HomeMy WebLinkAbout24043_Gas FIred Products_SIR_2022.04.13 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 04/14/2022 8:27 AM I. Inspection Information Date & Time: 04/13/2022 10:50 AM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: Shannon Switch - Hart & Hickman (H&H) Location: Lat: 35.2106687, Long: -80.8682944, Brownfields Inspection Report: Gas Fired Products (RN), 24043-20-060 04/13/2022 10:50 AM Page 2 of 7 II. Project Information Number: 24043-20-060 Name: Gas Fired Products (RN) Address: 421 W. Tremont Avenue City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: Observed vapor barrier inspection performed by H&H. See additional comments in Inspector Comments below. Summary: N/A Summary: High density apartments currently under construction. Summary: Consistent with development activities and EMP. Brownfields Inspection Report: Gas Fired Products (RN), 24043-20-060 04/13/2022 10:50 AM Page 3 of 7 Use of Basements: Observed Basement Violation: Unknown Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: Soil contact walls are present without a VIMS barrier on exterior side as designed. Additional details are provided in the March 3, 2022, Site Inspection Report. No interior VIMS barrier installation has occurred to date. Summary: N/A Condition: Summary: N/A No risk to the public observed at the time of the Site inspection. Brownfields Inspection Report: Gas Fired Products (RN), 24043-20-060 04/13/2022 10:50 AM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: VIMS barrier inspection facing east. The Site Inspection was performed during a H&H barrier inspection at the property. In general, the VIMS barrier installation looked good, with a couple of areas identified by H&H where the barrier was too taunt to lay flat along the bottom of some footer trenches. In these locations, the barrier was sliced, and large patches were added to allow barrier to relax as needed (Photos 4 and 5). During DEQ’s Site Inspection, it appeared that the VIMS barrier along the vertical concrete walls (Background Photo 1 and Photos 6 and 7) would not be adhered to the vertical concrete wall and did not appear to match any of the VIMP drawings. The design engineer was contacted during the site inspection, however, without internal discussions, the inspector was not prepared to give verbal approval on the proposed barrier modification. This was discussed with the DEQ project manager and the VI Specialist following the Site Inspection and subsequently, H&H was contacted regarding this issue. During a Teams call on May 17, 2022, H&H indicated that the VIMS barrier in Photos 6 & 7 had been extended and adhered directly to the vertical concrete wall. This was verbally approved by DEQ during the Teams call, and H&H will submit a VIMS Modification Request covering this barrier modification. In addition, the Modification Request will cover the installation of the VIMS barrier on the inside of soil contact walls where soil was inadvertently backfilled against some exterior walls prior to installing the VIMS barrier. Brownfields Inspection Report: Gas Fired Products (RN), 24043-20-060 04/13/2022 10:50 AM Page 5 of 7 Photo 2: VIMS riser painted orange, attached to suction line bridging thickened slab trench. Photo 3: electrical conduit held in place with solid stake (rebar). Brownfields Inspection Report: Gas Fired Products (RN), 24043-20-060 04/13/2022 10:50 AM Page 6 of 7 Photo 4: Bottom of footer trench where VIMS barrier was too taunt to lay flat. The VIMS barrier was cut, and a patch was installed to allow the barrier to better fit the footer contours. Photo 5: Photograph of VIMS barrier patch in the process of being installed. Brownfields Inspection Report: Gas Fired Products (RN), 24043-20-060 04/13/2022 10:50 AM Page 7 of 7 Photo 6: Based on field conversation, VIMS barrier to be terminated at wood ledger board. After requesting verification, design engineer phoned and suggested terminating VIMS barrier at exposed footer. Neither option appeared to match the VIMP drawings. Photo 7: Another section of wall similar to Photo 6 although wooden ledger boards are mounted directly on concrete wall footer.