Loading...
HomeMy WebLinkAbout06019_Central Park Landfill_SIR_2022.04.21 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 04/22/2022 1:33 PM I. Inspection Information Date & Time: 04/21/2022 12:22 PM Inspection Type: Drive-By Brownfields Staff: Kevin Slaughter, Tyler Pearson Other Personnel: N/A Location: Lat: 36.0822439, Long: -80.2402423, Brownfields Inspection Report: Central Park Landfill, 06019-02-034 04/21/2022 12:22 PM Page 2 of 7 II. Project Information Number: 06019-02-034 Name: Central Park Landfill Address: Salem, S. Main Sts. City: Winston Salem County: Forsyth III. Environmental Current Use of Property: Recreation/Festival Structures on Property: Existing Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Not Observed Exposed Soils Violation: No Summary: Passive methane venting system present using six gravel trenches ( MT-1 through MT-6). Trenches are vented through 2-inch dia. Sch 80, PVC vent pipes (See attachment). Summary: N/A Summary: Open air baseball dugouts and metal utility building on pavers present on the property. No new structures have been added to the property since the December 6, 2019 Site Inspection. Summary: N/A Brownfields Inspection Report: Central Park Landfill, 06019-02-034 04/21/2022 12:22 PM Page 3 of 7 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A No exposure to the public was observed at the time of the site inspection. Brownfields Inspection Report: Central Park Landfill, 06019-02-034 04/21/2022 12:22 PM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: Vent pipe following vegetation removal and bracing addition. The Site Inspection was performed to determine if the broken methane vent pipes identified during two previous Site Inspections in 2019 and 2020 had been repaired, and vegetation surrounding several of the vent pipes had been removed. All six of the vent risers were present, with repairs made to each of the previously broken vent pipe. Support bracing had been installed on five of the six PVC vent pipes. Vegetation that surrounded several of the vent pipes has been removed as requested. Brownfields Inspection Report: Central Park Landfill, 06019-02-034 04/21/2022 12:22 PM Page 5 of 7 Photo 2: Vent pipe following repair and bracing addition. Photo 3: Vent stack bracing. Brownfields Inspection Report: Central Park Landfill, 06019-02-034 04/21/2022 12:22 PM Page 6 of 7 Photo 4: One of the two chain link baseball dug outs with vinyl tarp walls and standing seam metal panel roofs. Photo 5: Previously existing storage building. Shed is located on concrete blocks allowing air circulation below the floor. Brownfields Inspection Report: Central Park Landfill, 06019-02-034 04/21/2022 12:22 PM Page 7 of 7 Photo 6: Settling observed around light pole during site inspection. Photo 7: Partial view of baseball field during site inspection.