HomeMy WebLinkAbout22055_Charlotte Oil & Fertilizer_SIR_20210819 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 08/19/2021 4:00 PM I. Inspection Information Date & Time: 08/19/2021 9:56 AM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: Jason Blanchard - Clean Vapor, Noah Secor - DPR Construction Location: Lat: 35.20894, Long: -80.8628, II. Project Information Number: 22055-18-060 Name: Charlotte Oil and Fertilizer Works Address: 2151 Hawkins St City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Mixed Use Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Summary: Observed smoke testing, barrier installation, current status of control panel and VIMS risers including current roof-top termination. Summary: N/A Summary: 17-Story Mixed Use building currently under construction. Brownfields Inspection Report: Charlotte Oil and Fertilizer Works, 22055-18-060 08/19/2021 9:56 AM Page 3 of 7 Exposed Soils: Observed Exposed Soils Violation: No Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: Excavation work taking place on the southeastern corner of building. Requested if hardcopy of EMP present on-site. Noah Secor stated that one was posted outside his office on the 7th floor where daily meetings are held. Summary: N/A Summary: Only chemicals observed was material used for liquid boot installation. Condition: Summary: N/A Site perimeter surrounded with temporary security fencing, no risk to the public observed at the time of the site inspection. Brownfields Inspection Report: Charlotte Oil and Fertilizer Works, 22055-18-060 08/19/2021 9:56 AM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: Current status of building construction facing northeast. Purpose of the site inspection was to observe smoke testing, and to check status of VIMS construction including VIMS risers. The only items identified during the inspection, which Clean Vapor was aware of, is the need to extend all 3 VIMS risers approximately 8-10 feet to clear adjacent wall (Photos 6 and 7). Brownfields Inspection Report: Charlotte Oil and Fertilizer Works, 22055-18-060 08/19/2021 9:56 AM Page 5 of 7 Photo 2: Recently applied spray VIMS barrier. Photo 3: Sealing around conduit bank. Brownfields Inspection Report: Charlotte Oil and Fertilizer Works, 22055-18-060 08/19/2021 9:56 AM Page 6 of 7 Photo 4: Injecting smoke below barrier during testing. No leaks observed during testing. Photo 5: Roll-out protective barrier on right of photo being installed following successful smoke testing of VIMS barrier. Brownfields Inspection Report: Charlotte Oil and Fertilizer Works, 22055-18-060 08/19/2021 9:56 AM Page 7 of 7 Photo 6: Three galvanized steel VIMS riser pipes penetrating roof-top in center of photo. Photo 7: VIMS riser pipes at bottom of photo will have to be extended above adjacent wall before reaching permanent termination height.