HomeMy WebLinkAboutWS-29296_48461_I_UST-10B_20220608Page 1 of 12 6/8/2022 11:24 AM
North Carolina
Department of Environmental Quality
Underground Storage Tank
UST-10BPrinted:6/8/2022 11:18 AM
Inspection Result:Passed Inspection Date:6/8/2022
Partial Inspection:No Arrive and Depart Times:9:10 AM-9:45 AM
Facility ID:00-0-0000009253 Inspector Jenny Lilley
Facility Name D &M GROCERY Insp.Type Compliance
Facility Address 6066 NC 704 HWY E
SANDY RIDGE,NC 27046
Stokes County
Located facility,USTs onsite
Reason(s)Routine Compliance,Referral From Incident
Manager
Location 36.471335,-80.100943
Permit Exp.6/30/2022
Facility Phone (336)871-2039
CONTACTS
Contact Type Contact Information
Owner
since 1/1/1998
HUFFMAN OIL COMPANY,INCORPORATED ,PO BOX 730 -1021 QUEEN ANN ST BURLINGTON,NC
27216-0730,Phone:(336)227-8881
Regulatory Operator
since 12/4/2014
MELISSA E YATES ,388 CASE ROAD MADISON ,NC 27025-7658,Phone:(336)
552-3118
Primary Operator
since 2/22/2019
STEVE BARNWELL,1448 N.FAYETTEVILLE ST.ASHEBORO,NC 27203,Phone:(336)227-8881,Email:
sbarnwell@huffmanoil.net
Trained:Yes,2/22/2019,Training Type:Online Training
OWNERSHIP CHANGE
New Owner Change Date Basis Transfer of Ownership Form (UST-15)Submitted
No
EMERGENCY RESPONSE
Emergency response placard with emergency response operator contact information is posted in the dispensing areas if the
dispensers are left on without an attendant present?
Yes
OTHER PARTICIPANTS
Name Organization
BILLY PILLAR HUFFMAN OIL
INSPECTOR COMMENTS
Type Date Comment
Tank 6/8/2022 1.BRASWELL/ARNOLD OMEGA INVOICE #440419,DATED 04/20/95 VERIFIES REG TANK
AS 8K GLASTEEL.REGULAR TANK IS FRP/STEEL CLAD BONDED INTO IC SYSTEM.
2.COLLSON-MURRAY COMPANY INVOICE #10791,DATED 08/31/88 VERIFIES STIP-3
UST-10B Facility ID:00-0-0000009253
Page 2 of 12 6/8/2022 11:24 AM
TANK.
3.557 FT FROM FACILITY'S WELL TO REGULAR ATG LID.
4.NO ACCESS AT PREM 2
7.LETTER DATED 06/01/95,SIGNED BY HAROLD KENDRICK OF HUFFMAN OIL VERIFIED
BALL FLOATS FOR ALL USTS EXCEPT KERO AND ALL PIPING IS FRP.
8.LETTER SIGNED BY HAROLD KENDRICK OF HUFFMAN OIL,INSTALLER,DATED
08/29/89 VERIFIED EUROPEAN SUCTION.
9.ALL SPILL BUCKET LINERS DATED 12/2017 EXCEPT FOR REGULAR WHICH IS DATED
09/2016.
Leak Dect.6/6/2022 ALL 5 TANKS PASSED TTT ON 05/31/22.
ADDITIONAL INSPECTOR COMMENTS
TANKS AND PIPING INFORMATION
Tanks Tank #1(1-PREM2)Tank #2(2-MID)Tank #3(3-PREM1)Tank #4(4-KERO)Tank #5(5-REG)
Tank ID 1-PREM2 2-MID 3-PREM1 4-KERO 5-REG
TIMS Tank ID 1 2 3 4 5
Is tank registered?Yes Yes Yes Yes Yes
Date tank installed 4/26/1962 4/26/1962 4/26/1962 10/1/1989 5/3/1995
Capacity of Tank in Gallons 2000 4000 3000 4000 8000
Is tank regulated Yes Yes Yes Yes Yes
Diameter (Inches)64 64 64 64 96
Tank /Product use Motor Fuel Motor Fuel Motor Fuel Motor Fuel Motor Fuel
Product stored in Tank Gasoline,Gas Mix Gasoline,Gas Mix Gasoline,Gas Mix Kerosene,Kero Mix Gasoline,Gas Mix
Product Detail Premium Mid-Grade Premium BLANK Regular
If hazardous substance,CAS#
or description
If other,description
Tank status Temporarily Closed Current Current Current Current
Tank closure report submitted
Date tank last operated 2/20/2017
Inches of product in Tank 0.000000
Compartment tank No No No No No
Other compartment(s)
Base compartment
Manifolded tank No No No No No
Manifolded with tank(s)
Master manifold tank
New Tank System installed in
accordance with NC or MI
Yes Yes
Tank Construction Material
(DW required after 11/1/07)
Single Wall Steel Single Wall Steel Single Wall Steel Single Wall Steel Single Wall
Steel/FRP
If other,description
UST-10B Facility ID:00-0-0000009253
Page 3 of 12 6/8/2022 11:24 AM
Tanks Tank #1(1-PREM2)Tank #2(2-MID)Tank #3(3-PREM1)Tank #4(4-KERO)Tank #5(5-REG)
Tank Manufacturer/Model Unknown Unknown Unknown Unknown Unknown
If other,describe
Tank material verified by UST-7A/B UST-7A/B UST-7A/B Invoice Invoice
Date Pipe Installed 5/3/1995 5/3/1995 5/3/1995 5/3/1995 5/3/1995
Was UST Piping Installed on or
after 11/1/2007?
No No No No No
Piping Construction Material
(DW required after 11/1/07)
None Single Wall FRP Single Wall FRP Single Wall FRP Single Wall FRP
If other,description
Pipe Manufacturer/Model Unknown Unknown Unknown Unknown Unknown
If other,describe
Pipe material verified by Visual Visual Visual Installer Letter Visual
If E-blend >10%or Biodiesel
Blend >20%;Was UST-20
completed and approved?
N/A N/A N/A N/A N/A
CORROSION PROTECTION
Tank Corrosion Protection Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-
REG)
DWM notified of current CP method Yes Yes Yes Yes Yes
Integrity assessment performed after 3/1/06 No No No No No
CP Method 1 Impressed
Current
Impressed
Current
Impressed
Current
Impressed
Current
Steel/FRP
Composite
if other,Description
CP Installation Date 5/30/1995 5/30/1995 5/30/1995 5/30/1995 5/30/1995
CP Method 2 Impressed
Current
if other,Description
CP Installation Date 5/30/1995
Flex Connector ,Piping Extensions,and/or other metal
fittings Present
None Ball Valve,
Elbow
Ball Valve,
Elbow
Ball Valve,
Elbow
Ball Valve,
Elbow
Flex connector isolated from ground No No No No
Source of verification of CP for Flex Connectors,piping
extensions and/or other metal fittings
CP Test
Results
CP Test
Results
CP Test
Results
CP Test
Results
if other,Description
Submersible pump (STP)is isolated from ground N/A Yes Yes N/A Yes
Piping extensions and/or other metal fittings are isolated
from ground
No No No No
Flex connector,STP and/or other metal fittings
protected from corrosion
N/A Yes Yes Yes Yes
Corrosion protection method Impressed
Current
Impressed
Current
Impressed
Current
Impressed
Current
UST-10B Facility ID:00-0-0000009253
Page 4 of 12 6/8/2022 11:24 AM
Tank Corrosion Protection Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-
REG)
Flex connector ,Piping extensions,and/or other metal
fittings CP Installation Date
5/30/1995 5/30/1995 5/30/1995 5/30/1995
Dielectric Coating Installed (If tank installed after
12/22/88
N/A N/A N/A Yes Yes
Pipe Corrosion Protection Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-REG)
DWM notified of current CP method Yes Yes Yes Yes Yes
CP method FRP Piping FRP Piping FRP Piping FRP Piping FRP Piping
if other,Description
CP Installation Date 5/30/1995 5/30/1995 5/30/1995 5/30/1995 5/30/1995
Dielectric Coating Installed (If piping installed
after 12/22/88
N/A N/A N/A N/A N/A
Dispenser Corrosion Protection Dispenser #1(1/2)Dispenser #2(3/4)Dispenser
#3(KEROSENE)
Flex Connector ,Piping Extensions,and/or other metal fittings
Present
Flex Connector Flex Connector Flex Connector
Flex connector isolated from ground Yes Yes No
Source of verification of CP for Flex Connectors,piping extensions
and/or other metal fittings
Visual Visual CP Test Results
if other,Description
Piping extensions and/or other metal fittings are isolated from
ground
Yes Yes No
Flex Connectors,Piping extensions and/or other metal fittings
protected from corrosion
N/A N/A Yes
Corrosion protection method Isolated Isolated Impressed Current
Flex connector,Piping extensions,and/or other metal fittings CP
Installation Date
5/30/1995
Source of Information for verification of corrosion protection for
Riser pipe and other metal piping
Visual Visual CP Test Results
if other,Description
CP Conclusions
CP Requirements Met?Yes
Issues
UST-10B Facility ID:00-0-0000009253
Page 5 of 12 6/8/2022 11:24 AM
Impressed Current Systems IC System #1
Applies to Tanks #1(1-PREM2),#2(2-MID),#3(3-PREM1),#4(4-KERO)
Current Voltage (Gauge)64.0000
Current Amperage (Gauge)2.0000
Current Voltage (Multimeter)
Measured Shunt Voltage (mV)
Rectifier Shunt Factor (Amps/mV)
Amps -Calculated
Last three 60-day readings available Yes
System operating properly Yes
If no,select all that apply
If other,describe
Hour meter reading?
Hour meter installed No
CP Tests Test #1
Applies to Tanks #1(1-PREM2),#2(2-MID),#3(3-PREM1),#4(4-
KERO),#5(5-REG)
Portion of System Tested Flex connectors,Tanks
Date of last Corrosion Protection Test 1/25/2022
CP Test Result Pass
Was CP Test done in accordance with National Standard?Yes
CP Tester Name JASON ROGERS
Certificate Number SEE110920.247
Certifying Organization SEE
CP Testing Company Name ENVIRO CONSULTING
CP Testing Company Phone (704)721-0101
As Left Voltage 64
As Left Current 1.8
UST7 form for last CP test submitted to DWM Yes
SPILL PREVENTION
Has DWM been notified of spill methods?Yes
Spill/Overfill Details Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-REG)
Is a drop tube present?Yes Yes Yes Yes Yes
Type of Stage I vapor recovery?Dual Point Dual Point Dual Point Not Required Dual Point
UST-10B Facility ID:00-0-0000009253
Page 6 of 12 6/8/2022 11:24 AM
Local Fill Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-REG)
Does Tank have a Second Fill?No No No No No
Spill Protection Catchment
Basin
Catchment
Basin
Catchment
Basin
Catchment
Basin
Catchment
Basin
Is spill prevention equipment provided and verified?Yes Yes Yes Yes Yes
Manufacturer/Model Spill bucket with
LINER (SW)
Spill bucket with
LINER (SW)
Spill bucket with
LINER (SW)
Spill bucket with
LINER (SW)
Spill bucket with
LINER (SW)
If other,describe
Spill bucket is double-walled?N/A N/A N/A N/A N/A
Monitoring Type
(UST-6B)
Is spill bucket interstice monitored every 30 days?
(If installed before 11/1/07)
Spill bucket is isolated or made of non-corroding
materials?(If installed after 11/1/07)
N/A N/A N/A N/A N/A
Date spill prevention provided 5/30/1995 5/30/1995 5/30/1995 5/30/1995 5/30/1995
Last 12 monthly spill bucket checks completed and
all deficiencies corrected (UST-27)?
Yes Yes Yes Yes Yes
Is spill prevention operating properly?Yes Yes Yes Yes Yes
If No,select all that apply
If other,describe
O&M walkthrough inspection completed in
accordance with national standard (e.g.PEI RP 900)
(UST-27)?
Yes Yes Yes Yes Yes
3 Year Tightness Test Date
(UST-6D/23A)
5/31/2022 5/31/2022 5/31/2022 5/31/2022 5/31/2022
Primary Tightness Test Result
(UST-6D/23A)
Pass Pass Pass Pass Pass
Secondary Tightness Test Result
(UST-6D/23A)
Tightness Testing done in accordance with a
standard?
Yes Yes Yes Yes Yes
OVERFILL PREVENTION
Has DWM been notified of overfill methods?Yes
Overfill Control Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-REG)
Is overfill prevention equipment provided and
verified?
Yes Yes Yes Yes Yes
Date overfill control provided 6/22/2018 6/22/2018 6/22/2018 6/22/2018 6/22/2018
Type of overfill equipment Overfill Alarm Overfill Alarm Overfill Alarm Overfill Alarm Overfill Alarm
UST-10B Facility ID:00-0-0000009253
Page 7 of 12 6/8/2022 11:24 AM
Overfill Control Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-REG)
Source of information for overfill control verification Visual
observation
Visual
observation
Visual
observation
Visual
observation
Visual
observation
If other,describe
Manufacturer/Model BLANK BLANK BLANK BLANK BLANK
If other,describe
Is overfill control operating properly?Yes Yes Yes Yes Yes
If No,select all that apply
If other,describe
Overfill check date (UST-22A)5/31/2022 5/31/2022 5/31/2022 5/31/2022 5/31/2022
Overfill check result (UST-22A)Pass Pass Pass Pass Pass
Capacity of Tank in Gallons 2000 4000 3000 4000 8000
Diameter (Inches)64 64 64 64 96
Dispenser Sumps Dispenser #1(1/2)Dispenser #2(3/4)Dispenser
#3(KEROSENE)
Are containment sumps present?Yes Yes No
Installation Date 5/30/1995 5/30/1995
Sump Manufacturer Unknown Unknown
If Other (Specify)
Sump Construction Type Single Walled Single Walled
Sump Construction Material Plastic Plastic
If Other (Specify)
Are containment sumps monitored?No No
Is monitoring required per 2N .0900?No No No
Piping components and/or STP were installed/replaced on or after
11/1/07?
No No No
Are spills or small weeps evident in sumps?No No No
Are single wall piping components located in containment sump?(If
installed after 11/1/07)
UDC Visual Inspection Date
(annually)(UST-22C)
5/31/2022 5/31/2022 5/31/2022
UDC Visual Inspection Results
(UST-22C)
Pass Pass Pass
Annual containment sump check completed in accordance with
national standard (e.g.PEI RP 900)?
Yes Yes Yes
Other Sumps Sump#1(KERO
TT)
Sump#2(MID STP)Sump#3(PREM1
STP)
Sump#4(REG
STP)
Are containment sumps present?No No No No
Installation Date
Sump Manufacturer
UST-10B Facility ID:00-0-0000009253
Page 8 of 12 6/8/2022 11:24 AM
Other Sumps Sump#1(KERO
TT)
Sump#2(MID STP)Sump#3(PREM1
STP)
Sump#4(REG
STP)
If Other (Specify)
Sump Construction Type
Sump Construction Material
If Other (Specify)
Are containment sumps monitored?
Is monitoring required per 2N .0900?No No No No
Piping components and/or STP were installed/replaced on
or after 11/1/07?
No No No No
Are spills or small weeps evident in sumps?No No No No
Are single wall piping components located in containment
sump?(If installed after 11/1/07)
Sump Visual Inspection Date
(annually)(UST-22C)
5/31/2022 5/31/2022 5/31/2022 5/31/2022
Sump Visual Inspection Results
(UST-22C)
Pass Pass Pass Pass
Annual containment sump check completed in accordance
with national standard (e.g.PEI RP 900)?
Yes Yes Yes Yes
SITING AND SECONDARY CONTAINMENT
Siting And Sec.Containment-General Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-REG)
UST system upgraded with corrosion protection,
spill and overfill before 1/1/91?
N/A N/A N/A N/A N/A
UST system and/or piping are located within siting
and secondary containment areas?
No No No No No
LEAK DETECTION
General Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-REG)
DWM notified of leak detection method?Yes Yes Yes Yes Yes
Piping Type
Piping type Manifold Bar Pressurized
System
Pressurized
System
European
Suction
Pressurized
System
if other,specify
Suction check type Dispenser
Type LLD present.Not Required ELLD ELLD Not Required ELLD
Tank Release Detection
Primary leak detection method Automatic Tank
Gauging
Automatic Tank
Gauging
Automatic Tank
Gauging
Automatic Tank
Gauging
Automatic Tank
Gauging
UST-10B Facility ID:00-0-0000009253
Page 9 of 12 6/8/2022 11:24 AM
General Tank #1(1-
PREM2)
Tank #2(2-MID)Tank #3(3-
PREM1)
Tank #4(4-
KERO)
Tank #5(5-REG)
if other,specify
Primary LD install date 5/30/1995 5/30/1995 5/30/1995 5/30/1995 5/30/1995
Secondary leak detection method
if other,specify
Piping Release Detection
Primary leak detection method Not Required Line Tightness
Testing (LTT)
Line Tightness
Testing (LTT)
Exempt
(European Style)
Line Tightness
Testing (LTT)
if other,specify
Primary LD install date 9/30/2000 9/30/2000 9/30/2000 9/30/2000 9/30/2000
Secondary leak detection method
if other,specify
Equipment Checks
Last 12 monthly RD equipment checks
completed and all deficiencies corrected
(UST-27)?
Yes Yes Yes Yes Yes
if no,select all that apply
Annual RD equipment operability check result
(UST-22B)
Pass Pass Pass Pass Pass
if Fail,select all that apply
Annual RD equipment operability check date
(UST-22B)
5/31/2022 5/31/2022 5/31/2022 5/31/2022 5/31/2022
RD equipment checks completed per national
standard (e.g.PEI RP 900/1200)(UST-22B/27)?
Yes Yes Yes Yes Yes
PIPING LEAK DETECTION
Pressurized Piping Tank #2(2-MID)Tank #3(3-PREM1)Tank #5(5-REG)
Last MLLD/ELLD Test Date 5/31/2022 5/31/2022 5/31/2022
MLLD/ELLD Test Result Pass Pass Pass
Last LTT Test Date 5/31/2022 5/31/2022 5/31/2022
LTT Test Result Pass Pass Pass
Does test result indicate
suspected release?
No No No
Number of MLLD/ELLD Types 1 1 1
MLLD/ELLD Equipment Tank #2(2-MID)LLD #1 Tank #3(3-PREM1)LLD #1 Tank #5(5-REG)LLD #1
MLLD/ELLD Manufacturer/Model V-R/RJ:FX1V (M)V-R:PLLD Series 8484 (E)V-R:PLLD Series 8484 (E)
If other,describe
MLLD/ELLD Third Party Certified?Yes Yes Yes
UST-10B Facility ID:00-0-0000009253
Page 10 of 12 6/8/2022 11:24 AM
MLLD/ELLD Testers MLLD/ELLD Tester #1
MLLD/ELLD Tester Name RICK UMBEL
MLLD/ELLD Testing Company Name PTS
MLLD/ELLD Testing Company Phone Number (704)892-8600
Pressurized Piping LTT LTT #1
LTT Manufacturer/Method AcuRite:Training &Serv
If other,describe
LTT Third Party Certified?Yes
Pressurized Piping LTT Tester LTT Tester #1
LTT Tester Name RICK UMBEL
LTT Testing Company Name PTS
LTT Testing Company Phone Number (704)892-8600
European Suction Tank #4(4-KERO)
Requirements for European suction piping verified?Yes
Source of information for European Suction verification.Installer Certification Letter
If other,specify
AUTOMATIC TANK GAUGE
ATG Systems ATG #1
ATG Manufacturer/Model V-R:TLS-350 CSLD
If other,describe
ATG Third Party Certified?Yes
Is ATG console operational?Yes
Tanks #1(1-PREM2),#2(2-MID),#3(3-PREM1),#4(4-KERO),#5(5-REG)
ATG Monthly LD Tank #1(1-PREM2)Tank #2(2-MID)Tank #3(3-PREM1)Tank #4(4-KERO)Tank #5(5-REG)
2022 Jun Pass Pass Pass Pass Pass
2022 May Pass Pass Pass Pass Pass
2022 Apr Pass Pass Pass Pass Pass
2022 Mar Pass Pass Pass Pass Pass
2022 Feb Pass Pass Pass Pass Pass
2022 Jan Pass Pass Pass Pass Pass
2021 Dec Pass Pass Pass Pass Pass
2021 Nov Pass Pass Pass Pass Pass
2021 Oct Pass Pass Pass Pass Pass
2021 Sep Pass Pass Pass Pass Pass
UST-10B Facility ID:00-0-0000009253
Page 11 of 12 6/8/2022 11:24 AM
ATG Monthly LD Tank #1(1-PREM2)Tank #2(2-MID)Tank #3(3-PREM1)Tank #4(4-KERO)Tank #5(5-REG)
2021 Aug Pass Pass Pass Pass Pass
2021 Jul Pass Pass Pass Pass Pass
ATG Conclusions
Leak Detection Requirements Met?Yes
Do the results indicate a suspected release?
Issues
TEMPORARY CLOSURE
Temporary Closure
Temporary Closure Requirements Met?Yes
Issues
REPAIRS
Repairs
Any Repair Issues?No
Issues
Delivery Information Tank #1(1-PREM2)Tank #2(2-MID)Tank #3(3-PREM1)Tank #4(4-KERO)Tank #5(5-REG)
All deliveries made to permitted tanks Yes Yes Yes Yes Yes
TRANSPORTER/FUEL DELIVERY INFORMATION
Name Address Phone
HUFFMAN OIL
UST-10B Facility ID:00-0-0000009253
Page 12 of 12 6/8/2022 11:24 AM
SITE DIAGRAM 1