HomeMy WebLinkAbout22023_Woodlawn Green_SIR_2021.09.21 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 09/22/2021 8:12 AM I. Inspection Information Date & Time: 09/21/2021 9:14 AM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: Sean H. - H&H Location: Lat: 35.1768712, Long: -80.8846047, Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 09/21/2021 9:14 AM Page 2 of 7 II. Project Information Number: 22023-18-060 Name: Woodlawn Green (RN) Address: 200, 202, 204, 206, 208, 210 E. Woodlawn Rd; 5000, 5019, 5111 Nations Crossing Rd City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: During the Site Inspection, sub-slab monitoring points and VIMS risers located within the walls of Building #1 were observed while communication testing was performed. Summary: N/A Summary: High density apartment complex currently under construction. Buildings in different phases of completion at the time of the Site Inspection. Summary: Exposed soil present consistent with site construction activities. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 09/21/2021 9:14 AM Page 3 of 7 Use of Basements: Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: Several of the apartment buildings, including Building #1, have lower levels with soil in contact with sidewalls of occupied spaces (Photo 1). Summary: N/A Condition: Summary: N/A Temporary chain-link construction fencing installed around the perimeter of the property. No public risk of exposure observed during the Site Inspection. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 09/21/2021 9:14 AM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: Building #1 where communication testing was performed. Soil contact with occupied space interior walls present where the number of floors transitions from three to four. On-site to observe communication testing scheduled for Building #1 and assisted with set-up of initial test, however, due to delays, I left for Gastonia to perform a scheduled piping inspection and additional inspections @10:40. Returned to Woodlawn Green approximately 13:45, and first of three tests had been completed and set-up for testing the eastern portion of Building #1 had started. Stayed on-site for set-up, and completion of the second communication test prior departing site. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 09/21/2021 9:14 AM Page 5 of 7 Photo 2: Typical sub-slab PVC monitoring point cap flush with concrete floor. Photo 3: Sub-slab monitoring point with threaded cap removed and temporary communication test assembly installed. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 09/21/2021 9:14 AM Page 6 of 7 Photo 4: Temporary VIMS fan attached to riser within wall. Riser piping will be repaired following completion of testing. Photo 5: Recording suction line vacuum during communication test. Brownfields Inspection Report: Woodlawn Green (RN), 22023-18-060 09/21/2021 9:14 AM Page 7 of 7 Photo 6: Recording sub-slab monitoring point vacuum during communication test. Photo 7: Vacuum measurement of 0.112“ WC (27.9 pascals) during communication testing.