Loading...
HomeMy WebLinkAbout22023_Woodlawn Green_SIR_20220404DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 04/04/2022 10:16 AM I.Inspection Information Date & Time: 04/04/2022 9:18 AM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: Shannon Sharp - Hart & Hickman Location: Lat: 35.1774379, Long: -80.8826121, Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 04/04/2022 9:18 AM Page 2 of 6 II.Project Information Number: 22023-18-060 Name: Woodlawn Green (RN) Address: 200, 202, 204, 206, 208, 210 E. Woodlawn Rd; 5000, 5019, 5111 Nations Crossing Rd City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: Existing Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: During Site Inspection, observed sub-slab stone, VaporVent. PVC risers and monitoring point stub-ups, and VB20 that has been installed previously (Photos 1-5). VB20 vapor barrier will wrap over stone and vapor vent,to become sub-slab VIMS barrier. Summary: N/A Summary: On-site to observe first townhome building (Building 1020) gravel and sub-slab VaporVent installation inspection. Summary: Consistant with EMP. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 04/04/2022 9:18 AM Page 3 of 6 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A No risk to the public observed at the time of the Site Inspection. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 04/04/2022 9:18 AM Page 4 of 6 IV.Inspector Comments V.PHOTOGRAPHS Photo 1: View of townhome footprint (5 individual units) being inspected. Vapor vent that will be wrapped over gravel and sealed visible in photograph. Site Inspection performed to observe stone and sub-slab piping (VaporVent) inspection being performed by H&H. No issues identified with VIMS components - exposed barrier, washed stone thickness VaporVent layout, or VIMS risers and monitoring points on the 5- unit townhome footprint. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 04/04/2022 9:18 AM Page 5 of 6 Photo 2: General layout of sub-slab components. Photo 3: Close-up of VaporVent. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 04/04/2022 9:18 AM Page 6 of 6 Photo 4: Typical VaporVent to PVC riser transition. Photo 5: Monitoring point riser to be accessed from exterior of garage.