HomeMy WebLinkAbout21050_South Saunders Street Assemblage_EMP_12082021_BF SIGNEDEnvironmental Management Plan South Saunders Street Assemblage Brownfields Project No. 21050-17-092 South Saunders Street, Raleigh, North Carolina H&H Job No. KCO-001 December 8, 2021 hart � hickman SMARTER ENVIRONMENTAL SOLUTIONS #C-1269 Engineering #C-245 Geology 2923 South Tryon Street, Suite 100 3921 Sunset Ridge Rd, Suite 301 Charlotte, NC 28203 Raleigh, NC 27607 www,harthickman.com 704.586.0007 main 919.847.4241 main Completed EMP Template Form CONTENTS Tables Table 1 Summary of Soil Gas Analytical Data Table 2 Summary of Soil Analytical Data Table 3 Summary of Well Construction Details & Groundwater Elevation Data Table 4 Summary of Groundwater Analytical Data Table 5 Summary of Surface Water Analytical Data Table 6 Summary of Sediment Analytical Data Table 7 Summary of TCLP Analytical Data Figures Figure 1 Site Location Map Figure 2 Site Map Figure 3 Sample Location Map Figure 4 Cut -Fill Sample Location Map Appendices Appendix A Redevelopment Plans Appendix B Grading Plan and Cut -Fill Analysis Appendix C Utility Plan hart hickman SMARTER ENVIRONMENTAL SOLUTIONS NORTH CAROLINA BROWNFIELDS PROGRAM ENVIRONMENTAL MANAGEMENT PLAN This form is to be used to prepare an Environmental Management Plan (EMP) for projects in the North Carolina Brownfields Program at the direction of a Brownfields project manager. The EMP is a typical requirement of a Brownfields Agreement (BFA). Its purpose is to clarify actions to be taken during the demolition and construction at Brownfields properties in an effort to avoid delays in the event of the discovery of new contamination sources or other environmental conditions. The EMP provides a means to document redevelopment plans and environmental data for each applicable environmental medium to inform regulatory -compliant decision -making at the site. As much detail as possible should be included in the EMP, including contingency planning for unknowns. Consult your project manager if you have questions. Prospective Developers and/or their consultants must complete and submit this form and all pertinent attachments, see checklist below, to their Brownfields project manager prior to any earthmoving or other development -related activities that have the potential to disturb soil at the Brownfields Property, including demolition. For the resultant EMP to be valid for use, it must be completed, reviewed by the program, signed by all parties working on the project, and approved by the Brownfields project manager. Failure to comply with the requirements of the EMP could jeopardize project eligibility, or in the event of a completed agreement, be cause for a reopener. The EMP is valid only for the scope of work described herein and must be updated to be applicable for new phases of redevelopment or after significant changes in applicable regulatory guidance. Voluntary Metrics Tab The NC Brownfields Program updates estimated capital investment (from the Brownfields Property Application) and estimated jobs created (from the Brownfields Agreement) whenever possible. As a voluntary measure, you may opt to complete the below information for capital investment and jobs created as estimated by your final redevelopment plans for the Brownfields Property: 1. Estimated capital investment in redevelopment project: Approximately $120M 2. Estimated jobs created: a. Construction Jobs: 200 b. Full Time Post -Redevelopment Jobs: To be determined EMP Version 2, January 2021 Table of Contents NORTH CAROLINA BROWN FIELDS PROGRAM ENVIRONMENTAL MANAGEMENT PLAN ........................... 1 GENERALINFORMATION........................................................................................................................ 4 COMMUNICATIONS................................................................................................................................ 4 NOTIFICATIONS TO THE BROWNFIELDS PROGRAM............................................................................... 5 REDEVELOPMENT PLANS........................................................................................................................ 5 CONTAMINATEDMEDIA......................................................................................................................... 7 PART1. Soil......................................................................................................................................... 8 PART 2. GROUNDWATER................................................................................................................. 20 PART 3. SURFACE WATER.................................................................................................................. 22 PART 4. SEDIMENT............................................................................................................................ 23 PART5. SOIL VAPOR......................................................................................................................... 23 PART 6. SUB -SLAB SOIL VAPOR........................................................................................................ 24 PART 7. INDOOR AIR......................................................................................................................... 25 VAPOR INTRUSION MITIGATION SYSTEM............................................................................................. 25 CONTINGENCY PLAN — encountering unknown tanks, drums, or other waste materials ..................... 26 POST -REDEVELOPMENT REPORTING..................................................................................................... 29 APPROVAL SIGNATURES....................................................................................................................... 30 EMP Version 2, January 2021 So that the EMP provides value in protecting brownfields eligibility and public health, the preparer shall ensure that the following steps have been completed prior to submitting the EMP for review. Any EMP prepared without completing these steps is premature. ® Site sampling and assessment that meets Brownfields' objectives is complete and has been reviewed and approved by the Brownfields Project Manager. ® Specific redevelopment plans, even if conceptual, have been developed for the project, submitted and reviewed by the Brownfields Project Manager. Please submit, along with the completed EMP form, the following attachments, as relevant and applicable to the proposed redevelopment: M A set of redevelopment plans, including architectural/engineering plans, if available; if not conceptual plans may suffice if updated when detailed plans are drafted. M A figure overlaying redevelopment plans on a map of the extent of contamination for each media. ® Site grading plans that include a cut and fill analysis. ❑ A figure showing the proposed location and depth of impacted soil that would remain on site after construction grading. ❑ Any necessary permits for redevelopment (i.e. demolition, etc.). ❑ A detailed construction schedule that includes timing and phases of construction. ® Tabulated data summaries for each impacted media (i.e. soil, groundwater, soil gas, etc.) applicable to the proposed redevelopment. ® Figures with the sampling locations and contamination extents for each impacted media applicable to the proposed redevelopment. ❑ A full final grade sampling and analysis plan, if the redevelopment plan is final. ❑ If known, information about each proposed potential borrow soil source, such as aerial photos, historic site maps, historic Sanborn maps, a site history, necessary for brownfields approval. ❑ Information and, analytical data if required, for quarries, or other borrow sources, detailing the type of material proposed for importation to the Brownfields Property. EMP Version 2, January 2021 ❑ A work plan for the sampling and analysis of soil to be brought onto the Brownfields Property. Refer to Issue Resolution 15 in Brownfields Program Guidelines. ❑ A map of the Brownfields Property showing the location of soils proposed for export and sampling data from those areas. ® If a Vapor Mitigation System is required by the Brownfields Program, the Vapor Intrusion Mitigation System (VIMS) plan will be signed and sealed by a NC Professional Engineer. The VIMS Plan may also be submitted under separate cover. Date: 12/8/2021 GENERAL INFORMATION Revision Date (if applicable): Click or tap to enter a date. Brownfields Assigned Project Name: South Saunders Street Assemblage Brownfields Project Number: 21050-17-092 Brownfields Property Address: South Saunders Street, Raleigh, Wake County, North Carolina (Figure 1) Brownfields Property Area (acres): 9.15 acres Is Brownfields Property Subject to RCRA Permit? ....................... ❑ Yes ® No If yes enter Permit No.: -i" -i, - i— , horn to enter text. Is Brownfields Property Subject to a Solid Waste Permit ............ ❑ Yes ® No If yes, enter Permit No.: Click or tap here to enter text. COMMUNICATIONS A copy of this EMP shall be distributed to all the parties below as well as any contractors or site workers that may be exposed to site vapors, soil, groundwater, and/or surface water. Additionally, a copy of the EMP shall be maintained at the Brownfields Property during redevelopment activities. NOTE, THE EMP DOES NOT TAKE THE PLACE OF A SITE -SPECIFIC HEALTH AND SAFETY PLAN. Prospective Developer (PD): Kane Realty Corporation Contact Person: Mr. Drew Yates Phone Numbers: Office: Click or tap hereto enter text. Mobile: (336) 689-3766 Email: Jyates@kanerealtycorp.com Contractor for PD: Samet Corporation Contact Person: Maria Houle Phone Numbers: Office: Click or tap hereto enter text. Mobile: (786) 510-4879 Email: :lick or tap here to enter text. 4 EMP Version 2, January 2021 Environmental Consultant: Hart & Hickman, PC Contact Person: Mr. Justin Ballard Phone Numbers: Office: (919) 847-4241 Mobile: (252) 548-9191 Email: iballard(@harthickman.com Brownfields Program Project Manager: Kelly Johnson Phone Numbers: Office: (919) 707-8279 Mobile: (919) 609-2334 Email: Kelly.Johnson@ncdenr.gov Other DEQ Program Contacts (if applicable, i.e., UST Section, Inactive Hazardous Site Branch, Hazardous Waste, Solid Waste): k or tap here NOTIFICATIONS TO THE BROWNFIELDS PROGRAM Written advance Notification Times to Brownfields Project Manager: Check each box to accept minimum advance notice periods (in calendar days) for each type of onsitetask: On -site assessment or remedial activities: .................................................... 10 days Prior Construction or grading start: .......................................................................... 10 days Prior Discovery of stained soil, odors, USTs, buried drums or waste, landfill, or other signs of previously unknown contamination: ................................................................................ Within 48 hours Implementation of emergency actions (e.g. dewatering, flood or soil erosion control measures in area of contamination, ventilation of work zones): ................................... Within 48 hours Installation of mitigation systems: ................................................................ 10 days Prior Other notifications as required by local, state or federal agencies to implement redevelopment activities: (as applicable): ................................................................................. Within 30 days REDEVELOPMENT PLANS 1) Type of Redevelopment (check all that apply): ©Residential ©Recreational El Institutional ®Commercial ®Office ®Retail ❑ Industrial ©Other specify: Parking, Open Space 2) Check the following activities that will be conducted prior to commencing earth -moving activities at the site: EMP Version 2, January 2021 ® Review of historic maps (Sanborn Maps, facility maps) ❑ Conducting geophysical surveys to evaluate the location of suspect UST, fuel lines, utility lines, etc. ❑ Interviews with employees/former employees/facility managers/neighbors 3) Summary of Redevelopment Plans (MANDATORY: attach detailed plans or conceptual plans, if detailed plans are not available. EMP review without such information would be premature): Provide brief summary of redevelopment plans, including demolition, removal of building slabs/pavement, grading plans and planned construction of new structures: Redevelopment plans for the central and northern portions of the Brownfields property include razing the existing Site buildings (including in the southern portion of the Site) and construction of four connected multi -use buildings with ground floor commercial, retail, office, amenity space, and/or parking, and upper -level residential spaces with the exception of the building located in the southeastern portion of the Site. The southeastern building is proposed for residential use is and is located in a fill area. See the Contaminated Media Section for details regarding cut/fill information. In summary, the proposed redevelopment consists of up to 11 stories that total approximately 371,640 gross square feet (sq ft). A copy of the current redevelopment Site plan is included in Appendix A. Once details associated with redevelopment plans for the southern portion of the Brownfields property are available, those plans will be provided to the DEQ Brownfields Program for review. If warranted based upon DEQ's review, a revised EMP will be prepared for the southern portion of the Site. 4) Do plans include demolition of structure(s)?: ® Yes ❑ No ❑ Unknown ® If yes, please check here to confirm that demolition will be conducted in accordance with applicable legal requirements, including without limitation those related to lead and asbestos abatement that are administered by the Health Hazards Control Unit within the Division of Public Health of the North Carolina Department of Health and Human Services. If available, please provide a copy of your demolition permit. 5) Are sediment and erosion control measures required by federal, state, or local regulations? ® Yes ❑ No ❑ Unknown ® If yes, please check here to confirm that demolition will be conducted in accordance with applicable legal requirements. If soil disturbance is necessary to install sediment and erosion control measures, they may not begin until this EMP is approved. 6) Which category of risk -based screening level is used or is anticipated to be specified in the Brownfields Agreement? Note: If children frequent the property, residential screening levels shall be cited in the Brownfields Agreement for comparison purposes. ® Residential ❑ Non -Residential or Industrial/Commercial 7) Schedule for Redevelopment (attach construction schedule): EMP Version 2, January 2021 a) Construction start date: 11/29/2021 b) Anticipated duration (specify activities during each phase): Redevelopment activities are expected to take up to approximately 28 months (i.e., Q1 2024) to complete. As previously mentioned, if warranted based upon DEQs review, a revised EMP will be prepared for the southern portion of the Site c) Additional phases planned? ® Yes ❑ No If yes, specify the start date and/or activities if known: Start Date: 10/1/2022 Planned Activity: Possible additional phases of redevelopment include new construction in the southern portion of the Brownfields property. Start Date: Click or tap to enter a date. Planned Activity: Click or tap here to enter text. Start Date: Click or tap to enter a date. Planned Activity: Click or tap here to enter te"' d) Provide the planned date of occupancy for new buildings: 11/1/2023 CONTAMINATED MEDIA Please fill out the sections below, using detailed site plans, if available, or estimate using known areas of contaminated soil and a conceptual redevelopment plan. Provide a figure overlaying new construction onto figure showing contaminated soil and groundwater locations. 1) Contaminated Media on the Brownfields Property Part 1. Soil: .............................................................. ® Yes ❑ No ❑ Suspected ❑ Unknown Part 2. Groundwater: ............................................ ® Yes ❑ No ❑ Suspected ❑ Unknown Part 3. Surface Water: .......................................... ® Yes ❑ No ❑ Suspected ❑ Unknown Part 4. Sediment: ................................................... © Yes ❑ No ❑ Suspected ❑ Unknown Part 5. Soil Vapor: .................................................. ❑ Yes ❑ No ® Suspected ❑ Unknown Part 6. Sub -Slab Soil Vapor: .................................. ® Yes ❑ No ❑ Suspected ❑ Unknown Part 7. Indoor Air: ................................................... ❑ Yes ❑ No ❑ Suspected ® Unknown 2) For the Area of Proposed Redevelopment on the Brownfields Property, attach tabulated data summaries for each impacted media and figure(s) with sample locations. EMP Version 2, January 2021 PART 1. Soil 1) Known or suspected contaminants in soil (list general groups of contaminants): Soil sampling has been completed at the Brownfields property as part of assessment activities documented in Hart & Hickman, P.C.'s (H&H's) Brownfields Assessment Report dated March 17, 2020. A tabular summary of the soil analytical data in comparison to the DEQ's Inactive Hazardous Sites Branch (IHSB) Preliminary Soil Remediation Goals (PSRGs) is included as Table 1 and soil sample locations are shown in Figure 2. A brief summary of the soil assessment results is included below. Volatile Organic Compounds (VOCs) Laboratory analytical results indicated low levels of several VOCs were detected in soil samples above laboratory reporting limits, but below their respective Residential PSRGs. Semi -Volatile Organic Compounds (SVOCs) Laboratory analytical results indicated SVOCs benz(a)anthracene (13.6 milligrams per kilogram [mg/kg] in SB-7 and 5.4 mg/kg in SB-9), benzo(b)fluoranthene (16.9 mg/kg in SB-7 and 6.3 mg/kg in SB-9), and indeno(1,2,3-cd)pyrene (9.2 mg/kg in SB-7 and 2.5 mg/kg in SB-9) were detected at concentrations above the Residential PSRGs. In addition, benzo(a)pyrene (13.3 mg/kg in SB-7 and 4.6 mg/kg in SB-9) was detected at concentrations above the Industrial/Commercial PSRG. No other SVOCs were detected at concentrations above their respective Residential PSRGs. Metals As expected, naturally occurring levels of several metals were detected at concentrations above laboratory reporting limits. Of the metals detected, arsenic was detected at concentrations up to 9.84 mg/kg in the soil sample collected from SB-11, which is above the Industrial/Commercial PSRG, but within published background levels for North Carolina soils. In addition, hexavalent chromium was detected at concentrations up to 4.85 mg/kg in soil sample SB-9, which is above the Residential PSRG. Results of soil assessment activities indicated that lead was detected in soil samples SB-4 (1,870 mg/kg), SB-7 (723 mg/kg) and SB-11 (1,320 mg/kg) at concentrations above the DEQ Residential and/or Industrial/Commercial PSRG, Site -specific background levels, and toxicity characteristic leaching procedure (TCLP) criteria using the Rule of 20. Results of TCLP analyses indicated that the leachate concentrations for soil samples SB-4, SB-7, and SB-11 do not exceed toxicity characteristic levels for lead or any other Resource Conservation and Recovery Act (RCRA) metal. A summary of TCLP laboratory analytical results is included in Table 7. 2) Depth of known or suspected contaminants (feet): 1 to 6 ft below ground surface (bgs) 3) Area of soil disturbed by redevelopment (square feet): 8 EMP Version 2, January 2021 Based on the preliminary site plan and grading plan (Appendices A and B, respectively), up to approximately 248,549 sq ft is expected to be disturbed during redevelopment activities. 4) Depths of soil to be excavated (feet): Grading activities are generally expected to include areas of cut up to approximately 7 ft bgs, excavations of up to approximately 7 ft bgs for installation of stormwater management infrastructure, and excavations of 7 ft or less in other redevelopment areas. A grading plan and cut -fill analysis, and utility plan are included in Appendices B and C, respectively. 5) Estimated volume of soil (cubic yards) to be excavated (attach grading plan): Grading activities are generally expected to include excavation of approximately 2,300 cubic yards (cy) of soil, which will be re -used on -Site as beneficial fill. A grading plan and cut -fill analysis is included in Appendix B. 6) Estimated volume of excavated soil (cubic yards) anticipated to be impacted by contaminants: If impacted soil is encountered, it will be managed as noted in Part 1.A. 7) Estimated volume of contaminated soil expected to be disposed of offsite, if applicable: Excavation of impacted soil for off -Site disposal is not anticipated; however, if warranted, export soil will be managed in accordance with Part 1.C. of this EMP. Part 1.A. MANAGING ONSITE SOIL If soil is anticipated to be excavated fromthe Brownfield Property, relocated on the Brownfields Property, or otherwise disturbed during site grading or other redevelopment activities, please provide a grading plan that clearly illustrates areas of cut and fill (approximate areas & volumes are acceptable, if only preliminarydata available). 1) HAZARDOUS WASTE DETERMINAT a) Does the soil contain a LISTED WASTE as defined in the North Carolina Hazardous Waste Section under 40 CFR Part 261.31-261.35?....................................... ❑Yes ®No ❑ If yes, explain why below, including the level of knowledge regarding processes generating the waste (include pertinent analytical results as needed). Click or tap here to enter text. ❑ If yes, do the soils exceed the "Contained -Out" levels in Attachment 1 of the North Carolina Contained -In Policy? ................................................. ❑ Yes ❑ No b) NOTE: IF SOIL MEETS THE DEFINITION OF A LISTED HAZARDOUS WASTE AND EXCEEDS THE CONTAINED -OUT LEVELS IN ATTACHMENT 1 TO THE NORTH CAROLINA CONTAINED -IN POLICYTHE SOIL MAY NOT BE RE -USED ON SITE AND MUST BE EMP Version 2, January 2021 DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUS WASTE SECTION RULES AND REGULATIONS. c) Does the soil contain a CHARACTERISTIC WASTE? .................................... ❑ Yes ® No ❑ If yes, mark reason(s) why below (and include pertinent analytical results). ❑ Ignitability Click or tap here to enter text. ❑ Corrosivity Click or tap here to enter text. ❑ Reactivity Click or tap here to enter text. ❑ Toxicity Click or tap here to enter text. ❑ TCLP results Click or tap here to enter text. ❑ Rule of 20 results (20 times total analytical results for an individual hazardous constituent on TCLP list cannot, by test method, exceed regulatory TCLP standard) © If no, explain rationale: Results of soil assessment activities indicated that lead was detected in soil samples S13-4 (1,870 mg/kg), S13-7 (723 mg/kg) and SB-11 (1,320 mg/kg) at concentrations above TCLP criteria using the Rule of 20. However, results of TCLP analyses indicated that the leachate concentrations for soil samples S13-4, S13-7, and SB-11 do not exceed toxicity characteristic levels for lead or any other RCRA metal. d) NOTE: IF SOIL MEETS THE DEFINITION OF A CHARACTERISTIC HAZARDOUS WASTE, THE SOIL MAYNOT BE RE -USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUS WASTE SECTION RULES AND REGULATIONS. 2) Screening criteria by which soil disposition decisions will be made (e.g., left in place, capped in place with low permeability barrier, removed to onsite location and capped, removed offsite): ® Preliminary Health -Based Residential SRGs ❑ Preliminary Health -Based Industrial/Commercial SRGs ® Division of Waste Management Risk Calculator (For Brownfields Properties Only) ❑ Site -specific risk -based cleanup level. Please provide details of methods used for determination/explanation. Click or tap here to enter text. Additional comments: Click or tap here to enter text. 3) If known impacted soil is proposed to be reused within the Brownfields Property Boundary, please check the measures that will be utilized to ensure safe placement and documentation of same. EMP Version 2, January 2021 Please attach a proposed location diagram/site map. ❑ Provide documentation of analytical report(s) to Brownfields Project Manager ® Provide documentation of final location, thickness and depth of relocated soil on site map to Brownfields Project Manager once known ❑ Geotextile to mark depth of fill material. Provide description of material: Click or tap here to enter text. ® Manage soil under impervious cap ® or clean fill ® Describe cap or fill: Should impacted soil be encountered during redevelopment, the potentially impacted soil will be concentrated with other potentially impacted soils in non-recreational/open space areas and placed beneath impervious surfaces (asphalt pavement, sidewalks, access roads, buildings, etc.), or a minimum of 2 ft of clean fill, with both scenarios involving notification of placement of potentially impacted soil to DEQ. As it pertains to soils associated with samples which exceed DEQ Residential and/or Industrial PSRGs and Site -specific and/or published background ranges for North Carolina soils (i.e., S13-4, S13-7, S13-9, and S13-11), these soils are located in areas of proposed fill, insignificant cut, and/or beneath future impervious surfaces (Figure 4). ❑ Confer with NC BF Project Manager if Brownfield Plat must be revised (or re -recorded if actions are Post -Recordation). ® GPS the location and provide site map with final location. ❑ Other. Please provide a description of the measure: Click or tap here to enter text. 4) Please describe the following action(s) to be taken during and following excavation and management of site soils: Management of fugitive dust from site ® Yes, describe the method will include: The grading contractor will consider conditions such as wind speed, wind direction, and moisture content of soil during grading and stockpiling (if warranted) activities to minimize dust generation. In the unlikely event that contaminated soil is encountered during Site redevelopment that requires excavation, particular attention will be paid by contractors to implement dust control measures as needed based on Site and atmospheric conditions (i.e., by controlled water application, hydro -seeding, and/or mulch, stone, or plastic cover). Should dust control measures be warranted, the contractor will contact the project environmental professional and the project environmental professional will contact the DEQ 11 EMP Version 2, January 2021 Brownfields project manager within two business days to advise that person of the condition. Potentially impacted soil will be managed as described below. ❑ No, explain rationale: Click or tap here to enter text. Field Screening of site soil ® Yes, describe the field screening method, frequency of field screening, person conducting field screening: During soil disturbance at the Site, the workers or contractors will observe soils for evidence of potential impacted soil, such as a distinct unnatural color, strong odor, or filled or previously disposed materials of concerns (i.e., chemicals, tanks, drums, etc.). Should the above be noted during Site work, the contractor will contact the project environmental professional to observe the suspect condition. If the project environmental professional confirms that the material may be impacted, then the procedures below will be implemented. In addition, the environmental professional will contact the DEQ Brownfields project manager within two business days to advise that person of the condition. During disturbance of soils in the vicinity of samples SB-4, SB-7, SB-9, and SB-11, the project environmental professional will be on -Site to observe grading activities. ❑ No, explain rationale: Click or tap here to enter text. Soil Sample Collection ❑ Yes, describe the sampling method (e.g., in -situ grab, composite, stockpile, etc.): Click or tap here to enter text. ® No, explain rationale: Collection of additional soil samples is not anticipated based on results of previous Site assessment activities. If significant soil impact is encountered during grading and/or installation or removal of utilities, excavation will proceed only as far as needed to allow grading and/or construction of the utility to continue and/or only as far as needed to allow alternate corrective measures described below. Suspect significantly impacted soil excavated during grading and/or utility line installation or removal may be stockpiled and covered in a secure area to allow construction to progress. Suspect impacted soil will be underlain by and covered with minimum 10-mil plastic sheeting. Specifically, one representative sample of the soil will be collected for analysis of VOCs, SVOCs, and RCRA metals at a frequency of one sample per approximately 500 to 2,000 cy. If the results of analysis indicate that the soil could potentially exceed toxicity characteristic hazardous 12 EMP Version 2, January 2021 waste criteria, then the soil will also be analyzed by TCLP for those compounds that could exceed the toxicity characteristic hazardous waste criteria. Impacted soil will be handled in the manner described below based upon the laboratory analyses: i. If no organic compounds are detected in a sample (other than those attributable to sampling or laboratory artifacts [subject to DEQ review and approval]) and metals are below Residential PSRGs or are consistent with Site -specific and/or published background ranges for North Carolina soils, then the soil will be deemed suitable for use as on -Site fill or as off -Site fill. The proposed location(s) for off -Site placement of soil (other than a permitted facility), other applicable off -Site information (i.e., sampling results, if available), and the receiving facility's written approval for acceptance of the soil will be provided to DEQ for approval prior to taking the soil off -Site. If detectable levels of compounds are found which do not exceed the DEQ Residential PSRGs (other than which are attributable to sampling or laboratory artifacts for which DEQ is the arbiter, or which are consistent with Site -specific and/or published background ranges for metals in North Carolina soils) and the TCLP concentrations are below hazardous waste criteria, then the soil may be used on -Site as fill without conditions. iii. If detectable levels of compounds are found which exceed the DEQ Residential PSRGs (other than which are attributable to sampling or laboratory artifacts for which DEQ is the arbiter, or which are consistent with Site -specific and/or published background ranges for metals in North Carolina soils) and the TCLP concentrations are below hazardous waste criteria, then the soil, with DEQ's written approval, may be used on -Site as fill in non-recreational/open space areas and below an impervious surface, or at least 2 ft of compacted clean soil. If the impacted soil with concentrations above Residential PSRGs is moved to an on -Site location, its location and depth will be documented, covered with a geotextile fabric so that its location can be identified if encountered in the future, and its location will be provided to DEQ and identified on the Brownfields plat (if not already recorded with the executed Brownfields Agreement). iv. Impacted soil may be transported to a permitted facility such as a Subtitle D lined landfill. Transport to another permitted facility such as an LCID or C&D landfill will require DEQ's prior written approval and comparison to site -specific concentrations from the receiving facility. If soil is transported to a permitted facility, the permitted facility's written approval to dispose of soil from the Site will be included with the final EMP report. In the unlikely event that the sample data indicates concentrations above TCLP hazardous waste criteria, then the soil must be transported off -Site to a permitted disposal facility that can accept or treat hazardous waste. V. If soil export is necessary, the procedure(s) in Part 1.c. Export Soils will be followed. If soil samples are collected for analysis, please check the applicable chemical analytes: ® Volatile organic compounds (VOCs) by EPA Method 8260 ® Semi -volatile organic compounds (SVOCs) by EPA Method 8270 13 EMP Version 2, January 2021 ® Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): EPA Methods 6020/7471 ❑ Pesticides: Specify Analytical Method Number(s): UICK or tap nere to enter text. ❑ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. © Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Specify Analytical Method Number(s): Soil samples will be collected for hexavalent chromium and put on hold for potential analysis by EPA Method 7199. The laboratory will be directed to hold all hexavalent chromium analyses pending the results of the total chromium analyses. If total chromium is detected in any of the soil samples above the current hexavalent chromium Residential PSRG, the sample exhibiting the highest total chromium concentration will be analyzed for hexavalent chromium. If hexavalent chromium is detected in that sample above the current hexavalent chromium Residential PSRG, the remaining soil samples may be analyzed for hexavalent chromium subject to approval by DEQ Brownfields. ® Check to confirm that stockpiling of known or suspected impacted soils will be conducted in accordance with Figure 1 of this EMP. Stockpile methodology should provide erosion control, prohibiting contact between surface water/precipitation and contaminated soil, and preventing contaminated runoff. Explain any variances or provide additional details as needed: lick or tap here to enter text. ® Final grade sampling of exposed native soil (i.e., soil that will not be under buildings or permanent hardscape). Select chemical analyses for final grade samples with check boxes below (Check all thatapply): ® Volatile organic compounds (VOCs) by EPA Method 8260 ® Semi -volatile organic compounds (SVOCs) by EPA Method 8270 ® Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): EPA Methods 6020/7471 ❑ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. 14 EMP Version 2, January 2021 ❑ PCBs: Specify Analytical Method Number(s): Click or tap here to ente-+- ® Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Soil samples will be collected for hexavalent chromium and put on hold for potential analysis by EPA Method 7199. The laboratory will be directed to hold all hexavalent chromium analyses pending the results of the total chromium analyses. If total chromium is detected in any of the soil samples above the current hexavalent chromium Residential PSRG, the sample exhibiting the highest total chromium concentration will be analyzed for hexavalent chromium. If hexavalent chromium is detected in that sample above the current hexavalent chromium Residential PSRG, the remaining soil samples may be analyzed for hexavalent chromium subject to approval by DEQ Brownfields. Please provide a scope of work for final grade sampling, including a diagram of soil sampling locations, number of samples to be collected, and brief sampling methodology. Samples should be collected from 0-2 ft below ground surface, with the exception of VOCs which should be taken from 1-2 ft below ground surface. Alternatively, indicate if a work plan for final grade sampling may be submitted under separate cover. nick or tap here to enter text. ❑ If final grade sampling was NOT selected, please explain rationale: Following completion of soil disturbance for any discrete future Site development (i.e., after grading and utility construction), an environmental professional will be contracted to assess residential development areas of high foot traffic for surfaces that are not covered with a minimum of 2 ft of clean fill soil or topsoil, building foundations, sidewalks, asphalt or concrete parking areas, driveways or other impervious surfaces. Specific attention will be paid to identify recreational and open space areas that will be frequented by the users of the Brownfields property. If such areas exist, a Work Plan will be prepared for final grade sampling for DEQ review and approval. If no such areas exist, documentation will be provided to DEQ. Part 1.13. IMPORTED FILL SOIL NO SOIL MAY BE BROUGHT ONTO THE BROWNFIELDS PROPERTY WITHOUT PRIOR APPROVAL FROM THE BROWNFIELDS PROGRAM. According to the Brownfields IR 15, "Documenting imported soil (by sampling, analysis, and reporting in accordance with review and written approval in advance by the Brownfields Program), will safeguard the liability protections provided by the brownfields agreement and is in the best interest of the prospective developer/property owner." Requirements for importing fill: EMP Version 2, January 2021 1) Will fill soil be imported to the site? ................................................ © Yes ❑ No ❑ Unknown 2) If yes, what is the estimated volume of fill soil to be imported? Approximately 12,500 cy of soil will be imported to the Site to reach final proposed grades. 3) If yes, what is the anticipated depth that fill soil will be placed at the property? (If a range of depths, please list the range.) Fill soils are planned to be placed at the Site at depths up to approximately 11 feet. A cut/fill analysis is included in Appendix B. 4) Provide the source of fill, including: location, site history, nearby environmental concerns, etc. Attach aerial photos, maps, historic Sanborn maps and a borrow source site history: The borrow source for fill material is unknown at this time. Upon determination of the borrow source, DEQ will be notified for pre -approval and the procedures outlined below will be implemented. 5) PRIOR TO ITS PLACEMENT AT THE BROWNFIELDS PROPERTY, provide a plan to analyze fill soil to demonstrate that it meets acceptable standards applicable to the site and can be approved for use atthe Brownfields property. The PD plans to import limited amounts of organic rich topsoil from a commercial landscape material vendor for use in proposed landscaped areas. The PD does not plan to collect samples of landscaping materials prior to placement at the Site; however, DEQ Brownfields will be notified of the volume of landscaping material needed and the proposed source of the material prior to placement in proposed landscaping areas. See No. 7 below for details outlining the proposed plan to demonstrate import soil meets acceptable standards to the Site. 6) Please check the applicable chemical analytes for fill soil samples. (Check all that apply): © Volatile organic compounds (VOCs) by EPA Method 8260 ® Semi -volatile organic compounds (SVOCs) by EPA Method 8270 ® Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): EPA Methods 6020/7471 ❑ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter texl ❑ PCBs: Specify Analytical Method Number(s): Click or tdF, „— 1i EMP Version 2, January 2021 ® Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Hexavalent Chromium by EPA Method 7199 7) The scope of work for import fill sampling may be provided below or in a Work Plan submitted separately for DEQ review and approval. Attach specific location maps for in -situ borrow sites. If using a quarry, provide information on the type of material to be brought onto the Brownfields Property. The PD will follow the procedures outlined below to demonstrate import soil meets acceptable criteria for Site use. If the PD plans to import virgin fill material from a DEQ Brownfields pre -approved borrow source (such as the Wake Stone Corporation quarry located in Knightdale, North Carolina), no samples of the import material will be collected because adequate analytical data is available in the DEQ Brownfields database to demonstrate material from these facilities is suitable for use as structural fill at a Brownfields property. If fill soil (other than topsoil) is obtained from an off -Site property that is not a known permitted quarry or is recycled material from a DEQ Brownfields pre -approved borrow source, the borrow source will be sampled in general accordance with the most recent versions of the U.S. Environmental Protection Agency (EPA) Region IV Science and Ecosystem Support Division (SESD) Field Branches Quality System and Technical Procedures guidance. If the proposed borrow material is a byproduct of crushing stone (referred to as "fines") from a permitted quarry, no samples will be collected for laboratory analysis. If the proposed borrow source is soil from a permitted quarry, one soil sample will be collected for laboratory analysis. If the proposed borrow source has not been previously developed (i.e., virgin land), soil samples will be collected for laboratory analysis at a general rate of approximately one per 1,000 cubic yards. If the borrow source property has been previously developed, soil samples will be collected for laboratory analysis at a general rate of approximately one per 500 cubic yards. Specifically, soil samples for the above scenarios will be collected using a hand auger. For metals and SVOC analyses, a composite sample will be comprised of soil from four grab sample locations (i.e., aliquots). The composite soil samples will be collected directly into dedicated laboratory - supplied sample containers and submitted to a North Carolina certified laboratory under standard chain of custody protocols for analysis of SVOCs by EPA Method 8270 and RCRA metals plus hexavalent chromium by EPA Methods 6020/7471/7199. For VOC analysis, one representative grab soil sample will also be collected. The grab soil samples will be collected from undisturbed portions of soil directly into laboratory -supplied glassware for laboratory analysis of VOCs by EPA Method 8260. The DEQ Brownfields project manager will be contacted should an alternate sampling frequency be sought for either type of borrow source property. EMP Version 2, January 2021 Fill soil will be considered suitable for use at the Site if it does not contain compound concentrations above DEQ Residential PSRGs, DEQ Risk Calculator risk thresholds, or typical metals concentrations which are consistent with published background ranges for metals in regional soils. DEQ approval of the analytical results will be obtained prior to transporting import soil to the Site. Part 1.C. EXPORTED SOIL NO SOIL MAY LEAVE THE BROWNFIELDS PROPERTY WITHOUT APPROVAL FROM THE BROWNFIELDS PROGRAM. FAILURE TO OBTAIN APPROVAL MAY VIOLATE A BROWNFIELDS AGREEMENT CAUSING A REOPENER OR JEOPARDIZING ELIGIBILITY IN THE PROGRAM, ENDANGERING LIABILITY PROTECTIONS AND MAKING SAID ACTION POSSIBLY SUBJECT TO ENFORCEMENT. JUSTIFICATIONS PROVIDED BELOW MUST BE APPROVED BY THE PROGRAM IN WRITING PRIOR TO COMPLETING TRANSPORT ACTIVITIES. Please refer to Brownfields IR 15 for additional details. 1) If export from a Brownfields Property is anticipated, please provide details regarding the proposed export actions. Volume of exported soil, depths, location from which soil will be excavated on site, related sampling results, etc. Provide a site map with locations of export and sampling results included. Export soil is not anticipated at this time. However, should soil need to be exported from the Brownfields property during redevelopment, soil will be sampled in general accordance with the most recent versions of the EPA Region IV SESD Field Branches Quality System and Technical Procedures guidance. Samples will be collected from export soil at a rate of one sample for every approximately 1,000 cubic yards of export for laboratory analysis of VOCs by EPA Method 8260, SVOCs by EPA Method 8270, and RCRA metals by EPA Methods 6020/7471. SVOCs and metals will be collected as composite samples using a decontaminated stainless -steel hand auger. Soil samples will also be collected for hexavalent chromium and put-on hold for potential analysis by EPA Method 7199. The laboratory will be directed to hold hexavalent chromium analyses pending the results of the total chromium analyses. If total chromium is detected in the soil samples above the current hexavalent chromium Residential PSRG, the sample exhibiting the highest total chromium concentration will be analyzed for hexavalent chromium. If hexavalent chromium is detected in that sample above the current hexavalent chromium Residential PSRG, the remaining soil samples may be analyzed for hexavalent chromium subject to approval by DEQ Brownfields. For each soil sample, three individual sample aliquots will be collected and be combined to form one sample for laboratory analysis of metals and SVOCs. The aliquots will also be field screened for the presence of VOCs using a calibrated photoionization detector (PID). In the general area of the aliquot which exhibits the highest indication of impact during field screening, a grab sample will be collected using a decontaminated stainless -steel hand auger for analysis of VOCs. The soil samples will be placed in dedicated laboratory -supplied sample containers, covered with ice, and 18 EMP Version 2, January 2021 shipped to a North Carolina -certified laboratory under standard chain of custody protocols. DEQ approval of the analytical results will be obtained prior to transporting export soil from the Site. Based on analytical results of soil samples collected from the export soil, and if applicable, other applicable off -Site information (i.e., sampling results, if available), the soil will be transported off -Site to a suitable permanent location. The PD will notify DEQ Brownfields of the location receiving the export soil. If not a permitted facility, DEQ Brownfields approval and written approval from the receiving facility will be obtained prior to transporting the soil off -Site. 2) To what type of facility will the export Brownfields soil be sent? © Subtitle D/Municipal Solid Waste Landfill (analytical program to be determined by landfill) ® Permitted but Unlined Landfill (i.e. LCID, C&D, etc.) Analytical program to be determined by the accepting Landfill; ® Landfarm or other treatment facility © Use as fill at another suitable Brownfields Property — determination that a site is suitable will require, at a minimum, that similar concentrations of the same or similar contaminants already exist at both sites, use of impacted soil will not increase the potential for risk to human health and the environment at the receiving Brownfields property, and thata record of the acceptance of such soil from the property owner of the receiving site is provided to Brownfields. Please provide additional details below. ® Use as Beneficial Fill off -site at a non-Brownfields Property - Please provide documentation of approval from the property owner for receipt of fill material. This will also require approval by the DEQ Solid Waste Section. Additional information is provided in IR 15. Please provide additional details below. 3) Additional Details: (if transfer of soil to another property is requested above, please provide details related to the proposed plans). The environmental professional will contact DEQ Brownfields to obtain DEQ Brownfields and DEQ Solid Waste approval prior to exporting soil to a non-Brownfields property or lined Subtitle D MSW landfill. Part 1.D. MANAGEMENT OF UTILITY TRENCHES ❑ Install liner between native impacted soils and base of utility trench before filling with clean fill (Preferred) ® Last out, first in principle for impacted soils (if soil can safely be reused onsite and is not hazardous waste), i.e., impacted soils are placed back at approximately the depths theywere removed from such that impacted soil is not placed at a greater depth than the original depth from which it was excavated. EMP Version 2, January 2021 ❑ Evaluate whether necessary to install barriers in conduits to prevent soil vapor transport, and/or degradation of conduit materials due to direct impact with contaminants? ❑ If yes, provide specifications on barrier materials or provide the results of this evaluation in the Vapor Mitigation Plan. Note that if vapor mitigation is planned for site buildings, utility corridors will need to be evaluated as part of mitigation designs: Click or tap here to enter text. ❑ If no, include rationale here: ® Unknown, details to be provided in the Vapor Mitigation Plan for site buildings Other comments regarding managing impacted soil in utility trenches: Although not anticipated, in the event contaminated soil and/or vapors (based on unusual odors) are encountered in utility trenches during redevelopment activities, the trench will be evacuated and appropriate safety screening (i.e., with a calibrated photoionization detector [PID] and/or similar instrument depending on the conditions) of the vapors will be performed to protect workers. If results indicate further action is warranted in response to vapors to protect workers, appropriate engineering controls (such as use of industrial fans) will be implemented. The contractor and workers will observe soil for potential impacts during utility installation activities. Evidence of potential impacted soil includes a distinct unnatural color, strong odor, or filled or previously disposed materials of concerns (i.e., chemicals, tanks, drums, etc.). Should the above be noted during utility work, the contractor will contact the project environmental professional to observe the suspect condition. If the project environmental professional confirms that the material may be impacted, then the procedures outlined Managing On -Site Soil above will be implemented. In addition, the environmental professional will contact the DEQ Brownfields project manager within two business days to advise that person of the condition. PART 2. GROUNDWATER 1) What is the depth to groundwater at the Brownfields Property? Based upon groundwater assessment activities conducted at the Site, groundwater is generally present at depths of approximately 7 to 20 ft bgs. 2) Is groundwater known to be contaminated by ®onsite ❑offsite ❑both or ❑unknown sources? Describe source(s): Groundwater assessment activities conducted at the Brownfields property have identified the presence of benzene, bromodichloromethane, ethylbenzene, naphthalene, tetra chloroethylene (PCE), toluene, total xylenes, 1-methylnapthalene, 2-methylnaphthalene, bis(2- 20 EMP Version 2, January 2021 ethyl hexyl)phthaIate, and total chromium at concentrations above the DEQ 2L Groundwater Quality Standards (2L Standards). 3) What is the direction of groundwater flow at the Brownfields Property? Groundwater flow direction at the Brownfields property is generally expected to flow towards Rocky Branch Creek, which is located in the north and eastern portions of the Site. 4) Will groundwater likely be encountered during planned redevelopment activities? ❑Yes ®No If yes, describe these activities: Groundwater is not expected to be encountered during redevelopment activities. However, if groundwater is encountered, the PD or the PD's contractor will contact the project environmental professional. The environmental professional will update the DEQ Brownfields project manager within two business days. Regardless of the answer; in the event that contaminated groundwater is encountered during redevelopment activities (even if no is checked above), list activities for contingent management of groundwater (e.g., dewateringof groundwater from excavations or foundations, containerizing, offsite disposal, discharge to sanitary sewer, NPDES permit, or sampling procedures). Although not anticipated, if groundwater is encountered during installation of foundation infrastructure, appropriate worker safety measures will be undertaken if groundwater gathers in an open excavation within an area determined to be impacted (based on strong odor, unnatural color, sheen, etc.) during construction activities. The contractor will contact the environmental professional to observe the suspected condition. The accumulated water will be allowed to evaporate/infiltrate to the extent time for dissipation does not disrupt the construction schedule. Should the time needed for natural dissipation of accumulated water be deemed inadequate, the water will be tested for the presence of VOCs, SVOCs, and RCRA metals and disposed off -Site (if impacted), or tested and discharged to the storm sewer (if not impacted above Title 15A NCAC 2B Surface Water Standards [213 Standards] and not considered listed hazardous waste) in accordance with applicable municipal and State regulations for erosion control and construction stormwater control. Documentation of approvals, if applicable, will be provided to DEQ Brownfields. The volume of groundwater that will require management during foundation installations is unknown, as it is largely dependent on Site -specific geological and hydrogeological conditions. The minority of drilling spoils is anticipated to be saturated soil, which will be managed as noted in Part 1.A. and Part 1.C. If free -flowing groundwater can be reasonably captured, it will be pumped to lined and covered roll -off containers or an aboveground tank prior to testing for the presence of VOCs, SVOCs, and RCRA metals. The groundwater will then be disposed off -Site (if impacted) or discharged to the storm sewer (if not impacted above 2B Standards and not considered listed and/or characteristic hazardous waste). Alternatively, additional groundwater 21 EMP Version 2, January 2021 sampling may be conducted under a DEQ-approved work plan in the areas of foundation installations to evaluate contaminant concentrations for potential discharge to storm sewer. Local officials will be contacted for approval prior to discharge of groundwater to the storm sewer. Documentation of approvals, if applicable, will be provided to DEQ Brownfields. 5) Are monitoring wells currently present on the Brownfields Property?.................❑XYes ❑No If yes, are any monitoring wells routinely monitored through DEQ or other agencies?..................................................................................................................❑Yes ®No 6) Please check methods to be utilized in the management of known and previously unidentified wells. © Abandonment of site monitoring wells in accordance with all applicable regulations. It is the Brownfields Program's intent to allow proper abandonment of well(s) as specified in the Brownfields Agreement, except if required for active monitoring through another section of DEQ or the EPA. ❑ Location of existing monitoring wells marked ❑ Existing monitoring wells protected from disturbance ❑ Newly identified monitoring wells will be marked and protected from further disturbance until notification to DEQ Brownfields can be made and approval for abandonment is given. 7) Please provide additional details as needed: Monitoring wells MW-3 and MW-7 (Figure 3) were installed during historical UST assessment activities in the northern portion of the Brownfields property and will be abandoned as part of redevelopment activities. Please note, disturbance of existing site monitoring wells without approval by DEQ is not permissible. If monitoring wells are damaged and/or destroyed, DEQ may require that the PD be responsible for replacement of the well. PART 3. SURFACE WATER 1) Is surface water present at the property? ® Yes ❑ No ❑ Unknown 2) Attach a map showing the location of surface water at the Brownfields Property. 3) Is surface water at the property known to be contaminated? ® Yes ❑ No 4) Will workers or the public be in contact with surface water during planned redevelopment activities? ❑ Yes ® No 5) In the event that contaminated surface water is encountered during redevelopment activities, or clean surface water enters open excavations, list activities for management of such events (e.g. flooding, contaminated surface water run-off, stormwater impacts): EMP Version 2, January 2021 If surface water run-off gathers in an open excavation within an area determined to be impacted during construction activities, appropriate worker safety measures will be undertaken. The accumulated water will be allowed to evaporate/infiltrate to the extent time for dissipation does not disrupt the construction schedule. Should the time be needed for natural dissipation of accumulated water be deemed inadequate, the water will be tested and disposed off -Site (if impacted), or tested and discharged to the storm sewer (if not impacted above 2B Standards and not considered listed hazardous waste) in accordance with applicable municipal and State regulations for erosion control and construction stormwater control. Documentation of approvals, if applicable, will be provided to DEQ Brownfields. PART 4. SEDIMENT 1) Are sediment sources present on the property? ® Yes ❑ No 2) If yes, is sediment at the property known to be contaminated: ® Yes ❑ No ❑ Unknown 3) Will workers or the public be in contact with sediment during planned redevelopment activities? ❑ Yes ® No 4) Attach a map showing location of known contaminated sediment at the property. 5) In the event that contaminated sediment is encountered during redevelopment activities, list activities for management of such events (stream bed disturbance): Not applicable. PARTS. SOIL VAPOR 1) Do concentrations of volatile organic compounds at the Brownfields property exceed the following vapor intrusion screening levels (current version) in the following media: IHSB Residential Screening Levels: Soil Vapor: ........... ❑ Yes ❑ No © Unknown Groundwater:.....® Yes ❑ No ❑ Unknown IHSB Industrial/Commercial Screening Levels: Soil Vapor: ........... ❑ Yes ❑ No ® Unknown Groundwater:.....® Yes ❑ No ❑ Unknown 2) Attach a map showing the locations of soil vapor contaminants that exceed site screening levels. 3) If applicable, at what depth(s) is soil vapor known to be contaminated? EMP Version 2, January 2021 Click or tap here to enter text. 4) Will workers encounter contaminated soil vapor during planned redevelopment activities? ❑ Yes ❑ No ❑X Unknown In the event that contaminated soil vapor is encountered during redevelopment activities (trenches, manways, basements or other subsurface work,) list activities for management of such contact: In the unlikely event impacted soil vapors are encountered during future redevelopment activities, worker breathing zone will be monitored using a calibrated PID detector. If results indicate further action is warranted, appropriate engineering controls (such as use of industrial fans) will be implemented. PART 6. SUB -SLAB SOIL VAPOR 1) Do concentrations of volatile organic compounds at the Brownfields property exceed the following vapor intrusion screening levels (current version) in sub -slab soil vapor: IHSB Residential Screening Levels: Soil Vapor:...........© Yes ❑ No ❑ Unknown Groundwater:.....® Yes ❑ No ❑ Unknown IHSB Industrial/Commercial Screening Levels: Soil Vapor:...........® Yes ❑ No ❑ Unknown 2) Groundwater: ..... ❑x Yes ❑ No ❑ Unknown If data indicate that sub -slab soil vapor concentrations exceed screening levels, attach a map showing the location of these exceedances. 3) At what depth(s) is sub -slab soil vapor known to be contaminated? 90-6 inches ❑Other, please describe: LaN I � enter teAL. 4) Will workers encounter contaminated sub -slab soil vapor during planned redevelopment activities? ❑ Yes ❑ No ❑X Unknown ❑ If no, include rationale here: Click or tap here to enter text. In the event that contaminated soil vapor is encountered during redevelopment activities, list activities for management of such contact In the unlikely event impacted soil vapors are encountered during future redevelopment activities, worker breathing zone will be monitored using a calibrated PID. If results indicate further action is warranted, appropriate engineering controls (such as use of industrial fans) will be implemented. Based upon the proposed redevelopment plans and Site assessment results, 2 i' EMP Version 2, January 2021 exposure of workers to significant soil vapor impacts is not anticipated. PART 7. INDOOR AIR 1) Are indoor air data available for the Brownfields Property? ❑ Yes ® No ❑ Unknown 2) Attach a map showing the location(s) where indoor air contaminants exceed site screening levels. 3) If the structures where indoor air has been documented to exceed risk -based screening levels will not be demolished as part of redevelopment activities, will workers encounter contaminated indoor air during planned redevelopment activities? ❑ Yes ❑ No ❑ Unknown ❑ If no, include rationale here: CH,— —,here too f r+ov+ In the event that contaminated indoor air is encountered during redevelopment activities, list activities for management of such contact: In the unlikely event there is evidence of potential indoor air issues (i.e., unusual odors) during future redevelopment activities, the area will be evacuated and appropriate safety screening of the indoor air will be performed. If warranted, safety screening procedures will include periodically screening indoor air for volatile organic vapors with a calibrated PID and calibrated methane gas detector. If results indicate further action is warranted, appropriate engineering controls (such as use of industrial fans) will be implemented. VAPOR INTRUSION MITIGATION SYSTEM Is a vapor intrusion mitigation system (VIMS) proposed for this Brownfields Property? © Yes ❑ No ❑ Unknown ❑ If no or unknown, include rationale here as well as plans for pre -occupancy sampling, as necessary: 'lick or tap here `,) ent— tex If yes, ❑ VIMS Plan Attached or © VIMS Plan to be submitted separately If submitted separately provide date: The PD understands that the Brownfields Program is requesting pre -occupancy vapor intrusion assessment following construction of the Site buildings. As such, the PD is electing to proactively install vapor intrusion mitigation systems (VIMSs) in the proposed Site buildings. VIMS details will EMP Version 2, January 2021 be provided to DEQ Brownfields under separate cover. VIMS Plan shall be signed and sealed by a NC Professional Engineer If no, please provide a brief rationale as to why no vapor mitigation plan is warranted: Note that approval of this EMP does not imply approval with any vapor intrusion mitigation land use restrictions or requirements of the recorded or draft Brownfields Agreement and that separate approval of mitigation measures will be required. CONTINGENCY PLAN — encountering unknown tanks, drums, or other waste materials In this section please provide actions that will be taken to identify or manage unknown potential new sources of contamination. During redevelopment activities, it is not uncommon that unknown tanks, drums, fuel lines, landfills, orother waste materials are encountered. Notification to DEQ Brownfields Project Manager, UST Section, Fire Department, and/or other officials, as necessary and appropriate, is required when new potential source(s) of contamination are discovered. These Notification Requirements were outlined on Page 1 of this EMP. Should potentially impacted materials be identified that are inconsistent with known site impacts, the DEQ Brownfields Project Manager will be notified and a sampling plan will be prepared based on the EMP requirements and site -specific factors. Samples will generally be collected to document the location of the potential impacts. Check the following chemical analysis that are to be conducted on newly identified releases: ® Volatile organic compounds (VOCs) by EPA Method 8260 ® Semi -volatile organic compounds (SVOCs) by EPA Method 8270 ® Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver) EPA Method 6020 and EPA Method 7471 ❑ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ❑ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text © Other Constituents & Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.) Please note, if field observations indicate the need for additional analyses, they should be conducted, even if not listed here. Soil samples will be collected for hexavalent chromium and put on hold for potential analysis by EPA Method 7199. The laboratory will be directed to hold all hexavalent EMP Version 2, January 2021 chromium analyses pending the results of the total chromium analyses. If total chromium is detected in any of the soil samples above the current hexavalent chromium Residential PSRG, the sample exhibiting the highest total chromium concentration will be analyzed for hexavalent chromium. If hexavalent chromium is detected in that sample above the current hexavalent chromium Residential PSRG, the remaining soil samples may be analyzed for hexavalent chromium subject to approval by DEQ Brownfields. Please provide details on the proposed methods of managing the following commonly encountered issues during redevelopment of Brownfields Properties. During construction activities, contractors may encounter unknown subsurface environmental conditions (i.e., tanks, drums, or waste materials) that if encountered, will require proper management. Prior to beginning Site work, H&H will attend a pre -construction meeting with the PD and the redevelopment contractors to discuss the DEQ approved EMP and various scenarios when it would be appropriate and necessary to notify H&H of the discovery of unknown subsurface features or potentially impacted media at the Site. In the event that such conditions are encountered during Site development activities, the environmental actions noted below will be used to direct environmental actions to be taken during these activities, and sampling data for potentially impacted soil and the disposition of impacted soil will be provided to DEQwhen the data becomes available. In addition, the environmental professional will contact the DEQ Brownfields project manager within two business days to advise that person of the condition Underground Storage Tanks: In the event a UST or impacts associated with a UST release are discovered at the Site during redevelopment activities, the UST and/or UST related impacts will be addressed through the Brownfields Program in accordance with the DEQ UST Section Guidance: Guidelines for Site Checks, Tank Closure and Initial Response and Abatement, May 17, 2021 version (UST Guidance) except that the collection of MADEP samples will not be necessary. If a UST is encountered, DEQ will be notified and the UST will be removed and transported off -Site for disposal at a suitable facility. If the UST contains residual fluids, the fluids will be sampled for VOCs, SVOCs, and RCRA metals, and transported off -Site for disposal at a suitable facility based on the laboratory analytical results prior to removing the UST from the ground. If a UST is encountered that cannot be removed or does not require removal for geotechnical or construction purposes, with DEQ prior approval it will be abandoned in -place and construction will proceed. Impacted soil in the vicinity of the UST will be managed in accordance with the Managing On -Site Soil section outlined above in the EMP. Impacted soil will be removed and confirmation samples will be collected from the base and sidewalls of the UST excavation, and along any product lines at a rate of 1 sample for every 10 feet of line. The analytical program will consist of EPA Methods 8260, 8270, and RCRA metals. 27 EMP Version 2, January 2021 Sub -Grade Feature/Pit: If a sub -grade feature or pit is encountered and does not require removal for geotechnical or construction purposes, DEQ Brownfields will be notified and the feature or pit will be filled with soil or suitable fill and construction will proceed. Where appropriate, the bottom may be penetrated before back filling to prevent fluid accumulation. If the pit has waste in it, the waste may be set aside in a secure area and will be sampled for waste disposal purposes for TCLP VOCs, TCLP SVOCs, and TCLP metals and disposed off -Site at a permitted facility or the waste will be managed in accordance with the Managing On -Site Soil section outlined above in the EMP, whichever is most applicable based on the type of waste present. If the pit must be removed and the observed waste characteristics indicate the concrete may potentially be contaminated, the concrete will be sampled and analyzed by methods specified by the disposal facility. Confirmation samples will be collected from the base and sidewalls of the excavation. The analytical program will consist of EPA Methods 8260, 8270, and RCRA metals. Buried Waste Material — Note that if buried waste, non-native fill, or any obviously filled materials is encountered, the DEQ Brownfields Program must be notified to determine if investigation of landfill gases is required: If excavation into buried wastes or impacted soils occurs, the contractor is instructed to stop work in that location and notify the environmental consultant, who will then notify the DEQ Brownfields Program. The environmental consultant will review the materials and collect confirmation samples at representative locations in the base and the sidewalls of the excavation after the waste or impacted soil is removed. The confirmation samples will be analyzed for VOCs, SVOCs, and RCRA metals. Areas of suspected contaminated soil that remain at the Site after excavation is complete above the DEQ IHSB Residential PSRGs will be managed pursuant to this plan. Re -Use of Impacted Soils On -Site: Please refer to description outlined in the Managing On -Site Soil section of the EMP above. If unknown, impacted soil is identified on -site, management on -site can be considered after the project team provides the necessary information, outlined in Part I.A. Item 11, for Brownfields Project Manager approval prior to final placement on -site. If other potential contingency plans are pertinent, please provide other details or scenarios as needed below: Click or tap here to enter text. 28 EMP Version 2, January 2021 POST -REDEVELOPMENT REPORTING ® Check this box to acknowledge that a Redevelopment Summary Report will be required for the project. If the project duration is longer than one year, an annual update is required and will be due by January 31 of each year, or 30 days after each one-year anniversary of the effective date of this EMP (as agreed upon with the Project Manager). These reports will be required for as long as physical redevelopment of the Brownfields Property continues, except that the final Redevelopment Summary Report will be submitted within 90 days after completion of redevelopment. Based on the estimated construction schedule, the first Redevelopment Summary Report is anticipated to be submitted on 1/31/2022 The Redevelopment Summary Report shall include environment -related activities since the last report, with a summary and drawings, that describes: 1. actions taken on the Brownfields Property; 2. soil grading and cut and fill actions; 3. methodology(ies) employed for field screening, sampling and laboratory analysis of environmental media; 4. stockpiling, containerizing, decontaminating, treating, handling, laboratory analysis and ultimate disposition of any soil, groundwater or other materials suspected or confirmed to be contaminated with regulated substances; and 5. removal of any contaminated soil, water or other contaminated materials (for example, concrete, demolition debris) from the Brownfields Property (copies of all legally required manifests shall be included). X❑ Check box to acknowledge consent to provide a NC licensed P.G. or P.E. sealed, Redevelopment Summary Report in compliance with the site's Brownfields Agreement. 29 EMP Version 2, January 2021 APPROVAL SIGNATURES Brownfields Project Number: 21050-17-092 Brownfields Project Name: South Saunders Street Assemblage Prospective Developer: Kane Realty Corporation Date ck or tap to enter a dat, Printed Name/Title/Company: Mr. Drew Yates / Senior Development Manager / Kane Realty Corporation Consultant: Hart & Hickman, PC Date Click or tap to enter a date. Printed Name/Title/Company: Mr. Justin Ballard, P.G. / Project Manager / Hart & Hickman, PC /l QAq' L�? �fv�l?i December 8, 2021 BrownfieloPr(64ct Ma#ger: Mr. Kelly Johnson Date Click or tap to enter a dat( EMP Version 2, January 2021 Figure 1 NCBP Diagram for Temporary Containment of Impacted or Potentially Impacted Soil Cross -Section View Top Plastic Cover Sheeting: Underliner: 1 layer, minimum of 10 (1 Layer, minimum: 10 mil thick) mil thick plastic Berm (Straw bales, composted earth, etc.) Land Surface \ z Straw Bale Berm 0 Weight (If plastic cover used) Contaminated Soils I' \ Map View ■ E:1 [0c ght .1, ..................... .......... . . 5�ZNj Contaminated Soils .. ....................................................... 000 o Plastic \ Sheeting Note: Adapted from NC DEQ UST Section "Guidelines for Ex Situ Petroleum Contaminated Soil Remediation" dated December, 1, 2013 32 EMP Version 2, January 2021 APPROXIMATE w 0 2000 4000 SCALE IN FEET U.S.G.S. QUADRANGLE MAP RALEIGH WEST, NORTH CAROLINA, 2002 QUADRANGLE 7.5 MINUTE SERIES (TOPOGRAPHIC) I (IIWVVRY'f it6=1) 9"ol :✓AFeALclJILTA! I SIC SSVP. TMW-9 C\ / SC ' SB ---^ - / TMW-8 ELEVATION soo-YEArs \ \FLOG ATON 10+00 I 07a :0 S 5s LEGEND BROWNFIELDS PROPERTY BOUNDARY PARCEL LINES CAPITAL AREA GREENWAY - ROCKY BRANCH TRAIL 6Afil - - - ROCKY BRANCH CREEK INV-243.7r ANV�2 / / �INV=243.7s PERMANENT GROUNDWATER MONITORING WELL '! - (INSTALLED BY OTHERS) TEMPORARY MONITORING WELL LOCATION (H&H) SOIL BORING LOCATION H&H ( ) 00 A SURFACE WATER / SEDIMENT SAMPLE LOCATION (H&H) l- - - - SUB -SLAB SOIL VAPOR SAMPLE LOCATION (H&H) TMW-3 TMW-2 `MW-3.► MW-7 T , - � FVE-zs7.o / INv= Iis>j ; PROPOSED GROUND FLOOR RETAIL, AMENITY SB-6 W-1/S ® SSVP_8 / �L SPACE, OR OFFICE SPACE ,_7 3.0 PROPOSED GROUND FLOOR RESIDENTIAL FFE-259.0 SB-1• _.�� ,� SPACE SB-8 PROPOSED PARKING GARAGE noe / E�pppp--yY�E�gg -J o-YYEAR NA Ji,/,///ii%� 10, -SW-3/SED-3 yi ,,/� y, // / � � PROPOSED MULTI -USE PATH SSVP-7 -TMW-1,'%,�/-�,L/:'% )SIDN I + ROW OF I woad Pos FLOOD ELEVATION \ ELEVATION FLOOD too-1EAe �, v A �/ sp /I i'EL/ATION/ 500-1�E'nN s=-�-�-- �--/ + -2/SED-2� j _ NOTES: 1. AERIAL IMAGERY OBTAINED FROM ESRI GIS SERVICES (2019). 2. BASE DATA OBTAINED FROM WAKE COUNTY GIS (2020). 1O0-YEAH FLOOD ELEVATION APPROXIMATE 0 70 140 -a0 ELEVA ON a / m I Elevations Table Number Minimum Elevation Maximum Elevation Area Color 1 -6.36 -1.53 24585.59 2 -1.53 -0.25 17802.32 3 -0.25 0.04 10714.13 4 0.04 0.32 13966.08 5 0.32 0.74 13599.80 6 0.74 1.74 24970.74 - ] 1.74 3.85 32409,96 8 L 3.85 11.18 1 34961.73 _ SCALE IN FEET I TITLE CUT -FILL SAMPLE LOCATION MAP IrOJECT SOUTH SAUNDERS STREET ASSEMBLAGE RALEIGH, WAKE COUNTY, NORTH CAROLINA BROWNFIELDS PROJECT NO. 21050-17-092 H&H JOB NO. MRG-003 ■ / t9 hart � h i c k m a n 3921 Sunset Ridge Road, Suite 301 Raleigh, North Carolina 27607 ` 919-847-4241(p) 919-847-4261(1} SMARTER ENVIRONMENTAL SOLUTIONS License # C-1269 / #C-245 Geology l ) GRAPHIC SCALE IN FEET 0 15 30 60 DATE: 8-24-21 REVISION NO.0 / JOB NO. ACO-001 FIGURE NO. 4 Table 1 Summary of Soil Gas Analytical Data South Saunders Street Assemblage Raleigh, North Carolina Brownfields Project No. 21050-17-092 H&H Job No. MRG-003 SSVP-4 SSVP-8 Sample ID SSVP-1 SSVP-2 SSVP-3 SSVP-5 SSVP-6 SSVP-7 SSVP-4 DUP-1 SSVP-8 DUP-2 Residential Non -Residential Sample Date 12/12/2018 12/12/2018 12/12/2018 12/12/2018 12/12/2018 12/12/2018 12/12/2019 Sub -Slab SGSL(') Sub -Slab SGSL('' Address 1001 South Saunders Street 1015A South Saunders Street 1015B South Saunders Street 927 South Saunders Street Units Ng/m3 VOCs (TO-15) Acetone 37 48 180 J 390 490 160 3,000 290 510 480 220,000 2,700,000 Benzene <0.64 <0.64 44 230 190 1.7 3.1 5.6 J 0.46 J 0.50 J 120 1,600 2-Butanone (Methyl Ethyl Ketone; MEK) 4.0 J <24 <240 <240 <240 7.5 81 26 J 11 J 9.6 J 35,000 440,000 Carbon Tetrachloride <1.3 48 <13 <13 <13 17 <1.3 <13 <1.3 <1.3 160 2,000 Chloroform 4.2 2.7 <9.8 130 <9.8 <0.98 <0.98 <9.8 <0.98 <0.98 41 530 1,3-Dichlorobenzene <1.2 <1.2 <12 <12 <12 <1.2 1.3 <12 <1.2 <1.2 NE NE 1,1-Dichloroethane <0.81 13 4,300 360 320 <0.81 <0.81 <8.1 <0.81 <0.81 580 7,700 1,1-Dichloroethene <0.79 150 27,000 2,900 2,600 21 <0.79 <7.9 <0.79 <0.79 1,400 18,000 Ethanol 87 74 230 210 310 2,100 2,600 1,100 170 170 NE NE Ethyl Acetate <1.4 11 <7.2 <7.2 <7.2 <1.4 <1.4 <14 <1.4 <1.4 490 6,100 Ethylbenzene <0.87 <0.87 <8.7 1,300 1,100 8.5 10 13 1.5 1.5 370 4,900 4-Ethyltoluene <0.98 <0.98 <9.8 2,800 2,400 17 16 24 1.6 1.6 NE NE Heptane <0.82 <0.82 <8.2 140 110 <0.82 10 9.8 0.72 J <0.82 2,800 35,000 Hexane NA NA NA NA NA NA NA 410 <28 <28 4,900 61,000 2-Hexanone <0.82 <0.82 <8.2 <8.2 <8.2 <0.82 14 <8.2 <0.82 <0.82 210 2,600 Isopropanol 9.0 J 13 J <200 <200 <200 35 200 350 59 57 1,400 18,000 Methylene Chloride 1.3 J 2.5 J <69 <69 <69 <6.9 <6.9 <69 <6.9 <6.9 4,200 53,000 4-Methyl-2-pentanone (MIBK) <0.82 <0.82 <10 <8.2 <8.2 <8.2 19 <8.2 <0.82 <0.82 21,000 260,000 Naphthalene <1.0 <1.0 <140 <10 <10 <1.0 2.7 <10 <1.0 <1.0 21 260 Styrene <0.85 <0.85 <8.5 <8.5 <8.5 1.6 <0.85 <8.5 <0.85 <0.85 7,000 88,000 Tetrachloroethene (PCE) 570 31 <14 78 87 160 340 7,000 25 24 280 3,500 Toluene 2.6 14 11 3,500 3,000 30 61 170 4.0 3.9 35,000 440,000 1,1,1-Trichloroethane <1.1 300 50,000 10,000 8,700 110 140 <11 <1.1 <1.1 35,000 440,000 Trichloroethene (TCE) 550 11 <11 <11 32 5.1 <1.1 <11 <1.1 <1.1 14 180 Trichlorofluoromethane (Freon 11) 1.6 J 2.5 J <45 <45 <45 1.1 J 1.3 J <45 1.1 J 1.1 J NE NE 1,2,4-Trimethylbenzene <0.98 2.8 <9.8 2,800 2,400 17 21 28 1.6 1.6 420 5,300 1,3,5-Trimethylbenzene <0.98 1.3 <9.8 1,700 1,400 9.2 5.9 9.8 1.3 1.2 420 5,300 m&p-Xylene <1.7 6.4 <17 8,000 6,800 48 46 46 12 13 700 8,800 o-Xylene <0.87 6.2 <8.7 4,800 4,100 28 19 23 6.4 6.4 700 8,800 Risk Evaluation (Soil Gas to Indoor Air)(z) 3.7E-05 4.7E-06 7.7E-05 9.2E-05 5.3E-05 2.2E-06 2.5E-06 2.0E-05 1.5E-07 1.5E-07 Residential Carcinogenic Risk Residential Hazard Index 8.3E+00 2.3E-01 4.2E+00 6.7E+00 6.1E+00 2.4E-01 3.5E-01 5.1E+00 3.4E-02 3.3E-02 Non -Residential Carcinogenic Risk 2.0E-06 3.5E-07 5.9E-06 7.0E-06 4.0E-06 1.6E-07 1.9E-07 1.5E-06 1.1E-08 1.1E-08 Non -Residential Hazard Index 6.6E-01 1.8E-02 3.3E-01 5.3E-01 4.9E-01 1.9E-02 2.8E-02 4.0E-01 2.7E-03 2.7E-03 Notes: 1) North Carolina Department of Environmental Quality (DEQ) Division of Waste Management (DWM) Sub -slab and Exterior Soil Gas Screening Levels (SGSLs) (February 2018). 2) Risk evaluation performed using the December 2019 DEQ Risk Calculator for the soil gas to indoor air vapor intrusion pathway. Only volatile organic compounds (VOCs) detected in at least one sample are shown. Compound concentrations reported to the laboratory method detection limits. Concentrations are reported in micrograms per cubic meter (pg/m'). Laboratory analytical method is shown in parentheses. Bold values indicate compounds detected above DEQ Residential SGSLs (February 2018). Underlined values indicate compounds detected above DEQ Non -Residential SGSLs (February 2018). Highlighted risk values exceed DEQ's acceptable risk limits of 1.0E-04 for carcinogenic risk or 1.0E+00 for hazard index. J = Estimated value that is less than the laboratory reporting limit and greater than or equal to the method detection limit. ft bgs = feet below the ground surface; NE = Not Established; -- = Not Applicable. Table 1 (Page 1 of 1) S ~-Master Prcj.WWerge Capital (MRG)\MRG-W3 S. Saunders Street AssemblageS-fields Assessment\Tables\S. Saunders DaW Tables_20200303 Hatt &Hickman, PC 3/5/2020 Table 2 Summary of Soil Analytical Data South Saunders Street Assemblage Raleigh, North Carolina Brownfields Project No. 21050-17-092 H&H Job No. MRG-003 Site -Specific Background Levels SB-2 Sample ID Industrial/ Regional Background SB-1 SB-3 SB-4 SB-5 SB-6 SB-7 SB-8 SB-9 SB-21 SB-22 SB-2 I DUP-SOIL Residential PSRGs('( Commercial PSRGs(') Metals in Soil(2) Depth (ft bgs) 5-6 1-2 1-2 1-2 2-3 2-3 1-2 7-8 5-6 1-2 1-2 Sample Date 12/12/2019 12/12/2019 Range Mean Ref. 12/12/2019 12/12/2019 12/12/2019 12/12/2019 12/12/2019 12/12/2019 12/11/2019 12/11/2019 12/12/2019 12/10/2019 Units mg/kg VOCs (8260B1 1,1,1-Trichloroethane 1,700 7,600 NA NA -- -- -- <0.00083 <0.00091 <0.00089 <0.00088 <0.00077 <0.00077 <0.00095 <0.0011 <0.00082 <0.00098 1,1-Dichloroethane 3.8 17 NA NA -- -- -- <0.00070 <0.00077 <0.00075 <0.00074 <0.00065 <0.00065 <0.00080 <0.00097 <0.00069 <0.00083 1,1-Dichloroethene 48 210 NA NA -- -- -- <0.0011 <0.0012 <0.0012 <0.0012 <0.0010 <0.0010 <0.0013 <0.0015 <0.0011 <0.0013 1,2,4-Trimethylbenzene 63 370 NA NA - -- - <0.0019 <0.0020 <0.0020 <0.0020 <0.0017 <0.0017 <0.0021 0.017 <0.0018 <0.0022 1,3,5-Trimethylbenzene 56 320 NA NA - -- - <0.0016 <0.0018 <0.0017 <0.0017 <0.0015 <0.0015 <0.0018 0.0090 <0.0016 <0.0019 Acetone 12,000 140,000 NA NA - -- -- <0.0090 <0.0099 <0.0096 0.041J 0.012J <0.0083 <0.010 0.15 0.017J 0.045J Benzene 1.2 5.4 NA NA - -- - <0.00086 <0.00094 <0.00091 <0.00091 <0.00080 <0.00079 <0.00098 <0.0012 <0.00085 0.0013J Bromomethane 1.4 6.4 NA NA - -- - <0.0022 <0.0025 <0.0024 <0.0024 <0.0021 <0.0021 <0.0026 <0.0031 <0.0022 <0.0027 Chloromethane 23 99 NA NA - -- -- <0.0031 <0.0034 <0.0033 <0.0033 <0.0029 <0.0029 <0.0036 <0.0043 <0.0031 <0.0037 Ethylbenzene 6.1 27 NA NA - -- - <0.0010 <0.0011 <0.0011 <0.0011 <0.00094 <0.00094 <0.0012 <0.0014 <0.0010 <0.0012 Methylene Chloride 58 650 NA NA - -- -- <0.0056 <0.0062 <0.0060 <0.0060 <0.0052 <0.0052 <0.0065 <0.0078 <0.0056 <0.0067 Tetrachloroethene 17 82 NA NA - -- -- <0.0015 <0.0017 <0.0016 <0.0016 0.0020J <0.0014 <0.0017 <0.0021 <0.0015 <0.0018 Toluene 990 9,700 NA NA - -- -- <0.0015 <0.0017 <0.0017 <0.0016 <0.0014 <0.0014 <0.0018 0.0025J <0.0015 0.0022J Xylene (Total) 120 530 NA NA - -- -- <0.0033 1 <0.0037 <0.0036 <0.0035 <0.0031 <0.0031 <0.0038 <0.0046 <0.0033 <0.0040 SVOCs(8270D) 1-Methylnaphthalene 18 73 NA NA -- -- -- <0.097 <0.10 <0.10 <0.10 <0.50 <0.49 <0.094 '0.61 <0.51 <0.49 2-Methylnaphthalene 48 600 NA NA -- -- -- <0.093 <0.097 <0.099 <0.10 <0.48 <0.47 <0.090 1.1J <0.49 <0.47 Acenaphthene 720 9000 NA NA -- -- -- <0.094 <0.098 <0.10 <0.10 <0.49 <0.47 <0.091 0.951 <0.50 1.4.1 Anthracene 3,600 45000 NA NA - -- -- <0.095 <0.099 <0.10 <0.10 <0.49 <0.48 <0.091 2.9J <0.50 2.1 Benz(a)anthracene 1.1 21 NA NA - -- -- <0.12 <0.12 <0.12 <0.12 <0.60 <0.59 <0.11 13.6 <0.61 5.4 Benzo(a)pyrene 0.11 2.1 NA NA - -- -- <0.16 <0.17 <0.17 <0.17 <0.82 <0.80 <0.15 13.3 <0.83 4_6 Benzo(b)fluoranthene 1.1 21 NA NA -- -- -- <0.15 <0.15 <0.16 <0.16 <0.76 <0.74 <0.14 16.9 <0.78 6.3 Benzo(g,hJ)perylene NE NE NA NA -- -- -- <0.14 <0.15 <0.15 <0.15 <0.74 <0.72 <0.14 11.1 <0.75 2.8 Benzo(k)fluoranthene 11 210 NA NA -- -- -- <0.15 <0.16 <0.16 <0.16 <0.80 <0.78 <0.15 6.4 <0.81 2.5 Butylbenzylphthalate 290 1,200 NA NA -- -- -- <0.097 <0.10 <0.10 <0.10 <0.50 <0.49 <0.094 <0.81 <0.51 2.0 Chrysene 110 2,100 NA NA - -- -- <0.11 <0.11 <0.11 <0.11 <0.55 <0.54 <0.10 12.0 <0.56 4.4 Dibenzofuran 15 210 NA NA - -- -- <0.091 <0.095 <0.097 <0.098 <0.47 <0.46 <0.088 <0.76 <0.48 0.46J Fluoranthene 480 6,000 NA NA - -- -- <0.11 <0.12 <0.12 <0.12 <0.57 0.85J <0.11 16.3 <0.58 11.5 Fluorene 480 6,000 NA NA - -- -- <0.098 <0.10 <0.10 <0.10 <0.51 <0.49 <0.094 <0.81 <0.52 0.74J Indeno(1,2,3-cd)pyrene 1.1 21 NA NA - -- -- <0.17 <0.17 <0.18 <0.18 <0.87 <0.84 <0.16 9.2 <0.88 2.5 Phenanthrene NE NE NA NA - -- -- <0.092 <0.096 <0.097 <0.098 <0.48 <0.46 <0.089 8.8 <0.49 9.3 Pyrene 360 4,500 NA NA - -- -- <0.10 I <0.10 <0.11 <0.11 1 <0.52 1.01 1 <0.097 20.7 1 <0.53 9.4 RCRA Metals (602017471171991 Arsenic 0.68 3 0.842 2.44 1.0-18 4.8 A 0.630 0.612 0.667 1.32 3.22 2.31 0.1911 4.53 3.34 2.94 Barium 3,100 47,000 121 87.8 50-1,000 356 A 77.5 131 147 146 68.4 58.5 28.9 189 83.3 142 Cadmium 7.5 110 <0.0861 <0.0985 1.0-10 4.3 B 0.122J <0.0873 <0.104 <0.0932 1.00 0.221J <0.0860 3.34 0.459J 3.93 Chromium (total) NE NE 24.4 51.3 7.0-300 65 A 22.7 19.6 19.3 26.6 19.0 13.4 0.879J 31.6 17.1 27.2 Hexavalent Chromium 0.31 6.5 <0.274 0.644J NE NE -- <0.294 <0.278 <0.332 <0.297 0.3101 <0.278 <0.274 1.23 <0.304 4.85 Trivalent Chromium 23,000 100,000 24.4 50.7 NE NE -- 22.7 19.6 19.3 26.6 18.7 13.4 0.879J 30.4 17.1 22.4 Lead 400 800 7.70 14.4 BRL-50 16 A 4.98 15.7 15.3 11.2 11,870 48.9 3.58 723 126 159 Selenium 78.0 1,200 0.377J 0.811 <0.1-0.8 0.121 A 0.578 0.333.1 0.555.1 0.567J 0.440J 0.524J 0.440J 0.897 0.512J 0.789 Silver 78.0 1,200 <0.167 <0.191 BRL-5.0 0.42 C <0.179 <0.169 <0.202 <0.181 0.1801 <0.169 <0.167 <0.187 <0.185 <0.176 Mercury 1 2.3 1 9.7 1 0.0149J 0.0850 0.03-0.52 NS I A 0.0212J 0.00939J 0.0167J I 0.0294J 1 0.195 1 0.0318J 1<0.00301 1 0.146 1 0.0817 1 0.0645 Notes: 1) North Carolina Department of Environmental Quality (DEQ) Inactive Hazardous Sites Branch (IHSB) Preliminary Soil Remediation Goals (PSRGs) (December 2019). 2) Range and mean of background metals for North Carolina soils taken from Elements in North American Soils by Dragun and Chekid, 2005. Ref. A. North Carolina soils, B. Southeastern US soils, C. Soils of the conterminous USA With the exception of metals, only analytes with concentrations above the laboratory reporting limit are shown. Soil concentrations are reported in milligrams per kilogram (mg/kg). Laboratory analytical methods are shown in parentheses. Only VOCs and SVOCs detected in at least one sample are shown. Laboratory analytical methods are shown in parentheses. Bold values indicate compounds detected above Residential PSRGs and Site -specific background levels for metals. Underlined values indicate compounds detected above Industrial/Commercial PSRGs and Site -specific background levels for metals. VOCs = volatile organic compounds; SVOCs = semi -volatile organic compounds; RCRA = Resource Conservation and Recovery Act; ft bgs = feet below the ground surface; NA = Not Analyzed; NE = Not Established; -- = Not Applicable. J = Estimated value that is less than the laboratory reporting limit and greater than or equal to the method detection limit. Table 2 (Page 1 of 2) L612020 a-PrgeckV.�e Gapibl(MRG)VA 03 S-d--Assemblage\&own 1d, Asse55mmPTab1,e Saw GMa Tades_20200305 Hart &Hickman, P(^ Table 2 Summary of Soil Analytical Data South Saunders Street Assemblage Raleigh, North Carolina Brownfields Project No. 21050-17-092 H&H Job No. MRG-003 Site -Specific Background Levels Sample ID Industrial/ Regional Background SB-10 SB-11 SB-12 SB-13 SB-14 SB-15 SB-16 SB-17 SB-18 SB-19 SB-20 SB-21 SB-22 Residential PSRGs'' Commercial PSRGs" Metals in Soili2' Depth (ft bgs) 5-6 1-2 2-3 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 1-2 Sample Date 12/12/2019 12/12/2019 Range Mean Ref. 12/12/2019 12/10/2019 12/10/2019 12/10/2019 12/11/2019 12/11/2019 12/11/2019 12/11/2019 12/10/2019 12/11/2019 12/11/2019 Units VOCs(8260B) 1,1,1-Trichloroethane 1,700 7,600 NA NA -- -- -- <0.00083 <0.00080 <0.00094 <0.00079 <0.00088 0.093 <0.00091 <0.0011 <0.00075 <0.0011 <0.0014 1,1-Dichloroethane 3.8 17 NA NA -- -- -- <0.00070 <0.00068 <0.00079 <0.00067 <0.00074 0.015 <0.00077 <0.00092 <0.00063 <0.00093 <0.0012 1,1-Dichloroethene 48 210 NA NA -- -- -- <0.0011 <0.0011 <0.0012 <0.0011 0.0012J 0.045 <0.0012 <0.0015 <0.0010 <0.0015 <0.0019 1,2,4-Trimethylbenzene 63 370 NA NA -- -- -- <0.0019 <0.0018 <0.0021 <0.0018 0.0072 <0.0024 <0.0020 <0.0024 <0.0017 <0.0025 <0.0032 1,3,5-Trimethylbenzene 56 320 NA NA -- -- -- <0.0016 <0.0015 <0.0018 <0.0015 0.0037J <0.0021 <0.0018 <0.0021 <0.0014 <0.0021 <0.0027 Acetone 12,000 140,000 NA NA -- -- -- <0.0090 0.053J <0.010 0.029J 0.084J <0.012 0.013J <0.012 0.15 0.16 0.051J Benzene 1.2 5.4 NA NA -- -- -- <0.00085 0.0012J <0.00096 <0.00081 <0.00091 <0.0011 <0.00094 <0.0011 <0.00077 <0.0011 <0.0015 Bromomethane 1.4 6.4 NA NA -- -- -- <0.0022 <0.0022 <0.0025 <0.0021 0.0071J <0.0029 <0.0025 <0.0030 <0.0020 <0.0030 <0.0039 Chloromethane 23 99 NA NA -- -- -- <0.0031 <0.0030 <0.0035 <0.0030 0.011 <0.0041 <0.0034 <0.0041 <0.0028 <0.0041 <0.0054 Ethylbenzene 6.1 27 NA NA -- -- -- <0.0010 <0.00098 <0.0011 <0.00096 0.0033J <0.0013 <0.0011 <0.0013 <0.00091 <0.0013 <0.0017 Methylene Chloride 58 650 NA NA -- -- -- 0.011J <0.0054 0.00901 <0.0054 0.0068J <0.0073 <0.0062 <0.0074 <0.0051 <0.0075 <0.0097 Tetrachloroethene 17 82 NA NA -- -- -- <0.0015 <0.0015 <0.0017 <0.0014 <0.0016 <0.0020 <0.0017 <0.0020 <0.0014 <0.0020 <0.0026 Toluene 990 9,700 NA NA -- -- -- <0.0015 <0.0015 <0.0017 <0.0015 0.0068 <0.0020 <0.0017 <0.0020 <0.0014 0.0021J <0.0027 Xylene(Total) 120 530 NA NA -- -- -- <0.0033 1 <0.0032 <0.0038 <0.0032 1 0.027 <0.0043 1 <0.0037 <0.0044 1 <0.0030 <0.0044 <0.0058 SVOCs(8270D) 1-Methylnaphthalene 18 73 NA NA -- -- -- <0.52 <1.0 <0.095 <0.98 <0.94 <0.96 <0.097 <0.097 0.14J <0.11 <0.12 2-Methylnaphthalene 48 600 NA NA -- -- -- <0.50 <0.98 <0.091 <0.93 <0.90 <0.92 <0.093 <0.093 0.12J <0.11 <0.12 Acenaphthene 720 9000 NA NA -- -- -- <0.51 <0.99 <0.092 <0.94 <0.91 <0.93 <0.094 <0.094 <0.10 <0.11 <0.12 Anthracene 3,600 45000 NA NA -- -- -- <0.51 <1.0 <0.092 <0.95 <0.91 <0.94 <0.094 <0.095 <0.10 <0.11 <0.12 Benz(a)anthracene 1.1 21 NA NA -- -- -- <0.63 <1.2 <0.11 <1.2 <1.1 <1.2 <0.12 <0.12 <0.13 <0.14 <0.14 Benzo(a)pyrene 0.11 2.1 NA NA -- -- -- <0.85 <1.7 <0.15 <1.6 <1.5 <1.6 <0.16 <0.16 <0.17 <0.19 <0.20 Benzo(b)fluoranthene 1.1 21 NA NA -- -- -- <0.79 <1.6 <0.14 <1.5 <1.4 <1.5 <0.15 <0.15 <0.16 <0.17 <0.18 Benzo(g,h,i)perylene NE NE NA NA -- -- -- <0.77 <1.5 <0.14 <1.4 <1.4 <1.4 <0.14 <0.14 <0.15 <0.17 <0.18 Benzo(k)fluoranthene 11 210 NA NA -- -- -- <0.83 <1.6 <0.15 <1.5 <1.5 <1.5 <0.15 <0.15 <0.17 <0.18 <0.19 Butylbenzylphthalate 290 1,200 NA NA -- -- -- <0.52 <1.0 <0.095 <0.98 <0.94 <0.96 <0.097 <0.097 <0.11 <0.11 <0.12 Chrysene 110 2,100 NA NA -- -- -- <0.57 <1.1 <0.10 <1.1 <1.0 <1.0 <0.11 <0.11 <0.11 <0.13 <0.13 Dibenzofuran 15 210 NA NA -- -- -- <0.49 <0.97 <0.089 <0.92 <0.88 <0.90 <0.091 <0.091 <0.099 <0.11 <0.11 Fluoranthene 480 6,000 NA NA -- -- -- <0.59 1.7J <0.11 <1.1 <1.1 <1.1 <0.11 <0.11 <0.12 <0.13 <0.14 Fluorene 480 6,000 NA NA -- -- -- <0.53 <1.0 <0.095 <0.98 <0.94 <0.97 <0.097 <0.098 <0.11 <0.12 <0.12 Indeno(1,2,3-cd)pyrene 1.1 21 NA NA -- -- -- <0.90 <1.8 <0.16 <1.7 <1.6 <1.7 <0.17 <0.17 <0.18 <0.20 <0.21 Phenanthrene NE NE NA NA -- -- -- <0.50 <0.97 <0.090 <0.92 <0.89 <0.91 <0.092 <0.092 <0.10 <0.11 <0.11 Pyrene 360 4,500 NA NA -- -- -- <0.54 1.7J <0.098 <1.0 1 <0.97 <1.0 I <0.10 <0.10 I <0.11 <0.12 <0.13 RCRA Metals (6020/7471171991 Arsenic 0.68 3 0.842 2.44 1.0-18 4.8 A 1.36 9.84 0.306J 1.38 1.95 2.53 0.439J 0.893 0.861 1.49 1.20 Barium 3,100 47,000 121 87.8 50-1,000 356 A 173 770 57.3 45.9 89.1 82.7 103 74.6 105 148 93.1 Cadmium 7.5 110 <0.0861 <0.0985 1.0-10 4.3 B 0.122J 1.83 <0.0878 0.496J <0.0875 0.195J <0.0896 <0.0915 0.195J <0.104 <0.111 Chromium (total) NE NE 24.4 51.3 7.0-300 65 A 25.2 38.8 4.04 19.7 21.0 12.1 13.2 13.4 41.4 118 53.5 Hexavalent Chromium 0.31 6.5 <0.274 0.644J NE NE -- <0.314 0.649.1 <0.280 0.476J 0.488J <0.288 <0.286 <0.292 0.565J 0.684.1 <0.353 Trivalent Chromium 23,000 100,000 24.4 50.7 NE NE -- 25.2 38.2 4.04 19.2 20.51 12.1 13.2 13.4 40.8 117 53.5 Lead 400 800 7.70 14.4 BRL-50 16 A 59.9 1.320 4.62 ill 119 234 5.78 21.5 24.2 15.5 20.4 Selenium 78.0 1,200 0.377J 0.811 <0.1-0.8 0.121 A 0.411J 0.497J <0.208 0.327J 0.437J 0.493J 0.289J 0.439J 0.670 0.92 0.691J Silver 78.0 1,200 <0.167 <0.191 BRL-5.0 0.42 C <0.191 0.294J <0.170 <0.183 <0.169 0.214J <0.174 <0.177 <0.201 <0.202 <0.214 Mercury 1 2.3 1 9.7 1 0.0149J 0.0850 0.03-0.52 INS I A 1 0.233 1 0.617 1 <0.00307 1 0.0324J 1 0.0878 1 0.101 1 <0.00314 1 0.0319J 1 0.0466 1 0.0258J 0.0782 Notes: 1) North Carolina Department of Environmental Quality (DEQ) Inactive Hazardous Sites Branch (IHSB) Preliminary Soil Remediation Goals (PSRGs) (December 2019). 2) Range and mean of background metals for North Carolina soils taken from Elements in North American Soils by Dragun and Chekiri, 2005. Ref. A. North Carolina soils, B. Southeastern US soils, C. Soils of the conterminous USA With the exception of metals, only analytes with concentrations above the laboratory reporting limit are shown. Soil concentrations are reported in milligrams per kilogram (mg/kg). Laboratory analytical methods are shown in parentheses. Only VOCs and SVOCs detected in at least one sample are shown. Laboratory analytical methods are shown in parentheses. Bold values indicate compounds detected above Residential PSRGs and Site -specific background levels for metals. Underlined values indicate compounds detected above Industrial/Commercial PSRGs and Site -specific background levels for metals. VOCs = volatile organic compounds; SVOCs = semi -volatile organic compounds; RCRA = Resource Conservation and Recovery Act; ft bgs = feet below the ground surface; NA = Not Analyzed; NE = Not Established; -- = Not Applicable. J = Estimated value that is less than the laboratory reporting limit and greater than or equal to the method detection limit. Table 2 (Page 2 of 2) 3 020 askr PrgeckV.1erge Gapibl(MRG�V.IRG-0035. Sauntlen S�reM Assemblage\Brpwnfieltls Asse55n,enNTables\5. SawMers �Ma Tades_20200303 Hart & Hickman, PC Table 3 Summary of Well Construction Details & Groundwater Elevation Data South Saunders Street Assemblage Raleigh, North Carolina Brownfields Project No. 21050-17-092 H&H Job No. MRG-003 Well ID Installation Date TOC Elevation (ft) Well Diameters (inches) Total Depth (ft bgs) Screen Interval (ft) Static Depth to Groundwater (ft below TOC) Groundwater Elevation (ft) TMW-1 12/09/19 486.85 1.0 19 9-19 14.49 472.36 TMW-2 12/09/19 490.16 1.0 20 10-20 14.43 475.73 TMW-3 12/09/19 493.55 1.0 20 10-20 10.46 483.09 TMW-4 12/10/19 494.26 1.0 18 8-18 7.14 487.12 TMW-5 12/10/19 500.69 1.0 18 8-18 11.57 489.12 TMW-6 12/10/19 499.88 1.0 19 9-19 18.09 481.79 TMW-7 12/10/19 497.98 1.0 24 14-24 16.84 481.14 TMW-8 12/10/19 504.31 1.0 24 14-24 20.45 483.86 TMW-9 12/10/19 506.51 1.0 21 11-21 13.64 492.87 Notes: Depth to groundwater measurements collected on December 11, 2019. TOC elevations surveyed by the John R. McAdams Company on 12/11/19. TOC = top of casing; ft = feet; bgs = below ground surface. Table 3 (Page 1 of 1) SAAAA-Master Projects\Merge Capital (MRG)\MRG-003 S. Saunders Street Assemblage\Brownfields Assessment\Tables\S. Saunders Data Tables_20200303 Hart & Hickman, PC Table 4 Summary of Groundwater Analytical Data South Saunders Street Assemblage Raleigh, North Carolina Brownfields Project No. 21050-17-092 H&H Job No. MRG-003 MW-7 TMW-3 DEQ Vapor Intrusion GWSLs Sample ID MW-3 TMW-1 TMW-2 TMW-4 TMW-5 TMW-6 TMW-7 TMW-8 TMW-9 NC 2L MW-7 DUP-1 TMW-3 DUP-GW Groundwater Sample Date 12/13/2018 12/13/2018 12/11/2019 12/11/2019 12/12/2019 12/12/2019 12/12/2019 12/12/2019 12/12/2019 12/12/2019 12/12/2019 12/12/2019 Standard) Residential GWSLs (2) Non -Residential GWSLS(2) Address 927 South Saunders Street 927 South Saunders Street 1001 South Saunders Street 1015 South Saunders Street 1017 South Saunders Street Units pg/L VOCs (820613) Acetone <20.0 <20.0 <20.0 <6.2 <61.7 <154 <154 <6.2 <6.2 10.3J <6.2 <6.2 <6.2 6,000 4,500,000 19,000,000 Benzene <5.00 36.9 45.0 <0.15 <1.5 <3.8 <3.8 <0.15 <0.15 <0.15 <0.15 <0.15 <0.15 1 16 69 Bromodichloromethane <5.00 <5.00 <5.00 <0.26 <2.6 <6.4 <6.4 <0.26 <0.26 <0.26 <0.26 <0.26 1.90 0.6 8.8 38 Chloroform <5.00 <5.00 <5.00 <2.3 <23.4 <58.5 <58.5 <2.3 <2.3 <2.3 <2.3 <2.3 13.9 70 8.1 36 Ethylbenzene 7.36 10.7 12.9 <0.26 202 1520 1�30 <0.26 <0.26 <0.26 <0.26 0.5901 <0.26 600 35 150 Isopropylbenzene (cumene) 38.9 28.8 44.2 NA NA NA NA NA NA NA NA NA NA 70 180 750 Methyl-tert-butyl ether <5.00 <5.00 <5.00 <0.28 <2.8 <6.9 <6.9 <0.28 <0.28 0.470J <0.28 <0.28 <0.28 20 4,500 20,000 Naphthalene 120 <5.00 <5.00 <0.35 303 1590 1�90 <0.35 <0.35 <0.35 0.490J <0.35 <0.35 6 35 150 n-Butylbenzene 4.60J 5.51 8.08 NA NA NA NA NA NA NA NA NA NA 70 NE NE N-Propylbenzene 30.5 28.7 38.1 NA NA NA NA NA NA NA NA NA NA 70 490 2,000 sec-Butylbenzene 4.81J 6.56 8.04 NA NA NA NA NA NA NA NA NA NA 70 NE NE Styrene <5.00 <5.00 <5.00 <0.27 <2.7 24.9J 24.8J <0.27 <0.27 <0.27 <0.27 <0.27 <0.27 70 1,900 7,800 tert-Butylbenzene 2.11J 3.12J 4.28J NA NA NA NA NA NA NA NA NA NA 70 NE NE Tetrachloroethene <5.00 <5.00 <5.00 2.90 <1.6 <4.0 <4.0 6.00 <0.16 <0.16 <0.16 <0.16 <0.16 0.7 12 48 Toluene <5.00 15.6 19.7 <0.24 <2.4 707 664 <0.24 <0.24 <0.24 <0.24 0.280J <0.24 600 3,800 16,000 Trichloroethene <5.00 <5.00 <5.00 0.830J <2.2 <5.5 <5.5 <0.22 <0.22 <0.22 <0.22 <0.22 <0.22 3 1.0 4.4 Xylene (Total) <10.0 10.4 9.88J <0.63 627 9 920 9550 <0.63 <0.63 <0.63 <0.63 3.40 <0.63 500 77 320 cis-1,2-Dichloroethene <5.00 <5.00 <5.00 13.0 <2.9 14.7J 14AJ <0.29 <0.29 <0.29 <0.29 <0.29 <0.29 70 NE NE p-Isopropyltoluene <5.00 5.45 7.01 <0.21 <2.1 <5.3 <5.3 <0.21 <0.21 <0.21 <0.21 <0.21 <0.21 25* NE NE SVOCs (8270D) 1-Methylnaphthalene 3.17 5.08 5.02 <1.4 61.1 134 138 <1.4 <1.4 <1.4 <1.4 <1.4 <1.4 1* NE NE 2-Methylnaphthalene 5.61 7.09 7.86 <1.4 83.0 200 201 <1.4 <1.4 <1.4 <1.4 <1.4 <1.4 30 NE NE Naphthalene 40.1 <1.76 <1.76 <1.4 196 813 819 <1.4 <1.4 <1.4 <1.4 <1.4 <1.4 6 35 150 bis(2-Ethylhexyl)phthalate <92.6 <92.6 <92.6 11.3 9.30 <2.1 <2.1 <2.1 <2.1 <2.1 <2.1 <2.1 <2.1 3 NE NE Metals (6020B/7470A) Arsenic <1.00 <1.00 <1.00 0.483J 0.715J 0.344J 0.290J <0.250 0.355J 1.62J <0.250 0.416J <0.250 10 NE NE Barium 276 455 467 102 207 297 296 63.3 156 92.2 74.2 80.7 37.1 700 NE NE Cadmium <1.00 <1.00 <1.00 <0.160 <0.160 <0.160 <0.160 <0.160 <0.160 <0.160 <0.160 <0.160 <0.160 2 NE NE Chromium 2.08 2.10 <2.00 <0.540 0.770J <0.540 0.688J 1.29J <0.540 17.5 2.97 4.38 1.68J 10 NE NE Lead <1.00 <1.00 <1.00 0.423J 1.34J 2.71 3.07 0.572J 0.792J 4.43 3.01 1.34J 1.14J 15 NE NE Selenium <5.00 <5.00 <5.00 <0.380 <0.380 0.424J <0.380 0.423J <0.380 1.48J 0.526J <0.380 <0.380 20 NE NE Silver <1.00 <1.00 <1.00 <0.310 <0.310 <0.310 <0.310 <0.310 <0.310 <0.310 <0.310 <0.310 <0.310 20 NE NE Mercury <0.200 <0.200 <0.200 <0.0490 <0.0490 <0.0490 <0.0490 <0.0490 <0.0490 <0.0490 <0.0490 <0.0490 <0.0490 1 0.18 NE General Chemistry (OIA 1677) Cyanide (available) <0.00200 <0.00200 <0.00200 NA NA NA NA NA NA NA NA NA NA 70 NE NE Notes: 1) North Carolina Department of Environmental Quality (DEQ) 15A NCAC 02L.0202 Groundwater Standards (NC 2L Standards) (April 2013). 2) DEQ Vapor Intrusion Ground Water Screening Levels (GWSLs) (February 2018). *2L Standard has not been established; therefore, the Interim Maximum Allowable Concentration was used. Only compounds detected in at least one sample are shown. Compound concentrations reported to the laboratory method detection limits. Concentrations are reported in micrograms per liter (pg/L). Laboratory analytical method is shown in parentheses. Bold values indicate compounds detected above NC 2L Standard (April 2013). Underlined values indicate compounds detected above Residential GWSLs. Highlighted values indicate compounds detected above Non -Residential GWSLs. J = Estimated value that is less than the laboratory reporting limit and greater than or equal to the method detection limit. VOCs = volatile organic compounds; SVOCs = semi -volatile organic compounds; RCRA = Resource Conservation and Recovery Act; NA = Not Analyzed; NE = Not Established. Table 4 (Page 1 of 1) SAAAA-Master Projects\Merge Capital (MRG)\MRG-003 S. Saunders Street Aa-blageS-fields Assessmenffables\S. Saunders Data Tables_20200303 3/5/2020 Hart & Hickman, PC Table 5 Summary of Surface Water Analytical Data South Saunders Street Assemblage Raleigh, North Carolina Brownfields Project No. 21050-17-092 H&H Job No. MRG-003 SW-2 Sample ID SW-1 SW-3 NC 2B Surface Water Standards SW-2 DUP-SW Sample Date 12/12/2019 12/12/2019 12/12/2019 Chronic Acute Location Upstream Mid -Stream Downstream Units pg/L VOCs (8206B) Methyl-tert-butyl ether 13.2 11.8 12.3 34,000* -- Trichloroethene <0.22 0.57J 30 -- SVOCs (8270D) bis(2-Ethylhexyl)phthalate 10.7 9.5 12.6 12.5 0.37* -- Metals (6020B/7470A) Arsenic <0.250 <0.250 0.280J 0.361 J 340 150 Barium 61.5 63.4 64.7 63.1 1,000 NS Cadmium <0.160 <0.160 <0.160 <0.160 2.33 (h) 0.37 (h) Calcium 22,000 22,900 22,900 22,500 NE NE Chromium 0.794J 0.744J 0.644J 0.837J 489.12 (h) 63.63 (h) Lead 1.16J 0.821 J 0.824J 1.46J 52.69 (h) 2.05 (h) Magnesium 6,240 6,490 6,540 6,340 NE NE Selenium <0.380 <0.380 <0.380 <0.380 5 (t) NE Silver <0.310 <0.310 <0.310 <0.310 2.33 (h) 0.06 Mercury <0.0490 <0.0490 <0.0490 <0.0490 0.012 (t) NE Hardness SM 2340 Median Hardness Value Hardness 80,700 83,800 84,200 82,200 83,000 Notes: 1. North Carolina Department of Environmental Quality's (DEQ's) 15A NCAC 02B Surface Water Quality Standards and Criteria for Class C; NSW waters (213 Standards) (June 10, 2019). 2. Standard derived using the DEQ Hardness -Dependent Metal Calculator dated September 22, 2017 using the median hardness for the samples collected of 83 milligrams per liter as CaCO3. With the exception of metals, only analytes with concentrations above the laboratory reporting limit are shown. Surface water concentrations are reported in micrograms per liter (pg/L). Bold indicates concentration 213 Standard. VOCs = volatile organic compounds; SVOCs = semi -volatile organic compounds; RCRA = Resource Conservation and Recovery Act; -- = Not Applicable; BRL = Below Laboratory Reporting Limit; NA = Not Analyzed; NE = Not Established. J = Estimated value that is less than the laboratory reporting limit and greater than or equal to the method detection limit. (h) = metal is hardness -dependent. See 15A NCAC 02B .0211 for more information. (t) = based upon measurement of total recoverable metal. See 15A NCAC 02B .0211 for more information. * = No NC 2B Standard established, value shown is the lower of the North Carolina In -Stream Target Value or EPA National Water Quality Criteria dated June 2019. Table 5 (Page 1 of 1) 3/ 52020 SAAAA-Master Projects\Merge Capital (MRG)\MRG-003 S. Saunders Street Assemblage\Brownfields Assessment\Tables\S. Saunders Data Tables_20200303 Hart &Hickman, PC Table 6 Summary of Sediment Analytical Data South Saunders Street Assemblage Raleigh, North Carolina Brownfields Project No. 21050-17-092 H&H Job No. MRG-003 SED-2 Sample ID SED-1 SED-3 Residential PSRGs') Industrial/ Commercial PSRGs(') Site -Specific Background Levels Regional Background Metals in Soil(2) SED-2 DUP-SED Sample Date 12/12/2019 12/12/2019 12/12/2019 SB-21 SB-22 Location Upstream Mid -Stream Downstream 12/12/2019 12/12/2019 Range Mean Ref. Units mg/kg VOCs (8206B) Acetone <0.0091 <0.011 <0.012 0.049J 12,000 140,000 NA NA -- -- -- Toluene <0.0016 <0.0019 0.0024J <0.0015 990 9,700 NA NA -- -- -- SVOCs (8270D) Acenaphthylene <0.10 <0.11 <0.11 0.15J NE NE NA NA -- -- -- Benz(a)anthracene <0.13 <0.15 <0.15 0.20J 1.1 21 NA NA -- -- -- Benzo(a)pyrene <0.18 <0.20 <0.21 0.20J 0.11 2.1 NA NA -- -- -- Benzo(b)fluoranthene <0.17 <0.19 <0.19 0.24J 1.1 21 NA NA -- -- -- Benzo(g,h,i)perylene <0.17 <0.18 <0.19 0.16J NE NE NA NA -- -- -- Chrysene <0.12 <0.14 <0.14 0.14J 110 2,100 NA NA -- -- -- Fluoranthene <0.13 <0.14 0.21 J 0.23J 480 6,000 NA NA -- -- -- Phenanthrene <0.11 <0.12 0.13J 0.12J NE NE NA NA -- -- -- Pyrene <0.12 <0.13 0.29J 0.34J 360 4,500 NA NA -- -- -- RCRA Metals (6020B/7470A/7199) Arsenic 0.406J 1.36 1.27 0.246J 0.68 3 0.842 2.44 1.0-18 4.8 A Barium 16.2 63.8 57.7 11.5 3,100 47,000 121 87.8 50-1,000 356 A Cadmium <0.0987 0.171J 0.141J <0.0958 7.5 110 <0.0861 <0.0985 1.0-10 4.3 B Chromium (total) 4.48 14.0 12.7 2.82 NE NE 24.4 51.3 7.0-300 65 A Hexavalent Chromium <0.314 0.448J 0.954.1 <0.305 0.31 6.5 <0.274 0.644J NE NE -- Trivalent Chromium 4.48 13.55 11.75 2.82 23,000 100,000 24.4 50.7 NE NE -- Lead 5.99 21.1 20.5 4.56 400 800 7.70 14.4 BRL-50 16 A Selenium <0.234 0.295J 0.372J <0.228 78.0 1,200 0.377J 0.811 <0.1-0.8 0.121 A Silver <0.191 <0.223 <0.222 <0.186 78.0 1,200 <0.167 <0.191 BRL-5.0 0.42 C Mercury <0.00345 0.0222J 0.0389J 0.0121J 2.3 9.7 0.0149J 0.0850 0.03-0.52 NS A Notes: 1) North Carolina Department of Environmental Quality (DEQ) Inactive Hazardous Sites Branch (IHSB) Preliminary Soil Remediation Goals (PSRGs) (December 2019). 2) Range and mean of background metals for North Carolina soils taken from Elements in North American Soils by Dragun and Chekiri, 2005. Ref. A. North Carolina soils, B. Southeastern US soils, C. Soils of the conterminous USA With the exception of metals, only analytes with concentrations above the laboratory reporting limit are shown. Soil concentrations are reported in milligrams per kilogram (mg/kg). Laboratory analytical methods are shown in parentheses. Bold values indicate compounds detected above Residential PSRGs and Site -specific background concentrations. VOCs = volatile organic compounds; SVOCs = semi -volatile organic compounds; RCRA = Resource Conservation and Recovery Act; NE = Not Established; -- = Not Applicable; NA = Not Analyzed. J = Estimated value that is less than the laboratory reporting limit and greater than or equal to the method detection limit. Table 6 (Page 1 of 1) SAAAA-Master Projects\Merge Capital (MRG)\MRG-003 S. Saunders Street Assemblage\Brownfields Assessment\Tables\S. Saunders Data Tables_20200303 3/5/2020 Hart & Hickman, PC Table 7 Summary of TCLP Analytical Data South Saunders Street Assemblage South Saunders Street Raleigh, North Carolina H&H Job No. KCO-001 Depth TCLP TCLP TCLP TCLP TCLP TCLP TCLP TCLP Sample ID Sample Date (ft bgs) Arsenic Barium Cadmium Chromium Lead Mercury Selenium Silver Maximum Concentration of Contaminants for the Toxicity 5.0 100.0 1.0 5.0 5.0 0.2 1.0 5.0 Characteristic October 2009 Units mg/L SB-4 2-3 8/30/2021 0.60 0.0066 J 0.019 J SB-7 5-6 8/30/2002 0.69 0.0043 J 0.0045 J SB-11 1-2 8/30/2021 1 1.20 0.012 0.052 J Notes: mg/L = milligrams per liter; TCLP = toxicity characteristic leaching procedure Analytical Method: EPA Method 6010D Table 7 (Page 1 of 11) hhtttp52 21 rthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/Kane Realty Corporation (KCO)/EMP/Soil Data for Metals.xlsx Hart &Hickman, PC Appendix A Redevelopment Plans 10 hart hickman SMARTER ENVIRONMENTAL SOLUTIONS PARK CITY SOUTH — PHASE 1A PD DESIGN PRINCIPLES — POD A PD/UDO PRINCIPLE ADDRESSED IN POD A PROHIBITED USES CAR WASH VEHICLE REPAIR NONE OF THESE USES ARE PROPOSED FOR THE PROJECT GAS STATION FREIGHT AND SERVICE FACILITY TRAILER STORAGE AND DROP OFF LOT BUS BARN TRUCKING OPERATION TRUCK OR MOTOR FREIGHT TERMINAL FACILITY PAWN SHOPS ADULT ESTABLISHMENTS BUILDING HEIGHT 20 STORIES MAX PROPOSED 11 STORIES POD A MAXIMUM OFFICE/INDUSTRIAL — 700,000 SF PROPOSED 16,800 SF RETAIL/OFFICE SPACE AND DEVELOPMENT INTENSITY RETAIL — 167,000 SF 336 RESIDENTIAL UNITS LODGING UNITS — 150 UNITS RESIDENTIAL DWELLING UNITS — 510 OVERALL DEVELOPMENT NO MORE THAN 50% OF OFFICE/INDUSTRIAL MAY BE INDUSTRIAL NO INDUSTRIAL USES ARE PROPOSED FOR THIS POD INDUSTRIAL SPACE OVERALL DEVELOPMENT AT LEAST 5% OF THE DWELLING UNITS CONSTRUCTED ON THE 5% OF DWELLING UNITS ARE NO GREATER THAN 550 GSF HOUSING VARIATION PROPERTY SHALL BE NO LARGER THAN 550 GSF PROTECTIVE YARDS NO PROTECTIVE YARDS (STREET OR TRANSITIONAL) REQUIRED NO PROTECTIVE YARDS PROVIDED BUILDING/PARKING SETBACKS S. SAUNDERS — 0' NO SETBACK ALONG S. SAUNDERS DAWSON — 5' + TCA WIDTH NO BUILDING OR PARKING IS LOCATED WITHIN 5' OF TCA ALONG DAWSON SIGHT TRIANGLES NO BUILDING SHALL BE LOCATED WITHIN A SIGHT DISTANCE NO BUILDING IS LOCATED WITHIN A SIGHT DISTANCE TRIANGLE EASEMENT TRIANGLE EASEMENT BUILD TO S. SAUNDERS — 0'-20' AT 407. SHEET C2.1 SHOWS BUILDING MEETS BUILD —TO REQUIREMENT ALONG S. SAUNDERS GROUND STORY THE GROUND STORY OF STRUCTURED PARKING MUST HAVE THE GROUND STORY SURROUNDING THE PARKING DECK IS SURROUNDING PARKING ACTIVE USES LOCATED BETWEEN THE PARKING STRUCTURE AND PROPOSED TO BE RETAIL/OFFICE SPACE FACING THE PUBLIC SIDEWALK ALONG S SAUNDERS STREET S. SAUNDERS BUILDING ENTRANCES EACH BUILDING FRONTING ALONG S SAUNDERS SHALL HAVE AT POD A PROPOSES AT LEAST 2 ENTRANCES ALONG LEAST ONE ENTRANCE FACING S SAUNDERS. FOR A BUILDING S SAUNDERS THAT HAS A LENGTH GREATER THAN 150 FEET ALONG S SAUNDERS, ONE ADDITIONAL ENTRANCE FACING S SAUNDERS MULTIPLE BUILDINGS THERE SHALL BE A DIFFERENCE OF AT LEAST 2 STORIES IN FOR ZONING PURPOSES, 1 BUILDING IS PROPOSED FOR HEIGHT BETWEEN THE TALLEST BUILDING AT SHORTEST BUILDING THE SITE WITHIN IN POD AMENITY AREA MINIMUM OF 10% TOTAL SITE AREA — CAN BE REALLOCATED POD A IS PROVIDING MORE THAN THE REQUIRED 10% FOR AMONG PODS WITHIN DEVELOPMENT THE POD. THE ADDITIONAL AMENITY AREA WILL BE USED TO COUNT TOWARDS THE AMENITY AREA REQUIREMENT ON OTHER PODS TREE CONSERVATION MINIMUM OF 10% OF TOTAL SITE AREA — APPLIED TO THE POD A WILL PROVIDE 10% TCA FOR THE PHASE 1A SITE PROPERTY AS A WHOLE RATHER THAN ON A POD —BY —POD AREA. ADDITIONAL TCA WILL BE PROVIDED ON OTHER BASIS PODS AT LATER PHASES TO MEET THE ENTIRE SITE TCA REQUIREMENT. PARKING A MINIMUM OF ONE PARKING SPACE IS REQUIRED PER DWELLING UNIT. NO VEHICLE PARKING REQUIRED FOR FIRST 16 DWELLING UNITS. ONE PARKING SPACE PER 500 SF FOR ALL NONRESIDENTIAL GSF, OR THE MINIMUM NUMBER OF PARKING SPACES SET FORTH IN UDO SECTION 7.1.2.C, WHICHEVER IS LESS. NO VEHICLE PARKING IS REQUIRED FOR THE FIRST 10,000 GSF. POD A WILL COMPLY WITH THE PARKING REQUIREMENTS SET FORTH IN THE PD. COMPLIANCE IS SHOWN ON SHEET NO VEHICLE PARKING IS REQUIRED FOR THE FOLLOWING USES C2.0. AND USE CATEGORIES UP TO 30,000 SQUARE FEET OF GROSS FLOOR AREA PROVIDED WHEN AT LEAST 25% OF THE GROUND FLOOR OF THE BUILDING IS DEVOTED TO SUCH USES: INDOOR RECREATION; PERSONAL SERVICE; RESTAURANT; RETAIL SALES; AND BANKS. NO COMBINATION OF THE ABOVE SHALL EXCEED 30,000 EXEMPTED SQUARE FEET OF GROSS FLOOR AREA. NO PARKING IS REQUIRED FOR AN INDOOR MOVIE THEATER. PARKING FOR OVERNIGHT LODGING REQUIRES ONLY ONE—HALF OF THE AMOUNT SPECIFIED IN UDO SEC. 7.1.2 STREET TYPES S. SAUNDERS STREET: POD A COMPLIES WITH ALL STREET SECTIONS. AND SIDEWALK WIDTHS MAIN STREET WITH PARALLEL PARKING (NO UDO MODIFICATION) INTERIOR STREET SECTIONS A AND B: AS DESCRIBED PER THE PD (UDO MODIFICATION) BLOCK PERIMETER BLOCK PERIMETER STANDARDS SHALL BE SATISFIED FOR THE THE FUTURE INTERNAL PUBLIC ROAD WILL SATISFY THE DEVELOPMENT BASED UPON THE EXISTING AND PROPOSED BLOCK PERIMETER REQUIREMENT FOR THE ENTIRE PUBLIC STREET NETWORK. DEVELOPMENT. LAKE WHEELER ROAD AND THE APPLICANT WILL DEDICATE THE LAND AREA NECESSARY TO THE PROPOSED RIGHT—OF—WAY DEDICATION "BUMP OUT" S. SAUNDERS INTERSECTION CONSTRUCT THE IMPROVEMENTS TO THE LAKE WHEELER AND IS BASED ON THE FUTURE S SAUNDERS ROAD ALIGNMENT. S SAUNDERS INTERSECTION THE PROJECT WILL CONSTRUCT THE CURB LINE IN THE "BUMP OUT" BASED ON THIS FUTURE ROAD ALIGNMENT. PUBLIC ACCESS/GREENWAY A 75' WIDE CITY OF RALEIGH GREENWAY EASEMENT AND A 10' THE EASEMENTS HAVE BEEN PROVIDED ON THE PLANS. EASEMENT WIDE PUBLIC ACCESS EASEMENT ALONG THE SOUTH SIDE OF ROCKY BRANCH CREEK ARE REQUIRED PER THE PD. BICYCLE REPAIR STATION AT LEAST ONE BICYCLE REPAIR STATION SHALL BE LOCATED POD A WILL PROVIDE A BICYCLE REPAIR STATION WITHIN WITHIN EACH OF THE PODS. THE BUILDING TO MEET THIS REQUIREMENT. DUMPSTERS DUMPSTERS WILL BE LOCATED WITHIN THE BUILDINGS. PHASE 1A COMPLIES. ALL CONSTRUCTION TO BE IN ACCORDANCE WITH ALL CITY OF RALEIGH AND/OR NCDOT STANDARDS AND SPECIFICATIONS. SURVEY NOTE: EXISTING INFORMATION TAKEN FROM BOUNDARY/TOPOGRAPHIC SURVEY PROVIDED BY KCI ASSOCIATES OF NC, 4505 FALLS OF NEUSE RD., FLOOR 4, RALEIGH, NC 27609. PHONE: 919-783-9266 AND DATED DECEMBER 1, 2020. PROJECT OWNER AND CONSULTANT OWNER: CS SMITH LLC 2321 BLUE RIDGE RD, SUITE 202 RALEIGH, NC 27607 PHONE: (919) 443-0262 ATTN.: COREY MASON corey@mergecap.com SITE DEVELOPER: KANE REALTY CORPORATION 4321 LASSITER AT NORTH HILLS AVE #250 RALEIGH, NC 27609 PHONE: (919) 719-5416 ATTN.: DREW YATES dyates@kanerealtycorp.com CIVIL ENGINEER: KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE ST., SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 653-2927 ATTN.: CHRIS BOSTIC, P.E. chris.bostic@kimley-horn.com LANDSCAPE ARCHITECT: KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE ST., SUITE 600 RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 678-4170 ATTN.: MATT GROSS, PLA matt.gross@kimley-horn.com SURVEYOR: KCI ASSOCIATES OF NC 4505 FALLS OF NEUSE ROAD, FLOOR 4 RALEIGH, NC 27609 PHONE: (919) 783-9214 ATTN.: ERIC M. MANTRUCK, PLS eric.mantruck@kci.com N W E S GREENSBORO • 4 0 ■III/ OXFORD 501 15 L0UIS BURG 00 1 URHAM � WAKE FOREST 40 E 5 APEX Is t SANFORD v KNIGHTDAL6000- CARY• LE • 9 440 PROJECT GARNER • LOCATION CLAYTON • (� 540 FUQUAY—VARINA 11 10000 95 PROJECT LOCATION NTS ADMINISTRATIVE SITE REVIEW PARK CITY SOUTH - PHASE 1 A ASR-0006-2021 SKETCH TRANS.# SCOPE-0150-2020 PARK CITY SOUTH — OVERALL MAXIMUM DESIGN INTENSITIES EXISTING PROPOSED ALLOWABLE INTENSITY INTENSITY INTENSITY POD A OFFICE/INDUSTRIAL — 700,000 SF 0 SF RETAIL/OFFICE — 16,800 SF RETAIL — 167,000 SF RESIDENTIAL DWELLING UNITS — 336 LODGING UNITS — 150 UNITS RESIDENTIAL DWELLING UNITS — 510 POD B OFFICE/INDUSTRIAL — 700,000 SF 0 SF 0 SF RETAIL — 167,000 SF LODGING UNITS — 240 UNITS RESIDENTIAL DWELLING UNITS — 510 POD C OFFICE/INDUSTRIAL — 700,000 SF 0 SF 0 SF RETAIL — 167,000 SF LODGING UNITS — 240 UNITS RESIDENTIAL DWELLING UNITS — 510 POD D OPEN SPACE AND RECREATIONAL USES 0 SF 0 SF OVERALL OFFICE/INDUSTRIAL — 1,042,600 SF 0 SF RETAIL/OFFICE — 16,800 SF MAXIMUM RETAIL — 312,500 SF RESIDENTIAL DWELLING UNITS — 336 LODGING UNITS — 382 UNITS RESIDENTIAL DWELLING UNITS — 975 NO MORE THAN 50% OF OFFICE/ INDUSTRIAL MAY BE INDUSTRIAL Administrative Site Review Application Planning and Development Customer Service Center • One Exchange Plaza, Suite 400 1 Raleigh, NC 27601 1 919-996-2500 MP-3-18 927 S SAUNDERS ST. RALEIGH, NORTH CAROLINA 27603 A DEVELOPMENT BY: KANE REALTY COPORATION 4321 LASSITER AT NORTH HILLS AVE #250 RALEIGH, NC 27609 A �00/ 00 1 Raleigh This form is required when submitting site plans as referenced in Unified Development Ordinance (UDO) Section 10.2.8. Please check the appropriate building types and include the plan checklist document when submitting. Office Use Only: Case #: _ Planner (print): Please review UDO Section 10.2.8. as amended by text change case TC-14-19 to determine the site plan tier. If assistance determining a Site Plan Tier is needed a Site Plan Tier Verification request can be submitted online via the Permit and Development Portal. (Note: There is a fee for this verification service.) Site Plan Tier: Tier Two Site Plan ❑ Tier Three Site Plan ❑✓ Building Type Site Transaction History ❑ Detached ❑ General Subdivision case #: ❑SCOping/sketch Attached ❑✓ Mixed use plan Case #: SCOPE-0150-2020 Certificate of Appropriateness #: ❑ Apartment ❑ Open lot Board of Adjustment #: ❑ Townhouse ❑ Civic Zoning Case #: Z-32-18 — Administrative Alternate #: GENERAL INFORMATION Development name: Park City South - Phase 1A Inside City limits? Yes v- No Property address(es).927 S Saunders Street, Raleigh, NC Site P.I.N.(s): 1703442683,1703442592, 1703444408, 1703444451, 1703446541, 1703442776,1703444797,1703453051 Please describe the scope of work. Include any additions, expansions, and change of use. -Project includes the demolition of existing buildings, parking areas, and associated infrastructure and the construction of a proposed multi -use development with multi -family residential and ground floor retail, restaurants, and office space with associated infrastructure. The project also includes the construction of a greenway on the site. Current Property Owner/Developer Contact Name: Drew Yates (Kane Realty) NOTE: please attach purchase agreement when submitting this form. Company: CS Smith LLC Title: Address:2321 Blue Ridge Rd, Suite 202, Raleigh, INC 27607 Phone #: 919-719-5416 Email: dyates@kanerealtycorp.com Applicant Name: Tim Carter, E.I. Company: Kimley-Horn and Associates, LLC Address: 421 Fayetteville St, Suite 600, Raleigh, NC 27601 Phone #: 919-677-2197 Email: tim.carter@kimley-horn.com DEVELOPMENT TYPE + SITE DATE TABLE (Applicable to all developments) SITE DATA BUILDING DATA Zoning district (if more than one, please provide the acreage of each): PD Existing gross floor area (not to be demolished): 0 Existing gross floor area to be demolished: 15,250 Gross site acreage:6.14 New gross floor area: 371,640 # of parking spaces required:377 Total sf gross (to remain and new):371,640 # of parking spaces proposed: 683 Proposed # of buildings:1 Overlay District (if applicable): N/A Proposed # of stories for each: 1 o Existing use (UDO 6.1.4): Retail, Vehicle Service, Vacant round Story Uses, and Multi -Family Residential Proposed use (UDO 6.1.4): Retail, Restaurant. Otfice, other STORMWATER INFORMATION Existing Impervious Surface. Proposed Impervious Surface: Acres: '.35 Square Feet: 58.810 Acres: 3.33 Square Feet: 145.054 Is this a flood hazard area? Yes7 No ✓ If yes, please provide: Alluvial soils: Flood study: FEMA Map Panel #: Neuse River Buffer Yes ❑ No ❑✓ I Wetlands Yes ❑ No ❑✓ RESIDENTIAL DEVELOPMENTS Total # of dwelling units: 336 1 Total # of hotel units: 0 # of bedroom units: 1 br 244 20r 87 3br 5 4br or more 0 # of lots:l I Is your project a cottage court? Yes❑ No ✓❑ SIGNATURE BLOCK In filing this plan as the property owner(s), I/we do hereby agree and firmly bind ourselves, my/our heirs, executors, administrators, successors, and assigns jointly and severally to construct all improvements and make all dedications as shown on this proposed development plan as approved by the City of Raleigh. I hereby designate Klrnley-Nonnand A,`ovaw-, In.to serve as my agent regarding this application, to receive and response to administrative comments, to resubmit plans on my behalf, and to represent me in any public meeting regarding this application. I/we have read, acknowledge, and affirm that this project is conforming to all application requirements applicable with the proposed development use. I a nowledge that this application is subject to the filing calendar and submittal policy, which s appli swill expire after 180 days of inactivity. Signature: Date: Printed Name: /1/jgyaj( ['g 5 t Page 1 of 2 REVISION 11.1920 Page 2 of 2 raleighnc.gov PREPARED IN THE OFFICE OF: NC CERTIFICATE OF AUTHORIZATION: F-0102 ) iorn © 2021 Kimley-Horn and Associates, Inc. 421 FAYETTEVILLE STREET — SUITE 600 — RALEIGH, NORTH CAROLINA 27601 PHONE: (919) 677-2000 i REVISION 11.18.20 raleighnc.gov This document, together with the concepts and designs presented herein, as an instrument of services, is intended only for the specific purpose and client for which it was prepared. Reuse of and improper reliance on this document without written authorization and adaptation by Kimley—Horn and Associates, Inc. shall be without liability to Kimley—Horn Copyright Kimley—Horn and Associates, Inc., 2021 I,eadDr fn Dorothea Dr e Wary \ ` _ esters alvd. ROckY Pronch k5w eJ, 70 r o Dord6* �011 00 Cate+sd � �l s y M A alin Lirthmr Kin Q ­tton Elementary PROJECT SITE �i �OrkY Bran�� CARALE1 H/FULLER HEIGHTS a+ 70 cMount Hope Cemetery s 401 i N c l VICINITY MAP N SCALE: 1 = 500' W E S U U m Ld o 00 00 z z Cn w LJ z O O O w U U N O KANE REALTY CORPORATION IlVerae CaDitall SHEET LIST TABLE Sheet Number Sheet Title CO.0 COVER SHEET COA ALTERNATE MATERIAL REQUEST CO.2 TRAFFIC IMPACT ANALYSIS C1.0 EXISTING CONDITIONS AND DEMOLITON PLAN C2.0 PRELIMINARY SITE PLAN C2.1 PRELIMINARY BUILD —TO TRUCK TURN EXHIBIT C2.2 PLAT EXHIBIT C3.0 PRELIMINARY GRADING AND DRAINAGE PLAN C4.0 PRELIMINARY UTILITY PLAN C10.0 SAND FILTER DETAILS TC1.0 TREE CONSERVATION PLAN 1-1.0 LANDSCAPE PLAN L2.0 LANDSCAPE DETAILS ARCH ARCHITECTURAL ELEVATIONS JANUARY 27, 2021 JOB NUMBER: 011440027 Kimley*Horn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY-HORN.COM #F-0102 JDAVIS>I z :�i :�i m H 3: U U 0 O N O LLJ N O u 00 N �\ r r o N mLd o o Q \ w Z Z Y = O _J c� O Q Cn Q w 0 W D_ = cn o o 0 W W 2 W O U 1 U z Z OQ�� LL LIJ U) 0 Q w 0. LLJ W Wi1� Z 1..� CD Q LL- O 0 ^ U SHEET NUMBER C0.0 v U >- m m m 0 M Q a 0 i 0 T 0 E Y 0 0 c 0 0 Q 0 0 a � Y T C 0 r o Q 0 0 a 0 ° 0 0 C 0 0 N 0 Q J o In - n 0 o � E � O O � 0 Q 0 0 N N m � 0 C -C:: 0 0 a C � 0 Q � o O � o T � N 0 a a o Q u J J o Y 0 a c 0 b 0 � a „ U U a T o o 0 C O �J C Y � J Q� r - o Q > c E Z Y .C: 0 0 J .T 0 a � 0 0 _J c 0 cn Q r o - a J a C Y o r 0 QQ 0 �U 3 �E D O 0 O Q) a o� .I =' Raleigh Fire Department Office of the Fire Marshal 310 W. Martin Street, Suite 200 Raleigh, NC 27602 Office: (919) 996-6392 Alternate Material, Design or Methods Application Transaction No. ASR-0006-2021 Design Professional: Chris Bostic, PE Phone #: 919-653-2927 ,TtTIIl1y/, Signature: Building Address: sunders St. 032562 I N Alternate Material, Design or Methods Application requires 10 bi1'sst11l4S1s`Ai 3R fol? review. In accordance with 2018 NORTH CAROLINA ADMINISTRATIVE CODE AND POLICIES Section 105 Alternative Material, Design or Methods. I am requesting review of an alternate or modification to the provisions of Section 503.2.3 _ of the 2018 NCFPC, Chapter 5 CODE: This code section requires: Fire apparatus access roads shall be designed and maintained to support the imposed loads of fire apparatus and shall be surfaced so as to provide all-weather driving capabilities. ProposedAlternate: (Include drawings to clearly illustrate request, before and after if appropriate) 503.2.3 - Grasspave2 Structural Soil system and asphalt greenway located within the fire access path along the City of Raleigh Greenway. The path runs on the east side of the proposed building from the SE corner to the NW corner of the site. Reason for Request: To achieve required hose pull lengths for the Phase 1 A building. GRASSPAVE2 FIRELANE STRAPPING TAPE CONTAINS ENHEI GRAVEL. NOWSHRNK MORTAR, CONCRETE ETC. FLUSH MOUNTED S MARKER WITH NTEGRATE0 OR REM OVARIE ANCHI (BY OTHERS) GRASSPAVE2 FIRELANE SHRUB MASS EASED t A A ACURB, HEI ��1E•�itiIGA�If�irlll��ElVARES GRAVELROADBASE CURB «» a► « i �:•i:•i•: is t•t ` 0 UPLIGHT FIMRE �11�ti►, _ A A n•� it'i�A NOTE: THIS DETAL IS SCHEMATIC N NATURE. DESIGNER SHALL SPECIFY SPACING AND DESIGN OF EDGE TREATMENTS. SPACING WILL VARY WITH TURF TYPE, SLOPE, FIRE OEPARTMRNT REQUIREMENTS, ETC.. NOT TO SCALE GRASSPAVE2 SIDLE 9TRUCTUREa" InV'sible Structures, Inc. GP2Firelanel I .dW9 INVISIBLE STRUCTURES' 303-233-8383 W W w.invisiblestructures.com V4.1 Request For Alternate Material, Design or Methods Staff Use Only Page 2 of 2 Date Received- 1� _ Z)_ Z U 2 1 Evaluation of Proposal by: RFD Office of the Fire Marshal Suitability: Strength: Effectiveness: Fire Resistance: Durability: Safety: Sanitation: Recommended Action: APPROVE DENY By: Conditions: Additional Information on Proposed Alternate: Approved by: ,S- 2 1-2) Compressive Test Results - GRASSPAVE2 and GRAVELPAVE2 A • G • Wassenaar 2IBO South Ivanhoe Street. Salta 5 0--or, Colorado 80222-5710 303-750.8100 Fax 303-756-2920 Geotechnical and Environmental Consultants www.agwassenaar,com ASTM D1621-10 COMPRESSIVE STRENGTH RESULTS MARCH 13, 2015 Grasspave2 Sand -filled Ring Units Source: 1001% Recycled HDPE Resins Form Tested: Four sand -filled Rings attached by grid and confined by taping (see photographs) I14e1 Area o.nu x o.uu x l u = ;01.st9 sq. in. Total Load Gross Area Net Area Deflection Sample No. Ibt sjs Strength (psi) Strength (psi) fial 1 500,000* 15,940 15,940 0.575 2 500,000* 15,940 15,940 0.581 3 500,000* 15,940 15,940 0.579 Average 15,940 15,940 0.578 Note: 1. *Maximum total load was not achieved, 500,000 pounds is the maximum load of this testing machine. 2. Testing Machine: Forney Model No. F-502F-F96 Serial No. 03040 Capacity: 500,000 pounds 3. Silica Sand: Oglebay/Norton washed silica sand, Colorado Springs, Colorado 4. Sand was confined by taping ring edges, 5. i Area calculated is the total gross and net area including the area filled by sand. I I INVISIBLE STRUCTURES' §DGRASSPAVE2 �GRAVELPAVEZ Soil Permeability Rates Data from "Civil Engineering Design Manual", 1995- Soil Type Coeff cm/sec Rate cm/sec Rate in/min Rate in/hr Description GW 2.5 EE -2 0.16 3.78 226.77 Well graded, clean gravels, gravel/sand mixtures GP 5 EE -2 0.04 0.94 56.69 Poorly graded, clean gravels, gravel/sand mixtures SW 5 EE -4 0.0016 0.04 2.27 Well graded, clean sands, gravely sands SP 5 EE -4 0.0016 0.04 2.27 poorly graded, clean sands, sand/gravel mix Best base course for GP2 and GV2 would be mix of 2/3GP and 1/3GW Rate cm/sec Rate in/min Rate in/hr 0.0272 0.64 38.55 TABLE ;SAUNDERS IED 10' r GREENWAY t J I r i H-20 and HS-20 loading H-20 Loading HS-20 Loading 8000 lbs 32,000 lbs 8000 lbs 32,000 lbs 32,000 lb, Dynamic •.• Sample Calculation Wheel. oad = WL= 8000Ibs (32,000 lb axle / 4) 32,000 lb load for single rear axle Dynamic Force = Fa =1.2 (20%greater than static force) Spread 'Area = A = 256 si (12"cover w/45 degree angle) 32,000 lbs / 4 tires per Weight of base = dy = 0.97 psi (12" road base @ 140 lbs/ rear axle = 8000 lbs per tire cf ) =(WLxFd /A)+dy 100sgin=contact area (10"x101 ova ova = (8000 lbs x 1.2 / 256 sgin), + 0.97 lbs. 8000 Ibs / 100 sq inches = 80 psi ova= 38.5 psi load results at top of RS3 Chamber 38.5 psi (256 kPa) on Rainstore3 Chamber with 80 psi (552 kPa) Static at Top H-20/HS-20 Loads of Cover E47.8 psi (330 kPa with HS-25 Loads] Rainstore3 has been independently field and laboratory tested to INVISIBLE meet H-20 Bridge Loading. S T R U G T U R E S` Lab tests determine average Rainstore3 load capacity to be 93 psi at 2x safety factor. www.invisiblestructures.com Grasspave2, Gravelpave2, and Slopetame2 can withstand 15,940 psi 303-233-8383 with fill material (109,906 kPa) or 2.3 mil lbs/sq ft. H-25 Loading _(7MF"MW77 10,000 lbs 40,000 Ibs HS-25 Loading 10,000 lbs 40,000 Has 40,000 lbs GRASSPAVE2 ILLI BY INVISIBLE STRUCTURES' 100% Grass Covered Porous Pavement CD CD 0 r� 0 Grasspave2 Flexible Plastice Porous Pavement • Maximum porosity • 1,ow to zero runoff Grasspave2 protects and en- • Free air/water movement hances the environment in three • Permits more trees ways: First, made from 100% • Cooler site recycled plastic, Grasspave2 ; • Greater oxygen keeps common consumer and in- • Removes air pollutants m dustrial products frogoing into • Can preserve existing trees landfills. Second, grass paving ° • Helps to meet "Green Coverage Codes" (n Cn directly improves the environ- • Fast, low cost installation Z Z (n ment by recharging water tables :°. 2 • Competes in cost with asphalt paving W W Z on site (reducing flooding hazards • No gutter and rain system needed > O downstream), reducing sources • No added land required for detention :5 :5of (n oils and solvents from asphalt, facilities O O absorbing carbon dioxide, and • Lower life cycle costs O O creating oxygen. Third, it en- arasa, ed {thin) Applications hances the beauty and quality of rsodd,dilNln) the built environment - replacing oQod&S sana Rn Grasspave2 -I In, 2.5 cln °%Rm U U hot asphalt paved areas with cool, HYe 09rowChurch/employee parking sparking green lawn -like ° sand and9-.1 •Overflow and event parking base wure..OWo121n . Golf cart aths Product DescriptionP �I�I=1��� subgrede 'HI ,1 I I�IJ1=Compacted IIII-1111- -1111- .Residential driveways Grasspave2 has thin -walled • Firelanes independent plastic rings con- nected by an interlocking geogrid structure, which, because it is Specifications installed below the surface, is invisible in the completed project. While the rings are rigid, the grid itself is flexible, which makes Unit Size - 20"x 20"x 1" (50 x 50 x 2.5cm) N O it easy to install on uneven grades, and reduces usual cut and fill Unit Weight - 18oz (5 10 grams) Z requirements. Strength - 15,940 psi (109,906 kPa) Connector Pull Apart Strength (Tensile) - 458 lbf/in The rings transfer loads from the surface to the grid structure and Color - Black engineered base course material below, thus preventing compac- Resin - 100% recycled HDPE with 3%" carbon black tion of the upper root zone of the grass. A single ring supports Shipped in Rolls (431 sq ft standard, other roll sizes available) IQ\NE small loads, such as shoes, several rings support tires and large 92% Void Space (8% plastic by volume) loads. Invisible Structures, Inc. REALTY CORPORATION The rings also act to contain the root zone medium (sand) and 303-233-8383 prevent lateral migration away from tires, feet, or other loads, www.invisiblestructures.com INVISIBLE This protects the grass root system, enabling roots to grow deep US Patent #5,250,340 S T R U C T U R E S" into the porous base course. The result is healthy, green turf at the surface. One person can easily install the Grasspave2 rolls at a rate of Merge Capita 70m2 (750 ft2) per hour, plus time for base course preparation and grass installation (seeding, sod or sprigging). Step-by-step instructions are included in our Installation Instructions, which w accompany each order. (� M Features and Benefits Kimley)))Horn • Allows 100% grass coverage instead of asphalt • Made from 100% post consumer plastic © 2021 KIMLEY-HORN AND ASSOCIATES, INC. • High strength to weight load -bearing capacity 421 FAYETTEVILLE STREET, SUITE 600 • Supports vehicular and pedestrian traffic RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KlmLEY-HORN.COM #F-0102 Material Safety Data Sheet Grasspave2 Grass Reinforcement System JDAVIS> Effective Date 15 May 1993 Invisible Structures, Inc. 3510 Himalaya Rd, Ste 200 Aurora, CO 80011 Emergency Phone: 303-233-8383 Product Identification: Product Grasspave2 Description: Solid plastic resin 20"x20"x1"high Injection molded grid integral with raised rings. Product Materials: HDPE (high density polyethylene) plastic resin, primarily from post -consumer and N� post-industrial recycled sources. May contain small percentages of other resins such as polypropylene, low density PE, or polyester. Health Hazard: Not Hazardous - per OSHA HCS 29-CFR-1910.1200. z :5 :5 m Fire Hazard: Treat as solid which will burn. Dense smoke emitted when burned without 3:O O O sufficient oxygen, which may emit carbon dioxide or other organics. Wear O N O O LLJpositive pressure, SCBA in any closed space. D N O N Extinguish Media - Water fog, foam, alcohol foam, CO2, dry chemical. 0 � \ U m >_ Flash point & Flammable Limits - Not Applicable. Q F-- Q m N C� m C� \ Spills or Leaks: Not Applicable. Q = Z w S O � 0U Storage Instructions: Plastic materials used have been modified with Ultraviolet light inhibitors to resist O U w � = degradation. Normal storage outdoors for periods of up to 4 weeks should not vn o o U cause any damage to the product. If longer storage is required, cover the product with a tarp which will protect the product from sunlight. Waste Disposal: Recycling of this material is encouraged. Landfill disposal of waste product may be made in accordance with local government regulations. This product should be considered non -biodegradable. /r Disclaimer: The information contained herein is believed to be accurate. However, it is provided solely for customer \� consideration, investigation and verification. Invisible Structures, Inc. hereby specifically disclaims any and all warranties - expressed or implied, regarding the accuracy and completeness of such information, and makes no representation with respect thereto. w V / WJ Irrlr I D 0 Q w Z 0.r' W IIIIIIIIIIII IJ Q U Z N O iIL U/ O J W U) Q LLJ Q La w W U=�Z W J Q nQ 0 SHEET NUMBER C0.1 J Q z Q 0 Q U Li lL Q 0_ N O cn _C U) 2 a U N O O 0 i Ld 0 J Q ,. I: 00 N O N J Q z Q Q u LL LL Q N O U 0 J E i c� m 0 v m v m m N N LLJ 6 O 0 Q C O Q Q C O I T N E Y O T (n U) U Z W z LLJ cn z o J Li N? 1E� O O w . S MCDOWELL ST. S SAUNDERS ST. NB D � L U) 0 — w w0 c `� Q Q wo 0 wZ Q N O z a 0 S DAWSON ST. U) Z 90 50' E —♦ —, w CD = 3Y REALTY CORPORATION Q w �/0 ° RESERVE AT LEAST 320 SQUARE FEET OF SPACE z o ON —SITE FOR BIKE SHARE INFRASTRUCTURE z Merge ergeCapital 6 I I g JJ c o :° I I I I Q z � U ZD Q Kimley)))Horn I I 0 0 Q w ~ No 3 © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 cn o w � m RALEIGH, -6 2760120 PHONE: 919-677-2000 RESTRIPE EXISTING PEDESTRIAN CROSSWALK I SI TE I w Q a J WWWKI#F 0102RN.COM 0 ON SOUTHBOUND APPROACH TO CONSIST OF HI —VISIBILITY I I o _j w= MARKINGS AND UPGRADE CURB RAMPS z � < �' w ~N Q) oN Q z l O oZ JDAVIS> E DV) I I LLJ 0 I �-�--� �-�--� I Z w ic J (/ o g c ° J V) I C/� I 0 0 0 U w o N w Q g� o 0 Q 0 N Q g�oP E Of LLI `—'=150'(RESTRIPE)100' � N o co 31: LLJ NJ Of a ` • �� O X U W N —3: N O N O = U U O O 6 Wm N m o m m o Q 200' Z �O = 0 1 — z z w ) �a C)wc � = U_ U / /1 QQ Z 3 Q Q o = J Q QQ U Z ozQ wo wQ U Q a Q = U Q N =Of W = ./ z~ - v Uwe J uJ N 0 T o O LdLL 4y* 3 Q) a Q � J Q V) F- wZ Q w w 0 o= N i D J LEGEND Z `` ~ O 0 Ld w O N F- w ° `0 EXISTING LANE ZC) Q Q 00 z J = U EXISTING STOP SIGN wD U)o O EXISTING TRAFFIC SIGNAL ~� 3 TI 1 Ld W Lv Z 0 Q RECOMMENDED LANE �w w tU o� 0 J ° co RECOMMENDED STOP SIGN ~w U) ° Q zO W N 0 W �i XX STORAGE LENGTH Dm Q ~ Q 0 0- w W U= Y _ �- O O Q F_ w n/ J I..L Q LL_ O o U E SHEET NUMBER O co 0.2 I ° U U c I \ u ° Q a c ° L Is, o T �\ E \ Y \ \ I\ o EX. ASPHALT TO BE RIM_ SMH Q SAWCUT AND TYARD INLET IN, \\ INV IN5254.33' 8" CLAY STUB (N)cy / y� REMOVED (TYP.) INV IN: 261.52' 15" RCP (N) \ INV IN=254.63' 6" CLAY (SW) / 4 o ""' " 261.23' 15" RCP (SW) \ INV OUT=254.28' 8" CLAY (S) / 261.20' 18" RCP (E) \ z EX. STORM EX. POWER POLE TO EX. POWER POLE TO CURB INLET Q ° DRAINAGE TO BE BE REMOVED (TYP.) BE REMOVED (TYP.) TOP=257.97'\ ° ABANDONED IN EX. POWER POLE EX. LIGHT POLE INV Irv=z55.87' 15" RCP (S) EX. POWER POLE /� �eH� TO BE REMOVED INV IN=255.12' 18" RCP (W) TO BE RELOCATED / j EX. POWER POLE TO 10.0' w x a.o' H TRIPLE z o PLACE TYP.) TO BE REMOVED - \ EX. TRAFFIC SIGNAL BE RELOCATED BARREL CULVERT INV OUT=254.98' 24" RCP (E) / o ° (TYP.) (TYP) (CONTRACTOR TO / / m \ \ LLJ � O r7 O I- ­­ z w z w cn z O O U O U Li U U J .o IN o ��� �'�� SMH COORDINATE WITH / / \ POLE TO REMAIN. (CONTRACTOR TO INV=243.96' O o N EX. POWER POLE RIM=260.37' - \ \ CONTRACTOR TO COORDINATE WITH N z EX. BUILDING TO CURB INLET INV IN=251.79' 8" CLAY (N) UTILITY PROVIDER) / / \ PROTECT IN PLACE Q TO BE REMOVED PLR CIS) TOP=2so.3s'' UTILITY PROVIDER Ld TION Box BE DEMOLISHED CURB INL INV OUT=251.70' 8" CLAY (E) -(TYP.) \ / \ / / \ TYP. ) DEMOLITION NOTES w a 1 V OUT=257.81' 15" RCP (N) ) ( ) L (TYP.) (TYP.) roP=266 5' \/ / \ .(TYP.)- - - - O I V OUT 260.9 yA� y _ � iS O'' P-- ---OHP --- ��� -OHP Q o - � �OHP - `� -oHP - - - - -- -OHP - -OHP -oHP_ _ _ - - - - -OHP - - - - - - T \ / /, 1. CONTRACTOR SHALL COORDINATE WITH THE CITY OF RALEIGH TO OBTAIN ALL _ _ _ EX. SIDEWALK TO BE \ < _ - - EX. ASPHALT \ r„ REMOVED (TYP.) EX. CB TO BE \ ' , ' NECESSARY DEMOLITION PERMITS PRIOR TO THE START OF ANY DEMOLITION WORK. S SAUNDERS STREE TO BE REMOVED METAL CONVERTED TO JB Z (D \ VER AL SIGN � �p SIGN Post EX. PROPERTY / �` PosslP__ NcYIo ox 2. SAW CUT AND REMOVE CONCRETE CURB TO LIMITS REQUIRED FOR NEW WORK. O / (TYP.) 0- N ONCRETE � ( ) \ (PER GIs) (TYP.) -�� IQ\Nl 16" CIP WATER LINE PRIMARY STREET) \ _ W No SIG LINE TYP. \ -\ EX. CURB & REALTY CORPORATIO o Y _ - - uRe INLET \ \ GUTTER TO BE - _ _ - 3. REMOVE VEGETATION AND GRASS IN AREAS TO RECEIVE NEW ASPHALT AND Z T - �/(VARIA E WI H PUBLIC F IV) 6" CIP TER LIN I / \ / 16" CIP WATR' LINE / �0 pOP=257.6 o I "� ti / g D� `L ��,� �� �,� ,°� a INV IN=2 Sss 1s R°P (S)�^ REMOVED (TYP.) -� - / CONCRETE PAVEMENTS. ^ - - - - 6 _' - N _5 -4 IN IN� .75' 24" zi_ �- / /1P I UT=250.10' 3s" RCP - - �� 25� �� 4. SAW CUT AND REMOVE ALL ASPHALT PAVEMENT TO LIMITS INDICATED ON PLAN. z / _ 1 I / \ - - -- Q• pp rr�� }ram / / _ / S 32'07Rwr- _5. DEMOLITION MATERIALS SHALL BE PROPERLY DISPOSED OF OFF SITE PER STATE X ° ® .10% - i N / ✓ / REGULATIONS. w Z OR EL 9.50 C / „� ✓ _ - - 0 0 / 20. / eLocK ,-sr qr euILDwG /ZfYc,` 5 / I r ;1'q \, 6. ALL PRIMARY UTILITIES DISCOVERED DURING DEMOLITION OPERATIONS THAT SERVE AREA: 4 SF. r; / \•�` / / " 1 ( ACTIVITIES OTHER THAN THE PROJECT SITE SHALL BE PROPERLY PRESERVED AND (� C J) \ 11( FFE: s.1,• L O I I / / / I E E I -x / \ ' I v 242�23' PROTECTED. Kimley*Horn w �' � I � rn / ��\ INV=2'42 / - I I (I PIN# 17034427 \� STO / cs SMITH LLc / I�� / I (/ fI II 7. THE CONTRACTOR SHALL IMMEDIATELY REPORT TO THE OWNER AND ENGINEER ANY CONCRETE w FAME, • \\� 0 PIN 1703453051 J I n } Cs- MITH LLc RACE n I I' I V DB 16758, PG 276 "�0 L DRAIN G / DB 11428, PG 486 c� I / / / / ll/ / I ///f INV=241.97' UNFORESEEN OR ADVERSE CONDITIONS, INCLUDING UNCHARTED UTILITIES, © 2021 KIMLEY-HORN AND ASSOCIATES, INC. PIN 1703442339 5F. s LL� I (1001 S SAUNDERS ST) / AB D9NED I OIL TANK / �/ / / / DISCOVERED DURING DEMOLITION OPERATIONS. 421 FAYETTEVILLE STREET, SUITE 600 ° \ # 1 I , II'\ 8,356 SQ. FT. O \ J GRAVEL 49,985 SQ. FT. \' / EX. BUILDING TO / / /Y � L � DB 17330, PG 1278 23. I I / / I GRAV / � � RALEIGH, NC 27601 1 \ OD 0.19 AC. - (T \ J 1.15 AC. BE DEMOLISHED / / / // / / / SFHA 8. SUBSURFACE FEATURES ARE SHOWN IN APPROXIMATE LOCATION. CONTRACTOR IS PHONE: 919-677-2000 / ( U21 B S SAUNDERS STREET) J, \ I1 \ - \'• 3- / / o \ EXJCONCRETE TO BE ' TYP. / // / / / 1 WWW.KIMLEY-HORN.COM r \ \ o / / (TYP.) / /J✓/ /// / I \FLOODWAY LINE RESPONSIBLE FOR SUBSURFACE UTILITY EXPLORATION TO DETERMINE UTILITY 6,454 s EX. ASPHALT / / EX. BUILDING TO a! / \ l , '� / / I #F-0102 o.1s TO BE REMOVED \ ) // / / °�� BE DEMOLISHED mow, / \�% REMOVED/(TYP.) ,' //1 // / / ///� 1 LOCATIONS AND DEPTHS. TYP. EX. OIL TANK ./ �`y / I I 0 3dau," //` oyA ( ) �� y \ \ _ - 1 /// / / 6pZL� / (TYP.) m�\\ �,� / (TYP.) / `f ���1�� ��\\, //// ( �- I ' 9. EXISTING STORM DRAINAGE CONNECTION CANNOT BE DISCONNECTED UNTIL NEW v - �7• \ CS SMITH LLC . /// / :S `� / / J` /1 v # �' s LeoLLARD / RElvl TREES BE \ \ / j y ✓ / / \ I o STORM DRAINAGE IS IN PLACE. PIN 1703442683 I / / O 7 N ✓✓� cs SMITH LLc - // jl�'Y E ) / / \ \ (� // / / //// r # DB 17288, PG 1so1 0 SMH // / // � / / , v 10. EXISTING SANITARY SEWER CONNECTION CANNOT BE DISCONNECTED UNTIL NEW j PIN 1703PG 127 \ } EX. BUILDING TO / \ (1015 S SAUNDERS ST ` / a , / DB 17330, PG 1278 \�\ \ 21,612 SQ. FT. //� ✓`7 / RIM=25�.96' < �\� ��/ �/ / '-1 SANITARY SEWER IS IN PLACE. H>(1oz1 s SAUNDERS sT)�^ \ JDAVIS> BE DEMOLISHED _ / I Y J 6 \\ \ 0.50 AC. ////� / l 1 V IN=25 .44' 8" CLAY/(NW) >o / (` o \ P (TYP.) - 6' G IN� OUT=24 0.06' 8" CLA (NE) 2n / �! D a 4,894 sQ. FT. J \\�� _ / / // �.'9� / o, I / ROW TO BE / / e /�/ / PARI���R / c PIN# 170344341z ` � / N ,per EX. SS R TO EX. STORM \ / �. DB 16872, PG 1643 / / / % \ ABANDONED TYP. BE REMOVED �\ / / \ \ �' // L .o (TYP.) / DRAINAGE TO BE > + \ 1019 S SAUNDERS ST / \ �I -1 \ a / / S• \( )� / \ ° / / �w \ / / \ / / / (TYP.) REMOVED (TYP.) - / / // %�//� o Y \ +2s•S / ��� 5,504 SQ. FT. / / \ I \ ErnL� �� 61. \ _ i / A /� ✓ " `( it / / \ ° yFo \ 0.13 Ac. / \ \ / \ LLA&K/ /�// . 1, 2 FENCE TO BE \ / // Q ° LLc 1 / ° \ \\ / �o°' i / / \ s// // /� / - / I m CURI ° ,08 \\ �� \\ \ e \ \ / \\ GRA/xEL / j�//// - EX. CONCRETE TO BE , 60' REMOVED,,(TYF `56 _( / /// / / = SIGN / TOP: .o_ 1643 / \\ \ \ \ / / \\ / LEAN 0 - / /// •cP REMOVED (TYP.) FENCE�ip Ts EX. S ORM DRAINAGE TO �• '\ //�// / / / / %�/- o INV / / \ \ \ \\ UILDi aoLLA� j / - L \-255 42" CMP 2S ST) I \ \ \ \ \ / / i N� / o L \ \ \\ Q \ \ // TREES TO BE\ / AREA a sF. / /// \ _ .25 MAIN. CONTRACTOR \ N INV-2 rn r. wti/EMOVED TYP. \ / / HEits.o .� /// / / \ T PROTECT IN PLACE 1 / - ,�ice x aL a J I \ \ PARIS FAMILY PARTNER. (TYP.) / \ i / / _ �' �� / _\ % / �j/jj//� WOOD POS / �I U 0 ✓� \' R \ ` ' ✓ \ DB 16872,,3PG41643 \ \ $ / -253- / /�/ j // } o 'N' # \ \ // / \/ /� l J / / / I 9 s, * �- \- ^ (1019 MOUNT HOPE DRIVE) - / / / / / �� / // / / ////// / 500-YEAR \ / E \ \ �- - - - / / �- // I \ FLOOD ELEVATION � •- / ✓ 17,228 SQ. FT. / / / / / / / k FEMA FLOODWAY / _ _ / / \ / / / o a r / PARIS FAMILY /0.40 AC. / -�' -✓ o�' L�-/ \ PARTNERSHIP LLC / \ / / - I / / 2 - - - \ . / J / // / - -` / (TYP ) / - /// / v\ ^ ✓ / �\ ` 100-YEAR FLOOD # 7 _ r �_ / J \ / // ELEVATION /� _ \ I _ _ / S8_ \ / y / / /i / 251- // / / / ° \'I PIN 1703443344 I \ \ /A / - \\ - - / //// N o \ 4 DB 16872, PG 1662 1 988, I \\ \\ / - �-�///����� 029 S SAUNDERS ST L `/ /� - �/ / / j/ ✓-�� \\ \ - �" • ` / o ) ' \ PROPERTY LINE TO / ` -- / \ / / - // / / /�/� i/ / /// / O u� \ '\ �` �- / -YEA \ \ 5,214 SO. FT. / _ L -�\ �\ ABANDONED �T� / /// // 1` / 1A - - /_ � /� / /moo �,F�� _ / rn \ \� / 500CIV EAR O o \ \ \ I �- / \ \ \ 26 ,\ / / / - _ h ✓ ` CS SMITH LLC //// mac, /� , �S PIN# 1703444797 i / // / r.��/ _ ✓/ - - \ \\ VL / '� \ \ \ 96$\\ / / �' % DB 16758, PG 2767Ld / ` - // /i/�i / // - O �\ e 24,293 SQ. FT. JI 1\ \ \ \ I 1 ( / /-`09\\\///l �l I ROW TO BE 2.8s Ac./�,/ /_ _ j//i% /� ' `� \ \, / // /\ 2� S- / � -\ ABANDONED (TYP.) �/ /�/ // // �� � �I� �1. / 36" FES / + INV=242.88'/ I \ \ I \ PARIS FAMILY PARTNERSHIP ILL \ / I ' / % / /� FLOODWA� �/ 67 // SMH \ \ \ / �'' �` /// /�/ LINE f _ / ✓/ RIM=251.12' PIN# 1703444451 \\ _ // / rod I /_ ✓ / _ �� / / / \ \ DB 16872, PG 1662 \\\ / //� ✓ - `� I ✓ ✓T //� , / // //% / / / X�L+/ INV IN: 24.80 " DIP E) / / , / / �� / / / / INV IN:246.80 6" DIP (E) I � 0 \ \ \\ / (1027 S SAUNDERS \ \\\\ ` n \\ \ \ / / �\\\ \ \ �� / �// `C�J��,k _\\ \\2$6_ // // %�' //// J�OP OF BANK%�/� j/// / /// / INV OUT=246.57 8" DIP (s) 13,008 S0. F \ ✓OH \ \ \ ( 0.30 A \ ! ��/ / / FENCE TO BE \ / / / % / // _ (TYP.) / / RIM=255.42 / / \ Q / / / �% / �� // / INV IN=248.92' 4" PVC (w) \ / c, \S / REMOVED TYP. / / NV _ PIN# 1703444351 �'� l / ( ) / / / , 11/I / J �� / - / / / // / >j INV OUT 247.878"BCLAY (E / " 25j- J PARIS FAMILY PARTNERSHIP LLC / \✓ e ;� �i \ k/ / / //// 24OG ✓ / \ J � - DB 16872, PG 1643 / / j� /� / � � \ � � / / / � }/ //� / � / - _ / / / / / / �// / � / DIP ° / (1025 S SAUNDERS ST) / �/ \ \ / \ 50' STREAM /i / j // /// \ ,oYEA}2 FLOo / - ^/ / / / // / / ✓ // 250•71 / BUFFER (TYP.) 6,467 SQ. FT. // / / _ ✓ } //// / // 100-YEAR / / / pi ]� /H/OMELESS / 0.38 AC. �/ // / // / I / cAMP S / // C FM L/EVkT� �1 ° / �/ / ///// /// 4 J/ / 25 �/ (1 / \ / X/J/ FLOODWAY LINE N rn o cn 2� I S ` // / SFHA o A //�- / 1, / / - ////// / \ \ / / / y 2" CPP 18" CPP INV=246.51' �� z � \ / / / / INV=246.08' _-- 0 �,� 100-YEAR FLOOD o� � a / / ////%/� // / / o J // I / / / ��/� ✓j - ELEVATION -- / / / \���/i �f 18" CPP k/ RMH251.40' /> INV -243.5 ' m///✓i / //1.1� s� YYo/ / S�IH ' / y /// /� //// / / % / / /_ 0 - / INV OUT 424 08 8" DIP () ) ���,P //RIM-251.37 - / Z / / / / j / // \ _/ / - ���yaa 4A. (W) / / / /',',,o' -• � / / / / // ✓ / / INV IN=2 97' 6" CLAY / Q / %// /// // e Dc� / �� / / INV IN=2 92 6" CLAYI(SW) 7 / _- o 500-YEAR /�� / INV IN=2 2.9T 6" CLAY�IJ) \ / \ \.`?244 18" CPP FLOOD ELEVATION / Z ? /6j + f - INV OUT= 42.92 6" CLAVSE) / / j� // / D� / 4 \ / / l i //// /// /� 5✓; S L S // �a / / \ \ / / / // /�/ d/ - 3\\\ / 1 i INV=244.38' / /� / /L'q41 t4 / / l PF�OPERTY LINE=\ TO \ / �� / 2 ✓ J > a / 20, /�� / ' t / eF� da • �6f / / Y \ Cs SMITH ILL �Y �. "O /// /�j / rD O a / ��� ti - ^ `�i j /2/ / / l� I l PIN# 170344654I ABANDONED �YP.) / s %// / '� / �245- ( / S��,�>� �9 DB 16758, PG 2773 / / `S" / / /� / �� -{ / NRP GATEWAY PARK LP LLJ o \ ✓ PIN 1703448901 0� r�\ / / �/ \ \ \ \ 39,806 sQ. Fr. S3\ `/ / / / sFHA / � EX. PROPERTY / / /o DB 0898, PG 818 0.91 AC. \ \ / // o / FLOOD LINE i LINE TYP. o \ / \ / / ( ) / / A BM 2002, PG 1698 Q a \\\\ I \ / \ \ \ \ / / / / / / / /�/ ) ° \ \\ \\\ \ / \ \ \ \ �2 / / //j�//� / / / // / / SMH (ABANDONED) RIM=249.42' / ' \\ \ \ \ \ \ \ / // / INV IN=245.57' 8" DIP (N) r / Z \ \ \\\\ \ \ I 100-YEAR'\ \ / / / // / /�y INV OUT=2145.67 8" DIP NE ° I \\\\\ \ ` \ ELEVATION \ \ \ \ \ �- /��/ ( ) Q o \�� \ \ \� \\ 500-YEAR \ \ \ 2$1 / \\\ \\\ \ FLOOD ELEVATION/// �\ \\\ \ \�sr O ° \\\\� EX. PROPERTY \ :\ LINE TYP. \\\ \ \ \ \ 2 / / / SMH / Z \\\\\\\�\ \ \ \� \\\�\\ \ \ \ \ \ 5(8 ✓ _ !/g / / RESERVED FOR RIM=251.16' / \ \ \ \ \ \ \ / / / GREEN WAY EASEMEN / \\ 25(� / / INV IN=241.96' 8" DIP (NW) n\\\\ \\ \ \\ \ �\ S 2 �- / I BM 2002, PG 16 8) INV OUT=241.85 8" DIP (SE) X \� \\\\ \� \\\ \ \ \ 1 ,• 4s. /LLI ///� N XC \\ D 0 as a S H \\_ \\ \\\ \ \ \ o �/ \\\\ -RIM=248.77' / �\\INV IN=(FULL OF WATER) \\ \\ / / / \ 1 FLOODWAY LINE 1 l _ ° / \ INV OUT=(FULL OF WATER)\\�\� \ ° / TOP OF WATER:242.77' \ \\\ a 00 K1 BOTTOM OF BOX:240.27' \\ \\ \� / ✓ �� l / GO 0 o \ \ \ \ F 100-YEAR FLOOD ELEVATION / \ \ 500 YEAR ( / n / I ♦ \ \\ \ \�\\ \ M� FLOOD ELEVATION -� 3 \ \ E / \ \\� 8.0' Wx8.0'H PEDESTRIAN TUNNEL o �y // ♦ / \ ♦ / \ GRAPHIC SCALE IN FEET / / I / �\ / 0 20 40 80 D // I 0 a / / ♦ / �� \ X / I \ \ \ o� LEGEND O BOUNDARY MONUMENT FOUND Co O BOUNDARY MONUMENT SET O SAN SEWER CLEANOUT � CALCULATED POINT S SAN SEWER MANHOLE ■ CONCRETE MONUMENT FOUND ❑E ELECTRIC BOX © GAS METER GV N GAS VALVE DECIDUOUS TREE O LP TANK CONIFEROUS TREE 0 BOLLARD SHRUB CATV CABLE BOX <�H FIRE HYDRANT RIP RAP ❑ CONCRETE WV H WATER VALVE ® WATER METER ® MONITORING WELL ID TELEPHONE BOX Q TELEPHONE MANHOLE ® HVAC UNIT E3 FIBER OPTIC MARKER cQ, UTILITY POLE GUY WIRE >Yc LIGHT POLE MAILBOX -o- SIGN SURVEY CONTROL POINT ® STORM INLETS ® FLARED END SECTION STORM DRAIN LINE OHP OVERHEAD POWER LINE FW FEMA FLOODWAY LINE FEMA 100 YR FLOODPLAIN LINE - - FEMA 500 YR FLOODPLAIN LINE CREEK LINE TR TRAFFIC SIGNAL LINE SS SANITARY SEWER LINE X FENCELINE GUARDRAIL WOODLINE 3: U U O NO w N O = O O LLJ c\ �\ �_ N Q m 0 0 Q O \ w Z Z Y Y O Q cn Q w V) 0 0 0 p Z J Q (D Z z Z � O O � X w - J 0 z O w U p U z Z D 0< LL LIJ U) 0 w 0� < w LLLI Z Q CD J Q LL- 0 O n c� SHEET NUMBER cl .0 U o NOTE: .- ° 1. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES IN Q U.S. SURVEY FEET. (UNLESS OTHERWISE STATED) 0 2. ALL BEARINGS ARE BASED ON THE NORTH CAROLINA STATE E PLANE COORDINATE SYSTEM (NAD 1983/2011). 0 = 3. DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. T E 0 .J' 0 0 3 ° 0 ° 0 ° U) o BUILDING OR WALL as° min min 36" o � PEDESTRIAN CLEARANCE min 72" SIDEWALK 4s" Y min o TREE GRATE 96 min 36" Y Lu Mmin m T BIKE RACK BIK� min 48" min 36" Q 12.5' FUTURE ROADWAY 0 C/L TO BOC- = STOP SIGN (TYP.) E 36.5' C/L TO Y PROPOSED ROW >1 15' X 3 4 0' SIGHT TRIANGLE STOP BAR ° 15' X 340' (TYP.) ° SIGHT TRIANGL Q -- TIE INTO EX. CURB 0 & GUTTER (TYP.) S SAUNDERS TREET o (PRIMARY STREE ) — �yARIABLE WIDTH PUBLI R/W) N — — o — _ __ ------- (n -- 62.10' VEL 3 L 79.50'1 _ S 10'49'57" W — --- r Q o 3e 'N CONCRETE \ SIDEWALK (TYP.) �o-A � PROPOSED ROW y wi TETE w n FRAME DEDICATION E } a CS SMITH LLC RAGE F \ O \ PIN# 1703442339 SF. \ �,y CS SMITH LLC 0 IDS 17330, PG 1278 23. Ry, PIN# 1703442592 \ I N -0 Q3 DB 17288, PG 1501 (� \ 021 B S SAUNDERS STREET) / (1017 S SAUNDERS ST) \ } / 6,454 SQ. FT. 15,096 SO. FT. o Z � \ \ 0.15 A\\/ tigg98 0.35 AC. 5' AWNING v, s /off gss9 23 tiw 3goa, (TYP.) � cs SMITH LLC �Y a DOOR TYP. PIN# 1703442374 POD A N DB 17330, PG 1278 a (1021 S SAUNDERS ST) \ )- BOUNDARY a o * PARIS FAMILY 3 ' CURB & a 4,894 SQ. FT. PARTNERSHIP LLC U E \ 0.11 AC. / PIN# 1703443412 / GUTTERN(TYP.) DID 16872, PG 1643 \ �s �} (1019 S SAUNDERS ST) A, R7 Jr / PIS FAMILY s)y� U�� 5,504 SQ. FT. OA�� POD A S.0' 0 NERSHIP LLC A� .0� 0.13 AC. ar,• BOUNDARY O 0 17034432081, 872, PG 1643 Q 0 SAUNDERS ST) O�\ ti'° 06 SQ. FT. a w PARIS FAMILY PARTNERSHIP LLC / o 011 AC. PROPOSED PROPERTY � g S• a 9eSRo1F LINE (TYP.)- / Q /,—o DQ. F I. � PARIS FAMILY 0.40 ACcn . / o� PARTNERSHIP LLC PUBLIC ACCESS b 6 PIN# 1703443344 3 �o DB 16872, PG 1662 AND CORPUD O•\ �• ` �'�s "\�(1029 S SAUNDERS ST) UTILITY EASMENT /y 5,214 SFT. 3 A / O � \- 0.12 AC. N IILY J� 7411 / e 0 .0 - LLc\" CORPUD UTILITY T 20.0e r4.O' 3 1643EASEMENT )ERS ST) ) PARIS FAMILY PARTNERSHIP LLO 0PIN# 17034444 60 DB 16872, PG 1662/FT.> D- (1027 S SAUNDERS S LLJC) 30' CORPUD SS_ 30.0'o Q / \ 13,008 s EASEMENT �! w 0.30 . /tip X. (D /q .c„�i PIN# 1703444351 0� PROPOSED BIKE / 0- ,� $ g0 PARIS FAMILY PARTNERSHIP LLC �RACK (TYP.) DB 16872, PG 1643 ° (1025 S SAUNDERS ST) 0 16,467 SO. FT. oT 0.38 AC. �A 20' PUBLIC DRAINAGE / 0 0\lps. EASEMENT (TYP.) /004 Lo Ln O AiP. ° 100-YEAR FLOOD / ,O• All - ELEVATION CONCRIETE �� O500-YEAR \ FLOOD ELEVATION (TYP.) y4° 0 29.76' 0lcv `A S 0 9 ' \ • /p / ° POD A -- BOUNDARY --/ \ _j 10' AS ULTI-USE-PATH (TYP.) o ° 100-YEAR FLOOD N L \ \ ELEVATION (-D \ o A 500-YEAR FLOOD ELEVATION o 10' PUBLIC ACCESS \ EASEMENT (TYP.) _ ° � a o s U) oo• CL -cE / ° ° � U — O \ Q) — S � �w Q �- 3 so ° E c, L U � ` \ v 0] Q U -6 O 0� STREET nuviv v nui-" BOLLARDS, TYP. / / RALEIGH GREENWAY / ■ ■ ■ ■ / EASEMENT, (TYP.) / P / s 10' GRASS PUBLIC ACCESS / / PAVERS (TYP o� J EASMENT / �O / p, • O• / / EX. PROPERTY / �W';^ LINE (TYP.) \ / 50' STREAM / BUFFER (TYP.) 6 RESERVED FOR / (20,GREENWAY EASEMENT / / ROOF OVERHANG (BM 2002, PG 1698) 292 NO TEMPORARY OR PERMANENT ENCROACHMENTS (INCLUDING BUT NOT LIMITED TO CLEARING, GRADING, FENCING, AND THE INSTALLATION OF RETAINING WALLS OR OTHER STRUCTURES) ARE PERMITTED WITHIN THE GREENWAY EASEMENT AREA WITHOUT PRIOR APPROVAL BY THE CITY OF RALEIGH. IN, _OADING ZONE \ EX. TRAFFIC SIGNAL POLE -TO _REMAIN. 100-YEAR FLOOD ROOF OVERHANG/ �Fw ELEVATION \ 500-YEAR FLOOD ELEVATION "OE10' ASPHALT / MULTI -USE -PATH i I I NEW POWER POLE (TYP.) EXACT/ 4 LOCATION WILL BE/ COORDINATED WITH PROVIDERS AT START / OF CONSTRUCTION PROPOSED CROSSWALK i VALLEY CURBING AT FIRE ACCESS TIE INTO EX. CURB & GUTTER R (TYP.) Ll- v / C �� :ESS X,00 30' CORPUD SS X� EASEMENT (TYP.) -�Fl i < wti a POD A rn BOUNDARY \ YEAR FLOOD FLOOD ELEVATION \ 100-YEAR FLOOD k ELEVATION / SF FLOODWAY TANG LINE PEDESTRIANyX�x GREENWAY --� BRIDGE TOP OF BANK tico (TYP.) 100-YEAR FLOOD ELEVATION 0-YEAR m DOD ELEVATION / X N m o X� SFHA FLOOp N T DWAY LIN N �O� 100-YEAR FLOOD ro ELEVATION / 500- oti YEAR /FLOOD ELEVATION NRP GATEWAY PARK LP / PIN# 1703448901 c BM 2002, PCC1698 / / 5 "J a / EX. CITY OF RALEIGH ROCKY BRANCH / \ GREENWAY TRAIL l FLOODWAY LINE 1 l / 1 z 3 EX. CITY OF RALEIGH ROCKY BRANCH GREENWAY TRAIL GRAPHIC SCALE IN FEET 0 20 40 80 100-YEAR FLOOD ELEVATION /Y 500-YEAR I I I 1 I SITE LEGEND PROPERTY LINE EASEMENT LINE FENCE STANDARD CURB AND GUTTER O$ PARKING SPACE COUNT SIGN (SEE PLAN) ❑-o-❑ LIGHT POLE 0 WHEEL STOP Wl ACCESSIBLE PARKING MARKING (VINDICATES VAN ACCESSIBLE) DIRECTIONAL PAVEMENT ARROWS ACCESSIBLE RAMP 4— DEPRESSED CURB RAMP LIGHT DUTY ASPHALT HEAVY DUTY ASPHALT STANDARD DUTY CONCRETE a • o GRASS PAVERS • • • ' ASPHALT GREENWAY �' • • HARDSCAPE SITE DATA PROPERTY INFORMATION EXISTING ZONING: PD EXISTING USE: AUTOMOTIVE, RETAIL, VACANT GROSS SITE AREA: 6.02 AC (265,514 SF) RIGHT-OF-WAY DEDICATION: 0.32 AC (13,965 SF) NET SITE AREA: 5.70 AC (248,549 SF) BUILDING SETBACKS: PRIMARY STREET = 0' SIDE STREET = 0' SIDE LOT LINE = 0' REAR LOT LINE = 0' PARKING SETBACKS: PRIMARY STREET = 0' SIDE STREET = 0' SIDE LOT LINE = 0' REAR LOT LINE = 0' PROJECT DATA PROPOSED USE: OFFICE/INSTITUTIONAL, RETAIL, RESTAURANT, RESIDENTIAL PIN# 1703442683, 1703442592, 1703444408, 1703444451, 1703446541, 1703442776, 1703444797, 1703453051 PROPOSED # OF BUILDINGS 1 BUILDING GROSS FLOOR AREA: 371,640 SF PARKING: REQUIRED: RESTAURANT - 1 PER 500 SF RESIDENTIAL - 1 SPACE PER DWELLING UNIT NO PARKING REQUIRED FOR FIRST 16 DWELLING UNITS. 1*(16,800/500)+(336-16)*1 = 354 SPACES PROVIDED: 691 SPACES ACCESSIBLE PARKING: REQUIRED: 14 SPACES PROVIDED: 21 SPACES TOTAL (4 VAN ACCESSIBLE) SHORT TERM BIKE PARKING: REQUIRED: OFFICE/RETAIL - 1 SPACE PER 5,000 SF, MINIMUM 4 RESIDENTIAL - 1 SPACE PER 20 UNITS, MINIMUM 4 1 *(16,800/5,000)+1 *(336/20) = 20 SPACES PROVIDED: 20 SPACES LONG TERM BIKE PARKING: REQUIRED: OFFICE/RETAIL - 1 SPACE PER 5,000 SF, MINIMUM 4 RESIDENTIAL - NONE 1*(16,800/5,000) = 4 SPACES PROVIDED: 4 SPACES AMENITY AREA: SEE LANDSCAPE PLANS FOR DETAILS REQUIRED: 248,549 SF X 10% = 24,855 SF PROVIDED: 36,416 SF SITE IMPERVIOUS AREA: EXISTING (PRE-DEV.): =58,810 SF (22.68%) PROPOSED (POST-DEV.): =145,054 SF (55.94%) COMMON OPEN SPACE: REQUIRED: 10% OF TOTAL POD AREA 248,549*10% = 24,855 SF PROVIDED: 51,499 PRIMARY COMMON OPEN SPACE (21%) I— --- z z cn LLl w z O O O U U LLJ u u N O KANE REALTY CORPORATION IlVerae CaDitall Kimley)))Horn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY-HORN.COM #F-0102 JDAVIS>I z U U m N 3: O a� cl:� O w N O = 00 N �\ �_ N Q m o Ld o Q O \ w z z LLJ 0 w < _ v cn o 0 0 w aQ Z J J W u z Z 0< LL LLJ0 U) w <0-w Z Y i CD w J LL- 0 0 SHEET NUMBER C2.0 o NOTE: U ° 1. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES IN Q U.S. SURVEY FEET. (UNLESS OTHERWISE STATED) 0 2. ALL BEARINGS ARE BASED ON THE NORTH CAROLINA STATE L PLANE COORDINATE SYSTEM (NAD 1983/2011). 0 3. DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. E Y O T 0 0 0 0 0 U) U c N 0 U O U) Q a O cy 3 0 = � I � T N m E = X Y LT z D-' O a 6 S SAUNDERS ST o _ (PRIMARY •ti i rtcr i ARIABLE WIDTI -'I INf C - -- m=--—--—----- — N-—— ------- ----� - — — — — — — — oe U o L GRAVEL -c �/ x (0 O c c t 2" METAL 6 3 _ PIPE \ / CONCRETE N w n FR qM\ N I E } CS SMITH LLC RAGE \ ° \ PIN# 1703442339 sE ( CS SMITH LLC o / DB 17330, PG 1278 23. CS 1703442592 \ I e U0 (1021 B S SAUNDERS STREET) (D� DB 17288, PG 1501 \ N (1017 S SAUNDERS ST) �� } / 6,454 SQ. FT. �(D \ 0.15 AC. 15,096 SQ. FT. o � U C cc��LL a CS SMITH LLC IN..I PIN# 1703442374 \ } DB 17330, PG 1278 °J �(1021 S SAUNDERS ST) 0 IN.I ° � / \ � PARIS FAMILY ' 4,894 SO, FT. a � PARTNERSHIP LLC E I-,0.11 AC. / PIN# 1703443412 \ DB 16872, PG 1643 \ (1019 S SAUNDERS ST) U o PIS FAMILY / 5,504 SQ. FT. NERSHIP LLC 0.13 AC. -t N 1703443208 + U ° 872, PG 1643 (D SAUNDERS ST) 1 ' Q 0011SAC FT. / PARIS HIP LLC PIN# 1703444408/ 7 r DB 16872, PG 1643 / N (1019 MOUNT HOPE DRIVE) CD a 17,228 SO. FT. w PARIS FAMILY 0,40 AC. p PARTNERSHIP LLC PIN# 1703443344 CD DB 16872, PG 1662 / (1029 S SAUNDERS ST) r ' D C) 12 5,201SO. ACFT, A° > ° 3 QI % 4 Ly c 1643 L — 0 ' LLC \ T }3285 \ I I >r ° E° )ERS ST) PARIS FAMILY PARTNERSHIP LL I I I I A C) 0 PIN# 1703444451 o FT. DB 16872, PG 1662 I \I i ■ O Q (1027 S SAUNDERS Lo Q 13,008 SQ. F w 0.30 A I I I r (D / PIN# 1703444351 PARIS FAMILY PARTNERSHIP LLC N O (D� DB 16872, PG 1643 N (D (1025 S SAUNDERS ST) 0 16,467 SO. FT. / 0.38 AC. E, E O m ° 100-YEAR FLOOD / / �o• ELEVATION X Ed .� 500-YEAR z FLOOD ELEVATION Y U H- (D O m IN, m 0 0 100-YEAR FLOOD N C \ ELEVATION C) 0 500-YEAR � r�� FLOOD ELEVATION o J c 0 \ � \ / > N 0 a / < O r ri- c U) O Q) -c �trgR� ... N°°vvrR0 AvsT a a FOqCRFFT m E U /O Q) -N 0 / 10' a / SFHA FLOODWAY UNEol RESERVED O GREENWAY EASEMENT (BM 2002, PG 1698) a � 0 o V \ // as � o x .. as � a / a k / \k IN, I � I LL \ \ I V 686.4 118.8' 9 s D. > ° ° ° 0 D. 0 bk 0 1 a s ° ma ■ ■ WWYQLAZA saw ♦ / / / 1 ■ ■ FLOODWA, / j c— ■ 20 BUILD TO LINE ♦ i // D / ■ -- ♦ ♦ / /// // /// D ■ // // // / �� D o ■ 'in L D \ ■ / /� J // / / o SFHA I N RETAIL/RESTAURANT TERRACE / / j / / / / "IFLOOUNE— Y// } I I ill lool ■ } \ 500-YEAR FLOOD ELEVATION / ■ / / / `� < 100-YEAR FLOOD ELEVATION / \ 100 YEAR ELEVATION 500-YEAR +/ / FLOOD ELEVATION SFHAFLOODWAY UNE / / X 0-YEAR FLOOD / EVATION JAT10N � / / \ SFHA o FLOODWAY UNE /Ir N �n O � I 100-YEAR FLOOD 1 / ELEVATION YEAR oti FLOOD ELLEVATION / y � 20, NRP GATEWAY PARK LP / PIN# 1703448901 DB 10898, PG 818 BM 2002, PG 1698 / a Y rn� J r l � VAY UNE lI l 1 z � / 1 GRAPH C SCALE IN FEET / 0 2 40 80 100-YEAR FLOOD ELEVATION /y 500 YEAR � � 3UILD TO: 'RIMARY STREET: 0'-20' REQUIRED: 40% PROPOSED: 374' FRONTAGE/686' = 54.5i 3" SURFACE COURSE (S-9.5A IN 2 LIFTS) 8° AGGREGRATE BASE COURSE (NCDOT CABC) COMPACTED SUBGRADE (SEE GEOTECHNICAL REPORT) REGULAR DUTY ASPHALT PAVING DETAIL NOT TO SCALE c� c� m m m m N \ LIJ cD � \ � o O O u� GO � H— z z cn LLJ LLJ z O O O O O LLJ O O KANE REALTY CORPORATION IMerae CaDital Kimley*Horn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY-HORN.COM #F-0102 J DAVIS �I 3: O O O N O LLJ N O O O N c= �\ N Q m 0 LLJ o Q O \ LLJ Z Z LLJ Y C) Y O Q U) Q (n 0 0 0 W Z � X �O w J Z W 0 J W U z D 0 / C/ O LL LIJ U) 0 Q LLJ �Qww i CD w L.L J Q LL- 0 o n U SHEET NUMBER C2. 1 C IM" W .0 NOTE: 0 1. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES IN Q U.S. SURVEY FEET. (UNLESS OTHERWISE STATED) ° 2. ALL BEARINGS ARE BASED ON THE NORTH CAROLINA STATE o PLANE COORDINATE SYSTEM (NAD 1983/2011). 3. DIMENSIONS ARE TO FACE OF CURB UNLESS OTHERWISE NOTED. PROPERTY LINE EASEMENT POD BOUNDARY E 0 T E 0 0 0) a u �i U 0 U 0 cn S SAUNDERS STREET EX. PROPERTY (PRIMARY STREET) ROW OSED LINE (TYP.) PROPOSED PROPERTY (VARIABLE WIDTH PUBLIC R/W) CORPUD SS LINE (TYP.) EASEMENT (TYP.) E Y PROPOSED ROW DEDICATIONsop o \ r CS SMITH LLC LLC / I a \ \ I I J I D13 167583PG 2761 / PN 8, PC08 o CS SMITH LLC DB 17428, PG 486 c / \ CS SMITH LLC L (1001 S SAUNDERS ST) o_ i CS SMITH LLC PIN# 1703442339 I / \ / / 8,356 SA FT. DB 17330, PG 1278 PIN# 1703442592 \ w I 49,985 SQ. FT. / / % PIN# 1703442235 DB 17288, PG 1501 I 0.19 AC. / / \ 1.15 AC. CS SMITH LLC (OBS1 SAUNDERS ST) (1021 B S SAUNDERS STREET) (1017 S SAUNDERS ST) \ui PUBLIC/ o PIN# 1703442220 6,454 SO. FT. 15,096 SQ. FT. ACCESS / \ /// /�/ // ��' / // / / DB 18091, PG 1831 \ 0.15 AC. EASEMENT / \ o (1035 S SAUNDERS ST) 6 g0 16SAAC.FT / \ 0.35 AC. I / / // // / / 3 4,483 SA FT. CS SMITH LLC / / / / // / 83 Q. I PROPERTY LINE TO BE i / / / m I I CS SMITH LLC / I FIN# 1703442683 / ABANDONED (TYP.) X I \ I k101B5 1S SAUNDERS 0ST) PIN# 1703442374 / \ LJ DB 17330, PG 1278 21,612 SQ. FT. (1021 s SAUNDERS sr) F- \ I 0.50 Ac. Q PARIS FAMILY // / / I J 3 \ 4, oi1 sAC Fr. PARTNERSHIP LLC \ / / / // // j / / / EASEMENT CORPUD POD A BOUNDARY I PIN# 1703443412 / I / / \ NEW LOT 1 \ \ DB 16872, PG 1643 \ / / / N 1019 S SAUNDERS ST / I \ / \ // // / / (TYP.) E ;T) ( ) / 248,549 S.F. / / // / / / j 0 PARIS FAMILY 5,504 SQ. FT. I PUBLIC ACCESS / 5.70 AC I / / r'0 . �/ // / / /� PARTNERSHIP LLC 0.13 Ac. POD A EASMENT I I / / O- / // N PIN# 1703443208 BOUNDARY / J DB 16872, PG 1643 , I I I--___—_—=a—�� --� / < // / - (1023 S SAUNDERS ST) / — — J 20' PUBLIC DRAINAGE 0 4,606 SO. FT. / I / I / / / — / / / \ EASEMENT (TYP.) / / � -11 0 PARIS FAMILY PARTNERSHIP LLC 0.11 AC. / PIN# 1703444408 \ / L Z —� — — -—_—_—_—_ —— — — / _ / / / c DB 16872, PG 1643 // / (1019 MOUNT HOPE DRIVE) / \ I / / / j_ — — — / \ \ / I / 17,228 SQ. FT. PUBLIC DRAINAGE / / / / — — — — — \ \ \ / \ PARIS FAMILY CORPUD UTILITY 0.40 AC. / EASEMENT (TYP.) -0 PARTNERSHIP LLC 0 0-o \ PIN# 1703443344 EASEMENT (TYP.) �� — /' \ I / / / / / \ \ / / a DB 16872, PG 1662 / \ — — / \ (1029 S SAUNDERS ST) \ 5,214 SQ. FT. a PUBLIC ACCESS / CS SMITH LLC o / / / / PIN# 1703444797 a EASMENT / / DB 16758, PG 2767 � PARIS FAMILY L / / / a 293 SQ. FT. / / / �, 0' PARTNERSHIP LLC\ POD_ T T T / / ROW TO BE 85 AC. 0 PIN 1703443285 I # BOUNDARY /' / ABANDONED (CITY DB 16872, PG 1643 \ Q (1033 S SAUNDERS ST) PARIS FAMILY PARTNERSHIP LLC ` I I I �/ COUNCIL RESOLUTION / POD A BOUNDARY / / / / / EX. 20' CORPUD SS / a \ PIN# 1703444451 I I / 261 2021-/ / / 4,794 SQ. FT. DB 16872, PG 1662 N0. I I ) / / EASEMENT (TYP.) a \ 0.11 AC. (1027 s SAUNDERS ST) 30.0' / PROPERTY LINE TO BE 0 13,008 SQ. FT. / 3 \ 0.30 AC. ABANDONED (TYP.) / / / TOP OF BANK �j // / (TYP.) \ I I / / / / / PIN# 1703444351 / / u / PARIS FAMILY PARTNERSHIP LLC 3O' CORPUD SS 20.0' I / // / / / / // / 0 3 DB 16872, D 1643 EASEMENT (/TYP. Q (1025 S SAUNDERS ST) (TYP.) o / PARIS FAMILY PARTNERSHIP LLC I I / / / / 75' CITY OF / / I� 16,467 SQ. FT. N , PIN# 1703444164 0.38 AC. \ 20' PUBLIC DRAINAGE / o DB 16872, PG 1643 J / RALEIGH GREENWAY o EASEMENT (TYP.) PROPERTY LINE TO BE / / � (1031 S SAUNDERS ST) \ / / I ABANDONED (TYP.) / / // EASEMENT, (TYP.)/ / // �m� I c 13,407 SQ. FT. 0.31 AC. ol w10 <w \ EX. 20' CORPUD SS /�O / / / / / p. / EASEMENT (TYP.) E / �S SMITH LLC o / P # 1 0 446541 DB 67 8, PG 2773 �/ / / EX. PROPERTY / / / / NRPIN#T1703448901 LP / 39, 06 Q.T�.� / o 0 / / DB 10898, PG 818 Lo 0 \ / \ ��� / / / / LINE (TYP.) BM 2002, PG 1698 / a \ 50' STREAM B' F �FFER (TYP.)qo- .L EX. PROPERTY \ // �-/ / W LINE (TYP.) 10' PUBLIC ACCESS \ / / / \ o EASEMENT (TYP.) / �p / � RESERVED EQR\,� / / GREENWAY EASEMEN ` / (BM 2002, PG 18) x \ Ld n \ / Q c / 0 0 w/ortiq a c°NTR�t"AV o° 110gT�QFF I 0 a �C 4� c J � 6 � \ 0 0 U)+� N N � E ` GRAPHIC SCALE IN FEET 0 20 40 80 L N U L U � M 7 U N 0� d: F-- N LJJ cD � \ � o �D r7 O 0 u� cr) z z cn w LLJ z o O O > U U W u u INl —lzl IQ\Nl REALTY CORPORATION IMerae CaDital Kimley*Horn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY-HORN.COM #F-0102 J DAVIS �I z ii ii m 3: O O O N O w N O = O O N �\ N Q m 0 LLJ o Q = O \ -1 o 3: LLJ 0 Y O Q Fn Q w V) o o 0 In x w Q J 1 U z D 0 c^ v, O LL Q LIJ U) 0 Q w Q w LLJ 111 Y i CD w J LL- O 0 ^ SHEET NUMBER C2.2 c ui 0 U O Q O C L O I T E Y O T p 3 0 0 U) U C N N O U O O Q a p 0 0 I T N Y T 3 � � o __jQ Q p w ° � a L � p w � O �N �o Z _c Q � U) p O c . 0 U 3 Q) o p L /E U U 0 .0 p � U " I Lo O a 0 / U U p 0 a � Q C 0 �E a a / p � O 0 0 0 0 cy U L C5 p a 0- I � � 0- N O o o O .p > 3 w L � o 0 Q � U / Y o E 0 a � a� Q 0 a� w Lo U a O 0 O 0 N T 0 � 0 � a � 0 U � m Q .- 1­ 6 w U > � N ~ o J w � � N z E Q i O — 0 0 v 0 .� 0 p 0 z � o a b L Q a D_ 0 p N � � Q �c N O _c U U N p _ _ 3 U 6 N � 0 a U +' U E m D U 0 Q� aL0 15" RCP OUTLET PIPE 0.50% MIN 6" SOLID WALL PVC DRAIN FROM FILTER CHAMBER. FASTEN TO BOTTOM WITH STAINLESS STEEL STRAPS 2.0' O.C. 20.00' I CONTRACTOR NOTE: ALL SAND HIL I ERb I U BE WA I EK I IGH I . CUN I KAC I UK TO CONTACT APPROPRIATE MANUFACTURER AND ENSURE WATERTIGHT APPLICATION IS PROVIDED. OVERFLOW WEIR. SEE OVERFLOW WEIR DETAIL THIS SHEET -PENETRATION IN SEPARATOR WALL FOR FLOW DISTRIBUTION PIPING. TYPICAL EVERY 10 FEET. SEE FLOW DISTRIBUTION PIPING DETAIL THIS SHEET 45.00' SAND FILTER - 1 SEDIMENT AREA = 300.0 SF C7 �O FILTER AREA = 300.0 SF O D i KEYNOTES SEDIMENT CHAMBER AREA FILTER CHAMBER AREA OUTFALL STRUCTURE AREA GRAPHIC SCALE IN FEET 0 5 10 20 15" RCP INLET PIPE 4" PERFORATED PVC PIPING FULL LENGTH OF FILTER CHAMBER. SEE SECTION A THIS SHEET. TOP= 259.00 1—INCH STORM ELEVATION: 255.05 6" PVC INLET FROM RD INV: 253.50 BOTTOM OF SPUTTER BOX INV= 253.50 15" RCP OUTLET TO SAND FILTER INV= 253.50 ROOF SLAB SEDIMENT CHAMBER " DIA. STAINLESS STEEL CONCRETE EXPANSION ANCHOR (TYP) 4" 90' PVC ELBOW 4" SOLID WALL — PVC PIPING 0 14 GAUGE 4" STAINLESS STEEL STRAP (TYP) 6" SOLID WALL PVC DRAIN FROM FILTRATION CHAMBER TOP= no nn BAFFLE WALL ELEVATION: 255.05 15" RCP OUTLET TO MH 15" RCP INV: 253.50 SAND FILTER IPV V. LJ J.Ju SPUTTER BOX -41 PROFILE FILTER CHAMBER (NTS) INV= 253.50 1—INCH STORM/BAFFLE WALL ELEVATION: 255.05 =R BOX SAND FILTER — 1 LOCATION DETAIL Iq 4" PERFORATED PVC PIPING 0 FULL LENGTH OF FILTER CHAMBER " PERFORATIONS @ 6" O.C. (4) PERFORATIONS PER ROW air 14 GAUGE 4" STAINLESS STEEL STRAPS @ 2' O.C. SAND p FILTER MEDIA FLOW DISTRIBUTION PIPING NOT TO SCALE CONTROL STRUCTURE TYPICAL FOR SEDIMENT CHAMBER ADJACENT TO OUTFALL STRUCTURE NOT TO SCALE 250.00' REFER TO THIS SHEET rnn ["A\In rll Trn ["Tnl InTI Inr nl\Ir\I["InAI C` ACCESS STEPS (TYP) 4" PVC ELBOW AND TURNDOWN SEE FLOW DISTRIBUTION PIPING DETAIL, THIS SHEET. SECTION A TYPICAL FOR SEDIMENT CHAMBER ADJACENT TO FILTER CHAMBER NOT TO SCALE FINISHED GRADE PAVEMENT AGGREGATE BASE ACCESS STEPS (TYP) 255.26' 251.50' 250.00' 6" PERFORATED PVC UNDERDRAIN PIPE IN SOCK. FASTEN TO WALL WITH STAINLESS STEEL STRAPS AT 2' ON CENTER (INVERT TO MATCH BOTTOM OF STRUCTURE) (f) U7 z z cn w w z : O O O U U W � � m U u REALTY CORPORATIO IlVerae Capital Kimley*Horn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY-HORN.COM #F-0102 JDAVIS>I U U O U N O D N O N c= N Q m 0 LLJ 0 Q O w Z Z w Y Y O w < _ v cn 0 0 0 1 U z 0< Wr^ � O LL Q w 0 w 0- W U=az=_ QCD Lv O 0 n U SHEET NUMBER Cl 0.0 U 0HP ---- S. SAUNDERS STREET I PROPERTY LINE —OHP —OHP�� — — — wnr —OH1 I � I � 0 W -- - - - - - - - - - - - _W_ --- —------w-- -- W- --- Tr y 0 IN L—wim PR 0 I 0 o \ I Q I E \9yQ / \ T \ LU N E L.L. Y I � z .0 / \ a ° / U �Q ° / z o� / J >LLJ° / 1 D- o / p 0 U � / -C p o oo, i U O I I ° I I I I II p(/ ° • ■ 7 ■ —W------W------W--- i i to ° p — — —�-- — — ° �— I b.p ° \\ \ \ \/ • , // � .� 20' FIRE ACCESS / / DRIVE (TYP.) �/ / �( / BUFFER TO BE SUPPLEMENTED @ RATE OF ■I 2 CANOPY TREES PER 50 LF PER SECTION 9.1.4� �/ / J O � \\ � PROPERTY LINE / --�----- ��---- — / GRAPHIC SCALE IN FEET >pF— 0 15 30 60 z z cn Lv Lv z 0 0 0 U U W N O KANFJ REALTY CORPORATION erge Capital KimlepMorn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY-HORN.COM #F-0102 _;� \\ \ �z TREE CONSERVATION NOTES: J DAV IS _ TREE CONSERVATION AREA - \ X 1. A TREE CONSERVATION PERMIT IS REQUIRED TO GREENWAY (3,388 SF) (0.078 ACRES) / \\ ESTABLISH TREE CONSERVATION AREAS IN THE FIELD. 2. A TREE CONSERVATION PERMIT IS REQUIRED PRIOR TO ISSUANCE OF A GRADING PERMIT. N 10' ASPHALT / / 3. PRIOR TO OBTAINING A BUILDING PERMIT, THE FOLLOWING MULTI -USE -PATH --- WILL BE RECORDED WITH THE WAKE COUNTY REGISTER OF /� / � Ss� � . / DEEDS: F� (TYP) A.) TREE CONSERVATION AREA MUST BE RECORDED o� "1� PRIOR TO OBTAINING A BUILDING PERMIT PER UDO 9.1.5.A.2. Q4v G 4. NEW PLANTINGS SHALL NOT BE INSTALLED WITHIN THE 1 FO E / i CRITICAL ROOTZONE OF ANY EXISTING TREE LOCATED �O o II I G�� / / /l WITHIN A TREE CONSERVATION AREA. Q I I II lb. , 5. TREE CONSERVATION AREAS IN THE NEUSE RIVER BUFFER -C° 20' PRIVATE I I II I / F� �`� / / ZONE 2 AND TREE CONSERVATION - GREENWAY AREAS o co DRAINAGE I I II �= QP` _ / / / >, SHALL BE PLANTED AT A RATE OF TWO SHADE TREES PER � � � of / F `' �` _ /� / / / 50 LINEAR FEET WHEN EXISTING VEGETATION IS U N O Q Q � \ EASEMENT (TYP.) I I II / R / ,l (''� / / % — INSUFFICIENT. _D N O c=n a I II �I ■ // O j �l il� �� 6. CRZ =CRITICAL ROOT ZONE O ~ \ m m i Q � rI I �� / ` PEDESTRIAN GREENWAY BRIDGE o \ ?: Z / I I ■ ■ //�� ,/ (EXACT LOCATION AND / REQUIREMENTS TO BE I / F� // / / DETERMINED AT SITE PERMIT � / I / REVIEW LEVEL) > I / I I ■ / S� / TOP OF BANK (TYP) 50' STREAM / JI THOROUGHFARE T / / / / �' BUFFER TYP. / Q ° / / / �� , / j ( ) _FCA AREA 2/ 2 / / / FLOODWAY (TYP) // 75' GREENWAY L Q THOROUGHFARE / I / EASEMENT TYP. ° \ TCA AREA 1 I (TYP.) 75' GREENWAY � EASEMENT (TYP.) 0 \ �/ � TREE CONSERVATION AREA- L6 _0�� \\ / / 50' STREAM / GREENWAY (7,498 SF) (0.172 ACRES) 0) ° BUFFER (TYP.) / -_ � = � � / �� �� �� / TREE CONSERVATION AREA - / EXISTING 10 ASPHALT GREENWAY (10,398 SF) (0.239 ACRES) %� / MULTI -USE -PATH (TYP.) w EXISTING TREE CRZ (TYP.) N / o EXISTING TREE (TYP.) N Q 0.1% OF CRZ OUTSIDE TCA ' 11.7% OF CRZ OUTSIDE TCA — >, 28.1% OF CRZ OUTSIDE TCA EXISTING TREES NOT COUNTED / �� (SEE NOTE 7) w TOWARDS BASAL AREA CALCULATIONS 15.8% OF CRZ OUTSIDE TCA A o (SEE NOTE 8) o PRIMARY TREE CONSERVATION J AREA -THOROUGHFARE \ / (4,264 SF) (0.098 ACRES) 21.4% OF CRZ OUTSIDE TCA 0 Q ♦ � •V n 40' ♦ At ' ; U Ar I' o Q _� 0 a) C, L O LL � E m D U U O �U) 0� ■ ■ ■ .aa_� PHASE 1 A TCA CALCULATIONS DESCRIPTION AREA (SF) NETS ITE AREA (GROSS SITE AREA LESS RIGHT OF WAY DEDICATION) 248,549 REQUIRED TCA (10%) 24,855 PRIMARY TCA THOROUGHFARE 4,264 GREENWAY AREA TOTAL 21,284 TOTAL PROPOSED SF 25,548 (10.3%) LEGEND PRIMARY TREE CONSERVATION AREA TREE CONSERVATION AREA - GREENWAY (OVERLAPS WITH ZONE 2 NEUSE BUFFER) EXISTING TREE CRITICAL ROOT ZONE (CRZ) EXISTING TREE NOT COUNTED TOWARDS BASAL AREA CALCULATIONS CODE NAME T1 Southern Sugar Maple T2 Boxelder Maple T3 Red Maple T4 Silver Maple T5 Pecan T6 Southem Hackberry T7 Chinese Elm T8 Flowering Dogwood T9 Persimmon T10 American Beech T11 American Holly T12 Black Walnut T13 Eastern Red Cedar T14 Yellow Poplar T15 Sweetgum T16 Yellow Poplar T17 Red Mulberry T18 Blackgum T19 Loblolly Pine T20 Sycamore T21 Princess Tree T22 Black Cherry T23 Callery Pear T24 Swamp Whlte Oak T25 Willow Oak T26 Northern Red Oak T27 Black Locust T28 I Black Willow T29 lAmerican Elm SITE AERIAL SCALE: 1 " = 200' 7. TREES OVER 10 INCHES DBH WITH 25% OR MORE OF THEIR o INQ o m o CRITICAL ROOT ZONE IMPACTED BY DEVELOPMENT OR Q — \ z z Y LOCATED OUTSIDE TREE CONSERVATION AREAS WILL NOT = O r O w J c° < Q � w BE COUNTED TOWARDS BASAL AREA CALCULATIONS. 8. TREES LISTED ON THE CITY OF RALEIGH INVASIVE SPECIES LIST WILL NOT BE COUNTED TOWARDS BASAL AREA CALCULATIONS. 9. TREE PROTECTION FENCE IS SHOWN OFFSET FOR CLARITY. Z FENCE SHALL BE INSTALLED ON TCA BOUNDARY. 0 GENERAL NOTES: 1. COMPLIANCE WITH SECTION 9.1 OF THE CITY OF RALEIGH UDO WILL BE REQUIRED AT SITE PLAN OR SUBDIVISION. Q 2. TREE LOCATIONS ON THIS PLAN HAVE BEEN TAKEN FROM A TREE SURVEY PERFORMED BY KIMLEY-HORN & ASSOC. / DATED AUGUST 8, 2020. 3. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND W Z DISTANCES IN U.S. SURVEY FEET. (UNLESS OTHERWISE U) v� Q STATED) Z J 4. ALL BEARINGS ARE BASED ON THE NORTH CAROLINA ^ L.L STATE PLANE COORDINATE SYSTEM (NAD 1983/2011). O 5. ALL AREAS WHERE TREE CONSERVATION HAS BEEN ` PROPOSED WITHIN THE ZONE 2 BUFFER SHALL BE V SUPPLEMENTED AS NECESSARY PER CITY OF RALEIGH w UDO SECTION 9.1 Nw I U Iz E 0< VJ � O Q LIJ VJ 0 w < W LLJ Z Q CD w J Q 0 O ^ L.L � C-) SHEET NUMBER TC1.0 0 0 M m m m 0 6 0 O O N Q a O i O I T E Y O .1 6 0 0 0 0 ('t U) =5X40' SIGHT TIE INTO EX. CURB 0 1 TRIANGLE & GUTTER (TYP.) 1 1 Ocn 1 \'9�\ PROPOSED PROPOSED � � \�t\ \ \ ROW � ROW 15' X 390'---°w------ ---- Cw------- ---� -- /-------- _ _ ____—---------- SIGHT / - TRIANGLE _ 15' X 390' SIGHT 15' X 340' SIGHT EXISTING EXISTING LOCKABLE/REMOVABLE TRIANGLE PROPOSED BIKE �+ LOADING I / EXISTING TRIANGLE RACK (TYP.) ROW ROW S . SAU N D E RS STREET ZONE j ROW BOLLARDS, TYP. _z— I j PROPOSED BIKE _ / �- - - - - - - - - - ------------------------ I ---- --- RACK TYP. / --- _---(8)UPA ---- _ _ ------ _--------- _ -- (TYP.) _ EXISTING _ �---------------- ------------------ -- ---------------___--- — - SIDEWALK -------- - - - _------------ - - ---- — --- -- -�� ------ ----------------�= WALK----- - 0 1 � - �- --•-- Z�r- �.����� �.'--•--'-__ �---�- -�--r - - -- - __ - - - _ ---•------r---- �r=--- ____�----- E (TYP) --- r-----�---� �-�---'� ------r--- r----'ter-----r-----r----- ----�--- --w _ ROW to s '� j __ --- --------------- ---------- —® C1 --------------- --- — — — — _ D a ° — —25. --- _ . n .QI g< (3) UPA _ — _ _ 1Q'102 — — r 1124 0 E 05. 1 — ��t�?c— r 62.10' — ° 79.50' S 10_49'57" W — > — — — — — — 1 S 45-2w055602" W� ♦ CONCRET I n--------- — Y8' 3+ + + \ + % SIDEWAL ° �'° \s? PROPOSED ROW V'C� DEDICATION 0 "t (D Q 30" CURB & O\ /+ GUTTER (TYP.) z o /n E /�� ` j /o� PROPOSED PROPERTY r` / �w LINE (TYP.) � j o / 98SR�'c PUBLIC ACCESS j o �, \ EASMENT / ;�,y EDGE OF ° \/i PAVEMENT / 01 a ic, I / a s Op- Qa FF J + o POD A o, BOUNDARY I I I A + + L On \\ \ LONG TERM BIKE I I j 1 I Q)) \ PARKING LOCATED Q \ \ IN BUILDING I I 1 + +I \ 30 CORPUD SS 1 -3 vti5 \ rn EASEMENT I I 1 I 0 \b� PROPOSED BIKE RACK (TYP.) I 1 + 0 3 0� 20' PRIVATE DRAINAGE 0- 0 SA. EASEMENT (TYP.) � I o CONCRETE /� \ SIDEWALK (TYP.) orx i i rrr o 2.9.76' a, 0- N 044_5'09" E�x, 20' CITY OF LOCKABLE/REMOVABLE I + a - y 2s, RALEIGH SANITARY BOLLARDS, TYP. s+ / 0 `/R�, SEWER EASEMENT X + +I POD A ,v 20• f I + Q\+ 1'5 s2` BOUNDARY 6,2 o ° a TREE PROTECTION FENCE ° (TYP.) \ c n .N PRIMARY TREE \ _ CONSERVATION AREA (SEE .L SHEET TC1.0) S R 10' PUBLIC ACCESS Q o / EASEMENT (TYP.) 2g2 1. _j \+ sr/.. (D / i Q —00 \ +\+ U) \ r \+ Zo + + + + + + + > PROPOSED ROW ++ I+ + ++ + + ++ ++ + ++ + + + ++ ++ + + + + + +�—+ ` / + +++ �ENTRYPLAZA ++++ + ++ +}++ Q+ + + + ++ + + ++ + + ++ + PROPOSED ROW + + + ++ Oi / +LU w - + + + + + + + + + + + + + TYPICAVAMENITY�I A U)I + + ++ ++ + +�++ TYPICAL MENITY ARE ++ + //' + + //i /i / (37,6V F) / +/ U + + + + + (36,416 SF + + + /' / + + �' i // // // J +++ +++ ++i' /+ i / / / m + // 6 + + +� +I} + + + ' /i + s'+ � 20' FIRE ACCESS 30' CORPUD SS I + + + + + j" + + + + + �' + + / DRIVE (TYP.) // EASEMENT + + // / + � I / /}+ ++ + ++ ++ + + ++ + �/� 20' PUBLIC DRAINAGE ///// / ` .• I +II + + + + + I I + + + + + + + + + i + + / i EASEMENT / // / S / •�' II+ + + + I� __ _ + + �_+_ �_+� /' + + /' // / PRIVATE DRAINAGE + + + + + +� �+ +++ + + + + // /+ + // /// / / �� •' +/ / II + + + + I + + + + + TERRA E + + + + /' / / / // /i /// EASEMENT (TYP.) It + + + + + + + + + + + + /+ + +" / // ✓ /'�J /+ / II + ++ + + ++ + + + + + + + + -�� + /// /// /�/ //// " J r s - / + + + + + + + + + + + ♦ r( • S/ / r / + + ++ + + + + + + + + + / \ \ / \ // / / / / / >��` + / +01 — — — — — — — — — — — — — —__ i �'+ P _ _ _ TREE CONSERVATION AREA - + + / • GREENWAY SUPPLEMENTAL / + PLANTINGS + + / + + ` D -- - 4 + + + + + + + + �// / Fw (7) NS + % +° +° + +° + + -� / Fw� (7)TD TREE PROTECTION +9/+� + ++ + + TYPICAL AMENITY AREA i�� + ++ + + +�' \• 10' ASPHALT FENCE (TYP.) (SEE LEGEND PRIMARY TREE CONSERVATION AREA TREE CONSERVATION AREA - GREENWAY (DENOTES AREAS WHERE GREENWAY OVERLAPS ZONE 2 NEUSE BUFFER) PRIMARY COMMON OPEN SPACE + + ++ + + AMENITY AREA EXISTING TREE LOCATION i 1 CRITICAL ROOT ZONE 1 / „F TREE PROTECTION FENCE NOTES: 13REES CANNOT BE PLANTED WITHIN A TREE CONSERVATION AREA OR THE CRITICAL ROOT ZONE OF AN EXISTING TREE AND MUST BE PLANTED AT LEAST15 FEET FROM ANY OTHER TREE AND NO FURTHER THAN 50 FEET FROM ANY OTHER TREE, MEASURED FROM TREE TRUNK TO TREE TRUNK (UDO 5.3.1.F.3.C). IF PROPOSED TREES CONFLICT WITH EXISTING TREES, FINAL PLANTING AREAS SHALL BE FIELD ADJUSTED AS REQUIRED 2. ALL TREES LOCATED WITHIN A SITE DISTANCE TRIANGLE SHALL BE LIMBED UP AND MAINTAINED 8' MIN ABOVE FINISHED GRADE TO PROVIDE CLEAR SITE LINES. 3. TREE PROTECTION FENCE IS SHOWN OFFSET FOR CLARITY. FENCE SHALL BE INSTALLED ON TCA BOUNDARY. +/+ ++ + + + + + 36,416 SF ++ "' / MULTI -USE -PATH + + + + \ NOTE 3) ✓ ® / + (TYP.) -�Ile✓ �+ + + + + + + + + + PRIMARY COMMON OPEN + ++ ++ + + ++ ++ • SPACE (51,449 SF) + + + ++ + O ++ + + + AMENITY POOL + ` �' �' �/ EX. CITY OF RALEIGH + + + + + + DECK + + ` ROCKY BRANCH I —� + + + + p + + + + + + PEDESTRIAN I� -x x + +p+ + + + + + + + + i/ / GREENWAY / ��� / �.� GREENWAY TRAIL * •� ' + +O + ++ ++ + ++ / ++ 4~ BRIDGE + + ++ + /++ +, ; /� N / / / % , ,�-' PLANT SCHEDULE + / CANOPY TREES CODE QTY BOTANICAL NAME COMMON NAME CONT. CALIPER HEIGHT REMARKS ++++++++++ ++ i , ++ / � / QO G / O / /' / + / / I + + + / + / / / TOP OF BANK + ++ ++ + + ++ +/ ++ / / // // (TYP.) ,\ //I *�*/ / + BN 9 BETULA NIGRA I RIVER BIRCH 10 GAL 1.5" CAL 6'-8' HT. PLANTED SHADE TREES + + + + + + + / J1L '' / .!� / / 1 MUST BE FREE OF + ++ ++ + ++/! + ++ / / / / / r - /� / CIRCLING ROOTS AT TIME + + + +� + + fj / / / �e , OF PLANTING / I ® + ++ + ' �/ /'" E 50' STREAM % �_ _ - -/ NS 8 NYSSA SYLVATICA BLACK GUM 10 GAL 1.5" CAL 6'-8' HT. PLANTED SHADE TREES + ''� + / / ♦ (4) NS BUFFER (TYP.) - % / MUST BE FREE OF 10' GRASS r►�� / / % y CIRCLING ROOTS AT TIME PAVERS (TYP.) / , / I OF PLANTING k + • 75' GREENWAY ' (e) Qa + �i + +/� 4, EASEMENT (TYP.) , �+ / / QB 10 QUERCUS BICOLPR SWAMP WHITE OAK 10 GAL 1.5" CAL 6'-8' HT. PLANTED SHADE TREES + / + / + / �c + , / / / MUST BE FREE OF +// + + // *� / CIRCLING ROOTS AT TIME + -+ ++ �/ ++ TREE CONSERVATION (4)Ty / / / + + + + AREA (SEE SHEET TC1.0) r 75' GREENWAY / / / 1 OF PLANTING \ ++ /+ ++ + • �� / / / /j �r / EASEMENT (TYP.) i +/ a SD ; O �� / ��• � m t Q a \ , �1 Cn c o �� ff -C if / , / ..� off ; i E -0 Q � 0 0 0, L O LL m 0 -6 O 0� d: --- I Ell / 50' STREAM / EX. PROPERTY BUFFER (TYP.) LINE (TYP.) TREE CONSERVATION AREA - t� GREENWAY SUPPLEMENTAL / PLANTINGS i EX. CITY OF RALEIGH / ROCKY BRANCH GREENWAY TRAIL PRIMARY COMMON OPEN SPACE (51,449 SF) TREE CONSERVATION/ AREA (SEE SHEET TC1.0) i /60 \ \ NJ xis "'ice \ TD 8 TAXODIUM DI S ICHUM BALD CYPRESS 10 GAL 1.5" CAL 6'-8' HT. PLANTED SHADE TREES / MUST BE FREE OF / CIRCLING ROOTS AT TIME OF PLANTING • UPA 11 ULMUS PARVIFOLIA'ALLEE' ALLEE LACEBARK ELM B&B 3" CAL 14'-16' HT. UNDERSTORY TREES CODE QTY BOTANICAL NAME 0 PC 9 PiSTACIA CHINENSIS COMMON NAME CONT. CALIPER HEIGHT REMARKS CHINESE PISTACHE B&B 1.5" CAL 10'-12' HT. LANDSCAPE REQUIREMENTS & CALCULATIONS Z-32-18 MP-3-18 PD Narrative SQUARE FEET/ AREA TO BE LANDSCAPED REQUIREMENT TOTAL QUANTITY REQUIRED TOTAL QUANTITY PROVIDED LINEAR FEET CANOPYTREES SPACED 40' O.C. S SAUNDERS STREET 600 LF 600 / 40 = 15 STREET TREES 17 STREET TREES* IN TREE GRATES INTERIOR STREET A CANOPYTREES SPACED 40' O.C. 114 LF 114 / 40 = 3 STREET TREES 3 STREET TREES IN TREE GRATES TREE CONSERVATION AREA - 2 CANOPYTREES PER 50 LF OF GREENWAY TCA - GREENWAY AREA NOT 865 LF (865 / 50) * 2 = 35 CANOPY TREES 35 CANOPY TREES (SUPPLEMENTAL PLANTINGS) CONTAINING EXISTING TREES AMENTY SPACE 10% OF TOTAL POD AREA 248,549SF 248,549 SF * 10% = 24,855 SF 36,416 SF (15% ) 51,449 SF PRIMARY COMMON OPEN COMMON OPEN SPACE 10% OF TOTAL POD AREA 248,549 SF 248,549 SF * 10% = 24,855 SF SPACE** (21%) * Understory trees spaced 20' o.c. in tree grates have been proposed in place of canopy trees where overhead ponerline conflicts exist. Strees trees are spaced a minimum of 30' from proposed stop sign location. Primary Open Space provided exceeds the requirement, therefore provisions of secondary and tertiary open space has not been allocated. GRAPHIC SCALE IN FEET 0 20 40 80 N W O O z z Cn LL LLJ z O 0 o > U U W m U U INl—izl KANE REALTY CORPORATION erge Capital Kimley*Horn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY—HORN.COM #F-0102 J DAV I S `- N O Q Q :�E LLJ N O = O O N LLJDO Q m DO 0 Ld o Q O \ LLJ Z Z Y Y O w < _ v V) 0 0 O Z J 0- LU I..L C) U)/ 0 Z J 1 U z D 0 LL LIJ U/ 0 w Q w LLJ Z 1..� CD LLJ LL- O 0 n U SHEET NUMBER L1.0 6 O Q O C O E O 0 3 0 0 0 Q 0 T E Y 0 Q � o W J Q W CO o� t W .N � O Q U � U o Z � Q J o N � J O u O �o U O L 0 Q o QQ E w ry U O a Q o N 0 o o /o W o u J Q / O cn O D 7 E� a w 00 N � 0 O 0 N � O N O Ln � T) T L O W - J N Q O LL N co W O Q O U N E W L z Q o 0 N cn J o o T 0 0 J � O co N un a u) O Y o Q � W O N u a 0 � 0 0 U E Q � o c, L o Q LL � m 0� DO NOT PRUNE LEADER. PRUNE OR CUT ONLY DEAD OR DAMAGED BRANCHES TO AMERICAN NATIONAL STANDARDS INSTITUTE (ANSI) A300 STANDARDS REMOVE EXCESS SOIL TO EXPOSE THE ROOT FLARE. THE ROOT FLARE SHALL BE PLANTED AT GRADE, NO HIGHER THAN 2" ABOVE GRADE, AND NEVER BELOW GRADE. TREE SHALL BE SET PLUMB MULCH DEPTH NOT MORE THAN 3". KEEP MULCH 3" FROM ROOT FLARE AND DO NOT CONTACT STEM PLANTING SOIL MIX AROUND ROOT BALL. 600 CU FT OF SOIL OR STRUCTURAL SOIL REQUIRED PER TREE COMPLETELY REMOVE TOP HALF OF BURLAP, LACING STRAPS, NAILS AND WIRE BASKET AND DISCARD FROM HOLE. ALL SYNTHETIC BURLAP MUST BE REMOVED FROM SIDES OF ROOT BALL. ROOT BALL SHALL BE PLACED DIRECTLY ON COMPACTED SUBGRADE. HANDLE TREE BY THE ROOT BALL ONLY. CONTACT INFORMATION: CITY OF RALEIGH PARKS, RECREATION AND CULTURAL RESOURCES DEPARTMENT URBAN FORESTER: TREES@RALEIGHNC.GOV WWW.RALEIGHNC.GOV NOTES: 1. TREES MUST MEET THE TREE QUALITY STANDARDS IN CH. 2 OF THE CITY TREE MANUAL. 2. CONTRACTOR IS RESPONSIBLE FOR ADEQUATE DRAINAGE OF ALL PLANTING PITS. (POSITIVE DRAINAGE AWAY FROM PIT) 3. TREES SHALL BE PLANTED BETWEEN OCTOBER 1ST AND APRIL 30TH. 4. A TREE IMPACT PERMIT IS REQUIRED. 5. ELECTRICAL OUTLETS AND OTHER UTILITIES ARE PROHIBITED IN THE PLANTING AREA IMMEDIATELY SURROUNDING THE TREE. 6. IF STAKING IN ACCORDANCE WITH THE CITY TREE MANUAL, THE STAKING MUST BE REMOVED WITHIN ONE YEAR. 7. TREES WILL HAVE A MINIMUM 1 YEAR WARRANTY AFTER THE INITIAL PLANTING IS APPROVED BY THE CITY. 73 3/8" FRAME 721/4" FRAME 36" i®I GRAY IRON, RECTANGULAR 4'X6', 1.5" MIN. THICK, WITH 1/4" OPENING OR LESS NOTES: 1. GRATE DESIGN MUST BE ADA COMPLIANT. 2. GENERAL PATTERN DESIGN MUST BE AS SHOWN. 3. EXCEPTIONS OR PERSONALIZATION MUST BE REVIEWED AND APPROVED BY THE CITY OF RALEIGH. 4. A TREE IMPACT PERMIT IS REQUIRED. 5. ADHERE TO STANDARDS IN THE CITY TREE MANUAL. 6. ELECTRIC OUTLETS AND OTHER UTILITIES ARE PROHIBITED IN THE GRATE AREA. CONTACT INFORMATION: CITY OF RALEIGH PARKS, RECREATION AND CULTURAL RESOURCES DEPARTMENT URBAN FORESTER:TREES@RALEIGHNC.GOV WWW.RALEIGHNC.GOV 9. ®® �® m -- we /', dal\\\\ \\ - E IL_ ..A'!III- ALL M M SLOTS ARE - Y" WIDE MAX. BOLT TREE GRATE HALVES TOGETHER w/ (2)1l2"A 3 x 3" STNL. STL. HEX BOLTS, GALV. FLAT WASHERS AND STNL. STL. HEX NUT �.f 7" 1 1 /4 11 A - 4 3/44 4 3/4" 1" I II I �1 3/4' N m m NOTE: ALL DIMENSIONS SHOWN ARE IN ENGLISH MATERIAL: CAST GRAY IRON ASTM A48, CLASS 35B FINISH: NO PAINT WEIGHT: 608#/SET Nz O O � U J W ON m O 0 CV co z 0 �w o co W a FRAMES ARE ASSEMBLED USING A 6" X 1 1/4" X 1/4" THICK STEEL PLATE BOLTED TO FRAME w/ (2) 3/8-16UNC —1 1/2" X 1 STNLS STL. FLAT HD. — 3/4" CAP SCREWS I BOLTED PLATE (2) 3/8-16UNC TAPPED HOLES ASSEMBLY DETAIL Z W 0 W �0 +I OCL Q , M W Q U � u-of ca m co NOTE: SEE TREE PLANTING DETAIL SECTION MULCH 3" DEEP MAX. AND 3" MIN. FROM THE BASE OF THE TREE SIDEWALK PAVING AND SUBBASE PLANTING SOIL 4" DIAMETER PVC PIPE WRAPPED IN FABRIC LOCATED IN THE LOWEST POINT AND CONNECTED TO THE STORM DRAINAGE SYSTEM WHERE APPLICABLE COMPACTED OR UNDISTURBED SUBGRADE NOTES: 1. A SITE SPECIFIC PLAN MUST BE DEVELOPED TO ENSURE THAT: 1.1. EACH TREE IS PROVIDED A MIN. ROOT -ACCESSIBLE SOIL VOLUME OF 600 CUBIC FEET. 1.2. THE TREE ROOT AREA BENEATH THE SIDEWALK IS EXPANDED TO MAXIMIZE ROOT ACCESSIBLE SOIL SPACE UNDER THE PAVEMENT. 1.3. CONNECT SOIL SPACE FOR ROOT EXPANSION WHERE POSSIBLE TO ALLOW ROOT SYSTEMS OF TREES TO OVERLAP AND COLONIZE A SHARED SOIL SPACE. 1.4. ANY COMBINATION OF STRUCTURAL SOILS, SOIL CONTAINMENT SYSTEM (e.g., SILVA CELL), OR ROOT CHANNELING (e.g., SOIL STRIP DRAIN/AERATION SYSTEM) THAT PERFORMS AS SPECIFIED IS ACCEPTABLE. 3. 40' X 6' WIDTH MINIMUM APPLIES TO BOTH STRUCTURAL SOILS AND SUBSURFACE SOIL CONTAINMENT SYSTEMS. 4. SUBSURFACE APPLICATION SHALL BE REVIEWED AND APPROVED BY CITY OF RALEIGH PARKS, RECREATION AND CULTURAL RESOURCES URBAN FORESTRY DIVISION PRIOR TO INSTALLATION. STRUCTURAL SOIL SYSTEM CONTACT INFORMATION: CITY OF RALEIGH PARKS, RECREATION AND CULTURAL RESOURCES DEPARTMENT URBAN FORESTER: TREES@RALEIGHNC.GOV WWW.RALEIGHNC.GOV asioll NG/PATHWAYS ROAD CITY OF RALEIGH STANDARD DETAIL REVISIONS I DATE: &2020 NOT TO SCALE TREE PLANTING IN SIDEWALK WITHIN ROW TPP-07 co � H- z z cn w w z O O O U U L1J m u u I I I I INI—IzI KANE REALTY CORPORATION erge Capital Kimley*Horn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY-HORN.COM #F-0102 J DAV IS ` N O Q Q :E LLJD N O u O 0 N LLJ\ r r o N mLd o o Q \ W z z Y �0 U) Q o Q W 0 W D_ = U) o o 0 U) 1 TYPICAL CITY OF RALEIGH TREE PLANTING DETAIL TYPCIAL CITY OF RALEIGH TREE GRATE IN SIDEWALK WITHIN ROW TYPCIAL CITY OF RALEIGH TREE PLANTING IN SIDEWALK WITHIN ROW LJJ 0 NTS SECTION NTS SECTION NTS LnJJ rC) V 0 Z J 1 z Z 0< v / � O LlJ U) �0 LL L LJ ~ Q LJJ w N 1..� C J LL- 0 � n Li \ u SHEET NUMBER L2.0 vilrilow joi �I jim INS 11-11 Eli 3, hal Al W ' ' _ �■ :r: ' ' I I in X.— mill1 I 1 ilirl �111 oil ��� 1 1�. ����1 - �,�i.li..*■"To I ii ■-i i A111 i: m m i v.d! MONISM= V ■, ■ �I�w��. ��,! l.■■■■.■■.■■■■■ M■. 11 _I 11! I IM! 1 __■_1'''I__I 1 I_ • 11■■1■I■ �■le■■1■I� NOW 11■■ 1■■I■ IE1 11 111111110in I _k�, 1!■��1■I■�1■■11■■1.I� :1:1 in, :1 pool :1:11 _!�_ ■ � r :111; i I ill 11Mimi : m1 �■®. +mill 1■I� i I ��■ � [ill:1 �- i +�� "' 72 : : ■�i.�: :.i.i i 1 1 ■ ■ ■ ■im .i .�■ ■s. __n I,1 ■ ■ ■!w III '■■ ■ ■NIMMI :E :�: :C _ I,1 ■ ■ . ■ ■■ R ■i ■i�+l ii C 1 1 ■ ■ ■ ■ ■ ■i ■.W%/ ■i I,1 ■ ■ ■MMMN.. ■ ■i our: � !,1 ■ ■ ■.■ ■ ■i ■ .i Nor, - 1 1 ■ ■ ■ ■.■ a :MMWP� i 1 ■ ■ ■ ■ ■ ►1►I►I� V, lr, ■w..,9►, RW.,�i_ .. ,..:� PASSTHRU 7 99 aw■ - oil = No ■ ■ = ■ ■ NEW ■ 1:19.0.14i ffm �■i■■!,1■11,1■■II■i,1■■I,1■11■■i■llli■1■■III■i■1■11■1 ■■ log I I I Arm PEI rI�IIIillill■ �- �■ 1m,�■�1' 1■ :I �■■ d ��� i�■� �■� .t_ -mil-. ■1 ■ .� I■ —■ ■ ■1 .� .m 11 on owl 411 IIIIIiIPfIIIRfIII� _ '� - � MEN No lilt_ �r;I ��1 �■ 5 I: NINE jII ■■■ �■■■i �� 11 i� I ,�_H� -, ■� WIN 111-1II I:on:I I::::I I: OEM A III :: �I II■j �I IIyy��' I'll �■ I. �1 ,1�. �I I■ ■■ IIII ■■ Ill I. . ■ �I I■ . ■ ■ Il . ■ IIII ,�� - I I II� � II .� �■ �■ I■■I � Ilil III ,... I � �■ I �■ r � I■ lion��1^ I�::I I::::I I:::I I: ::I I: as •I 1� :: �I I :zp, !!! ; I ;I ; ;I I It 1 1 ■■■ ■ i■ ■ 1■ 1 ■ ■■ ■ 1 ■■ llm.1.■I I■ ■ ■ �I 1■ ■ ■ 11 I� 1 ■ •I I■ ;■ ■ ■I Il . ■ >II I I I,J IIII II I-li� m � . �■ 1■ 11 ■I 1� ■I I■ ■on ■ III III :::I I: A I �I I� ::I I � :: 1 � I ICI � �� I I� IIII II �■ �. �I. ■■■ IIII ,� kil IIITlIFIf =:� .'ll � , ! IIII I � II, �I I- ME .�■ ■ I loll 1 �N !'ll NN !I I��Ih to mc.uui.1. I II III■ �■■:■■■��:I�rl■:■�� � �!�■■:■■■■:■:■� RONNIE ■■! ! !!_!=■:■�:��■:■■:■■■■��:■: -INN �■■■�■-�ME In I I■■�■■:■■� loin ■_���__■-� NEW ■■■■mC■■l II:1 AU 1F 1 1 10 ■■ INS ■■■ I■ ■■■� 1�._ .. Mimi,; ■ I■■=_1i■i■� ■1N —mm■I SE■N ■_ _■■■ -- s ma %Eqg w- :1 its MKW40r, I C I ro, o11 1 :U�li[I 264.98 AVERAGE EXI G GR S SAUNDERS (MOST RE *NOTE: SIGNAGE IS PERMITTED SEPARATELY ELEVATIONS 1Q.V\IE REALTY CORPORATION Merge Capital PARKING DECK PARK CITY SOUTH SP2.01 11 - 11 RES 1_ 1 n 373.00' 10-10RES 1_ 0 362.33' 09 - RES 0_ 9 n 351.67' 08 -RES 341.00' 07 - RES 0_ 7 n 330.0 06 -RES 0_ 6 I1 319.67' 1 05 - RES 0_ 5 I1 309.00' 1 04 -RES 0_ 4 n 298.33' V 03 - RES 0_ 3 n 287.67' 1 02 -RES 277.00' 1 00 - RETAIL LEVEL n 258.00' EAST ELEVATION 1" = 20'-0" Kiomley))) Horn J DAVIS > LEVEL TYPE COUNT LEVEL TYPE COUNT PARKING DECK- FIRST FLOOR (1 PARKING DECK 01 FIRST FLOOR 8'-6" X 18' - 90 DEG ADA 2 01 FIRST FLOOR 9'-0" X 18' - 90 DEG VAN 4 01 FIRST FLOOR 9'-0" X 18' - 90 DEG 62 68 02 SECOND FLOOR 8'-6" X 18' - 90 DEG ADA 2 02 SECOND FLOOR 9'-0" X 18' - 90 DEG 66 68 03 THIRD FLOOR 8'-6" X 18' - 90 DEG ADA 2 03 THIRD FLOOR 9'-0" X 18' - 90 DEG 66 68 04 FOURTH FLOOR 8'-6" X 18' - 90 DEG ADA 2 04 FOURTH FLOOR 9'-0" X 18' - 90 DEG 66 68 05 FIFTH FLOOR 8'-6" X 18' - 90 DEG ADA 2 05 FIFTH FLOOR 9'-0" X 18' - 90 DEG 66 68 06 SIXTH FLOOR 8'-6" X 18' - 90 DEG ADA 2 06 SIXTH FLOOR 9'-0" X 18' - 90 DEG 66 68 n 0 E 85.90' / / / \ / N \ lf) \ PARKING DECK- TYPICAL FLOORS (2-10)12 1116"=1'-0 07 SEVENTH FLOOR 8'-6" X 18' - 90 DEG ADA 2 07 SEVENTH FLOOR 9'-0" X 18' - 90 DEG 66 68 08 EIGHTH FLOOR 8'-6" X 18' - 90 DEG ADA 1 08 EIGHTH FLOOR 9'-0" X 18' - 90 DEG 67 68 09 NINTH FLOOR 8'-6" X 18' - 90 DEG ADA 1 09 NINTH FLOOR 9'-0" X 18' - 90 DEG 67 68 10 TENTH FLOOR 8'-6" X 18' - 90 DEG ADA 1 10 TENTH FLOOR 9'-0" X 18' - 90 DEG 67 68 11 ELEVENTH FLOOR 8'-6" X 18' - 90 DEG ADA 0 11 ELEVENTH FLOOR 9'-0" X 18' - 90 DEG 11 11 TOTAL 8'-4" X 16' - 90 DEG ADA 21 8'-8" X 18' - 60 DEG 670 691 NCBC 1106: 2% OF TOTALSPACES OR 1 FOR EACH TYPE A UNIT 336 RESIDENTIAL UNITS 5% TO BE TYPE A UNITS = 17 TYPE A UNITS 17 ACCESSIBLE PARKING SPACES REQUIRED (3 OF WHICH WOULD BE VAN SPACES) OR TOTAL SPACES, 2%= 16 REQUIRED TO BE ACCESSIBLE 3 OF WHICH WOULD BE VAN SPACES PROVIDED 18 ADA SPACES 3 VAN SPACES 670 REGULAR SPACES 691 TOTAL SPACES � 1 _PARKING DECK- TOP FLOOR (11) 3 1116" = V-0" Merge Capital REALTY CORPORATION PARK CITY SOUTH SP3.01 Kimley>>>Horn r 271' - 0" FLEX SPACE A FLEX SPACE B I 140 150 2,093 SF 2,123 SF ■ 272' -10" �v 269 - 0" FLEX SPACE C 160 2,603 SF 15 4 270' -11" XFORMERS MAIN ELEC v 135 136 � 5.99% 269 - 0" I o ■ 266' - 0" \ / D&-M—Es TIC \ N / I J WATER 2�' °" u RESIDENTIAL LOBBY too LILJ ■ / \ \ 42'-0" 101'-6" \ \ \ 270, - 0" I " 4.93% _ i 265' - 0" 7 I u UTIL 131 15 \ \ LOADING & ■ ■ ■ ■ ■ ■ ■ ■ ■ s TRASH 130 ■ ■ IL — — ■ 000 ■ �■ i 263' 0� • a • _ � M 0000 / ♦ ` // / 263' - 0" 26Z - 0" ■ ° / 0000 I BIKE ROOM I I 120 Il� LOFT UNIT ABOVE LOFT UNIT ABOVE I (NO GROUND LEVEL (NO GROUND LEVEL ACCESS) I ACCESS) LOFT UNIT ABOVE LOFT UNIT ABOVE (NO GROUND LEVEL (NO GROUND LEVEL ACCESS) ACCESS) LOFT UNIT ABOVE LOFT UNIT ABOVE (NO GROUND LEVEL (NO GROUND LEVEL ACCESS) ACCESS) LOFT UNIT ABOVE II • P -- (NO GROUND LEVEL ■ ACCESS) LOFT UNIT ABOVE (NO GROUND LEVEL ACCESS) I v 26T - 0" ' It FLOOR PLAN -LEVEL 01 REALTY CORPORATION m! Merge Capital PARK CITY SOUTH I I I I �'� RETAIL Al— /� 181 RETAIL A2 ♦ 3,216 SF 3,691 SF O 259' - 0" RESIDENTIAL LOBBY 260' _ °„ 260, _ 9' 0 _ °„ 190 RETAIL B2 RETAIL Bl 257' - 0" r77170 171 TRASH 0 / 1,960 SF 1,765 SF ELECTRICAL ♦ // ■ ❑ ❑ ■ 191 / — a -LLB—'—�— ��.�♦♦. � CAI/ .�♦s�♦�♦�♦� SP4.01 im e orn It A JD/�VIS> L�-- # UNITS <550S F 3 14 14 14 14 14 73 TOTAL # U NITS 36 59 59 59 59 59 330 FLOOR PLAN - LEVEL 02 1Q.V\IE REALTY CORPORATION Merge Capital PARK CITY SOUTH S P4.02 22.1 % Kimley>>>Horn J DAVIS > FLOOR PLAN - LEVEL 03 1Q.V\IE REALTY CORPORATION Merge Capital PARK CITY SOUTH SP4.03 Kimley>>>Horn J DAVIS > FLOOR PLAN - LEVEL 04 1Q.V\IE REALTY CORPORATION Merge Capital PARK CITY SOUTH S P4.04 Kimley>>>Horn J DAVIS > FLOOR PLAN - LEVEL 05 1Q.V\IE REALTY CORPORATION Merge Capital PARK CITY SOUTH SP4.05 Kimley>>>Horn J DAVIS > FLOOR PLAN - LEVEL 06 1Q.V\IE REALTY CORPORATION Merge Capital PARK CITY SOUTH SP4.06 Kimley>>>Horn J DAVIS > FLOOR PLAN - LEVEL 07 1Q.V\IE REALTY CORPORATION Merge Capital PARK CITY SOUTH SP4.07 Kimley>>>Horn J DAVIS > Appendix B Grading Plan and Cut -Fill Analysis hart hickman SMARTER ENVIRONMENTAL SOLVTI DNS U I 0 GRADING AND DRAINAGE LEGEND PROPERTY LINE < \ \ \ I TCE TEMPORARY CONSTRUCTION EASEMENT o I LL STORM DRAIN (> 12 INCH) L ° \ I STORM DRAIN (< 12 INCH) I RD ROOF DRAIN E l Y \ UNDER DRAIN o T \ CURB AND GUTTER o IN,\ / SPILL CURB AND GUTTER \ss \ I CL CLEARING LIMITS \ \ EXISTING CONTOUR \ \ l 805 PROPOSED CONTOUR IN, SMH N YARD INLET �\ RIM 257.88' 826.00 SPOT ELEVATION u TOP-263.52' \ INV IN=254.33' 8" CLAY STUB (N) c INV IN: 261.52' 15" RCP (N) \ INy IN=254.63' 6" CLAY (SW) _ ® CATCH BASIN (CB) INV IN: 261.23' 15" RCP (SW) V A OUT=254.28' 8" CLAY (S) INV OUT=261.20' 18" RCP (E) \� I / SD MANHOLE (SDMH) CURB INLET v TOP=257.97' yi / o SMH INV IN=255.87' 15" RCP (S) A / / -lam � CLEANOUT (SDCO) Z Q RIM=259.01' NV IN=255.12' 18" RCP (W) / r:�� 10.0' Wx 8.0' H TRI< -a INV IN=251.16' 8" CLAY (W)NV OUT=254.98' 24" RCP (E) / BARREL CULVERT ■ DROP INLET (DI) INV OUT=251.06' 8" CLAY (SE) SMH 0) � INV=243.96' INV=243.73'LPROPOSED INV IN=251.79' 8CA60 �N� /� \ <tcuRB wLET ��INV=243.75' � AREA DRAIN (AD) 0 p TOP=260.36' BLE JUNCTION BOX CATCH BASIN, INV OUT=251.70' 8" CLAY (E) / \< Z INV OUT=257.81' 15' RCP (N) TYP. / - - -CONTROL STRUCTURE (CS) SS --OH�--- 0 •_ - - - - _ _ REPLACE EXISTING ® FLARED END SECTION (FES) ' CATCH BASIN, t- D' � ---OHP-----OHP ---- OHP---- -- J PROPOSED z 31 \ CATCH BASIN WITH TYP. < J / I / Q CONCRETE HEADWALL (HW) < 1' S SAUNDERS STREET PROPOSED STORM \ PROPOSED STORM \ \ / r \ I JUNCTION BOX / I \ 0 16' CIP WATER LINE PRIMARY STREET PIPE, TYP. - PIPE, TYP. \ -1 / - - 1s" cIP z RIA E WI H P LIC I I - \ _ - -- - - � - '� -\ - - - RD INLET -Z / - - RIP -RAP APRON Q a _ - ) ^� 6 CIP � TER LI^�F. - / - CIP WATE LINE - - - - - ��5 -R� �- / _ '�� -� FLOW ARROW -- -=`ti= - - ---N - - 6- -f0--- `l• `l/ - - CL - - - - RCP h - - o-�W-� -�- _ -1�� - - - - - _ -- - 1 - �M- - s - - - - - - - -W- / T- RCP E -W- -CL a / Iva -/ - - - / \r TW TOP OF WALL (GRADE ELEV.) Mj ° - ------ --- - -- -- -f- I- - � 2)3-rL1''j /_r'�� b. ^ �^�--�_, �% tJ•� - -N= �c065 �' N ° p, 11 11 ° \ / I / g` / ��c, `�'� TN=>_N -cow_ 6'cP� =�� �N- �dr rn� - s - - - - ►�- - - °D �o - - �b BW BOTTOM OF WALL (GRADE ELEV.) > ■ ■ aJ ■ C� ° N 1 / / > - ? - �� - - - TP TOP OF PAVEMENT (GRADE ELEV.) / FLEX SPACE A FLEX SPACE B EX S p rp N p e ° A � .4� r \ \ \ Q N \ �i / _� ��/ u / / / n 140 160 / / M� N -r��r �� TC TOP OF CURB (GRADE ELEV.) l // } / / \ 2 P PEA PROPOSED 1 / ^ E: 273.17 , FFE=269.0 oMEsrl ~ram �,°�O N I ��' / 256.59 / I \ ° T / / �J / 1% DOGHOUSE / N P: 272.95 FFE=271.0 I I I I WATER \ //� I ( ���� �_�____� s CO - 1i� FFE=257.0CL 257.00 ♦ < i / INv=2 s 42. 3' / w Fa \ CATCH BASIN \\� FFE=272.0 ■ ■ III I ■ FFE=266.0 FFE=263.0 �EiV'TRY P�AZA ` n/ FFE=258.0 ^ / / I I _ / / I� / I / / /III TC/TP FLUSH CURB (GRADE ELEV.) cs SMITH LLC RACE \ I \\� / ^ 0 I I \ 1 / /crRl PROPOSED STORM \ I / /� /l / I / I L ` � / / / // / INV-241.97' WT WATER TIGHT JOINTS WT •- 3 // PIN# 1703442339 sF. / CS SMITH LLC \� N RB5IDENTIAL / 91 S PIPE, TYP. ♦ PROPOSED ///// ( ) - \ DB 17330, PG 1278 PIN# 1703442592 III /% J LOBBY ��� ��������� - �_� c0 JUNCTION BOX, / \ z 3' DB 17288, PG 1501 \\ \ / oo -� REdD ♦ / SFHA \ / RETAIL / / 0 o (1021 B S SAUNDERS STREET) 017 S SAUNDERS ST V I I I \ ) gg g G3 - - - OBBY / / / LOODWAY UNE U _ } / I / / / Fes• 1■ 180 ` / / _ •1O� /" // 6,454 SQ. FT. N ( / / f0 \ 15,096 so. Fr. /IPROPOSED - - - 0.15 AC. 0.35 AC. c / r � AIL B2 TAIL B7 FORM MAIN ELEC 7 / / �\ SPLITTER BOX ,o�7, / N / / ti.0 / N \ 135 136 5.99k \ / 4f pc�i o o 1 - - / / \ / ° / /'� L� FFE=261.0 FFE-260.0 / 75 / / / / �ha�� v�' a / cs sMITH LLc\\ �J �p / 1 FFE=269.0 / /'� / PIN# 1703442374 \ \\ `} ^ / / .N t DB 17330, PG 1278 _ / J 1 ■ - \ \ PROPOSED SAND 20 PUBLIC DRAINAGE .►�._ \ // FILTER OUTLET 7 / / / (1021 s RIDERS ST), v _ I I///EASEMENT (TYP.) - b\ \ A * PARIS FAMILY / / / I A \ / / / �/ ' c" 4,894 SQ. FT. ROOFDRAIN To 9 Ir / \ / / / 2 j/ / o \\ � PARTNERSHIP LLC / / 25 �` PIPE AND / �/ / • � - ,y //� °° } �,, z ' U ( r J \ \ \ # N / TERRACEDRAIN 0.11 AC. \\ PIN 1703443412 / / / \ \ v �` r// SAND FILTER / \ DB 16872, PG 1643 J ' VA(1019 S SAUNDERS ST) �/ / �-� // N / 42.� //� / ?�1. V� / / V / / I ZfJ �l Z �S / //// �INC -3 .RIS FAMILY \ 4' L7 > s 5,504 SO. FT. \ D 26 ti /�� \\ \ \ / \ \ N ���°� 1 -4.93r �\ 1 \� - PROPOSED I M-o ET L/RES AURANT TERRACE / / ^ PROPOSED BUILDING / / j I j�ll FNERSHIP LLC FQ / �^ \ 0.13 AC. I \\ f0 \ / / Frl / / a 1703443208 // \ \\ \ \\ \ \ / % / // l �� �� o �672, PG 1643 �S' \ \\ \ � / / \ / �// �Sg; � \ �� _SAND FILTER �% _ / , x \slcN a > SAUNDERS sT) / / / \ \ \ \ \\\ \ /�/// �/ \ 266 / / \ 9^ / �� 42" P CONNECTION } o L -sob SQ. FT. \ \ \ °/ FFE=266.0 / \'' �lh ' - / //// / 0.11 AC. I �\ , / w \ Nv woos OF \ PARIS FAMILY PARTNERSHIP LLC / \ \ �- ��lp �� - / / / / / I / \ N a a ,�A\ � PIN# 1703444408 / / �} J DB 16872, PG 1643 5 i ■ - �� // / / } 500-YEAR / NO \C/ (1019 17,MOUNT SO.PFT.DRIVE) 28 /LOADINH`�6 / / ■ ■ ■ ■ ■ ■ 10' PUBLIC DRAINAGE , _ % / ��1 nF2' ^ \ / / \ \ \�- \ \ ✓ / ■ / _ / / _\ TIE INTO EXISTING / / / FLOOD ELEVATION O N \ \ PA FAMILY _ / i o.4o AC. 5 130 / - - 2g EASEMENT (TYP.) / - �J % ` / / I k \ / / / /ii PROPOSED \ \ PARTNERSHIP LLC / • \\ i I/ _ - - - _ -256 '"' jam. / STORMWATER PIPE ��/ / 100-YEAR FLOOD � \ \ \\ PIN# 1703443344 ; I \\ / G - /� \ _ _ - \ \ PROPOSED �� - DOGHOUSE -_ / J \ ri \ - / / ELEVATION // \ \ DB 16872, PG 1662 ^\\ JUNCTION BOX \� I // /// // J 0 a \ (1029 S SAUNDERS ST ' L \ ?64�"p ��_ _~ �/ / ■ J / \ / TYPCTION BOX, - ` s,214 so. FT L -\ _■-� / ■ - /i' 1�0-YEAR /� 0) LLJ AC. / / -- - \� 2 // //� > ° - - \ / h�N _ J % / i /� �V� -� / _ / 26iEVAT10 \ -/ /// (V / 263' 500-YEAR] I F 57 QI o \ \ \ \ \� �o // \- • �s, - 3 \ 20' PUBLIC DRAINAGE L Sco / 1 PROPOSED I EASEMENT TYP. / TERRACE DECK / / LY \ \ ) // /' DRAINS TYP. \RESIDENTIAL /�// / / P LLCM _ / / / / /� //� Y 43285 I \ \ b'2 \ / C;' \ // �/ F \ ✓ / Jl 2 // /' c 1643 ` \ I \ \ ( PROPOSED STORM y AMENITY / r� DERS ST `\ ( \ I PARIS FAMILY P PIPE, \\ `� / 63 \ �j,0�a/y/ _ + SMH 3 \ \\ TYP. '20.0 j� 2 POOL DECK /// / / UNE % t � / \ \ PIN# 17G / / x� / RIM=251.12' 0 o FT. \ \ DB 16872, PG 1662 \\ \ \ ♦ / // �// /// / �// / / / X NV IN=246.64 8" DIP (W) m - \ 1 / 1027 S SAUNDERS \\ \ 6� \ 256 4j' /// /// / //�/ / C/ / / / �+ I NV IN:246.80 6" DIP (E) c� - \ \ \ \\ t l \\ ( \ \ /�II '%/ /"/Nv our-246.57 8" DIP (s) 13,008 SQ. F \ 4- BHfERUOM.. .�./�/X� MH 0� A \ \ _ �6 ♦ /'��1'I(�/ i // Nv IN5248.92' 4" PVC (W) U INV IN=248.04' 8" CLAY (� o \ � ` PIN# 170344435125%� li 2¢/ \y PARIS FAMILY PARTNERSHIP LLC // \ 9\ / /// / _� / / / / �j NV OUT=247.87' 8+ (E) / \\ N m / / DB 16872, PG 1643 /� 7,� / //�/ / 10 /Y/E FL00�/ / / O o \ (1025 S SAUNDERS ST / / /// \ �l'� N 16,467 SO. FT. 250 \ AI ■ / ■ ■ �� / / �/ %/% \ - EL ONE / /// / 5 0 YEAR / / 1 '38 AC � t j \ i �� /� FLOOD E WMON / SFHA N 'U ' 1 / / / / �� FLOODWAY LINE N O / /// / / l 249 5a ■ ■ ■ ■ `� / / / / I \ / z_ � I a X2 _ / //lam //`12"CPP //PROPOSED CATCH I / //// / \ / / / 100-YEAR FLOOD/BASIN, TYP. / I ` r / / / //// wv=246.5r//�//// � 4, / ■ I■ ■ 1� / / /// \ / / 118'-246.08' � 1 � y o / \ ELEVATION Q /// // /� / / / 1` / 18" CPR >c / SMH �.a \/ , / Y� 2 INV=243.50 NV IN=246.15' 8" DIP (N) � RIM=251.40' � 25s P / / //// / i r l 1-1 Ld o j// /� // i / 257' / / /// / / _ �D _ - f Nv our=246.08 a" DIP / p3 / - 500-YEAR __�i� I / / / / j / /// % / �� / -�- - �` / / / 18" CPR FLOOD ELEVATION a �J///// �77L / / I I \ / / 0 / 24 \ 7 / INV=244.38' / m c �% // ///%� / / �// / / // J g z .N / j // - ^ �2 / I \ \/ �o� 245- � NRP GATEWAY PARK LP cp .21 � o o , PROPOS D I l 2 / / ���// // //// / / / r - - / /� / / /�\� 1 PIN# 1703448901 z " \ \ (\ / JUNCTION BOX, \ \ \ � o /i j SFHA DB 1o89a, PG 81a \ // FLOODWAY LINE / < o �\ \\ \\\ \ \� I \ / TYP. / / /// / // / / / �� / / / / /.� BM 2002, PG 1698 SMH (ABANDONED) a r, RIM-249.42'"� J \\\ \ \� \\\ \\�\\ \ I `� 100-YEAR FLOOD ' / / / // / //� / l / INV IN=245.57' 8" DIP (N) \\~\ \ \ \ \�\�\ \ / \ /% / ice -� / ( ) NV OUT-2145.67 8" DIP NE r Q \ \ \ �\ \\\\ \ ELEVATION z _ FLOOD EOLEOVATION W c \\\\\\\\\\\\\\\\ \' \ \\�\ �' -G / o �� \\�\ \� \� \ \ \ \ \ 2�9- - // / SMH D \ \ \\ \ \ \\\�\ RESERVED FOR RIM=251.16 'V GREEN WAY EASEMENT _ 2 6•' �/ J/ i / INV OUT 2- \ 1 4 / PROPOSED BUILDING r (BM 2002, PG 1698) \\\�\\\\\\\� \\\ I//// ROOF DRAIN / o I \\\ \ \\� \ \ \� \ \�\� � PROPOSED FES \ / CONNECTION AND RIP RAP 0 SMH o O c I / � \\\\RIM=248.77' U) ° / / �\'INV IN=(FULL OF WATER) \\ \\r '\\\ / \ 1 FLOODWAYUNE INV OUT=(FULL OF WATER) / I \ \ TOP OF WATER: 242.77' 0ll'O BOTTOM OFF L � In U \ \ \ \ \\\\ `\�" \ 00-YEAR FLOOD ELEVATION / "11 �\ \ \\\ \\� \ / 500-YEAR\\\ �\\\ \ \ j�� / FLOOD ELEVATION -� 0 8.0' W x 8.0, H / PEDESTRIAN TUNNEL AVERAGE GRADE CALCULATIONS (S SAUNDERS STREET) EXISTING HIGH EXISTING LOW AVERAGE PROPOSED PROPOSED LOW AVERAGE POINT POINT EXISTING HIGHT POINT POINT PROPOSED GRADE GRADE 273.17 256.59 264.98 272.95 257.00 265.91 EXISTING AVERAGE GRADE (MOST RESTRICTIVE) 264.88 PROPOSED AVERAGE GRADE 264.98 1 GRAPHIC SCALE IN FEET 0 20 40 80 I- � z z cn W LLJ z O O O U U W � � m 0 u N � Z KANT REALTY CORPORATIO IlVerae Caaitall Kimley*Horn © 2021 KIMLEY-HORN AND ASSOCIATES, INC. 421 FAYETTEVILLE STREET, SUITE 600 RALEIGH, NC 27601 PHONE: 919-677-2000 WWW.KIMLEY-HORN.COM #F-0102 JDAVIS>I cl\l ,V��'o� GO z I I I w N O O O N C �� �_ N Q m 0 LLJ 0 Q O w Z Z Y Y O < in < w V) 0 0 0 Z 0 � Q � Q Z (D LLJ � Z CD w Q Q Q llcll� �(D o m I m D 0 r^ v, � O LL Q W U) �0 w 0. aLI W L Z CD LJJ J Q � 0 n u °1_c SHEET NUMBER C3.0 OHP/ / �- / *, oyP - / 10.0' W x 8 0' H TRIPLE BARREL CULVERT 0/ J I - - / 7 p, `VO / / \ \ INV=243.73' INV=243. 6' INV=243.75' rn co L0 /O� / / / \ �� r L 0 rn w co - N O M sF / -- - ,`4jX / - - / i � M r O r rn ---- N M�-- Z02 -- - oOHP------OH ----- �- OHP --- O ---- + ----- --- --- - -- -- - - - -OH-----OHP--- + r °°AUNDEF STRE 1 r d CL d a a a 1 ° 9+00 (PRIMARYTREET) 10+00 \ 11+00 12+o \ 8 0o ARIABLE WIDT PUBLIC R/W) - - Ov- IV�O ro 6 0 cb N O J / �� / ? / / / S4 5.1 5.0� /5 \ �° 2 / / �° /�k S �� �� �� 14 10 2 / / 7- �Fqw -1 ---IWP F ko cc -41 0) \ \ / I s � ssD / 2° �ETAL FFE=269.0 JjOi \car I,o _ II IIIIIII IIII IIII \ / f / I INS/= 42.�3 / /PIPE !III FFE=272.o III FFE=266.0 I o- : I, �I IIIIIII �JINIIIH z5.- \ FFE=257.0 \ \ �.o /K // I INV=2r42.6 \ - II !!I. IIIIIII nnm IIIII�I� �� � � IIIIIII IIII � .IIIIII � 1 CONCRETE/ \\ I ICI - 255.00 FFE=263.o II III IIIIII IIIIIIIII IIIII d IIIIIIIII IIIIIIIIII,II n FR/ME \ / \\ \ 1 III: I FFE- 272.5� pp- `� pm� r - _ /I / / lie / I / \ CS IT -ELc ,RACE IIII q _ I _ _ IIIIIIIIIIIIIIIIII / IIIIIIIIIIIIIIIII IIIIII , �', o \ / / /� / // / / I INV=241.s7' 1703442339 I SF. v / G SMITH LLc v �v I 1 hll - \ - � I I IIIIIIIIIIIIIIIIIIII IIII' �;]IIII�11111 IIIIIIIIIIIIIIIIIIIIII IIIIIII ;ti / J i PIN#3PC127 0 A\ IIII . nl' / • DB 17330, PG 1278 23, \ / PIN 1703442592 \\\\ \„ I 1 I I/ nnl 11111111111 llll ,rlllnnnlllllllllllllllllllllW IIIIIIIIIIIIIIIIIP o- I � / //-i/' / 021 B S SAUNDERS STREET 1288, PG 1501 \ \ ;, ,I IIIIII IIIIIIIII III I ml�rl///SFHA �(� )\FFE=259.0 / \ / / / / \^(101S SAUNDERS ST) % 1I II ! !!!!I !! I/ ♦ / / /�/ / / / / / // / LOODWAY LINE >✓ �r45a\SQ. FT. _ _282 \ ,� ( - V ' IIIIII ulllllllll IIIII!J I 260 IIIIIIIII ... 1 �� / / / /`Y // // / � / \ - 15,096 SQ. FT. / v lilul IIIIIIIWn.._....1 / r / / / a 1.., _ ..._I ..�� muii - � o.35 AC. � � rW1!111111 171 VI I _`_ -- J y �I IIIIII II II IIII- F =270.0 IIIII! nrrli�ll' /IIII ,IIIII■iml�ll f (/ / °' / / //// / /1000, o - - - - -, s �{ �� FFE=261.0 FFE=261.0 m / j / / j / / //i / / SMITH LLc _- \�tiA l _ / / \ / �lut I!llll �ulllllll IIIII-�inlll PIN# 170344237�� \\ A II�I����I ' IIII!!!!!! , ....� I!!!! I!!!!!1► / / / / // / / / �L �\ DB 17330, PG r - =:516. p I • ill m: pnnnn, ! / + ~ \\ �021 S SAUNDERS' � \ \ � \\ � -QS � / r /,/ ��'' �11lII ,I -r'I � IIII �ill�Illllle � / / �/ Y - / _ PARIS FAMILY / V A , i - - �.��_� I 1 v / 4 894 SQ. FT! \ -� / / / / / / / / \ � / ® IIIIIII IIIli Illlllllllliial. ` /i/ � // // _ �� i// �/� // o / 0.11 AC/ -/ \\\\\\QARTI»-�Lc__ ��� / / \� - �I�- J• / /`��� 'W 4,ZO3443412 - i / / \ \ \ J !!-_ / / ® II II �� �Bil Q-Y-2� '6- �43 278 y / r ■ ■ \ .m ��,II IIII h IIIIIIIIIIiIII►; / IIIIIII dlllll __.....r III. .�I�IIIP�I IIII Illllllllllllilllllnl_nalll � / = nnmlL- •, Ilr Ir V' II 1 I ""i 1 - i `i''/ / / / / / / / / IIIIIII Illlllllnnvnnu� nnillllllllllllllllll lill.� Ilellla�l!! _ un 1111111111l�!!lIa1.9------ / / / „ m m m m m m m nri m ,�gllrrn/nr ns lu III m.,• \ I \ \ \ s �6 � � � \ ^ / �; � \, , ■I \ - - IIIII•;II �- IIIIIl1111l�111!lIIIIlIIIIl111111111111111lllllllllluill�lllll,l� � •�Ililrllillll� / /// RI FA ILV Sh o� - \ \ `S,�$,SQL\\ \ ^ / \ "� $ � \ � � �� II m ll Illllllllllllllllllllllllllllhlli,nlil�llllllllllllll�llilllll � - IIIIV/ � / / /.� � � / � / �. ( I \E� sHI\ L c / / \ \ \3��\ \\ J \ J 4.94 �IIIIIIIIIII'Illlllllll�illlllllllllllllllllllllllllllllllllllAlllllllPl' ,Illy.,. \ (+�. / �' / ///i� m 1703443 _ IIIIIIIIIII �► -- / / �,� / //i 872, �G 43 \ oo // / \ \ \ \ \ \\ \ \ / / SIGN / / J II SAUNC�ERS\ S f \ / \\ \ \ \ \ \ \\ \ \ //� 6.5 ® /� / / IIIIIIIIIIIIIIVIIIII / / //� ✓ / %//// / / + I \�, / \ \ \ \ \ \�' \ \ \\ \ /j/ _ / � � � / � Illlllllallll:iil - ,..._ - � � / //i/ /i / I \ \ \\ // /� I I - "91111�E••� - .� /// \ Zg5' //�///� / �� �i// / ROW OF >p6 SO. T. \\,e\��IJ �k�ERSHIP LLc I- =266.0 ,�__ ; / 15 J `f - - \ i� / ( /�/ //// l wooD PosT / 11 AC.� 1 V.`���S�F44408 N - - �±E / � II I Vic/ /�� � l PG 1643 LJ / / / 2s / / \ \ \/ / /�%// / J / 500-YEAR \ / \ \ �n9 f � _. ` // /� / / / / �` -- FLOOD ELEVATION vUNT HOPE DR�VE � �� �� ' \ / 17,228 SQ. FT. / �\\\\ ) �$ 0 _ _, 1 '1� � I_ J 1 � -ice/%� / � 2S / \\� \ �\/ �i \ i- \\\ ( P�A� 1 FAMIL /' \\\\ \ 0.40 AC. - \ PARERSHIP L`�C \\ \ / / i//\ �� �/ \ /� / I / /2 / / \ \ / / 100-YEAR FLOODIN7034433 4 // \ ///�/ l / DID 1 872, PG 1 62 ELEVATION / \ \\ \ 029 SAUNDER ST \ \ ( ( ) I I 2g sue\ - / �� / ✓/ /// / I �\ / 100-YEAR FL \ \ , A 4 SQ. F L / L _26AS� \ \ I o '^ ���1`. \ \ - •siii �.. / - %� ii/ / i _ ` I ELEVATION \ \ \ \\\ 12 A C. / - 263 - �500-EAR \ \ \ \ \ \ \\\ \� / / \ \ `I. � •.��� � ���♦ �f � � _ 2 � _ - - - _ -FtOAB-ELC�i,�ilON pm„ \ 262 T � I L Y \ \ I ! / / \ � / � � � ( .♦ ♦....� / /� // / / /� i � � D� �' // LLC '00,// 43 85 \ \ $ l I I \ � A �� 1 ( -�O � /- = � v vI I � � � ' � �� � FFE= 26 3.0 pios�Y:>• � _ �\ \ PA IS f1AMIL`(/PARTI OAS IP/L \\ \ \ I � � / 25 / / / FLOOD - D E R S \S T) \ 1 \ \\\ 1 I `b %� \ \ • ®®���������������<�'' / // / PIN 1703441+/ \ \\ - -� ♦.♦ i.��.�•� ////�/ // / _ LINE �1 a Wig T. \ 1 I D 1 q 872,A G /�j F Y \ \\\ " 0�000:�00. 000;"; �s°•o \ \ \ \ \ f \\ \ 07 S A'U N` /// \ � \\ 1 / \ - / FFE= 26 4.0 ••i'®`i000' �✓ OO�i .000s' `�1' / // / / / �o � 1 � \ \ 1 1 I \ 1, \ �\ \ I / / �/ / � I' � •.••,9s33::�3i,:•�'►:,•�, / 111 �/ /i ,- � /�, � �/ / / - � \ I \ / PIN.o# 17t34)4311 P�R�SI F/WILY AR NER HIP LI[C /(�// / 1 - �, - _ - • O 2 / \ �i i %/ / D� 16 72, G 1643 / '�! / / / II'rr'*1� •� / / /// /j/ lot A) // //// �A ! �� r / ///// // i \ ELg;A EAR FLOOCY / - / / I \16,V 6 7 S Q. F7, / / - --- / // Cy.3 AC./ // j///�//// // / / 1 II - TII.1 '"� ` , Q / i ///�/ //� / FL(�DD ELF1A'fION ^ �� �� 5b0-YEAR / // /i _ / . / /�/ \ "\ // 7► \/ X� SFHA o n ////// r1 J ❑� .. / /�l / \ L 11� � � / \ � \ \ / r / ` -+ ' /- �� FLOODWAY LINE N � 0 I 249 - / 4_ \ /// / %i� cif �F �Y //// / - - - - �I}o/ / I / /� / / / /// /// //// �// / j \ - 100-YEAR FLOOD / / / / / / / / - - - J . I - -� / / /� k _-- ELEVATION l /l//11 - 247- /5`11� c� /;Xf� -' - - - / / - / / / / FLOOD ELEVATION ,` -� - /l/ / / � 500-YEAR �_//�j - -J\\\/ l // �� / / _/� / / / 20 / J I �; I S� ///�/ // /� / /'/NRP GATEWAY PARK LP / / // o PIN 198, PC 901 SFHA / / BM 2002, PC 1698 / 818 FLOODWAY LINE \/ \ \ \ \ \\ \\ \\\\41100-YEAR FL ELEVATION // / / 500-YEAR \\\\\\\ \\\\\ \\\ \ \ \ \ I -251� �// /// \ \ \ \ \ \ \ FLOOD ELEVATION \ / / � \ \ \ \ \ \\\ \\ \\ \ \\I -- \ \ \ \ \ I / / � , 250-�� ���/ / \\\\� \ // 0 j I I / a \ \\\ \ \\� \ \\\ `\ \ \ \ �• \ \249 / RESERVED FOR � 1-1 \ 24 -- jL f \\ \\ \\ \ �\ \ \ ` / \ �24 8 J ky, / GREENWAY EASEME \� NT\ / \\\� ��/246�' (BM 2002, PG 1698) / I \\\ \�\\\\\\\\ \ \�/ 1 pA / 1 GRAPHIC SCALE IN FEET / \ \ SFHA ��� \�\\� �\\\\\ , \\\\ / /� / I \\� \\\\\\\\\ \ \\\ / / I % FLOODWAY LINE 0 15 30 60 � ' / / I yc°/vrRI�NST Cut/+'i'il Summary \`may \ \ � N a� Cut Factor Fill Factor 2d Area Cut Fill Net / I % \XN N\� � t''�'�\\ \�\ \\\` 1 I EARTHWORKS 1.000 1.000 4.00acres 2234.45 Cu. Yd. 14789.38 Cu. Yd. / 12554.93 Cu. Yd.<Fill> 100-YEAR FLOOD Totals 4.00acres 2234.45 Cu. Yd. 14789.38 Cu. Yd. 12554.93 Cu. Yd.<Fill> / l 1-1 Elevations Table Number Minimum Elevation Maximum Elevation Area Color 1 -6.36 -1.53 24585.59 2 -1.53 -0.25 17802.32 3 -0.25 0.04 10714.13 4 0.04 0.32 13966.08 5 0.32 0.74 13599.80 6 0.74 1.74 24970.74 7 1.74 3.85 32409.96 0 8 3.85 11.18 34961.73 E/ Appendix C Utility Plan hart hickman SMARTER ENVIRONMENTAL SOLVTI DNS UTILITY LEGEND �_ m o \ N N o \ - - PROPERTY LINE \ � Q `\ WATER LINE \ \ o \ \ I 0O 0 FW FIRE LINE E \ o \ SANITARY SEWER LINE A A E ELECTRIC E ` SMH V YARD INLET \ RIM=257.88' FO FIBER OPTIC o TOP RCP ( ) INV IN-254.33' 8" CLAY STUB (N) 'INV IN: 261.52' 15" RCP (N) � IN IN=254.63' 6" CLAY (SW) � � G GAS � � INV IN: 261.23' 15" RCP (SW) A I OUT=254.28' 8" CLAY (S) z Z (n INV OUT=261.20' 18" RCP (E) CURB INLET \ P POWER LLJ LLJ z : O TOP=257.97' `SS\ -OHP T TELECOMMUNICATION � U) O RIM=259.01' INV IN=255.12' 18" RCP (W) Hp - � \ �� 10.0' W x 8.0' H TRIPLE O O W INV IN=251.16' 8" CLAY (W) NV OUT=254.98' 24" RCP (E) BARREL CULVERT TV CABLE INV=243.96' 0 INV OUT=251.06' 8" CLAY (SE) SMH / A \ INV=243.73 � GATE RIM=260.37' �--L,,_�--� LIGHT POLE U U 8" TAPPING SLEEVE VALVE CURB INLET INV IN=251.79' 8" CLAY (N) / \� \ INV=243.75' I__f I__I TOP=260.36' INV OUT=251.70' 8" CLAY (E) AND VALVE TYP.) (TYP.) INV OUT-257.81' 15' RCP (N) / �� A V -m WATER METER - - - - - - ] --- ----oHPI - oHP f P--OHP ----- 8" TAPPING SLEEVE ' ' P 6 TAP_ GATE VALVE AND VALVE (TYP.) PUBLIC FIRE 8" TAPPING GATE TIE INTO CORPUD SS/ C / / E 5 POINT OF CONNECTION S SAUNDERS STREET HYDRANT 4" WATER SERVICE SLEEVE AND VALVE VALVE I EX. SSWR EASEMENT (TYP.) SSWR MANHOLE (TYP.) METER TYP. TYP. - - - 1s" CIP - / / BACKFLOW PREVENTOR o 0 5" CIP WATER LINE PRIMARY STREET - (TYP.) 1" IRRIGATION -� - - - _ - - - -MANHOLE I c RB INLET (TYP.) - - _ - �{ - / m N z Q -(VARIABLE WIDTH PUBLIC R/W 1s" cIP WATER LINE - - - - - - - - -- -- -METER (TYP. - - - - _ _/-sr6s = _ _ - - _ ) - - - - - - - INN 250.55' 18" RCP (S) PRIVATE FIRE / / I1 Imo' I-� I=I I�I PIPE TEE/BENDS - - - - - _ ----- - --- - -- --- - - = HYDRANT (TYP.) 0 _---W------ =-Y(�= - --- - - ---- --- - -- 24 Rc - -- - - - _ - - -- - - -- - - - - - I05505 0' - 6F RCP E R L .�- � - - - I �- - E REDUCER - o - - a - �- --- °_� ° 4" DIP WATER 1 IRRIGATION _ ° ° FIRE HYDRANT GAT ---- - - - - _------- ------ -- +_ -'- - - SERVICE N - cep ° � � � � S p, -VALVE Y (FH) LINE D 6" DIP ° ° °a $� . ° ' (TYP.) - GRAVEL ® _ , - 3 ■ ■ . FIRE DEPARTMENT CONNECTION (FDC) - I o FIRE LINE > ° c1+ - FLEXSPACEA FLEX SPACE B FLEX SPACE C ° 5 REALTY CORPORATION Y _ _ n 8' DIP WATER ° I 1ao so so D. - ° > ° KANE T 11 = \ LINE (TYP.) C OMESTI1GREASE D \® SANITARY SEWER CLEANOUT (SSCO) 2 METAL �-1 �,. FDC FOR WATER PUBLIC FIRE _ 8" PVC SSWR / ' INV=242.23' �. o \ \ INTERCEPTOR__ (i INV=242.62' b o 8" DIP - PIPE TYP. SANITARY SEWER MANHOLE SSMH o � o � PARKING iss HYDRANT (TYP.) � � ( ) / ® ( ) z ■ ■ ■ ■ ■ FIRE LINE ■ (TYP.) SANITARY SEWER REIAILAI ONCRETE w n FagM` I DECK I a, a CS SMITH LLC RAGE V ■ ■ I (TYP.) 0 INV=241.97' ® SANITARY SEWER GREASE TRAP ��� a ita PIN# 1703442339 SF. (5L CS SMITH LLC �� RESIDENTIAL CLEAN OUT TYP. o De n33o, PG 1278 PI 17o3442s92 \ I ° FDC FOR 1" IRRIGATION RPDA (AMES = - 2.3 ({� DB 17288, PG 1501 RESID RETAILA2 ♦ / / 8" RPDA (AMES MAXIM 021 B s sauvDERs STREET) APARTMENTS SFHA (1017 s sauvDERs sr) \ ° MAXIM LF500) BACKFLOW - LOBBY 80 - / / LF500) BACKFLOW LOODWAY LINE 0 6 F- 15, 0 3s SO. FT. e AND -DETAIL 4"RPDA (AMES MAXIM PRE\\\\\�IIN BUILDING RETAIL RETAIL BI 90 / / / / / 0, / / / / GROUNDPREVENER IN HEATED ENCLOSURE STANDARD UTILITY NOTES (AS APPLICABLE ) \\/ I PREVENTERFW00 IN BUILDING LF500) (AMES OW ■ ■ ° ■ ■TRASH ♦ / / 1. ALL MATERIALS & CONSTRUCTION METHODS SHALL BE IN ACCORDANCE WITH CITY OF Kimley*Horn \ \oyQ FORMER MAIN36LEC ) 8" RPDA AMES MAXIM / / �� / RALEIGH DESIGN STANDARDS, DETAILS & SPECIFICATIONS (REFERENCE: CORPUD o ° ■ / HANDBOOK, CURRENT EDITION . PREVENTER WITHIN BUILDING / / ' ) © 2021 KIMLEY-HORN AND ASSOCIATES, INC. I / / / / ` �� I : 421 FAYETTEVILLE STREET, SUITE 600 SMITH LLC �y RALEIGH, NO 27601 � ° no3442374 \ } � 3 ° ■ ♦ ♦ / � o / / / / '�% = 2. UTILITY SEPARATION REQUIREMENTS: �30, PG 1278 SAUNDERS Sr \ I ° / / / 5� / / �/ (`o f A) A DISTANCE OF 100' SHALL BE MAINTAINED BETWEEN SANITARY SEWER & ANY PHONE: 919-677-2000 Q )° PARIS FAMILY ' r ■ ■ 2 X 8" PVC ■ // ' 100, z (� PRIVATE OR PUBLIC WATER SUPPLY SOURCE SUCH AS AN IMPOUNDED RESERVOIR www.KIMLEY-HORN.coM 4 S0. FT. PARTNERSHIP LLC SSWR PIPE c #F-0102 .11 AC. \ I / / / I / USED AS A SOURCE OF DRINKING WATER. IF ADEQUATE LATERAL SEPARATION CANNOT CL PIN# 1703443412 / �e TYP. `� ° C BE ACHIEVED, FERROUS SANITARY SEWER PIPE SHALL BE SPECIFIED & INSTALLED TO / DB 16872, PG 1643 \ GREASE INTERCEPTOR (TYP.), ■ ( ) / / F 30' CORPUD SS ° + o (1019 S SAUNDERS ST) / 42.0' CONNECTION TO BE I ■ / / / ? WATERLINE SPECIFICATIONS. HOWEVER, THE MINIMUM SEPARATION SHALL NOT BE LESS s• O` � _ ?I - � "'� EASMENT (TYP.) � / +zs• COORDINATED WITH PLUMBING '�� / 5� SFHA I < THAN 25' FROM A PRIVATE WELL OR 50' FROM A PUBLIC WELL. 5,504 SQ. FT. FLOODWAY Fo 0.13 AC. o. I RETAIL/RESTAURANT TERRACE / . / + I I-j"� cul B) WHEN INSTALLING WATER &/OR SEWER MAINS, THE HORIZONTAL SEPARATION 0 _ ass' ' / 10.5 SEPARATION BETWEEN \ / TOE BETWEEN UTILITIES SHALL BE 10'. IF THIS SEPARATION CANNOT BE MAINTAINED DUEJDAVIS> o ° / 8" DIP WATER / °� / ■--- ---_- = / WATER AND STORM-'/ o SIGN IN,, TO EXISTING CONDITIONS, THE VARIATION ALLOWED IS THE WATER MAIN IN A LINE (TYP.) I _ D / 42' SiuP / / / of SEPARATE TRENCH WITH THE ELEVATION OF THE WATER MAIN AT LEAST 18"ABOVE NV 46.90' / ° / ROW OF x / THE TOP OF THE SEWER & MUST BE APPROVED BY THE PUBLIC UTILITIES DIRECTOR. r,r PARTNERSHIP LLC / UTIL ■ �N \ / / S I � � PARIS FAMILY / PIN# 1703444408 / ° _ 131L - - - - - - - - - - - - - - - / \ / / WOOD POST. ALL DISTANCES ARE MEASURED FROM OUTSIDE DIAMETER TO OUTSIDE DIAMETER. ° -172, PG 1643 ■ C WHERE IT IS IMPOSSIBLE TO OBTAIN PROPER SEPARATION, OR ANYTIME A SANITARY IT HOPE DRIVE) LOADING ■ ■ ■ ■ ■ ■ ■ \ PRIVATE FIRE OGHOUSE FLOOD ) / CORPUD UTILITY \ / , \ / �� FLOOD ELEVATION / \ SEWER PASSES OVER A WATERMAIN, DIP MATERIALS OR STEEL ENCASEMENT EXTENDED o so. FT. TRASH MANHOLE � PARIS r EASEMENT (TYP.) Ac. / � / � � HYDRANT (TYP.) � / l 10' ON EACH SIDE OF CROSSING MUST BE SPECIFIED &INSTALLED TO WATERLINE PARTNER`_ LLc , / / 30 ■ l// \ '< SPECIFICATIONS. PIN 1703443344 - - /` � � � / � 100-YEAR FLOOD / # ` ELEVATION 1 D) 5.0' MINIMUM HORIZONTAL SEPARATION IS REQUIRED BETWEEN ALL SANITARY SEWER m 0 DB 16872, PG 1662 / ■ �- FW 36" FES J - 1029 S SAUNDERS ST ■ ■ ° / &STORM SEWER FACILITIES, UNLESS DIP MATERIAL IS SPECIFIED FOR SANITARY SEWER. �G � j > WATER `' INV=242.88/ 4 / A ■ ■ � T, 10O-YEAR FLOC-/ / -� E) MAINTAIN 18"MIN. VERTICAL SEPARATION AT ALL WATERMAIN & RCP STORM DRAIN s,20112SO. cFT. /\ I / / / s a ° - TY LINE (TYP.) ELEVATION �/ CROSSINGS; MAINTAIN 24"MIN. VERTICAL SEPARATION AT ALL SANITARY SEWER & RCP ° o / \ I y, / / �✓ D -VC\\, M 500-YEAR EX. SSWR /� / \ +/ STORM DRAIN CROSSINGS. WHERE ADEQUATE SEPARATIONS CANNOT BE ACHIEVED, / \ / ■ ■ / FLOOD ELEVATION (TYP.), /� SPECIFY DIP MATERIALS & A CONCRETE CRADLE HAVING 6"MIN. CLEARANCE (PER Lo _ a- PUBLIC FIRE L_ / / / ° %� / 5/ / / / CORPUD DETAILS W-41 & S-49). HYDRANT (TYP.) - / ° ♦ // /5 / / + F) ALL OTHER UNDERGROUND UTILITIES SHALL CROSS WATER & SEWER FACILITIES WITH T e/ ♦ RESIDENTIAL i � F.N / / / / 18"MIN. VERTICAL SEPARATION REQUIRED. 0 8" RPDA (AMES MAXIM I I I ° �\ AMENITY / SFHA ° LF500) BACKFLOW I -� POOL DECKS // FLOODWAY / / / / / SMH 3. ANY NECESSARY FIELD REVISIONS ARE SUBJECT TO REVIEW & APPROVAL OF AN AMENDED �. A\ POOL OUTLET, LINE / �s X RIM=251.12' z O O m PREVENTER IN ABOVE I ♦ \\\\\\ / / / /5`' / / �X INV IN=246.64 8" DIP (W) PLAN &/OR PROFILE BY THE CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT PRIOR TO m m O ■ ♦ MAX. DISCHARGE / H H O •E o' GROUND HEATED ENCLOSURE I I ♦ / � / / / \ INv IN:246.80 6" DIP (E) � CONSTRUCTION. O � N O \I I I �� 50 GPM / �/ r y \ NV OUT=246.57 8" DIP (S) � N O = \ 13,008 s F I WATER 30.0' BIKE ROOM �� / MH \ 4. CONTRACTOR SHALL MAINTAIN CONTINUOUS WATER & SEWER SERVICE TO EXISTING O w N o A� 0.30 y RIM=255.42' m >- \\D "LINE (TYP.) I ' 0 �� i INV IN=24a.92' 4" PVC (w) RESIDENCES &BUSINESSES THROUGHOUT CONSTRUCTION OF PROJECT. ANY NECESSARY Q Q > m NV IN=248.04' 8" CLAY SERVICE INTERRUPTIONS SHALL BE PRECEDED BY A 24 HOUR ADVANCE NOTICE TO THE o N o m o Q �# no3444351 I I _ GATE / ( w w 11LY PARTNERSHIP LLC �j NV OUT=247.87' a' (E) CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT. \ z z ° 16872, PG 1643 30' CORPUD SS I I / VALVE Cr P w Y S SAUNDERS ST) GATE VALVE TYP. 100-YEAR FLOOD / ✓ Y O Q Q U Q w _ EASEMENT (TYP.) I TYP. ( ) ELEVATION / / / / 5. 3.0' MINIMUM COVER IS REQUIRED ON ALL WATER MAINS & SEWER FORCEMAINS. 4.0' 0 LLw m = v 6,467 S0. FT. I A ■ (TYP.) ■ / PRIVATE FIRE 500-YEAR / " \ MINIMUM COVER IS REQUIRED ON ALL REUSE MAINS. 0.38 AC. \ 8" PVC SSWR / V FLOOD ELEVATION\ HYDRANT / /_SFHA o ➢ 6. IT IS THE DEVELOPER'S RESPONSIBILITY TO ABANDON OR REMOVE EXISTING WATER & PIPE (TYP.) / - y`� FLOODWAY LINE N r� O ■ ■ ■ ■ / �A SEWER SERVICES NOT BEING USED IN REDEVELOPMENT OF A SITE UNLESS OTHERWISE o / / zc DIRECTED BY THE CITY OF RALEIGH PUBLIC UTILITIES DEPARTMENT. THIS INCLUDES PRIVATE FIRE / � �` 12" CPR N w , m ABANDONING TAP AT MAIN &REMOVAL OF SERVICE FROM ROW OR EASEMENT PER o HYDRANT TYP. / `� 18" CPP Nv=246.51' � z 100-YEAR FLOOD �o / ti I ■ : ■) ■ F� � // / 100-YEAR FLOOD CORPUD HANDBOOK PROCEDURE. / INV=246.08' MH It 0 ELEVATION SSWR MANHOLE / / 18" CPR k SMH ELEVATION a / / / - 7. INSTALL 4" DIP WATER SERVICES WITH METERS LOCATED AT ROW OR WITHIN A 2'X2' 500-YEAR / (TYP.) yf INV=243.` RIM= =240' o o P / wv w=z46.1s' 6" DIP (N) WATERLINE EASEMENT IMMEDIATELY ADJACENT. NOTE: IT IS THE APPLICANT'S FLOOD ELEVATION / / INV our=246.oa 8" oIP (s) RESPONSIBILITY TO PROPERLY SIZE THE WATER SERVICE FOR EACH CONNECTION TO w ° / / / / a I I 8" DIP WATER / / PROVIDE ADEQUATE FLOW & PRESSURE. o Q / / �. - I I 10.5' / LINE (TYP.) / ��� / .� / / 500-YEAR / / 8" CPP / oti FLOOD ELEVATION 10.5' SEPARATION BETWEEN 0 \ / / o / / �� N" 78, / / / ' 8. INSTALL 8" PVC SEWER SERVICES ® 1.0% MINIMUM GRADE WITH CLEANOUTS LOCATED AT Q ° �\ WATER AND STORM I I / // ROW OR EASEMENT LINE & SPACED EVERY 50 LINEAR FEET MAXIMUM. _ /. - - Y o r 7 / / �j ,�'>i/ z / 9. PRESSURE REDUCING VALVES ARE REQUIRED ON ALL WATER SERVICES EXCEEDING 80 PSI; NRP GATEWAY PARK LP / BACKWATER VALVES ARE REQUIRED ON ALL SANITARY SEWER SERVICES HAVING BUILDING Q PIN# 1703448901 DRAINS LOWER THAN 1.0'ABOVE THE NEXT UPSTREAM MANHOLE. / SFHA q DB 10898, PG 818 \ / / \ M / / FLOODWAY UNE / / Ai BM 2002, PG 1698 J o EX. SSWR / \ / / SMH (ABANDONED) / / 10. ALL ENVIRONMENTAL PERMITS APPLICABLE TO THE PROJECT MUST BE OBTAINED FROM N \� PIPE (TYP.) `� \ �/ RIM-249.42' NCDWQ, USACE &/OR FEMA FOR ANY RIPARIAN BUFFER, WETLAND &/OR FLOODPLAIN Z / = INV IN=245.57' 8" DIP (N) r IMPACTS (RESPECTIVELY) PRIOR TO CONSTRUCTION. `� O o a. 100-YEAR FLOOD NV OUT=2145.67 8" DIP (NE) �� I ELEVATION N oo \ 500-YEAR / / / 11. NCDOT / RAILROAD ENCROACHMENT AGREEMENTS ARE REQUIRED FOR ANY UTILITY WORK 5 L k FLOOD ELEVATION I / (INCLUDING MAIN EXTENSIONS & SERVICE TAPS) WITHIN STATE OR RAILROAD ROW PRIOR G TO CONSTRUCTION. SMH / RESERVED FOR 12. GREASE INTERCEPTOR / OIL WATER SEPARATOR SIZING CALCULATIONS & INSTALLATION GREEN WAY EASEMENT RIM-251.16' / \ INV IN=241.96' 8" DIP (NW) / SPECIFICATIONS SHALL BE APPROVED BY THE CORPUD FOG PROGRAM COORDINATOR PRIOR w .� / \� (BM zoo2, PG 1698) 1> INV OUT-241.85 8" DIP (SE) TO ISSUANCE OF A BUILDING PERMIT. CONTACT TIM BEASLEY AT (919) 996-2334 OR TIMOTHY.BEASLEY@RALEIGHNC.GOV FOR MORE INFORMATION. / o ` 13. CROSS -CONNECTION CONTROL PROTECTION DEVICES ARE REQUIRED BASED ON DEGREE OF HEALTLIC Q o a / / / / l WATER H SYSTEMS IN HAZARD INVOLVED CAROL NEA..THESE GUIDELIND IN ES ARE THE MINIMUM F THE RULES OEREQUIREMRNING EN S. E \ a THE DEVICES SHALL MEET AMERICAN SOCIETY OF SANITARY ENGINEERING (ABBE) C� >- a SMH a ya \ / / /- STANDARDS OR BE ON THE UNIVERSITY OF SOUTHERN CALIFORNIA APPROVAL LIST. THE z RIM=248.77' \� a a DEVICES SHALL BE INSTALLED AND TESTED (BOTH INITIAL AND PERIODIC TESTING _J INV IN -(FULL OF WATER) I / FLOODWAY LINE ° INV OUT=(FULL OF WATER) \ a THEREAFTER) IN ACCORDANCE WITH THE MANUFACTURER'S RECOMMENDATIONS OR THE o \ TOP of WATER-242.77' I a a `\ LOCAL CROSS -CONNECTION CONTROL PROGRAM, WHICHEVER IS MORE STRINGENT. CONTACT o S BorroM of Box:24o.27' a / JOANIE HARTLEY AT (919) 996-5923 OR JOANIE.HARTLEY@RALEIGHNC. GOV FOR MORE / \ O,9V�S a aN41/ �� / INFORMATION. 0 / a i o 0 < O � M 0 � , 100-YEAR FLOOD W 0 W c / ELEVATION / --\\� 500-YEAR ((( � ) FLOOD ELEVATION �/ / 0 Q w LLJ / 8.0' Wx8.0'H / a Q a � / / / PEDESTRIAN TUNNEL / CD / O w 5 -5 �y' // I \ / _ 5 / / \ \ Q 0 NO TEMPORARY OR PERMANENT ENCROACHMENTS (INCLUDING BUT NOT LIMITED TO CLEARING GRADING FENCING AND THE � � GRAPHIC SCALE IN FEET � �� / / / INSTALLATION OF RETAINING WALLS OR OTHER STRUCTURES) 0 20 40 80 U ARE PERMITTED WITHIN THE GREENWAY EASEMENT AREA u / 10.0' W x 8.O' H TRIPL / \ I WITHOUT PRIOR APPROVAL BY THE CITY OF RALEIGH. SHEET NUMBER -0 / J* / BARREL CULVERT 7 \ `l U \ o�C4.0 CL