HomeMy WebLinkAbout24025_Crayton Printing_SIR_20220721
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 07/27/2022 1:20 PM
I. Inspection Information
Date & Time: 07/21/2022 8:01 AM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Erin Lash - Hart & Hickman
Location:
Lat: 35.20713847, Long: -80.86531947
Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060
07/21/2022 8:01 AM
Page 2 of 6
II. Project Information
Number: 24025-20-060 Name: Crayton Printing (RN)
Address: 2301, 2321, 2327
Distribution St.; 2300, 2302,
2304, 2306 Dunavant St.
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Residential
Structures on Property: New Structures Violation: No
Vapor Mitigation Systems: Observed Vapor Mitigation Violation: Unknown
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: Observed Vapor barrier inspection. There were significant issues with the
VIMS barrier, and H&H will have to perform a reinspection later in the day (Photos 1-5).
Summary: N/A
Summary: High density apartment and parking garage currently under construction.
Summary: Consistent with EMP and general construction.
Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060
07/21/2022 8:01 AM
Page 3 of 6
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: Not observed in the area or the property being inspected.
Summary: N/A
Condition:
Summary: N/A
No risk of public exposure was observed at the time of the Site Inspection.
Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060
07/21/2022 8:01 AM
Page 4 of 6
IV. Inspector Comments
V. PHOTOGRAPHS
Photo 1: View of general VIMS barrier area scheduled to be inspected. Note exposed gravel on
and loose sections of barrier along right side of photograph.
The purpose of the Site Inspection was to observe an 08:00 barrier inspection being
performed and scheduled by H&H. Upon arrival, it was quickly obvious that the VIMS
barrier section to be inspected was not completed and ready for an actual inspection.
Observed work that had taken place with H&H personnel and installation contractors
were made aware of areas that needed to be addressed prior to a barrier reinspection.
DEQ was subsequently notified of the barrier reinspection, however, this reinspection
was not attended by Brownfields personnel.
Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060
07/21/2022 8:01 AM
Page 5 of 6
Photo 2: Sections of VIMS barrier that were not completed at the time of the scheduled barrier
inspection.
Photo 3: Additional sections of barrier to be inspected which were not completed in time for a
final inspection.
Brownfields Inspection Report: Crayton Printing (RN), 24025-20-060
07/21/2022 8:01 AM
Page 6 of 6
Photo 4: Barrier penetrations that would require sealing were observed during the Site
Inspection.
Photo 5: Contractors continued working on VIMS barrier installation during the Site Inspection,
however, there were so many areas that had to be addressed, a reinspection was required.