DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 11/18/2022 7:56 AM
I. Inspection Information
Date & Time: 11/17/2022 11:50 AM Inspection Type: Drive-By
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Billy Threatt – Construction Superintendent
Location:
Lat: 35.19563738, Long: -80.87132674
Brownfields Inspection Report: Radio Center Property, 19072-15-060
11/17/2022 11:50 AM
Page 2 of 6
II. Project Information
Number: 19072-15-060 Name: Radio Center Property
Address: 3229, 3235 South
Boulevard
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Commercial/Retail
Structures on Property: New Structures Violation: No
Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: VIMS is currently under construction although the installers were not onsite at
the time of the Inspection. Several “sections” of washed stone, GeoVent, VI-20
geomembrane, Liquid Boot and UltraShield protection layer fabric have been installed
prior to the Site Inspection (Photos 1-5). DEQ is not being notified prior to key VIMS
installation benchmarks as required. See Inspector Comments.
Summary: N/A
Summary: A Lidl supermarket is currently under construction on the southwestern
portion of the property.
Summary: Exposed soils are visible onsite, and are consistent with EMP. The conduit
trench observed during the 11/1/22 Site Inspection has since been backfilled.
Brownfields Inspection Report: Radio Center Property, 19072-15-060
11/17/2022 11:50 AM
Page 3 of 6
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Summary: N/A
Condition:
Summary: N/A
The perimeter of the property is fenced, and no public risk was observed at the time of
the Site Inspection.
Brownfields Inspection Report: Radio Center Property, 19072-15-060
11/17/2022 11:50 AM
Page 4 of 6
IV. Inspector Comments
V. PHOTOGRAPHS
Photo 1: Washed stone, GeoVent, and green VI-20 Geomembrane visible in photograph.
A Site Inspection was performed following an 11/9/2022 email from ECS that work was starting on the
VIMS the following day. Nothing else was heard regarding the VIMS installation, so an inspection was
performed while in the area.
There were several sections of the building where the sub-slab VIMS components were installed
without any DEQ notification. Mr. Orrell with ECS was contacted by email following the Site Inspection
on 11/21 & 11/22/2022 and reminded that during each of the required VIMS inspections (stone, sub-
slab piping, VIMS barrier inspection), DEQ Brownfields should be notified, 48-hours in advance if
possible.
Brownfields Inspection Report: Radio Center Property, 19072-15-060
11/17/2022 11:50 AM
Page 5 of 6
Photo 2: Green VI-20 geomembrane and UltraShield protection layer visible. Liquid boot spray
applied layer not visible, although overspray is visible on geomembrane. Once concrete footer
is poured, wood form board supports will have to be removed and patched.
Photo 3: Workers placing rebar prior to concrete slab pour over UltraShield protection layer.
Brownfields Inspection Report: Radio Center Property, 19072-15-060
11/17/2022 11:50 AM
Page 6 of 6
Photo 4: Another photo of GeoVent extending out from under VIMS barrier prior to installation
of additional barrier material.
Photo 5: Close up of Liquid boot material sprayed around PVC piping penetration prior to
placement of UltraShield protection layer.