HomeMy WebLinkAbout22047_University Place Mall_O_UST Lift Closure Proposal_20190801Via Email July 12, 2019 Ram Realty Advisors 127 W. Worthington Avenue, Suite 290 Charlotte, North Carolina 28203 Attention: Mr. Ashley Saulpaugh Re: Proposal Environmental Services Chapel Hill Tire Hydraulic Lifts University Place Mall Chapel Hill, North Carolina H&H Proposal No. 19-431 Dear Ashley: 1.0 Introduction hart hickman SMARTER ENVIRONMENTAL SOLUTIONS Hart & Hickman, PC (H&H) is pleased to present this proposal for environmental services to be performed for the University Place Mall property located at 201 South Estes Drive in Chapel Hill, Orange County, North Carolina (Site). Prior site assessment activities identified evidence of releases in the area of the underground hydraulic lifts (UHLs) at the Chapel Hill Tire (CHT) facility. Based on discussions with NC Department of Environmental Quality (NCDEQ) Underground Storage Tank (UST) Section staff, the following additional activities will be required prior to issuance of no further action (NFA) status for the UHL release incident: • Proper closure of the UHLs • Completion of a receptor survey • Filing of a Notice of Residual Petroleum (NORP) and associated survey plat limiting land -use in the area of the CHT facility to non-residential 2923 South Tryon Street, Suite 100 3921 Sunset Ridge Rd, Suite 341 Charlotte, NC 28203 Raleigh, NC 27607 www.harthickman.com 704.586.0007 main 919.847A241 main Mr. Ashley Saulpaugh July 12, 2019 Page 2 • Public notification activities • Monitoring well abandonment H&H's proposed scope of work to complete the activities required by the UST Section is outlined in the following sections. 2.0 Scope of Work Task No. 1 — UHL Closure UST Section staff indicated that abandonment in -place would be an acceptable method of closure for the UHLs. Based on previous Site observations, two of the UHLs located at the Site have previously been abandoned. Therefore, this proposal covers costs associated with abandonment of the remaining four UHLs. H&H will subcontract Hazmat Emergency Response and Remediation, Inc. (HERR) to conduct UHL abandonment activities. H&H will coordinate with CHT personnel to obtain approval for the proposed schedule for field activities. Prior to conducting the UHL abandonment activities, H&H will contact North Carolina 811, the public utility locator, as well as utilize a private utility locate to screen the UHL areas for subgrade utilities. H&H will also prepare a site -specific Health and Safety Plan in accordance with Occupational Safety and Health Administration (OSHA) requirements. At each of the UHL locations, HERR will remove a center bolt located on the top portion of the piston. Once the bolt has been removed, the piston will be lifted from the outer casing. The outer casings will be pressure washed to remove residual hydraulic fluid and pumped via vacuum truck. Additionally, each of the pistons removed will be pressure washed and allowed to drain of potential residual fluids. The fluids generated from rinsing the pistons will be disposed of in the vacuum truck. Once the pistons have been removed and the cylinders rinsed, HERR S:\AAA-Master Proposals & SOQs\2019 Proposals\19-431 University Mall Lift Closure Activities (RAM).doc hart : h i c k m a n SMARTER ENVIRONMENTAL SOLUTIONS Mr. Ashley Saulpaugh July 12, 2019 Page 3 will fill each casing with 3,500 pounds per square inch (PSI) concrete to the ground surface. Upon completion of UHL abandonment activities, HERR will transport the UHL pistons for disposal at a metal salvage yard. The fluids generated during abandonment activities will be transported off -site for disposal as non -hazardous material. H&H expects UHL abandonment activities to take approximately two days. At the conclusion of the UHL abandonment activities, H&H will prepare a report documenting the abandonment for submittal to the UST Section. The report will contain a discussion of the UHL abandonment procedures, disposal manifests, and photographs documenting field activities. Task No. 2 — Receptor Survey H&H will conduct a receptor survey in accordance with UST Section Requirements. The receptor survey will document potential water supply wells, public water supplies, surface water, wellhead protection areas, site hydrogeology, and subsurface structures. The survey will include a desktop review of publicly available information and reporting of field observations collected during the prior Brownfields receptor survey. A mailing to property owners within 500 feet of the site inquiring about water supply wells will also be performed in accordance with UST Section requirements. The results of the receptor survey will be incorporated into the UHL Abandonment Report to be completed under Task 1. Task No. 3 — NORP and Survey Plat A NORP will be prepared in accordance with UST Section guidelines. The NORP will consist of a document specifying perpetual LURs required as part of the site closure activities. Based on discussions with UST Section personnel, the only LUR expected to be required in the NORP is a restriction limiting land -use to industrial/commercial purposes within the footprint of the CHT facility. A survey plat must also be prepared in conjunction with the NORP detailing the S:\AAA-Master Proposals & SOQs\2019 Proposals\19-431 University Mall Lift Closure Activities (RAM).doc hart : h i c k m a n SMARTER ENVIRONMENTAL SOLUTIONS Mr. Ashley Saulpaugh July 12, 2019 Page 4 location where the LUR will be applied. H&H understands that the client recently obtained a survey plat for the property prior to the recent property purchase. H&H will work with the client's surveyor to modify the survey plat to meet the requirements of the UST Section. Note that costs for the surveyor are not included in this proposal and H&H assumes that the client will pay the surveyor directly. Upon completion, H&H will provide the draft NORP and survey plat to Ram and then NCDEQ for review. After approval by Ram and NCDEQ, H&H will coordinate with Ram and NCDEQ to obtain the required notarized signatures from both entities on the documents. Once the fully executed documents are obtained, H&H will file the NORP and associated survey plat with the Orange County Register of Deeds. H&H assumes that one visit to the Register of Deeds will be required to complete the filing. H&H will request that the Orange County Register of Deeds provide a certified copy of the filing. The certified copy of the filing will be submitted to NCDEQ with a copy to Ram for their records. Once NCDEQ receives the certified copy of the filing, H&H expects that they will issue a conditional NFA letter which is contingent on completion of public notification and monitoring well abandonment activities, as described further below. Task No. 4 — Public Notification The NFA letter issued by NCDEQ is expected to require public notification of the site closure. The public notification activities consist of sending a copy of the NFA letter to contiguous property owners and public officials via certified mail. H&H will complete the require mailings, then provide delivery confirmation of the mailings to NCDEQ. S:\AAA-Master Proposals & SOQs\2019 Proposals\19-431 University Mall Lift Closure Activities (RAM).doc hart : h i c k m a n SMARTER ENVIRONMENTAL SOLUTIONS Mr. Ashley Saulpaugh July 12, 2019 Page 5 Task No. 5 — Monitoring Well Abandonment One monitoring well exists in the area of the CHT facility that was installed during investigation of a historical waste oil release. Although the monitoring well is not specifically associated with the UHL release, H&H recommends proper abandonment of the well. H&H will contract a NC -certified well driller to abandon the monitoring well in accordance with NCDEQ requirements. The well will be abandoned by filling the screen and casing with grout using a tremie pipe. The well pad will be removed and the surface will be finished with asphalt patch or painted concrete to generally match the surrounding area. H&H will prepare a letter report documenting the well abandonment activities for submittal to the NCDEQ. The report will include a brief summary of the abandonment activities and a well abandonment record. 3.0 Estimated Cost H&H proposes to conduct the proposed activities on a time and materials basis for the estimated costs summarized below. Task 1 — UHL Closure Field Supervision and Project Management Labor $4,600 Field Equipment and Expenses $700 Utility Locator $1,100 Lift Closure Subcontractor $10,000 Report Preparation Labor $2,100 Subtotal $18,500 S:\AAA-Master Proposals & SOQs\2019 Proposals\19-431 University Mall Lift Closure Activities (RAM).doc hart : h i c k m a n SMARTER ENVIRONMENTAL SOLUTIONS Mr. Ashley Saulpaugh July 12, 2019 Page 6 Task 2 — Receptor Survey Labor and expenses $1,900 Subtotal $1,900 Task 3 — NORP and Survey Plat Labor and expenses $3,000 Subtotal $3,000 Task 4 — Public Notification Labor and expenses $1,300 Subtotal $1,300 Task 5 — Monitoring Well Abandonment Field Supervision, Project Management, and Report Labor $1,000 Field Equipment and Expenses $200 Drilling Subcontractor $700 Subtotal $1,900 TOTAL $26,600 The UHL closure and receptor survey activities will be completed within three weeks of authorization to proceed, pending subcontractor availability and CHT agreement with the proposed schedule. A report documenting the UHL closure and receptor survey will be completed within two weeks following completion of field activities. The schedule for the remaining activities will be dependent on NCDEQ response timeframes. The activities will be conducted in accordance with the previously agreed upon Professional Services Agreement (PSA) between Ram and H&H. In order to authorize these services, please sign in the space indicated on the attached Proposal Authorization Page and return the signed S:\AAA-Master Proposals & SOQs\2019 Proposals\19431 University Mall Lift Closure Activities (RAM).doc hart : h i c k m a n SMARTER ENVIRONMENTAL SOLUTIONS Mr. Ashley Saulpaugh July 12, 2019 Page 7 document to me, or please incorporate this cost proposal into the Ram and H&H contract template and provide a copy of the contract for execution. Thank you for the opportunity to provide this proposal. Please contact us if you have any questions or require additional information. Sincerely, Hart & Hickman, PC Genna Olson, PG Senior Project Manager *6� 4, A�a Patrick Stevens Assistant Project Environmental Scientist SAAAA-Master Proposals & SOQs\2019 Proposals\19-431 University Mall Lift Closure Activities (RAM).doc h a f : h i c k m a n SMARTER ENVIRONMENTAL SOLUTIONS Mr. Ashley Saulpaugh July 12, 2019 Page 8 AUTHORIZATION The scope of work and costs presented in H&H's Proposal No. 19-431 and the terms and conditions of the previously agreed upon Professional Services Agreement are acceptable. H&H is authorized to proceed with the scope of work. M. Date: For: S:\AAA-Master Proposals & SOQs\2019 Proposals\19-431 University Mall Lift Closure Activities (RAM).doc hart : h ick ma n SMARTER ENVIRONMENTAL SOLLIT1ONS