HomeMy WebLinkAbout17020_Chronicle Mill_SIR_20210416
DWM Brownfields Inspection Report
Submitted By: jkslaughter_ncdenr
Submitted Time: 04/21/2021 7:51 AM
I. Inspection Information
Date & Time: 04/16/2021 8:01 AM Inspection Type: Meeting
Brownfields Staff:
Kevin Slaughter
Other Personnel:
Jim Reilly- Site Superintendent/Armada
Associates, Aaron Long- Excel Engineering
Location:
Lat: 35.24327, Long: -81.03387,
Brownfields Inspection Report: Chronicle Mill, 17020-13-036
04/16/2021 8:01 AM
Page 2 of 7
II. Project Information
Number: 17020-13-036 Name: Chronicle Mill
Address: 96 East Catawba
Street
City: Belmont
County: Gaston
III. Environmental
Current Use of Property: Residential
Structures on Property: Existing Structures Violation: No
Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No
Use of Surface Water or Groundwater: Not Observed Water Use Violation: No
Exposed Soils: Observed Exposed Soils Violation: No
Summary: At the time of the inspection, the new apartment building is proposed to have
a VIMS under approximately 50% of the building. However, additional assessment is
being completed to determine the necessity of a passive vs active system beneath all site
buildings. No work has begun on the VIMS at the time of the inspection.
Summary: N/A
Summary: The existing mill building is currently being renovated into a multi-residential
apartment building. Work is in the early stages with large sections of the building being
removed at the time of the Site Inspection. An additional apartment building will also be
constructed on the western portion of the property, but has not broken ground at the
time of the inspection.
Summary: Typical soil grading during construction activities observed. No soil stockpiles
observed during the site inspection.
Brownfields Inspection Report: Chronicle Mill, 17020-13-036
04/16/2021 8:01 AM
Page 3 of 7
Use of Basements: Not Observed Basement Violation: No
Storage of Chemicals: Not Observed Chemical Violation: No
Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No
Current Exposure to Public/Public Risk:
Summary: N/A
Although there are some portions of the existing mill with soil along interior sidewalls, following
demolition of approximately 25-30’ of the northern façade of the building, and additional building
demolition and regrading, no interior walls will remain in contact with soil according to the site
superintendent.
Summary: N/A
Condition:
Summary: N/A
No public exposure was observed at the time of the Site Inspection, with the entire
property being surrounded by temporary construction fencing.
Brownfields Inspection Report: Chronicle Mill, 17020-13-036
04/16/2021 8:01 AM
Page 4 of 7
IV. Inspector Comments
V. PHOTOGRAPHS
Photo 1: View of Chronicle Mill looking southwest from Catawba St.
The purpose of the site inspection was to view renovation activities and discuss DEQ
concerns with renovation/new construction without mitigation based on the known
impacts on-site. During the site visit, we discussed the possibility of mitigating the entire
“new” apartment building, and I suggested that mitigation of the existing mill building
should be considered given the entire slab would be removed and addressing any
potential VI issues at this stage of construction would be much less expensive and
disruptive than in the future.
Recommended the collection of sub-slab or soil gas samples below existing mill building
at a minimum which was being discussed when I departed the site. Following site
inspection, a conference call with DEQ, the consultant, and developer determined that
assessment activities would best determine if an active or passive mitigation system
would be best for the site buildings. Assessment has been approved by DEQ and data will
be presented following collection.
Brownfields Inspection Report: Chronicle Mill, 17020-13-036
04/16/2021 8:01 AM
Page 5 of 7
Photo 2: View of south side of mill building from the Brownfield property.
Photo 3: Inside the southwestern corner of mill building. Façade of the building to be removed
back to first row of columns during demolition stage.
Brownfields Inspection Report: Chronicle Mill, 17020-13-036
04/16/2021 8:01 AM
Page 6 of 7
Photo 4: Photo of floor slab within eastern portion of building. Floor slab to be removed and
new floor poured within entire mill building. Approximately 75% of floor slab had been
removed at the time of the inspection.
Photo 5: Photo looking west showing section of floor slab that has already been removed.
Brownfields Inspection Report: Chronicle Mill, 17020-13-036
04/16/2021 8:01 AM
Page 7 of 7
Photo 6: View of southwestern corner of mill building, and general area of new construction
apartment building. Construction of this apartment building had not begun at the time of the
Site Inspection.
Photo 7: View of the north side of building. Entire brick façade adjacent to Catawba St. to be
removed. A sunken garden will be installed, eliminating current soil contact with interior walls.