HomeMy WebLinkAbout18015_Craighead_Amaze NODA_Quarterly Vacuum Monitoring_2nd Q 2021 Via Email June 17, 2021 NCDEQ – Division of Waste Management Brownfields Program 1646 Mail Service Center Raleigh, NC 27699-1646 Attn: Ms. Carolyn Minnich Re: Quarterly Vacuum Monitoring – 1st and 2nd Quarter 2021 Craighead Road (Abernethy Lumber) Brownfields Site Charlotte, Mecklenburg County, North Carolina Brownfields Project No. 18015-14-060 H&H Project No. SHR-001 Dear Carolyn: On behalf of the FortyTwo, LLC, Hart & Hickman, PC (H&H) has prepared this letter report summarizing vapor intrusion mitigation system (VIMS) vacuum monitoring activities conducted for the 1st and 2nd quarter 2021 at the Amaze @ NoDa apartment complex located on the Craighead Road (Abernethy Lumber) Brownfields property (Brownfields Project No. 18015-14-060) in Charlotte, Mecklenburg County, North Carolina (Site). The apartment complex consists of two residential apartment buildings, identified as Building 1 and Building 2 (see Attachment 1). An active VIMS is installed at each building consisting of a sub-slab depressurization system with sub-slab vent piping, risers to the rooftop, and electric fans located on the risers above the roofline. The VIMS also contains a 15-mil vapor barrier installed below the ground floor slabs of each building. The VIMS installation activities for Building 1 were summarized in the Request for Occupancy / VIMS Construction Completion – Building 1 (Revision 2), dated March 6, 2020, and the installation activities for Building 2 were summarized in VIMS Construction Completion Report – Building 2 (Revision 1), dated May 1, 2020. The North Carolina Department of Environmental Quality Ms. Carolyn Minnich June 17, 2021 Page 2 https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/FortyTwo LLC (FTY) Amaze @ NODA/Q2 2021/Amaze NODA_Quarterly Vacuum Monitoring_2nd Q 2021.docx (DEQ) provided compliance approval for the VIMS installation for Building 1 on March 11, 2020 and for Building 2 on May 1, 2020. As of August 2020, Building 1 has been occupied with residential tenants and Building 2 has been occupied since December 2020. In accordance with the Vapor Intrusion Mitigation Plan (VIMP) – Revision 1 dated May 23, 2017 (Work Plan) and Request for VMP Modification dated February 25, 2019 (Work Plan Modification), sub-slab vacuum measurements below these occupied residential structures are recorded on a quarterly basis. Building 1 has 18 vacuum monitoring points that are divided across five slab sections (1A, 1B, 1C, 1D, and 1E), and Building 2 has nine vacuum monitoring points that are divided across two slab sections (2A and 2B). The locations of the monitoring points are depicted on the Sheet VMP-1 for Building 1 and Building 2 (Attachment 2). H&H completed post-occupancy vacuum monitoring for Building 1 and Building 2 on February 9, 2021 (1st quarter 2021) and May 24, 2021 (2nd quarter 2021). The results of both vacuum monitoring events are provided in the attached Table 1 (Attachment 3). The 1st quarter vacuum monitoring indicated that vacuum levels within Building 1 ranged from 15.8 Pascals (Pa) to 125.4 Pa and that vacuum levels in Building 2 ranged from 78.5 Pa to 146.2 Pa. The 2nd quarter vacuum monitoring indicated that vacuum levels within Building 1 ranged from 17.7 Pa to 108.3 Pa and that vacuum levels within Building 2 ranged from 87.1 Pa to 153.7 Pa. Vacuum levels measured in each building during the 1st quarter 2021 and 2nd quarter 2021 were generally stable or slightly increased with the previous data, with the exception of vacuum at monitoring point MP-4 located in Slab Section A in Building 1. The vacuum observed at MP-4 during 1st and 2nd quarter 2021 was stable with vacuum levels of 15.8 Pa and 17.7 Pa, respectfully. However, these vacuum levels decreased from the previous monitoring events. If vacuum levels decrease further, additional troubleshooting will be performed to determine the cause and potential solutions or repairs to maintain adequate vacuum levels at this location. https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/FortyTwo LLC (FTY) Amaze @ NODA/Q2 2021/Amaze NODA_Quarterly Vacuum Monitoring_2nd Q 2021.docx Ms. Carolyn Minnich June 17, 2021 Page 3 All vacuum measurements collected during 1st quarter 2021 and 2nd quarter 2021 were notably greater than 4 Pa, which is the minimum vacuum deemed acceptable by DEQ to indicate adequate sub-slab depressurization is occurring below the slab. Furthermore, during both quarterly monitoring events, H&H inspected the fans on the roof of each building and all fans were operational and no issues were noted. Copies of the O&M forms completed by H&H are attached (Attachment 4). This data indicates that the VIMS installed in Building 1 and Building 2 at the Site continues to operate as designed and appears to be sufficiently depressurizing the sub-slab below the residential apartment buildings at the Site. In accordance with the DEQ-approved VIMP, vacuum measurements will continue to be collected on a quarterly basis for the first year of operation at both Building 1 and Building 2 and on an annual basis thereafter. To date, three quarterly vacuum monitoring events have occurred at each building after both buildings were occupied. Therefore, another quarterly event will be conducted in 3rd quarter 2021. Following this next quarterly update, future vacuum monitoring will occur on an annual schedule, unless the data indicates that additional vacuum monitoring may be warranted. Maintenance staff at Building 1 and Building 2 will be responsible for completing the monthly O&M forms to ensure the continued performance of the VIMS. Ms. Carolyn Minnich June 17, 2021 Page 4 https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/FortyTwo LLC (FTY) Amaze @ NODA/Q2 2021/Amaze NODA_Quarterly Vacuum Monitoring_2nd Q 2021.docx If you have any questions or require additional information, please do not hesitate to contact us at 704-586-0007. Sincerely, Hart & Hickman, PC Seal: Trinh DeSa, PE Senior Project Engineer #C1269 – Engineering #245 – Geology cc: Mr. Kevin Slaughter, NCDEQ Attachments: Attachment 1: Figure 1 – Site Map Attachment 2: Building 1 and Building 2 VIMS Layout (VMP-1) Attachment 3: Table 1 – VIMS Post-Occupancy Vacuum Monitoring Attachment 4: 1st and 2nd Quarter Fan O&M Forms Attachment 1 Figure 1- Site Map REVISION NO. 02923 South Tryon Street-Suite 100Charlotte, North Carolina 28203704-586-0007(p) 704-586-0373(f)License # C-1269 / #C-245 GeologyJOB NO. SHR-001DATE: 11-09-19FIGURE NO. 1CRAIGHEAD ROAD(ABERNETHY LUMBER) BROWNFIELDS SITEE. CRAIGHEAD ROAD & PHILEMON AVENUECHARLOTTE, NORTH CAROLINASITE MAPLEGENDSITE PROPERTY BOUNDARYCRAIGHEAD ROAD (ABERNETHY LUMBER)BROWNFIELDS PROPERTY BOUNDARYSURFACE WATER FEATUREE. CRAIGHEAD ROADPHILEMON AVENUENORFOLK SOUTHERN RAILROADN. DAVIDSON STREETPLC, INC.(3737 PHILEMON AVENUE)VACANT LAND(FORMER AGGREGATESTORAGE YARD)TRUCKING FACILITY(132 E. CRAIGHEAD ROAD)LITTLE SUGAR CREEK SOUTHERN RESOURCES(3826 RALEIGH STREET)CATS TRANSITRIGHT-OF-WAYTRIBUTARY OF LITTLE SUGAR CREEKADV FLEET SERVICES(3600 PHILEMON AVENUE)HAL ABERNETHYCONTRACTING(3934 RALEIGH STREET)PARKING AREA BUILDING FOOTPRINTBUILDING 1BUILDING 2S:\AAA-Master Projects\Stonehenge Real Estate Group - SHR\SHR-001 Former Abernethy Lumber\VIMS Construction\Occupancy Requests\Figures\Site Map.dwg, 11/10/2019 5:09:05 PM, DWG To PDF.pc3 Attachment 2 Building 1 and Building 2 VIMS Layout (VMP-1) 4" x 4" SCH 40 PVC 90DEGREE ELBOW (TYPICAL)SOLID TO SLOTTED 4" SCH 40 PVCPIPE TRANSITION (TYPICAL)4" x 4" x 4" SCH 40 PVC TEE(TYPICAL)4" PVC VENT PIPE PROTECTION SCREEN(TYPICAL AT ENDS OF SLOTTED PIPE)4" PVC VENT PIPE PROTECTION SCREEN(TYPICAL AT ENDS OF SLOTTED PIPE)POSITION VERTICAL RISER F1-3 WITHINTOILET WALL OF MENS BATHROOM ONGROUND FLOOR. POSITION VERTICALRISER TO EXTEND THROUGH BATHROOMOR TENANT SEPARATION WALL FORUPPER FLOORS.POSITION VERTICAL RISER F1-1WITHIN BATHROOM WALL. POSITIONVERTICAL RISER TO EXTENDTHROUGH BATHROOM OR TENANTSEPARATION WALL FOR UPPERFLOORS.4" TO 4" SCH 40 PVCREDUCER (TYPICAL)F1-21F1-20F1-19F1-18F1-17F1-16F1-15F1-13F1-12F1-14F1-11F1-10F1-9F1-8F1-7F1-5F1-6F1-4F1-2F1-1F1-32" PVC VENT PIPE PROTECTIONSCREEN (TYPICAL AT ENDS OFSOLID PIPE CONNECTORS)4" x 4" x 4" SCH 40 CROSSTEE (TYPICAL)2" PVC VENT PIPE PROTECTIONSCREEN (TYPICAL AT ENDS OFSOLID PIPE CONNECTORS)4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"4"LOCATE VERTICAL RISERF1-17 WITHIN TOILET ORSHOWER WALLLOCATE VERTICAL RISERF1-12 IN KITCHEN BUILD-OUTBEHIND PANTRYPOSITION PRESSURE MEASURINGPOINT WITHIN HALLWAYPOSITION PRESSURE MEASURINGPOINT WITHIN HALL (OPEN) AREAOF STAIRWELLPOSITION PRESSURE MEASURINGPOINT WITHIN HALL (OPEN) AREAOF STAIRWELLBUILDING 1EBUILDING 1DBUILDING 1CBUILDING 1BBUILDING 1AMP-2MP-1MP-4MP-3MP-3MP-2MP-1MP-4MP-1MP-2MP-5MP-4MP-3MP-2MP-1MP-1MP-2MP-3PROPOSED FOOTER REMOVEDFROM DESIGN PRIOR TOCONSTRUCTIONPROPOSED FOOTER REMOVEDFROM DESIGN PRIOR TOCONSTRUCTIONPROPOSED FOOTER REMOVEDFROM DESIGN PRIOR TOCONSTRUCTIONOPEN AIR PATIO(TYPICAL)OPEN AIR PATIO(TYPICAL)AS-BUILT DRAWINGBUILDING 1REVISION 2MARCH 6, 20203736 Winterfield Road, Suite 102Midlothian, Virginia 23113Telephone 804.225.0215www.2pa.netNC FIRM #51972© 2016 Poole & Poole Architecture, LLCDrawings and specifications are and shall remain theproperty of Poole & Poole Architecture, LLC and shall notbe used or reproduced in whole or part in any formwithout prior written consent of Poole & PooleArchitecture, LLC.Drawing Title:VMP-12923 South Tryon Street-Suite 100Charlotte, North Carolina 28203704-586-0007(p) 704-586-0373(f)License # C-1269 / #C-245 GeologyVapor Mitigation Plan Prepared By:PROFESSIONAL APPROVALNODA VILLAGE an Apartment Community by PHILEMON NODA PARTMERS, LLC at 327 EAST CRAIGHEAD, Charlotte, North Carolina 28206LEGENDLOCATION OF VERTICAL RISER AND APPROXIMATE LOCATION OF VACUUM FAN ONBUILDING ROOF AND FAN NUMBER4" DIA SOLID SCH 40 PVC PIPE4" DIA SLOTTED SCH 4O PVC PIPESUB-SLAB PRESSURE MEASURING POINT (SOLID BLUE LINE INDICATES EXTENDED INTAKE LINE;REFER TO DETAILS 8 AND 9 ON SHEET VMP-2)GROUND FLOOR SLAB STEP (HEIGHT VARIES)THICKENED SLABTHICKENED SLAB SEPARATING BUILDING 1 SECTIONS (SEE DETAIL 13 ON SHEET VMP-2)EXTENT OF VAPOR BLOCK VB-15 VAPOR BARRIERGRAY SHADED AREAS REPRESENT OPEN AIR PATIOSNOTES:1.GROUND FLOOD SLAB DESIGN INCLUDES POST-TENSION CABLES.2.FOUNDATION PLAN AND DETAILS PROVIDED BY POOLE & POOLE ARCHITECTURE OFMIDLOTHIAN, VA AND DAVIS & CHURCH STRUCTURAL ENGINEERS OF APLHARETTA,GA AND ARE SUBJECT TO COPYRIGHT PROTECTION.F1-103/06/20\\hhfs01\MasterFiles\AAA-Master Projects\Stonehenge Real Estate Group - SHR\SHR-001 Former Abernethy Lumber\VIMS Construction\Occupancy Requests\Figures\Building 1 - AS-Built_VMP-1_Rev 2.dwg, 3/6/2020 5:07:24 PM, DWG To PDF.pc3 F2-12F2-11F2-10F2-9F2-8F2-7F2-6F2-5F2-4F2-3F2-2F2-12" x 2" SCH 40 PVC 90DEGREE ELBOW (TYPICAL)SOLID TO SLOTTED 2" SCH 40 PVCPIPE TRANSITION (TYPICAL)2" x 2" x 2" SCH 40 PVC TEE(TYPICAL)2" PVC VENT PIPE PROTECTION SCREEN(TYPICAL AT ENDS OF SLOTTED PIPE)3" TO 2" SCH 40 PVCREDUCER (TYPICAL)2" PVC VENT PIPE PROTECTIONSCREEN (TYPICAL AT ENDS OFSOLID PIPE CONNECTORS)2" x 2" x 2" SCH 40 CROSSTEE (TYPICAL)3"POSITION VERTICAL RISER F2-12 INTENANT WALL, NOT IN STAIRWELLCOORDINATE VERTICAL RISER F2-5POSITION IN SINK WALL OF UNIT B3 FORUPPER FLOORS (RISER LOCATION MAYBE ADJUSTED IN FIELD)POSITION VERTICAL RISER F2-2WITHIN BATHROOM WALLBUILDING 2ABUILDING 2BMP-6MP-5MP-4MP-2MP-1MP-3MP-1MP-2MP-3AS-BUILT DRAWINGBUILDING 2APRIL 2, 20203736 Winterfield Road, Suite 102Midlothian, Virginia 23113Telephone 804.225.0215www.2pa.netNC FIRM #51972© 2016 Poole & Poole Architecture, LLCDrawings and specifications are and shall remain theproperty of Poole & Poole Architecture, LLC and shall notbe used or reproduced in whole or part in any formwithout prior written consent of Poole & PooleArchitecture, LLC.Drawing Title:VMP-12923 South Tryon Street-Suite 100Charlotte, North Carolina 28203704-586-0007(p) 704-586-0373(f)License # C-1269 / #C-245 GeologyVapor Mitigation Plan Prepared By:PROFESSIONAL APPROVALNODA VILLAGE an Apartment Community by PHILEMON NODA PARTMERS, LLC at 327 EAST CRAIGHEAD, Charlotte, North Carolina 28206 04/02/20LEGENDLOCATION OF VERTICAL RISER AND APPROXIMATE LOCATION OF VACUUM FAN ONBUILDING ROOF AND FAN NUMBER4" DIA SOLID SCH 40 PVC PIPE4" DIA SLOTTED SCH 4O PVC PIPESUB-SLAB PRESSURE MEASURING POINT (SOLID BLUE LINE INDICATES EXTENDED INTAKE LINE;REFER TO DETAILS 8 AND 9 ON SHEET VMP-2)GROUND FLOOR SLAB STEP (HEIGHT VARIES)THICKENED SLABTHICKENED SLAB SEPARATING BUILDING 1 SECTIONS (SEE DETAIL 13 ON SHEET VMP-2)EXTENT OF VAPOR BLOCK VB-15 VAPOR BARRIERGRAY SHADED AREAS REPRESENT OPEN AIR PATIOSF1-1NOTES:1. GROUND FLOOD SLAB DESIGN INCLUDES POST-TENSION CABLES.2. FOUNDATION PLAN AND DETAILS PROVIDED BY POOLE & POOLE ARCHITECTURE OFMIDLOTHIAN, VA AND DAVIS & CHURCH STRUCTURAL ENGINEERS OF APLHARETTA,GA AND ARE SUBJECT TO COPYRIGHT PROTECTION.S:\AAA-Master Projects\Stonehenge Real Estate Group - SHR\SHR-001 Former Abernethy Lumber\VIMS Construction\Occupancy Requests\Building 2\NDS1.2_H&H_rev04022020.dwg, 4/2/2020 4:03:19 PM, DWG To PDF.pc3 Attachment 3 Table 1- VIMS Post-Occupancy Vacuum Monitoring Table 1 VIMS Post-Occupancy Vacuum Monitoring Craighead Road (Abernethy Lumber) Brownfields Site (Brownfields Project No. 18015-14-060) H&H Project: SHR.001 Initial Monitoring Event Q3 2020 Q4 2020 Q1 2021 Q2 2021 Date 1/13/2020 9/29/2020 11/20/2020 2/9/2021 5/24/2021 MP‐1 51.3 68.9 58.2 34.8 45.2 MP‐2 54.8 47.3 38.1 39.4 54.0 MP‐3 67.3 80.0 51.3 50.3 61.0 MP‐4 64.8 52.6 37.3 15.8 17.7 MP‐1 76.5 81.6* 67.7 65.5 78.5 MP‐2 58.8 77.8 54.0 52.4 65.4 MP‐3 64.0 71.9 55.2 56.5 65.1 MP‐4 73.7 82.4 59.2 61.4 70.3 MP‐1 99.1 110.4 82.1 79.2 88.4 MP‐2 100.1 57.8 38.1 49.1 93.1 MP‐1 90.7 112.5 91.3 87.8 104.9 MP‐2 96.4 87.3 89.1 80.7 108.3 MP‐3 91.7 116.0 88.3 72.4 103.8 MP‐4 86.9 116.3 89.6 84.1 102.6 MP‐5 89.2 110.3 86.3 82.8 98.5 MP‐1 65.8 96.6 86.8 125.4 95.5 MP‐2 64.5 95.1 87.1 99.1 93.4 MP‐3 67.3 108.2 84.6 91.1 97.3 Date 2/26/2020 -- 11/20/2020 2/9/2021 5/24/2021 MP‐1 113.0 -- 123.7 125.4 128.3 MP‐2 95.9 -- 92.6 99.1 106.5 MP‐3 90.0 -- 84.4 91.1 100.0 MP‐4 91.6 -- 76.1 87.9 99.5 MP‐5 91.0 -- 71.2 84.8 94.6 MP‐6 73.9 -- 62.0 78.5 87.1 MP‐1 125.8 -- 119.4 138.9 139.5 MP‐2 131.7 -- 132.1 146.2 153.7 MP‐3 129.2 -- 137.1 126.3 142.9 Notes Vacuum measurements are reported in Pascals (Pa). -- = Not measured; VIMS = Vapor Intrusion Mitigation System; NC = VIMS not complete during monitoring event. Gray shading indicates the building was currently under construction. * = Monitoring point was measured on 10/2/2020; monitoring point was covered with carpet; carpet cover removed prior to measurement. Building 2 Monitoring Point  ID 2B 1A 1B 2A 1C 1D 1E Building 1 Building Number Building Slab  Section Vacuum Monitoring Point Measurements (Pa) https://harthick.sharepoint.com/sites/MasterFiles-1/Shared Documents/AAA-Master Projects/Stonehenge Real Estate Group - SHR/SHR-001 Former Abernethy Lumber/VIMS Construction/Quarterly Monitoring/Quarterly VIMS Monitoring Data (2021.5.25) Table 1 Hart & Hickman, PC Attachment 4 1st and 2nd Quarter Fan O&M Forms NODA Village Vapor Mitigation System Monthly Fan O&M Form Date___________________Inspector_____________________________ Comments Yes No Note any damage, malfunctions, repairs needed, etc. F1-1 F1-2 F1-3 F1-4 F1-5 F1-6 F1-7 F1-8 F1-9 F1-10 F1-11 F1-12 F1-13 F1-14 F1-15 F1-16 F1-17 F1-18 F1-19 F1-20 F1-21 F2-1 F2-2 F2-3 F2-4 F2-5 F2-6 F2-7 F2-8 F2-9 F2-10 F2-11 F2-12 2. If fan is not operating or damage is observed, contact Hart & Hickman at 704-586-0007. Fan Operating? Building 1 Building 2 1. Vapor mitigation fans shall be inspected on a monthly basis and these forms shall be submitted to the DEQ Brownfields Program on a yearly basis. Fan Number 2/9/2021 Amir Stewart (Hart & Hickman) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X NODA Village Vapor Mitigation System Monthly Fan O&M Form Inspector_____________________________ Comments Yes No Note any damage, malfunctions, repairs needed, etc. F1-1 F1-2 F1-3 F1-4 F1-5 F1-6 F1-7 F1-8 F1-9 F1-10 F1-11 F1-12 F1-13 F1-14 F1-15 F1-16 F1-17 F1-18 F1-19 F1-20 F1-21 F2-1 F2-2 F2-3 F2-4 F2-5 F2-6 F2-7 F2-8 F2-9 F2-10 F2-11 F2-12 2. If fan is not operating or damage is observed, contact Hart & Hickman at 704-586-0007. Fan Operating? Building 1 Building 2 1. Vapor mitigation fans shall be inspected on a monthly basis and these forms shall be submitted to the DEQ Brownfields Program on a yearly basis. Fan Number 5/24/2021Date__________________ Amir Stewart (Hart & Hickman) X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X X