HomeMy WebLinkAbout23062_Herrin Brothers Coal and Ice_SIR_20220622 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 06/24/2022 12:42 PM I. Inspection Information Date & Time: 06/22/2022 9:05 AM Inspection Type: Drive-By Brownfields Staff: Kevin Slaughter Other Personnel: C. J. Jennings & Jason Tucker - SAMET Corporation Location: Lat: 35.2501494, Long: -80.806325, Brownfields Inspection Report: Herrin Brothers Coal and Ice, 23062-19-060 06/22/2022 9:05 AM Page 2 of 6 II. Project Information Number: 23062-19-060 Name: Herrin Brothers Coal and Ice Address: 315, 319, 321 E 36th Street City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: N/A Summary: N/A Summary: New high-density apartment buildings and a parking garage currently under construction. Summary: Consistant with EMP and property redevelopment. Brownfields Inspection Report: Herrin Brothers Coal and Ice, 23062-19-060 06/22/2022 9:05 AM Page 3 of 6 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A No risk to the public was observed at the time of the inspection, with the exception of a concrete retaining wall bordering Sugar Creek where a steel handrail is proposed (Photos 3 & 4). The perimeter of the property is fenced with temporary construction and barricade fencing to prevent unauthorized entry to the property, and temporary orange barrier type fencing is installed as a safety measure. Brownfields Inspection Report: Herrin Brothers Coal and Ice, 23062-19-060 06/22/2022 9:05 AM Page 4 of 6 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: View facing west of apartment building and parking deck under construction. A copy of the EMP and erosion control documents were in the job trailer, and Mr. Jennings acted as an escort during the Site Inspection. While walking the property, Mr. Jennings explained that a metal handrail would be mounted on the concrete retaining wall for safety purposes. Subsequent to the Site Inspection, Hart & Hickman’s July 14th, 2022 - Stream Access Control Barrier and Signage plan was submitted. This plan proposed the installation of control barriers and signage to limit creek access to satisfy the Brownfields Agreement paragraph 13 (l). This plan was subsequently approved by DEQ on July 15th 2022. Brownfields Inspection Report: Herrin Brothers Coal and Ice, 23062-19-060 06/22/2022 9:05 AM Page 5 of 6 Photo 2: View facing west of apartment building under construction, future road, and staged materials. Photo 3: Stormwater discharge to Little Sugar Creek. Brownfields Inspection Report: Herrin Brothers Coal and Ice, 23062-19-060 06/22/2022 9:05 AM Page 6 of 6 Photo 4: View facing east along concrete retaining wall. An iron handrail will be installed along top of retaining wall. Orange barrier fencing temporarily installed as a safety measure. Photo 5: Silt and barricade fencing along Little Sugar Creek appeared in good condition.