep) = 240 lf of SVE wells Trenches and lines Blowers pumps SVE pumps Building Pilot Testing and Startup SUBTOTAL OPTION 3: AIR SPARGING AND ENHANCED BIOREMEDIATION Description Eight (8) 4" dia. air sparging wells, 50 (50) feet deep = 400 lf of sparging wells Eight (8) 4" dia. air sparging wells, 50 (50) feet deep = 400 lf of sparging wells 10,000 gallon above ground storage tank Lines and secondary containment for storage tank SUBTOTAL Quarterly Microbe Injections: 4 per year x 3 years = 12 injections @ $5,000 each SUBTOTAL Blowers pumps Building Pilot Testing and Startup Subtotal Air Sparging/Enhanced Bioremediation Costs OPTION 4: CHEMICAL INJECTION** Description Injection Wells