HomeMy WebLinkAbout24010_Yandle Witherspoon_SIR_20220721
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 07/27/2022 1:21 PM
I. Inspection Information
Date & Time: 07/21/2022 9:53 PM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel:
David Kahn - H&H
Location:
Lat: 35.23275085377783, Long: -80.82910257144917
Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060
07/21/2022 9:53 PM
Page 2 of 6
II. Project Information
Number: 24010-20-060 Name: Yandle-Witherspoon (RN)
Address: N. Brevard and
Belmont Ave.
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Residential
Structures on Property: None Structures Violation: No
Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: Observed stone, VaporVent, and MonoShield installation (Photos 1-5)
Summary: N/A
Summary: Apartment complex and parking garage currently under construction.
Summary: Consistant with EMP and redevelopment activities.
Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060
07/21/2022 9:53 PM
Page 3 of 6
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Summary: N/A
Condition:
Summary: N/A
No risk to the public observed at the time of the Site Inspection.
Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060
07/21/2022 9:53 PM
Page 4 of 6
IV. Inspector Comments
V. PHOTOGRAPHS
Photo 1: Partial section of sub-slab gravel and suction piping (Land Science TerraVent) being
inspected prior to installation of MonoShield VIMS barrier that would begin later in day.
Met with H&H inspector onsite to observe a washed stone and TerraVent inspection. In
general, the area inspected looked good, with only a few issues that were identified
which were pointed out to the superintendent. Also looked at the Monoshield barrier
which was previously installed. There were only a few issues observed, and these would
be point
Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060
07/21/2022 9:53 PM
Page 5 of 6
Photo 2: TerraVent transition to PVC piping and vertical PVC riser (painted orange). Solid
section of PVC piping checked for proper pitch to prevent condensation collection within piping.
Photo 3: H&H inspector pointing out sealing issues to GC, where lower-level sub-slab VIMS
MonoShield VIMS barrier will tie into barrier to be installed over stone layer being inspected.
Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060
07/21/2022 9:53 PM
Page 6 of 6
Photo 4: Partial seam separation on previously installed MonoShield barrier.
Photo 5: MonoShield barrier penetrations where sealing had not been completed.