HomeMy WebLinkAbout22007_South Tryon Commercial_SIR_2022.03.23
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 03/24/2022 10:41 AM
I. Inspection Information
Date & Time: 03/23/2022 1:32 PM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Juliann Lima – Hart & Hickman (H&H)
Location:
Lat: 35.2115475, Long: -80.8657523,
Brownfields Inspection Report: South Tryon Commercial, 22007-18-060
03/23/2022 1:32 PM
Page 2 of 7
II. Project Information
Number: 22007-18-060 Name: South Tryon Commercial
Address: 2001, 2027 S Tryon
St
City: Charlotte
County: Mecklenburg
III. Environmental
Current Use of Property: Commercial/Retail
Structures on Property: New Structures Violation: No
Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Not Observed Exposed Soils Violation: No
Summary: VIMS barrier in the process of being installed within the building. No fan,
risers, or sub-slab piping installed. Confirm this is correct.
Summary: N/A
Summary: Single story brick exterior retail/ commercial building shell. Building will be a
future brewery according to the general contractor.
Summary: N/A
Brownfields Inspection Report: South Tryon Commercial, 22007-18-060
03/23/2022 1:32 PM
Page 3 of 7
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Summary: N/A
Condition:
Summary: N/A
No risk to the public observed at the time of the site inspection.
Brownfields Inspection Report: South Tryon Commercial, 22007-18-060
03/23/2022 1:32 PM
Page 4 of 7
IV. Inspector Comments
V. PHOTOGRAPHS
Onsite to attend VIMS barrier inspection performed by H&H. Arrived at 11:00 as
originally scheduled, met Julianna from H&H on-site, however, vapor barrier taping not
complered. We were asked to return at 2:00 PM for final barrier inspection. Left site and
returned at 2:00.
The VIMP for this site indicates that only VaporBlock 20 is to be installed, with no system
(including passive), installed. Significant sealing still required during return trip where
barrier tape pulling apart, and along some perimeter areas. Stayed onsite observing
vapor barrier sealing until H&H approved barrier installation.
Brownfields Inspection Report: South Tryon Commercial, 22007-18-060
03/23/2022 1:32 PM
Page 5 of 7
Photo 1: Photo of VIMS barrier during first mobilization. A second mobilization was required at
2:00 PM due to incomplete taping of barrier.
Photo 2: VaporBlock 20 used as VI barrier. Although typically installed with colored side up,
there is nothing in RAVENS Installation guidelines requiring it to be installed this way.
Photo 3: VaporBoot Tape used to seal VI barrier around sub-slab utility penetrations.
Brownfields Inspection Report: South Tryon Commercial, 22007-18-060
03/23/2022 1:32 PM
Page 6 of 7
Photo 4: Sealing of vapor barrier around perimeter concrete dowels.
Photo 5: VaporSeal Tape not sticking properly in some locations due to barrier not being clean.
Brownfields Inspection Report: South Tryon Commercial, 22007-18-060
03/23/2022 1:32 PM
Page 7 of 7
Photo 6: Even though double-sided Butyl Seal Tape installed below overlap of vapor barrier
sheets, additional double-sided Butyl Seal Tape installed at edge of vapor barrier overlap in
places where VaporSeal tape not sealing correctly. Backing left on exposed side of double-