Loading...
HomeMy WebLinkAbout23070_Red Carpet Inn_EMP_20211013 01671-003/00322972 1 EMP Version 2, January 2021 NORTH CAROLINA BROWNFIELDS PROGRAM ENVIRONMENTAL MANAGEMENT PLAN This form is to be used to prepare an Environmental Management Plan (EMP) for projects in the North Carolina Brownfields Program at the direction of a Brownfields project manager. The EMP is a typical requirement of a Brownfields Agreement (BFA). Its purpose is to clarify actions to be taken during the demolition and construction at Brownfields properties in an effort to avoid delays in the event of the discovery of new contamination sources or other environmental conditions. The EMP provides a means to document redevelopment plans and environmental data for each applicable environmental medium to inform regulatory-compliant decision-making at the site. As much detail as possible should be included in the EMP, including contingency planning for unknowns. Consult your project manager if you have questions. Prospective Developers and/or their consultants must complete and submit this form and all pertinent attachments, see checklist below, to their Brownfields project manager prior to any earthmoving or other development-related activities that have the potential to disturb soil at the Brownfields Property, including demolition. For the resultant EMP to be valid for use, it must be completed, reviewed by the program, signed by all parties working on the project, and approved by the Brownfields project manager. Failure to comply with the requirements of the EMP could jeopardize project eligibility, or in the event of a completed agreement, be cause for a reopener. The EMP is valid only for the scope of work described herein and must be updated to be applicable for new phases of redevelopment or after significant changes in applicable regulatory guidance. Voluntary Metrics Tab The NC Brownfields Program updates estimated capital investment (from the Brownfields Property Application) and estimated jobs created (from the Brownfields Agreement) whenever possible. As a voluntary measure, you may opt to complete the below information for capital investment and jobs created as estimated by your final redevelopment plans for the Brownfields Property: 1. Estimated capital investment in redevelopment project: Click or tap here to enter text. 2. Estimated jobs created: a. Construction Jobs: Click or tap here to enter text. b. Full Time Post-Redevelopment Jobs: Click or tap here to enter text. 01671-003/00322972 2 EMP Version 2, January 2021 Table of Contents NORTH CAROLINA BROWNFIELDS PROGRAM ENVIRONMENTAL MANAGEMENT PLAN ........................... 1 GENERAL INFORMATION ........................................................................................................................ 5 COMMUNICATIONS ................................................................................................................................ 5 NOTIFICATIONS TO THE BROWNFIELDS PROGRAM ............................................................................... 6 REDEVELOPMENT PLANS ........................................................................................................................ 6 CONTAMINATED MEDIA ......................................................................................................................... 8 PART 1. Soil ......................................................................................................................................... 9 PART 2. GROUNDWATER .................................................................................................................. 19 PART 3. SURFACE WATER .................................................................................................................. 21 PART 4. SEDIMENT ............................................................................................................................ 22 PART 5. SOIL VAPOR ......................................................................................................................... 22 PART 6. SUB‐SLAB SOIL VAPOR ........................................................................................................ 23 PART 7. INDOOR AIR ......................................................................................................................... 24 VAPOR INTRUSION MITIGATION SYSTEM ............................................................................................. 24 CONTINGENCY PLAN – encountering unknown tanks, drums, or other waste materials ..................... 25 POST‐REDEVELOPMENT REPORTING..................................................................................................... 28 APPROVAL SIGNATURES ....................................................................................................................... 30 LIST OF ATTACHMENTS: Exhibit 1 – NCBP Diagram for Temporary Containment of Impacted or Potentially Impacted Soil Exhibit 2 – Topographic Map Exhibit 3 – Redevelopment Plans Exhibit 4 – Grading / Cut and Fill Heat Map Exhibit 5 – Soil Sample Location Map w/ Grading Overlay Exhibit 6 – Groundwater and Soil Vapor Sample Location Map w/ Redevelopment Overlay Exhibit 7 – Proposed Final Grade Sample Locations Exhibit 8 – Preliminary Construction Schedule Table 1 – Summary of Historical Soil Analytical Results (Pre-2020) Table 2 – Summary of Historical Groundwater Analytical Results (Pre-2020) Table 3 – Summary of Historical Soil Analytical Results (2020) Table 4 – Summary of Historical Groundwater Analytical Results (2020) Table 5 – Summary of Historical Soil Gas Analytical Results (2020) Table 6 – Summary of Historical Soil Gas Analytical Results (2021) DEQ Risk Calculator – Vapor Intrusion –Soil Gas to Indoor Air (Residential; 2020 and 2021) 01671-003/00322972 3 EMP Version 2, January 2021 So that the EMP provides value in protecting brownfields eligibility and public health, the preparer shall ensure that the following steps have been completed prior to submitting the EMP for review. Any EMP prepared without completing these steps is premature. ☒ Site sampling and assessment that meets Brownfields’ objectives is complete and has been reviewed and approved by the Brownfields Project Manager. ☒ Specific redevelopment plans, even if conceptual, have been developed for the project, submitted and reviewed by the Brownfields Project Manager. The proposed redevelopment (“The Radius Dilworth”) will consist of two multi-family structures, hereafter referred to as the Enclave Building and the Overlook Building. The Enclave building will be an eight-story structure containing solely multi-family rental apartment units and the associated amenities (e.g. swimming pool). The Overlook building will be a 26-story high-rise residential tower that will also contain a parking garage and commercial (e.g. office/retail) space on the first floor. Excerpts of the development plans (architectural plans showing the building footprints and select elevations) are provided as Exhibit 3. Please submit, along with the completed EMP form, the following attachments, as relevant and applicable to the proposed redevelopment: ☒ A set of redevelopment plans, including architectural/engineering plans, if available; if not conceptual plans may suffice if updated when detailed plans are drafted. ☒ A figure overlaying redevelopment plans on a map of the extent of contamination for each media. ☒ Site grading plans that include a cut and fill analysis. Grading plans for the redevelopment are included in Exhibit 4. ☒ A figure showing the proposed location and depth of impacted soil that would remain on site after construction grading. ☒ Any necessary permits for redevelopment (i.e. demolition, etc.). Permits for redevelopment have not been yet been obtained. Applicable permits will be provided to the Brownfields Program upon their receipt. 01671-003/00322972 4 EMP Version 2, January 2021 ☒ A detailed construction schedule that includes timing and phases of construction. A proposed construction schedule is provided as Exhibit 8. ☒ Tabulated data summaries for each impacted media (i.e. soil, groundwater, soil gas, etc.) applicable to the proposed redevelopment. ☒ Figures with the sampling locations and contamination extents for each impacted media applicable to the proposed redevelopment. A map showing the locations of historical soil, groundwater, and soil vapor samples with to footprint of the proposed development is provided as Exhibits 5 and 6. Summaries of the corresponding analytical data are provided as Tables 1 through 6. ☒ A full final grade sampling and analysis plan, if the redevelopment plan is final. ☐ If known, information about each proposed potential borrow soil source, such as aerial photos, historic site maps, historic Sanborn maps, a site history, necessary for brownfields approval. ☐ Information and, analytical data if required, for quarries, or other borrow sources, detailing the type of material proposed for importation to the Brownfields Property. ☐ A work plan for the sampling and analysis of soil to be brought onto the Brownfields Property. Refer to Issue Resolution 15 in Brownfields Program Guidelines. ☐ A map of the Brownfields Property showing the location of soils proposed for export and sampling data from those areas. ☐ If a Vapor Mitigation System is required by the Brownfields Program, the Vapor Intrusion Mitigation System (VIMS) plan will be signed and sealed by a NC Professional Engineer. The VIMS Plan may also be submitted under separate cover. 01671-003/00322972 5 EMP Version 2, January 2021 GENERAL INFORMATION Date: 9/13/2021 Revision Date (if applicable): 10/13/2021 Brownfields Assigned Project Name: Red Carpet Inn Brownfields Project Number: 23070-19-060 Brownfields Property Address: 615 East Morehead Street, Charlotte, Mecklenburg County, North Carolina Brownfields Property Area (acres): 2.83 acres Is Brownfields Property Subject to RCRA Permit?.......................☐ Yes ☒ No If yes enter Permit No.: Click or tap here to enter text. Is Brownfields Property Subject to a Solid Waste Permit….……..☐ Yes ☒ No If yes, enter Permit No.: Click or tap here to enter text. COMMUNICATIONS A copy of this EMP shall be distributed to all the parties below as well as any contractors or site workers that may be exposed to site vapors, soil, groundwater, and/or surface water. Additionally, a copy of the EMP shall be maintained at the Brownfields Property during redevelopment activities. NOTE, THE EMP DOES NOT TAKE THE PLACE OF A SITE-SPECIFIC HEALTH AND SAFETY PLAN. Prospective Developer (PD): MOD CLT Property, LLC Contact Person: Ian S. Levine Phone Numbers: Office: 646-747-2199 Mobile: Click or tap here to enter text. Email: ilevine@spandreldevelopment.com Contractor for PD: Gilbane Building Company Contact Person: Jason Mari Phone Numbers: Office: 704-501-0963 Mobile: 724-309-2854 Email: jmari@gilbaneco.com Environmental Consultant: Terracon Consultants, Inc. Contact Person: Will Frazier Phone Numbers: Office: 704-324-7375 Mobile: 336-409-0772 Email: will.frazier@terracon.com Brownfields Program Project Manager: Bill Schmithorst Phone Numbers: Office: 919-707-8159 Mobile: 919-441-3606 Email: William.schmithorst@ncdenr.gov Other DEQ Program Contacts (if applicable, i.e., UST Section, Inactive Hazardous Site Branch, 01671-003/00322972 6 EMP Version 2, January 2021 Hazardous Waste, Solid Waste): Click or tap here to enter text. NOTIFICATIONS TO THE BROWNFIELDS PROGRAM Written advance Notification Times to Brownfields Project Manager: Check each box to accept minimum advance notice periods (in calendar days) for each type of onsite task: On‐site assessment or remedial activities: ……………………………………….…… 10 days Prior ☒ Construction or grading start: ……………………………………….………………………. 10 days Prior ☒ Discovery of stained soil, odors, USTs, buried drums or waste, landfill, or other signs of previously unknown contamination: ……………………………….……………………………………. Within 48 hours ☒ Implementation of emergency actions (e.g. dewatering, flood or soil erosion control measures in area of contamination, ventilation of work zones): …………….……….……… Within 48 hours ☒ Installation of mitigation systems: ………………………….………………….……….. 10 days Prior ☒ Other notifications as required by local, state or federal agencies to implement redevelopment activities: (as applicable): ……………………….…………………………………………..… Within 30 days ☒ REDEVELOPMENT PLANS 1) Type of Redevelopment (check all that apply): ☒Residential ☒Recreational ☐Institutional ☒Commercial ☒Office ☒Retail ☐Industrial ☐Other specify: The proposed redevelopment (“The Radius Dilworth”) will consist of two multi-family structures: the Enclave Building and the Overlook Building. The Enclave building will be an eight-story structure containing solely multi-family rental apartment units and the associated amenities (e.g. swimming pool). The Overlook building will be a 26-story high-rise residential tower that will also contain a parking garage and commercial (e.g. office/retail) space on the first floor. 2) Check the following activities that will be conducted prior to commencing earth‐moving activities at the site: ☒ Review of historic maps (Sanborn Maps, facility maps) ☒ Conducting geophysical surveys to evaluate the location of suspect UST, fuel lines, utility lines, etc. ☒ Interviews with employees/former employees/facility managers/neighbors 01671-003/00322972 7 EMP Version 2, January 2021 3) Summary of Redevelopment Plans (MANDATORY: attach detailed plans or conceptual plans, if detailed plans are not available. EMP review without such information would be premature): Provide brief summary of redevelopment plans, including demolition, removal of building slabs/pavement, grading plans and planned construction of new structures: See attached drawings (Exhibit 3) for proposed redevelopment plans. An overlay of the grading plans showing areas of cut and fill with respect to historical soil sample locations is also available in Exhibit 5. 4) Do plans include demolition of structure(s)?: ☐ Yes ☒ No ☐ Unknown ☐ If yes, please check here to confirm that demolition will be conducted in accordance with applicable legal requirements, including without limitation those related to lead and asbestos abatement that are administered by the Health Hazards Control Unit within the Division of Public Health of the North Carolina Department of Health and Human Services. If available, please provide a copy of your demolition permit. Demolition will be limited to removal of existing hardscape (parking lot) and associated landscaping and utilities. 5) Are sediment and erosion control measures required by federal, state, or local regulations? ☒ Yes ☐ No ☐ Unknown ☒ If yes, please check here to confirm that demolition will be conducted in accordance with applicable legal requirements. If soil disturbance/grading activities are necessary to install sediment and erosion control measures, the activities will not begin until this EMP is approved. 6) Which category of risk‐based screening level is used or is anticipated to be specified in the Brownfields Agreement? Note: If children frequent the property, residential screening levels shall be cited in the Brownfields Agreement for comparison purposes. ☒ Residential ☐ Non‐Residential or Industrial/Commercial Both the Enclave and Overlook buildings contain residential rental units; as such, residential screening levels will be uses in the Brownfields Agreement. 7) Schedule for Redevelopment (attach construction schedule): a) Construction start date: 2/22/2022 b) Anticipated duration (specify activities during each phase): Construction is anticipated to run through September of 2024. A summary of the preliminary schedule is attached as Exhibit 8. Building A on the attached schedule refers to the Overlook Building (Floors 13 and up), Building B refers to the residential units wrapping around the parking garage of the Overlook Building, Building C refers to the Enclave Building, and Building D refers to the parking garage that is part of the Overlook Building. 01671-003/00322972 8 EMP Version 2, January 2021 c) Additional phases planned? ☐ Yes ☒ No If yes, specify the start date and/or activities if known: Start Date: Click or tap to enter a date. Planned Activity: Click or tap here to enter text. Start Date: Click or tap to enter a date. Planned Activity: Click or tap here to enter text. Start Date: Click or tap to enter a date. Planned Activity: Click or tap here to enter text. d) Provide the planned date of occupancy for new buildings: Building C (Enclave Building) is expected to be completed in December 2023, with occupancy planned to begin early 2024. Building B (residential units of the Overlook Building that wrap around the garage) is projected to be completed in May 2024, with occupancy planned shortly thereafter. Buildings A and D (remainder of Overlook Building) are projected to be completed in September 2024, with occupancy planned shortly thereafter. CONTAMINATED MEDIA Please fill out the sections below, using detailed site plans, if available, or estimate using known areas of contaminated soil and a conceptual redevelopment plan. Provide a figure overlaying new construction onto figure showing contaminated soil and groundwater locations. 1) Contaminated Media on the Brownfields Property Part 1. Soil: ……………………………………….……………. ☒ Yes ☐ No ☐ Suspected ☐ Unknown Part 2. Groundwater: .……………………….……..……. ☒ Yes ☐ No ☐ Suspected ☐ Unknown Part 3. Surface Water: .……………...……..…………… ☐ Yes ☒ No ☐ Suspected ☐ Unknown Part 4. Sediment: .……………...……..…………………… ☐ Yes ☒ No ☐ Suspected ☐ Unknown Part 5. Soil Vapor: …..…………...……..…………………. ☒ Yes ☐ No ☐ Suspected ☐ Unknown Part 6. Sub‐Slab Soil Vapor: ……...……..…………….. ☐ Yes ☐ No ☐ Suspected ☒ Unknown Part 7. Indoor Air: ...……..…………………………………. ☐ Yes ☐ No ☐ Suspected ☒ Unknown 2) For the Areas of Proposed Redevelopment on the Brownfields Property, attach tabulated data summaries for each impacted media and figure(s) with sample locations. Summaries of soil, groundwater, and soil vapor analytical data available at the site are provided in Tables 1 through 6. The associated sample locations are depicted on Exhibits 5 and 6. 01671-003/00322972 9 EMP Version 2, January 2021 PART 1. Soil 1) Known or suspected contaminants in soil (list general groups of contaminants): Numerous subsurface investigations have been conducted at the site since 2000 to investigate impacts related to a release (NCDEQ Incident No. 15378) from an underground storage tank (UST) system formerly located on the adjacent property to the northwest of the site (521 East Morehead Street). These investigations identified low levels of petroleum constituents at depth, near the water table. Naphthalene was identified above its protection of groundwater Preliminary Soil Remediation Goal (PSRG) in two locations (P-1, 12 to 16 feet below land surface [bls]; and P-9, 12 to 16 feet bls), above its residential PSRG in one location (P-2, 12 to 16 feet bls), and above its non- residential PSRG at one location along the property line with 521 E. Morehead Street (GP-9, 11 to 13 feet bls). The following constituents were also identified above their protection of groundwater PSRG at GP-9: ethylbenzene, xylenes, isopropylbenzene, n-propylbenzene, 1,3,5- trimethylbenzene, n-butylbenzene, and sec-butylbenzene. 1,2,4-trimethylbenzene was identified above its residential PSRG at GP-9 as well. Other petroleum constituents or volatile organic compounds (VOCs) were not identified above their PSRGs at the site during historical sampling events. In 2020, Terracon collected additional soil samples at the site for VOCs, semi-volatile organic compounds (SVOCs), and Resource Conservation and Recovery Act (RCRA) Metals (plus hexavalent chromium). The sole compound identified above laboratory detection limits in the samples collected was arsenic at concentrations ranging from 0.72 milligrams per kilogram (mg/kg) to 2.6 mg/kg. While these concentrations exceed arsenic’s residential PSRG, these concentrations are considered naturally occurring based on the magnitude, range, and frequency of detections, as well as the lack of a historical process at the site that could have resulted in arsenic releases. 2) Depth of known or suspected contaminants (feet): Contaminants at concentrations exceeding their non-residential PSRG(s) have been detected in a sample collected from 11 to 13 feet bls. Contaminants exceeding their residential or protection of groundwater PSRG(s) from samples collected from between 11 and 16 feet bls. 3) Area of soil disturbed by redevelopment (square feet): Approximately 123,275 square feet. 4) Depths of soil to be excavated (feet): Based on the existing grading plan, soil excavation beneath the southwestern portion of the Enclave Building will be up to approximately 7 feet. Cut beneath the Overlook Building will be limited to the approximate top 2 feet of soil. The areas of cut and fill are provided as a heat map in Exhibit 4. 5) Estimated volume of soil (cubic yards) to be excavated (attach grading plan): 01671-003/00322972 10 EMP Version 2, January 2021 Per the current grading plans, approximately 10,642 cubic yards of soil will be cut at the site. 6) Estimated volume of excavated soil (cubic yards) anticipated to be impacted by contaminants: Sample data does not exist for the majority of the soils to be excavated at the site, as most of the historical samples were collected from deeper than the proposed cut depths (S-4, 0 to 5 feet bls is the main sample within the cut area that may be representative of soils to be excavated). The areas of cut are not expected to be impacted based on the site history; however, Terracon will be submitting a Work Plan under separate cover for the sampling of soils in areas of cut to properly characterize these soils prior to their disposal (see Part 1.B below). 7) Estimated volume of contaminated soil expected to be disposed of offsite, if applicable: Based on current grading plans, there will be a net cut of approximate 4,614 cubic yards that will require off-site disposal. It is not anticipated that the proposed cut soils at the site are contaminated; however, as discussed in Part 1.C below, Terracon will submit a Work Plan to sample and characterize soils that must leave the site for disposal purposes. Part 1.A. MANAGING ONSITE SOIL If soil is anticipated to be excavated from the Brownfield Property, relocated on the Brownfields Property, or otherwise disturbed during site grading or other redevelopment activities, please provide a grading plan that clearly illustrates areas of cut and fill (approximate areas & volumes are acceptable, if only preliminary data available). 1) HAZARDOUS WASTE DETERMINATION: a) Does the soil contain a LISTED WASTE as defined in the North Carolina Hazardous Waste Section under 40 CFR Part 261.31‐261.35?....................................... ☐Yes ☒No ☐ If yes, explain why below, including the level of knowledge regarding processes generating the waste (include pertinent analytical results as needed). Click or tap here to enter text. ☐ If yes, do the soils exceed the “Contained‐Out” levels in Attachment 1 of the North Carolina Contained‐In Policy?................................................. ☐ Yes ☐ No b) NOTE: IF SOIL MEETS THE DEFINITION OF A LISTED HAZARDOUS WASTE AND EXCEEDS THE CONTAINED‐OUT LEVELS IN ATTACHMENT 1 TO THE NORTH CAROLINA CONTAINED‐IN POLICY THE SOIL MAY NOT BE RE‐USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUS WASTE SECTION RULES AND REGULATIONS. c) Does the soil contain a CHARACTERISTIC WASTE?.................................... ☐ Yes ☒ No ☐ If yes, mark reason(s) why below (and include pertinent analytical results). ☐ Ignitability Click or tap here to enter text. ☐ Corrosivity Click or tap here to enter text. 01671-003/00322972 11 EMP Version 2, January 2021 ☐ Reactivity Click or tap here to enter text. ☐ Toxicity Click or tap here to enter text. ☐ TCLP results Click or tap here to enter text. ☐ Rule of 20 results (20 times total analytical results for an individual hazardous constituent on TCLP list cannot, by test method, exceed regulatory TCLP standard) Click or tap here to enter text. ☒ If no, explain rationale: Based on the TCLP Rule of 20 results, residual contaminants identified in the soils on the site do not exceed the TCLP limits. d) NOTE: IF SOIL MEETS THE DEFINITION OF A CHARACTERISTIC HAZARDOUS WASTE, THE SOIL MAY NOT BE RE‐USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUS WASTE SECTION RULES AND REGULATIONS. 2) Screening criteria by which soil disposition decisions will be made (e.g., left in place, capped in place with low permeability barrier, removed to onsite location and capped, removed offsite): ☒ Preliminary Health‐Based Residential SRGs ☐ Preliminary Health‐Based Industrial/Commercial SRGs ☒ Division of Waste Management Risk Calculator (For Brownfields Properties Only) ☐ Site‐specific risk‐based cleanup level. Please provide details of methods used for determination/explanation. Click or tap here to enter text. Additional comments: Click or tap here to enter text. 3) If known impacted soil is proposed to be reused within the Brownfields Property Boundary, please check the measures that will be utilized to ensure safe placement and documentation of same. Please attach a proposed location diagram/site map. ☒ Provide documentation of analytical report(s) to Brownfields Project Manager ☒ Provide documentation of final location, thickness and depth of relocated soil on site map to Brownfields Project Manager once known ☐ Geotextile to mark depth of fill material. Provide description of material: Click or tap here to enter text. ☒ Manage soil under impervious cap ☒ or clean fill ☒ ☒ Describe cap or fill: Impervious caps will consist of hardscapes (asphalt and/or concrete pavement and building 01671-003/00322972 12 EMP Version 2, January 2021 footprint) or at least two feet of demonstrably non-impacted soils from other portions of the site. ☐ Confer with NC BF Project Manager if Brownfield Plat must be revised (or re‐recorded if actions are Post‐Recordation). ☒ GPS the location and provide site map with final location. ☐ Other. Please provide a description of the measure: 4) Please describe the following action(s) to be taken during and following excavation and management of site soils: Management of fugitive dust from site ☒ Yes, describe the method will include: Soils that are dry and have the potential to migrate through air from the site will be managed in accordance with typical construction practices, which include a periodic light application of water via tanker truck to moisten soils and reduce airborne dust. Management of fugitive dust for constituents of concern will not be conducted at the site beyond typical construction practices. ☐ No, explain rationale: Click or tap here to enter text. Field Screening of site soil ☒ Yes, describe the field screening method, frequency of field screening, person conducting field screening: If during grading, impacted soils are discovered, procedures for screening and sampling the soils will be implemented as described in the section for “Contingency for encountering unknown tanks, drums, or other waste materials”. Visual observations of discoloration and the detection of odors by on-site construction personnel during grading activities will prompt notification of the on-call environmental consultant. The consultant will visit the site and assess the questionable soils. ☐ No, explain rationale: Soil Sample Collection ☐ Yes, describe the sampling method (e.g., in‐situ grab, composite, stockpile, etc.): Click or tap here to enter text. ☒ No, explain rationale: If during grading activities impacted soils are discovered, procedures for screening and Click or tap here to enter text. 01671-003/00322972 13 EMP Version 2, January 2021 sampling the soils will be implemented as described in the section for “Contingency for encountering unknown tanks, drums, or other waste materials.” Laboratory analysis for such soil sampling will be determined based on the nature of the unexpected impacts and a discussion with the Brownfields Project Manager. If soil samples are collected for analysis, please check the applicable chemical analytes: ☒ Volatile organic compounds (VOCs) by EPA Method 8260 ☒ Semi‐volatile organic compounds (SVOCs) by EPA Method 8270 ☒ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): Click or tap here to enter text. ☐ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ☐ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. ☒ Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Specify Analytical Method Number(s): Hexavalent chromium by EPA Method 7199. Laboratory analysis for soil sampling will be determined based on the nature of the unexpected impacts and a discussion with the Brownfields Project Manager at the time the impacts are encountered. ☒ Check to confirm that stockpiling of known or suspected impacted soils will be conducted in accordance with Figure 1 of this EMP. Stockpile methodology should provide erosion control, prohibiting contact between surface water/precipitation and contaminated soil, and preventing contaminated runoff. Explain any variances or provide additional details as needed: ☒ Final grade sampling of exposed native soil (i.e., soil that will not be under buildings or permanent hardscape). Select chemical analyses for final grade samples with check boxes below (Check all that apply): ☒ Volatile organic compounds (VOCs) by EPA Method 8260 ☒ Semi‐volatile organic compounds (SVOCs) by EPA Method 8270 Deviations from Figure 1 will not occur during stockpiling of soils. If construction logistics (e.g. schedule, physical site constraints, etc.) prevent proper stockpiling of soils, the contingency procedures will be to directly load soils onto trucks for export and disposal off the site. Should this alternative be required, the exported soils will be sampled in accordance with Brownfields requirements and the selected disposal facility will be contacted to discuss sampling requirements (analyses, frequency). Brownfields approval will be obtained prior to soil export from the site. 01671-003/00322972 14 EMP Version 2, January 2021 ☒ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): Click or tap here to enter text. ☐ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ☐ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. ☒ Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Hexavalent chromium by EPA Method 7199. Please provide a scope of work for final grade sampling, including a diagram of soil sampling locations, number of samples to be collected, and brief sampling methodology. Samples should be collected from 0-2 ft below ground surface, with the exception of VOCs which should be taken from 1-2 ft below ground surface. Alternatively, indicate if a work plan for final grade sampling may be submitted under separate cover. Based on preliminary development plans for the site, it is expected that exposed soils (not capped under structures or hardscapes) will be limited to relatively minor landscaped areas at the site between the buildings and sidewalks. Six composite soil samples will be collected from these areas of exposed soil, as shown on Exhibit 7. Composite soil samples will be collected using a decontaminated hand auger from shallow depths (0 to 2 feet) in accordance with the sampling procedures outlined in the NCDEQ Inactive Hazardous Site Branch’s (IHSB) Guidelines for Assessment and Cleanup of Contaminated Sites (January 2020). Each of the samples will be composited from three or four individual locations. The soils from each location will be divided equally with one half placed in a sealed plastic bag that is placed on ice within a cooler and the other half placed in a sealed plastic bag that is left in the sun and allowed to volatilize for approximately 5 to 10 minutes. After the volatilization period, the headspace of the second plastic bag will be screened for volatile vapors using a photo-ionization detector (PID). A grab sample for VOC analysis will be collected from the sealed plastic bag that had been stored on ice from the location exhibiting the highest PID reading. For composite sample collection, soils from the sealed plastic bags (placed on ice) from each set of borings will then be composited using a decontaminated stainless-steel bowl and spoon via the sample homogenization procedures outlined in the U.S. Environmental Protection Agency’s SESDPROC-300-R3 (June 11, 2020) guidance. Samples will be analyzed for VOCs (8260), SVOCs (8270), RCRA 8 Metals (6010/7471), and hexavalent chromium (7199). In addition to the six composite samples, Terracon will also collect the following samples for quality assurance/quality control purposes: one 01671-003/00322972 15 EMP Version 2, January 2021 field/equipment blank (collected by rinsing deionized water over the bucket of the hand auger and the mixing bowl and collecting the rinsate in laboratory-supplied glassware; sample to be analyzed for VOCs only), one blind duplicate sample analyzed for the full suite of analyses, and one matrix spike/matrix spike-duplicate sample analyzed for the full suite of analyses. A Level II QA/QC package will be requested from the laboratory, whose reporting and method detection limits will meet applicable screening criteria to the extent technologically feasible. The analytical report will include the use of J-flags for estimated concentrations. Please note that the soil sample aliquot locations shown in Exhibit 7 are subject to change based on possible changes to the final locations of exposed landscaping post- redevelopment and the possible location of sub-grade utilities to be installed at the site. The NCBP Project Manager will be contacted to discuss changes to these locations if/as needed. ☐ If final grade sampling was NOT selected, please explain rationale: Click or tap here to enter text. Part 1.B. IMPORTED FILL SOIL NO SOIL MAY BE BROUGHT ONTO THE BROWNFIELDS PROPERTY WITHOUT PRIOR APPROVAL FROM THE BROWNFIELDS PROGRAM. According to the Brownfields IR 15, “Documenting imported soil (by sampling, analysis, and reporting in accordance with review and written approval in advance by the Brownfields Program), will safeguard the liability protections provided by the brownfields agreement and is in the best interest of the prospective developer/property owner.” Requirements for importing fill: 1) Will fill soil be imported to the site?................................................ ☐ Yes ☒ No ☐ Unknown Based on current grading plans, the site has a net cut of approximately 4,614 cubic yards. The proposed redevelopment will utilize cut soils from portions of the site to satisfy fill requirements in other areas. As such, no fill soil is planned for import at this time. 2) If yes, what is the estimated volume of fill soil to be imported? 0 cubic yards. 3) If yes, what is the anticipated depth that fill soil will be placed at the property? (If a range of depths, please list the range.) Some portions of the site will require fill up to approximately 8-feet (filling and raising grade of the existing stormwater detention pond in the northeast portion of the site). The majority of areas to receive fill will only require between 0 and 2 feet of fill. As discussed above, import of soils for use of fill is not planned, as cut soils from other portions of the site will be utilized as fill material. 01671-003/00322972 16 EMP Version 2, January 2021 4) Provide the source of fill, including: location, site history, nearby environmental concerns, etc. Attach aerial photos, maps, historic Sanborn maps and a borrow source site history: There are no plans for import fill. If soils are proposed for import to the site in the future; a work plan for pre-import sampling would be submitted to the Brownfields PM for approval, or such soils will be obtained from a source which has been pre-approved by the Brownfields Program as a suitable fill source and pre-import sampling is not necessary. 5) PRIOR TO ITS PLACEMENT AT THE BROWNFIELDS PROPERTY, provide a plan to analyze fill soil to demonstrate that it meets acceptable standards applicable to the site and can be approved for use at the Brownfields property. Not applicable, as import soil is not currently planned. If plans change and soils are to be imported, attempts will be made to import them from an NCDEQ-approved source. If construction plans/logistics dictate an alternative, non-approved fill source be selected during the project, a work plan for pre-import sampling will be submitted to the Brownfields PM for approval that demonstrates acceptable criteria for obtaining soils from the alternate fill source. Approval will be obtained from the PM prior to the import of soils. 6) Please check the applicable chemical analytes for fill soil samples. (Check all that apply): ☒ Volatile organic compounds (VOCs) by EPA Method 8260 ☒ Semi‐volatile organic compounds (SVOCs) by EPA Method 8270 ☒ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): Click or tap here to enter text. ☐ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ☐ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. ☒ Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Hexavalent chromium by EPA Method 7199. 7) The scope of work for import fill sampling may be provided below or in a Work Plan submitted separately for DEQ review and approval. Attach specific location maps for in-situ borrow sites. If using a quarry, provide information on the type of material to be brought onto the Brownfields Property. A work plan will be prepared and submitted under separate cover if it is determined that the source of any import soils has not been pre-approved by the NCDEQ. 01671-003/00322972 17 EMP Version 2, January 2021 Part 1.C. EXPORTED SOIL NO SOIL MAY LEAVE THE BROWNFIELDS PROPERTY WITHOUT APPROVAL FROM THE BROWNFIELDS PROGRAM. FAILURE TO OBTAIN APPROVAL MAY VIOLATE A BROWNFIELDS AGREEMENT CAUSING A REOPENER OR JEOPARDIZING ELIGIBILITY IN THE PROGRAM, ENDANGERING LIABILITY PROTECTIONS AND MAKING SAID ACTION POSSIBLY SUBJECT TO ENFORCEMENT. JUSTIFICATIONS PROVIDED BELOW MUST BE APPROVED BY THE PROGRAM IN WRITING PRIOR TO COMPLETING TRANSPORT ACTIVITIES. Please refer to Brownfields IR 15 for additional details. 1) If export from a Brownfields Property is anticipated, please provide details regarding the proposed export actions. Volume of exported soil, depths, location from which soil will be excavated on site, related sampling results, etc. Provide a site map with locations of export and sampling results included. Based on current grading plans, approximately 4,614 cubic yards of excavated soils will require export from the site. Existing sample data does not exist for these soils. Terracon is preparing a Work Plan to be submitted under separate cover to adequately characterize these soils for disposal purposes. Disposal decisions for these soils will be based on the analytical results of said sampling. Based on site history and past sampling, it is not anticipated that the soils to be exported will be impacted by contaminants. Soils determined to not be impacted would be disposed at a nearby LCID landfill such as the Lakeview Road Landfill, Reeves Landfill, Old 27 Landfill, or Kelly Road Landfill (please note that these landfills are provided as examples of possible LCID disposal facilities and this list is not intended to limit the PD’s disposal options). Soils determined to be impacted by contaminants would either be disposed off-site at a permitted, lined landfill (Subtitle D) such as the CMS Republic Landfill located at 5105 Morehead Road in Concord, North Carolina) or instead transferred to another Brownfields site with similar contaminants and contaminant concentrations, should such a site be present nearby and willing to accept the soils and prior DEQ approval is obtained. Additional off-site soil disposal methods (landfarming, as beneficial fill at a non-Brownfields property) have also been selected to provide flexibility in the event the PD wishes to change its contingency plans. 2) To what type of facility will the export Brownfields soil be sent? ☒ Subtitle D/Municipal Solid Waste Landfill (analytical program to be determined by landfill) ☒ Permitted but Unlined Landfill (i.e. LCID, C&D, etc.) Analytical requirements to be determined by the accepting landfill; ☒ Landfarm or other treatment facility ☒ Use as fill at another suitable Brownfields Property – determination that a site is suitable will require, at a minimum, that similar concentrations of the same or similar contaminants already exist at both sites, use of impacted soil will not increase 01671-003/00322972 18 EMP Version 2, January 2021 the potential for risk to human health and the environment at the receiving Brownfields property, and that a record of the acceptance of such soils from the property owner of the receiving site is provided to the Brownfields Program. Please provide additional details below. ☒ Use as Beneficial Fill off-site at a non-Brownfields Property - Please provide documentation of approval from the property owner for receipt of fill material. This will also require approval by the DEQ Solid Waste Section. Additional information is provided in IR 15. Please provide additional details below. 3) Additional Details: (if transfer of soil to another property is requested above, please provide details related to the proposed plans). See Part 1.C Item 1 above. Following completion of in situ soil characterization, proposed soil export disposal locations (other than CMS Republic) will be provided to the Brownfields Program for approval before any export occurs. Part 1.D. MANAGEMENT OF UTILITY TRENCHES ☐ Install liner between native impacted soils and base of utility trench before filling with clean fill (Preferred) ☒ Last out, first in principle for impacted soils (if soil can safely be reused onsite and is not a hazardous waste), i.e., impacted soils are placed back at approximately the depths they were removed from such that impacted soil is not placed at a greater depth than the original depth from which it was excavated. During initial site grading activities, workers should use appropriate safety personal protective equipment (PPE). The on-site Health and Safety Plan will address potential exposure of workers to constituents of concern (COCs). Soils will at times be disturbed for the construction of utilities or other structures. With respect to subsurface utility construction at the site, the general rule will be to remove and stockpiled soils so that a “last out, first in” process occurs. During excavation, soils in the upper 2 feet will be stockpiled and segregated as the first materials removed. These soils/fill materials will be the last returned to the excavation during backfilling. Soils will typically “bulk” or expand in volume when disturbed by excavation. The contractor will compact these materials into place according to the compaction requirements of the construction design. If no specifications for compacted fill exist, the contractor will tamp the materials in place using the mechanical excavator or equivalent. Utilities or structures will replace a certain volume of soils in these areas, resulting in excess soils as excavation spoils. After the initial grading of the site, the worker and contractor should plan from onset of construction to maintain a cap comprised of either (a) clean fill, or (b) other barrier approved by the NCDEQ for areas that will not be capped with a building, asphalt, or concrete surface. If excess contaminant impacted soils/fill are produced from excavation as spoils which cannot be restored to original depths through the process of “first out, last in”, they must be handled with special care. The worker or contractor will work with the Brownfields Project Manager to ensure that, if the soils are contaminated, they are either properly re-used on the site or disposed at an off-site location. 01671-003/00322972 19 EMP Version 2, January 2021 ☒ Evaluate whether necessary to install barriers in conduits to prevent soil vapor transport, and/or degradation of conduit materials due to direct impact with contaminants? ☐ If yes, provide specifications on barrier materials or provide the results of this evaluation in the Vapor Mitigation Plan. Note that if vapor mitigation is planned for site buildings, utility corridors will need to be evaluated as part of mitigation designs: Click or tap here to enter text. ☒ If no, include rationale here: Soil vapor data at the site indicates that vapor mitigation measures are not necessary at the site. Summaries of the NCDEQ Risk Calculator model results, which do not indicate unacceptable risk associated with vapor intrusion from soil vapor concentrations obtained in both 2020 and 2021, are included as attachments to the EMP. ☐ Unknown, details to be provided in the Vapor Mitigation Plan for the site. Click or tap here to enter text. Other comments regarding managing impacted soil in utility trenches: Concerns and methods for handling impacted soils do not preclude or modify any of the Occupational Safety and Health Administration (OSHA) requirements for worker safety incumbent upon contractors for regular site safety and trenching/excavation activities. OSHA requirements will dictate adjustments of the soil management methods, where necessary. PART 2. GROUNDWATER 1) What is the depth to groundwater at the Brownfields Property? Depth to groundwater has been ranging from approximately 17 to 25 feet bls at the site. 2) Is groundwater known to be contaminated by ☐onsite ☒offsite ☐both or ☐unknown sources? Describe source(s): Existing data indicate various petroleum constituents, including benzene, toluene, ethylbenzene, and xylene (BTEX) have been identified above their 2L Standards at the site. Refer to attached Table 2 for specific concentrations. These compounds are due to the release (NCDEQ LUST Incident 15378) from the UST system formerly located on the adjacent property to the northwest of the site. 3) What is the direction of groundwater flow at the Brownfields Property? Based on surficial topography, the direction of shallow groundwater flow is inferred to be toward the east. 4) Will groundwater likely be encountered during planned redevelopment activities? ☒Yes ☐No If yes, describe these activities: 01671-003/00322972 20 EMP Version 2, January 2021 Based on the proposed development plans, grading activities at the site are not anticipated to exceed a depth of approximately 8 feet bls; as such, groundwater will likely not be encountered during the majority of the soil work that will occur will not encountered groundwater. However, the Overlook building will require the installation of deep foundations that will be installed into bedrock, which averages approximately 31 feet bls. The installation of the foundations will be achieved by drilling large diameter boreholes (ranging from approximately 3 to 6.5 feet) to the necessary depth, installing concrete caissons within the boreholes, and then installing the deep foundations inside the caissons. As these boreholes intersect the water table, it is anticipated that some temporary dewatering will be necessary. The boreholes typically are open for approximately one day prior to installation of the caissons. Based on the anticipated extent of the interaction with groundwater during construction activities (e.g. during installation of foundational caissons only), construction activities are not expected to modify existing groundwater flow in a manner that would have an effect on adjacent properties or increase vapor intrusion risk at the property. Regardless of the answer; in the event that contaminated groundwater is encountered during redevelopment activities (even if no is checked above), list activities for contingent management of groundwater (e.g., dewatering of groundwater from excavations or foundations, containerizing, offsite disposal, discharge to sanitary sewer, NPDES permit, or sampling procedures). Generally speaking, excavations in areas where groundwater is encountered will be allowed to re-infiltrate for approximately 24 hours, if it does not affect the construction schedule. If the groundwater must be removed so that construction activities may proceed, the groundwater will be discharged to a tanker or aboveground storage containers pending approval by the Brownfields Program, and laboratory analysis for disposal. Copies of laboratory data and disposal manifests will also be provided to the Brownfields Program. In the case of the temporary dewatering that will likely be necessary during foundation installation, the PD is currently evaluating its options. Such options may include off-site disposal, temporary containerization coupled with on-site treatment (e.g. use of a granular activated carbon filtration) prior to discharge in accordance with the site’s construction stormwater permit, or discharge to the municipal POTW (if granted permission by the municipality), etc. Please note that the above procedures are given as possible examples and are not intended to limit the PD in its selection of the ultimate groundwater management protocol(s). Once a groundwater management option that complies with all applicable laws has been selected, the Brownfields Program will be contacted for approval. 5) Are monitoring wells currently present on the Brownfields Property?.................☐Yes ☒No If yes, are any monitoring wells routinely monitored through DEQ or other agencies?..................................................................................................................☐Yes ☐No 6) Please check methods to be utilized in the management of known and previously unidentified wells. ☒ Abandonment of site monitoring wells in accordance with all applicable regulations. It is the Brownfields Program’s intent to allow proper abandonment of well(s) as specified in the Brownfields Agreement, except if required for active monitoring through another section of DEQ or the EPA. 01671-003/00322972 21 EMP Version 2, January 2021 ☐ Location of existing monitoring wells marked ☐ Existing monitoring wells protected from disturbance ☒ Newly identified monitoring wells will be marked and protected from further disturbance until notification to DEQ Brownfields can be made and approval for abandonment is given. 7) Please provide additional details as needed: Please note, disturbance of existing site monitoring wells without approval by DEQ is not permissible. If monitoring wells are damaged and/or destroyed, DEQ may require that the PD be responsible for replacement of the well. PART 3. SURFACE WATER 1) Is surface water present at the property? ☐ Yes ☒ No ☐ Unknown 2) Attach a map showing the location of surface water at the Brownfields Property. 3) Is surface water at the property known to be contaminated? ☐ Yes ☒ No 4) Will workers or the public be in contact with surface water during planned redevelopment activities? ☐ Yes ☒ No Stormwater can potentially accumulate in excavations and utility trenches during construction activities following precipitation events. In the event stormwater management is required, the applicable excavation activities should cease pending infiltration of the water or removal and characterization of the water. 5) In the event that contaminated surface water is encountered during redevelopment activities, or clean surface water enters open excavations, list activities for management of such events (e.g. flooding, contaminated surface water run‐off, stormwater impacts): Water is not anticipated to discharge into open excavations. Excavations and trenches shall be graded, bermed, or provided with an equivalent barrier where necessary to help prevent surface water and/or stormwater from entering excavations and/or leaving the site boundaries. Stormwater or water from an unidentified source that collects in excavation areas will be allowed to infiltrate naturally if construction schedule allows or removed so that construction activities may proceed. The water will be containerized or diverted to an on-site stormwater management basin where the water will be sampled for disposal characterization before it is allowed to leave the site. Based on the types of contaminants documented on the site, water samples will be analyzed for VOCs, SVOCs and RCRA metals. If containerized water is determined to be above regulatory standards, the Brownfields Project Manager will be contacted, and the water will be disposed in accordance with regulatory requirements. Any identified monitoring wells will be abandoned in accordance with the applicable regulations, following approval from NCDEQ. 01671-003/00322972 22 EMP Version 2, January 2021 PART 4. SEDIMENT 1) Are sediment sources present on the property? ☐ Yes ☒ No 2) If yes, is sediment at the property known to be contaminated: ☐ Yes ☒ No ☐ Unknown 3) Will workers or the public be in contact with sediment during planned redevelopment activities? ☐ Yes ☒ No 4) Attach a map showing location of known contaminated sediment at the property. 5) In the event that contaminated sediment is encountered during redevelopment activities, list activities for management of such events (stream bed disturbance): Not applicable. There are no known current or historical natural drainage features on the site. PART 5. SOIL VAPOR 1) Do concentrations of volatile organic compounds at the Brownfields property exceed the following vapor intrusion screening levels (current version) in the following media: IHSB Residential Screening Levels: Soil Vapor: ………..☒ Yes ☐ No ☐ Unknown Groundwater: .….☒ Yes ☐ No ☐ Unknown IHSB Industrial/Commercial Screening Levels: Soil Vapor: ………..☐ Yes ☒ No ☐ Unknown Groundwater: …..☒ Yes ☐ No ☐ Unknown 2) Attach a map showing the locations of soil vapor contaminants that exceed site screening levels. 3) If applicable, at what depth(s) is soil vapor known to be contaminated? In 2020, five soil vapor points were installed within the footprint of the planned building at depths ranging from approximately 3 to 5.25 feet bls. While numerous VOCs were detected, the sole compound exceeding its residential Soil Gas Screening Level (SGSL) was chloroform (at a concentration of 8.37 µg/m3 vs. its residential SGSL of 8.1 µg/m3). Five additional soil vapor points were installed and sampled at the site in 2021 to confirm the prior results. The 2021 soil vapor points were installed to depths ranging from 5.25 feet to 8 feet bls. VOC concentrations were not identified above their residential SGSLs. Refer to the attached Tables 5 and 6 for specific soil vapor concentrations. Copies of modeled vapor intrusion risk results using the NCDEQ Risk Calculator for both the 2020 and 2021 sample data sets are also included behind the tables in the appendices. The NCDEQ Risk Calculator indicates there is not unacceptable risk to future residential site occupants from the identified soil vapor VOC concentrations. 01671-003/00322972 23 EMP Version 2, January 2021 4) Will workers encounter contaminated soil vapor during planned redevelopment activities? ☐ Yes ☒ No ☐ Unknown In the event that contaminated soil vapor is encountered during redevelopment activities (trenches, manways, basements or other subsurface work,) list activities for management of such contact: Volatile organic compounds (VOCs) have been identified in localized areas (building footprint) within soil vapor and groundwater. The concentrations of VOCs detected within soil vapor were below residential SGSLs with the exception of chloroform in one sample, at a level only slightly in excess of its SGSL. Based on the identified levels, it is not anticipated that construction workers will encounter contaminated soil vapor during redevelopment activities. However, during construction, site workers will be informed of the possible presence of contaminated soil vapors particularly in trenches and other excavations on the site. If during construction, workers identify evidence of elevated vapor concentrations (odor, lightheadedness, etc.), work will be stopped until Terracon can mobilize to the site to complete vapor screening activities. Work will not begin again until the vapor field screening indicates concentrations have returned to background levels. PART 6. SUB‐SLAB SOIL VAPOR 1) Do concentrations of volatile organic compounds at the Brownfields property exceed the following vapor intrusion screening levels (current version) in sub-slab soil vapor: IHSB Residential Screening Levels: Soil Vapor:………..☐ Yes ☐ No ☒ Unknown Groundwater:.….☐ Yes ☐ No ☒ Unknown IHSB Industrial/Commercial Screening Levels: Soil Vapor:………..☐ Yes ☐ No ☒ Unknown 2) Groundwater:…..☐ Yes ☐ No ☒ Unknown If data indicate that sub‐slab soil vapor concentrations exceed screening levels, attach a map showing the location of these exceedances. 3) At what depth(s) is sub‐slab soil vapor known to be contaminated? ☐0‐6 inches ☐Other, please describe: There are no structures currently located on the site; as such, sub-slab soil vapor samples have not been collected. 4) Will workers encounter contaminated sub‐slab soil vapor during planned redevelopment activities? ☐ Yes ☐ No ☒ Unknown ☒ If no, include rationale here: There are no structures currently located on the site. 5) In the event that contaminated soil vapor is encountered during redevelopment activities, list activities for management of such contact Volatile organic compounds (VOCs) have been identified in localized areas within soil vapor and groundwater beneath the site. Vapors will be evaluated, as discussed in Part 5. 01671-003/00322972 24 EMP Version 2, January 2021 PART 7. INDOOR AIR 1) Are indoor air data available for the Brownfields Property? ☐ Yes ☒ No ☐ Unknown 2) Attach a map showing the location(s) where indoor air contaminants exceed site screening levels. 3) If the structures where indoor air has been documented to exceed risk‐based screening levels will not be demolished as part of redevelopment activities, will workers encounter contaminated indoor air during planned redevelopment activities? ☐ Yes ☒ No ☐ Unknown ☒ If no, include rationale here: Not applicable. 4) In the event that contaminated indoor air is encountered during redevelopment activities, list activities for management of such contact: VAPOR INTRUSION MITIGATION SYSTEM Is a vapor intrusion mitigation system (VIMS) proposed for this Brownfields Property? ☐ Yes ☒ No ☐ Unknown ☒ If no or unknown, include rationale here as well as plans for pre-occupancy sampling, as necessary: Based on the 2020 and 2021 soil vapor sampling, concentrations of VOCs have not been identified at levels that pose unacceptable risk to future residential occupants (see attached NCDEQ Risk Calculator summaries). DEQ’s determination is based on site conditions observed prior to redevelopment. While a source of petroleum contamination is located on the property adjacent to the Brownfields Property, based on the anticipated extent of the interaction with groundwater during construction activities (e.g. during installation of foundational caissons only), construction activities are not expected to modify existing groundwater flow in a manner that would have an effect on adjacent properties or increase vapor intrusion risk at the property. If yes, ☐ VIMS Plan Attached or ☐ VIMS Plan to be submitted separately If submitted separately provide date: VIMS Plan shall be signed and sealed by a NC Professional Engineer If no, please provide a brief rationale as to why no vapor mitigation plan is warranted: See above Note that approval of this EMP does not imply approval with any vapor intrusion mitigation land use restrictions or requirements of the recorded or draft Brownfields Agreement and that separate approval of mitigation measures will be required. Not applicable. 01671-003/00322972 25 EMP Version 2, January 2021 CONTINGENCY PLAN – encountering unknown tanks, drums, or other waste materials In this section please provide actions that will be taken to identify or manage unknown potential new sources of contamination. During redevelopment activities, it is not uncommon that unknown tanks, drums, fuel lines, landfills, or other waste materials are encountered. Notification to DEQ Brownfields Project Manager, UST Section, Fire Department, and/or other officials, as necessary and appropriate, is required when new potential source(s) of contamination are discovered. These Notification Requirements were outlined on Page 1 of this EMP. Should potentially impacted materials be identified that are inconsistent with known site impacts, the Brownfields Project Manager will be notified, and a sampling plan will be prepared based on the EMP requirements and site-specific factors. Samples will generally be collected to document the location of the potential impacts. Should potentially impacted materials be identified that are inconsistent with known site impacts, the DEQ Brownfields Project Manager will be notified and a sampling plan will be prepared based on the EMP requirements and site-specific factors. Samples will generally be collected to document the location of the potential impacts. Check the following chemical analysis that are to be conducted on newly identified releases: ☒ Volatile organic compounds (VOCs) by EPA Method 8260 ☒ Semi‐volatile organic compounds (SVOCs) by EPA Method 8270 ☒ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver) Click or tap here to enter text. ☐ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ☐ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. ☒ Other Constituents & Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.) Please note, if field observations indicate the need for additional analyses, they should be conducted, even if not listed here. Hexavalent chromium by EPA Method 7199. Please provide details on the proposed methods of managing the following commonly encountered issues during redevelopment of Brownfields Properties. There is a possibility that materials of unknown type (tanks, drums or impacted soils) could be present on the site. The worker and contractor will be able to recognize when conditions change at the site. Field staff will be able to determine if a new discovery of changed chemical conditions has occurred, and if so, if it is significant. If there is question of the significance of a new discovery or 01671-003/00322972 26 EMP Version 2, January 2021 changed condition, the environmental manager (Terracon) or equivalent qualified environmental professional should make the determination. The worker or contractor will be alert during earthwork for the following indications that will trigger the possible identification of a new condition not addressed by previous investigations and evaluation. All work will be completed in accordance with applicable regulatory requirements. Prior to beginning site work, the environmental manager will attend a pre-construction kick-off meeting with the PD and the redevelopment contractors to discuss the DEQ-approved EMP and various scenarios when it would be appropriate and necessary to notify the environmental manager of the discovery of unknown subsurface features or potentially impacted media at the site. Underground Storage Tanks: Prior assessment reports have not identified suspected underground storage tanks (USTs) remaining at the site. The worker and contractor will be cognizant of man-made containers or remnants of containers of any material. The presence of whole or crushed drums or containers in excess of one gallon in the soils in combination with odor or unique color changes may be indicative of a changed condition. Should USTs, drums, or similar items be encountered during redevelopment activities, the environmental manager (Will Frazier) will be contacted immediately, and the identified item should remain as encountered. The NCBP Project Manager will be notified by the environmental manager for the site within 48 hours of discovery. Following notification of the Brownfields Project Manager, the UST or other containers will be removed from the ground after potential combustible vapors have been stabilized. Residual fluids, if present, will be removed and sampled for VOCs, SVOCs, and RCRA 8 metals. The fluids will be transported off-site for disposal at a suitable facility based on the laboratory analytical results. The UST or other containers will be hauled to an off-site facility for proper disposal and soil samples will be collected from the location of the UST or other containers and analyzed for VOCs (EPA Method 8260B), SVOCs (EPA Method 8270D) and RCRA metals (EPA Methods 6010D and 7471B), in accordance with the applicable DEQ UST Guidance and Brownfields Program protocols. Impacted soil, if encountered, will be managed in accordance with the “Managing On-site Soil” section of the EMP, as outlined above. Documentation of the UST/container removal activities, UST disposal, and sampling results will be provided to the Brownfields Project Manager upon receipt by the environmental manager. Sub-Grade Feature/Pit: If during redevelopment activities, an unknown sub-grade feature/pit is encountered, the environmental manager (Will Frazier) will be notified immediately. The feature will be removed if possible and the environmental manager will supervise exploratory excavation near the feature and soils will be screened for potential impacts. If potential impacts are identified, the Brownfields Project Manager will be notified, and soil samples will be collected from the area of potential impacts and analyzed for VOCs (EPA Method 8260B), SVOCs (EPA Method 8270D) and RCRA metals (EPA Methods 6010D and 7471B). The sample frequency will be determined based on the nature of the feature and will be discussed with the Brownfields Project Manager prior to the collection of the samples. If left in place, the location of the feature will be recorded for future reference. Soil sampling results will be provided to the Brownfields Project Manager. If water is encountered within a sub-grade pit, the procedures outlined in Part 3 will be followed. If a sub-grade feature or pit is encountered and does not require removal for environmental, geotechnical, or construction 01671-003/00322972 27 EMP Version 2, January 2021 purposes, it will be filled with soil or suitable fill and construction will proceed. Buried Waste Material – Note that if buried waste, non-native fill, or any obviously filled materials is encountered, the DEQ Brownfields Program must be notified to determine if investigation of landfill gases is required: The below described protocols apply only to debris encountered during construction. If removal of the debris is not necessary for construction or geotechnical reasons, the below protocols will not apply. If during redevelopment activities, buried waste materials are encountered, the environmental manager (Will Frazier) will be notified immediately, and the identified waste should remain as encountered. The Brownfields Project Manager will be notified by the environmental manager within 24 hours of the environmental manager being notified. Following notification of the Brownfields Project Manager, the environmental manager will supervise exploratory excavation activities near the waste and soils will be screened for potential impacts. The waste will be segregated from surrounding soils, inventoried and evaluated for proper management. If potential impacts are identified, the Brownfields Project Manager will be notified, and soil samples will be collected from the area of potential impacts and analyzed for VOCs (EPA Method 8260B), SVOCs (EPA Method 8270D) and RCRA metals (EPA Methods 6010D and 7471B). The sample frequency will be determined based on the nature of the debris and will be discussed with the Brownfields Project Manager prior to the collection of the samples, and a determination will be made regarding the need for an investigation of landfill gases. Additional laboratory analyses may be required based on the types of waste discovered. The location of the debris will be recorded for future reference. Documentation of the waste management activities and sampling results will be provided to the Brownfields Project Manager upon receipt by the environmental manager. If construction debris is identified during site grading, Terracon will evaluate whether the debris is likely to be environmentally deleterious. If the debris appears to consist solely of former building materials (e.g. concrete, wood, etc.), with Brownfields Program approval, the debris will be disposed at an off-site C&D landfill. If the debris appears to consist of impacted materials, a sampling and disposal protocol will be determined in coordination with the Brownfields Program. Areas of suspected contaminated soil that remain at the site after excavation is complete above the NCDEQ Residential PSRG will be managed pursuant to this plan. Re-Use of Impacted Soils On-Site: See Part 1 – Soil and Part 1.A for details regarding the re-use of impacted soils on the site. If unknown, impacted soil is identified on-site, management on-site can be considered after the project team provides the necessary information, outlined in Part 1.A. Item 11, for Brownfields Project Manager approval prior to final placement on-site. If other potential contingency plans are pertinent, please provide other details or scenarios as needed below: If impacted soils are noted at the site, the suspected soils will be isolated as soon as possible from contact and disturbance from rain and wind until screening identification can be conducted. Construction flagging tape attached to stakes can be used to prevent accidental movement of the soils by earthwork operations. Covering of the soils with plastic sheeting anchored by planks, 01671-003/00322972 28 EMP Version 2, January 2021 sandbags, or an equivalent material will occur. The soils will be screened for volatile and semi- volatile organic compounds and RCRA metals. The screening will be conducted by the on-site environmental manager or other qualified environmental professional. The owner or contractor may alternatively go directly to laboratory testing for identification purposes. Screening activities can be conducted on the site and can produce preliminary results quickly. The field tests do not produce a precise measurement of the amounts of contaminants found in the soils but indicates whether contaminants are likely present and will generally warrant further caution and actual measurement. If preliminary screening activities indicate a changed condition may be present, it may be necessary to conduct laboratory testing to determine if contaminants are present in the soil and actually pose a significant risk. Laboratory testing requires time that varies depending on the type of test needed. In general, laboratory testing for VOCs, SVOCs and metals can be completed in approximately 5 to 7 business days unless special arrangements are made with the laboratory for more expensive “RUSH” results. During this time, the suspected impacted soils should be further isolated from worker and public exposure. Special handling and care must be taken in sampling and transporting soils for the laboratory tests to be accurate. The workers in physical contact with suspected impacted soils should have training consistent with 29 OSHA 1910.120. For small volumes, the soils may be placed temporarily in steel open-top drums with bolt-on lids. After sealing, the drum should be clearly labeled with pertinent information such as “Do Not Disturb”, sample number, date, and name of sampler. The drums should be placed in an on-site area protected from general traffic. For larger volumes, it may be effective to place the soils into commercial roll-off dumpsters which have been previously washed and cleaned of residues or soils can be stockpiled on plastic sheeting. The containers will not have free-draining bottoms and stockpiles shall be graded, bermed, or provided with an equivalent barrier where necessary to help prevent water run-off, in accordance with Figure 1. The tops of the containers or stockpiles will then be covered with plastic sheeting and secured against wind and rain. The commercial containers or stockpiles should be placarded with information similar to the notation on drums. POST‐REDEVELOPMENT REPORTING ☒ Check this box to acknowledge that a Redevelopment Summary Report will be required for the project. If the project duration is longer than one year, an annual update is required and will be due by January 31 of each year, or 30 days after each one-year anniversary of the effective date of this EMP (as agreed upon with the Project Manager). These reports will be required for as long as physical redevelopment of the Brownfields Property continues, except that the final Redevelopment Summary Report will be submitted within 90 days after completion of redevelopment. Based on the estimated construction schedule, the first Redevelopment Summary Report is anticipated to be submitted on 1/31/2023 The Redevelopment Summary Report shall include environment-related activities since the last report, with a summary and drawings, that describes: 1. actions taken on the Brownfields Property; 01671-003/00322972 29 EMP Version 2, January 2021 2. soil grading and cut and fill actions; 3. methodology(ies) employed for field screening, sampling and laboratory analysis of environmental media; 4. stockpiling, containerizing, decontaminating, treating, handling, laboratory analysis and ultimate disposition of any soil, groundwater or other materials suspected or confirmed to be contaminated with regulated substances; and 5. removal of any contaminated soil, water or other contaminated materials (for example, concrete, demolition debris) from the Brownfields Property (copies of all legally required manifests shall be included). ☒ Check box to acknowledge consent to provide a NC licensed P.G. or P.E. sealed, Redevelopment Summary Report in compliance with the site’s Brownfields Agreement. 01671-003/00322972 31 EMP Version 2, January 2021 APPROXIMATE SITE BOUNDARY TOPOGRAPHIC MAP Red Carpet Inn Brownfields Site(AKA Morehead Overlook)NCBP #23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina TOPOGRAPHIC MAP IMAGE COURTESY OF THE U.S. GEOLOGICAL SURVEY QUADRANGLES INCLUDE: CHARLOTTE EAST, NC (1/1/1988). 2701 Westport Road Charlotte, NC 28208-3608 71197661 Project Manager: Drawn by: Checked by: Approved by: WOF MNM MNM 1”=2,000’ 71197661.1 Mar. 2021 Project No. Scale: File Name: Date: 2 WOF Exhibit B C B C B EXISTING 5 LEVEL OFFICE BUILDING EUCLID AVEEAST MOREHEAD STREETEXISTING DUKE ENERGY SUBSTATIONNEW PRIVATE DRIVE150' LONG FIRE ACCESS EXISTING 1 LEVEL PARKING STRUCTURE 26' SETBACK ALONG MOREHEAD PROPERTY LINE 16' SETBACK ALONG EUCLID GROUND LEVELS MF BASEMENT MAIN LOBBY RETAIL RETAIL TRASH MOVE-IN GENERATOR TRASH RISER FCC TELE/DATA POE ELECTRICAL RESIDENTIAL RESIDENTIAL PLAZA / FORECOURT SERVICE R AMENITY RESIDENTIAL PARKING ENTRANCE / EXIT AT PRIVATE DRIVE SPEED RAMP UP TO TYPICAL PARKING LEVELS ENCLAVE UTILITY YARD MAIL T T T T OVERLOOK UTILITY YARD PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 6:01:35 PM C:\Users\jgraham\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - Tower_jgraham@bbm-arch.com.rvt RADIUS DILWORTH OVERLOOK DESIGN DEVELOPMENT PROGRESS ARCHITECTURAL SITE PLAN 20SPN100 08.03.2021 JG/KW CHARLOTTE, NC A0.01SCALE: 3/64" = 1'-0"A0.01 1 OVERALL SITE PLAN Revisions No. Description DateExhibit 4 – Grading MapRed Carpet Inn Brownfields SiteAKA Morehead OverlookNCBP #23070-19-060615 East Morehead StreetCharlotte, North CarolinaExhibit 4 – Grading MapRed Carpet Inn Brownfields SiteAKA Morehead OverlookNCBP #23070-19-060615 East Morehead StreetCharlotte, North Carolina 1. COLORS ARE DIAGRAMATIC AND DO NOT REFLECT FINAL MATERIAL SELECTIONS. ALL FINAL SELECTIONS TO BE APPROVED BY OWNER AND ARCHITECT. 2. ALLOWED OPENINGS ARE UNLIMITED ON ALL ELEVATIONS EXCEPT THE NORTH. PROXIMITY OF THE NORTH ELEVATION TO THE PEROPERTY LINE LIMITS THE OPENINGS AT ANY NON-PARKING LEVEL TO 45% (NCBC T705.8) 3. WINDOW TRIM TO MATCH COLOR OF SURROUNDING FINISH UNLESS NOTED OTHERWISE. 4. BRICK CONTROL JOINES ARE TO BE FREE OF MORTAR AND PROVIDED WITH BACKER ROD AND SEALANT. 5. AT ALL RECESSES IN THE BUILDING FACADE, EXTERIOR MATERIAL IS TO BE CONTINUED TO THE INSIDE CORNER UNLESS NOTED OTHERWISE. GENERAL NOTES MATERIAL KEY NOTES NOTE: COLORS ARE FOR DIAGRAMATIC PURPOSES ONLY BRK-1: STANDARD MASONRY VENEER, RUNNING BOND. COLOR: TBD BRK-2: LARGE-FORMAT MASONRY VENEER (ROCKCAST 12"x24", SMOOTH) COLOR: TBD BRK-3: LARGE-FORMAT MASONRY VENEER (ROCKCAST 12"x24", SMOOTH) COLOR: TBD, ACCENT EIFS-1: MIN. 2" EIFS VENEER SYSTEM(SMOOTH FINISH)WITH INTEGRAL REVEAL AND ACCENT BANDS (STOTHERM) COLOR: TBD EIFS-2: MIN. 2" EIFS VENEER SYSTEM(SMOOTH FINISH)WITH INTEGRAL REVEAL AND ACCENT BANDS (STOTHERM) COLOR: TBD FC-1: FIBER CEMENT PANEL RAINSCREEN SYSTEM WITH APPLIED TRIM COLOR: TBD MTL SCREEN: DECORATIVE METAL SCREENING SYSTEM WITH REQUIRED STRUCTURAL FRAMING AND SUPPORT. ALTERNATE TO INCLUDE FABRIC SYSTEM IN LIEU OF METAL SCREEN LEVEL 1-H EL 713' -6" LEVEL 3 EL 733' -6" LEVEL 2 EL 722' -10" LEVEL 1-M EL 711' -6" LEVEL 4 EL 744' -2" LEVEL 5 EL 754' -10" LEVEL 6 EL 765' -6" LEVEL 7 EL 776' -2" LEVEL 8 EL 786' -10" LEVEL 9 EL 797' -6" LEVEL 10 EL 808' -2" LEVEL 6.5 EL 770' -10" LEVEL 11 EL 818' -10" LEVEL 12 EL 832' -10" LEVEL 13 EL 844' -10" LEVEL 14 EL 855' -6" LEVEL 15 EL 866' -2" LEVEL 16 EL 876' -10" LEVEL 17 EL 887' -6" LEVEL 18 EL 898' -2" LEVEL 19 EL 908' -10" LEVEL 20 EL 919' -6" LEVEL 21 EL 930' -2" LEVEL 22 EL 940' -10" LEVEL 23 EL 951' -6" LEVEL 25 EL 974' -2" TOWER ROOF EL 998' -2" LEVEL 26 EL 986' -2" LEVEL 24 EL 962' -2" DW ROOF BRG EL 785' -6" EIFS-1 EIFS-1 FC-1 BRK-2 EIFS-2 ROOF FEATURE EL 1010' -2" BRK-3 GUARD-HEIGHT PREFINISHED ALUMINUM RAILING SYSTEM WITH HORIZONTAL BARS 60"+ GLASS GUARDRAIL SYSTEM AT AMENITY DECK ANODIZED STOREFRONT WINDOW SYSTEM W/ INTEGRAL MULLION CAPS HANGER-SUPPORTED CANOPY WITH BRACKETS AND METAL PROFILE ANODIZED ALUMINUM STOREFRONT SYSTEM W/ VISION GLAZING ANODIZED ALUMINUM CURTAINWALL SYSTEM PROJECTED ROOF FEATURE WITH ACM PROFILE AND SOFFIT OVERBUILT FRAMING WITH EIFS FINISH ANODIZED ALUMINUM WINDOW WALL SYSTEM W/ INTEGRAL MULLION CAPS METAL PANEL COVER INTEGRAL WITH WINDOW SYSTEM AT SLAB EDGES PROVIDE EIFS OVER LIGHT-GAUGE FRAMING AT RAISED WINDOW UNITS, TYP. PREFINISHED ALUMINUM COPING, TYP. AT PARAPET COPING CONDITIONS OVERBUILT FIBER-CEMENT WRAPPED CORNICE PROFILE VEHICULAR CABLE CRASH BARRIER, TYP. SITE WALLS TO BE MASONRY VENEER WITH CAST STONE CAP, TYP. VINYL WINDOW ASSEMBLY WITH DOUBLE-HUNG AND FIXED UNITS. TYP ASSEMBLY IS 8'W X 6'H ANODIZED ALUMINUM CURTAINWALL SYSTEM WITH DECORATIVE GLAZING MULTIFAMILY ENTRANCE AT MOREHEAD RETAIL ENTRANCEPROVIDE TUBE STEEL TO SUPPORT UPPER WINDOW UNITS PROVIDE SOLDIER COURSE AT WINDOW HEADS AND ROWLOCK SILLS, TYP. PROVIDE GRANITE WATER TABLE AT PIERS MODULAR BRICK VENEER W/ ACCENT DETAILING AT OPENINGS AND HORIZONTAL BANDS METAL SCREENING AT PARKING DECK RETAIL ENTRANCE PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 4:29:11 PM C:\Users\kwarren\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - Tower_kwarrenLJ2JT.rvt RADIUS DILWORTH OVERLOOK DESIGN DEVELOPMENT PROGRESS BUILDING ELEVATIONS 20SPN100 08.03.2021 JG/AW/KW CHARLOTTE, NC A4.01 Revisions No. Description Date SCALE: 1/16" = 1'-0"A4.01 1 MOREHEAD ST. ELEVATION - 1. COLORS ARE DIAGRAMATIC AND DO NOT REFLECT FINAL MATERIAL SELECTIONS. ALL FINAL SELECTIONS TO BE APPROVED BY OWNER AND ARCHITECT. 2. ALLOWED OPENINGS ARE UNLIMITED ON ALL ELEVATIONS EXCEPT THE NORTH. PROXIMITY OF THE NORTH ELEVATION TO THE PEROPERTY LINE LIMITS THE OPENINGS AT ANY NON-PARKING LEVEL TO 45% (NCBC T705.8) 3. WINDOW TRIM TO MATCH COLOR OF SURROUNDING FINISH UNLESS NOTED OTHERWISE. 4. BRICK CONTROL JOINES ARE TO BE FREE OF MORTAR AND PROVIDED WITH BACKER ROD AND SEALANT. 5. AT ALL RECESSES IN THE BUILDING FACADE, EXTERIOR MATERIAL IS TO BE CONTINUED TO THE INSIDE CORNER UNLESS NOTED OTHERWISE. GENERAL NOTES MATERIAL KEY NOTES NOTE: COLORS ARE FOR DIAGRAMATIC PURPOSES ONLY BRK-1: STANDARD MASONRY VENEER, RUNNING BOND. COLOR: TBD BRK-2: LARGE-FORMAT MASONRY VENEER (ROCKCAST 12"x24", SMOOTH) COLOR: TBD BRK-3: LARGE-FORMAT MASONRY VENEER (ROCKCAST 12"x24", SMOOTH) COLOR: TBD, ACCENT EIFS-1: MIN. 2" EIFS VENEER SYSTEM(SMOOTH FINISH)WITH INTEGRAL REVEAL AND ACCENT BANDS (STOTHERM) COLOR: TBD EIFS-2: MIN. 2" EIFS VENEER SYSTEM(SMOOTH FINISH)WITH INTEGRAL REVEAL AND ACCENT BANDS (STOTHERM) COLOR: TBD FC-1: FIBER CEMENT PANEL RAINSCREEN SYSTEM WITH APPLIED TRIM COLOR: TBD MTL SCREEN: DECORATIVE METAL SCREENING SYSTEM WITH REQUIRED STRUCTURAL FRAMING AND SUPPORT. ALTERNATE TO INCLUDE FABRIC SYSTEM IN LIEU OF METAL SCREEN LEVEL 1-H EL 713' -6" LEVEL 3 EL 733' -6" LEVEL 2 EL 722' -10" LEVEL 1-M EL 711' -6" LEVEL 4 EL 744' -2" LEVEL 5 EL 754' -10" LEVEL 6 EL 765' -6" LEVEL 7 EL 776' -2" LEVEL 8 EL 786' -10" LEVEL 9 EL 797' -6" LEVEL 10 EL 808' -2" LEVEL 11 EL 818' -10" LEVEL 12 EL 832' -10" LEVEL 13 EL 844' -10" LEVEL 14 EL 855' -6" LEVEL 15 EL 866' -2" LEVEL 16 EL 876' -10" LEVEL 17 EL 887' -6" LEVEL 18 EL 898' -2" LEVEL 19 EL 908' -10" LEVEL 20 EL 919' -6" LEVEL 21 EL 930' -2" LEVEL 22 EL 940' -10" LEVEL 23 EL 951' -6" LEVEL 25 EL 974' -2" TOWER ROOF EL 998' -2" LEVEL 26 EL 986' -2"12' - 0"12' - 0"12' - 0"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"12' - 0"14' - 0"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"9' - 4"2' - 0"286' - 8"LEVEL 24 EL 962' -2" DW ROOF BRG EL 785' -6" ROOF FEATURE EL 1010' -2" EIFS-2 EIFS-2EIFS-1 FC-1 BRK-1 BRK-2 METAL SCREENING AT PARKING DECK SITE WALLS TO BE MASONRY VENEER WITH CAST STONE CAP, TYP. ANODIZED ALUMINUM CURTAINWALL SYSTEM WITH APPLIED DECORATIVE SCREEN MULTIFAMILY ENTRANCE AT EUCLID ANODIZED ALUMINUM STOREFRONT SYSTEM W/ VISION GLAZING OVERBUILT FIBER-CEMENT WRAPPED CORNICE PROFILE VINYL WINDOW ASSEMBLY WITH DOUBLE-HUNG AND FIXED UNITS. TYP ASSEMBLY IS 8'W X 6'H PROVIDE SOLDIER COURSE AT WINDOW HEADS AND ROWLOCK SILLS, TYP. GUARD-HEIGHT PREFINISHED ALUMINUM RAILING SYSTEM WITH HORIZONTAL BARS ANODIZED STOREFRONT WINDOW SYSTEM W/ INTEGRAL MULLION CAPS PREFINISHED ALUMINUM COPING, TYP. AT PARAPET COPING CONDITIONS ANODIZED ALUMINUM WINDOW WALL SYSTEM W/ INTEGRAL MULLION CAPS METAL PANEL COVER INTEGRAL WITH WINDOW SYSTEM AT SLAB EDGES PROVIDE EIFS OVER LIGHT-GAUGE FRAMING AT RAISED WINDOW UNITS, TYP. PROJECTED ROOF FEATURE WITH ACM PROFILE AND SOFFIT ANODIZED ALUMINUM CURTAINWALL SYSTEM VEHICULAR CABLE CRASH BARRIER, TYP. MODULAR BRICK VENEER W/ ACCENT DETAILING AT OPENINGS AND HORIZONTAL BANDS HANGER-SUPPORTED CANOPY WITH BRACKETS AND METAL PROFILE PROVIDE GRANITE WATER TABLE AT PIERS PROVIDE TUBE STEEL TO SUPPORT UPPER WINDOW UNITS PRIMARY GARAGE ACCESS FROM EUCLID AVENUE EIFS-1 PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 4:29:25 PM C:\Users\kwarren\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - Tower_kwarrenLJ2JT.rvt RADIUS DILWORTH OVERLOOK DESIGN DEVELOPMENT PROGRESS BUILDING ELEVATIONS 20SPN100 08.03.2021 JG/AW/KW CHARLOTTE, NC A4.02 Revisions No. Description Date SCALE: 1/16" = 1'-0"A4.02 1 EUCLID AVE. ELEVATION 1. COLORS ARE DIAGRAMATIC AND DO NOT REFLECT FINAL MATERIAL SELECTIONS. ALL FINAL SELECTIONS TO BE APPROVED BY OWNER AND ARCHITECT. 2. ALLOWED OPENINGS ARE UNLIMITED ON ALL ELEVATIONS EXCEPT THE NORTH. PROXIMITY OF THE NORTH ELEVATION TO THE PEROPERTY LINE LIMITS THE OPENINGS AT ANY NON-PARKING LEVEL TO 45% (NCBC T705.8) 3. WINDOW TRIM TO MATCH COLOR OF SURROUNDING FINISH UNLESS NOTED OTHERWISE. 4. BRICK CONTROL JOINES ARE TO BE FREE OF MORTAR AND PROVIDED WITH BACKER ROD AND SEALANT. 5. AT ALL RECESSES IN THE BUILDING FACADE, EXTERIOR MATERIAL IS TO BE CONTINUED TO THE INSIDE CORNER UNLESS NOTED OTHERWISE. GENERAL NOTES MATERIAL KEY NOTES NOTE: COLORS ARE FOR DIAGRAMATIC PURPOSES ONLY BRK-1: STANDARD MASONRY VENEER, RUNNING BOND. COLOR: TBD BRK-2: LARGE-FORMAT MASONRY VENEER (ROCKCAST 12"x24", SMOOTH) COLOR: TBD BRK-3: LARGE-FORMAT MASONRY VENEER (ROCKCAST 12"x24", SMOOTH) COLOR: TBD, ACCENT EIFS-1: MIN. 2" EIFS VENEER SYSTEM(SMOOTH FINISH)WITH INTEGRAL REVEAL AND ACCENT BANDS (STOTHERM) COLOR: TBD EIFS-2: MIN. 2" EIFS VENEER SYSTEM(SMOOTH FINISH)WITH INTEGRAL REVEAL AND ACCENT BANDS (STOTHERM) COLOR: TBD FC-1: FIBER CEMENT PANEL RAINSCREEN SYSTEM WITH APPLIED TRIM COLOR: TBD MTL SCREEN: DECORATIVE METAL SCREENING SYSTEM WITH REQUIRED STRUCTURAL FRAMING AND SUPPORT. ALTERNATE TO INCLUDE FABRIC SYSTEM IN LIEU OF METAL SCREEN LEVEL 1-H EL 713' -6" LEVEL 3 EL 733' -6" LEVEL 2 EL 722' -10" LEVEL 1-M EL 711' -6" LEVEL 4 EL 744' -2" LEVEL 5 EL 754' -10" LEVEL 6 EL 765' -6" LEVEL 7 EL 776' -2" LEVEL 8 EL 786' -10" LEVEL 9 EL 797' -6" LEVEL 10 EL 808' -2" LEVEL 11 EL 818' -10" LEVEL 12 EL 832' -10" LEVEL 13 EL 844' -10" LEVEL 14 EL 855' -6" LEVEL 15 EL 866' -2" LEVEL 16 EL 876' -10" LEVEL 17 EL 887' -6" LEVEL 18 EL 898' -2" LEVEL 19 EL 908' -10" LEVEL 20 EL 919' -6" LEVEL 21 EL 930' -2" LEVEL 22 EL 940' -10" LEVEL 23 EL 951' -6" LEVEL 25 EL 974' -2" TOWER ROOF EL 998' -2" LEVEL 26 EL 986' -2"12' - 0"12' - 0"12' - 0"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"12' - 0"14' - 0"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"9' - 4"2' - 0"286' - 8"LEVEL 24 EL 962' -2" DW ROOF BRG EL 785' -6" ROOF FEATURE EL 1010' -2" EIFS-2 EIFS-1 EIFS-1 BRK-1 BRK-2 FC-1 ANODIZED ALUMINUM CURTAINWALL SYSTEM PROJECTED ROOF FEATURE WITH ACM PROFILE AND SOFFIT OVERBUILT FRAMING WITH EIFS FINISH ANODIZED ALUMINUM WINDOW WALL SYSTEM W/ INTEGRAL MULLION CAPS METAL PANEL COVER INTEGRAL WITH WINDOW SYSTEM AT SLAB EDGES PROVIDE EIFS OVER LIGHT-GAUGE FRAMING AT RAISED WINDOW UNITS, TYP. 60"+ GLASS GUARDRAIL SYSTEM AT AMENITY DECK OVERBUILT FIBER-CEMENT WRAPPED CORNICE PROFILE VEHICULAR CABLE CRASH BARRIER, TYP. SERVICE ACESS POINTS ON PRIVATE DRIVE VINYL WINDOW ASSEMBLY WITH DOUBLE- HUNG AND FIXED UNITS. TYP ASSEMBLY IS 8'W X 6'H ANODIZED STOREFRONT WINDOW SYSTEM W/ INTEGRAL MULLION CAPS PREFINISHED ALUMINUM COPING, TYP. AT PARAPET COPING CONDITIONS METAL SCREENING AT PARKING DECK MODULAR BRICK VENEER W/ ACCENT DETAILING AT OPENINGS AND HORIZONTAL BANDS PROVIDE SOLDIER COURSE AT WINDOW HEADS AND ROWLOCK SILLS, TYP. STEEL FRAMED CONNECTOR BRIDGE WITH INDEPENDENT COLUMN SUPPORTS FOR PEDESTRIAN ACCESS BETWEEN MIDRISE AND PARKING DECK PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 4:29:35 PM C:\Users\kwarren\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - Tower_kwarrenLJ2JT.rvt RADIUS DILWORTH OVERLOOK DESIGN DEVELOPMENT PROGRESS BUILDING ELEVATIONS 20SPN100 08.03.2021 JG/AW/KW CHARLOTTE, NC A4.03 Revisions No. Description Date SCALE: 1/16" = 1'-0"A4.03 1 I-277 ELEVATION 1. COLORS ARE DIAGRAMATIC AND DO NOT REFLECT FINAL MATERIAL SELECTIONS. ALL FINAL SELECTIONS TO BE APPROVED BY OWNER AND ARCHITECT. 2. ALLOWED OPENINGS ARE UNLIMITED ON ALL ELEVATIONS EXCEPT THE NORTH. PROXIMITY OF THE NORTH ELEVATION TO THE PEROPERTY LINE LIMITS THE OPENINGS AT ANY NON-PARKING LEVEL TO 45% (NCBC T705.8) 3. WINDOW TRIM TO MATCH COLOR OF SURROUNDING FINISH UNLESS NOTED OTHERWISE. 4. BRICK CONTROL JOINES ARE TO BE FREE OF MORTAR AND PROVIDED WITH BACKER ROD AND SEALANT. 5. AT ALL RECESSES IN THE BUILDING FACADE, EXTERIOR MATERIAL IS TO BE CONTINUED TO THE INSIDE CORNER UNLESS NOTED OTHERWISE. GENERAL NOTES MATERIAL KEY NOTES NOTE: COLORS ARE FOR DIAGRAMATIC PURPOSES ONLY BRK-1: STANDARD MASONRY VENEER, RUNNING BOND. COLOR: TBD BRK-2: LARGE-FORMAT MASONRY VENEER (ROCKCAST 12"x24", SMOOTH) COLOR: TBD BRK-3: LARGE-FORMAT MASONRY VENEER (ROCKCAST 12"x24", SMOOTH) COLOR: TBD, ACCENT EIFS-1: MIN. 2" EIFS VENEER SYSTEM(SMOOTH FINISH)WITH INTEGRAL REVEAL AND ACCENT BANDS (STOTHERM) COLOR: TBD EIFS-2: MIN. 2" EIFS VENEER SYSTEM(SMOOTH FINISH)WITH INTEGRAL REVEAL AND ACCENT BANDS (STOTHERM) COLOR: TBD FC-1: FIBER CEMENT PANEL RAINSCREEN SYSTEM WITH APPLIED TRIM COLOR: TBD MTL SCREEN: DECORATIVE METAL SCREENING SYSTEM WITH REQUIRED STRUCTURAL FRAMING AND SUPPORT. ALTERNATE TO INCLUDE FABRIC SYSTEM IN LIEU OF METAL SCREEN LEVEL 1-H EL 713' -6" LEVEL 1-H EL 713' -6" LEVEL 3 EL 733' -6" LEVEL 2 EL 722' -10" LEVEL 1-M EL 711' -6" LEVEL 1-M EL 711' -6" LEVEL 3.5 EL 738' -10" LEVEL 4 EL 744' -2" LEVEL 5 EL 754' -10" LEVEL 6 EL 765' -6" LEVEL 7 EL 776' -2" LEVEL 8 EL 786' -10" LEVEL 9 EL 797' -6" LEVEL 10 EL 808' -2" LEVEL 4.5 EL 749' -6" LEVEL 5.5 EL 760' -2" LEVEL 6.5 EL 770' -10" LEVEL 7.5 EL 781' -6" LEVEL 8.5 EL 792' -2" LEVEL 11 EL 818' -10" LEVEL 12 EL 832' -10" LEVEL 12 EL 832' -10" LEVEL 13 EL 844' -10" LEVEL 14 EL 855' -6" LEVEL 15 EL 866' -2" LEVEL 16 EL 876' -10" LEVEL 17 EL 887' -6" LEVEL 18 EL 898' -2" LEVEL 19 EL 908' -10" LEVEL 20 EL 919' -6" LEVEL 21 EL 930' -2" LEVEL 22 EL 940' -10" LEVEL 23 EL 951' -6" LEVEL 25 EL 974' -2" TOWER ROOF EL 998' -2" LEVEL 26 EL 986' -2"286' - 8"LEVEL 9.5 EL 802' -10" LEVEL 10.5 EL 813' -6" LEVEL 2.5 EL 727' -6" LEVEL 24 EL 962' -2"2' - 0" 14' - 0" 11' - 4" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 19' - 4" 12' - 0" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 12' - 0" 12' - 0" 12' - 0"2' - 0" 9' - 4" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 10' - 8" 14' - 0" LEVELS 1 THROUGH LEVEL 13 ON THIS ELEVATION REQUIRES LIMITED PERCENTAGE OF OPENING (45%) DUE TO PROXIMITY TO PROPERTY LINE DW ROOF BRG EL 785' -6" ROOF FEATURE EL 1010' -2" EIFS-2 EIFS-1EIFS-2 EIFS-1 EIFS-1 BRK-2 FC-1 ANODIZED ALUMINUM CURTAINWALL SYSTEM PROJECTED ROOF FEATURE WITH ACM PROFILE AND SOFFIT OVERBUILT FRAMING WITH EIFS FINISH ANODIZED ALUMINUM WINDOW WALL SYSTEM W/ INTEGRAL MULLION CAPS METAL PANEL COVER INTEGRAL WITH WINDOW SYSTEM AT SLAB EDGES PROVIDE EIFS OVER LIGHT-GAUGE FRAMING AT RAISED WINDOW UNITS, TYP. 60"+ GLASS GUARDRAIL SYSTEM AT AMENITY DECK VEHICULAR CABLE CRASH BARRIER, TYP. METAL SCREENING AT PARKING DECK OVERBUILT FIBER- CEMENT WRAPPED CORNICE PROFILE PROVIDE SOLDIER COURSE AT WINDOW HEADS AND ROWLOCK SILLS, TYP. GUARD-HEIGHT PREFINISHED ALUMINUM RAILING SYSTEM WITH HORIZONTAL BARS SITE WALLS TO BE MASONRY VENEER WITH CAST STONE CAP, TYP. STEEL FRAMED CONNECTOR BRIDGE WITH INDEPENDENT COLUMN SUPPORTS FOR PEDESTRIAN ACCESS BETWEEN MIDRISE AND PARKING DECK PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 4:29:55 PM C:\Users\kwarren\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - Tower_kwarrenLJ2JT.rvt RADIUS DILWORTH OVERLOOK DESIGN DEVELOPMENT PROGRESS BUILDING ELEVATIONS 20SPN100 08.03.2021 JG/AW/KW CHARLOTTE, NC A4.04 Revisions No. Description Date SCALE: 1/16" = 1'-0"A4.04 1 UPTOWN ELEVATION (NORTH) KEY NOTE/MATERIAL LEGEND NOTE: COLORS ARE FOR DIAGRAMATIC PURPOSES ONLY FCT-1:FIBER CEMENT TRIM BOARD COLOR: TBD ALG-1:POWDER COATED ALUMINUM GUARD RAIL COLOR: TBD AAU-1:ALUMINUM ARCHITECTURAL LOUVER UNIT COLOR: TBD FCT-2:FIBER CEMENT TRIM BOARD COLOR: TBD FCL-1:FIBER CEMENT LAP SIDING COLOR: TBD FCL-2:FIBER CEMENT LAP SIDING COLOR: TBD FCL-3:FIBER CEMENT LAP SIDING COLOR: TBD BRK-1:MASONRY VENEER, RUNNING BOND COLOR: TBD FCL-4:FIBER CEMENT LAP SIDING COLOR: TBD FCP-3:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD FCP-4:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD MCA-1:METAL CANOPY COLOR: TBD FCP-2:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD FCP-1:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD 1. BALCONY RAIL TO BE POWDER-COATED ALUMINUM. FINISHED COLOR TO BE APPROVED BY OWNER AND ARCHITECT. 2. WINDOW TRIM TO MATCH COLOR OF SURROUNDING FINISH. 3. AT MASONRY VENEER PROVIDE CONTROL JOINTS PER BIA STANDARDS AND VERTICAL CONTROL JOINTS AT CHANGES IN WALL HEIGHT, NEAR CORNERS ON RETURN WALL 2 FEET BACK FROM FACE OF MAIN VENEER, AT INSIDE CORNER OF SETBACKS, AT OFFSETS, AND ALIGNED WITH VERTICAL EDGES OF WINDOWS. PROVIDE HORIZONTAL CONTROL JOINTS AT LOOSE LINTELS, EXTEND IN 1/4" PAST EDGE OF LINTEL. 4. BRICK CONTROL JOINTS ARE TO BE FREE OF MORTAR AND PROVIDED WITH BACKER ROD AND SEALANT. 5. PROVIDE CORNER MASONRY UNIT AT ALL MASONRY VENEER CORNER RETURNS. 6. USE FIBER CEMENT PANEL WITH FIBER CEMENT TRIM, FIBER CEMENT LAP SIDING AND MASONRY VENEER AS BASIS OF DESIGN. 7. PAINTED FIBER CEMENT COLORS TO BE APPROVED BY ARCHITECT. 8. EXTERIOR MATERIALS, DETAILING, AND COLORS TO WRAP CORNER AT BALCONY, ALCOVE, AND PARAPET CONDITIONS AND TERMINATE AT INSIDE CORNER, UNLESS NOTED OTHERWISE. 9. G.C. TO PROVIDE CONTINUOUS PRE-FINISHED ALUM. COPING AT ALL PARAPET WALLS, INCLUDING SIDE FACE OF STEPPED PARAPET. 10. ALL WINDOW SILLS IN BRICK VENEER TO BE ROWLOCK SILL COURSE. 11. POOL COURTYARD: AT LEVEL MF-0 PATIOS IN POOL COURTYARD, PROVIDE 42" HIGH ALUMINUM GUARDRAIL. USE WINDOW LIMITERS FOR ALL OPERABLE WINDOWS ON LEVEL MF-B WHICH OPEN TO POOL AND ARE NOT BEHIND A 42" HIGH GUARDRAIL. GENERAL ELEVATION NOTES AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" B1 B13B7 5' - 6"9' - 10"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"90' - 0"FCL-2 FCP-3 BRK-1 FCP-3BRK-1 BRK-1 FCL-2 ALG-1 FCL-1 FCL-2 FCP-3 FCL-2 FCL-1AAU-1 FCP-2 FCL-4 BRK-1 FCL-2 T.O. PARAPET EL 789' -2"FCP-4 FCP-4 AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" 2 A5.01 1 A5.01 BBBL 90' - 0"5' - 6"9' - 10"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"FCL-2 FCP-3 BRK-1BRK-1 FCL-4 ALG-1 MCA-1 PEDESTRIAN BRIDGE WITH COVER TO PARKING GARAGE FCP-4 FCL-2 FCL-4 AAU-1 FCP-2 S3S4S4 FCL-1FCP-4 T.O. PARAPET EL 789' -2" S5 1 A5.20 (DRIVE) (DRIVE) PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 5:23:56 PM C:\Users\jmarshall\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - MF_JMarshall_BBM.rvt RADIUS DILWORTH ENCLAVE DESIGN DEVELOPEMENT PROGRESS SET BUILDING ELEVATIONS 20SPN110 08.03.2021 DC A4.01 CHARLOTTE, NC SOUTHWESTNORTH EASTNORTHWESTNORTH EASTPOOL DRIVE W E S NTYP CORNER W I-277KEY PLAN SCALE: 3/32" = 1'-0"A4.01 1 ELEVATION - SOUTH SCALE: 3/32" = 1'-0"A4.01 2 ELEVATION - WEST (FRONT) Revisions No. Description Date KEY NOTE/MATERIAL LEGEND NOTE: COLORS ARE FOR DIAGRAMATIC PURPOSES ONLY FCT-1:FIBER CEMENT TRIM BOARD COLOR: TBD ALG-1:POWDER COATED ALUMINUM GUARD RAIL COLOR: TBD AAU-1:ALUMINUM ARCHITECTURAL LOUVER UNIT COLOR: TBD FCT-2:FIBER CEMENT TRIM BOARD COLOR: TBD FCL-1:FIBER CEMENT LAP SIDING COLOR: TBD FCL-2:FIBER CEMENT LAP SIDING COLOR: TBD FCL-3:FIBER CEMENT LAP SIDING COLOR: TBD BRK-1:MASONRY VENEER, RUNNING BOND COLOR: TBD FCL-4:FIBER CEMENT LAP SIDING COLOR: TBD FCP-3:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD FCP-4:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD MCA-1:METAL CANOPY COLOR: TBD FCP-2:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD FCP-1:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD 1. BALCONY RAIL TO BE POWDER-COATED ALUMINUM. FINISHED COLOR TO BE APPROVED BY OWNER AND ARCHITECT. 2. WINDOW TRIM TO MATCH COLOR OF SURROUNDING FINISH. 3. AT MASONRY VENEER PROVIDE CONTROL JOINTS PER BIA STANDARDS AND VERTICAL CONTROL JOINTS AT CHANGES IN WALL HEIGHT, NEAR CORNERS ON RETURN WALL 2 FEET BACK FROM FACE OF MAIN VENEER, AT INSIDE CORNER OF SETBACKS, AT OFFSETS, AND ALIGNED WITH VERTICAL EDGES OF WINDOWS. PROVIDE HORIZONTAL CONTROL JOINTS AT LOOSE LINTELS, EXTEND IN 1/4" PAST EDGE OF LINTEL. 4. BRICK CONTROL JOINTS ARE TO BE FREE OF MORTAR AND PROVIDED WITH BACKER ROD AND SEALANT. 5. PROVIDE CORNER MASONRY UNIT AT ALL MASONRY VENEER CORNER RETURNS. 6. USE FIBER CEMENT PANEL WITH FIBER CEMENT TRIM, FIBER CEMENT LAP SIDING AND MASONRY VENEER AS BASIS OF DESIGN. 7. PAINTED FIBER CEMENT COLORS TO BE APPROVED BY ARCHITECT. 8. EXTERIOR MATERIALS, DETAILING, AND COLORS TO WRAP CORNER AT BALCONY, ALCOVE, AND PARAPET CONDITIONS AND TERMINATE AT INSIDE CORNER, UNLESS NOTED OTHERWISE. 9. G.C. TO PROVIDE CONTINUOUS PRE-FINISHED ALUM. COPING AT ALL PARAPET WALLS, INCLUDING SIDE FACE OF STEPPED PARAPET. 10. ALL WINDOW SILLS IN BRICK VENEER TO BE ROWLOCK SILL COURSE. 11. POOL COURTYARD: AT LEVEL MF-0 PATIOS IN POOL COURTYARD, PROVIDE 42" HIGH ALUMINUM GUARDRAIL. USE WINDOW LIMITERS FOR ALL OPERABLE WINDOWS ON LEVEL MF-B WHICH OPEN TO POOL AND ARE NOT BEHIND A 42" HIGH GUARDRAIL. GENERAL ELEVATION NOTES AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" 1 A5.01 BJ 90' - 0"5' - 6"9' - 10"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"FCL-4 FCP-3 FCL-2 FCL-1 BRK-1 ALG-1 FCL-2 FCP-4 T.O. PARAPET EL 789' -2" AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" B2 B1B3B5B6B4 90' - 0"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"9' - 10"5' - 6"BRK-1 FCL-4 FCL-1 FCP-4 FCL-1 FCL-2 FCP-3BRK-1 FCL-4 ALG-1 FCL-1 FCL-2 FCP-3 DRIVE RETAINING WALL T.O. PARAPET EL 789' -2" AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" 1 A5.01 BLBJBK DRIVE UP TO PRIVATE ST.90' - 0"5' - 6"9' - 10"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"FCL-1 FCL-2 FCL-4 FCP-3 BRK-1 ALG-1 FCL-1 FCL-2FCP-4 T.O. PARAPET EL 789' -2" AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8"84' - 6"9' - 10"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"FCL-2 FCP-1 ALG-1 FCP-4 FCL-4 FCP-3 BRK-1 FCL-1 PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 5:24:03 PM C:\Users\jmarshall\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - MF_JMarshall_BBM.rvt RADIUS DILWORTH ENCLAVE DESIGN DEVELOPEMENT PROGRESS SET BUILDING ELEVATIONS 20SPN110 08.03.2021 DC A4.02 CHARLOTTE, NC SOUTHWESTNORTH EASTNORTHWESTNORTH EASTPOOL DRIVE W E S NTYP CORNER W I -277KEY PLAN SCALE: 3/32" = 1'-0"A4.02 3 ELEVATION - DRIVE EAST SCALE: 3/32" = 1'-0"A4.02 1 ELEVATION - NORTH SCALE: 3/32" = 1'-0"A4.02 2 ELEVATION - DRIVE WEST SCALE: 3/32" = 1'-0"A4.02 4 ELEVATION - TYPICAL CORNER BALCONY Revisions No. Description Date KEY NOTE/MATERIAL LEGEND NOTE: COLORS ARE FOR DIAGRAMATIC PURPOSES ONLY FCT-1:FIBER CEMENT TRIM BOARD COLOR: TBD ALG-1:POWDER COATED ALUMINUM GUARD RAIL COLOR: TBD AAU-1:ALUMINUM ARCHITECTURAL LOUVER UNIT COLOR: TBD FCT-2:FIBER CEMENT TRIM BOARD COLOR: TBD FCL-1:FIBER CEMENT LAP SIDING COLOR: TBD FCL-2:FIBER CEMENT LAP SIDING COLOR: TBD FCL-3:FIBER CEMENT LAP SIDING COLOR: TBD BRK-1:MASONRY VENEER, RUNNING BOND COLOR: TBD FCL-4:FIBER CEMENT LAP SIDING COLOR: TBD FCP-3:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD FCP-4:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD MCA-1:METAL CANOPY COLOR: TBD FCP-2:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD FCP-1:FIBER CEMENT PANEL WITH F.C. TRIM COLOR: TBD 1. BALCONY RAIL TO BE POWDER-COATED ALUMINUM. FINISHED COLOR TO BE APPROVED BY OWNER AND ARCHITECT. 2. WINDOW TRIM TO MATCH COLOR OF SURROUNDING FINISH. 3. AT MASONRY VENEER PROVIDE CONTROL JOINTS PER BIA STANDARDS AND VERTICAL CONTROL JOINTS AT CHANGES IN WALL HEIGHT, NEAR CORNERS ON RETURN WALL 2 FEET BACK FROM FACE OF MAIN VENEER, AT INSIDE CORNER OF SETBACKS, AT OFFSETS, AND ALIGNED WITH VERTICAL EDGES OF WINDOWS. PROVIDE HORIZONTAL CONTROL JOINTS AT LOOSE LINTELS, EXTEND IN 1/4" PAST EDGE OF LINTEL. 4. BRICK CONTROL JOINTS ARE TO BE FREE OF MORTAR AND PROVIDED WITH BACKER ROD AND SEALANT. 5. PROVIDE CORNER MASONRY UNIT AT ALL MASONRY VENEER CORNER RETURNS. 6. USE FIBER CEMENT PANEL WITH FIBER CEMENT TRIM, FIBER CEMENT LAP SIDING AND MASONRY VENEER AS BASIS OF DESIGN. 7. PAINTED FIBER CEMENT COLORS TO BE APPROVED BY ARCHITECT. 8. EXTERIOR MATERIALS, DETAILING, AND COLORS TO WRAP CORNER AT BALCONY, ALCOVE, AND PARAPET CONDITIONS AND TERMINATE AT INSIDE CORNER, UNLESS NOTED OTHERWISE. 9. G.C. TO PROVIDE CONTINUOUS PRE-FINISHED ALUM. COPING AT ALL PARAPET WALLS, INCLUDING SIDE FACE OF STEPPED PARAPET. 10. ALL WINDOW SILLS IN BRICK VENEER TO BE ROWLOCK SILL COURSE. 11. POOL COURTYARD: AT LEVEL MF-0 PATIOS IN POOL COURTYARD, PROVIDE 42" HIGH ALUMINUM GUARDRAIL. USE WINDOW LIMITERS FOR ALL OPERABLE WINDOWS ON LEVEL MF-B WHICH OPEN TO POOL AND ARE NOT BEHIND A 42" HIGH GUARDRAIL. GENERAL ELEVATION NOTES AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" D26D27D28 D29D33 90' - 0"5' - 6"9' - 10"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"FCL-2 BRK-1 FCL-4 FCP-3 FCL-4 ALG-1 FCP-4 FCP-2 FCL-2 FCL-2 T.O. PARAPET EL 789' -2"FCP-4 AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" D24D25 90' - 0"5' - 6"9' - 10"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"FCL-2 BRK-1 FCP-3 ALG-1 BRK-1 ALG-1 FCL-2 FCL-2 FCP-4 FCL-1 FCL-4 T.O. PARAPET EL 789' -2"FCP-4 AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" B11B12B13 90' - 0"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"9' - 10"5' - 6"FCL-4 FCP-3 BRK-1 FCL-2 FCP-1 FCL-4 ALG-1 FCP-4T.O. PARAPET EL 789' -2" AVERAGE GRADE EL 701' -4" MAX BLDG HT -TYPE III-A EL 786' -7" LEVEL MF-3 (T.O.S.) EL 731' -2" LEVEL MF-4 (T.O.D.) EL 741' -10" LEVEL MF-5 (T.O.D.) EL 752' -6" LEVEL MF-6 (T.O.D.) EL 763' -2" LEVEL MF-7 (T.O.D.) EL 773' -10" LEVEL MF-2 (T.O.S.) EL 720' -6" LEVEL MF-1 (T.O.S.) EL 709' -10" LEVEL MF-B (T.O.S.) EL 699' -2" MF-ROOF BEARING EL 783' -8" D27D28D34 90' - 0"5' - 6"9' - 10"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"10' - 8"FCL-2 ALG-1 BRK-1 FCP-2 FCL-4 FCP-4 T.O. PARAPET EL 789' -2" FCP-4 PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 5:24:10 PM C:\Users\jmarshall\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - MF_JMarshall_BBM.rvt RADIUS DILWORTH ENCLAVE DESIGN DEVELOPEMENT PROGRESS SET BUILDING ELEVATIONS 20SPN110 08.03.2021 DC A4.03 CHARLOTTE, NC SOUTHWESTNORTH EASTNORTHWESTNORTH EASTPOOL DRIVE W E S NTYP CORNER W I-277KEY PLAN SCALE: 3/32" = 1'-0"A4.03 1 ELEVATION - NORTH WEST SCALE: 3/32" = 1'-0"A4.03 2 ELEVATION - NORTH EAST SCALE: 3/32" = 1'-0"A4.03 3 ELEVATION - SOUTH POOL SCALE: 3/32" = 1'-0"A4.03 4 ELEVATION - NORTH POOL Revisions No. Description Date 712711710705700705700695700703 695690 690695695691691695695690695695696710709710710715715710711713 713714 708TSSTTLD LD LD LD LDLD LDLDLDLDLDLDLDLD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LD LD LD LD LDLDLDLDLDLDLDLDLDLDLDLDLDLD LD LD LD LD 715713 714712 711710 709708707705 702 700 698699698697 6 91 694 698 699TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->RADIUSDILWORTHSPANDREL DEVELOPMENTPARTNERS615 E MOREHEAD STCHARLOTTE, NC 282021019447EROSION CONTROL PLANPHASE IIN/A######C2-028/3/2021 6:44 PM ALEX RHODE N:\_2019\1019447\CAD\DOCUMENTATION\1019447_PLN_ECP.DWGKEY MAPSEALSHEET NUMBERSHEET TITLELANDDESIGN PROJ.#SCALEPROJECTNORTHNO.DESCRIPTIONDATEREVISION / ISSUANCEORIGINAL SHEET SIZE: 30" X 42"VERT:HORZ:CHECKED BY:DRAWN BY:DESIGNED BY:223 NORTH GRAHAM STREETCHARLOTTE, NC 28202704.333.0325WWW.LANDDESIGN.COMSITEE MOREHEAD STEU C L I D A VE ROY AL CT MY R T L E A VE ORI O LE S T S MC DO WE L L STLEXINGTON AVESCHEMATIC DESIGN02-23-20211PRICING SETNOT FORCONSTRUCTION08-03-2021SEAL033804SEALC-0653 ---- 1" = 30'6030015PROP. LIMITS OFDISTURBANCE (TYP.)PROP. SILT FENCE (TYP.)PROP. CONSTRUCTION ENTRANCEWITH TIRE WASH (TYP.)PROP. INLETPROTECTION (TYP.)EROSION CONTROL NOTES:1.CONTRACTOR TO PROVIDE AS MUCH SPACE AS POSSIBLE BETWEEN TOE OF FILLSLOPE AND SILT FENCE.2.PLEASE CONTACT JAMES MOORE WITH NCDEQ @ 704-235-2138 TO ADVISE ONSTART DATE AND SCHEDULE PRE-CONSTRUCTION MEETING.3.ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROMTHE ZONING ADMINISTRATOR.4.ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION SHOWN ON THIS PLAN ISSUBJECT TO A FINE.5.GRADING 1 ACRE OR MORE WITHOUT AN APPROVED EROSION CONTROL PLAN IS AVIOLATION AND SUBJECT TO A FINE.6.ALL SLOPES MUST BE SEEDED AND MULCHED WITHIN 7 CALENDAR DAYS.7.ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIREDBY THE EROSION CONTROL COORDINATOR.8.SLOPES SHALL BE GRADED NO STEEPER THAN 3:1. FILL SLOPES GREATER THAN 10'REQUIRE ADEQUATE TERRACING. SLOPES GREATER THAN 3:1 SHALL RECEIVEMATTING.9.ALL ELEVATIONS ARE IN REFERENCE TO THE SURVEYORS BENCHMARK WHICHMUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING.10.ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE N.C.EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL.11.PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION SHOULDBE CONSTRUCTED AT 3:1 (HORIZONTAL TO VERTICAL) OR FLATTER. PERMANENTSLOPES OF 3:1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND ASINDICATED. IF FILL MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTEMATERIAL IS HAULED FROM THE PROPERTY THEN THE CONTRACTOR SHALLDISCLOSE THE LOCATION OF ANY ON-SITE AND/OR OFF-SITE BORROW LOCATIONAND/OR WASTE BURIAL LOCATION TO THE EROSION CONTROL INSPECTOR.BORROW AND WASTE SITES MUST HAVE APPROVE EROSION CONTROL PLAN.12.LIMITS OF CLEARING SHOWN ARE BASED ON CUT AND FILL SLOPES OR OTHERGRADING REQUIREMENTS.13.CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES AS INDICATEDPRIOR TO GRADING OPERATIONS. NO DEVICE MAY BE REMOVED WITHOUTAPPROVAL OF EROSION CONTROL COORDINATOR.14.CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY WITH EXISTINGCONTOURS.15.ALL DISTANCES ARE HORIZONTAL GROUND.16.ANCHOR SILT FENCE WITH STONE ON TREE PROTECTION ZONES. DO NOT BURY.17.INLET PROTECTION IS REQUIRED FOR ALL INLETS LOCATED IN THE WORKING AREA18.INLET PROTECTION IS REQUIRED FOR ALL PHASES OF THE PROJECT AND UNTILTHE DISTURBED AREA IS FULLY STABILIZED.19.SEDIMENT TRAP AND BASIN SLOPES SHALL BE STABILIZED AND SEEDEDIMMEDIATELY AFTER CONSTRUCTION.20.CONTRACTOR TO REPLACE ALL STAGING AND STOCKPILE AREAS TO PRECONSTRUCTION CONDITIONS. PROVIDE PHOTO DOCUMENTATION OFPRE-CONSTRUCTION CONDITION AT THESE AREASEXISTING ASPHALT TO BE REMOVEDLIMITS OF DISTURBANCELEGENDLDTEMPORARY SILT FENCE (CLDS 30.06A)EXISTING CURB/WALL TO BE REMOVEDTREE PROTECTION (CLDS 40.02)PROPERTY LINEPROP. TREEPROTECTION (TYP.)PROP. TREEPROTECTION (TYP.)PROP. INLETPROTECTION (TYP.)PROP. INLETPROTECTION (TYP.)E. MOREHEAD ST EUCLID AVECONSTRUCTION SEQUENCE1.OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE CITY OFCHARLOTTE ENGINEERING DEPARTMENT.2.FLAG THE CONSTRUCTION LIMITS AND MARK ANY TREES, WETLANDS, OREXISTING STRUCTURES NOTED TO REMAIN.3.SET UP AN ON-SITE PRE-CONSTRUCTION CONFERENCE WITH EROSION CONTROLINSPECTOR OF THE CITY ENGINEERING DEPARTMENT TO DISCUSS EROSIONCONTROL MEASURES. FAILURE TO SCHEDULE SUCH CONFERENCE 48 HOURSPRIOR TO ANY LAND-DISTURBING ACTIVITY IS A VIOLATION OF THE CITY CODEAND IS SUBJECT TO FINE.4.INSTALL TEMPORARY CONSTRUCTION ENTRANCE.5.INSTALL ALL TEMPORARY SILT FENCE, TREE PROTECTION, AND ANY OTHERTEMPORARY MEASURES AS DEEMED NECESSARY BY THE EROSION CONTROLINSPECTOR.6.INSTALL SKIMMER SEDIMENT BASIN, CHECK DAMS AND DIVERSION DITCHES.7.CALL FOR ON-SITE INSPECTION BY EROSION CONTROL INSPECTOR. WHENAPPROVED, INSPECTOR WILL ISSUE THE GRADING PERMIT AND CLEARING,GRUBBING AND DEMOLITION MAY BEGIN.8.GENERAL CONTRACTOR SHALL ENSURE THAT EROSION CONTROL MEASURES AREIN PLACE AND FUNCTIONING PRIOR TO GRUBBING AND GRADING OPERATIONS.9.BEGIN CLEARING, GRUBBING AND DEMOLITION OPERATIONS. CLEARING ANDGRUBBING SHALL BE DONE ONLY IN AREAS WHERE EARTHWORK WILL BEPERFORMED AND ONLY IN AREAS WHERE CONSTRUCTION IS PLANNED TOCOMMENCE WITHIN 14 DAYS AFTER CLEARING AND GRUBBING.10.BEGIN MASS GRADING, INSTALLING ADDITIONAL EROSION CONTROL MEASURESAS INDICATED, AS REQUIRED, AND AS DEEMED NECESSARY BY THE EROSIONCONTROL INSPECTOR.11.STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDINGIS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS ANDESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTIONSEQUENCE.12.NO DEVICE SHALL BE REMOVED UNTIL SITE IS STABILIZED AND WITH APPROVALFROM EROSION CONTROL INSPECTOR.13.ALL EROSION CONTROL DEVICES SHOULD BE MONITORED ONCE A WEEK ANDAFTER EVERY STORM EVENT OF 6" OR GREATER BY A CERTIFIED INSPECTOR. IFANY FAILURES ARE FOUND THEY SHOULD BE REPAIRED AS SOON AS POSSIBLE.14.ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCEWITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGNMANUAL, U.S. DEPT. OF AGRICULTURE, CITY OF CHARLOTTE, EROSION CONTROLORDINANCE, AND THE CHARLOTTE MECKLENBURG LAND DEVELOPMENTSTANDARDS.15.APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENTPROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING,PERMISSION MUST BE OBTAINED FROM THE AFFECTED PROPERTY OWNERS.16.UPON STABILIZATION OF ALL UPSTREAM AREA, SKIMMER SEDIMENT BASIN TO BEMUCKED OUT AND FILLED. (PHASE 3)PROP. CONSTRUCTION ENTRANCEWITH TIRE WASH (TYP.)BASEMENT PAD: 698.00711 EAST MOREHEAD STPARCEL #: 12517402NCDOT R/W CDOT R/WPROPERTY LINE (TYP.)EX. STORM AND BMP TO REMAIN IN PLACE UNTIL PROP.STORM AND BMP ARE INSTALLED.DRAINAGE FROM 521 EAST MOREHEAD AND EXISTINGPARKING DECK TO BE BYPASSED TO FES.PROP. LIMITS OFDISTURBANCE ALONG PROPERTY LINE.NOTE: NO ENCROACHMENTS ALLOWED INNCDOT CONTROLLED ACCESS UNTILFINAL APPROVAL FROM THE STATEPROP. LIMITS OFDISTURBANCE ALONG PROPERTYLINE.NOTE: LOWER LEVEL ACCESS TOPARKING DECK WILL BE CLOSEDDURING CONSTRUCTIONTOTAL DENUDED AREA:3.30 ACRES ON-SITE +2.38 ACRES OFF-SITE IMPERVIOUS= 5.38 ACRESPERMANENT STORM PIPE ANDSTRUCTURES TO BE INSTALLED INPHASE 1. BYPASS 521 E MOREHEADDRAINAGE TO OUTLET .REFER TO SHEET C3.00 FOR FULLSTORMWATER LAYOUTPROP. TEMPORARY DIVERSIONDITCH BEFORE FULL STORMSYSTEM BUILDOUT.PROP. TEMPORARYDIVERSION DITCH (TYP.)Exhibit 4 – Grading MapRed Carpet Inn Brownfields SiteAKA Morehead OverlookNCBP #23070-19-060615 East Morehead StreetCharlotte, North Carolina Exhibit 4 –Grading / Cut and Fill Heat Map Red Carpet Inn Brownfields Site AKA Morehead Overlook NCBP #23070-19-060 615 East Morehead Street Charlotte,North Carolina EXHIBIT NO. File Path: Date: PM: Drawn By: Checked By: Approved By: 1 in = 100 ft Project No. Scale: 5 WOF WOF MNM MNM 2701 Westport Road Charlotte, North Carolina 28208Phone: (704) 509-1777 Fax: (704) 509-1888 Soil Sample Location Map w/ Grading Overlay Red Carpet Inn Brownfields Site(AKA Morehead Overlook)NCBP #23070-19-060615 East Morehead StreetCharlotte, Mecklenburg County, North Carolina8/23/2021 71197661 0 200100Feet Legend Site BoundaryTax ParcelsSoil SampleGroundwater / Soil Sample East M orehead Street Euclid AvenueRoyal Court B-11/MW-10 B-6/MW-6 B-8/MW-7 B-7 P-2/TW-1 P-5 P-1 P-3 P-8 P-4 P-7 P-6 P-9 B-5/MW-3 B-8/MW-1 B-9/MW-2 B-10/MW-4 GP-9GP-8 GP-7 BG-1 BG-2 S-1 S-2/TW-2 S-3/TW-3 S-4/TW-4 @A @A @A @A @A @A @A @A @A @A #* #* #* #* #* @A @A@A @A #* #* #* #* #* @A @A @A @A EXHIBIT NO. File Path: Date: PM: Drawn By: Checked By: Approved By: 1 in = 100 ft Project No. Scale: 6 WOF WOF MNM MNM 2701 Westport Road Charlotte, North Carolina 28208Phone: (704) 509-1777 Fax: (704) 509-1888 Red Carpet Inn Brownfields Site(AKA Morehead Overlook)NCBP #23070-19-060615 East Morehead Street4/30/2021 Charlotte, Mecklenburg County, North Carolina 71197661 ³ 0 200100Feet Legend Site Boundary @A Historical Vapor Intrusion GWSL Exceedance @A Historical Groundwater Sample #*2020 Soil Vapor Sample #*2021 Soil Vapor Sample East M orehead Street Euclid AvenueRoyal Court B-11/MW-10 B-6/MW-6 B-8/MW-7 MW-11 P-2/TW-1 P-10/TW-2 B-5/MW-3 B-8/MW-1 B-9/MW-2 B-10/MW-4 HHTW-4 HHTW-5 S-2/TW-2 S-3/TW-3 S-4/TW-4 SV-03 SV-04 SV-05 SV-02 SV-01 Garage R etail ResidentialResidentialResidential 2021-SV-01 2021-SV-02 2021-SV-03 2021-SV-04 2021-SV-05 B C B C B EXISTING 5 LEVEL OFFICE BUILDING EUCLID AVEEAST MOREHEAD STREETEXISTING DUKE ENERGY SUBSTATIONNEW PRIVATE DRIVE150' LONG FIRE ACCESS EXISTING 1 LEVEL PARKING STRUCTURE 26' SETBACK ALONG MOREHEAD PROPERTY LINE 16' SETBACK ALONG EUCLID GROUND LEVELS MF BASEMENT MAIN LOBBY RETAIL RETAIL TRASH MOVE-IN GENERATOR TRASH RISER FCC TELE/DATA POE ELECTRICAL RESIDENTIAL RESIDENTIAL PLAZA / FORECOURT SERVICE R AMENITY RESIDENTIAL PARKING ENTRANCE / EXIT AT PRIVATE DRIVE SPEED RAMP UP TO TYPICAL PARKING LEVELS ENCLAVE UTILITY YARD MAIL T T T T OVERLOOK UTILITY YARD PROJECT # / 1435 WEST MOREHEAD STREET SUITE 160 CHARLOTTE, NC 28208 704.334.1716 BEACHAM BUNCE + MANLEY ARCHITECTURE PLLC COPYRIGHT 2021 BB+M ARCHITECTURE PLLC. WWW.BBM-ARCH.COM LOCATION / DATE / DRAWN / PRELIMINARY: NOT FOR REGULATORY APPROVAL, PERMITTING, OR CONSTRUCTION 8/3/2021 6:01:35 PM C:\Users\jgraham\Documents\Revit Local Files\SPANDREL_CENTRAL_R20 - Tower_jgraham@bbm-arch.com.rvt RADIUS DILWORTH OVERLOOK DESIGN DEVELOPMENT PROGRESS ARCHITECTURAL SITE PLAN 20SPN100 08.03.2021 JG/KW CHARLOTTE, NC A0.01SCALE: 3/64" = 1'-0"A0.01 1 OVERALL SITE PLAN Revisions No. Description Date Activity IDActivity NameRemDurStartFinishCommentsProject: MHOL-19-1 Morehead Overlook - 19.1 - Comfortable Case Schedule 7-30-21 - DraftProject: MHOL-19-1 Morehead Overlook - 19.1 - Comfortable Case Schedule 7-30-21 - Draft84717-May-2119-Sep-24WBS: MHOL-19-1.0 SUMMARY & MILESTONEWBS: MHOL-19-1.0 SUMMARY & MILESTONE79204-Aug-2119-Sep-24LOE.1000Summary - Design & Permitting13804-Aug-2121-Feb-22MS.2040Mobilize/ Start Construction022-Feb-22MS.9350Owner Turnover L14 - L17 - Building A&D028-Aug-24MS.9360Owner Turnover L18 - L21 & L13 - Building A&D005-Sep-24MS.9370Owner Turnover L22 - L25 - Building A&D018-Sep-24MS.9300Project Substantial Completion019-Sep-24MS.9380Owner Turnover L26 - L30 - Building A&D019-Sep-24WBS: MHOL-19-1.0.1 SUMMARY & MILESTONE A&DWBS: MHOL-19-1.0.1 SUMMARY & MILESTONE A&D65422-Feb-2219-Sep-24WBS: MHOL-19-1.0.2 SUMMARY & MILESTONE BWBS: MHOL-19-1.0.2 SUMMARY & MILESTONE B42312-Sep-2213-May-24WBS: MHOL-19-1.0.3 SUMMARY & MILESTONE CWBS: MHOL-19-1.0.3 SUMMARY & MILESTONE C46122-Feb-2218-Dec-23WBS: MHOL-19-1.11 ENGINEERING & PERMITSWBS: MHOL-19-1.11 ENGINEERING & PERMITS23817-May-2125-Apr-22A1000TIA Submission7817-May-21*03-Sep-21ENG.4080DD Documents Progress Set less Specs4501-Jun-2103-Aug-21MS.9540Design Assist Constraints for Concrete Finalized003-Aug-21ENG.3000100% DD Documents and Specs1804-Aug-2127-Aug-21MS.9560Remaining Design Assist On-Board027-Aug-21Need Specs to really lock down the DA guys.MS.9550Design Assist Concrete On-Board027-Aug-21ENG.4070100% DD Pricing Update Deliverable Submitted2030-Aug-2127-Sep-21ENG.405050% CD Development2030-Aug-2127-Sep-21A1030Land Development Submitted to City6607-Sep-2110-Dec-21A1020Land Development Submitted to NCDOT11507-Sep-2121-Feb-225.5 Months for NCDOT ReviewA1110Enclave Sanitary Sewer DOT Permit2007-Sep-2104-Oct-21ENG.406090% CD Development2028-Sep-2125-Oct-21GMP.1000Develop GMP3826-Oct-2121-Dec-21A1040F&F Building A & D Permit Cycle 12013-Dec-2111-Jan-22A1060F&F Building C Permit Cycle 12013-Dec-2111-Jan-22A1100Duke Energy Underground Duct Bank on Private Drive3013-Dec-2125-Jan-22GMP.2000Approve GMP522-Dec-2129-Dec-21A1050F&F Building A & D Permit Cycle 22025-Jan-2221-Feb-22A1090F&F Building C Permit Cycle 22025-Jan-2221-Feb-22MS.3000Notice to Proceed Construction021-Feb-22A1070Building Permit A & D4522-Feb-2225-Apr-22A1080Building Permit C4522-Feb-2225-Apr-22WBS: MHOL-19-1.16 SHOP DRAWINGSWBS: MHOL-19-1.16 SHOP DRAWINGS5526-Oct-2117-Jan-22MAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASO2021202220232024Summary - Design & PermittingMobilize/ Start ConstructionOwOOPOTIA SubmissionDD Documents Progress Set less SpecsDesign Assist Constraints for Concrete Finalized100% DD Documents and SpecsRemaining Design Assist On-BoardDesign Assist Concrete On-Board100% DD Pricing Update Deliverable Submitted50% CD DevelopmentLand Development Submitted to CityLand Development Submitted to NCDOTEnclave Sanitary Sewer DOT Permit90% CD DevelopmentDevelop GMPF&F Building A & D Permit Cycle 1F&F Building C Permit Cycle 1Duke Energy Underground Duct Bank on Private DriveApprove GMPF&F Building A & D Permit Cycle 2F&F Building C Permit Cycle 2Notice to Proceed ConstructionBuilding Permit A & DBuilding Permit CMHOL-19-1Finish Date: 19-Sep-24Data Date: 15-Apr-21Run Date: 17-Aug-21 13:52Page 1 of 3Remaining Level of EffortActual Level of EffortProject Baseline BarActual WorkRemaining WorkCritical Remaining WorkPrimary BaselineSecondary BaselineSummary MilestonesCritical MilestonesMorehead Overlook - 19.1 - Comfortable Case Schedule 7-30-21 - Draft Activity IDActivity NameRemDurStartFinishCommentsWBS: MHOL-19-1.17 FAB & DELIVERWBS: MHOL-19-1.17 FAB & DELIVER2024-Nov-2123-Dec-21WBS: MHOL-19-1.18 SITE CONSTRUCTIONWBS: MHOL-19-1.18 SITE CONSTRUCTION44122-Feb-2216-Nov-23SITE.C.1140Excavate Vault - Building C1029-Mar-2211-Apr-22SITE.C.1150Set Precast Retention Vaults - Building C1012-Apr-2225-Apr-22SITE.C.1160Back Fill Vaults - Building C1026-Apr-2209-May-22WBS: MHOL-19-1.18.1 SITE ACTIVITIESWBS: MHOL-19-1.18.1 SITE ACTIVITIES44122-Feb-2216-Nov-23SITE.C.1000Mobilize on Site - Building C522-Feb-22*28-Feb-22SITE.C.1010Implement Pedestrian Route and Signage - Building C1001-Mar-2214-Mar-22SITE.C.1020Site Fencing and Lane Closure Barriers - Building C1015-Mar-2228-Mar-22SITE.C.1030Construction Office Set-up - Building C1029-Mar-2211-Apr-22SITE.C.1040Site Temp Power - Building C1029-Mar-2211-Apr-22SITE.C.1050Site Utility Cut Offs - Building C2029-Mar-2225-Apr-22SITE.C.1060Site Demo and Off-haul - Building C1029-Mar-2211-Apr-22SITE.C.1070Install Telecom into Building - Building C2012-Apr-2209-May-22SITE.C.1080Install Water Services - Building C2012-Apr-2209-May-22SITE.C.1090Install Storm Piping - Building C2012-Apr-2209-May-22SITE.C.1100Develop Staging and Access Areas - Building C1012-Apr-2225-Apr-22SITE.C.1110Pool/Patio Terrace Construction - Building C7507-Jul-2220-Oct-22SITE.C.1120Hardscape and Planting - Building C3528-Sep-2316-Nov-23SITE.C.1130Curb Gutter and Site Paving - Building C3028-Sep-2308-Nov-23WBS: MHOL-19-1.18.2 SITE WORKWBS: MHOL-19-1.18.2 SITE WORK7022-Feb-2231-May-22SITE.A.1020Mobilize - Building A&D1022-Feb-2207-Mar-22SITE.A.1040Install Tree Protection - Building A&D222-Feb-2223-Feb-22SITE.A.1050Close Euclid Ave - Building A&D522-Feb-2228-Feb-22SITE.A.1060Install Fencing - Building A&D522-Feb-2228-Feb-22SITE.A.1070Install Erosion Control - Building A&D522-Feb-2228-Feb-22SITE.A.1080Install Temporary Construction Entrance - Building A&D522-Feb-2228-Feb-22SITE.A.1090Install Temporary Drain Swales - Building A&D501-Mar-2207-Mar-22SITE.A.1100Mass Excavation - Building A&D1008-Mar-2221-Mar-22SITE.A.1120Set Precast Retention Vaults - Building A&D1022-Mar-2204-Apr-22SITE.A.1140Backfill Vaults - Building A&D1005-Apr-2218-Apr-22SITE.A.1160Install Temporary Roadways - Building A&D1019-Apr-2202-May-22SITE.A.1170Install Site Storm System - Building A&D1019-Apr-2202-May-22SITE.A.1180Install Sewer System - Building A&D1003-May-2216-May-22SITE.A.1190Install Site Water & Gas - Building A&D1017-May-2231-May-22WBS: MHOL-19-1.18.6 A&D - UNDERGROUND & SOGWBS: MHOL-19-1.18.6 A&D - UNDERGROUND & SOG7022-Mar-2228-Jun-22MAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASO2021202220232024Excavate Vault - Building CSet Precast Retention Vaults - Building CBack Fill Vaults - Building CMobilize on Site - Building CImplement Pedestrian Route and Signage - Building CSite Fencing and Lane Closure Barriers - Building CConstruction Office Set-up - Building CSite Temp Power - Building CSite Utility Cut Offs - Building CSite Demo and Off-haul - Building CInstall Telecom into Building - Building CInstall Water Services - Building CInstall Storm Piping - Building CDevelop Staging and Access Areas - Building CPool/Patio Terrace Construction - Building CHardscape and PlanCurb Gutter and Site Mobilize - Building A&DInstall Tree Protection - Building A&DClose Euclid Ave - Building A&DInstall Fencing - Building A&DInstall Erosion Control - Building A&DInstall Temporary Construction Entrance - Building A&DInstall Temporary Drain Swales - Building A&DMass Excavation - Building A&DSet Precast Retention Vaults - Building A&DBackfill Vaults - Building A&DInstall Temporary Roadways - Building A&DInstall Site Storm System - Building A&DInstall Sewer System - Building A&DInstall Site Water & Gas - Building A&DMHOL-19-1Finish Date: 19-Sep-24Data Date: 15-Apr-21Run Date: 17-Aug-21 13:52Page 2 of 3Remaining Level of EffortActual Level of EffortProject Baseline BarActual WorkRemaining WorkCritical Remaining WorkPrimary BaselineSecondary BaselineSummary MilestonesCritical MilestonesMorehead Overlook - 19.1 - Comfortable Case Schedule 7-30-21 - Draft Activity IDActivity NameRemDurStartFinishCommentsUG.A.1000Deep Foundations3522-Mar-2209-May-22UG.A.1010Elevator Pits & Utilities1010-May-2223-May-22UG.A.1020Water Proof & Backfill524-May-2231-May-22UG.A.1040Grade Beams & Caps - Level 011001-Jun-2214-Jun-22TS.01.1000SOG - Level 011015-Jun-2228-Jun-22WBS: MHOL-19-1.A&D A&D - BUILDING A&DWBS: MHOL-19-1.A&D A&D - BUILDING A&D58401-Jun-2219-Sep-24WBS: MHOL-19-1.B B - BUILDINGWBS: MHOL-19-1.B B - BUILDING41912-Sep-2207-May-24WBS: MHOL-19-1.21 C - BUILDINGWBS: MHOL-19-1.21 C - BUILDING41626-Apr-2218-Dec-23MAMJJASONDJFMAMJJASONDJFMAMJJASONDJFMAMJJASO2021202220232024Deep FoundationsElevator Pits & UtilitiesWater Proof & BackfillGrade Beams & Caps - Level 01SOG - Level 01MHOL-19-1Finish Date: 19-Sep-24Data Date: 15-Apr-21Run Date: 17-Aug-21 13:52Page 3 of 3Remaining Level of EffortActual Level of EffortProject Baseline BarActual WorkRemaining WorkCritical Remaining WorkPrimary BaselineSecondary BaselineSummary MilestonesCritical MilestonesMorehead Overlook - 19.1 - Comfortable Case Schedule 7-30-21 - Draft Sample ID: B-6 (MW-6) B-7 B-8 (MW-7) B-11 (MW-10) P-2 P-4 Sample Interval (ft bgs): 19-21 24-26 9-11 14-16 4-8 12-16 12-16 8-12 12-16 12-16 Sample Date: 2/26/1996 2/26/1996 2/26/1996 2/26/1996 9/28/2000 9/28/2000 9/28/2000 9/28/2000 9/28/2000 9/28/2000 Gasoline Range Organics ND ND ND ND NS NS NS NS NS NS NE NE NE MADEP VPH C5-C8 Aliphatics NS NS NS NS ND ND 120 ND ND ND NE NE NE C9-C12 Aliphatics NS NS NS NS ND 31 1,300 39 95 240 NE NE NE C9-C22 Aromatics NS NS NS NS ND ND 250 ND ND 53 NE NE NE Residential PSRGs Non-Residential PSRGs Total Petroleum Hydrocarbons (TPH) PoG PSRG Volatile Organic Compounds by EPA Method 8260 P-1 P-3 Benzene NS NS NS NS ND ND ND ND ND ND 0.01 1.2 5.4 Toluene NS NS NS NS ND 0.4 ND ND 0.049 ND 8.3 990 9,700 Ethylbenzene NS NS NS NS ND 0.64 ND ND 0.056 0.048 13 6.1 27 Xylenes NS NS NS NS ND 3.2 ND ND 0.31 0.251 9.8 120 500 Isopropylbenzene NS NS NS NS ND 0.19 ND ND ND 0.036 2.3 410.0 2,100 n-Propylbenzene NS NS NS NS ND 0.73 ND ND 0.048 0.16 2.6 780.0 5,100 1,2,4-Trimethylbenzene NS NS NS NS 0.031 4.5 9.1 0.028 0.38 1.1 12 63 370 1,3,5-Trimethylbenzene NS NS NS NS ND 1.3 2.6 0.0063 0.096 0.33 11 56 320 n-Butylbenzene NS NS NS NS ND 0.44 0.77 ND ND 0.13 4.5 780 12,000 sec-Butylbenzene NS NS NS NS ND 0.15 ND ND ND 0.045 4.1 1,600 23,000 tert-Butylbenzene NS NS NS NS ND ND 0.61 ND ND ND 3.1 1,600 23,000 p-Isopropyltoluene NS NS NS NS ND 0.081 0.15 ND ND ND NE NE NE Naphthalene NS NS NS NS ND 1.0 2.1 0.0066 0.14 0.38 0.39 2.1 8.8 Methylene Chloride NS NS NS NS 0.0091 ND ND ND ND ND 0.025 58 650 Acetone NS NS NS NS ND ND ND ND ND ND 25 12000 250,000 Notes: Results are shown in milligrams per kilogram (mg/kg). ft bgs - Feet Below Ground Surface ppm - parts per million Only compounds detected within one or more sample are shown except for TPH- Gasoline Range Organics NA - Not Analyzed ND - Not Detected above laboratory method detection limit NE - Not Established Detections are indicated in bold. J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. PSRG - NCDEQ Inactive Hazardous Sites Branch Preliminary Soil Remediation Goals (July 2020) Shaded cells indicate the detected concentrations exceed the regulatory threshold of the corresponding color. Table 1 Summary of Historical Soil Analytical Results (Pre-2020) Red Carpet Inn Brownfields Site Brownfields Site No. 23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No.71197661 Sample ID: P-6 P-7 P-9 Sample Interval (ft bgs): 8-12 12-16 8-12 8-12 12-16 13.5-15 16-17.5 16-17.5 18.5-20 Sample Date: 9/28/2000 9/28/2000 9/28/2000 9/28/2000 9/28/2000 6/29/2005 6/29/2005 6/29/2005 6/29/2005 Gasoline Range Organics NS NS NS NS NS NS NS NS NS NE NE NE MADEP VPH C5-C8 Aliphatics ND 21 ND ND ND 0.78 J 0.56 J ND 1.0 J NE NE NE C9-C12 Aliphatics ND 99 ND ND 59 ND ND ND ND NE NE NE C9-C22 Aromatics ND 21 ND ND 12 1.5 3.2 ND 2.6 NE NE NE Benzene ND 0.0063 ND ND ND 0.0053 0.003 J ND ND 0.01 1.2 5.4 Toluene ND 0.0064 ND ND 0.27 0.017 0.0093 0.00074 J 0.0025 J 8.3 990 9,700 Ethylbenzene ND 0.014 ND ND 0.62 0.011 0.018 0.00071 0.0014 13 6.1 27 Xylenes 0.032 0.09 ND ND 2.92 0.041 0.051 0.003 J 0.007 J 9.8 120 500 Isopropylbenzene ND 0.0078 ND ND 0.22 NS NS NS NS 2.3 410.0 2,100 n-Propylbenzene ND 0.031 ND ND 0.79 NS NS NS NS 2.6 780.0 5,100 1,2,4-Trimethylbenzene ND 0.25 ND ND 2.6 NS NS NS NS 12 63 370 1,3,5-Trimethylbenzene 0.033 0.077 ND ND 1.3 NS NS NS NS 11 56 320 n-Butylbenzene ND 0.043 ND ND 0.47 NS NS NS NS 4.5 780 12,000 sec-Butylbenzene ND 0.011 ND ND 0.18 NS NS NS NS 4.1 1,600 23,000 tert-Butylbenzene ND ND ND ND ND NS NS NS NS 3.1 1,600 23,000 p-Isopropyltoluene ND 0.0073 ND ND 0.094 NS NS NS NS NE NE NE Naphthalene ND 0.12 ND ND 1.1 0.0038 J 0.0068 ND 0.0014 J 0.39 2.1 8.8 Methylene Chloride ND ND ND ND ND NS NS NS NS 0.025 58 650 Acetone ND ND ND ND ND ND ND ND ND 25 12000 250,000 Notes: Results are shown in milligrams per kilogram (mg/kg). ft bgs - Feet Below Ground Surface ppm - parts per million Only compounds detected within one or more sample are shown except for TPH- Gasoline Range Organics NA - Not Analyzed ND - Not Detected above laboratory method detection limit NE - Not Established Detections are indicated in bold. J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. PSRG - NCDEQ Inactive Hazardous Sites Branch Preliminary Soil Remediation Goals (July 2020) Shaded cells indicate the detected concentrations exceed the regulatory threshold of the corresponding color. Total Petroleum Hydrocarbons (TPH) Volatile Organic Compounds by EPA Method 8260 P-5 B-8 (MW-1)B-9 (MW-2) PoG PSRG Residential PSRGs Non-Residential PSRGs Table 1 Summary of Historical Soil Analytical Results (Pre-2020) Red Carpet Inn Brownfields Site Brownfields Site No. 23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No.71197661 Sample ID: GP-7 Sample Interval (ft bgs): 13.5-15 16-17.5 16-17.5 18.5-20 16-18 10-12 14-16 8-10 11-13 Sample Date: 6/29/2005 6/29/2005 6/29/2005 6/29/2005 1/21/2014 1/21/2014 1/21/2014 1/21/2014 1/21/2014 Gasoline Range Organics NS NS NS NS NS NS NS NS NS NE NE NE MADEP VPH C5-C8 Aliphatics ND ND 0.79 J 0.69 J ND ND ND ND 32 NE NE NE C9-C12 Aliphatics ND ND ND ND ND ND ND ND ND NE NE NE C9-C22 Aromatics 0.31 ND 0.69 J 0.69 J ND ND 17 ND 62 NE NE NE Benzene ND ND ND ND ND ND ND ND ND 0.01 1.2 5.4 Toluene 0.0012 J 0.00054 J 0.00075 J 0.0024 J ND ND ND ND ND 8.3 990 9,700 Ethylbenzene 0.00078 J 0.0005 J 0.00075J 0.0012 J ND ND 0.019 ND 16 13 6.1 27 Xylenes 0.0049 J 0.0031 J 0.004 J 0.0068 J ND ND 0.10 ND 37 9.8 120 500 Isopropylbenzene NS NS NS NS ND ND 0.020 ND 6.5 2.3 410 2,100 n-Propylbenzene NS NS NS NS ND ND ND ND 29 2.6 780 5,100 1,2,4-Trimethylbenzene NS NS NS NS ND ND 0.22 ND 110 12 63 370 1,3,5-Trimethylbenzene NS NS NS NS ND ND 0.057 ND 35 11 56 320 n-Butylbenzene NS NS NS NS ND ND 0.096 ND 19 4.5 780 12,000 sec-Butylbenzene NS NS NS NS ND ND 0.022 ND 5.0 4.1 1,600 23,000 tert-Butylbenzene NS NS NS NS ND ND ND ND ND 3.1 1,600 23,000 p-Isopropyltoluene NS NS NS NS ND ND 0.013 ND 2.5 NE NE NE Naphthalene ND ND ND ND ND ND ND ND 18 0.39 2.1 8.8 Methylene Chloride NS NS NS NS 0.0061 0.0079 ND ND ND 0.025 58 650 Acetone ND ND ND ND ND 0.019 ND ND ND 25 12000 250,000 Notes: Results are shown in milligrams per kilogram (mg/kg). ft bgs - Feet Below Ground Surface ppm - parts per million Only compounds detected within one or more sample are shown except for TPH- Gasoline Range Organics NA - Not Analyzed ND - Not Detected above laboratory method detection limit NE - Not Established Detections are indicated in bold. J - Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. PSRG - NCDEQ Inactive Hazardous Sites Branch Preliminary Soil Remediation Goals (July 2020) Shaded cells indicate the detected concentrations exceed the regulatory threshold of the corresponding color. Non-Residential PSRGs Total Petroleum Hydrocarbons (TPH) Volatile Organic Compounds by EPA Method 8260 B-10 (MW-4)B-5 (MW-3)GP-8 GP-9 PoG PSRG Residential PSRGs Table 1 Summary of Historical Soil Analytical Results (Pre-2020) Red Carpet Inn Brownfields Site Brownfields Site No. 23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No.71197661 Sample ID: Sample Date:3/1/1996 5/19/2000 1/2/2004 10/12/2005 1/26/2012 4/5/2012 1/17/2014 7/21/2014 3/1/1996 5/19/2000 3/22/1996 5/19/2000 6/30/2005 C5-C8 Aliphatics NA NA 8,700 20,000 NA 10,100 11,000 6,000 NA NA NA NA ND 400 NE NE NE C9-C18 Aliphatics NA NA 1,100 7,800 NA 2,550 NA 1,300 NA NA NA NA ND 700 NE NE NE C9-C22 Aromatics NA NA 5,500 8,100 NA 5,340 4,600 4,300 NA NA NA NA ND 200 NE NE NE Benzene 1,800 600 280 170 38.6 NA 25 80 ND ND ND ND ND 1 5,000 16 69 Toluene 8,700 1,800 2,000 2,300 197 NA 240 1,300 ND ND ND ND ND 600 260,000 3,800 16,000 Ethylbenzene 2,400 1,100 1,100 1,600 402 NA 370 1,500 ND ND ND ND ND 600 84,500 35 150 Xylene 7,200 2,000 2,900 3,800 856 NA 1,090 5,700 ND ND ND ND 0.59 J 500 85,500 77 320 MTBE 120 ND ND ND ND NA ND ND 2.8 ND ND ND 140 20 20,000 4,500 2,000 IPE ND 340 ND NA ND NA ND ND ND ND ND ND NA 70 70,000 1,400 5,900 EDB 0.022 ND ND NA ND NA ND ND ND ND ND ND NA 0.02 50 1.8 7.7 Chloroform NA NA NA NA ND NA ND ND ND ND ND ND NA 70 70,000 8.1 36 Trichloroethene ND ND NA NA ND NA ND ND ND ND ND ND NA 3 3,000 1.0 4.4 Naphthalene 270 NA NA NA 210 NA 98 310 ND NA NA NA 1.3 J 6 6,000 35 150 Isopropylbenzene NA NA NA NA 53.3 NA 45 73 NA NA NA NA NA 70 25,000 180 750 p-Isopropyltoluene NA NA NA NA ND NA 8.4 8.0 NA NA NA NA NA 25 11,700 NE NE 2-Butanone NA NA NA NA ND NA ND ND NA NA NA NA NA 4,000 4,000,000 450,000 1,900,000 n-Butylbenzene NA NA NA NA ND NA 43 20 NA NA NA NA NA 70 6,900 NE NE sec-Butylbenzene NA NA NA NA ND NA 14 12 NA NA NA NA NA 70 8,500 NE NE tert-Butylbenzene NA NA NA NA ND NA NA NA NA NA NA NA NA 70 15,000 NE NE n-Propylbenzene NA NA NA NA 86.7 NA 98 160 NA NA NA NA NA 70 30,000 490 2,000 1,2,4-Trimethylbenzene NA NA NA NA 337 NA 620 1,700 NA NA NA NA NA 400 28,500 50 210 1,3,5-Trimethylbenzene NA NA NA NA 96.9 NA 200 460 NA NA NA NA NA 400 25,000 35 150 Bis(2-ethylhexyl)phthalate ND NA NA NA NA NA NA NA 4.3 NA NA NA NA 3 170 NE NE Phenol ND NA NA NA NA NA NA NA 1.6 NA NA NA NA 30 30,000 NE NE Lead 0.0093 J ND NA NA NA ND 4.5 ND 0.0089 J ND ND ND NA 15 15,000 NE NE Notes: Data obtained from the following prior reports prepared by others: LAW Engineering Comprehensive Site Assessment (1996); LAW Report of Groundwater Monitoring (2000); ECS Assessment of Petroleum Impacted Soils (2000); S&ME Soil and Groundwater Assessment Report (2004); Schnabel Environmental Assessment (2004); Hart & Hickman Pre-CAP Monitoring Plan (2014); and Hart & Hickmman Groundwater Monitoring Report (2014). NA - Not Analyzed ND - Not Detected above laboratory method detection limits NE - Not Established All results are shown in micrograms per liter (µg/L). Only compounds detected in one or more sample are shown. Detections are indicated in bold. J - Estimated concentration between method detection limit and reporting limit. Concentrations highlighted in yellow exceed their respective NCDEQ 2L groundwater standards (or Interim Maximum Contaminant Levels if a 2L standard has not been established). Concentrations highlighted in orange exceed their respective Gross Contaminant Levels. Concentrations shaded in green exceed their respective NCDEQ Residential Groundwater Screening Levels for Vapor Intrusion (February 2018). Concentrations shaded in blue exceed their respective NCDEQ Non-Residential Groundwater Screening Levels for Vapor Intrusion (February 2018). In cases where a concentration exceeds multiple standards, the shading for the exceedance of a vapor standard is given preference. Gross Contaminant Level VI-GWSL Residential VI-GWSL Non- Residential NCDEQ 2L Groundwater Standard Analyte Semi-Volatile Organic Compounds by EPA Method 8270 MADEP VPH Lead by EPA Method 6010 Volatile Organic Compounds by EPA Method 8260, 601/602, and/or 504-1 MW-7 MW-10MW-6 Table 2 Summary of Historical Groundwater Analytical Results (Pre-2020) Red Carpet Inn Brownfields Site Brownfields Site No. 23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No. 71197661 Table 2 Summary of Historical Groundwater Analytical Results (Pre-2020) Red Carpet Inn Brownfields Site Brownfields Site No. 23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No. 71197661 Sample ID:MW-11 TW-1 (P-2)*TW-2 (P-10)MW-2 MW-3 MW-4 HTTW-4 HTTW-5 Sample Date:10/5/2000 10/5/2000 10/5/2000 6/30/2005 6/30/2005 6/30/2005 1/22/2014 1/22/2014 MADEP VPH C5-C8 Aliphatics ND 3,700 6,200 ND ND ND 620 66 400 NE NE NE C9-C18 Aliphatics ND 26,000 42,000 ND ND ND 71 100 700 NE NE NE C9-C22 Aromatics ND 2,400 3,900 ND ND ND 720 75 200 NE NE NE Volatile Organic Compounds by EPA Method 8260, 601/602, and/or 504-1 Benzene ND ND 16,000 190 1.2 NA 6.6 ND 1 5,000 16 69 Toluene ND ND 77,000 1,300 NA 0.26 J 0.82 ND 600 260,000 3,800 16,000 Ethylbenzene ND ND 25,000 1,800 NA NA 4.3 ND 600 84,500 35 150 Xylene ND ND 121,000 7,400 NA 0.41 J 2 ND 500 85,500 77 320 MTBE ND ND ND ND ND 4.5 J ND 1.9 20 20,000 4,500 2,000 IPE ND ND ND NA NA NA 8.5 ND 70 70,000 1,400 5,900 EDB NA NA NA NA NA NA ND 0.033 0.02 50 1.8 7.7 Chloroform ND 5.3 ND NA NA NA 0.29 1.7 70 70,000 8.1 36 Trichloroethene ND ND ND NA NA NA ND 1.1 3 3,000 1.0 4.4 Naphthalene NA NA NA 730 2.9 ND 2.7 ND 6 6,000 35 150 Isopropylbenzene NA NA NA NA NA NA ND ND 70 25,000 180 750 p-Isopropyltoluene NA NA NA NA NA NA ND ND 25 11,700 NE NE 2-Butanone NA NA NA NA NA NA 6.1 ND 4,000 4,000,000 450,000 1,900,000 n-Butylbenzene NA NA NA NA NA NA 2.9 ND 70 6,900 NE NE sec-Butylbenzene NA NA NA NA NA NA 3.5 ND 70 8,500 NE NE tert-Butylbenzene NA NA NA NA NA NA 0.3 ND 70 15,000 NE NE n-Propylbenzene NA NA NA NA NA NA 1.8 ND 70 30,000 490 2,000 1,2,4-Trimethylbenzene NA NA NA NA NA NA 1.5 ND 400 28,500 50 210 1,3,5-Trimethylbenzene NA NA NA NA NA NA 0.44 ND 400 25,000 35 150 Semi-Volatile Organic Compounds by EPA Method 8270 Bis(2-ethylhexyl)phthalate NA NA NA NA NA NA NA NA 3 170 NE NE Phenol NA NA NA NA NA NA NA NA 30 30,000 NE NE Lead by EPA Method 6010 Lead NA NA NA NA NA NA 5.5 34 15 15,000 NE NE Notes: Data obtained from the following prior reports prepared by others: LAW Engineering Comprehensive Site Assessment (1996); LAW Report of Groundwater Monitoring (2000); ECS Assessment of Petroleum Impacted Soils (2000); S&ME Soil and Groundwater Assessment Report (2004); Schnabel Environmental Assessment (2004); Hart & Hickman Pre-CAP Monitoring Plan (2014); and Hart & Hickmman Groundwater Monitoring Report (2014). NA - Not Analyzed ND - Not Detected above laboratory method detection limits NE - Not Established All results are shown in micrograms per liter (µg/L). Only compounds detected in one or more sample are shown. Detections are indicated in bold. J - Estimated concentration between method detection limit and reporting limit. Concentrations highlighted in yellow exceed their respective NCDEQ 2L groundwater standards (or Interim Maximum Contaminant Levels if a 2L standard has not been established). Concentrations highlighted in orange exceed their respective Gross Contaminant Levels. Concentrations shaded in green exceed their respective NCDEQ Residential Groundwater Screening Levels for Vapor Intrusion (February 2018). Concentrations shaded in blue exceed their respective NCDEQ Non-Residential Groundwater Screening Levels for Vapor Intrusion (February 2018). In cases where a concentration exceeds multiple standards, the shading for the exceedance of a vapor standard is given preference. Analyte NCDEQ 2L Groundwater Standard Gross Contaminant Level VI-GWSL Residential VI-GWSL Non- Residential Sample ID:S-1 S-2 S-3 S-4 BG-1 BG-2 Sample Date:02/21/20 02/21/20 02/21/20 02/21/20 02/21/20 02/21/20 Sample Interval (ft bgs):10-15 10-14 5-10 0-5 25 12,000 140,000 0.0108J 0.0128J 0.019J <0.0069 NA NA 4.5 780 12,000 0.0124 <0.0022 <0.0023 <0.0021 NA NA 4.1 1,600 23,000 0.0026J <0.0017 <0.0017 <0.0016 NA NA 2.3 410 2,100 0.0013J <0.0011 <0.0012 <0.0011 NA NA 1.24 NS NS 0.0059 <0.0019 <0.002 <0.0018 NA NA 0.39 4.1 18 0.027 <0.0033 <00034 <0.0031 NA NA 2.6 780 5,100 0.0058 <0.0013 <0.0014 <0.0012 NA NA 12 63 370 0.052 <0.0015 <0.0016 <0.0014 NA NA 11 56 320 0.0131 <0.0013 <0.0014 <0.0012 NA NA 9.9 120 530 0.0021J <0.0027 <0.0028 <0.0026 NA NA 5.8 0.68 3 0.67J 1.4 2.2 0.72 2.6 1.3 580 3,100 47,000 194 18.2 30 65.7 113 31 360,000 23,000 350,000 22.3 7.6 104 42 19.8 5.9 270 400 800 2.1 2 6.3 2.3 7.2 7.1 1 2.3 9.7 <0.0027 0.008 0.043 0.011 0.015 0.043 Notes: All results are shown in milligrams per kilogram (mg/kg). ft bgs - Feet Below Ground Surface NS - No Standard ND - Not detected NA- Not analyzed J - estimated concentration above the method detection limit but below the laboratory reporting limit Total chromium is assumed to consist exclusively of trivalent chromium since hexavalent chromium was not detected in the soils. PSRG - NCDEQ Inactive Hazardous Sites Branch Preliminary Soil Remediation Goals, updated December, 2019. Concentrations highlighted in yellow exceed their respective residential PSRG. Concentrations highlighted in orange exceed their respective non-residential PSRG. No semi-volatile organic compounds were detected. Semi-Volatile Organic Compounds by EPA Method 8270 Naphthalene n-Propylbenzene 1,2,4-Trimethylbenzene 1,3,5-Trimethylbenzene Total Xylenes Volatile Organic Compounds by EPA Method 8260 Analyte Acetone Mercury RCRA Metals by EPA Method 6010, 7196, and 7471 Arsenic Barium Chromium Lead Residential PSRGs Non- Residential PSRGs Protection of Groundwater PSRGs n-Butylbenzene sec-Butylbenzene Isopropylbenzene (Cumene) p-Isopropyltoluene Table 3 Summary of Historical Soil Analytical Results (2020) Red Carpet Inn Brownfields Site Brownfields Site No. 23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No.71197661 Sample ID:TW-2 TW-3 TW-4 Sample Date:02/21/20 2/21/2020 2/21/2020 Screen Interval (ft bgs):9-24 16-31 25-40 Benzene 1 45.1 <0.15 <0.15 Diisopropyl ether 70 <1.1 <0.22 0.22J Ethylbenzene 600 636 <0.26 <0.26 p-Isopropyltoluene 25 17.5 <0.21 <0.21 Methyl tert-butyl ether 20 <1.4 0.31J 0.31J Naphthalene 6 186 0.65J <0.35 Toluene 600 421 <0.24 <0.24 Total Xylenes 500 810 1.7 <0.63 Benzo(a)anthracene 0.05 <1.5 <1.5 3.7J Benzo(a)pyrene 0.005 <1.8 <1.8 4.1J Benzo(b)fluoranthene 0.05 <1.7 <1.7 3.8J Benzo(g,h,i)perylene 200 <1.6 <1.6 4.7J Benzo(k)fluoranthene 0.5 <1.5 <1.5 4.2J Butylbenzylphthalate 1000 <1.9 <1.9 3.8J Chrysene 5 <1.4 <1.4 4.2J Dibenz(a,h)anthracene 0.005 <1.6 <1.6 4.5J Di-n-butylphthalate 700 <1.6 <1.6 2.9J Di-n-octylphthalate 100 <2.2 <2.2 4.6J bis(2-Ethylhexyl)phthalate 3 <2.0 <2.0 4.6J Fluoranthene 300 <1.6 <1.6 2.7J Hexachlorobenzene 0.02 <1.3 <1.3 1.4J Indeno(1,2,3-cd)pyrene 0.05 <1.7 <1.7 4.5J 1-Methylnaphthalene 1 16.5 <1.4 <1.4 2-Methylnaphthalene 30 24 <1.4 <1.4 Naphthalene 6 63 <1.6 <1.6 Phenanthrene 200 <1.4 <1.4 1.6J Pyrene 200 <1.5 <1.5 2.8J Barium 700 92.9 133 66.7 Lead 15 <1.6 1.8J <1.6 Notes: Concentrations are reported in micrograms per liter (µg/L). Only detected compounds are shown. J - estimated concentration above the method detection limit but below the laboratory reporting limit NCAC 2L GWQS - North Carolina Administrative Code Subchapter 2L Groundwater Quality Standards (April 1, 2013). Concentrations highlighted in yellow exceed their respective NCAC 2L GWQS RCRA Metals by EPA Method 6010 Mercury not detected in any of the samples. Analyte NCAC 2L GWQS Volatile Organic Compounds by EPA Method 8260 Mercury by EPA Method 7470 Semi-Volatile Organic Compounds by EPA Method 8270 Table 4 Summary of Historical Groundwater Analytical Results (2020) Red Carpet Inn Brownfields Site Brownfields Site No. 23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No. 71197661 Sample ID:SV-01 SV-02 DUP-01 (SV-02)SV-03 SV-04 SV-05 Sample Depth:4.5-5 3-3.5 3-4 4.75-5.25 4.5-5 4.5-5 Helium NS <0.1 %NS NS NS NS NE NE 12.6 6.56 6.2 6.68 60.6 7.51 220,000 2,700,000 Benzene <0.639 <0.639 <0.639 <0.639 3.51 <0.639 120 1,600 Carbon Disulfide 11.2 <0.622 <0.622 13.4 220 16.8 4,900 61,000 Chloroform <0.973 1.24 0.988 1.02 8.37 1.14 8.1 530 Chloromethane 0.551 <0.413 0.477 <0.413 6.92 1.13 630 7,900 Cyclohexane <0.689 <0.689 <0.689 <0.689 1.17 <0.689 42,000 530,000 1,3-Dichlorobenzene 3.23 5.31 3.14 6.13 <1.20 6.43 NE NE Ethanol 82.8 45.6 49.4 25.8 21.7 39 NE NE Ethylbenzene <0.867 <0.867 <0.867 1.19 8.71 <0.867 370 4,900 4-Ethyltoluene <0.982 <0.982 <0.982 1.65 9.91 <0.982 NE NE Trichlorofluoromethane (Freon 11)<1.12 1.12 1.16 1.54 1.78 8.04 NE NE Dichlorodifluoromethane (Freon 12)1.61 1.67 1.77 1.69 2.03 4.64 700 8,800 Heptane <0.818 <0.818 <0.818 <0.818 3.19 <0.818 2,800 35,000 Hexane <0.705 <0.705 <0.705 <0.705 2.98 <0.705 4,900 61,000 Methyl Ethyl Ketone (2-Butanone)<3.69 <3.69 <3.69 <3.69 8.14 <3.69 35,000 440,000 Methyl tert-Butyl Ether (MTBE)<0.721 <0.721 <0.721 <0.721 3.96 <0.721 3,600 47,000 Methylene Chloride 1.26 <0.694 0.802 <0.694 <0.694 <0.694 4,200 1,800,000 2-Propanol 5.73 4.52 <3.07 18.2 4.62 4.01 1,400 18,000 Tetrachloroethylene <1.36 <1.36 3.93 <1.36 <1.36 <1.36 280 3,500 Tetrahydrofuran 2.59 4.19 2.95 3.89 50.1 2.06 14,000 180,000 Toluene 2.99 <0.753 1.14 4.11 32.8 1.23 35,000 440,000 1,2,4-Trimethylbenzene 2.02 <0.982 <0.982 2.54 13.3 <0.982 420 5,300 1,3,5-Trimethylbenzene <0.982 <0.982 <0.982 <0.982 3.57 <0.982 420 5,300 2,2,4-Trimethylpentane <0.934 <0.934 <0.934 <0.934 1 <0.934 NE NE m&p-xylene 2.25 <1.73 <1.73 4.81 33.9 <1.73 700 8,800 o-Xylene 1.28 <0.867 <0.867 1.94 12.1 <0.867 700 8,800 Notes: Vapor samples were collected on Apri 14, 2020. Concentrations are reported in micrograms per cubic meter (μg/m3) unless otherwise noted. Only compounds detected in one or more samples are shown. Concentrations detected above the laboratory reporting limit are shown in bold. NS - Not Sampled/Analyzed NE - Not Established DWM - North Carolina Department of Environmental Quality, Division of Waste Management SGSL - DWM Sub-slab and Exterior Soil Gas Screening Level, updated February 2018. Concentrations highlighted in yellow exceed their respective Residential SGSL. Residential SGSL Non-Residential SGSL EPA Method 3C EPA Method TO-15 Acetone Table 5 Summary of Historical Soil Gas Analytical Results (2020) Red Carpet Inn Brownfields Site Brownfields Site No. 23070-19-060 615 East Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No. 71197661 Table 6 Summary of Historical Soil Vapor Analytical Results (2021) Red Carpet Inn Brownfields Site NCBP ID: 23070-19-060 615 E. Morehead Street Charlotte, Mecklenburg County, North Carolina Terracon Project No. 71197661 Sample ID: 2021-SV-01 2021-SV-02 (2021-SV-02)2021-SV-03 2021-SV-04 2021-SV-05 Sample Depth:7.5-8 7.5-8 7.5-8 5.25-5.75 7.5-8 7.5-8 Acetone 15 34 33 42 37 55 220,000 2,700,000 Benzene 0.58 5.5 5.6 4 4.2 11 12 160 2-Butanone (MEK)<0.98 6.4 J 6.3 J 7.3 J 5 J 9.5 J 35,000 440,000 Chloroform 0.28 J <0.12 <0.12 <0.12 <0.12 3.5 4.1 53 Ethanol 4.9 J 30 18 15 27 9.1 NE NE Ethylbenzene 0.74 3.5 3.4 2.2 3.1 5 37 490 Heptane <0.18 46 41 2.6 19 37 2,800 35,000 Hexane <0.64 <0.64 <0.64 9.4 J 9.4 J 25 4,900 61,000 Isopropanol <2.3 6.4 J 7.2 J 7.9 J <2.3 6.1 J 1,400 18,000 Propene <0.58 30 <0.58 110 62 170 21,000 260,000 Styrene <0.12 0.36 J <0.12 1.1 0.6 1.9 7,000 88,000 Tetrachloroethylene 0.75 0.85 1.3 1.4 0.81 0.72 280 3,500 Toluene 190 140 110 220 70 84 35,000 440,000 Trichloroethylene <0.20 <0.20 <0.20 <0.20 1.3 <0.20 14 180 Trichlorofluoromethane (Freon 11)3.3 2.8 2.8 6.4 2.3 1.7 J NE NE 1,2,4-Trimethylbenzene <0.11 2.5 <0.11 <0.11 <0.11 2.4 420 5,300 1,3,5-Trimethylbenzene <0.13 0.65 <0.13 <0.13 0.51 0.64 420 5,300 m&p-Xylene 2.8 11 11 5.2 9.4 13 700 8,800 o-Xylene 0.84 4.4 4.2 2 3.7 5.5 700 8,800 Notes: Vapor samples were collected on March 26, 2021. Concentrations are reported in micrograms per cubic meter (μg/m3) unless otherwise noted. Only compounds detected in one or more samples are shown. Concentrations detected above the laboratory reporting limit are shown in bold. J - Estimated concentration between laboratory method detection and reporting limits. NE - Not Established DWM - North Carolina Department of Environmental Quality, Division of Waste Management SGSL - DWM Sub-slab and Exterior Soil Gas Screening Level, updated January 2021. Concentrations highlighted in yellow exceed their respective Residential SGSL. Residential SGSL Non- Residential SGSL EPA Method TO-15 Version Date: Basis: Site Name: Site Address: DEQ Section: Site ID: Exposure Unit ID: Submittal Date: Reviewed By: North Carolina Department of Environmental Quality Risk Calculator Red Carpet Inn Brownfields Site 615 East Morehead Street, Charlotte NC NCBP 23070-19-060 December 2019 November 2019 EPA RSL Table Prepared By:Terracon Consultants Inc North Carolina DEQ Risk Calculator Complete Exposure Pathways Version Date: December 2019 Basis: November 2019 EPA RSL Table Site ID: 23070-19-060 Exposure Unit ID: Note: Risk output will only be calculated for complete exposure pathways. Receptor Pathway Check box if pathway complete Soil Groundwater Use Soil Groundwater Use Construction Worker Soil Soil Surface Water Groundwater to Indoor Air Soil Gas to Indoor Air Indoor Air Groundwater to Indoor Air Soil Gas to Indoor Air Indoor Air Source Soil Source Groundwater Source Soil Source Groundwater Resident Non-Residential Worker CONTAMINANT MIGRATION PATHWAYS Groundwater Surface Water Input Form 1A VAPOR INTRUSION PATHWAYS DIRECT CONTACT SOIL AND WATER PATHWAYS Resident Non-Residential Worker Recreator/Trespasser North Carolina DEQ Risk Calculator Exposure Point Concentrations Version Date: December 2019 Basis: November 2019 EPA RSL Table Site ID: 23070-19-060 Exposure Unit ID: Exposure Point Concentration (mg/kg) Notes:CAS Number Chemical Minimum Concentration (Qualifier) Maximum Concentration (Qualifier) Units Location of Maximum Concentration Detection Frequency 0.019 67-64-1 Acetone mg/kg 2.6 7440-38-2 Arsenic, Inorganic mg/kg 194 7440-39-3 Barium mg/kg 0.0124 104-51-8 Butylbenzene, n-mg/kg 0.0026 135-98-8 Butylbenzene, sec-mg/kg 104 16065-83-1 Chromium(III), Insoluble Salts mg/kg 0.0013 98-82-8 Cumene mg/kg 7.2 7439-92-1 ~Lead and Compounds mg/kg 0.043 7439-97-6 ~Mercury (elemental)mg/kg 0.027 91-20-3 ~Naphthalene mg/kg 0.0058 103-65-1 Propyl benzene mg/kg 0.052 95-63-6 Trimethylbenzene, 1,2,4-mg/kg 0.0131 108-67-8 Trimethylbenzene, 1,3,5-mg/kg 0.0021 1330-20-7 Xylenes mg/kg Soil Exposure Point Concentration Table Description of Exposure Point Concentration Selection: North Carolina DEQ Risk Calculator Range of Detection Limits Concentration Used for Screening Background Value Screening Toxicity Value (Screening Level) (n/c) Potential ARAR/TBC Value Potential ARAR/TBC Source COPC Flag (Y/N) Rationale for Selection or Deletion Input Form 2A North Carolina DEQ Risk Calculator Exposure Point Concentrations Version Date: December 2019 Basis: November 2019 EPA RSL Table Site ID: 23070-19-060 Exposure Unit ID: Description of Exposure Point Concentration Selection: Exposure Point Concentration (ug/L)Notes:CAS Number Chemical Minimum Concentration (Qualifier) Maximum Concentration (Qualifier) Units Location of Maximum Concentration Detection Frequency 133 7440-39-3 Barium ug/L 45.1 71-43-2 Benzene ug/L 0.22 108-20-3 Diisopropyl Ether ug/L 636 100-41-4 Ethylbenzene ug/L 1.4 118-74-1 Hexachlorobenzene ug/L 1.8 7439-92-1 ~Lead and Compounds ug/L 0.31 1634-04-4 Methyl tert-Butyl Ether (MTBE)ug/L 4.6 117-81-7 ~Bis(2-ethylhexyl)phthalate ug/L 3.8 85-68-7 ~Butyl Benzyl Phthalate ug/L 2.9 84-74-2 ~Dibutyl Phthalate ug/L 4.6 117-84-0 ~Octyl Phthalate, di-N-ug/L 3.7 56-55-3 ~Benz[a]anthracene ug/L 4.1 50-32-8 ~Benzo[a]pyrene ug/L 3.8 205-99-2 ~Benzo[b]fluoranthene ug/L 4.2 207-08-9 ~Benzo[k]fluoranthene ug/L 4.2 218-01-9 ~Chrysene ug/L 4.5 53-70-3 ~Dibenz[a,h]anthracene ug/L 2.7 206-44-0 ~Fluoranthene ug/L 4.5 193-39-5 ~Indeno[1,2,3-cd]pyrene ug/L 16.5 90-12-0 ~Methylnaphthalene, 1-ug/L 24 91-57-6 ~Methylnaphthalene, 2-ug/L 186 91-20-3 ~Naphthalene ug/L 2.8 129-00-0 ~Pyrene ug/L 421 108-88-3 Toluene ug/L 810 1330-20-7 Xylenes ug/L Groundwater Exposure Point Concentration Table North Carolina DEQ Risk Calculator Range of Detection Limits Concentration Used for Screening Background Value Screening Toxicity Value (Screening Level) (n/c) Potential ARAR/TBC Value Potential ARAR/TBC Source COPC Flag (Y/N) Rationale for Selection or Deletion Input Form 2B North Carolina DEQ Risk Calculator Exposure Point Concentrations Version Date: December 2019 Basis: November 2019 EPA RSL Table Site ID: 23070-19-060 Exposure Unit ID: Description of Exposure Point Concentration Selection: Note: Chemicals highlighted in orange are non-volatile chemicals. Since these chemicals do not pose a vapor intrusion risk, no risk values are calculated for these chemicals. Exposure Point Concentration (ug/m3) Notes:CAS Number Chemical Minimum Concentration (Qualifier) Maximum Concentration (Qualifier) Units Location of Maximum Concentration Detection Frequency 60.6 67-64-1 Acetone ug/m3 3.51 71-43-2 Benzene ug/m3 220 75-15-0 Carbon Disulfide ug/m3 8.37 67-66-3 Chloroform ug/m3 6.92 74-87-3 Chloromethane ug/m3 1.17 110-82-7 Cyclohexane ug/m3 4.64 75-71-8 Dichlorodifluoromethane ug/m3 8.71 100-41-4 Ethylbenzene ug/m3 50.1 109-99-9 ~Tetrahydrofuran ug/m3 3.19 142-82-5 Heptane, N-ug/m3 2.98 110-54-3 Hexane, N-ug/m3 18.2 67-63-0 Isopropanol ug/m3 8.14 78-93-3 Methyl Ethyl Ketone (2-Butanone)ug/m3 3.96 1634-04-4 Methyl tert-Butyl Ether (MTBE)ug/m3 1.26 75-09-2 Methylene Chloride ug/m3 3.93 127-18-4 Tetrachloroethylene ug/m3 32.8 108-88-3 Toluene ug/m3 8.04 75-69-4 Trichlorofluoromethane ug/m3 13.3 95-63-6 Trimethylbenzene, 1,2,4-ug/m3 3.57 108-67-8 Trimethylbenzene, 1,3,5-ug/m3 1 25167-70-8 Trimethylpentene, 2,4,4-ug/m3 33.9 106-42-3 Xylene, P-ug/m3 33.9 108-38-3 Xylene, m-ug/m3 12.1 95-47-6 Xylene, o-ug/m3 Soil Gas Exposure Point Concentration Table North Carolina DEQ Risk Calculator Range of Detection Limits Concentration Used for Screening Background Value Screening Toxicity Value (Screening Level) (n/c) Potential ARAR/TBC Value Potential ARAR/TBC Source COPC Flag (Y/N) Rationale for Selection or Deletion Input Form 2D North Carolina DEQ Risk Calculator DEQ Risk Calculator - Vapor Intrusion - Resident Soil Gas to Indoor Air Version Date: December 2019 Basis: November 2019 EPA RSL Table Site ID: 23070-19-060 Exposure Unit ID: CAS #Chemical Name: Soil Gas Concentration (ug/m3) Calculated Indoor Air Concentration (ug/m3) Target Indoor Air Conc. for Carcinogens @ TCR = 1E-06 Target Indoor Air Conc. for Non- Carcinogens @ THQ = 0.2 Calculated Carcinogenic Risk Calculated Non- Carcinogenic Hazard Quotient 67-64-1 Acetone 60.6 1.818 -6.5E+03 5.6E-05 71-43-2 Benzene 3.51 0.1053 3.6E-01 6.3E+00 2.9E-07 3.4E-03 75-15-0 Carbon Disulfide 220 6.6 -1.5E+02 9.0E-03 67-66-3 Chloroform 8.37 0.2511 1.2E-01 2.0E+01 2.1E-06 2.5E-03 74-87-3 Chloromethane 6.92 0.2076 -1.9E+01 2.2E-03 110-82-7 Cyclohexane 1.17 0.0351 -1.3E+03 5.6E-06 75-71-8 Dichlorodifluoromethane 4.64 0.1392 -2.1E+01 1.3E-03 100-41-4 Ethylbenzene 8.71 0.2613 1.1E+00 2.1E+02 2.3E-07 2.5E-04 109-99-9 ~Tetrahydrofuran 50.1 1.503 -4.2E+02 7.2E-04 142-82-5 Heptane, N-3.19 0.0957 -8.3E+01 2.3E-04 110-54-3 Hexane, N-2.98 0.0894 -1.5E+02 1.2E-04 67-63-0 Isopropanol 18.2 0.546 -4.2E+01 2.6E-03 78-93-3 Methyl Ethyl Ketone (2-Butanone)8.14 0.2442 -1.0E+03 4.7E-05 1634-04-4 Methyl tert-Butyl Ether (MTBE)3.96 0.1188 1.1E+01 6.3E+02 1.1E-08 3.8E-05 75-09-2 Methylene Chloride 1.26 0.0378 1.0E+02 1.3E+02 3.7E-10 6.0E-05 127-18-4 Tetrachloroethylene 3.93 0.1179 1.1E+01 8.3E+00 1.1E-08 2.8E-03 108-88-3 Toluene 32.8 0.984 -1.0E+03 1.9E-04 75-69-4 Trichlorofluoromethane 8.04 0.2412 -- 95-63-6 Trimethylbenzene, 1,2,4-13.3 0.399 -1.3E+01 6.4E-03 108-67-8 Trimethylbenzene, 1,3,5-3.57 0.1071 -1.3E+01 1.7E-03 25167-70-8 Trimethylpentene, 2,4,4-1 0.03 -- 106-42-3 Xylene, P-33.9 1.017 -2.1E+01 9.8E-03 108-38-3 Xylene, m-33.9 1.017 -2.1E+01 9.8E-03 95-47-6 Xylene, o-12.1 0.363 -2.1E+01 3.5E-03 Cumulative:2.6E-06 5.7E-02 All concentrations are in ug/m3 Output Form 3B Carcinogenic risk and hazard quotient cells highlighted in orange are associated with non-volatile chemicals. Since these chemicals do not pose a vapor intrusion risk, no risk values are calculated for these chemicals. North Carolina DEQ Risk Calculator DEQ Risk Calculator - Vapor Intrusion - Non-Residential Worker Soil Gas to Indoor Air Version Date: December 2019 Basis: November 2019 EPA RSL Table Site ID: 23070-19-060 Exposure Unit ID: CAS #Chemical Name: Soil Gas Concentration (ug/m3) Calculated Indoor Air Concentration (ug/m3) Target Indoor Air Conc. for Carcinogens @ TCR = 1E-06 Target Indoor Air Conc. for Non- Carcinogens @ THQ = 0.2 Calculated Carcinogenic Risk Calculated Non- Carcinogenic Hazard Quotient 67-64-1 Acetone 60.6 0.606 -2.7E+04 4.5E-06 71-43-2 Benzene 3.51 0.0351 1.6E+00 2.6E+01 2.2E-08 2.7E-04 75-15-0 Carbon Disulfide 220 2.2 -6.1E+02 7.2E-04 67-66-3 Chloroform 8.37 0.0837 5.3E-01 8.6E+01 1.6E-07 1.9E-04 74-87-3 Chloromethane 6.92 0.0692 -7.9E+01 1.8E-04 110-82-7 Cyclohexane 1.17 0.0117 -5.3E+03 4.5E-07 75-71-8 Dichlorodifluoromethane 4.64 0.0464 -8.8E+01 1.1E-04 100-41-4 Ethylbenzene 8.71 0.0871 4.9E+00 8.8E+02 1.8E-08 2.0E-05 109-99-9 ~Tetrahydrofuran 50.1 0.501 -1.8E+03 5.7E-05 142-82-5 Heptane, N-3.19 0.0319 -3.5E+02 1.8E-05 110-54-3 Hexane, N-2.98 0.0298 -6.1E+02 9.7E-06 67-63-0 Isopropanol 18.2 0.182 -1.8E+02 2.1E-04 78-93-3 Methyl Ethyl Ketone (2-Butanone)8.14 0.0814 -4.4E+03 3.7E-06 1634-04-4 Methyl tert-Butyl Ether (MTBE)3.96 0.0396 4.7E+01 2.6E+03 8.4E-10 3.0E-06 75-09-2 Methylene Chloride 1.26 0.0126 1.2E+03 5.3E+02 1.0E-11 4.8E-06 127-18-4 Tetrachloroethylene 3.93 0.0393 4.7E+01 3.5E+01 8.3E-10 2.2E-04 108-88-3 Toluene 32.8 0.328 -4.4E+03 1.5E-05 75-69-4 Trichlorofluoromethane 8.04 0.0804 -- 95-63-6 Trimethylbenzene, 1,2,4-13.3 0.133 -5.3E+01 5.1E-04 108-67-8 Trimethylbenzene, 1,3,5-3.57 0.0357 -5.3E+01 1.4E-04 25167-70-8 Trimethylpentene, 2,4,4-1 0.01 -- 106-42-3 Xylene, P-33.9 0.339 -8.8E+01 7.7E-04 108-38-3 Xylene, m-33.9 0.339 -8.8E+01 7.7E-04 95-47-6 Xylene, o-12.1 0.121 -8.8E+01 2.8E-04 Cumulative:2.0E-07 4.5E-03 All concentrations are in ug/m3 Output Form 3E Carcinogenic risk and hazard quotient cells highlighted in orange are associated with non-volatile chemicals. Since these chemicals do not pose a vapor intrusion risk, no risk values are calculated for these chemicals. North Carolina DEQ Risk Calculator Output Form 3E North Carolina DEQ Risk Calculator Risk for Individual Pathways Output Form 1A Version Date: December 2019 Basis: November 2019 EPA RSL Table Site ID: 23070-19-060 Exposure Unit ID: Receptor Pathway Carcinogenic Risk Hazard Index Risk exceeded? Soil 3.8E-06 9.2E-02 NO Groundwater Use*NC NC NC Soil 8.7E-07 7.3E-03 NO Groundwater Use*NC NC NC Construction Worker Soil 1.4E-07 7.8E-02 NO Soil 2.1E-06 4.9E-02 NO Surface Water*NC NC NC Receptor Pathway Carcinogenic Risk Hazard Index Risk exceeded? Groundwater to Indoor Air NC NC NC Soil Gas to Indoor Air 2.6E-06 5.7E-02 NO Indoor Air 0.0E+00 0.0E+00 NO Groundwater to Indoor Air NC NC NC Soil Gas to Indoor Air 2.0E-07 4.5E-03 NO Indoor Air 0.0E+00 0.0E+00 NO Pathway Source Source Soil NM Source Groundwater NM Source Soil NM Source Groundwater NM 3. NM = Not Modeled 4. NC = Pathway not complete 2. * = If concentrations in groundwater exceed the NC 2L Standards or IMAC, or concentrations in surface water exceed the NC 2B Standards, appropriate remediation and/or institutional control measures will be necessary to be eligible for a risk-based closure. Surface Water Exceedence of 2B at Receptor? Exceedence of 2B at Receptor? VAPOR INTRUSION CALCULATORS Resident Non-Residential Worker CONTAMINANT MIGRATION CALCULATORS Target Receptor Concentrations Exceeded? Groundwater Exceedence of 2L at Receptor? Exceedence of 2L at Receptor? 1. If lead concentrations were entered in the exposure point concentration tables, see the individual calculator sheets for lead concentrations in comparison to screening levels. Note that lead is not included in cumulative risk calculations. Notes: DIRECT CONTACT SOIL AND WATER CALCULATORS Resident Non-Residential Worker Recreator/Trespasser North Carolina DEQ Risk Calculator Version Date: Basis: Site Name: Site Address: DEQ Section: Site ID: Exposure Unit ID: Submittal Date: Reviewed By: North Carolina Department of Environmental Quality Risk Calculator Red Carpet Inn Brownfields Site 615 East Morehead Street, Charlotte, North Carolina Brownfields 23070-19-060 January 2021 November 2020 EPA RSL Table Prepared By:Terracon Consultants, Inc. North Carolina DEQ Risk Calculator Risk for Individual Pathways Output Form 1A Version Date: January 2021 Basis: November 2020 EPA RSL Table Site ID: 23070-19-060 Exposure Unit ID: Receptor Pathway Carcinogenic Risk Hazard Index Risk exceeded? Soil NC NC NC Groundwater Use* NC NC NC Soil NC NC NC Groundwater Use* NC NC NC Construction Worker Soil NC NC NC Soil NC NC NC Surface Water* NC NC NC Receptor Pathway Carcinogenic Risk Hazard Index Risk exceeded? Groundwater to Indoor Air NC NC NC Soil Gas to Indoor Air 2.0E-06 5.1E-02 NO Indoor Air NC NC NC Groundwater to Indoor Air NC NC NC Soil Gas to Indoor Air 1.5E-07 4.0E-03 NO Indoor Air NC NC NC Pathway Source Source Soil NC Source Groundwater NC Source Soil NC Source Groundwater NC 3. NM = Not Modeled 4. NC = Pathway not calculated DIRECT CONTACT SOIL AND WATER CALCULATORS Resident Non-Residential Worker Recreator/Trespasser 2. * = If concentrations in groundwater exceed the NC 2L Standards or IMAC, or concentrations in surface water exceed the NC 2B Standards, appropriate remediation and/or institutional control measures will be necessary to be eligible for a risk-based closure. Surface Water Exceedence of 2B at Receptor? Exceedence of 2B at Receptor? VAPOR INTRUSION CALCULATORS Resident Non-Residential Worker CONTAMINANT MIGRATION CALCULATORS Target Receptor Concentrations Exceeded? Groundwater Exceedence of 2L at Receptor? Exceedence of 2L at Receptor? 1. If lead concentrations were entered in the exposure point concentration tables, see the individual calculator sheets for lead concentrations in comparison to screening levels. Note that lead is not included in cumulative risk calculations. Notes: North Carolina DEQ Risk Calculator Exposure Point ConcentrationsVersion Date: January 2021Basis: November 2020 EPA RSL TableSite ID: 23070-19-060Exposure Unit ID: Description of Exposure Point Concentration Selection:Exposure Point Concentration (ug/m3)Notes: CAS Number ChemicalMinimum Concentration (Qualifier)Maximum Concentration (Qualifier)UnitsLocation of Maximum ConcentrationDetection FrequencyRange of Detection LimitsConcentration Used for ScreeningBackground ValueScreening Toxicity Value (Screening Level) (n/c)Potential ARAR/TBC ValuePotential ARAR/TBC SourceCOPC Flag (Y/N)Rationale for Selection or Deletion55 67-64-1 Acetoneug/m311 71-43-2 Benzeneug/m33.5 67-66-3 Chloroformug/m35 100-41-4 Ethylbenzeneug/m346 142-82-5 Heptane, N-ug/m325 110-54-3 Hexane, N-ug/m37.9 67-63-0 Isopropanolug/m39.5 78-93-3 Methyl Ethyl Ketone (2-Butanone)ug/m3170 115-07-1 Propyleneug/m31.9 100-42-5 Styreneug/m31.4 127-18-4 Tetrachloroethyleneug/m3220 108-88-3 Tolueneug/m31.3 79-01-6 Trichloroethyleneug/m36.4 75-69-4 Trichlorofluoromethaneug/m32.5 95-63-6 Trimethylbenzene, 1,2,4-ug/m30.65 108-67-8 Trimethylbenzene, 1,3,5-ug/m313 106-42-3 Xylene, P-ug/m313 108-38-3 Xylene, m-ug/m35.5 95-47-6 Xylene, o-ug/m3Input Form 2DSoil Gas Exposure Point Concentration TableNote: Chemicals highlighted in orange are non-volatile chemicals. Since these chemicals do not pose a vapor intrusion risk, no risk values are calculated for these chemicals.If the chemical list is changed from a prior calculator run, remember to select "See All Chemicals" on the data output sheet or newly added chemicals will not be included in risk calculationsNorth Carolina DEQ Risk Calculator