HomeMy WebLinkAbout24010_Yandle Witherspoon_SIR_20220922 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 09/23/2022 7:28 AM I. Inspection Information Date & Time: 09/22/2022 10:55 AM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter, Seth Titley, Tyler Pearson Other Personnel: Nick Hunt - TCR Supervisor Location: Lat: 35.2328247, Long: -80.82871223 Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060 09/22/2022 10:55 AM Page 2 of 6 II. Project Information Number: 24010-20-060 Name: Yandle-Witherspoon (RN) Address: N. Brevard and Belmont Ave. City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: During the Site Inspection, observed sub-slab gravel, piping and TerraVent, MonoShield VIMS barrier, VIMS riser and monitoring point locations (Photos 1-4). Observed one location where the MonoShield barrier had split at the top of a soil contact wall (Photo 5). Site superintendent would make sure it was patched once barrier installers were set-up. Summary: N/A Summary: Apartment buildings and parking garage being constructed on the property Summary: N/A Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060 09/22/2022 10:55 AM Page 3 of 6 Use of Basements: Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: Soil contact walls are present at the property. Summary: N/A Condition: Summary: N/A No risk of public exposure observed at the time of the Site Inspection. Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060 09/22/2022 10:55 AM Page 4 of 6 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: Section of completed MonoShield Barrier installed. Site inspection was performed as a drive-by training session so that two DEQ employees could see MonoShield VIMS barrier being installed on a property. After checking in, the Site superintendent walked the site with us. As pointed out previously, a split in a section of VIIMS barrier was observed during the inspection and would be repaired once the VIMS installers had finished setting up their equipment. Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060 09/22/2022 10:55 AM Page 5 of 6 Photo 2: Patching around vertical conduits. Photo 3: Horizontal piping bridging thickened footer. Brownfields Inspection Report: Yandle-Witherspoon (RN), 24010-20-060 09/22/2022 10:55 AM Page 6 of 6 Photo 4: Section of building foundation where sub-slab piping is being installed. Photo 5: During Site Inspection, identified separation of vertical soil contact wall VIMS barrier. This was discussed with the general contractor, and it will be patched later today.