Loading...
HomeMy WebLinkAbout23035_Theron Property_SIR_2021.03.24 DWM Brownfields Inspection Report Submitted By: jkslaughter_ncdenr Submitted Time: 03/29/2021 11:52 AM I. Inspection Information Date & Time: 03/25/2021 1:50 PM Inspection Type: Meeting Brownfields Staff: Kevin Slaughter Other Personnel: Trinh DeSa - Hart & Hickman Location: Lat: 35.24349, Long: -80.81304, Brownfields Inspection Report: Theron Properties, 23035-19-060 03/25/2021 1:50 PM Page 2 of 7 II. Project Information Number: 23035-19-060 Name: Theron Properties Address: 431, 500, 508 Charles Avenue City: Charlotte County: Mecklenburg III. Environmental Current Use of Property: Residential Structures on Property: New Structures Violation: No Vapor Mitigation Systems: Observed Vapor Mitigation Violation: No Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Exposed Soils: Observed Exposed Soils Violation: No Summary: Gravel/piping inspection being performed by H&H. Horizontal VIMS piping, and future riser locations observed. Sub-slab sampling/vacuum monitoring points not installed at time of inspection. Summary: N/A Summary: Currently in early phase of construction. On-site to observe VIMS gravel/piping inspection prior to VIMS barrier installation. Summary: Typical exposed soils associated with a construction site. Brownfields Inspection Report: Theron Properties, 23035-19-060 03/25/2021 1:50 PM Page 3 of 7 Use of Basements: Not Observed Basement Violation: No Storage of Chemicals: Not Observed Chemical Violation: No Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: No Current Exposure to Public/Public Risk: Summary: N/A Summary: N/A Condition: Summary: N/A With entire site (other than paved parking lot) being surrounded by temporary construction fencing, no public risk observed at the time of the Site Inspection. Brownfields Inspection Report: Theron Properties, 23035-19-060 03/25/2021 1:50 PM Page 4 of 7 IV. Inspector Comments V. PHOTOGRAPHS Photo 1: Residential apartments under construction in foreground of Theron property with parking deck in background. Met with Mr. Trinh DeSa to observe H&H gravel/piping inspection prior to installation of VIMS barrier in section of floor slab of apartment building under construction. While on- site, it was pointed out by the PE to the construction crew that several sections of VIMS piping would require additional gravel installed under them, and a concrete pad under future stairwell (Photograph 5) would require an alternate sealing method due to required 2’ x 2” area in center of pad where a vertical steel beam will have to be bolted into the concrete pad. H&H to reinspect these requested repairs the following day Brownfields Inspection Report: Theron Properties, 23035-19-060 03/25/2021 1:50 PM Page 5 of 7 Photo 2: Photo of VIMS Piping taken during piping/gravel inspection. Photo 3: During inspection, several areas identified where additional gravel required under horizontal piping. Gravel to be installed later in day, with follow up inspection by H&H the following morning. Brownfields Inspection Report: Theron Properties, 23035-19-060 03/25/2021 1:50 PM Page 6 of 7 Photo 4: Section of solid piping at screened collection piping “T” to be replaced with screened piping to prevent condensation collection. Future riser visible next to concrete column. Photo 5: Screened piping on left of photo to transition to solid piping to cross concrete footer, then transition back to screened piping within small gravel field in future stairwell. Brownfields Inspection Report: Theron Properties, 23035-19-060 03/25/2021 1:50 PM Page 7 of 7 Photo 6: Although technically part of the adjacent “Chadbourn Mill” development, soil along backside of former Boiler room building observed on adjacent parcel during Site Inspection. Photo 7: View of retaining wall holding back soil along rear wall of Boiler room building on Chadbourn Mill site.