HomeMy WebLinkAbout21018_E Craighead Storage_SIR_2022.06.07 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 06/08/2022 11:46 AM I. Inspection Information Date & Time: 06/07/2022 9:25 AM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter, Seth Titley, Tyler Pearson Other Personnel: Juliana Lima - Hart & Hickman (H&H) Location: Lat: 35.2525912, Long: -80.7991686, Brownfields Inspection Report: East Craighead Storage, 21018-17-060 06/07/2022 9:25 AM Page 2 of 6 II. Project Information Number: 21018-17-060 Name: East Craighead Storage Address: 204 E Craighead Rd City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: Observed sub-slab gravel and piping inspection within footprint of apartment building, and vapor barrier installation being installed within another section of the same building. The vapor barrier installation had not been completed, so this was not a completed VIMS barrier inspection (Photos 2-5). Summary: N/A Summary: There are no structures on the property, although contraction has started on multiple apartment building foundations (Photo 1) Summary: Exposed soil was observed across the site and was consistent with EMP and redevelopment activities taking place. Brownfields Inspection Report: East Craighead Storage, 21018-17-060 06/07/2022 9:25 AM Page 3 of 6 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: No chemicals were observed during the Site Inspection except for the small tubs of Stego Mastic used to seal penetrations in the VIMS barrier (Photo 4). Condition: Summary: N/A No risk to the public was observed at the time of the Site Inspection. Brownfields Inspection Report: East Craighead Storage, 21018-17-060 06/07/2022 9:25 AM Page 4 of 6 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: View of building footprint where VIMS piping is being installed. The Site Inspection was performed to observe the gravel/sub-slab piping inspection being performed by H&H prior to the VIMS barrier installation (Photos 1-3). At the time the Site Inspection, there was another section of the building where this inspection had already been completed and the VIMS barrier was in the process of being installed (Photos 4 and 5). Brownfields Inspection Report: East Craighead Storage, 21018-17-060 06/07/2022 9:25 AM Page 5 of 6 Photo 2: Sub-slab VIMS piping within gravel base connected to stubbed up riser (painted orange). Orange 2-inch PVC monitoring point is visible on right side of photo. Photo 3: Solid PVC VIMS piping visible bridging thickened footer trenches, with screened sections of piping embedded in gravel. Brownfields Inspection Report: East Craighead Storage, 21018-17-060 06/07/2022 9:25 AM Page 6 of 6 Photo 4: Stego Mastic used to seal penetrations in VIMS barrier. Photo 5: Photograph showing vapor barrier penetration sealing prior to concrete pour.