Loading...
HomeMy WebLinkAbout22030 Durafiber Eastern Fence EMP 20211027 Environmental Management Plan Eastern Fence Expansion Project Durafiber Brownfields Site Salisbury, North Carolina Brownfields Project No. 24030-18-080 H&H Job No. OAN-001 October 26, 2021 #C-1269 Engineering #C-245 Geology Environmental Management Plan Eastern Fence Expansion Durafiber Brownfields Site Salisbury, North Carolina Brownfields Project No. 24030-18-080 H&H Job No. OAN-001 Table of Contents Completed EMP Template Form List of Figures Figure 1 NCBP Diagram for Temporary Containment of Impacted or Potentially Impacted Soil Figure 2 Site Map Figure 3 P Building Area Detail Figure 4 P Building Soil Disturbance Area Detail List of Appendices Appendix A Construction Drawings Appendix B Draft Brownfields Plat and Contaminant Tables Appendix C Soil Vapor Sample Location Map and Data Summary Appendix D Liquid Stabilizer SDS 1 EMP Version 2, January 2021 NORTH CAROLINA BROWNFIELDS PROGRAM ENVIRONMENTAL MANAGEMENT PLAN This form is to be used to prepare an Environmental Management Plan (EMP) for projects in the North Carolina Brownfields Program at the direction of a Brownfields project manager. The EMP is a typical requirement of a Brownfields Agreement (BFA). Its purpose is to clarify actions to be taken during the demolition and construction at Brownfields properties in an effort to avoid delays in the event of the discovery of new contamination sources or other environmental conditions. The EMP provides a means to document redevelopment plans and environmental data for each applicable environmental medium to inform regulatory-compliant decision-making at the site. As much detail as possible should be included in the EMP, including contingency planning for unknowns. Consult your project manager if you have questions. Prospective Developers and/or their consultants must complete and submit this form and all pertinent attachments, see checklist below, to their Brownfields project manager prior to any earthmoving or other development-related activities that have the potential to disturb soil at the Brownfields Property, including demolition. For the resultant EMP to be valid for use, it must be completed, reviewed by the program, signed by all parties working on the project, and approved by the Brownfields project manager. Failure to comply with the requirements of the EMP could jeopardize project eligibility, or in the event of a completed agreement, be cause for a reopener. The EMP is valid only for the scope of work described herein and must be updated to be applicable for new phases of redevelopment or after significant changes in applicable regulatory guidance. Voluntary Metrics Tab The NC Brownfields Program updates estimated capital investment (from the Brownfields Property Application) and estimated jobs created (from the Brownfields Agreement) whenever possible. As a voluntary measure, you may opt to complete the below information for capital investment and jobs created as estimated by your final redevelopment plans for the Brownfields Property: 1. Estimated capital investment in redevelopment project: Click or tap here to enter text. 2. Estimated jobs created: a. Construction Jobs: b. Full Time Post-Redevelopment Jobs: Click or tap here to enter text. 2 EMP Version 2, January 2021 Table of Contents NORTH CAROLINA BROWNFIELDS PROGRAM ENVIRONMENTAL MANAGEMENT PLAN ........................... 1 GENERAL INFORMATION ........................................................................................................................ 4 COMMUNICATIONS ................................................................................................................................ 4 NOTIFICATIONS TO THE BROWNFIELDS PROGRAM ............................................................................... 5 REDEVELOPMENT PLANS ........................................................................................................................ 6 CONTAMINATED MEDIA ......................................................................................................................... 8 PART 1. Soil ......................................................................................................................................... 8 PART 2. GROUNDWATER .................................................................................................................. 17 PART 3. SURFACE WATER .................................................................................................................. 19 PART 4. SEDIMENT ............................................................................................................................ 19 PART 5. SOIL VAPOR ......................................................................................................................... 19 PART 6. SUB-SLAB SOIL VAPOR ........................................................................................................ 20 PART 7. INDOOR AIR ......................................................................................................................... 21 VAPOR INTRUSION MITIGATION SYSTEM ............................................................................................. 22 CONTINGENCY PLAN – encountering unknown tanks, drums, or other waste materials ..................... 22 POST-REDEVELOPMENT REPORTING..................................................................................................... 24 APPROVAL SIGNATURES ....................................................................................................................... 26 3 EMP Version 2, January 2021 So that the EMP provides value in protecting brownfields eligibility and public health, the preparer shall ensure that the following steps have been completed prior to submitting the EMP for review. Any EMP prepared without completing these steps is premature. ܈܈ Site sampling and assessment that meets Brownfields’ objectives is complete and has been reviewed and approved by the Brownfields Project Manager. ܈ Brownfields objectives at the date of the signing of this EMP are to begin construction activities in accordance with EMP requirements. Specific redevelopment plans, even if conceptual, have been developed for the project, submitted and reviewed by the Brownfields Project Manager. Please submit, along with the completed EMP form, the following attachments, as relevant and applicable to the proposed redevelopment: ܈ A set of redevelopment plans, including architectural/engineering plans, if available; if not conceptual plans may suffice if updated when detailed plans are drafted. ܆ A figure overlaying redevelopment plans on a map of the extent of contamination for each media. ܆ Site grading plans that include a cut and fill analysis. ܆ A figure showing the proposed location and depth of impacted soil that would remain on site after construction grading. ܆ Any necessary permits for redevelopment (i.e. demolition, etc.). ܈ A detailed construction schedule that includes timing and phases of construction. ܈ Tabulated data summaries for each impacted media (i.e. soil, groundwater, soil gas, etc.) applicable to the proposed redevelopment. ܈ Figures with the sampling locations and contamination extents for each impacted media applicable to the proposed redevelopment. ܆ A full final grade sampling and analysis plan, if the redevelopment plan is final. ܆ If known, information about each proposed potential borrow soil source, such as aerial photos, historic site maps, historic Sanborn maps, a site history, necessary for brownfields approval. ܆ Information and, analytical data if required, for quarries, or other borrow sources, 4 EMP Version 2, January 2021 detailing the type of material proposed for importation to the Brownfields Property. ܆܆ A work plan for the sampling and analysis of soil to be brought onto the Brownfields Property. Refer to Issue Resolution 15 in Brownfields Program Guidelines. ܆ A map of the Brownfields Property showing the location of soils proposed for export and sampling data from those areas. ܆ If a Vapor Mitigation System is required by the Brownfields Program, the Vapor Intrusion Mitigation System (VIMS) plan will be signed and sealed by a NC Professional Engineer. The VIMS Plan may also be submitted under separate cover. GENERAL INFORMATION Date: 10/26/2021 Revision Date (if applicable): Click or tap to enter a date. Brownfields Assigned Project Name: Durafiber Brownfields Project Number: 24030-18-080 Brownfields Property Address: 7401 Statesville Blvd, Salisbury, Rowan County Brownfields Property Area (acres): The Brownfields property consists of approximately 500 acres. The area which is the subject of this EMP is located near the P Building (formerly known as the Training Building) in the southeastern portion of the former Durafiber plant. A Site map showing the location of the P Building is provided as Figure 2. Is Brownfields Property Subject to RCRA Permit?.......................܆ Yes ܈ No If yes enter Permit No.: Site is subject to RCRA Administrative Order but not a RCRA Permit. Is Brownfields Property Subject to a Solid Waste Permit….……..܆ Yes ܈ No If yes, enter Permit No.: Click or tap here to enter text. COMMUNICATIONS A copy of this EMP shall be distributed to all the parties below as well as any contractors or site workers that may be exposed to site vapors, soil, groundwater, and/or surface water. Additionally, a copy of the EMP shall be maintained at the Brownfields Property during redevelopment activities. NOTE, THE EMP DOES NOT TAKE THE PLACE OF A SITE-SPECIFIC HEALTH AND SAFETY PLAN. Prospective Developer: Salisbury Investments I, LLC Contact Person: Mr. Houston Roberts Phone Numbers: Office: 704-364-9100 Mobile: 704-361-0129 Email: Houston@forsiteinc.com 5 EMP Version 2, January 2021 Prospective Developer Contact Person: Houston Roberts Phone Numbers: Office: Click or tap here to enter text. Mobile: 704-361-0129 Email: houston@forsiteinc.com Contractor for Construction: OA Newton Contact Person: Dean Hetrick Phone Numbers: Office: Click or tap here to enter text. Mobile: 302-337-3720 Email: dean.hetrick@oanewton.com Environmental Consultant: Hart & Hickman, PC Contact Person: Mr. Steve Hart Phone Numbers: Office: 704-887-4610 Mobile: 704-576-0145 Email: shart@harthickman.com Brownfields Program Project Manager: Mr. Bill Schmithorst Phone Numbers: Office: 919-707-8159 Mobile: 919-441-3606 Email: william.schmithorst@ncdenr.gov Other DEQ Program Contacts (if applicable, i.e., UST Section, Inactive Hazardous Site Branch, Hazardous Waste, Solid Waste): Rob McDaniel DEQ Hazardous Waste Section Robert.mcdaniel@ncdenr.gov 919-707-8215 NOTIFICATIONS TO THE BROWNFIELDS PROGRAM Written advance Notification Times to Brownfields Project Manager: Check each box to accept minimum advance notice periods (in calendar days) for each type of onsite task: On-site assessment or remedial activities:……………………………………….…… 10 days Prior ܆܆ Construction or grading start:……………………………………….………………………. 10 days Prior ܈  Discovery of stained soil, odors, USTs, buried drums or waste, landfill, or other signs of previously unknown contamination: ……………………………….……………………………………. Within 48 hours ܈ Implementation of emergency actions (e.g. dewatering, flood or soil erosion control measures in area of contamination, ventilation of work zones):…………….……….……… Within 48 hours ܈ Installation of mitigation systems:………………………….………………….……….. 10 days Prior ܆ Other notifications as required by local, state or federal agencies to implement redevelopment activities: (as applicable): ……………………….…………………………………………..… Within 30 days ܆ 6 EMP Version 2, January 2021   REDEVELOPMENT PLANS 1) Type of Redevelopment (check all that apply): ܆Residential ܆Recreational ܆Institutional ܆Commercial ܆Office ܆Retail ܈Industrial ܆Other specify: 2) Check the following activities that will be conducted prior to commencing earth-moving activities at the site: ܆ Review of historic maps (Sanborn Maps, facility maps) ܈ Conducting geophysical surveys to evaluate the location of suspect UST, fuel lines, utility lines, etc. ܈ Interviews with employees/former employees/facility managers/neighbors 3) Summary of Redevelopment Plans (MANDATORY: attach detailed plans or conceptual plans, if detailed plans are not available. EMP review without such information would be premature): Provide brief summary of redevelopment plans, including demolition, removal of building slabs/pavement, grading plans and planned construction of new structures: The redevelopment activities covered under this EMP include shallow soil excavations within and north of the P Building (formerly known as the Training Building) for the installation of concrete foundations for additional equipment to be used by the current tenant Eastern Fence. Eastern Fence manufactures PVC fencing at the P Building using PVC powder and injection molding equipment. The construction activities include installation of concrete foundations for the following: x Two silos north of the P Building. These silos will contain a mixture of PVC powder and calcium carbonate. x Three silos northeast of the P Building. The westernmost of these silos will contain calcium carbonate, and the other two will contain PVC powder. x Liquid stabilizer tank containment north of the P Building. A Safety Data Sheet for the liquid stabilizer is provided in Appendix D. The liquid stabilizer tank will be in secondary containment. The containment will have a central drain that will remain closed until accumulated rainwater is inspected and verified to be non-impacted before draining. x Mixer/cooler within the P Building. This is a high intensity mixer and a vertical drum cooler with a water jacket. x Approximate 100 ft long trench to a new power pole will also be performed to install a new underground power line to the P Building. The approximate locations and sizes and depths of the excavations are indicated in Figures 3 and 4, respectively. Construction drawings are provided in Appendix A. Excavation depths are not expected to exceed 2.5 ft. In addition, two blower pads will be installed northeast and east of 7 EMP Version 2, January 2021 the P Building; however, they will be installed on existing ground surface and will involve minimal soil disturbance. The locations of the blower pads are indicated in Figure 4. 4) Do plans include demolition of structure(s)?: ܆܆Yes ܈No܆Unknown ܆If yes, please check here to confirm that demolition will be conducted in accordance with applicable legal requirements, including without limitation those related to lead and asbestos abatement that are administered by the Health Hazards Control Unit within the Division of Public Health of the North Carolina Department of Health and Human Services. If available, please provide a copy of your demolition permit. 5) Are sediment and erosion control measures required by federal, state, or local regulations? ܆Yes ܈No ܆Unknown ܆ If yes, please check here to confirm that demolition will be conducted in accordance with applicable legal requirements. If soil disturbance is necessary to install sediment and erosion control measures, they may not begin until this EMP is approved. 6) Which category of risk-based screening level is used or is anticipated to be specified in the Brownfields Agreement? Note: If children frequent the property, residential screening levels shall be cited in the Brownfields Agreement for comparison purposes. ܆Residential ܈Non-Residential or Industrial/Commercial 7) Schedule for Redevelopment (attach construction schedule): a) Construction start date: 11/1/2021 b) Anticipated duration (specify activities during each phase): It is anticipated that the activities will be conducted over a one to two months period. c) Additional phases planned? ܆ Yes ܈ No If yes, specify the start date and/or activities if known: Start Date: Click or tap to enter a date. Planned Activity: There are no plans for additional phases of redevelopment. Start Date: Click or tap to enter a date. Planned Activity: Click or tap here to enter text. Start Date: Click or tap to enter a date. Planned Activity: Click or tap here to enter text. d) Provide the planned date of occupancy for new buildings: Not Applicable 8 EMP Version 2, January 2021 CONTAMINATED MEDIA Please fill out the sections below, using detailed site plans, if available, or estimate using known areas of contaminated soil and a conceptual redevelopment plan. Provide a figure overlaying new construction onto figure showing contaminated soil and groundwater locations. 1) Contaminated Media on the Brownfields Property Part 1. Soil:……………………………………….……………. ܈܈ Yes ܆ No ܆ Suspected ܆ Unknown Part 2. Groundwater:.……………………….……..……. ܈ Yes ܆ No ܆ Suspected ܆ Unknown Part 3. Surface Water:.……………...……..…………… ܈ Yes ܆ No ܆ Suspected ܆ Unknown Part 4. Sediment:.……………...……..…………………… ܈ Yes ܆ No ܆ Suspected ܆ Unknown Part 5. Soil Vapor:…..…………...……..…………………. ܆ Yes ܆ No ܆ Suspected ܈ Unknown Part 6. Sub-Slab Soil Vapor:……...……..…………….. ܆ Yes ܈ No ܆ Suspected ܆ Unknown Part 7. Indoor Air:...……..…………………………………. ܆ Yes ܈ No ܆ Suspected ܆ Unknown 2) For the Area of Proposed Redevelopment on the Brownfields Property, attach tabulated data summaries for each impacted media and figure(s) with sample locations. PART 1. Soil 1) Known or suspected contaminants in soil (list general groups of contaminants): There are no known or suspected soil impacts in the area of the proposed soil excavations. The P Building was previously used for training, and manufacturing operations were not conducted in the building. The locations of soil samples at the site above DEQ screening levels and a summary of soil analytical data are provided in the draft Brownfields plat and Contaminant Tables provided in Appendix B. As indicated in the figure, there are no soil samples with compound concentrations above health-based screening levels in the area of the proposed excavations. The primary areas where contamination has been detected at the Site are the former DowTherm heater areas located east of the main manufacturing building and two disposal areas located in the eastern portion of the site (see Figure 2). These areas are not located in the vicinity of the P Building. 2) Depth of known or suspected contaminants (feet): There are no known soil impacts in the area of the proposed excavations. 3) Area of soil disturbed by redevelopment (square feet): ~2,100 sq ft 4) Depths of soil to be excavated (feet): 9 EMP Version 2, January 2021 Up to approximately 2.5 ft deep. 5) Estimated volume of soil (cubic yards) to be excavated (attach grading plan): ~200 6) Estimated volume of excavated soil (cubic yards) anticipated to be impacted by contaminants: None 7) Estimated volume of contaminated soil expected to be disposed of offsite, if applicable: None Part 1.A. MANAGING ONSITE SOIL If soil is anticipated to be excavated from the Brownfield Property, relocated on the Brownfields Property, or otherwise disturbed during site grading or other redevelopment activities, please provide a grading plan that clearly illustrates areas of cut and fill (approximate areas & volumes are acceptable, if only preliminary data available). 1) HAZARDOUS WASTE DETERMINATION: a) Does the soil contain a LISTED WASTE as defined in the North Carolina Hazardous Waste Section under 40 CFR Part 261.31-261.35?....................................... ܆܆Yes ܈No ܆ If yes, explain why below, including the level of knowledge regarding processes generating the waste (include pertinent analytical results as needed). Click or tap here to enter text. ܆ If yes, do the soils exceed the “Contained-Out” levels in Attachment 1 of the North Carolina Contained-In Policy?................................................. ܆ Yes ܆ No b) NOTE: IF SOIL MEETS THE DEFINITION OF A LISTED HAZARDOUS WASTE AND EXCEEDS THE CONTAINED-OUT LEVELS IN ATTACHMENT 1 TO THE NORTH CAROLINA CONTAINED-IN POLICY THE SOIL MAY NOT BE RE-USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUS WASTE SECTION RULES AND REGULATIONS. c) Does the soil contain a CHARACTERISTIC WASTE?.................................... ܆ Yes ܈ No ܆ If yes, mark reason(s) why below (and include pertinent analytical results). ܆ Ignitability Click or tap here to enter text. ܆ Corrosivity Click or tap here to enter text. ܆ Reactivity Click or tap here to enter text. ܆ Toxicity Click or tap here to enter text. ܆ TCLP results Click or tap here to enter text. 10 EMP Version 2, January 2021 ܆܆ Rule of 20 results (20 times total analytical results for an individual hazardous constituent on TCLP list cannot, by test method, exceed regulatory TCLP standard) Click or tap here to enter text. ܈ If no, explain rationale: No soil impacts are expected in the area of the excavations. If potentially impacted soil is identified during excavation based upon field screening, the soil will be sampled and managed as described below under Part 1.A. Section 4 below. d) NOTE: IF SOIL MEETS THE DEFINITION OF A CHARACTERISTIC HAZARDOUS WASTE, THE SOIL MAY NOT BE RE-USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUS WASTE SECTION RULES AND REGULATIONS. 2) Screening criteria by which soil disposition decisions will be made (e.g., left in place, capped in place with low permeability barrier, removed to onsite location and capped, removed offsite): ܆ Preliminary Health-Based Residential SRGs ܈ Preliminary Health-Based Industrial/Commercial SRGs ܈ Division of Waste Management Risk Calculator (For Brownfields Properties Only) ܆ Site-specific risk-based cleanup level. Please provide details of methods used for determination/explanation. Click or tap here to enter text. Additional comments: Click or tap here to enter text. 3) If known impacted soil is proposed to be reused within the Brownfields Property Boundary, please check the measures that will be utilized to ensure safe placement and documentation of same. Please attach a proposed location diagram/site map. ܆ Provide documentation of analytical report(s) to Brownfields Project Manager ܆ Provide documentation of final location, thickness and depth of relocated soil on site map to Brownfields Project Manager once known ܆ Geotextile to mark depth of fill material. Provide description of material: Click or tap here to enter text. ܆ Manage soil under impervious cap ܈ or clean fill ܈ ܆ Describe cap or fill: 11 EMP Version 2, January 2021 ܆܆ Confer with NC BF Project Manager if Brownfield Plat must be revised (or re-recorded if actions are Post-Recordation). ܆ GPS the location and provide site map with final location. ܆ Other. Please provide a description of the measure: 4) Please describe the following action(s) to be taken during and following excavation and management of site soils: Management of fugitive dust from site ܈ Yes, describe the method will include: Contaminated soil is not expected to be encountered or disturbed as part of the excavations. However, the construction contractor will take into account conditions such as wind speed, wind direction, and moisture content of soil during soil disturbance and stockpiling activities to minimize dust generation. Particular attention will be paid by contractors to implement dust control measures as needed based on Site and atmospheric conditions (i.e., by controlled water application, hydro-seeding, and/or mulch, stone, or plastic cover). ܆ No, explain rationale: Click or tap here to enter text. Field Screening of site soil ܈ Yes, describe the field screening method, frequency of field screening, person conducting field screening: During soil disturbance at the Site, the contractor will observe soils for evidence of potential significantly impacted soil. Evidence of potential impacted soil includes a distinct unnatural color, strong odor, or filled or previously disposed materials of concerns (i.e., chemicals, tanks, drums, etc.). Should the above be noted during Site work, the contractor will contact the project environmental consultant to observe the suspect condition. If the project environmental engineer confirms that the material may be impacted, then the procedures below will be implemented. In addition, the environmental consultant will contact the DEQ Brownfields project manager within 48-hours to advise that person of the condition. ܆ No, explain rationale: Click or tap here to enter text. Soil Sample Collection ܆ Yes, describe the sampling method (e.g., in-situ grab, composite, stockpile, etc.): Click or tap here to enter text. ܈ No, explain rationale: Click or tap here to enter text. 12 EMP Version 2, January 2021 Collection of additional soil samples is not anticipated based on results of previous Site assessment activities and previous use of the P Building for training. If previously unknown significant soil impact is encountered during soil disturbance, excavation will proceed only as far as needed to allow construction to continue and/or only as far as needed to allow alternate corrective measures described below. Suspect impacted soil excavated during will be stockpiled and covered in a secure area to allow construction to progress. Suspect impacted soil will be underlain by and covered with minimum 10-mil plastic sheeting. At least one representative soil sample (no less than 3 aliquot soil samples) at a sample ratio of 1 soil sample per every approximately 200 cubic yards of soil will be collected for the analyses selected below (i.e., total VOCs, SVOCs, and RCRA metals plus hexavalent chromium). If the soil sample laboratory analytical results indicate that the soil could potentially exceed toxicity characteristic hazardous waste criteria, then the soil will also be analyzed by TCLP for those compounds that could exceed the toxicity characteristic hazardous waste criteria. Impacted soil will be managed in the manner described below based upon the laboratory analyses: i. If no organic compounds are detected in a sample (other than which are attributable to sampling or laboratory artifacts) and metals are below the Protection of Groundwater or Residential PSRG (whichever is lower for the detected compounds) and are consistent with Site-specific background levels with acceptable cumulative risk calculator results, then the soil will be deemed suitable for use as on-Site fill or as off-Site fill. The proposed location(s) for off-Site placement of soil (other than a permitted facility) along with the receiving facility’s written approval for acceptance of the soil will be provided to DEQ for approval prior to taking the soil off-Site. ii. If detectable levels of compounds are found which do not exceed the DEQ IHSB Industrial PSRGs (other than which are attributable to sampling or laboratory artifacts or which are consistent with Site-specific background levels for metals), the TCLP concentrations are below hazardous waste criteria, and cumulative risk calculator results are acceptable, then the soil may be used on-Site as fill without conditions. iii. If detectable levels of compounds are found which exceed the DEQ IHSB Industrial PSRGs (other than which are attributable to sampling or laboratory artifacts or which are consistent with background levels for metals) and the TCLP concentrations are below hazardous waste criteria, then the soil, with DEQ written approval, may be used on-Site as fill below an impervious surface, or at least 2 ft of documented compacted clean soil. If the impacted soil with concentrations above Industrial PSRGs is moved to an on-Site location, its location and depth will be documented using GPS, and its location will be provided to DEQ iv. Impacted soil may be transported to a Brownfields approved permitted facility such as a landfill provided that the soil is accepted at the disposal facility. If soil is transported to a permitted facility, the permitted facility’s written approval or acceptance to dispose of soil from the Site will be provided to the DEQ Brownfields project manager. v. In the unlikely event that the sample data indicates concentrations above TCLP hazardous waste criteria, then the soil must be transported off-Site to a permitted disposal facility that can accept or treat hazardous waste. 13 EMP Version 2, January 2021 *Please note that should export soil be transported off-Site to a permitted facility or to a another DEQ Brownfields pre-approved receiving facility, soil will be direct loaded onto trucks for transport off-Site. If soil samples are collected for analysis, please check the applicable chemical analytes: ܈ Volatile organic compounds (VOCs) by EPA Method 8260 ܈ Semi-volatile organic compounds (SVOCs) by EPA Method 8270 ܈ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): EPA Methods 6020/7471 ܆ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ܆ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. ܈ Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Specify Analytical Method Number(s): Hexavalent Chromium by EPA Method 7199 ܈ Check to confirm that stockpiling of known or suspected impacted soils will be conducted in accordance with Figure 1 of this EMP. Stockpile methodology should provide erosion control, prohibiting contact between surface water/precipitation and contaminated soil, and preventing contaminated runoff. Explain any variances or provide additional details as needed: ܆ Final grade sampling of exposed native soil (i.e., soil that will not be under buildings or permanent hardscape). Select chemical analyses for final grade samples with check boxes below (Check all that apply): ܆ Volatile organic compounds (VOCs) by EPA Method 8260 ܆ Semi-volatile organic compounds (SVOCs) by EPA Method 8270 ܆ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): Click or tap here to enter text. ܆ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ܆ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. Click or tap here to enter text. 14 EMP Version 2, January 2021 ܆܆ Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Click or tap here to enter text. Please provide a scope of work for final grade sampling, including a diagram of soil sampling locations, number of samples to be collected, and brief sampling methodology. Samples should be collected from 0-2 ft below ground surface, with the exception of VOCs which should be taken from 1-2 ft below ground surface. Alternatively, indicate if a work plan for final grade sampling may be submitted under separate cover. ܈ If final grade sampling was NOT selected, please explain rationale: No final grade soil sampling is proposed because there are no known soil impacts in the area of the excavations and there will be minimal disturbance of soil outside the excavation areas. If significantly impacted soil is identified during the excavations and the impacted soil removed from the excavations is found to contain compounds above Industrial PSRGs, then the need for final grade soil sampling will be discussed with the Brownfields Project Manager. Part 1.B. IMPORTED FILL SOIL NO SOIL MAY BE BROUGHT ONTO THE BROWNFIELDS PROPERTY WITHOUT PRIOR APPROVAL FROM THE BROWNFIELDS PROGRAM. According to the Brownfields IR 15, “Documenting imported soil (by sampling, analysis, and reporting in accordance with review and written approval in advance by the Brownfields Program), will safeguard the liability protections provided by the brownfields agreement and is in the best interest of the prospective developer/property owner.” Requirements for importing fill: 1) Will fill soil be imported to the site?................................................܆Yes ܈No ܆Unknown 2) If yes, what is the estimated volume of fill soil to be imported? Click or tap here to enter text. 3) If yes, what is the anticipated depth that fill soil will be placed at the property? (If a range of depths, please list the range.) 4) Provide the source of fill, including: location, site history, nearby environmental concerns, etc. Attach aerial photos, maps, historic Sanborn maps and a borrow source site history: 15 EMP Version 2, January 2021 5) PRIOR TO ITS PLACEMENT AT THE BROWNFIELDS PROPERTY, provide a plan to analyze fill soil to demonstrate that it meets acceptable standards applicable to the site and can be approved for use at the Brownfields property. In the unlikely event that import fill soil is needed, it will be taken from a location on-Site south of the parking lot where no prior industrial activities have occurred. If off-Site fill soil is needed for some reason, then the location where the fill soil will be obtained while be submitted to the DEQ Project Manager for prior approval. If the import fill soil is not from a DEQ Brownfields pre- approved soil import facility (i.e., pre-characterized quarry), then a plan for characterization of the soil will also be submitted for DEQ approval. 6) Please check the applicable chemical analytes for fill soil samples. (Check all that apply): ܈܈ Volatile organic compounds (VOCs) by EPA Method 8260 ܈ Semi-volatile organic compounds (SVOCs) by EPA Method 8270 ܈ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver): Specify Analytical Method Number(s): EPA Methods 6020/7471 ܆ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ܆ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. ܈ Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.): Hexavalent Chromium by EPA Method 7199 7) The scope of work for import fill sampling may be provided below or in a Work Plan submitted separately for DEQ review and approval. Attach specific location maps for in-situ borrow sites. If using a quarry, provide information on the type of material to be brought onto the Brownfields Property. See above. Part 1.C. EXPORTED SOIL NO SOIL MAY LEAVE THE BROWNFIELDS PROPERTY WITHOUT APPROVAL FROM THE BROWNFIELDS PROGRAM. FAILURE TO OBTAIN APPROVAL MAY VIOLATE A BROWNFIELDS AGREEMENT CAUSING A REOPENER OR JEOPARDIZING ELIGIBILITY IN THE PROGRAM, ENDANGERING LIABILITY PROTECTIONS AND MAKING SAID ACTION POSSIBLY SUBJECT TO ENFORCEMENT. JUSTIFICATIONS PROVIDED BELOW MUST BE APPROVED BY THE PROGRAM IN WRITING PRIOR TO COMPLETING TRANSPORT ACTIVITIES. Please refer to Brownfields IR 15 for 16 EMP Version 2, January 2021 additional details. 1) If export from a Brownfields Property is anticipated, please provide details regarding the proposed export actions. Volume of exported soil, depths, location from which soil will be excavated on site, related sampling results, etc. Provide a site map with locations of export and sampling results included. No off-Site export of soil is anticipated based upon the large size of the Site where soil can be placed (unless impacted soil is identified in the excavations and is disposed off-Site in accordance with Part 1.A. Section 4.) 2) To what type of facility will the export Brownfields soil be sent? ܈܈ Subtitle D/Municipal Solid Waste Landfill (analytical program to be determined by landfill) ܆ Permitted but Unlined Landfill (i.e. LCID, C&D, etc.) Analytical program to be determined by the accepting Landfill; ܆ Landfarm or other treatment facility ܆ Use as fill at another suitable Brownfields Property – determination that a site is suitable will require, at a minimum, that similar concentrations of the same or similar contaminants already exist at both sites, use of impacted soil will not increase the potential for risk to human health and the environment at the receiving Brownfields property, and that a record of the acceptance of such soil from the property owner of the receiving site is provided to Brownfields. Please provide additional details below. ܆ Use as Beneficial Fill off-site at a non-Brownfields Property - Please provide documentation of approval from the property owner for receipt of fill material. This will also require approval by the DEQ Solid Waste Section. Additional information is provided in IR 15. Please provide additional details below. 3) Additional Details: (if transfer of soil to another property is requested above, please provide details related to the proposed plans). Part 1.D. MANAGEMENT OF UTILITY TRENCHES ܆ Install liner between native impacted soils and base of utility trench before filling with clean fill (Preferred) ܈ Last out, first in principle for impacted soils (if soil can safely be reused onsite and is not a hazardous waste), i.e., impacted soils are placed back at approximately the depths they were removed from such that impacted soil is not placed at a greater depth than the original depth from which it was excavated. ܆ Evaluate whether necessary to install barriers in conduits to prevent soil vapor transport, and/or degradation of conduit materials due to direct impact with contaminants? ܆ If yes, provide specifications on barrier materials or provide the results of this evaluation in the 17 EMP Version 2, January 2021 Vapor Mitigation Plan. Note that if vapor mitigation is planned for site buildings, utility corridors will need to be evaluated as part of mitigation designs: Click or tap here to enter text. ܈܈ If no, include rationale here: Results of previous sub-slab soil vapor assessment activities completed below the P Building (as well as elsewhere at the Site) did not indicate the presence of compounds above DEQ Non- Residential Soil Gas Screening Levels (SGSLs). Therefore, no soil vapor impacts are expected in utility trenches or other excavations. ܆ Unknown, details to be provided in the Vapor Mitigation Plan for site buildings Other comments regarding managing impacted soil in utility trenches: The contractor and workers will observe soil for potential impacts during utility installation activities. Evidence of potential significant impacted soil includes a distinct unnatural color, strong odor, or filled or previously disposed materials of concerns (i.e., chemicals, tanks, drums, etc.). Should the above be noted during utility work, the contractor will contact the project environmental consultant to observe the suspect condition. If the project environmental consultant confirms that the material may be impacted, then the procedures outlined in Part 1.A. Section 4 above will be implemented. In addition, the environmental consultant will contact the DEQ Brownfields project manager within 48-hours to advise that person of the condition. Should impacted soil be discovered during utility trenching activities, appropriate safety screening will be performed by the contractor to protect workers during utility installation activities. If safety screening results indicate further action is warranted, the environmental consultant will be contacted and the work zone will be evacuated until appropriate engineering controls (such as use of industrial fans) are implemented. The environmental consultant will notify the DEQ project manager within 48 hours if engineering controls are warranted. PART 2. GROUNDWATER 1) What is the depth to groundwater at the Brownfields Property? The depth to groundwater in the area of the P Building is approximately 30 ft below ground surface. 2) Is groundwater known to be contaminated by ܈onsite ܆offsite ܆both or ܆unknown sources? Describe source(s): The primary sources of groundwater impacts are the former DowTherm heaters located east of the main Site building, the Glycol Recovery Unit Bottom (GRUB) landfill in the eastern portion of the site, the Chromium Reduction Unit basins in the area of the current wastewater treatment plant, and the wastewater polishing ponds. These areas are identified in Figure 2. 3) What is the direction of groundwater flow at the Brownfields Property? 18 EMP Version 2, January 2021 Groundwater flow is to the east toward Second Creek (see Figure 2). 4) Will groundwater likely be encountered during planned redevelopment activities? ܆܆Yes ܈No If yes, describe these activities: . Regardless of the answer; in the event that contaminated groundwater is encountered during redevelopment activities (even if no is checked above), list activities for contingent management of groundwater (e.g., dewatering of groundwater from excavations or foundations, containerizing, offsite disposal, discharge to sanitary sewer, NPDES permit, or sampling procedures). Appropriate worker safety measures will be undertaken in the highly unlikely event that groundwater gathers in an open excavation within an area determined to be impacted during construction activities. The accumulated water will be allowed to evaporate/infiltrate to the extent time for dissipation does not disrupt the construction schedule. Should the time needed for natural dissipation of accumulated water be deemed inadequate, an environmental professional will be contacted and the water will be tested and disposed off-Site or discharged to the on-site wastewater treatment plant. 5) Are monitoring wells currently present on the Brownfields Property?.................܈Yes ܆No If yes, are any monitoring wells routinely monitored through DEQ or other agencies?..................................................................................................................܈Yes ܆No 6) Please check methods to be utilized in the management of known and previously unidentified wells. ܆ Abandonment of site monitoring wells in accordance with all applicable regulations. It is the Brownfields Program’s intent to allow proper abandonment of well(s) as specified in the Brownfields Agreement, except if required for active monitoring through another section of DEQ or the EPA. ܆ Location of existing monitoring wells marked ܈ Existing monitoring wells protected from disturbance ܆ Newly identified monitoring wells will be marked and protected from further disturbance until notification to DEQ Brownfields can be made and approval for abandonment is given. 7) Please provide additional details as needed: Please note, disturbance of existing site monitoring wells without approval by DEQ is not permissible. If monitoring wells are damaged and/or destroyed, DEQ may require that the PD be responsible for replacement of the well. No monitoring wells are located in the area of the proposed excavations. The closest monitoring well is located approximately 180 ft northwest of the closest excavation area (well DT-3SS; see plat in Appendix B). 19 EMP Version 2, January 2021 PART 3. SURFACE WATER 1) Is surface water present at the property? ܈܈ Yes ܆ No ܆ Unknown 2) Attach a map showing the location of surface water at the Brownfields Property. 3) Is surface water at the property known to be contaminated? ܈ Yes ܆ No 4) Will workers or the public be in contact with surface water during planned redevelopment activities? ܆ Yes ܈ No 5) In the event that contaminated surface water is encountered during redevelopment activities, or clean surface water enters open excavations, list activities for management of such events (e.g., flooding, contaminated surface water run-off, stormwater impacts): If surface water run-off gathers in an open excavation within an area determined to contain impacted soil, appropriate worker safety measures will be undertaken. The accumulated water will be allowed to evaporate/infiltrate to the extent time for dissipation does not disrupt the construction schedule. Should the time needed for natural dissipation of accumulated water be deemed inadequate, the water will be tested and disposed off-Site or discharged to the on-Site wastewater treatment plant. If surface water collects in an excavation with non-impacted soil, the water will be discharged to the surface and allowed to evaporate or discharged to the on-Site wastewater treatment plant. PART 4. SEDIMENT 1) Are sediment sources present on the property? ܈ Yes ܆ No 2) If yes, is sediment at the property known to be contaminated: ܈ Yes ܆ No ܆ Unknown 3) Will workers or the public be in contact with sediment during planned redevelopment activities? ܆ Yes ܈ No 4) Attach a map showing location of known contaminated sediment at the property. 5) In the event that contaminated sediment is encountered during redevelopment activities, list activities for management of such events (stream bed disturbance): Contaminated sediment is known to present in the wastewater polishing ponds. The closest pond is located greater than 900 ft from the P Building. PART 5. SOIL VAPOR 1) Do concentrations of volatile organic compounds at the Brownfields property exceed the following vapor intrusion screening levels (current version) in the following media: IHSB Residential Screening Levels: 20 EMP Version 2, January 2021 Soil Vapor:………..܆܆ Yes ܆ No ܈ Unknown Groundwater:.….܆ Yes ܆ No܈ Unknown IHSB Industrial/Commercial Screening Levels: Soil Vapor:………..܆ Yes ܆ No܈ Unknown Groundwater:…..܈ Yes ܆ No܆ Unknown 2) Attach a map showing the locations of soil vapor contaminants that exceed site screening levels. 3) If applicable, at what depth(s) is soil vapor known to be contaminated? 4) Will workers encounter contaminated soil vapor during planned redevelopment activities? ܆ Yes ܈ No܆ Unknown In the event that contaminated soil vapor is encountered during redevelopment activities (trenches, manways, basements or other subsurface work,) list activities for management of such contact: If potential soil or vapor impacts are identified during excavation, appropriate vapor monitoring will be performed by the contractor. If vapor monitoring results indicate potential vapor phase contamination at levels of concern for worker protection, an environmental professional will be contacted and the work zone will be evacuated until appropriate engineering controls (such as use of industrial fans) are implemented. PART 6. SUB-SLAB SOIL VAPOR 1) Do concentrations of volatile organic compounds at the Brownfields property exceed the following vapor intrusion screening levels (current version) in sub-slab soil vapor: IHSB Residential Screening Levels: Soil Vapor:………..܆ Yes ܆ No ܈ Unknown Groundwater:.….܆ Yes ܆ No܈ Unknown IHSB Industrial/Commercial Screening Levels: Soil Vapor:………..܆ Yes ܈ No܆ Unknown Groundwater:…..܈ Yes ܆ No܆ Unknown 2) If data indicate that sub-slab soil vapor concentrations exceed screening levels, attach a map showing the location of these exceedances. 3) At what depth(s) is sub-slab soil vapor known to be contaminated? ܈0-6 inches ܆Other, please describe: H&H collected sub-slab soil gas samples for laboratory analysis in June 2020 from below the P Building as well as other Site buildings. The sample locations and a summary of the sub-slab soil vapor analytical data is provided in Appendix C. As shown in Appendix C, no VOCs were detected at concentrations above the DEQ Non-Residential SGSLs below the P Building or other Site See below regarding sub-slab soil vapor. 21 EMP Version 2, January 2021 buildings where samples were collected. . 4) Will workers encounter contaminated sub-slab soil vapor during planned redevelopment activities? ܆܆ Yes ܈ No ܆ Unknown ܆ If no, include rationale here: Based upon previous sub-slab soil vapor analytical data at the P Building, it is unlikely that contaminated soil vapor will be encountered during the shallow soil excavations. 5) In the event that contaminated soil vapor is encountered during redevelopment activities, list activities for management of such contact As noted above, if potential soil or vapor impacts are identified during excavation, appropriate vapor monitoring will be performed by the contractor. If vapor monitoring results indicate potential vapor phase contamination at levels of concern for worker protection, an environmental professional will be contacted and the work zone will be evacuated until appropriate engineering controls (such as use of industrial fans) are implemented. PART 7. INDOOR AIR 1) Are indoor air data available for the Brownfields Property? ܆ Yes ܈ No ܆ Unknown 2) Attach a map showing the location(s) where indoor air contaminants exceed site screening levels. 3) If the structures where indoor air has been documented to exceed risk-based screening levels will not be demolished as part of redevelopment activities, will workers encounter contaminated indoor air during planned redevelopment activities? ܆ Yes ܈ No ܆ Unknown ܈ If no, include rationale here: Previous sampling of sub-slab soil vapor at the P Building did not indicate concentrations above SGSLs. Therefore, it is unlikely that there are contaminants in indoor above risk-based screening levels from soil or groundwater impacts at the Site. 4) In the event that contaminated indoor air is encountered during redevelopment activities, list activities for management of such contact: In the unlikely event there is evidence of potential indoor air issues (i.e., unusual odors) during the interior soil excavation, appropriate indoor air monitoring will be performed by the contractor. If indoor air monitoring results indicate potential indoor air contamination of concern for worker protection, an environmental professional will be contacted and the work area will be evacuated until appropriate engineering controls (such as use of industrial fans) are implemented and follow up sampling is performed to confirm a safe working environment. 22 EMP Version 2, January 2021 VAPOR INTRUSION MITIGATION SYSTEM Is a vapor intrusion mitigation system (VIMS) proposed for this Brownfields Property? ܆܆ Yes ܈ No ܆ Unknown ܈ If no or unknown, include rationale here as well as plans for pre-occupancy sampling, as necessary: Sub-slab sampling did not indicate that vapor mitigation is warranted at the Brownfields site for existing buildings. No vapor mitigation is required for existing buildings per the draft Brownfields agreement. If yes, ܆ VIMS Plan Attached or ܆ VIMS Plan to be submitted separately If submitted separately provide date: VIMS Plan shall be signed and sealed by a NC Professional Engineer If no, please provide a brief rationale as to why no vapor mitigation plan is warranted: See above. Note that approval of this EMP does not imply approval with any vapor intrusion mitigation land use restrictions or requirements of the recorded or draft Brownfields Agreement and that separate approval of mitigation measures will be required. CONTINGENCY PLAN – encountering unknown tanks, drums, or other waste materials In this section please provide actions that will be taken to identify or manage unknown potential new sources of contamination. During redevelopment activities, it is not uncommon that unknown tanks, drums, fuel lines, landfills, or other waste materials are encountered. Notification to DEQ Brownfields Project Manager, UST Section, Fire Department, and/or other officials, as necessary and appropriate, is required when new potential source(s) of contamination are discovered. These Notification Requirements were outlined on Page 1 of this EMP. Should potentially impacted materials be identified that are inconsistent with known site impacts, the DEQ Brownfields Project Manager will be notified and a sampling plan will be prepared based on the EMP requirements and site-specific factors. Samples will generally be collected to document the location of the potential impacts. Check the following chemical analysis that are to be conducted on newly identified releases: ܈ Volatile organic compounds (VOCs) by EPA Method 8260 ܈ Semi-volatile organic compounds (SVOCs) by EPA Method 8270 ܈ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and silver) EPA Methods 6020/7471 23 EMP Version 2, January 2021 ܆܆ Pesticides: Specify Analytical Method Number(s): Click or tap here to enter text. ܆ PCBs: Specify Analytical Method Number(s): Click or tap here to enter text. ܈ Other Constituents & Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.) Please note, if field observations indicate the need for additional analyses, they should be conducted, even if not listed here. Hexavalent Chromium by EPA Method 7199 Please provide details on the proposed methods of managing the following commonly encountered issues during redevelopment of Brownfields Properties. During construction activities, contractors may encounter unknown sub-surface environmental conditions (i.e., tanks, drums, or waste materials) that if encountered, will require proper management. In the event that such conditions are encountered during construction activities, the actions noted below will be taken. Sampling data for potentially impacted soil and the disposition of impacted soil will be provided to DEQ when the data becomes available. Underground Storage Tanks: In the event a UST or impacts associated with a UST release are discovered at the Site during the activities, the UST and/or UST related impacts will be addressed through the Brownfields Program. DEQ Brownfields will be notified within 48-hours of discovery of the UST. If a UST is encountered, the UST will be removed, if possible and the UST will be transported off-Site for disposal at a suitable facility. If the UST contains residual fluids, the fluids will be sampled for VOCs, SVOCs, and RCRA metals (unless the fluids are a known product such as fuel oil), and transported off-Site for disposal at a suitable facility based on the laboratory analytical results prior to removing the UST from the ground. If a UST is encountered that cannot be removed or does not require removal for geotechnical or construction purposes, it may be abandoned in-place with prior DEQ approval and construction will proceed. Where appropriate, the bottom may be penetrated after removal of residual fluids and before abandonment to prevent fluid accumulation. Impacted soil in the vicinity of the UST will be managed in accordance with the Managing On-Site Soil section outlined above in the EMP. DEQ UST Program protocol (or other protocol approved in advance by the DEQ Brownfields Program) will be followed for UST abandonment procedures. Sub-Grade Feature/Pit: If a sub-grade feature or pit is encountered and does not require removal for geotechnical or construction purposes, it will be filled with soil or suitable fill and construction will proceed. Where appropriate, the bottom may be penetrated before back filling to prevent fluid accumulation. If the pit has waste in it, the waste will be set aside in a secure area and will be sampled for waste disposal purposes for TCLP VOCs, TCLP SVOCs, and TCLP metals and disposed off-Site at a permitted facility or the waste will be managed in accordance with Part 1.A. Section 4 outlined above in the 24 EMP Version 2, January 2021 EMP, whichever is most applicable based on the type of waste present. If the pit must be removed and the observed waste characteristics indicate the concrete may potentially be contaminated to a significant degree, the concrete will be sampled and analyzed by methods specified by the disposal facility. Buried Waste Material – Note that if buried waste, non-native fill, or any obviously filled materials is encountered, the DEQ Brownfields Program must be notified to determine if investigation of landfill gases is required: If excavation into buried wastes or significantly impacted soils occurs, the contractor is instructed to stop work in that location and notify the environmental consultant. The environmental consultant will review the materials and collect samples, if warranted. In this event, confirmation sampling will be conducted at representative locations in the base and the sidewalls of the excavation after the waste or significantly impacted soil is removed. The confirmation samples will be analyzed for VOCs, SVOCs, and RCRA metals plus hexavalent chromium. Areas of suspected contaminated soil that remain at the Site after excavation is complete above the DEQ IHSB Industrial PSRGs will be managed pursuant to this plan. Re-Use of Impacted Soils On-Site: Please refer to description outlined in the Part 1.A. Section 4 of the EMP above. If unknown, impacted soil is identified on-site, management on-site can be considered after the project team provides the necessary information, outlined in Part 1.A. Item 11, for Brownfields Project Manager approval prior to final placement on-site. If other potential contingency plans are pertinent, please provide other details or scenarios as needed below: Click or tap here to enter text. POST-REDEVELOPMENT REPORTING ܈܈ Check this box to acknowledge that a Redevelopment Summary Report will be required for the project. If the project duration is longer than one year, an annual update is required and will be due by January 31 of each year, or 30 days after each one-year anniversary of the effective date of this EMP (as agreed upon with the Project Manager). These reports will be required for as long as physical redevelopment of the Brownfields Property continues, except that the final Redevelopment Summary Report will be submitted within 90 days after completion of redevelopment. Based on the estimated construction schedule, the first Redevelopment Summary Report is anticipated to be submitted on 3/1/2022 The Redevelopment Summary Report shall include environment-related activities since the last report, with a summary and drawings, that describes: 1. actions taken on the Brownfields Property; 2. soil grading and cut and fill actions; 25 EMP Version 2, January 2021 3. methodology(ies) employed for field screening, sampling and laboratory analysis of environmental media; 4. stockpiling, containerizing, decontaminating, treating, handling, laboratory analysis and ultimate disposition of any soil, groundwater or other materials suspected or confirmed to be contaminated with regulated substances; and 5. removal of any contaminated soil, water or other contaminated materials (for example, concrete, demolition debris) from the Brownfields Property (copies of all legally required manifests shall be included). ܈ Check box to acknowledge consent to provide a NC licensed P.G. or P.E. sealed, Redevelopment Summary Report in compliance with the site’s Brownfields Agreement. 27 EMP Version 2, January 2021 “P” Building(Eastern Fence)SITE MAPFIGURE NO. 2 0200400APPROXIMATESCALE IN FEETNTITLEPROJECTP BUILDING AREA DETAILFORMER DURAFIBER TECHNOLOGIESSALISBURY, NORTH CAROLINADATE:JOB NO:REVISION NO:FIGURE:9-28-21 03OAN-001P BUILDINGAPPROX. SOIL DISTURBANCE AREAS 050100APPROXIMATESCALE IN FEETNTITLEPROJECTP BUILDING SOIL DISTURBANCE AREA DETAILFORMER DURAFIBER TECHNOLOGIESSALISBURY, NORTH CAROLINADATE:JOB NO:REVISION NO:FIGURE:9-28-21 04OAN-001New Power PolePower Line Trench(~1 ft W x 100 ft L x 1.5 ft D )Blower Pad (install on existing ground)Blower Pad (install on existing ground)Mixer/Cooler Foundation (~12 ft x 16 ft x 2.5 ft D)Liquid Stabilizer Pad/Containment (~20 ft x 20 ft x 2.5 ft D)(3) Silos Pad(~18 ft x 48 ft x 2.5 ft D)(2) Silos Pad(~16 ft x 33 ft x 2.5 ft D Appendix A Construction Drawings Appendix B Draft Brownfields Plat and Contaminant Tables VESTED IN:Salisbury Investments I LLCBook 1307, Page 44APN: 750 002APN: 750 030APN: 750 031STATESVILLE ROAD [U.S. HIGHWAY 70]NORFOLK SOUTHERN RAILROADNORFOLK SOUTHERN RAILROADRICHARD ROADLYNN ROADWWTP LAND AREA:5,387,936 Square Feet123.690 AcresNow or Formerly:DAVID B. MCSWAIN & FELECIA S. MCSWAINb762 p598826 020Now or Formerly:LAUREN KENEMORE & RYAN KASHOLAb1343 p636826 011Now or Formerly:MARGARET DOBBIN GUDEb1247 p893454 129Now or F o r m er l y : THOMAS G R E G O R Y T A Y L O R & J E S S I C A D A W N E L L I S b1255 p 8 6 9 750 042 Now or Formerly:TODD T. SHUPINGb1236 p524750 041Now or Formerly:JOE D. PADGETT & VICKI J. PADGETTb860 p184750 003Now or Formerly:MICHAEL E. SLUSARZb1172 p788750 032Now or Formerly:TAMARA KEPLEY & JEFFREY M. KEPLEYb796 p432750 029Now or Formerly:JOE HAMPTON & ROBIN HAMPTONb1318 p681750 051Now or Formerly:JOE HAMPTON & ROBIN HAMPTONb1316 p109750 004Now or Formerly:PERRY MARTIN BARBEE & DORIS R. BARBEEb1273 p949751 019Now or Formerly:BRAD A. STROUDb1036 p279751 009Now or Formerly:SHIRLEY J. HILDERBRAND751 045751 007Now or Formerly:PERRY MARTIN BARBEE & DORIS R. BARBEEb1273 p949751 019Now or Formerly:BRAD A. STROUDb1150 p775751 044Now or Formerly:SALISBURY INVESTMENTS I LLCb1307 p44827 014HILDEBRAND ROAD Now or Formerly: MERI (NC) LLC 826 013Now or Formerly:JERRY LEE HILDERBRAND 751 048Surveyor's SealNORTHSheet No.2of2PRELIMINARYFOR REVIEW ONLYEXHIBIT B to the Notice of Brownfields Property - SURVEY PLATProspective Developer and Property Owner: Salisbury Investments I, LLCTax Parcel IDs 750 002, 750 030, 750 031, 827 0147401 Statesville Blvd., Salisbury, NCBrownfields Project No.: 22030-18-080Brownfields Project Name: DurafiberBOUNDARY SURVEY4800 The Woods RoadKitty Hawk, NC 27949Phone: 252-351-0018Corporate Headquarters4111 Bradley Circle NWCanton, OH 44718Phone: 800-520-1010Fax: 330-342-0834PM:Drafter:SMRDWGMSI Project No. 48149PC: JJL 22030-18-080/Durafiber (20200923)   1 DRAFT Exhibit 2 The most recent environmental sampling at the Property reported in the Environmental Reports occurred on July 10, 2020.The following tables set forth, for contaminants present at the Property above commercial/industrial use standards or screening levels, the concentration found at each sample location, and the applicable standard or screening level. Screening levels and groundwater and surface water standards are shown for reference only and are not set forth as cleanup levels for purposes of this Agreement. GROUNDWATER Groundwater contaminants in micrograms per liter (the equivalent of parts per billion), the standards for which are contained in Title 15A of the North Carolina Administrative Code, Subchapter 2L (2L), Rule .0202, (April 1, 2013 version): Groundwater Contaminant Sample Location Date of Sampling Concentration Exceeding Standard (Pg/L) Standard (Pg/L) Aluminum 4A-80 5/22/1993 345 NE 4A-218 5/23/1993 230 4B-250 5/23/1993 252 CCC-155 6/20/1993 2,140 DDD-154 6/2/1993 722 EW-1 6/2/1993 214 EW-3 6/2/1993 227 EW-4 6/2/1993 975 EW-6 6/8/1993 216 EW-10 5/19/1993 1,070 EW-12 5/20/1993 1,260 EW-13 5/20/1993 294 EW-16 6/3/1993 212 EW-23 6/9/1993 791 EW-27 6/3/1993 1,840 EW-28 6/8/1993 1,210 EW-29 5/25/1993 557 EW-30 5/24/1993 2,250 EW-31 5/24/1993 3,440 EW-32 5/21/1993 4,760 EW-33 5/23/1993 1,310 EW-34 6/8/1993 6,730 EW-35 6/10/1993 5,640 22030-18-080/Durafiber (20200923)   2 EW-36 6/9/1993 2,000 YYY-180 5/19/1993 335 LLL-200 5/19/1993 919 UUU-100 5/24/1993 7,270 UUU-200 5/25/1993 618 VVV-145 5/21/1993 376 Barium Z-90 6/10/2020 3,020 700 Benzene S-58/DUP 6/10/2020 61.2 J/58.4 J 1 GG-43 1/1995 1.3 J X-156 1/1995 8.7 Benzyl Alcohol Z-90 6/10/2020 1,780 NE 1,1-Biphenyl 4A-80 1/1995 736 400 4A-218 9/9/2019 758 4G-77 9/9/2019 391 EW-11 5/9/1993 406 T-60 9/11/2019 447 X-156 8/1995 9,760 Bis(2- ethylhexyl)phthalate BBB-15 1/1995 5.1 J 3 CCC-37 1/1995 36.4 QQ-250 1/1995 5.6 J R-57 1/1995 6.8 J X-156 1/1995 8.6 J S-58/GW- DUP 6/10/2020 3.7 J/4.6 J Cadmium Z-90 6/10/2020 9.66 2 EW-9 5/25/1993 53 EW-10 5/25/1993 109 EW-11 9/10/2019 82.5 EW-12 5/20/1993 116 HH-97 9/11/2019 1,100 Q-59 9/10/2019 273 QQ-75 9/10/2019 99.3 S-58/DUP 6/10/2020 12,500/12,500 Y-119 9/10/2019 244 YY-37 6/10/2020 53.4 Z-90 6/10/2020 9.66 1-Chlorophenol S-58/DUP 6/10/2020 14.8/13.5 NE Chromium 4A-80 5/22/1993 139 10 4B-250 5/23/1993 14 CCC-155 6/20/1993 16 DD-40 6/10/2020 10.6 EW-29 5/25/1993 23 22030-18-080/Durafiber (20200923)   3 EW-32 5/21/1993 12 EW-34 6/8/1993 22 EW-35 6/10/1993 14 GG-43 6/10/2020 190 RR-102 6/10/2020 69.4 UUU-100 5/24/1993 18 UUU-200 5/25/1993 33 VVV-145 5/21/1993 29 YYY-180 5/19/1993 134 Z-90 6/10/2020 13.6 Hexavalent Chromium DD-40 6/10/2020 3.86 NE GG-43 6/10/2020 3.97 RR-102 6/10/2020 9.51 TT-34 6/10/2020 0.16 1,2-Dichlorobenzene AA-71 9/10/2019 59.1 20 GG-43/DUP 9/11/2019 464/438 EW-11 5/19/1993 63 EW-12 5/20/1993 34 EW-21 6/7/1993 74 HH-97 1/1995 3.6 J PP-2 1/1995 31.2 Q-59 1/1995 50.2 QQ-75 1/1995 29.3 YY-37 6/10/2020 248 1,4-Dichlorobenzene S-58/DUP 6/10/2020 140/137 6 1,1-Dichloroethane 4A-80 1/1995 16.7 6 EW-2 6/2/1993 102 EW-24 6/10/1993 22 M-104 1/1995 15.8 Y-119 1/1995 115 J 1-4-Dioxane 4A-80 9/9/2019 233 3 4A-218 9/9/2019 64.7 4G-77 9/9/2019 195 4G-231/DUP 9/9/2019 53/49.3 AA-71 9/10/2019 371 CCC-155 9/8/2019 377 DDD-154 9/9/2019 34 EE-58 9/11/2019 1,740 EEE-14 10/2/2017 15.5 EEE-114 9/9/2019 17 EEE-368 9/9/2019 4 EW-01 9/10/2019 51 22030-18-080/Durafiber (20200923)   4 EW-02 9/10/2019 2,050 EW-03 9/10/2019 269 EW-04 9/10/2019 834 EW-05 9/10/2019 876 EW-6 6/8/1993 2,055 EW-7 5/25/1993 2,102 EW-8 5/25/1993 5,775 EW-9 5/25/1993 3,258 EW-10 5/25/1993 3,874 EW-11 9/10/2019 2,200 EW-12 5/20/1993 2,067 EW-13 5/20/1993 894 EW-14 5/21/1993 41 EW-15 5/21/1993 218 EW-16 6/3/1993 10 EW-20 6/15/1993 115 EW-21 6/7/1993 22 EW-22 6/7/1993 144 EW-23 6/9/1993 14 EW-24 6/10/1993 18 EW-25 6/10/1993 20 EW-26 6/11/1993 19 EW-27 6/3/1993 875 EW-28 6/8/1993 898 EW-29 5/25/1993 1,036 EW-30 5/24/1993 166 EW-31 5/24/1993 312 EW-32 5/21/1993 1,184 EW-34 6/8/1993 43 EW-35 6/10/1993 80 EW-36 6/9/1993 10 FFF-51 1/1995 21.3 FFF-101 1/1995 9,500 GG-43/DUP 9/11/2019 155/155 HH-97 9/11/2019 774 K-50 1/1995 2,390 L-41 1/1995 6.8 J LLL-25 9/10/2019 5.2 LLL-96 9/10/2019 5.3 M-104 8/1995 126 PP-3 1/1995 1,600 PP-4 1/1995 1,430 22030-18-080/Durafiber (20200923)   5 PPP-27 8/1995 7,270 PPP-100 8/1995 1,980 Q-59 9/10/2019 2,390 QQ-48 9/10/2019 73 QQ-75 9/10/2019 631 R-30 9/11/2019 63.8 R-57 9/11/2019 951 RR-102 9/11/2019 4.2 S-58 9/11/2019 20,300 SI-2 9/11/2019 17.1 T-60 9/11/2019 1,620 TT-34 9/10/2019 873 TT-84 9/10/2019 1,430 UUU-200 9/8/2019 21 V-47 1/1995 194 VVV-145 9/10/2019 1,060 WWW-154 9/9/2019 940 X-156 8/1995 287 XXX-116 9/10/2019 6.3 Y-119 9/10/2019 1,020 YY-37 9/11/2019 1,810 YY-96 9/11/2019 1,630 Z-90 9/10/2019 1,400 Diphenyl Ether 4A-80 9/9/2019 2,130 NE 4A-218 9/9/2019 2,280 4B-230 9/9/2019 36.7 4G-231/DUP 9/9/2019 764/902 4G-77 9/9/2019 1,430 AA-71 9/10/2019 51.2 CCC-155 1/1995 11.9 EE-58 9/11/2019 698 EEE-114 1/1995 4.9 J EW-5 10/4/2019 21.2 EW-6 6/8/1993 56 EW-7 5/25/1993 34 EW-8 5/25/1993 192 EW-9 5/25/1993 15 EW-10 5/25/1993 79 EW-11 9/10/2019 47.8 EW-12 5/20/1993 170 EW-21 6/7/1993 10 EW-22 6/7/1993 69 22030-18-080/Durafiber (20200923)   6 EW-24 6/10/1993 910 EW-29 5/25/1993 14 FFF-51 1/1995 15.9 FFF-101 1/1995 68.1 GG-43/DUP 9/11/2019 116 J/167 J HH-97 9/11/2019 540 K-50 8/1995 400 M-104 1/1995 3.4 J PP-2 1/1995 28.4 PP-4 1/1995 14.1 PPP-27 1/1995 9.1 J QQ-48 9/10/2019 53.7 Q-59 9/10/2019 157 QQ-75 9/10/2019 311 QQ-250 1/1995 22.6 R-57 9/11/2019 34.7 S-58 9/11/2019 322 T-60 9/11/2019 2,620 VVV-145 9/10/2019 43.1 WWW-154 9/9/2019 14.7 X-156 8/1995 32,500 Y-119 9/10/2019 238 YY-37 9/11/2019 70.8 YY-96 9/11/2019 28.2 Z-90 9/10/2019 131 Fluoranthene Y-119 1/1995 975 300 Iron 4A-80 5/22/1993 1,030 300 4C-200 5/23/1993 345 CCC-155 6/20/1993 2,430 DDD-154 6/2/1993 660 EW-1 6/2/1993 10,100 EW-2 6/2/1993 9,710 EW-3 6/2/1993 6,070 EW-4 6/2/1993 6,050 EW-5 6/8/1993 7,100 EW-6 6/8/1993 10,000 EW-7 5/25/1993 3,000 EW-8 5/25/1993 7,160 EW-9 5/25/1993 42,600 EW-10 5/25/1993 4,700 EW-11 5/19/1993 2,170 EW-12 5/20/1993 7,560 22030-18-080/Durafiber (20200923)   7 EW-13 5/20/1993 11,100 EW-14 5/21/1993 7,710 EW-15 5/21/1993 2,930 EW-16 6/3/1993 4,350 EW-17 6/14/1993 14,100 EW-18 6/14/1993 10,600 EW-19 6/15/1993 2,520 EW-20 6/15/1993 2,750 EW-21 6/7/1993 685 EW-22 6/7/1993 2,220 EW-23 6/9/1993 42,600 EW-24 6/10/1993 2,710 EW-25 6/10/1993 5,100 EW-26 6/11/1993 2,950 EW-27 6/3/1993 2,150 EW-28 6/8/1993 906 EW-29 5/25/1993 608 EW-30 5/24/1993 2,120 EW-31 5/24/1993 3,920 EW-32 5/21/1993 8,000 EW-33 5/23/1993 1,950 EW-34 6/8/1993 10,800 EW-35 6/10/1993 8,000 EW-36 6/9/1993 3,430 LLL-200 5/19/1993 687 UUU-100 5/24/1993 3,630 UUU-200 5/25/1993 726 VVV-145 5/21/1993 621 YYY-180 5/19/1993 1,440 Lead CCC-155 6/2/1993 16 15 Manganese CCC-155 6/20/1993 57 50 DDD-154 6/2/1993 77 EW-1 6/2/1993 63 EW-2 6/2/1993 386 EW-3 6/2/1993 92 EW-4 6/2/1993 90 EW-5 6/8/1993 139 EW-6 6/8/1993 116 EW-7 5/25/1993 141 EW-8 5/25/1993 1,140 EW-9 5/25/1993 679 EW-10 5/25/1993 683 22030-18-080/Durafiber (20200923)   8 EW-11 5/19/1993 475 EW-12 5/20/1993 155 EW-13 5/20/1993 169 EW-14 5/21/1993 113 EW-17 6/14/1993 179 EW-18 6/14/1993 76 EW-22 6/7/1993 122 EW-23 6/9/1993 223 EW-24 6/10/1993 50 EW-25 6/10/1993 71 EW-27 6/3/1993 56 EW-28 6/8/1993 271 EW-29 5/25/1993 85 EW-31 5/24/1993 172 EW-32 5/21/1993 488 EW-34 6/8/1993 397 EW-35 6/10/1993 107 EW-36 6/9/1993 114 LLL-200 5/19/1993 54 UUU-100 5/24/1993 93 Methylene Chloride EW-29 5/25/1993 25 5 EW-31 5/24/1993 6 K-50 1/1995 5.5 B Y-119 1/1995 105 J 3&4-Methylphenol Z-90 6/10/2020 58.9 NE 4-Methylphenol Y-119 1/1995 947 40 Naphthalene X-156 1/1995 28.7 6 Phenol K-50 1/1995 19,900 30 Z-90 6/10/2020 2,730 Tetrachloroethene GG-43 1/1995 7 0.7 K-50 1/1995 11.1 M-104 1/1995 9.2 Y-119 1/1995 70 J 1,1,1-Trichloroethane EW-29 5/25/1993 8,915 200 EW-30 5/24/1993 1,284 EW-31 5/24/1993 882 Trichloroethene GG-43 1/1995 3.1 J 3 K-50 1/1995 147 M-104 1/1995 4.9 Y-119 1/1995 150 J J = Concentration is estimated value detected between laboratory method detection limit and reporting liming 22030-18-080/Durafiber (20200923)   9 B = Analyte detected in method blank GROUNDWATER VAPOR INTRUSION RISK Groundwater contaminants with potential for vapor intrusion (VI) in micrograms per liter (the equivalent of parts per billion), the vapor intrusion screening levels for which are derived from the Non-Residential Vapor Intrusion Screening Levels of the Division of Waste Management (July 2020 version): Groundwater Contaminant with Potential for Vapor Intrusion Sample Location Date of Sampling Concentration Exceeding Screening Level (Pg/L) Non- Residential VI Screening Level1 (Pg/L) 1,1-Biphenyl 4A-80 9/9/2019 103 28 4A-218 9/9/2019 758 4B-230 9/9/2019 36.7 4G-77 9/9/2019 391 4G-231 9/9/2019 149 EW-5 6/8/1993 71 EW-6 6/8/1993 56 EW-7 5/25/1993 34 EW-8 5/25/1993 192 EW-10 5/25/1993 79 EW-11 5/19/1993 406 EW-12 5/20/1993 170 EW-24 6/10/1993 290 GG-43 8/1995 169 HH-97 1/1995 36.4 K-50 8/1995 230 S-58 9/11/2019 27.6 T-60 9/11/2019 447 X-156 8/1995 9,760 Z-90 9/10/2019 20.1 Chlorobenzene HH-97 9/11/2019 1,100 340 S-58/DUP 6/10/2020 12,500/12,500 Z-90 6/10/2020 1,500 1,2-Dichlorobenzene GG-43 1/1995 8,840 2,200 Diphenyl Ether 4A-80 9/9/2019 2,130 31 4A-218 9/9/2019 2,280 4B-230 9/9/2019 36.7 22030-18-080/Durafiber (20200923)   10 4G-231 9/9/2019 764/902 4G-77 9/9/2019 1,430 AA-71 9/10/2019 51.2 EE-58 9/11/2019 698 EW-5 10/4/2019 21.2 EW-6 6/8/1993 56 EW-7 5/25/1993 34 EW-8 5/25/1993 192 EW-10 5/25/1993 79 EW-11 9/10/2019 47.8 EW-12 5/20/1993 170 EW-22 6/7/1993 69 EW-24 6/10/1993 910 FFF-101 1/1995 68.1 GG-43/DUP 9/11/2019 116 J/167 J HH-97 9/11/2019 540 K-50 8/1995 400 QQ-48 9/10/2019 53.7 Q-59 9/10/2019 157 QQ-75 9/10/2019 311 R-57 9/11/2019 34.7 S-58 9/11/2019 322 T-60 9/11/2019 2,620 VVV-145 9/10/2019 43.1 X-156 8/1995 32,500 Y-119 9/10/2019 238 YY-37 9/11/2019 70.8 Z-90 9/10/2019 131 Tetrachloroethene Y-119 1/1995 70 J 48 1,1,1-Trichloroethane EW-29 5/25/1993 8,915 6,200 Trichloroethene K-50 1/1995 147 4.4 M-104 1/1995 4.9 Y-119 1/1995 150 J J - Concentration is estimated value detected between laboratory method detection limit and reporting liming 1 Screening levels displayed for non-carcinogens are for a hazard quotient equal to 0.2. Screening levels displayed for carcinogens are for a 1.0E-5 lifetime incremental cancer risk. 22030-18-080/Durafiber (20200923)   11 SOIL Soil contaminants in milligrams per kilogram (the equivalent of parts per million), the screening levels for which are derived from the Preliminary Industrial Health- Based Soil Remediation Goals of the Inactive Hazardous Sites Branch of DEQ’s Superfund Section (July 2020 version): Soil Contaminant Sample Location Depth (ft) Date of Sampling Concentration Exceeding Screening Level (mg/kg) Non- Residential Screening Level1 (mg/kg) Antimony GRUB-1 15 1991-1994 6,880 93 GRUB-2 5 1991-1994 9,690 GRUB-3 10 1991-1994 8,800 GRUB-4 10 1991-1994 5,960 GRUB-5 10 1991-1994 8,880 GRUB-6 15 1991-1994 6,000 GRUB-7 15 1991-1994 7,400 GRUB-8 5 1991-1994 6,010 GRUB-9 10 1991-1994 5,850 GRUB-10 10 1991-1994 6,450 GRUB-11 5 1991-1994 5,989 GRUB-12 15 1991-1994 6,490 GRUB-13 10 1991-1994 6,970 GRUB-14 15 1991-1994 828 GRUB-15 5 1991-1994 2,940 GRUB-18 15 1991-1994 16,399 PP-01-3B NR 5/11/1994 369 PP-01-4B NR 5/12/1994 625 Arsenic GRUB-5 10 1991-1994 3.1 3 GRUB-11 5 1991-1994 4.5 GRUB-13 10 1991-1994 6.9 GRUB-15 5 1991-1994 15.6 GRUB-18 15 1991-1994 4.4 PP-01-3B NR 5/11/1994 5.12 PP-01-4B NR 5/12/1994 8.9 1,1-biphenyl GRUB-1 15 1991-1994 69.498 D 43 GRUB-2 5 1991-1994 247.537 D GRUB-5 10 1991-1994 129.464 D GRUB-6 15 1991-1994 366 22030-18-080/Durafiber (20200923)   12 GRUB-8 5 1991-1994 56.979 GRUB-10 10 1991-1994 402.752 GRUB-11 5 1991-1994 60.912 GRUB-12 15 1991-1994 81.913 GRUB-13 10 1991-1994 214.133 DJ GRUB-14 15 1991-1994 133.796 GRUB-15 5 1991-1994 495.223 GRUB-18 15 1991-1994 190.855 Biphenyl ether GRUB-1 15 1991-1994 220.077 D NE GRUB-2 5 1991-1994 996.305 D GRUB-4 10 1991-1994 73.005 J GRUB-5 10 1991-1994 426.339 D GRUB-6 15 1991-1994 4,354 GRUB-8 5 1991-1994 181.938 GRUB-9 10 1991-1994 75.862 GRUB-10 10 1991-1994 1,503.376 GRUB-11 5 1991-1994 145.603 GRUB-12 15 1991-1994 240.367 GRUB-13 10 1991-1994 578.158 DJ GRUB-14 15 1991-1994 413.58 D GRUB-15 5 1991-1994 1,689.172 D GRUB-18 15 1991-1994 607.555 PP-01-4B NR 5/12/1994 276 DTHA-1 3.5 6/1986 1,603 DTHA-2 3.5 6/1986 106 5.0 68.1 DTHA-3 3.0 6/1986 98.5 DTHA-4 3.5 6/1986 2,665 8.0 1,417 DTHA-5 7.5 6/1986 5,299 DTHA-6 6.5 6/1986 1,054 DTHA-7 3.5 6/1986 841 4.5 1,498 DTHA-8 3.0 6/1986 181 7.0 2,786 DTHA-8 3.0 6/1986 181 DT-4SS 15 (DUP) 1991-1994 0.126 J/ 0.064 J 20 0.065 J DT-5SS 20 1991-1994 0.124 25 0.13 DT-6SS 10 1991-1994 0.095 J 22030-18-080/Durafiber (20200923)   13 DTPT- 1SS 5 1991-1994 0.16 J DTPT- 2SS 5 1991-1994 5.065 10 0.634 15 0.109 J 20 0.359 J 25 0.236 J 40 0.225 J 45 0.119 J POND-3 5-10 1/25/1991 24.603 Calcium DTPT- 1SS 5 1991-1994 3,331 NE 15 4,467 20 5,192 25 1,791 30 1,967 35 8,728 DTPT- 2SS 5 1991-1994 2,606 10 2,957 15 6,218 20 3,657 25 3,462 35 3,946 40 7,687 45 3,594 DT-3SS 5 1991-1994 4,650 10 (DUP) 2,740/2,410 15 4,370 20 5,270 25 4,470 DT-4SS 5 1991-1994 1,720 10 543 B 15 (DUP) 92.9 B/79.7 B 20 752 B 25 2,430 30 4,120 35 5,110 DT-5SS 5 1991-1994 5,100 10 3,590 15 5,220 22030-18-080/Durafiber (20200923)   14 20 (DUP) 6,310/6,810 25 2,880 DT-6SS 5 1991-1994 2,130 10 1,700 15 (DUP) 1,000/1,800 20 1,620 25 2,520 30 2,970 PP-01-1B NR 5/11/1994 1,660 PP-01-2B NR 5/11/1994 1,180 PP-01-3B NR 5/11/1994 6,330 PP-01-4B NR 5/12/1994 5,590 PP-02-1 NR 5/11/1994 2,210 PP-02-2 NR 5/11/1994 2,130 PP-02-1 NR 5/12/1994 441 PP-03-2 NR 5/12/1994 1,250 PP-04-1 NR 5/12/1994 2,800 PP-04-2 NR 5/12/1994 1,060 Chromium GRUB-1 15 1991-1994 199 6.5 GRUB-2 5 1991-1994 84.7 GRUB-3 10 1991-1994 9.5 GRUB-4 10 1991-1994 7.1 GRUB-5 10 1991-1994 48.5 GRUB-6 15 1991-1994 33.6 GRUB-7 15 1991-1994 27.2 GRUB-8 5 1991-1994 18.7 GRUB-9 10 1991-1994 34.9 GRUB-10 10 1991-1994 21.8 GRUB-11 5 1991-1994 27.6 GRUB-13 10 1991-1994 7.5 GRUB-14 15 1991-1994 47.1 GRUB-15 5 1991-1994 8,020 GRUB-18 15 1991-1994 32.3 GRUB-1 30 1991-1994 20.8 GRUB-8 20 1991-1994 16.1 PP-01-1B NR 5/11/1994 92.3 PP-01-2B NR 5/11/1994 56.7 PP-01-3B NR 5/11/1994 2,150 PP-01-4B NR 5/12/1994 3,320 PP-02-1 NR 5/11/1994 21.4 22030-18-080/Durafiber (20200923)   15 PP-02-2 NR 5/11/1994 40.5 PP-03-1 NR 5/12/1994 19.5 PP-03-2 NR 5/12/1994 30.4 PP-04-1 NR 5/12/1994 16.6 PP-04-2 NR 5/12/1994 29.3 DTPT- 1SS 5 1991-1994 62 15 77.4 20 386 25 12.8 30 9.6 35 16.5 DTPT- 2SS 5 1991-1994 14.9 10 16.6 15 37.6 20 27.8 25 26.3 35 10.3 40 11.1 45 10.2 DT-3SS 5 1991-1994 57.5 10 (DUP) 202/194 15 22.6 20 28 25 57.8 DT-4SS 5 1991-1994 47.3 10 14.5 15 (DUP) 10.8/12 20 14 25 19.1 30 13 35 11.9 DT-5SS 5 1991-1994 40.4 10 45 15 25 20 (DUP) 80.9/51.4 25 7.8 5 73.4 10 67.6 22030-18-080/Durafiber (20200923)   16 DT-6SS 15 (DUP) 1991-1994 148/77 20 38.3 25 20.3 30 16.7 CRU-1SS 5 1991-1994 44.4 10 35.6 15 25.8 25 14.7 30 23.2 CRU-2SS 5 1991-1994 50.1 10 60.2 15 35.1 20 36 25 27.8 30 16 35 12.6 CRU-3SS 5 1991-1994 60 10 138 CRU-4SS 5 1991-1994 46.9 10 12.1 15 19.1 Cobalt DT-3SS 10 1991-1994 132 70 15 80 Magnesium PP-01-1B NR 5/11/1994 1,090 NE PP-01-2B NR 5/11/1994 3,880 PP-01-3B NR 5/11/1994 3,340 PP-01-4B NR 5/12/1994 2,210 PP-02-1 NR 5/11/1994 2,620 PP-02-2 NR 5/11/1994 2,830 PP-03-1 NR 5/12/1994 1,560 PP-03-2 NR 5/12/1994 2,260 PP-04-1 NR 5/12/1994 5,660 PP-04-2 NR 5/12/1994 2,490 DTPT- 1SS 5 1991-1994 3,910 15 4,880 20 19,011 25 4,114 30 4,744 35 3,720 5 2,374 10 4,796 22030-18-080/Durafiber (20200923)   17 DTPT- 2SS 15 1991-1994 13,514 20 4,649 25 4,198 35 3,059 40 4,068 45 5,832 DT-3SS 5 1991-1994 3,810 10 (DUP) 3,990/4,580 15 6,500 20 5,600 25 3,030 DT-4SS 5 1991-1994 1,940 10 1,600 15 (DUP) 3,180/2,200 20 3,160 25 11,000 30 5,160 35 4,270 DT-5SS 5 1991-1994 3,530 10 3,400 15 5,760 20 (DUP) 9,410/10,000 25 3,390 DT-6SS 5 1991-1994 3,430 10 2,970 15 (DUP) 1,670/2,860 20 3,590 25 6,450 30 3,630 1,4- Dichlorobenzene GRUB-10 10 1991-1994 13.714 12 1,4-Dioxane GRUB-6 15 1991-1994 31.154 25 GRUB-7 15 1991-1994 47.536 D GRUB-12 15 1991-1994 51.344 GRUB-18 15 1991-1994 28.936 POND-3 5-10 1/21/1991 34.284 D p-Isopropyltoluene SB-3DUP 2-4 6/9/2020 0.0608 NE Potassium PP-01-1B NR 5/11/1994 457 NE 22030-18-080/Durafiber (20200923)   18 PP-01-2B NR 5/11/1994 1,720 PP-01-3B NR 5/11/1994 1,750 PP-01-4B NR 5/12/1994 1,190 PP-02-1 NR 5/11/1994 103 PP-02-2 NR 5/11/1994 497 PP-03-1 NR 5/12/1994 550 PP-03-2 NR 5/12/1994 1,200 PP-04-1 NR 5/12/1994 300 PP-04-2 NR 5/12/1994 1,520 DTPT- 1SS 5 1991-1994 1,075 15 521 B 20 743 B 25 1,299 30 2,326 35 666 B DTPT- 2SS 5 1991-1994 1,664 15 695 B 20 496 B 25 453 B DT-3SS 5 1991-1994 1,610 10 (DUP) 607 B/864 B 15 813 B 20 672 B 25 574 B DT-4SS 5 1991-1994 789 B 10 694 B 15 (DUP) 1,170/728 B 20 409 B 25 4,470 30 1,390 35 433 B DT-5SS 5 1991-1994 1,390 10 1,300 15 455 B 20 (DUP) 1,660/1,630 25 999 B 5 929 B 10 650 B 22030-18-080/Durafiber (20200923)   19 DT-6SS 15 1991-1994 692 B 25 685 B 30 944 B Sodium PP-01-1B NR 5/11/1994 224 PP-01-2B NR 5/11/1994 166 PP-01-3B NR 5/11/1994 1,440 PP-01-4B NR 5/12/1994 1,570 PP-02-1 NR 5/11/1994 188 PP-02-2 NR 5/11/1994 235 PP-03-1 NR 5/12/1994 186 PP-03-2 NR 5/12/1994 312 PP-04-1 NR 5/12/1994 188 PP-04-2 NR 5/12/1994 235 DTPT- 1SS 5 1991-1994 233 B 15 318 B 20 326 B 25 204 B 30 208 B 35 460 B DTPT- 2SS 5 1991-1994 332 B 10 209 B 15 419 B 20 289 B 25 302 B 35 243 B 40 257 B 45 197 B DT-3SS 5 1991-1994 1,180 10 (DUP) 556 B/541 B 15 312 B 20 228 B 25 247 B DT-4SS 5 1991-1994 551 B 15 (DUP) 246 B/250 B 20 317 B 25 304 B 30 389 B 35 271 B 5 886 B 10 896 B 22030-18-080/Durafiber (20200923)   20 DT-5SS 15 1991-1994 333 B 20 (DUP) 259 B/274 B DT-6SS 5 1991-1994 210 B 30 254 B Trichloroethene GRUB-1 15 1991-1994 11.088 4 GRUB-8 5 1991-1994 7.42 GRUB-12 15 1991-1994 15.538 1Screening levels displayed for non-carcinogens are for a hazard quotient equal to 0.2. Screening levels displayed for carcinogens are for a 1.0E-6 lifetime incremental cancer risk. NE – No established screening level J – Estimated value D – Secondary dilution required SUB-SLAB VAPOR OR SOIL GAS Soil gas contaminants in micrograms per cubic meter, the screening levels for which are derived from Non-Residential Vapor Intrusion Screening Levels of the Division of Waste Management (July 2020 version): Soil Gas Contaminant Sample Location Date of Sampling Concentration Exceeding Screening Level (Pg/m3) Non-Residential Screening Limit1 (Pg/m3) cis-1,2- Dichloroethylene SS-7 6/9/2020 1.0 NE Ethanol SS-1 6/10/2020 1,000 NE SS-2 6/10/2020 630 SS-3/DUP 6/10/2020 910/690 SS-4 6/9/2020 560 SS-5 6/9/2020 860 SS-6 6/9/2020 900 SS-7 6/9/2020 530 SS-8 6/9/2020 560 SS-9 6/9/2020 3,600 SS-10 6/9/2020 1,700 SS-11 6/9/2020 750 4-Ethyltoluene SS-8 6/9/2020 2.4 NE SS-9 6/9/2020 0.73 J SS-10 6/9/2020 2.0 SS-11 6/9/2020 5.9 22030-18-080/Durafiber (20200923)   21 Trichlorofluoromethane SS-1 6/10/2020 3.6 J NE SS-2 6/10/2020 1.9 J SS-3/DUP 6/10/2020 2.0 J/2.0 J SS-4 6/9/2020 2.1J SS-5 6/9/2020 1.7 J SS-6 6/9/2020 1.6 J SS-7 6/9/2020 1.3 J SS-8 6/9/2020 1.6 J SS-9 6/9/2020 2.1 J SS-10 6/9/2020 3.1 J SS-11 6/9/2020 1.5 J 1Screening levels displayed for non-carcinogens are for a hazard quotient equal to 0.2. Screening levels displayed for carcinogens are for a 1.0E-5 lifetime incremental cancer risk. NE-No established screening level  SURFACE WATER Surface water contaminants (in micrograms per liter, the equivalent of parts per billion), the unrestricted use standards for which are contained in Title 15A of the North Carolina Administrative Code, Subchapter 2B, Rule .0208 (June 2019): Surface Water Contaminant Sample Location Date of Sampling Concentration Exceeding Standard (Pg/L) Standard (Pg/L) 1,4-Dioxane SW-2 9/10/2019 5.9 NE SW-3 9/10/2019 6.3 SW-4 9/9/2019 2.4 SW- 5/DUP 9/9/2019 7.6/7.8 SW-6 9/9/2019 4.3 NE-No established standard Appendix C Soil Vapor Sample Location Map and Data Summary Table 5Summary of Sub-Slab Soil Vapor Analytical DataSalisbury Investments Salisbury, North CarolinaH&H Job No. FDP-058Evaluation AreaSample IDSS-1 SS-2 SS-4 SS-5 SS-6 SS-7 SS-8 SS-9 SS-10 SS-11Sample DateSlab Thickness (in)16 9 12141817 8 121112UnitsVOCs (TO-15)Acetone (2)120380360340861101901202102904602302,700,000Benzene1.0<0.26<0.260.40<0.26<0.26<0.260.51 J 0.31 J<0.26<0.260.59 J1,6002-Butanone (MEK)7.3 J6.6 J7.4 J8.3 J5.3 J8.7 J12 J6.0 J8.1 J16 J605.5 J440,000Carbon Disulfide2.7 J<0.43<0.43<0.43<0.43<0.43<0.435.9 J<0.43<0.43<0.43<0.4361,000Carbon Tetrachloride0.83 J<0.41<0.41<0.41<0.41<0.41<0.41<0.41<0.41<0.41<0.41<0.412,000Chloroform3.9<0.36<0.36<0.36<0.36<0.36<0.364.8<0.361.0<0.36<0.36530 Dichlorodifluoromethane (Freon 12)3.12.12.52.52.11.91.91.71.91.9<0.431.98,8001,1-Dichloroethane17<0.25<0.25<0.25<0.25<0.25<0.25<0.25<0.25<0.25<0.25<0.257,7001,1-Dichloroethylene210<0.43<0.43<0.43<0.43<0.43<0.43<0.43<0.43<0.43<0.43<0.4318,000cis-1,2-Dichloroethylene<0.32<0.32<0.32<0.32<0.32<0.32<0.321.0<0.32<0.32<0.32<0.32NEEthanol (2)1,0006309106905608609005305603,6001,700750NEEthyl Acetate12<0.54<0.54<0.54<0.547.8<0.54<0.545.610<0.54116,100Ethylbenzene0.50 J<0.50<0.50<0.50<0.500.56 J<0.50<0.501.10.66 J1.22.44,9004-Ethyltoluene<0.60<0.60<0.60<0.60<0.60<0.60<0.60<0.602.40.73 J2.05.9NEHeptane0.82<0.48<0.48<0.48<0.48<0.48<0.48<0.48<0.48<0.48<0.481.135,0002-Hexanone (MBK)<0.48<0.48<0.48<0.48<0.48<0.48<0.48<0.48<0.48<0.4815<0.482,600Isopropanol2002201701602222362121427017 J18,000Methylene Chloride8.41.3 J1.8 J1.3 J1.7 J6.7 J1.4 J2.6 J1.5 J2.3 J2.2 J5.6 J53,0004-Methyl-2-pentanone (MIBK)<0.43<0.432.52.8<0.43<0.43<0.43<0.43<0.4314<0.4334260,000Naphthalene<0.80<0.80<0.80<0.800.82 J<0.80<0.800.88 J4.55.74.09.2260Styrene0.63 J<0.53<0.53<0.53<0.53<0.53<0.53<0.530.920.901.32.488,000Tetrachloroethylene752.29.79.56100.84 J2601.3 J33530693.93,500Tetrahydrofuran<0.59<0.59<0.59<0.59<0.59<0.59<0.599.1<0.59<0.59<0.59<0.59180,000Toluene4.01.30.68 J 0.63 J1.34.61.61.53.02.53.17.4440,0001,1,1-Trichloroethane4.2132.62.50.79 J<0.412.9<0.41<0.411.1<0.41<0.41440,000Trichloroethylene17<0.43<0.43<0.43<0.43<0.43<0.430.82 J<0.43<0.43<0.43<0.43180 Trichlorofluoromethane (Freon 11)3.6 J1.9 J2.0 J2.0 J2.1 J1.7 J1.6 J1.3 J1.6 J2.1 J3.1 J1.5 JNE1,1,2-Trichloro-1,2,2-trifluoroethane (Freon 113)<1.2<1.2<1.2<1.2<1.2<1.2<1.2<1.2<1.2<1.23.8 J<1.2440,0001,2,4-Trimethylbenzene<0.63<0.63<0.63<0.63<0.63<0.63<0.63<0.63<0.63<0.63<0.63255,3001,3,5-Trimethylbenzene<0.62<0.62<0.62<0.62<0.62<0.62<0.62<0.624.61.34.0125,300m&p-Xylene1.7 J2.01.2 J1.5 J1.1 J1.8 J1.3 J1.2 J103.98.3218,800o-Xylene0.69 J 0.69 J<0.54<0.54<0.540.82 J 0.57 J 0.61 J3.41.42.97.18,800Notes:1) North Carolina Department of Environment Quality (DEQ) Division of Waste Management (DWM) Non-Residential Sub-slab and Exterior Soil Gas Screening Levels (SGSLs) dated February 20182) Concentrations were reported with the V-06 laboratory qualifier. V-06 = Continuing calibration verification did not meet method specifications and was biased on the high side for the compound.Only constituents detected in at least one sample are shown in the table above.Compound concentrations are reported in micrograms per cubic meter (μg/m3).Compound concentrations are reported to the laboratory detection limits.Laboratory analytical method is shown in parentheses. J = Compound was detected above the laboratory method detection limit, but below the laboratory reporting limit resulting in a laboratory estimated concentration. VOCs = Volatile Organic Compounds; in = Inches; NE = Not Established 6/9/2020 6/9/2020Non-Residential SGSLs (1)μg/m3SS-3 / SS-DUPFilament WarehouseStaple Warehouse Maintenance Building Training Building6/10/2020136/9/2020S:\AAA-Master Projects\ForSite Development Partners (FDP)\FDP-058 Durafiber Celanese Salisbury\Brownfields\Assessment\Tables\Data Table FDP-0587/8/2020Table 5 (Page 1 of 1) Hart & Hickman, PC POLISHINGPONDPOLISHINGPONDPOLISHINGPONDPOLISHINGPONDDIGESTORPROCESSWATERPONDABANDONED AERATION BASINREC CLUBHOUSEFIBERLAKESTAPLE WAREHOUSEFILAMENTWAREHOUSECLARIFIERDOW STORAGESB-1SB-2SB-3SB-4SB-5SB-6SB-7SS-2SS-5SS-1SS-3SS-4SS-6SS-7SS-8SS-9SS-10SS-11SW-4SW-1BG-1BG-2PARKINGPARKINGCELANESE DRIVE TT-34YY-37R-30Z-90RR-102S-58DD-40GG-43FORMER GRUB LANDFILLDOWTHERM AREAWASTE WATERTREATMENT PLANTDOW REBOILERSDOW STORAGEDOW BOILERSFUEL OIL STORAGEMAINTENANCE BUILDINGTRAINING BUILDINGEQUALIZATION TANKS(FORMER CRU BASIN)REVISION NO. 0JOB NO. FDP-058DATE: 7-8-20FIGURE NO. 4SALISBURY INVESTMENTS7401 STATESVILLE BOULEVARDSALISBURY, NORTH CAROLINASAMPLE LOCATION MAP2923 South Tryon Street-Suite 100Charlotte, North Carolina 28203704-586-0007(p) 704-586-0373(f)License # C-1269 / #C-245 GeologyNOTES:1. AERIAL IMAGERY OBTAINED FROM NC ONEMAP,2019.2. PARCEL DATA OBTAINED FROM ROWAN COUNTYGIS, 2020.LEGENDBROWNFIELDS PROPERTY BOUNDARYSECOND CREEKRAILROAD SPURDOWTHERM AREA SOIL SAMPLEFUEL OIL STORAGE SOIL SAMPLECOOLING TOWER SOIL SAMPLEBACKGROUND SOIL SAMPLEGROUNDWATER MONITORING WELLSURFACE WATER SAMPLESUB-SLAB SOIL VAPOR SAMPLES:\AAA-Master Projects\ForSite Development Partners (FDP)\FDP-058 Durafiber Celanese Salisbury\Figures\Sample Location Map.dwg, FIG 4, 7/16/2020 12:23:08 PM, sperry Appendix D Liquid Stabilizer SDS