Loading...
HomeMy WebLinkAbout21018_E Craighead Storage_SIR_2022,09.13 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 09/14/2022 3:39 PM I. Inspection Information Date & Time: 09/13/2022 12:01 PM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: David Kahn – Hart & Hickman (H&H) Location: Lat: 35.25262204, Long: -80.79911014 Brownfields Inspection Report: East Craighead Storage, 21018-17-060 09/13/2022 12:01 PM Page 2 of 6 II. Project Information Number: 21018-17-060 Name: East Craighead Storage Address: 204 E Craighead Rd City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: Observed completed vapor barrier (Vapor Block 20) inspection on Building ‘B’ being performed by H&H (Photos 1-4). Summary: N/A Summary: Apartment complex currently under construction on the property. Summary: (N/A) Brownfields Inspection Report: East Craighead Storage, 21018-17-060 09/13/2022 12:01 PM Page 3 of 6 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A No risk to the public observed at the time of the Site Inspection. Brownfields Inspection Report: East Craighead Storage, 21018-17-060 09/13/2022 12:01 PM Page 4 of 6 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: View of barrier facing northwest towards little Sugar Creek. Post tension cables visible in photographs. Attended H&H barrier inspection on Building ‘B’ while performing other Site Inspections in the vicinity. Barrier appeared to be in good condition when inspected and appears ready for upcoming concrete pour. No VI pathways were observed, and the barrier was installed as outlined the approved VIMP. Brownfields Inspection Report: East Craighead Storage, 21018-17-060 09/13/2022 12:01 PM Page 5 of 6 Photo 2: Vertical penetration sealed with Stego tape and mastic. Solid stakes used in all cases where needed. Photo 3: Horizontal penetration also sealed with tape and mastic. Brownfields Inspection Report: East Craighead Storage, 21018-17-060 09/13/2022 12:01 PM Page 6 of 6 Photo 4: View of Building “B” vapor barrier installation prior to concrete pour facing west. Apartment building ‘A” visible in the background