HomeMy WebLinkAbout18034-14-090_RP Scherer_EMP Rev 2_20200724 FINAL SIGNED    1  EMP Version 2, June 2018    NORTH CAROLINA BROWNFIELDS PROGRAM  ENVIRONMENTAL MANAGEMENT PLAN    This form is to be used to prepare an Environmental Management Plan (EMP) for projects in  the North Carolina Brownfields Program at the direction of a Brownfields project manager.    The EMP is a typical requirement of a Brownfields Agreement (BFA).  Its purpose is to clarify  actions to be taken during the demolition and construction at Brownfields properties in an  effort to avoid delays in the event of the discovery of new contamination sources or other  environmental conditions.  The EMP provides a means to document redevelopment plans and  environmental data for each applicable environmental medium to inform regulatory‐compliant  decision‐making at the site.  As much detail as possible should be included in the EMP,  including contingency planning for unknowns.  Consult your project manager if you have  questions.    Prospective Developers and/or their consultants must complete and submit this form and all  pertinent attachments, see checklist below, to their Brownfields project manager prior to any  earthmoving or other development‐related activities that have the potential to disturb soil at  the Brownfields Property, including demolition.  For the resultant EMP to be valid for use, it  must be completed, reviewed by the program, signed by all parties working on the project,  and approved by the Brownfields project manager.  Failure to comply with the requirements of  the EMP could jeopardize project eligibility, or in the event of a completed agreement, be  cause for a reopener      So that the EMP provides value in protecting brownfields eligibility and public health, the  preparer shall ensure that the following steps have been completed prior to submitting the  EMP for review.  Any EMP prepared without completing these steps is premature.      ☐ Site sampling and assessment that meets Brownfields’ objectives is complete and has  been reviewed and approved by the Brownfields Project Manager.  X Specific redevelopment plans, even if conceptual, have been developed for the project,  submitted and reviewed by the Brownfields Project Manager.                          2  EMP Version 2, June 2018    Please submit, along with the completed EMP form, the following attachments, as relevant  and applicable to the proposed redevelopment:            X A set of redevelopment plans, including architectural/engineering plans, if available; if  not conceptual plans may suffice if updated when detailed plans are drafted.    X A figure overlaying redevelopment plans on a map of the extent of contamination for  each media.    x Site grading plans that include a cut and fill analysis.    N/A A figure showing the proposed location and depth of impacted soil that would remain  on site after construction grading.    ☐ Any necessary permits for redevelopment (i.e. demolition, etc.).    ☐ A detailed construction schedule that includes timing and phases of construction.    x Tabulated data summaries for each impacted media (i.e. soil, groundwater, soil gas, etc.)  applicable to the proposed redevelopment.    X Figures with the sampling locations and contamination extents for each impacted media  applicable to the proposed redevelopment.    ☐ A full final grade sampling and analysis plan, if the redevelopment plan is final.    ☐ If known, information about each proposed potential borrow soil source, such as aerial  photos, historic site maps, historic Sanborn maps, a site history, necessary for  brownfields approval.    ☐ Information and, analytical data if required, for quarries, or other borrow sources,  detailing the type of material proposed for importation to the Brownfields Property.    ☐ A work plan for the sampling and analysis of soil to be brought onto the Brownfields  Property.  Refer to Issue Resolution 15 in Brownfields Program Guidelines.    ☐ A map of the Brownfields Property showing the location of soils proposed for export  and sampling data from those areas.    ☐ If a Vapor Mitigation System is required by the Brownfields Program, the Vapor  Intrusion Mitigation System (VIMS) plan will be signed and sealed by a NC Professional  Engineer.  The VIMS Plan may also be submitted under separate cover.        3  EMP Version 2, June 2018    GENERAL INFORMATION      Date: January 13, 2020 Revision Date (if applicable): July 23, 2020.    Brownfields Assigned Project Name: R.P. Scherer/Catalent.    Brownfields Project Number: 18034‐14‐090    Brownfields Property Address: 2021 E. Roosevelt Blvd., Monroe, NC  28110.    Brownfields Property Area (acres): 9 Acres.  Is Brownfields Property Subject to RCRA Permit?.......................☐ Yes   X  No  If yes enter Permit No.: Click or tap here to enter text.  Is Brownfields Property Subject to a Solid Waste Permit….……..☐ Yes   X  No  If yes, enter Permit No.: Click or tap here to enter text.      COMMUNICATIONS    A copy of this EMP shall be distributed to all the parties below as well as any contractors or site workers  that may be exposed to site vapors, soil, groundwater, and/or surface water.  Additionally, a copy of the  EMP shall be maintained at the Brownfields Property during redevelopment activities.  NOTE, THE EMP  DOES NOT TAKE THE PLACE OF A SITE‐SPECIFIC HEALTH AND SAFETY PLAN.    Prospective Developer (PD): Mac, LLC.    Contact Person: William MacTaggart.   Phone Numbers:   Office: 704‐282‐4424. Mobile: 704‐661‐3495.    Email: bill@rppmfg.com.      Contractor for PD: Mac, LLC.    Contact Person: William MacTaggart  Phone Numbers:   Office: 704‐282‐4424. Mobile: 704‐661‐3495.    Email: bill@rppmfg.com.       Environmental Consultant: Harmon Environmental, PA      Contact Person: Richard L. Harmon, P.G..  Phone Numbers:   Office: 704‐292‐4527 Mobile: 704‐292‐4527.    Email: harmonenv@yahoo.com.     Brownfields Program Project Manager:  Joselyn Harriger.  Phone Numbers:   Office: 704‐235‐2195. Mobile: 704‐431‐9825.    Email: joselyn.harriger@ncdenr.gov      Other DEQ Program Contacts (if applicable, i.e., UST Section, Inactive Hazardous Site Branch,      4  EMP Version 2, June 2018    Hazardous Waste, Solid Waste):   Inactive Hazardous Sites Branch   Project Manager:  Collin Day   Office Phone Number:  (336) 776‐9675    NOTIFICATIONS TO THE BROWNFIELDS PROGRAM      Written advance Notification Times to Brownfields Project Manager: Check each box to accept  minimum advance notice periods (in calendar days) for each type of onsite task:    On‐site assessment or remedial activities:……………………………………….…… 10 days Prior        X     Construction or grading start:……………………………………….………………………. 10 days Prior       X    Discovery of stained soil, odors, USTs, buried drums or waste, landfill, or other signs of previously  unknown contamination: ……………………………….……………………………………. Within 48 hours   X    Implementation of emergency actions (e.g. dewatering, flood or soil erosion control measures in  area of contamination, ventilation of work zones):…………….……….……… Within 48 hours  X    Installation of mitigation systems:………………………….………………….……….. 10 days Prior         X    Other notifications as required by local, state or federal agencies to implement redevelopment  activities: (as applicable): ……………………….…………………………………………..… Within 30 days     X   REDEVELOPMENT PLANS    1) Type of Redevelopment (check all that apply):  ☐Residential  ☐Recreational  ☐Institutional  ☐Commercial  ☐Office  ☐Retail  X Industrial  ☐Other specify:  Click or tap here to enter text.    2) Check the following activities that will be conducted prior to commencing earth‐moving activities  at the site:  X Review of historic maps (Sanborn Maps, facility maps)     Conducting geophysical surveys to evaluate the location of suspect UST, fuel lines, utility  lines, etc.  X Interviews with employees/former employees/facility managers/neighbors    3) Summary of Redevelopment Plans (MANDATORY: attach detailed plans or conceptual plans, if  detailed plans are not available. EMP review without such information would be premature):    Provide brief summary of redevelopment plans, including demolition, removal of building      5  EMP Version 2, June 2018    slabs/pavement, grading plans and planned construction of new structures:   Mac LLC propose to construct an approximately 20,000 Square foot slab on grade metal building  in the parking area east of the existing structure.  Detailed plans are attached.  To complete this  task, the asphalt parking surface at the location of the proposed building will be removed and  transported off‐site to an asphalt recycling facility in Monroe, North Carolina.  Following removal  of the asphalt, approximately 76 cubic yards of soil or gravel will be imported from off‐site for  leveling the surface beneath the slab.  Soil excavated from the building footings (approximately  54 cubic yards will also be used of this backfill process.  Following leveling the site, a slab on‐ grade steel structure will be constructed.      4) Do plans include demolition of structure(s)?:     ☐ Yes  X No ☐ Unknown   ☐ If yes, please check here to confirm that demolition will be conducted in accordance with  applicable legal requirements, including without limitation those related to lead and asbestos  abatement that are administered by the Health Hazards Control Unit within the Division of Public  Health of the North Carolina Department of Health and Human Services.  If available, please  provide a copy of your demolition permit.     5) Are sediment and erosion control measures required by federal, state, or local regulations?    X Yes      No    ☐ Unknown   X  If yes, please check here to confirm that demolition will be conducted in accordance with  applicable legal requirements.  If soil disturbance is necessary to install sediment and erosion  control measures, they may not begin until this EMP is approved.    [See Sheet C‐1 of attached  Plans]    6) Which category of risk‐based screening level is used or is anticipated to be specified in the  Brownfields Agreement?  Note: If children frequent the property, residential screening levels shall  be cited in the Brownfields Agreement for comparison purposes.  ☐ Residential   X Non‐Residential or Industrial/Commercial    7) Schedule for Redevelopment (attach construction schedule):  a) Construction start date: August 1, 2020   b) Anticipated duration (specify activities during each phase):   1 year.  Removal of Asphalt, Placement of Fill, Construction of Building, and Installation of  Utilities.    c) Additional phases planned? ☐ Yes  X No       If yes, specify the start date and/or activities if known:   Start Date:  .      Planned Activity:  Click or tap here to enter text.  Start Date:  Click or tap to enter a date.      6  EMP Version 2, June 2018        Planned Activity:  Click or tap here to enter text.      Start Date: Click or tap to enter a date.      Planned Activity:  Click or tap here to enter text.  d) Provide the planned date of occupancy for new buildings: Click or tap to enter a date.     CONTAMINATED MEDIA    1) Contaminated Media on the Brownfields Property  Part 1. Soil:……………………………………….……………. ☐  Yes   X No   ☐ Suspected    Part 2. Groundwater:.……………………….……..……. X  Yes   ☐ No   ☐ Suspected    Part 3. Surface Water:.……………...……..…………… ☐  Yes   X No   ☐ Suspected    Part 4. Sediment:.……………...……..…………………… ☐  Yes   X No   ☐ Suspected    Part 5. Soil Vapor:…..…………...……..…………………. ☐  Yes   ☐ No   X  Suspected    Part 6. Sub‐Slab Soil Vapor:……...……..…………….. ☐  Yes   X  No       Suspected  Part 7. Indoor Air:...……..…………………………………. ☐  Yes   X  No   ☐ Suspected    2) For the Area of Proposed Redevelopment on the Brownfields Property, attach tabulated data  summaries for each impacted media and figure(s) with sample locations.       PART 1. Soil – Please fill out the information below, using detailed site plans, if available, or estimate  using known areas of contaminated soil and a conceptual redevelopment plan.  Provide a figure  overlaying new construction onto figure showing contaminated soil and groundwater locations.    1) Known or suspected contaminants in soil (list general groups of contaminants):  Reviewing site assessment reports from 1993 and 1995 available on NCDEQ’s online file  system, contamination at the site was confined to the west and northwest of the building.   Contaminated soils were excavated and disposed off site in 1992; the contaminated soils were  located north of the building, several hundred feet west and downgradient of the proposed  new construction.  Monitor well 7 is located between the proposed development area and the  contaminated soils.  Based on the 2013 Annual Groundwater Remediation Monitoring Report,  dated April 2014, VOCs have historically detected in this well in excess of the Groundwater  Standards on one occasion over 19 years.  Tetrachloroethene was detected in August 1999 at a  concentration of 1.5 micrograms per liter (µg/L).   Additionally, historic site assessment has  established groundwater flow direction to be toward the north‐northeast away from the  proposed new building and active groundwater remediation is augmenting this flow.    2) Depth of known or suspected contaminants (feet):      7  EMP Version 2, June 2018    None     3) Area of soil disturbed by redevelopment (square feet):  Approximately 20,000 Square feet     4) Depths of soil to be excavated (feet):  Footings (not to exceed 3 feet) and utilities trenches located south of the existing structure  (not to exceed 3 feet)    5) Estimated volume of soil (cubic yards) to be excavated (attach grading plan):  Based on the attached grading plan, approximately 54 cubic yards will be excavated to install  the footings to depths of 2 feet each. (See Attachment A).   This soil will be incorporated into  the fill material used to level the site prior to constructing the pad.  Based on the attached  drawings, approximately 76 cubic yards of soil and/or gravel will be imported from off‐site to  compete the fill process.  If soil is used, it will either be acquired from the DEQ approved  sources at the Vulcan facility on Nations Ford Road in Charlotte, North Carolina; from the  approved sources at the Martin Marietta facility on Beatties Ford Road in Charlotte, North  Carolina, or acquired from a pre‐sampled and pre‐approved local source.  If gravel is used it  will be acquired from the Martin Marietta Quarry in Bakers, North Carolina.      6) Estimated volume of excavated soil (cubic yards) anticipated to be impacted by contaminants:              none     7) Estimated volume of contaminated soil expected to be disposed of offsite, if applicable:    none       Part 1.A. MANAGING ONSITE SOIL  If soil is anticipated to be excavated from the Brownfield Property, relocated on the Brownfields  Property, or otherwise disturbed during site grading or other redevelopment activities, please  provide a grading plan that clearly illustrates areas of cut and fill (approximate areas & volumes are  acceptable, if only preliminary data available).      1) HAZARDOUS WASTE DETERMINATION:   a) Does the soil contain a LISTED WASTE as defined in the North Carolina Hazardous  Waste Section under 40 CFR Part 261.31‐261.35?....................................... ☐Yes   X No  ☐ If yes, explain why below, including the level of knowledge regarding processes  generating the waste (include pertinent analytical results as needed).  Click or tap here to enter text.    ☐ If yes, do the soils exceed the “Contained‐Out” levels in Attachment 1 of the  North Carolina Contained‐In Policy?................................................. ☐ Yes   ☐ No        8  EMP Version 2, June 2018    b) NOTE: IF SOIL MEETS THE DEFINITION OF A LISTED HAZARDOUS WASTE AND EXCEEDS  THE CONTAINED‐OUT LEVELS IN ATTACHMENT 1 TO THE NORTH CAROLINA  CONTAINED‐IN POLICY THE SOIL MAY NOT BE RE‐USED ON SITE AND MUST BE  DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUS WASTE SECTION RULES AND  REGULATIONS.      c)  Does the soil contain a CHARACTERISTIC WASTE?.................................... ☐ Yes   X  No  ☐ If yes, mark reason(s) why below (and include pertinent analytical results).  ☐ Ignitability  Click or tap here to enter text.                ☐ Corrosivity Click or tap here to enter text.  ☐ Reactivity Click or tap here to enter text.  ☐ Toxicity Click or tap here to enter text.  ☐ TCLP results Click or tap here to enter text.  ☐ Rule of 20 results (20 times total analytical results for an individual  hazardous constituent on TCLP list cannot, by test method, exceed regulatory  TCLP standard)    Click or tap here to enter text.    ☐ If no, explain rationale:   Assessment and remediation activities began at the site in the early 1990’s in  conjunction with UST removal activities.  These activities were conducted  several hundred feet to the west and northwest of the proposed building.   During these early remediation activities, approximately 1,200 cubic yards of  tetrachloroethene impacted soil was excavated and stockpiled in the field at  the west end of the site.  This excavated material was subsequently  appropriately disposed of ‐site.  Subsequent historic investigations have not  indicated the presence of soil contamination at the site.   No soil samples have  been collected at the location of the proposed building, on October 2, 2019,  Harmon Environmental, PA conducted a Soil Vapor Sampling event within the  footprint of the proposed building.  As indicated in Table 3 of this report (See  Attachment B), detected concentrations of targeted compounds were below  the Non‐Residential Vapor Intrusion Screening Levels published by the DEQ in  February 2018.     d) NOTE: IF SOIL MEETS THE DEFINITION OF A CHARACTERISTIC HAZARDOUS WASTE, THE  SOIL MAY NOT BE RE‐USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE  WITH DEQ HAZARDOUS WASTE SECTION RULES AND REGULATIONS.    2) Screening criteria by which soil disposition decisions will be made (e.g., left in place, capped in  place with low permeability barrier, removed to onsite location and capped, removed offsite):        ☐ Preliminary Health‐Based Residential SRGs       9  EMP Version 2, June 2018          X Preliminary Health‐Based Industrial/Commercial SRGs              X Division of Waste Management Risk Calculator (For Brownfields Properties Only)      ☐ Site‐specific risk‐based cleanup level. Please provide details of methods used for  determination/explanation.   Click or tap here to enter text.    Additional comments:   The assessment and remediation records for the R.P. Scherer facility are available on the DEQ  Laserfiche site.  Based on these files, no soil samples have been collected from the proposed  building location.  Harmon Environmental, PA has conducted a limited soil gas survey in the  area.  While the results of the soil gas survey do not indicate the presence of significant VOC  impacted soil or groundwater, it does not mean soil contamination is not present.  As a result,  in the event impacted soil is discovered during this project, samples will be collected and  analyzed in accordance with Item 3. below.  The analytical results associated with these  samples would be used to determine options.        3) If known impacted soil is proposed to be reused within the Brownfields Property Boundary,  please check the measures that will be utilized to ensure safe placement and documentation of  same.   Please attach a proposed location diagram/site map.         X Provide documentation of analytical report(s) to Brownfields Project Manager  X Provide documentation of final location, thickness and depth of relocated soil on site map to  Brownfields Project Manager once known  ☐ Geotextile to mark depth of fill material.   Provide description of material:       X Manage soil under impervious cap ☐  or clean fill ☐   X Describe cap or fill:   In the event impacted soil is discovered and following appropriate sampling as describe  below, with the consent of the Brownfields Program, this soil may potentially be capped on  site under the asphalt parking area..    x Confer with NC BF Project Manager if Brownfield Plat must be revised (or re‐recorded if  actions are Post‐Recordation).          ☐ GPS the location and provide site map with final location.  ☐ Other. Please provide a description of the measure:        4) Please describe the following action(s) to be taken during and following excavation and  management of site soils:  Click or tap here to enter text.      10  EMP Version 2, June 2018    Management of fugitive dust from site  X Yes, describe the method will include:  Water mist will be used to control dust, if necessary.     ☐ No, explain rationale:  Click or tap here to enter text.     Field Screening of site soil    Yes, describe the field screening method, frequency of field screening, person conducting  field screening:       X No, explain rationale:       Harmon Environmental, PA personnel will be on‐site and observe the excavation process  for both the footings and the utility trenches.  In the event stained soils, strong odors, or  unexpected discoveries (i.e. tanks, drums, etc.) are encountered, excavation in this portion  of the site will be temporarily halted while the DEQ is notified of a newly identified area of  concern in accordance with the Notification Section above and the discovery will be  assessed via sampling.  Following sampling should contamination be detected the  impacted soil will be stockpiled in accordance with NCBP Diagram for Temporary  Containment of Impacted or Potentially Impacted Soil and disposed of appropriately off‐ site.  In the event impacted soil encountered extends beyond the limits of the proposed  excavation(s), The excavation(s) will be lined with geotextile fabric prior to installing the  backfill material.      Soil Sample Collection   Yes, describe the sampling method (e.g., in‐situ grab, composite, stockpile, etc.):       X No, explain rationale:   Harmon Environmental, PA personnel will be on‐site and observe the excavation process  for both the footings and the utility trenches.  In the event stained soils, strong odors, or  unexpected discoveries (i.e. tanks, drums, etc.) are encountered, excavation in this  portion of the site will be temporarily halted while the discovery is assessed via sampling.    The DEQ will be notified in accordance with the Notification Section of this Plan.  Grab soil  samples will be collected to both determine the contaminate present and to define the  portion of each excavation impacted by the discovery.      If soil samples are collected for analysis, please check the applicable chemical analytes:  X Volatile organic compounds (VOCs) by EPA Method 8260  X Semi‐volatile organic compounds (SVOCs) by EPA Method 8270      11  EMP Version 2, June 2018    X Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium  and silver): Specify Analytical Method Number(s):  Click or tap here to enter text.   ☐ Pesticides: Specify Analytical Method Number(s):   Click or tap here to enter text.   ☐ PCBs: Specify Analytical Method Number(s):   Click or tap here to enter text.   ☐ Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium,  Herbicides, etc.): Specify Analytical Method Number(s):  Hexavalent Chromium by SW 846 Method 7199A.   X Check to confirm that stockpiling of known or suspected impacted soils will be conducted in  accordance with Figure 1 of this EMP.  Stockpile methodology should provide erosion  control, prohibiting contact between surface water/precipitation and contaminated soil,  and preventing contaminated runoff.  Explain any variances or provide additional details as  needed:      ☐ Final grade sampling of exposed native soil (i.e., soil that will not be under buildings or  permanent hardscape). Select chemical analyses for final grade samples with check boxes  below (Check all that apply):  ☐ Volatile organic compounds (VOCs) by EPA Method 8260  ☐ Semi‐volatile organic compounds (SVOCs) by EPA Method 8270  ☐ Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead,  selenium and silver): Specify Analytical Method Number(s):  Click or tap here to enter text.   ☐ Pesticides: Specify Analytical Method Number(s):     Click or tap here to enter text.   ☐ PCBs: Specify Analytical Method Number(s):   Click or tap here to enter text.   ☐ Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent  Chromium, Herbicides, etc.):   Click or tap here to enter text.   Please provide a scope of work for final grade sampling, including a diagram of soil  sampling locations, number of samples to be collected, and brief sampling methodology.   Samples should be collected from 0‐2 ft below ground surface, with the exception of VOCs  which should be taken from 1‐2 ft below ground surface.  Alternatively, a work plan for  final grade sampling may be submitted under separate cover.  The proposed disturbed area will be covered with concrete and asphalt. (see Site Plans in        12  EMP Version 2, June 2018    Attachment C)  X If final grade sampling was NOT selected please explain rationale:  Historic site uses did not indicate a potential concern, and available soil gas data does not  indicate a significant source in the area of the proposed development.  Unless new releases  are identified during construction, final grade sampling is not proposed.        Part 1.B. IMPORTED FILL SOIL    NO SOIL MAY BE BROUGHT ONTO THE BROWNFIELDS PROPERTY WITHOUT PRIOR APPROVAL  FROM THE BROWNFIELDS PROGRAM.  According to the Brownfields IR 15, “Documenting  imported soil (by sampling, analysis, and reporting in accordance with review and written  approval in advance by the Brownfields Program), will safeguard the liability protections provided  by the brownfields agreement and is in the best interest of the prospective developer/property  owner.”    Requirements for importing fill:    1) Will fill soil be imported to the site?................................................ X Yes  ☐ No  Unknown    2) If yes, what is the estimated volume of fill soil to be imported?   Approximately 76 Cubic Yards.    3) If yes, what is the anticipated depth that fill soil will be placed at the property? (If a range  of depths, please list the range.)  Existing grade slopes gently to the northeast.  The fill will be approximately 0.5 feet thick in the  southwest corner of the proposed building up to 5.5 feet thick in the northeast corner of the  proposed building.  Approximately 54 cubic yards of material will be excavated from the proposed  footings and reused as fill material.  The remainder (approximately 76 cubic yards will be  imported from off‐site source.    4) Provide the source of fill, including: location, site history, nearby environmental concerns,  etc. Attach aerial photos, maps, historic Sanborn maps and a borrow source site history:  If fill soil is utilized, it will either be acquired from the pre‐approved NCDEQ Brownfields sources  at the Vulcan Materials Facility on Nations Ford Road in Charlotte , from the pre‐approved NCDEQ  Brownfields sources at the Martin Marietta facility on Beatties Ford Road in Charlotte, or from a  pre‐sampled, pre‐approved local source.   If gravel is used to complete the backfill beneath the  slab, the aggregate will be acquired from the Martin Marrietta Quarry in Bakers North Carolina.   Any fill material imported to the site will be from virgin undisturbed land, and not part of a  recycling program at the quarry.    5) Please check the applicable chemical analytes for fill soil samples.  (Check all that apply):  X Volatile organic compounds (VOCs) by EPA Method 8260D      13  EMP Version 2, June 2018    X Semi‐volatile organic compounds (SVOCs) by EPA Method 8270E  X Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium  and silver): Specify Analytical Method Number(s):  SW‐846 Method 6010C.   ☐ Pesticides: Specify Analytical Method Number(s):     Click or tap here to enter text.   ☐ PCBs: Specify Analytical Method Number(s):   Click or tap here to enter text.   X Other Constituents & Respective Analytical Method(s) (i.e. Hexavalent Chromium,  Herbicides, etc.):   Hexavalent Chromium by SW‐846 Method 7199A.   6) The scope of work for import fill sampling may be provided below or in a Work Plan  submitted separately for DEQ review and approval.  Attach specific location maps for in‐situ  borrow sites.  If using a quarry, provide information on the type of material to be brought  onto the Brownfields Property.  In the event MAC LLC opts to utilize fill soil from a permitted quarry that is not pre‐approved by  the NCDEQ Brownfields, a Work Plan will be submitted under separate cover.  This proposed plan  will include the location of the proposed fill source and analytical data for the DEQ’s review and  approval.       Part 1.C. EXPORTED SOIL    NO SOIL MAY LEAVE THE BROWNFIELDS PROPERTY WITHOUT APPROVAL FROM THE  BROWNFIELDS PROGRAM.  FAILURE TO OBTAIN APPROVAL MAY VIOLATE A BROWNFIELDS  AGREEMENT CAUSING A REOPENER OR JEOPARDIZING ELIGIBILITY IN THE PROGRAM,  ENDANGERING LIABILITY PROTECTIONS AND MAKING SAID ACTION POSSIBLY SUBJECT TO  ENFORCEMENT.  JUSTIFICATIONS PROVIDED BELOW MUST BE APPROVED BY THE PROGRAM IN  WRITING PRIOR TO COMPLETING TRANSPORT ACTIVITIES.  Please refer to Brownfields IR 15 for  additional details.     1) If export from a Brownfields Property is anticipated, please provide details regarding the  proposed export actions.  Volume of exported soil, depths, location from which soil will  be excavated on site, related sampling results, etc. Provide a site map with locations of  export and sampling results included.  No excess soil is anticipated to be exported from the site during this project.  However, in the  event export is necessary, the soil will be transported to a Subtitle D Landfill or used on site in  accordance with Part 1. A..    2) To what type of facility will the export Brownfields soil be sent?   ☐ Subtitle D/Municipal Solid Waste Landfill (analytical program to be determined by  landfill)      14  EMP Version 2, June 2018    ☐ Permitted but Unlined Landfill (i.e. LCID, C&D, etc.) Analytical program to be  determined by the accepting Landfill;   ☐ Landfarm or other treatment facility   ☐ Use as fill at another suitable Brownfields Property – determination that a  site is suitable will require, at a minimum, that similar concentrations of the same or  similar contaminants already exist at both sites, use of impacted soil will not increase  the potential for risk to human health and the environment at the receiving Brownfields  property, and that a record of the acceptance of such soil from the property owner of  the receiving site is provided to Brownfields.  Please provide additional details below.   ☐ Use as Beneficial Fill off‐site at a non‐Brownfields Property ‐ Please provide  documentation of approval from the property owner for receipt of fill material.  This will  also require approval by the DEQ Solid Waste Section.  Additional information is  provided in IR 15.  Please provide additional details below.     3) Additional Details: (if transfer of soil to another property is requested above, please provide  details related to the proposed plans).  Click or tap here to enter text.      Part 1.D. MANAGEMENT OF UTILITY TRENCHES    ☐ Install liner between native impacted soils and base of utility trench before filling with clean fill  (Preferred)    X Last out, first in principle for impacted soils (if soil can safely be reused onsite and is not a  hazardous waste), i.e., impacted soils are placed back at approximately the depths they  were removed from such that impacted soil is not placed at a greater depth than the original  depth from which it was excavated.    ☐ Evaluate whether necessary to install barriers in conduits to prevent soil vapor transport,  and/or degradation of conduit materials due to direct impact with contaminants?  ☐ If yes, provide specifications on barrier materials:  Click or tap here to enter text.    X If no, include rationale here:  Utility trenches are planned for the un‐impacted portion of the site. .    Other comments regarding managing impacted soil in utility trenches:   Click or tap here to enter text.      PART 2. GROUNDWATER – Please fill out the information below.    1) What is the depth to groundwater at the Brownfields Property?      15  EMP Version 2, June 2018    20 to 25 feet.       2) Is groundwater known to be contaminated by ☐onsite  ☐offsite   Xboth or ☐unknown sources?   Describe source(s):   historic on‐site activities.  As indicated in the attached Figure 4 (Attachment D) from the Rogers  Callcott April 2019 Report the current groundwater contamination extends from the northern  side of the on‐site access road north of the existing structure across Hasty Road onto the Tyson  property.  Detailed reports are available in the DEQ Laserfiche files.    3) What is the direction of groundwater flow at the Brownfields Property?   North.    4) Will groundwater likely be encountered during planned redevelopment activities?     ☐Yes    XNo   If yes, describe these activities:  Click or tap here to enter text.    Regardless of the answer; in the event that contaminated groundwater is encountered  during redevelopment activities (even if no is checked above), list activities for contingent  management of groundwater (e.g., dewatering of groundwater from excavations or  foundations, containerizing, offsite disposal, discharge to sanitary sewer, NPDES permit, or  sampling procedures).   In the event groundwater in encountered, during redevelopment activities, the water will be  containerized, and sampled for the volatile organic compounds by SW‐846 Method 8260D;  semi‐volatile organic compounds by SW‐846 Method 8270E BN/A, RCRA Metals by SW‐846  Method 6010C and; Hexavalent Chromium by SW‐846 Method 7199A.  Based on the results of  this analysis, the water will be either discharged to the municipal POTW or disposed of via an  approved off‐site disposal facility.    5) Are monitoring wells currently present on the Brownfields Property?.................XYes   ☐No     If yes, are any monitoring wells routinely monitored through DEQ or other  agencies?..................................................................................................................XYes   ☐No     6) Please check methods to be utilized in the management of known and previously  unidentified wells.    ☐ Abandonment of site monitoring wells in accordance with all applicable regulations.  It  is the Brownfields Program’s intent to allow proper abandonment of well(s) as  specified in the Brownfields Agreement, except if required for active monitoring  through another section of DEQ or the EPA.    X Location of existing monitoring wells marked  X Existing monitoring wells protected from disturbance   X Newly identified monitoring wells will be marked and protected from further  disturbance until notification to DEQ Brownfields can be made and approval for  abandonment is given.        16  EMP Version 2, June 2018    7) Please provide additional details as needed:        Please note, disturbance of existing site monitoring wells without approval by DEQ is not  permissible.  If monitoring wells are damaged and/or destroyed, DEQ may require that the PD  be responsible for replacement of the well.          PART 3. SURFACE WATER ‐Please fill out the information below.  1) Is surface water present at the property?  ☐ Yes X No  2) Attach a map showing the location of surface water at the Brownfields Property.  3) Is surface water at the property known to be contaminated? ☐ Yes  X No  4) Will workers or the public be in contact with surface water during planned redevelopment  activities?    ☐ Yes  X No  5) In the event that contaminated surface water is encountered during redevelopment  activities, or clean surface water enters open excavations, list activities for management of  such events (e.g. flooding, contaminated surface water run‐off, stormwater impacts):  In the event clean stormwater accumulates in the active construction area, construction will be  delayed until the water has either infiltrated or evaporated.  In the event impervious surfaces  impeded this approach, accumulated water will be managed through the sites sediment and  erosion control plan developed to comply with Monroe stormwater regulations.        PART 4. SEDIMENT – Please fill out the information below.    1) Are sediment sources present on the property?  ☐ Yes  X No    2) If yes, is sediment at the property known to be contaminated: ☐ Yes  ☐ No    3) Will workers or the public be in contact with sediment during planned redevelopment  activities?   ☐ Yes ☐ No    4) Attach a map showing location of known contaminated sediment at the property.    5) In the event that contaminated sediment is encountered during redevelopment activities, list  activities for management of such events (stream bed disturbance):  Not Applicable.        Click or tap here to enter text.      17  EMP Version 2, June 2018    PART 5.  SOIL VAPOR – Please fill out the information below.    1) Do concentrations of volatile organic compounds at the Brownfields property exceed the  following vapor intrusion screening levels (current version) in the following media:  IHSB Residential Screening Levels:  Soil Vapor:………..☐ Yes X  No  ☐ Unknown  Groundwater:.….X Yes ☐ No ☐ Unknown  IHSB Industrial/Commercial Screening Levels:  Soil Vapor:………..☐ Yes X  No ☐ Unknown  Groundwater:…..X Yes ☐ No ☐ Unknown  2) Attach a map showing the locations of soil vapor contaminants that exceed site  screening levels.  [See Attached Figure 4 from Rogers & Callcott April 2019 Report Wells  MW‐2, MW‐3, MW‐4, MW‐5, PZ‐1 and RW‐2A]   3) If applicable, at what depth(s) is soil vapor known to be contaminated?        4) Will workers encounter contaminated soil vapor during planned redevelopment activities?    ☐ Yes  X  No ☐ Unknown  5) In the event that contaminated soil vapor is encountered during redevelopment activities  (trenches, manways, basements or other subsurface work,) list activities for management  of such contact:   As trenches, footings and any other planned subsurface work is undertaken, Harmon  Environmental, PA personnel will monitor the site in accordance with the Site‐Specific Health  and Safety Plan prepared in accordance with 29 CFR 1910.120.  In the event action is  warranted, engineered solutions (i.e fans, relocation of the proposed excavation, etc.) will be  implemented.  The NCDEQ Brownfields will be notified if changes in site conditions occur.         PART 6.  SUB‐SLAB SOIL VAPOR – Please fill out the information below if existing buildings or  foundations will be retained in the redevelopment.  1) Are sub‐slab soil vapor data available for the Brownfields Property? X  Yes   ☐ No   ☐ Unknown  2) If data indicate that sub‐slab soil vapor concentrations exceed screening levels, attach a map  showing the location of these exceedances.  3) At what depth(s) is sub‐slab soil vapor known to be contaminated? ☐0‐6 inches ☐Other, please  describe:    Both the recent Soil Vapor Sampling Report results and the Sub‐Slab Vapor Samples associated  with the existing structure (See Table 3 from Sub‐Slab Vapor Samples collected February 6, 2015  in Attachment E) did not detect targeted compounds at concentrations exceeding the Non‐ See Attached Table 3 in Attachment B.  As indicated in this table, the detected concentrations of  targeted compounds are below the Non‐Residential Standards.      18  EMP Version 2, June 2018    Residential Vapor Intrusion Screening Levels (February 2018)..    4) Will workers encounter contaminated sub‐slab soil vapor during planned redevelopment  activities? ☐ Yes   X  No   ☐ Unknown  5) In the event that contaminated soil vapor is encountered during redevelopment activities, list  activities for management of such contact  As redevelopment activities are undertaken and the potential for soil vapor exposure is present,  Harmon Environmental, PA personnel will monitor the site in accordance with the Site‐Specific  Health and Safety Plan prepared in accordance with 29 CFR 1910.120.  In the event action is  warranted, engineered solutions (i.e fans, etc.) will be implemented.  The NCDEQ Brownfields  will be notified if changes in site conditions occur.        PART 7. INDOOR AIR – Please fill out the information below.    1) Are indoor air data available for the Brownfields Property? ☐ Yes   X  No   ☐ Unknown  2) Attach a map showing the location(s) where indoor air contaminants exceed site screening levels.  3) If the structures where indoor air has been documented to exceed risk‐based screening levels will  not be demolished as part of redevelopment activities, will workers encounter contaminated  indoor air during planned redevelopment activities? ☐ Yes   ☐ No   ☐ Unknown  4) In the event that contaminated indoor air is encountered during redevelopment activities, list  activities for management of such contact:            VAPOR INTRUSION MITIGATION SYSTEM – Please fill out the information below.  Is a vapor intrusion mitigation system (VIMS) proposed for this Brownfields Property?  ☐ Yes   X  No   ☐ Unknown  If yes, ☐ VIMS Plan Attached or ☐ VIMS Plan to be submitted separately    If submitted separately provide date:   Click or tap here to enter text.    VIMS Plan shall be signed and sealed by a NC Professional Engineer    If no, please provide a brief rationale as to why no vapor mitigation plan is warranted:   Historic site assessment activities indicate groundwater impacts on the site are limited to the  northern side of the existing building.  This plume is contained by a groundwater recovery and  treatment system that discharges the treated groundwater to the POTW via a sewer located on the  This is not applicable as there is no structure currently present on this portion of the property.      19  EMP Version 2, June 2018    north and west side of the facility.  Soil Vapor Samples collected from three locations within the  proposed building foot print did not indicate the presence of targeted compounds at  concentrations exceeding the Non‐Residential Vapor Intrusion Screening Levels, and 2015 Sub‐Slab  Air samples collected from the existing building (Closer to the plume than the planned building)  also did not exceed the Non‐Residential Vapor Intrusion Screening Levels  (See Attached Reports  Figures and Tables).  Proposed utility trenches associated with this project are located to the south  side of the existing structure well clear of the documented groundwater contamination on‐site.   Based on these data, a vapor mitigation plan is not warranted at this time.         CONTINGENCY PLAN – encountering unknown tanks, drums, or other waste materials    In this section please provide actions that will be taken to identify or manage unknown  potential new sources of contamination.   During redevelopment activities, it is not uncommon  that unknown tanks, drums, fuel lines, landfills, or other waste materials are encountered.   Notification to DEQ Brownfields Project Manager, UST Section, Fire Department, and/or other  officials, as necessary and appropriate, is required when new potential source(s) of  contamination are discovered.  These Notification Requirements were outlined on Page 1 of this  EMP.      Should potentially impacted materials be identified that are inconsistent with known site  impacts, the DEQ Brownfields Project Manager will be notified and a sampling plan will be  prepared based on the EMP requirements and site‐specific factors.  Samples will generally be  collected to document the location of the potential impacts.      Check the following chemical analysis that are to be conducted on newly identified releases:  X  Volatile organic compounds (VOCs) by EPA Method 8260D  X  Semi‐volatile organic compounds (SVOCs) by EPA Method 8270E  X  Metals RCRA List (8) (arsenic, barium, cadmium, chromium, mercury, lead, selenium and  silver)  SW‐846 Method 6010C.    ☐ Pesticides: Specify Analytical Method Number(s):   Click or tap here to enter text.   ☐ PCBs: Specify Analytical Method Number(s):   Click or tap here to enter text.   X Other Constituents & Analytical Method(s) (i.e. Hexavalent Chromium, Herbicides, etc.)  Please note, if field observations indicate the need for additional analyses, they should  be conducted, even if not listed here.   Hexavalent Chromium by SW‐846 Method 7199A. Please provide details on the proposed methods of managing the following commonly      20  EMP Version 2, June 2018    encountered issues during redevelopment of Brownfields Properties.  Unforeseen conditions will be handled on a case‐by‐case basis and Brownfields will be notified in  accordance with the Notifications page.    Underground Storage Tanks:   In the event underground storage tanks (USTs) or impacts associated with USTs are discovered at  the site during the redevelopment activities, the UST or UST related impacts will be addressed  through the Brownfields Program.  DEQ Brownfields will be notified within 48‐hours of discovery.   If an unknown UST is encountered, the UST will be removed if possible and the UST will be  transported off‐site for disposal or recycling at a suitable facility.  If the UST contents are  unknown residual fluids, the contents will be sampled for volatile organic compounds, semi‐ volatile organic compound and RCRA Metals and transported off‐site of disposal at a suitable  facility based on the analytical data prior to removing the UST from the ground.  If a UST is  encountered and cannot be removed, it may be abandoned in‐place with prior DEQ approval and  construction will proceed.  The UST will be filled with concrete to prevent fluid accumulation and  impacted soil in the vicinity of the UST will be managed in accordance with the Managing On‐Site  Soil section outlined above.    Confirmation soil samples will be collected and analyzed in  accordance with the UST Section Guidelines.    Sub‐Grade Feature/Pit:  If a sub‐grade feature or pit is encountered, it will be removed, if possible and will be  transported off‐site for disposal or recycling at a suitable facility.   If a sub‐grade feature or pit is  encountered and cannot be removed, it will be filled with soil or suitable fill and construction  will proceed.  Where appropriate, the bottom may be penetrated before backfilling to prevent  fluid accumulation.  If the pit has waste in it, the waste will be set aside in a secure area and will  be sampled for waste disposal purposes for TCLP volatile organic compounds, TCLP Semi‐volatile  organic compounds, and TCLP RCRA Metals for disposal at a permitted facility or the waste will  be managed in accordance with the Managing On‐Site Soils section outlined above, whichever is  most applicable based on the type of waste present,  If the pit must be removed ant the  observed waste characteristics indicate the pit material (i.e. concrete or brick) may potentially  be contaminated, the pit material may be sampled and analyzed by methods specified by the  disposal facility.  Confirmation sampling will be performed.  If any portion of the structure  remains, it will be documented on the plat.    Buried Waste Material:  In the event buried waste is encountered during redevelopment activities, the NC DEQ  Brownfields Project Manager will be notified within 48‐hours of discovery.  Discovered waste  material will be excavated and stockpiled on site pending sampling to determine appropriate  off‐site disposal.    The analytical methods utilized will be based on the requirements of the  selected disposal facility.  Following removal of buried waste material, the base and side walls  of the excavation will be sampled in accordance with the On‐Site Soils section of this Plan prior  to continuing construction activities.         21  EMP Version 2, June 2018    Re‐Use of Impacted Soils On‐Site:  Impacted soils will not be reused on this project site.     If unknown, impacted soil is identified on‐site, management on‐site can be considered after the  project team provides the necessary information, outlined in Part 1.A. Item 11, for Brownfields  Project Manager approval prior to final placement on‐site.     If other potential contingency plans are pertinent, please provide other details or scenarios as  needed below:  Click or tap here to enter text.     POST‐REDEVELOPMENT REPORTING    X   Check this box to acknowledge that a Redevelopment Summary Report will be required for the  project.  If the project duration is longer than one year, an annual update is required and will be  due by January 31 of each year, or 30 days after each one‐year anniversary of the effective date of  this EMP (as agreed upon with the Project Manager).  These reports will be required for as long as  physical redevelopment of the Brownfields Property continues, except that the final  Redevelopment Summary Report will be submitted within 90 days after completion of  redevelopment.  Based on the estimated construction schedule, the first Redevelopment Summary  Report is anticipated to be submitted on January 31, 2021.    The Redevelopment Summary Report shall include environment‐related activities since the last  report, with a summary and drawings, that describes:   1. actions taken on the Brownfields Property;    2. soil grading and cut and fill actions;   3. methodology(ies) employed for field screening, sampling and laboratory analysis of  environmental media;   4. stockpiling, containerizing, decontaminating, treating, handling, laboratory analysis and  ultimate disposition of any soil, groundwater or other materials suspected or confirmed  to be contaminated with regulated substances; and   5. removal of any contaminated soil, water or other contaminated materials (for example,  concrete, demolition debris) from the Brownfields Property (copies of all legally required  manifests shall be included).    X  Check box to acknowledge consent to provide a NC licensed P.G. or P.E. sealed, Redevelopment  Summary Report in compliance with the site’s Brownfields Agreement.     7/23/2020     23  EMP Version 2, June 2018          Figure 1 NCBP Diagram for Temporary Containment of Impacted or Potentially Impacted Soil Cross-Section View Top Plastic Cover Sheeting: (1 Layer, minimum: 10 mil tllick) Underliner: llayer, minimum of 10 mil thick plastic Land Surface Straw Bale Berm Map View Contaminated Soils Weight Plastic Sheeting Note: Adapted from NC DEQ UST Section "Guidelines for Ex Situ Pctrolewn Contaminated Soil Remediation" dated December, I, 2013             Attachment A Calculation Sheet Harmon Environmental, PA 615 Bruce Thomas Road 704-292-4527 Monroe, North Carolina 28112 harmonenvironmental.com June 3, 2020 MAC, LLC Proposed Building Addition Former R.P. Scherer/Catalant Site 2021 E. Roosevelt Boulevard, Monroe, North Carolina Brownfields Project No. 18034-14-090 Project No. 695-03 Calculations Sheet Proposed Building Dimensions: 180 feet long (NS), 120 feet wide (EW). Total Roofed Area 19,800 Square Feet A total of approximately 3,500 cubic feet (129 cubic yards) of asphalt to be removed from the site and recycled. Construction: Slab on Grade: Continuous Wall Footing: 3 ft wide, 1.5 feet deep. Total length 600 feet. Total Volume of soil removed for continuous footing, approximately 2,700 cubic feet or 100 cubic yards. Column Footings: 5 F-1 footings: 7 ft by 7 ft by 2 ft = 490 cubic ft 12 F-2 footings: 5.5 ft by 5.5 ft by 2 ft = 726 cubic ft 2 F-3 footings: 3.5 ft by 3.5 ft by 2 ft = 42 cubic ft 8 F-4 footings: 3.5 ft by 3.5 ft by 2 ft = 196 cubic ft Approximate total volume of soil excavated from footings: 1,454 cubic ft (approximately 54 cubic yards). To be incorporated into backfill under the planned floor slab. Calculated Imported Fill Volume 3,500 cubic ft by average fill depth of 1.4 ft = 4,900 cubic ft (182 cubic yards) of fill. 3,500 cubic ft – 1,454 cubic ft from footings = 2,046 cubic ft (76 cubic yards). Attachment B Soil Vapor Survey Report Relevant Figure and Table 0 LEGEND APPROXIMATE LOCATION OF BUILDINGS AND BUILDINGS AND ON-SITE STRUCTURES APPROXIMATE LOCATION OF PROPERTY BOUNDARY APPROXIMATE LOCATION OF ROADS AND HIGHWAYS o APPROXIMATE LOCATION OF SOIL BORINGS ~-~ APPROXIMATE LOCATION OF PROPOSED APPROXIMATE SCALE IN FEET 0 250 500 \..-J BUILDING SOURCE: UNION COUNTY GIS DEPARTMENT HARMON ENVIRONMENTAL, PA FIGURE 3 615 BRUCE THOMAS ROAD SITE lAYOUT MAP MONROE, NORTH CAROLINA MAC, LLC PROPERTY ~ L.----~~~~7~04~-2~9~24~52~7~~~~----~-------20_2_1_E_AS_T_R_o_o __ sEV--EL_r_s_L_v_o _______ _J~ HARMONENVIRONMENTALCOM MONROE, NORTH CAROLINA ~ Non-Residential Vapor Compounds Intrusion Screening 395-02B1 395-03B2 395-02B3 Levels (ug/M3) acetone 2,700,000 40.9 290 90.0 benzene 1,600 1.7 29.5 7.8 2-butanone 440,000 16.1 330 67.1 carbon disulfide 61,000 6.4 33.9 31.1 chloromethane 7,900 2.1 13.5 2.4 cyclohexane 540,000 2.1 J 14.1 11.7 dichlorofluoromethane 8,800 1.8 J 1.9 J 1.7 J ethyl acetate 6,100 1.7 46.4 12.0 ethylbenzene 4,900 1.4 J 10.5 8.9 4-ethyltoluene NS <1.2 2.4 J 2.5 J n-heptane 35,000 3.5 36.7 17.6 n-hexane 61,000 6.5 55.0 26.7 2-hexanone 2,600 3.5 J 30.4 7.9 J methylene chloride 53,000 17.4 28.4 26.0 4-methyl-2-pentanone 260,000 2.6 J 58.4 11.4 naphthalene NS <2.6 4.7 J 5.0 J propylene 260,000 62.1 934 235(E) styrene 88,000 <1.7 6.5 1.1 J tetrachloroethene 3,500 6.7 28.2 70.4 tetrahydrofuran NS <1.2 10.8 2.7 toluene 440,000 23.8 56.0 85.4 trichlorofluoromethane NS 1.2 J 1.5 J <0.82 1,2,4-trimethylebenzene 5,300 1.5 J 11.5 8.8 1,3,5-trimethylebenzene 5,300 <2.0 3.0 2.4 vinyl chloride 2,800 <0.53 2.3 <0.58 m&p-xylene 8,800 5.3 32.8 37.1 o-xylene 8,800 1.6 J 11.7 12.4 Notes: Soil vapor samples collected by Harmon Environmental, PA personnel and analyized by Pace Analytical LLC in Minniapolis, MN Non-Residential Vapor Intrusion Screening Levels published by the NC DEQ in Feburary 2018 NC DEQ = North Carolina Department of Environmental Quality ug/M3 = micrograms per cubic meter NS = No Standard E = Analyte concentration exceeded calibration range. The reported result is and estimate. J = Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. Table 3 Brownfields Project No. 18034-14-90 Monroe,North Carolina Project No. 695-03 Environmental Management Plan Soil Vapor Samples Analytical Results RP Scherer/Catalent 2021 East Roosevelt Blvd. Attachment C Redevelopment Plans A-001 PROJECT NO: MODEL FILE: DRAWN BY: CHK'D BY: DATE OF ISSUE DESCRIPTION 19010 REM/SDG 4.30.2020 DATE SHEET TITLE REVISIONS MARK 4. 3o. 2o2o /Users/robertmoore/Dropbox/Projects/19010 RPP MNC/19010 5.0 Construction Document/19010 Drawings/19010_CD1.plnROBERT E. MOORE A R C H I T E C T MONROE, NC 28110 704.283.1196 rmoore@remarchitect.com MAC L.L.C. ROYAL PALM POOLS 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 100 N. SUTHERLAND AVENUE COVER SHEET R E Ma MAC L.L.C. 75' 4 ROBERT E. MOORE.ARCHITECT >30 EXISTING A-103 EXISTING PARKING IN ADJACENT BUILDING THIS BUILDING HAS A PRIMARY OCCUPANCY OF STORAGE AND IS EXEMPT FROM THE REQUIREMENTS OF THE NC ENERGY CODE PER N.C. SESSION LAW 2017-10. ALL INSULATION PROVIDED IS AT OWNER'S REQUEST AND IS NOT REQUIRED. DESIGN JOINTS ConstrucƟon Type:Primary Occupancy Classification:Institutional: Parking Garage: Storage: Hazardous: TOTAL FLOOR Sprinklers: Standpipes: EXISTING (SQ. FT.) Phone # E-Mail: Code Enforcement JurisdicƟon: Owned By: Name of Project: Address: County City City/County Private State * Indicate secƟon number permiƫng reducƟon. Smoke Barrier SeparaƟon Tenant Dwelling Unit/Sleeping Unit SeparaƟon Emergency LighƟng:Smoke DetecƟon Systems: Exit Signs: Fire Alarm: Interior walls & parƟƟons Floor ConstrucƟon Including SupporƟng Beams & Joists Party/Fire Wall SeparaƟon Corridor SeparaƟon ShaŌ enclosures ‐ Other ShaŌ enclosures ‐ Exit Occupancy Fire Barrier Yes No Exterior Walls Bearing Walls Exterior Walls North South North West East BUILDING ELEMENT Structural frame, includingcolumns, girders, trusses FIRE SEPARATION DISTANCE (FT) PROVIDED w/RATING** REQ'D DETAIL AND SHEET DESIGN # FOR RATED # ASSEMBLY# #FORDESIGN RATED PENETRATION Building Height in Feet Building Height in Stories ALLOWABLE REGULAR w/ 5' # LOT OR PARKING AREA PROVIDEDREQUIRED PARKING SPACESTOTAL# 132"ACCESS ISLEACCESS ISLE OF ACCESSIBLE SPACES PROVIDED# VAN SPACES w/PROVIDEDACCESSIBLE#TOTAL ParƟal 2018 NORTH CAROLINA EXISTING BUILDING CODE: Fire and/or Smoke Rated Wall Locations (Chapter 7) Assumed and Real Property Line Locations (if not on the site plan) Exterior Wall Openings w/ Respect to Distance to Assumed Property Lines (705.8) Occupancy Use for Each Area as it Relates to Occupant Load Calculation (Table 1004.1.2) Exist Access Travel Distance (1017) Common Path of Travel Distances (1006.2.1 & 1006.3.2(1)) Dead End Lengths (1020.4) Clear Exit Widths for Each Exit Door. Max Calculated Occupant load capacity each exit door can accommodate based Actual Occupant Load for Each Exit Door A Separate Schematic Plan Indicating Where Fire Rated Floor/Ceiling and/or Roof Structure is Provided for Purposes of Occupancy Separation. Location of Doors w/ Panic Hardware (1010.1.10) Loction of Doors w/ Delayed Egress Locks & the Amount of Delay (1010.1.9.7) Location of Doors w/ Electromagnetic Egress Locks (1010.1.9.9) Location of Doors Equipped w/ Hold-Open Devices. Location of Emergency Escape Windows (1030) The Sq Footage of Each Fire Area (202) The Sq Footage of Each Smoke Compartment for Occupancy Classification (407.5) Note ANY Code Exceptions or Table Notes That May Have Been Utilized Regarding UNITS TOTAL UNITS ACCESSIBLE REQUIRED UNITS ACCESSIBLE PROVIDED UNITS TYPE A REQUIRED UNITS TYPE A PROVIDED UNITS TYPE B REQUIRED UNITS TYPE B PROVIDED ACCESSIBLE UNITS TOTAL PROVIDED Owner/Authorized Agent: State Occupant Loads for Each Area 8'ACCESS ISLE U-Value of total assembly: R-Value of insulation: Description of assembly: Horizontal/vertical requirement: Floors Slab on Grade slab heated: The following data shall be considered minimum and any special aƩribute required to meet the Energy for the plan data sheet. If Performance Method, state the annual energy cost for the standard referenceCode shall also be provided. Each Designer shall furnish the required porƟons of the project informaƟon U-Value of total assembly: R-Value of insulaƟon: DescripƟon of assembly: U-Value of total assembly: DescripƟon of assembly: design vs annual energy cost for the proposed design. Roof/Ceiling Assembly (PrescripƟve Method Only) Educational: Assembly: Business: Residential: Utility & Miscellaneous: Columns SupporƟng Floor Openings (Windows /Doors w/ Glazing) South West East 2018 NC BUILDING CODE (Select One:) CONTACT: FOR RATED HR REDUCTION Energy Requirements: projecƟon factor: SHGC coefficient: U-Value of Assembly: NEW(SQ. FT.)SUB-TOTAL Zip Code: 2018 APPENDIX B BUILDING CODE SUMMARY (Except 1 & 2-Family Dwellings & Townhouses) (Select One:) CONSTRUCTED: RENOVATED: CURRENT OCCUPANCY PROPOSED OCCUPANCY OCCUPANCY CATEGORY (Table 1604.5): CURRENT: (date) (date) (Ch. 3) (Ch. 3) New Building Addition First Time Interior Completion Shell Core Phased Construction N/A Prescriptive Repair Chapter 14 Alteration Level I Alteration Level II Alteration Level III Historic Property Change of Use Arch Civil Elect AlarmFire Plumb Mech Standpipe Sprinkler Structural Walls>5'H Retaining Other N/A I II III IV PROPOSED:N/A I II III IV BASIC BUILDING DATA: I-A I-B II-A II-B III-A III-B IV V-A V-B N/A YES NO PARTIAL N/A NFPA 13 NFPA 13R NEPA 13D N/A NO CLASS I-WET CLASS I-DRY CLASS II-WET CLASS II-DRY CLASS III-WET CLASS III-DRY Primary Fire District:YES NO Floor Hazard Area:YES NO Special InspecƟons Required:YES NO (Contact the Local Inspection Jurisdiction for Procedures & Requirements) GROSS BUILDING AREA TABLE 3rd Floor 2nd Floor Mezzanine 1st Floor Basement ALLOWABLE AREA A-1 A-2 B E Factory:F-1 Moderate F-2 Low A-3 A-4 A-5 H-1 Detonate H-2 Deflagrate H-3 Combust H-4 Health H-5 HPM I-1 Condition 1 I-1 Condition 2 I-2 Condition 1 I-2 Condition 2 I-3 Condition 1 I-3 Condition 2 I-3 Condition 3 I-3 Condition 4 I-3 Condition 5 Mercantile:M R-1 R-2 R-3 R-4 S-1 S-1 High Piled S-2 S-2 High Piled Open Enclosed Repair Garage U Institutional: Parking Garage: Storage: Hazardous: Educational: Assembly: Business: Residential: Utility & Miscellaneous: A-1 A-2 B E Factory:F-1 Moderate F-2 Low A-3 A-4 A-5 H-1 Detonate H-2 Deflagrate H-3 Combust H-4 Health H-5 HPM I-1 Condition 1 I-1 Condition 2 I-2 Condition 1 I-2 Condition 2 I-3 Condition 1 I-3 Condition 2 I-3 Condition 3 I-3 Condition 4 I-3 Condition 5 Mercantile:M R-1 R-2 R-3 R-4 S-1 S-1 High Piled S-2 S-2 High Piled Open Enclosed Repair Garage UAccessory Occupancy Classification:Incidental Uses (Table 509): Special Uses (Chapter 4- List Code SecƟons): Special Provisions (Chapter 5- List Code SecƟons): Mixed Occupancy:YES NO SeparaƟon:1-Hr 2-Hr 3-Hr 4-Hr ExcepƟon: Allowable Area of Occupancy A Actual Area of Occupancy A Maximum Building Area=Total number of stories in the building x D (max of 3 stories) (506.2). Unlimited area applicable under conditions of Section 507. towers must comply with 412.3.1. The maximum area of open parking garages must comply with 406.5.4. The maximum area of air traffic control area of each use divided by the allowable floor area for each use shall not Exceed 1. MIXED OCCUPANCY/USE: DESCRIPTION AND USE Separated Use (508.4) - See below for area calculations. For each story,the area of the occupancy shall be such that the sum of the ratios of the actual floor 3 4 STORY NO. Actual Area of Occupancy B Allowable Area of Occupancy B )()( story (actual)bldg area per A B 4tableAREA506.2 + + )( area for frontage C increase 1,5 1< <1.00 SEPARATION: EXCEPTION: = Frontage area increases from Section 506.2 are computed thus:Perimeter which fronts a public way or open space having 20 feet minimum width = _______ (F) Percent of frontage increase I W = Minimum width of public way = _______________________________ (W) Ratio (F/P) = ___________ (F/P) Total Building Perimeter 2 1 a. b. e. d. c. = _________ (P) = 100 [ F/P - 0.25] x W/30f = _______ (%) YES NO 1-Hr 2-Hr 3-Hr 4-Hr Non-Separated Use (508.3) YES NO )( allowable area per D story or unlimited2,3 Frontage increase is based on the unsprinklered area value in Table 506.2.5 ALLOWABLE HEIGHT CODE REFERENCESHOWN ON PLANS FIRE PROTECTION REQUIREMENTS Non-Bearing Wallsand ParƟƟons Interior walls & parƟƟons Floor Ceiling Assembly SeparaƟon Incidental Use SeparaƟon PERCENTAGE OF WALL OPENING CALCULATIONS FIRE SEPARATIONDISTANCE (Ft) FROM DEGREE OF OPENINGSPROTECTION(Table 705.8) ALLOWABLE AREA (%)ACTUAL SHOWN ON PLANS (%)PROPERTY LINE ENERGY SUMMARY Yes No Yes No Carbon Monoxide DetecƟon: Yes No Yes No LIFE SAFETY PLAN REQUIREMENT ACCESSIBLE DWELLING UNITS (SECTION 1107) ACCESSIBLE PARKING (SECTION 1106) PLUMBING FIXTURE REQUIREMENTS (SECTION 2902.1) LAVATORIESWATERCLOSETS MALE USE FEMALE URINALS MALE DRINKING FOUNTAINS FEMALE SPACE SHOWERS/TUBS EXISTING NEW REQUIRED UNISEX UNISEX SERVICESINK REGULAR ACCESSIBLEMALEFEMALEUNISEX Existing Building Code Complies w/ Code:YES NO (Remainder of this SecƟon is N/A) Exempt Building:YES NO Climate Zone:N/A 3A 4A 5A Method of Compliance:Energy Code Performance Energy Code Prescriptive Ashrae 90.1 Performance Ashrae 90.1 Prescriptive Other (Performance) (If 'Other' Specify Source here) Skylights in Each Assembly: R-Value of InsulaƟon: U-Value of Skylight: Total SF of Skylights/ Each Assembly: Exterior Walls: (each assembly) Door R-Values: U-Value of total assembly: R-Value of insulaƟon: DescripƟon of assembly: Walls Below Grade: (each assembly) U-Value of total assembly: R-Value of insulaƟon: DescripƟon of assembly: Floors over uncondiƟoned space:  (each assembly) LIFE SAFETY SYSTEM REQUIREMENTS FIRM NAME LICENSE#PHONE#EMAIL on egress width (1005.3) the Items Above. FOR ALL COMMERCIAL PROJECTS Life Safety Plan Sheet # SPECIAL APPROVALS Special Approval: (Local Jurisdiction, Department of Insurance, OSC, DPI, DHHS, etc., describe below) >30'Unprotected, Sprinklered No LimitFRONT LEFT >30'No LimitRIGHT >30'No LimitREAR 30' ONE T504.3 T504.4 0 >30 0 >30 0 >30 0 N/A N/A N/A 0 N/A 0 0 0 0 0 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 2021 E ROOSELVELT BLVD: MONROE, NC 28112 BILL MacTAGGART (704-282-4424)bill@rppmfg.com MONROE FIRST STORAGE 19,800 104,000 UNLIMITED78,000 600 600 1 30' .75 19,800 IN ADJACENT BUILDING STORAGE S-2 19,800 19,800 19,800 Unprotected, Sprinklered Unprotected, Sprinklered Unprotected, Sprinklered No Limit>30' 1 1 1 1 1 HI-LO 508.3 FIRST FACTORY 19,800 92,000 UNLIMITED69,000 1 1 1 1 1 HI-LOF2/S2 rmoore@remarchitect.com chrisl@coastalplainseng.comCHRIS LOCKLEAR ROBERT E.MOORE COASTAL PLAINS ENGINEERING 4891 20193 704-283-1196 910-521-7213 chrisl@coastalplainseng.comCHRIS LOCKLEARCOASTAL PLAINS ENGINEERING 20193 910-521-7213 chrisl@coastalplainseng.comCHRIS LOCKLEARCOASTAL PLAINS ENGINEERING 20193 910-521-7213 chrisl@coastalplainseng.comCHRIS LOCKLEARCOASTAL PLAINS ENGINEERING 20193 910-521-7213 SHEET 2 OF 14 A-C 001 PROJECT NO: MODEL FILE: DRAWN BY: CHK'D BY: DATE OF ISSUE DESCRIPTION 19010 REM/SDG 4.30.2020 DATE SHEET TITLE REVISIONS MARK 4.3O.2O2O /Users/robertmoore/Dropbox/Projects/19010 RPP MNC/19010 5.0 Construction Document/19010 Drawings/19010_CD1.plnROBERT E. MOORE A R C H I T E C T MONROE, NC 28110 704.283.1196 rmoore@remarchitect.com MAC L.L.C. ROYAL PALM POOLS 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 100 N. SUTHERLAND AVENUE SITE R E Ma B B A A 1 1 B B C C D D E E F F G G 2 2 3 3 60'180'120' 204'-7"60' 118' 45' 19,800 sq. ft. 14 SPACES 8 SPACES 0" -3'3"-5' -1' DOCK 2A-201 3A-201 1A-201 4A-201 SCALE: 1" = 50'1 SITE 0 20'50'100' A-101 PROJECT NO: MODEL FILE: DRAWN BY: CHK'D BY: DATE OF ISSUE DESCRIPTION 19010 REM/SDG 4.30.2020 DATE SHEET TITLE REVISIONS MARK 4. 3o. 2o2o /Users/robertmoore/Dropbox/Projects/19010 RPP MNC/19010 5.0 Construction Document/19010 Drawings/19010_CD1.plnROBERT E. MOORE A R C H I T E C T MONROE, NC 28110 704.283.1196 rmoore@remarchitect.com MAC L.L.C. ROYAL PALM POOLS 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 100 N. SUTHERLAND AVENUE 1st FLOOR PLAN R E Ma 12 10'10'11 10'10'0914' 18'107' 3' 08 14'10'07 7'3'06 18'18'01 7'3'02 7'3'03 7'3'04 7'3'05 7'3'A A 1 1 B B C C D D E E F F G G 2 2 3 3 1 A-401 120'180'60'60'150'30' 30'30'30'30'30'30' 5' 11'-6"12'6'-6" 16' 8'5'3' 11'-4"13'-8"5'14'2'-6"5'5'5'5'4'-6"1'5'6'-8"18'12' A A-301 A A-301 BA-301 B A-301 B A-301 B A-301 C A-301 C A-301 2A-201 3A-201 1A-201 4A-201LOADING DOCKWHEYEWASHSERVICESINKTOILETEWCTOILETSPRINKLERROOM8" CONCRETE RETAINING WALLFEFEFEFEAPPROXIMATELY MACHINE LOCATION (VERIFY WITH INSTALLER) HAND RAILS EACH SIDE EXTEND 1' BEYOND LAST STEP & TOP OF LANDING EXTEND HAND RAIL 1' BEYOND LAST STEP LOADING DOCK LOADING RAMP CURB CURBACCESSIBLE RAMPHAND RAILS EACH SIDE EXTEND 1' BEYOND LAST STEP & TOP OF LANDING EXTEND HAND RAIL 1' BEYOND RAMP TACTICAL MARKER TACTICAL MARKER TACTICAL MARKER SCALE: 1/8" = 1'-0"1 1st FLOOR PLAN 0 4'8'16' A-201 PROJECT NO: MODEL FILE: DRAWN BY: CHK'D BY: DATE OF ISSUE DESCRIPTION 19010 REM/SDG 4.30.2020 DATE SHEET TITLE REVISIONS MARK 4. 3o. 2o2o /Users/robertmoore/Dropbox/Projects/19010 RPP MNC/19010 5.0 Construction Document/19010 Drawings/19010_CD1.plnROBERT E. MOORE A R C H I T E C T MONROE, NC 28110 704.283.1196 rmoore@remarchitect.com MAC L.L.C. ROYAL PALM POOLS 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 100 N. SUTHERLAND AVENUE ELEVATIONS R E Ma 3 3 2 2 1 160'60' G G F F E E D D C C B B A A30'30'30'30'30'30' 1 1 2 2 3 360'60' A A B B C C D D E E F F G G30'30'30'30'30'30'30'SCALE: 1/8" = 1'-0"1 NORTH ELEVATION 0 4'8'16' SCALE: 1/8" = 1'-0"3 EAST ELEVATION 0 4'8'16' SCALE: 1/8" = 1'-0"2 SOUTH ELEVATION 0 4'8'16' SCALE: 1/8" = 1'-0"4 WEST ELEVATION 0 4'8'16' A-103 PROJECT NO: MODEL FILE: DRAWN BY: CHK'D BY: DATE OF ISSUE DESCRIPTION 19010 REM/SDG 4.30.2020 DATE SHEET TITLE REVISIONS MARK 4. 3o. 2o2o /Users/robertmoore/Dropbox/Projects/19010 RPP MNC/19010 5.0 Construction Document/19010 Drawings/19010_CD1.plnROBERT E. MOORE A R C H I T E C T MONROE, NC 28110 704.283.1196 rmoore@remarchitect.com MAC L.L.C. ROYAL PALM POOLS 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 100 N. SUTHERLAND AVENUE LIFE/SAFETY PLAN R E Ma WAREHOUSE S-2 OCCUPANCY EXIT SIGN FLOOR GENERAL REQUIREMENTS EXITDOOR BRAILLE Interior Exit Sign Detail FLOOR EXIT 60" Maximum60" MaximumALL SIGNS SHALL HAVE LETTERS, NUMERAL, CHARACTERS AND BACKGROUND ON WHICH THEY ARE LOCATED IN AN EGGSHELL (SEMI-MATT), MATTE (FLAT), OR OTHER NON-GLARE FINISH ONLY. CHARACTERS AND SYMBOLS SHALL CONTRAST WITH THE BACKGROUND ON WHICH THEY ARE MOUNTED EITHER BY HAVING LIGHT CHARACTERS ON A DARK BACKGROUND OR DARK CHARACTERS ON A LIGHT BACKGROUND. ON RAISED AND BRAILLE LETTERS AND NUMERALS, PICTORIAL SYMBOLS, LETTERS AND NUMBERS SHALL BE RAISED 1/32 INCH (0.8MM) FROM THE BACKGROUND ON WHICH THEY ARE MOUNTED AND SHALL BE 5/8 INCH (16MM) MINIMUM TO 2 INCHES (50MM) MAXIMUM IN HEIGHT. LETTERS SHALL BE CAPITAL LETTERS ONLY. LETTERS AND NUMERALS SHALL HAVE SHARPLY DEFINED EDGES AND MAY BE EITHER SANS SERIF OR SIMPLE SERIF. ALPHABETIC/NUMERIC SIGNAGE SHALL BE ACCOMPANIED BY GRADE 2 BRAILLE. ALL SPECIFICATIONS FOR SIGNAGE MUST COMPLY w/ ICC A117.1 CHAPTER 7, COMMUNICATION ELEMENTS and FEATURES (Pages 65-74) and NCSBC SECTION 1011. 216' / 2 = 108' REQUIRED DISTANCE BETWEEN EGRESS DOORS 15,800 SF / 500 SF PER PERSON = 32 OCCUPANTS 200' TRAVEL DISTANCE CONVENIENCE DOORNOT A REQUIRED EXIT DOORDOOR HAS 33" CLEAR OPENING MAXIMUM OCCUPANT LOAD: 165 ACTUAL OCCUPANT LOAD: 52 EXIT SIGN SEE DETAIL THIS SHEET REQUIRED EXIT DOORDOOR HAS 33" CLEAR OPENING MAXIMUM OCCUPANT LOAD: 165 ACTUAL OCCUPANT LOAD: 52 EXIT SIGN SEE DETAIL THIS SHEET ACTUAL DISTANCE 110 239' TRAVEL DISTANCE FACTORY F-2 OCCUPANCY 4000 SF / 200 SF PER PERSON = 20 OCCUPANTS 120'180' 110' 216'5'WALK/DOCKSPRINKLERROOMFEFEFEFE ACCESSIBLE RAMPTACTICAL MARKER SCALE: 1/8" = 1'-0"1 LIFE/SAFETY PLAN 0 4'8'16' A-301 PROJECT NO: MODEL FILE: DRAWN BY: CHK'D BY: DATE OF ISSUE DESCRIPTION 19010 REM/SDG 4.30.2020 DATE SHEET TITLE REVISIONS MARK 4. 3o. 2o2o /Users/robertmoore/Dropbox/Projects/19010 RPP MNC/19010 5.0 Construction Document/19010 Drawings/19010_CD1.plnROBERT E. MOORE A R C H I T E C T MONROE, NC 28110 704.283.1196 rmoore@remarchitect.com MAC L.L.C. ROYAL PALM POOLS 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 100 N. SUTHERLAND AVENUE WALL SECTIONS R E Ma SECTION AT FRONT AND REAR WALL NOTE: ARCHITECTURAL WALL SECTIONS ARE FOR OVERALL WALL REPRESENTATION; TO SHOWN VARIOUS FINISHES, INSULATION LOCATION, ETC. THEY ARE NOT MEANT TO SHOW FRAMING DETAILS, STRUCTURAL MEMBER SIZES OR ANY OTHER INFORMATION PERTINENT TO THE STRUCTURE AND STABILITY OF THIS BUILDING. VERIFY ALL INFORMATION AND REFER TO STRUCTURAL DRAWINGS AND DRAWINGS BY METAL BUILDING MANUFACTURER. B 30'-0" EAVE HEIGHTHEIGHT VARIESCOMPACTEDSUBGRADE SCALE: 3/4" = 1'-0" 6" SEALED CONCRETE FLOORWITH WIRE REINFORCING ON6 MIL POLY VAPOR BARRIER FINISH GRADE FINISH GRADE R-13 VINYL BACKEDINSULATION HORIZONTALMETAL GIRTS R-13 VINYL BACKEDINSULATION HORIZONTALMETAL GIRTS METAL BUILDINGSTRUCTURE SEE SEALED METAL BUILDING DRAWINGS 26 GAUGEMETAL BUILDING WALL PANELS 26 GAUGE METAL BUILDINGWALL PANELS 26 GAUGE STANDING SEAM METAL ROOFON METAL BUILDING STRUCTURE 6" R-19 VINYLBACKED INSULATION METAL BUILDING STRUCTURE SEE SEALED METAL BUILDING DRAWINGS 26 GAUGE STANDING SEAM METAL ROOFON METAL BUILDING STRUCTURE PREFINISHEDMETALRAKE TRIM PREFINISHED METAL GUTTER (AND DOWNSPOUTS NOT SHOWN) BY METAL BUILDING SUPPLIER12 6" R-19 VINYLBACKED INSULATION 1 A-301 A SCALE: 3/4" = 1'-0" SECTION AT LEFT SIDE WALL CONTINUOUS CONCRETE FOOTING SEE STRUCTURAL DRAWINGS 4" STONE6"1'6"COMPACTEDSUBGRADE 6" SEALED CONCRETE FLOORWITH WIRE REINFORCING ON6 MIL POLY VAPOR BARRIER CONTINUOUS CONCRETE FOOTING SEE STRUCTURAL DRAWINGS 4" STONE6"1=6"HEIGHT VARIESCOMPACTEDSUBGRADE 6" SEALED CONCRETE FLOORWITH WIRE REINFORCING ON6 MIL POLY VAPOR BARRIER FINISH GRADE R-13 VINYL BACKEDINSULATION HORIZONTALMETAL GIRTS 26 GAUGEMETAL BUILDING WALL PANELS 6" R-19 VINYLBACKED INSULATION METAL BUILDING STRUCTURE SEE SEALED METAL BUILDING DRAWINGS 26 GAUGE STANDING SEAM METAL ROOFON METAL BUILDING STRUCTURE CONTINUOUS CONCRETE FOOTINGSEE STRUCTURAL DRAWINGS 4" STONE6"4'-6"FINISH FLOOR C SCALE: 3/4" = 1'-0" SECTION AT RIGHT SIDE WALL 1. GENERAL CONTRACTOR TO VERIFY ALL FINISHES WITH THE OWNER. 2. ALL MATERIALS AND FINISHES ARE TO BE INSTALLED PER THE MANUFACTURERS WRITTEN INSTRUCTIONS. 3. GENERAL CONTRACTOR TO VERIFY ALL INTERIOR COLORS WITH THE OWNER. 4. GENERAL CONTRACTOR TO VERIFY ALL HARDWARE, DIMENSIONS, FINISH, ETC. WITH THE OWNER. 5. IT SHALL BE THE RESPONSIBILITY OF THE OWNER AND GENERAL CONTRACTOR TO FURNISH AND INSTALL ALL WALL AND CEILING FINISHES PER SECTION 803.1 AND TABLE 803.5 OF THE 2018 NORTH CAROLINA BUILDING CODE AND TABLE 803.3 OF THE 2018 NORTH CAROLINA FIRE CODE. CONCRETE WALL WITH REINFORCINGSEE STRUCTURAL DRAWINGS PREFINISHED METALRAKE TRIM NTSA-301 A-301 COUMN FOOTING SCALE: 3/4" = 1'-0"1 Wall SECTIONS 0 1'2'3' A-401 PROJECT NO: MODEL FILE: DRAWN BY: CHK'D BY: DATE OF ISSUE DESCRIPTION 19010 REM/SDG 4.30.2020 DATE SHEET TITLE REVISIONS MARK 4. 3o. 2o2o /Users/robertmoore/Dropbox/Projects/19010 RPP MNC/19010 5.0 Construction Document/19010 Drawings/19010_CD1.plnROBERT E. MOORE A R C H I T E C T MONROE, NC 28110 704.283.1196 rmoore@remarchitect.com MAC L.L.C. ROYAL PALM POOLS 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 100 N. SUTHERLAND AVENUE ENLARGED PLAN R E Ma 4 WATER COOLER NTS 5 STAIR HANDRAIL NTS 6 RAMP HANDRAIL NTS057' 3'067' 3'077' 3'047' 3' D E 20"18" 24"34"40"36"8"36"20"16 1/2" MIN.19 1/2" MAX.36" 42"12" 18" 6" 36" GRABBAR MIRROR TOWELPAPER DISPENSER TOILET ROOM ELEVATIONS TISSUE DISPENSER 42" GRABBAR TOILET TOILET TISSUE 18" GRAB BAR 1'3" SCALE: 1/2" = 1'-0"A-401 1 SCALE: 1/2" = 1'-0" 2 3 A-401 A-401 A-401 A-401 TOILET ROOM ELEVATIONS A-401 6'6'-9"7'-9 1/2"7'-9 1/2"6'-9"3'3'1'3'-6"3'3'1' 1'3'3'-6"3'1' WH EYE WASH SERVICE SINK TOILET EWC UTILITY SPRINKLER ROOM 60" TURNING DIAMETER 1/4" THICK SIGNS H/C SIGN DETAIL PROVIDE ROOM IDENTIFICATION SIGN ON LATCH SIDE OF DOOR. CHARACTERS AND SYMBOLS SHALL CONTRAST WITH THEIR BACKGROUND. ARE TO BE DISTINCTLY DIFFERENT FROM THE DOOR IN COLOR AND CONTRAST. 5/8" HIGH & SHALL BE SANS-SERIF UPPERCASE CHARACTERS ACCOMPANIED BY IDENTIFICATION SYMBOLS ARE TO BE CENTERED ON DOOR 60" ABOVE FLOOR AND LETTERS & NUMBERS ON SIGNS SHALL BE RAISED 1/32" MIN., SHALL BE A MIN. OF NTS GRADE 2 BRAILLE. 1. 3. 4. 2. NOTES ADA SIGN GRADE 2 BRAILLE SIGN #1 GUARDRAIL HANDRAIL 6" RISERS 12" TREADS FIELD VERIFY NUMBER OF STEPS GUARDRAIL HANDRAIL 6" RISERS 12" TREADS FIELD VERIFY NUMBER OF STEPS HANDRAIL 1. ALL INTERIOR FINISHES TO COMPLY WITH IBC CHAPTER 8 2 ALL INTERIOR DOORS TO BE 3'0"x7'0" HOLLOW METAL PAINTED ON SITE. 3. ALL HARDWARE TO HAVE ADA APPROVED LEVER HANDLES. 4. ALL INTERIOR DOOR FRAMES TO BE HOLLOW METAL WITH MIN. 3 HINGE. 5. ALL TOILET ROOM DOORS TO BE SELF CLOSING AND HAVE A PRIVACY LOCK. 6. TOILET ROOMS TO HAVE A NON-ABSORBENT FINISH. 7. CEILING TO BE 2X2 LAY-IN WITH EXPOSED GRID. 8. INTERIOR WALLS TO HAVE R-11 INSULATION (UN-FACED) . 9. VCT & 4" COVE VINYL BASE BY ROPPE IN TOILETS AND UTILITY ROOM. HANDRAIL RAMP NOT TO EXCEED 1 ON 12 FIELD VERIFY RAMP LENGTH 1 1/2" PAINTED STEEL TUBING 1 1/2" PAINTED STEEL TUBING 1 1/2" PAINTED STEEL TUBING GUARDRAIL LANDING SCALE: 1/2" = 1'-0"1 ENLARGED PLAN 0 1'2'4' z \.1CINITY MAP 0 NOT TO SCALE U1 U1 :::;;; 0:: w 0... z w ~ 0:: 5: ~ U1 0:: w w z CJ z w w I f- f- :::J 0 I f- 5: 0 w 0... 0 u 0:: 0 0 w U1 :::J w rn ~ 2 f- 0:: < 0... 0 z 5: :'S _j < 0:: w 0 w LL. >-rn 0 w f-u w f-0 0:: 0... U1 w U1 :::J 0 w N 0:: 0 I f-::::l < z :::J 0:: 0 _j :::J LL. 5: :'S z :::J 0:: w w z CJ z w w I f- >-rn 0 w f- I CJ 0:: >-0... 0 FOOTING SCHEDULE u w CONCRETE FOOTING FOOTING REINFORCING 0:: <t: U1 CJ z COLUMN FOOTING SIZE BOTIOM TOP 5: <t: MARK "X"SQUARE "y" L/W S/W L/W S/W 0:: 0 F-1 7'-o" 2'-0" 12-#6 12-#6 6-#4 6-#4 w U1 w F-2 5'-6" 2'-0" 7-#6 7-#6 6-#4 6-#4 I f-F-3 3'-6" 2'-0" 5-#6 5-#6 6-#4 6-#4 @ F-4 3'-0" 2'-0" 4-#6 4-#6 6-#4 6-#4 CONCRETE PIERS 0 I 0 I") • 0 I 0 I") • 0 I 0 I") • 0 I 0 I") MIN. 18"X18" CONCRETE W/ 6-#6 BARS VERTICAL W/ #3 TIES AT MAX. 12" O.C. (1) (1) 120' -0" 60' -0" 60' -0" 20' -0" 20' -o" CD 20' -o" 20' -0" Cp 20' -0" <6) 20' -o" @ 60'-o" @ COMMENTS/NOTES: 4 120' -0" BASE PL. MIN.5/8" THICK A36 STEEL ANCHOR BOLTS MIN. A307 STEEL 2-MIN. 3/4" DIAMETER X 12"L .. 2-MIN. 3/4" DIAMETER X 12"L. 2-MIN. 3/4" DIAMETER X 12"L. 2-MIN. 3/4" DIAMETER X 12"L. cv 6o' -o" (6) REVISION PLAN DA TEo 04{25/]J.Y}JJ PROJECT No. l!Hl19-A DRAWN BY' GCM APPROVED BY' GCM SHEET z 0 en en 2 0::: w (]__ z w ~ 0::: :s: 1 120' -0" en 60' -0" (4) 0::: w w z C) 20' -0" 2 20' -0" ~D 20'-0" 20' -0" z w w I 1-'"" "-" 1-::::l 0 I 1-' :s: 0 I 0 w 0 I") (]__ 0 u -0::: = 0 0 w en ::::l ' 0 I w m ~ 0 :)p F I") /s ,..0 E SL !-- ' 2 ~ 1-0::: <( (]__ 0 z :s: ::5 "'"' ~ ~< ~ w ;:; z ' )' _j 0 c I w 0 0 I") 0 -IX _J 0 <( 0::: w 0 w LL.. >-m I ~ 0 "'-' t !Xl ~' ~ ~< ;> ' p· 0 'c I 0 w 0 I") 1-u w 1-0 0::: ~ ""' (]__ en ' w 0 en I ::::l 0 w 0 ,:: LO PE Sl OF I") E / I N I 0::: " 0 I 1-::::l <( z ::::l a: 0 (f) ~~ "'< ~' w ;> z ' ~2 p' _j 0 I w 0 0 I") 0 - _J IX ::::l LL.. :s: ::5 ~ ""' z ::::l . a: 20'-o" 20'-0" 20' -0" 20' -0" w w z ® 60' -0" @ C) z w ~ w I 120' -0" 1- >-1 m 0 w 1- I C) 0::: >-(]__ 0 u w a: <( en C) z ~ a: 0 w en w I 1- @ (~ 60' -0" CD 20' -0" 6 20' -0" ' 0 I 0 I") M AI~ f R/ ME "" ~ ' 0 I . 0 I") / M AI~ F RA ME "" = ' 0 I 0 I") ' M AI~ FRA ME 0 '"'I ~c, !Xl ~ ' 0 I 0 I") M AI~ F R/ ME ""' ~ ' 0 I 0 I") M AI~ F Rfl ME -® ' 0 I 0 I") 20' -0" 20' -0" ® 60' -0" @ ( ~ --"""""~ -"" __________ "_ "" ~ "" ""' --"-------------- ~ ~~ ~<!lii ~~ ~~<4~ ~~ ~~~t71 ~z REVISION DATE• 04/25/WW PROJECT No. 16-019-A DRAIIN BY• GCM APPROVED BY• GCM SHEET §=2 z 0 r.n (j) :::;;;: 0:: w 0... z w f:: 0:: 3: (j) 0:: w w z Cl z w w :r: 1- 1-:::) 0 :r: 1- 3: 0 w 0... 0 0 0:: 0 0 w (j) :::) w CD ~ :::;;;: 1-0:: <( 0... 0 z ~ _j <( 0:: w 0 w LL.. >-(I) 0 w 1-0 w 1-0 0:: 0... r.n w (/] ::J 0 w N 0:: 0 :r: 1-::J <( z ::J 0:: 0 _j ::J LL.. 3: :::5 z :::) 0:: w w z Cl z w w :r: 1- ' >- I CD 11 0 w 1-:r: Cl 0:: >-0... 0 0 w 0:: <( r.n Cl z ~ 0:: 0 w r.n w :r: 1- @ STEEL COL. 6" CONCRETE SLAB W/6X6X2.9X2.9 WWF ON 6 MIL VAPOR BARRIER ON COMPACTED FILL • <0 • 0 I • <0 "' I -- BEYOND CONCRETE FOOTING STEEL COL. a" n 6" 1'-0" 1'-6" STEEL GIRT NOMINAL a" WIDE • 0 I - FINISH GRADE FINISH FLOOR 1/4 BARS AT 16" O.C. 2-1/4 BARS CONT. 6" CONCRETE SLAB W/6X6X2.9X2.9 WWF ON 6 MIL. VAPOR BARRIER ON COMPACTED FILL 'b I 0. • <0 CONCRETE FOOTING STEEL COL. BEYOND a· n STEEL GIRT NOMINAL a• WIDE FINISH GRADE FINISH FLOOR ,. ~ ,.t... II< ."• r. 6" W/6 ON 6 MIL ON STEEL COL CONCRETE SLAB X6X2.9X2.9 WWF VAPOR BARRIER COMPACTED FILL\ .. ... • . \.(.. .. "' . ..... . : -\" ,. 1'-6" STEEL BASE 6" CONCRffi SLAB PLATE-SEE W/6X6X2.9X2.9 WWF SHOP ON 6 MIL. VAPOR BARRIER " I 9 [DRAWINGS I FINISH FLOOR ON COMPACTED FlU. .• 1: .. , • • .. . " ' .. ., ... "' ,• ..... __ ..... • ' .. ·• ~ '. ~-•.. ~-"t. .... ·• .. · :< : !(. .. -;...-·_-_;~·~: ~-SEE FOOTING SCHEDULE :i.." .. "-~ -~-:,.; ... ; ., . ·•"-' CONCRETE PIER • . ... • MIN. 1a"X181\ .. ... .. COMPACTED icb.MIL. POLY VAPOR BARRIER "X" .I SEE FOOTING SCHEDULE ...... ~ • •' '!" .. _ :· SEE FOOTING SCHEDULE SEE FOOTING SCHEDULE • 0 I ;,. W/6-#6 BARS _, ' ., &: 1/3 TIES .. AT MAX 12" O.C. <. ~ ~-..... < ...... COMPACTED ' FILL . !"" . .. . -.-'«. ,, <u .... '[~.-£ : ~ ~ 4 :_, .... ,:.:: . ' . .. '< .. -~~ . , . ".: .. . ' CONCR~7 FOOTING I ·x· I • SEE FOOTING SCHEDULE ' FILL • 0 I ;,. }- ~SEE FOOTIN G SCHEDULE SEE FOOTING SCHEDULE STEEL COL. • ....., 17 • - · ... ~ -~ !' .. SAWED CONTROL JOINT AT MAX • 12'-6" o.c. +/- .. . ~· CONT. SLAB REINFORCING STEEL COL STEEL COL BEYOND. 6" CONCRETE SLAB w ON 6 /6X6X2.9X2.9 WWF MIL VAPOR BARRIER ON COMPACTED FILL\ • <0 ' . .'."·. • "' COMPACTED I I 0. FILL 8" n ·. ~~. \f« .. , ... . . , . ... . ' < .. ,. .. . ,. ' .. ,, ' ·. • . : . ~· .. -~" ·. ·' ... , ,,., 0 .· : .. ~~·>: :>< ·<. .. I < --.. .. . . CONCRET~/ FOOTING 2'-4" 8" 3'-0" ' . 5-0 STEEL GIRT NOMINAL 8" WIDE /~· CONCRETE w/ #4 BARS FINISH WALL AT 12"0.C. EACH WAY FLOOR / • 0 • ,. I 0 :::> ;., I "' ;,. ~ "' FIN. GRADE • 0 I -~#4 BARS AT 5-#4 BARS 16" o.c. CONT. 6" a· n STEEL GIRT BEYOND NOMINAL a· WIDE CONCRETE SLAB a· n STEEL GIRT STEEL COL NOMINAL a· WIDE 6" CONCRETE SLAB a· n STEEL GIRT BEYOND NOMINAL a" WIDE 6" CONCRETE SLAB BEYOND I 8" CONCRETE SLAB I ............--~EL GIRT 6" W/6 ON 6 MIL ON X6X2.9X2.9 WWF VAPOR BARRIER COMPACTED FILL\ ic .. . , ... :: : ... " .... COMPACTED FILL • ,· . . . ,-.< ,, • ., . , . ,. " 0 6" CONCRETE SLA~""' ... I I ;,. W/6X6X2.9X2.9 WWF r-:, • <0 ON 6 MIL. VAPOR BARRIER ON COMPACTED FILL ·"f K "' .. ' . ·, ~ e.--. _,il:_. .. .. • • H ·':"\ .. -.... H'J.~ ... 0 .. . !;.:. . \L. I ~ ' . . . ... ·,_'"IL. --... . ' . ' , .. ~-. . . ONCR~/ FOOTING c 3'-4 .. a· 4'-0" "'· \ o, WALL w/ /f4 BARS /~· CONCRETE AT 12"0.C. EACH WAY FINISH FLOOR v • <0 • I 0 ;, I ;,. ~ .. • .. .. ,., . -"' • 0 I -- ~#4BARSAT 5-64 BARS 16" o.c. CONT. 1/6 BAR BY 20' -0" • c .I "' /6X6X2.9X2.9 w ON 6 WWF MIL VAPOR BARRIER 0 N COMPACTED FILL~ • . . ·. · . ., ... !~ .. ,. "' ' .. .'."· .. .. ... , . .. .. CONCRETE PIER I C: ~· ·'". .. . l'k ! : MIN. 18"X18" . l.. • .• .. .. W/6-#6 BARS ... .. .. ,, 'L . &: #3 TIES ' --·• ' 12" D.C. .. ~14-I AT MAX . .. .. ... .. , ·'· ,. .. COMPACTED •• FILL '•', . '•. .. • .... )~ • 0 ;,. ·. • ... • . ... , .. · ' . ... · ... • . --~ ":' .. · .. .. >-\..!! ... . . .. < • ·. . "X" SEE FOOTING SCHEDUU /~· CONCRETE w/ 1/4 BARS FINISH F / • 0 • ::;; I 0 :::> ;., I "' ;,. ~ FIN. GRADE • 0 I -- ~SEE FOOTING SEE FOOTING W/6X6X2.9X2.9 WWF 0 N 6 MIL. VAPOR BARRIER WALL AT 12"0.C. EACH WAY LOOR SCHEDULE SCHEDULE ON COMPACTED ic • 0 I I ;, • <0 "' --.. .. • ... 0 :"' ·. ·. I --. ' ONCRET~/ FOOTING c ....... -.... __ , .......... ~~----~- FILL\ .. . •. !!<.' .. COMPACTED FILL .. .. . .r:: • . .. ... '• .. . .. ' .. • ' • :". • • ... : • 4'-4" 5'-o" /~" CONCRETE w/ #4 BARS FINISH F . ' .. .V • • ... • "' ' I 'io ·< • ' . 0 I .. ;, 'il': : • • • ... ., • <0 .'.:. ·"1:.,!< I . .. . -.. .. ~#4 BARS AT 5-1/4 BARS 8" CONT. X6X2.9X2.9 WWF VAPOR BARRIER WALL W/6 ON 6 MIL ON AT 12"0.C. EACH WAY LOOR COMPACTIEO FILL\ 16" o.c. • <D I • <0 • 0 I ;,. -r-• 0 I -- ONCR~/ FOOTING c ..· . . .•. • ·. . . .. • ... . • ·. ,• .. . COMPACTED FILL ..... .. . . ' . · .. .. • • • ' .. . .. ·. :.,. .. '. 3'-4" NOMINAL a" WIDE /~" CONCRETE WALL fY.~" CONCRETE w/ #4 BARS AT 12"0.C. EAC W w/ 1/4 BARS SLOPE--.., FINISH F . . 1/.: ." · . • I ~ .... . .. ... • • ' '"""' • .. .• .. • ' .• COMPACTED FILL • "' • • I . 0 ;, . . I • ;,. 6" CONCRETE SLA~""' ···I·· · . .. • W/6X6X2.9X2.9 WWF t;;_ ' ON 6 MIL. VAPOR BARRIER ON COMPACTED FILL .. ~ • • • ,_. .. · .. • .. • .. '" .. . "' ,., ' .. .. • ' • ~-·' " . ,.. : . • .. -~ ... .. :• .'·. 0 t:: . .. !"' . .. •. • .. .· . I -;... ... • ' ' ... .. •· .· . ~#4 BARS AT 8-#4 BARS a· 4'-4" a" CONT. 9'-0" ___ , ____ ..... -------------~----~··· ,._ ----.... ------------- WALL AT 12"0.C. EACH WAY LOOR 16" o.c • ~ ~~ ~~~~ ~~ ~~~u ~~ ~~~~ ~i REVISION DATE• 04/25{1JJ}JJ PROJECT No. 16-()19-A DRAWN BY• GCM APPROVED BY• GCM SHEET §=3 z 0 en en 2 0:: w Q_ z w ~ 0:: S: en 0:: w w z 0 z w w :r: I- I-=:J 0 :r: I- S: 0 w Q_ 0 0 0:: 0 0 w en =:J w m ~ 2 1-0:: <( Q_ 0 z _] <( 0:: w 0 w LL >-m 0 w 1-0 w 1-0 0:: Q_ en w en =:J 0 w N 0:: 0 :r: 1- =:J <( z =:J 0:: 0 _j =:J LL S: :5 z =:J 0:: w w z 0 z w w :r: I- >-m 0 w 1-:r: 0 0:: >-Q_ 0 0 w 0:: <( en 0 z ~ 0 w en w :r: I- @ APPENDIX B STRUCTURAL DESIGN DESIGN LOADS: Importance Factors: Wind (I w) 1.0 ________ _ Live Loads: Snow Load: Wind Load: Snow (Is) 1.0 _________ _ Seismic (I E) 1.Q_ ______ _ Roof Mezzanine/Second Floor First Floor 10 __:_::___ psf 20 __:N:=./.,.A--psf ~:.!...:.;. __ psf 125 __:..::::.:::._ __ psf mph (ASCE-7-98) Basic Wind Speed __:1,:.:15::...._ __ Exposure Category __:B:...._ __ Wind Base Shears (for MWFRS) Vx=~2:_9_~--- Cladding Design Pressure 28.0 PSF BUILDING CLASSIFICATION: I Compliance with Section 1616.4 only? DYes SITE CLASS DEFINITION: D SEISMIC DESIGN CATEGORY: C Provide the following Seismic Design Parameters: Vy= 80.6 k ----- Seismic Use Group ____ .!_ _____ _ Spectral Responses Acceleration SMs 0.35 SMI __ 0::_:_.1'-=3c3:._~%g Site Classification _____bDL___ Basic structural system (check one) --1-Bearing Wall Dual w/Special Moment Frame ___:_v'_ Building Frame Dual w/lntermediate R/C or Special Steel __ Moment Frame Inverted Pendulum S . . b h v -64.8 k v -43.2 k e1sm1c ase s ear x-________ 7 y= ______ _ Analysis Procedure Simplified __.::.f._ Equivalent Lateral Force --Modal Architectural, Mechanical, Components anchored? _Yes _______ _ LATERAL DESIGN CONTROL: Earthquake __ _ Wind j SOIL BEARING CAPACITIES: Field Test (provide copy of test report) n/a psf Presumptive Bearing capacity __ ...2D.QQ_____________ psf Pile size, type, and capacity n/a --------------------~-------~-----~ STRUCTURAL NOTES & SPECIFICATIONS: 1. CIVIL AND STRUCTURAL DRAWINGS SHALL BE USED IN CONJUNCTION AND IN COORDINATION WITH ARCHITECTURAL DRAWINGS AND OTHER CONTRACT DOCUMENTS. IN THE EVENT OF DISCREPANCY, CONTRACTOR SHALL NOTIFY THE ARCHITECT/ENGINEER FOR RESOLUTION OF CONFLICT. 2. EXACT SIZES AND LOCATIONS OF ALL OPENINGS THROUGH THE STRUCTURE SHALL BE COORDINATED WITH THE RESPECTIVE TRADES BY THE GENERAL CONTRACTOR. 3. GENERAL CONTRACTOR SHALL COORDINATE AND VERIFY THE SIZE, LOCATION, TYPE, AND DIRECTION OF ALL PADS, DEPRESSIONS, BOLTS, SLEEVES, ANCHORS, INSERTS, PIPING, ETC. TO BE SET IN OR UNDER CONCRETE AND/OR MASONRY BEFORE THE POUR OR ERECTION IS PERFORMED. ALL BUILT -IN ITEMS AND INDENTATIONS OR ELEVATIONS ARE TO BE SET BY THE GENERAL CONTRACTOR IN STRICT ACCORDANCE WITH REVIEWED SHOP DRAWINGS SUPPLIED BY THE SUPPLIERS,VENDORS,OR SUBCONTRACTOR OF THE VARIOUS TRADES. 4. COLUMN ANCHOR BOLTS SHALL BE POSITIONED WITH A SUITABLE TEMPLATE PER APPROVED SETTING PLAN PRIOR TO POURING CONCRETE. SECURE NUTS TO TEMPLATE PRIOR TO POURING CONCRETE TO PREVENT ROTATION OF BOLTS. 5. CONTRACTOR SHALL SUBMIT SHOP DRAWINGS FOR APPROVAL PRIOR TO FABRICATION. SHOP DRAWINGS SHALL SHOW ALL MATERIALS REQUIRED WITH RELATIVE LOCATIONS IN SUFFICIENT DETAIL FOR PROPER APPLICATION AND ERECTION IN ACCORDANCE WITH ALL CONTRACT DOCUMENTS. CONTRACTOR SHALL CHECK AND STAMP SHOP DRAWINGS PRIOR TO SUBMITTAL TO THE ARCHITECT /ENGINEER. 6. FOUNDATION DESIGN BASED ON ALLOWABLE SOIL BEARING PRESSURE OF 2000 POUNDS PER SQUARE FOOT. OWNER SHALL EMPLOY A QUALIFIED GEOTECHNICAL ENGINEER TO VERIFY BEARING ALLOWANCES AT ALL FOOTINGS AND TO OBSERVE ANY SITE PREPARATION AND FILL REPLACEMENT. CERTIFIED WRITTEN REPORTS SHALL BE SUBMITTED TO THE ARCHITECT/ENGINEER. GEOTECHNICAL REPORT WILL BE REQUIRED FOR FOUNDATION ELEMENTS PER SECTION 1803.5.11 OF YJR 2012 NCBC. 7. FOOTING EXCAVATIONS WHICH CANNOT BE IMMEDIATELY FILLED WITH FOUNDATION CONCRETE SHALL RECEIVE A TWO TO FOUR INCH THICK LAYER OF "LEAN" 2000 P.S.I. CONCRETE TO FORM A "MUD MAT" BENEATH THE FOUNDATION. THE THICKNESS OF THE "MUD MAT" IS IN ADDITION TO THE REQUIRED FOUNDATION THICKNESS. WHEN REQUIRED BY THE GEOTECHNICAL ENGINEER, REPAIR OF UNSUITABLE BEARING FOR FOOTINGS SHALL BE DONE BY OVEREXCAVATING AND BACKFILLING WITH 2000 P.S.I. CONCRETE OR SOIL CEMENT. 8. ALL CAST -IN PLACE CONCRETE UNLESS SPECIFIED OTHERWISE SHALL HAVE A 28-DAY COMPRESSIVE STRENGTH OF 3000 P.S.I. MINIMUM AND A DRY UNIT WEIGHT OF 144-150 P.C.F. CONCRETE DESIGN, PRODUCTION, AND PLACEMENT SHALL BE DONE IN ACCORDANCE WITH A.C.I. 301 AND A.C.I. 318. 9. CONCRETE THAT IS PLACED WHEN THE MEAN DAILY OUTDOOR TEMPERATURE IS LESS THAN 40 DEGREES FAHRENHEIT, SHALL BE PLACED IN ACCORDANCE WITH A.C.I. 306 "RECOMMENDED PRACTICE FOR COLD WEATHER CONCRETING". HOT WEATHER CONCRETING SHALL BE DONE IN ACCORDANCE WITH A.C.I. 305 "RECOMMENDED PRACTICE FOR HOT WEATHER CONCRETING". 10. SLAB-ON GRADE CONCRETE SHALL HAVE THE THICKNESS AND REINFORCING AS SHOWN OR NOTED ON THE STRUCTURAL DRAW- INGS. CONTRACTION JOINTS SHALL BE FORMED WITH A CONTINUOUS KEYED JOINT OR SAWED. WHERE SAWED JOINTS ARE USED, DISCONTINUE 1/2 OF THE REINFORCING THROUGH THE JOINT. MAXIMUM SPACING OF CONSTRUCTION JOINTS SHALL BE AS NOTED. THE UPPER 1' -0" OF FILL BENEATH SLABS SHALL BE COMPACTED TO 100 PERCENT OF THE STANDARD PROCTOR MAXIMUM DRY DENSITY. SEE OTHER CONTRACT DRAWINGS FOR LOCATION AND EXTENT OF SLAB DEPRESSIONS, EMBEDMENTS, UNDERFLOOR PIPING.ETC. 11. ALL CAST -IN PLACE CONCRETE WHICH IS TO REMAIN EXPOSED SHALL BE FORMED WITH PLYWOOD OR SONOTUBES AS REQUIRED AND SHALL BE RUBBED TO ERASE ALL VISUAL EVIDENCE OF FORMING. ALL FORMWORK SHALL BE REMOVED FROM CONCRETE. NO COVERING OF WOOD OR OTHER FORMING MATERIALS BY EARTH BACKFILL OR MASONRY WILL BE PERMITTED. 12. REINFORCING STEEL SHALL BE A.S.T.M. 615, GRADE 60, UNLESS NOTED OTHERWISE, FABRICATED AND PLACED IN ACCORDANCE WITH A.C.I. 318. PROVIDE CLASS "B" TENSION LAP SPLICES UNLESS OTHERWISE NOTED. CONTACT SPLICES MAY BE USED AT LAPS. WELDED WIRE FABRIC (W.W.F.) SHALL CONFORM TO A.S.T.M. A 185. PROVIDE BAR SUPPORTS AND SPACERS IN STRICT ACCORDANCE WITH C.R.S.I. MANUAL OF STANDARD PRACTICE, LATEST EDITION. 13. MASONRY: A) HOLLOW CONCRETE MASONRY UNITS SHALL CONFORM TO A.S.T.M. C90. B) GROUT AND MORTAR SHALL CONFORM TO A.S.T.M. C476. C) HORIZONTAL JOINT REINFORCEMENT SHALL CONFORM TO A.S.T.M. A82 (GALVANIZED) WIRE, 9 GAUGE MINIMUM SIZE, FACTORY FABRICATED. D) MASONRY MINIMUM DESIGN COMPRESSIVE STRENGTH AT 28 DAYS SHALL BE 2000 P.S.I. E) BRICK UNITS SHALL CONFORM TO A.S.T.M. C216 AND SHALL BE FBX,SW GRADE. F) MAXIMUM SIZE AGGREGATE FOR MASONRY FILL CONCRETE SHALL BE 3/8" (0.375" PEA GRAVEL). G) SEE ARCHITECTURAL DRAWINGS FOR MASONRY CONTROL AND EXPANSION JOINTS. 14. ALL STRUCTURAL STEEL WIDE FLANGE SECTIONS, ANGLES, AND PLATES SHALL BE A.S.T.M. A36. PIPE SHAPES SHALL BE A.S.T.M. A53. TUBE SHAPES SHALL BE A.S.T.M. A500(B). DESIGN, DETAILING, FABRICATION AND ERECTION OF STRUCTURAL STEEL SHALL BE IN STRICT ACCORDANCE WITH WITH A.I.S.C. "MANUAL OF STEEL CONSTRUCTION". SHOP DRAWINGS FOR ALL STEEL SHALL BE APPROVED PRIOR TO FABRICATION. 15. STEEL STUDS AND/OR JOISTS AND ACCESSORIES SHALL BE MADE OF THE TYPE, SIZE, GAUGE AND SPACING SHOWN ON THE DRAWINGS AND SHALL BE DESIGNED IN ACCORDANCE WITH A.I.S.I. "SPECIFICATION FOR THE DESIGN OF COLD-FORMED STEEL STRUCTURAL MEMBERS", LATEST EDITION. ALL MEMBERS AND ACCESSORIES SHALL BE ZINC COATED AND SHALL MEET A.S.T.M. A525, G60, OR EQUIVALENT. 16. ALL STEEL CONNECTIONS, UNLESS OTHERWISE NOTED SHALL BE SHOP WELDED AND/OR FIELD BOLTED USING 3/4" DIAMETER HIGH STRENGTH BOLTS IN ACCORDANCE WITH A.I.S.C. MANUAL, FASTENER DESIGNATON A325-N. NO CONNECTION SHALL HAVE LESS BOLTS THAN THE MINIMUM NUMBER INDICATED BY A.I.S.C. STANDARD FRAMED BEAM CONNECTIONS. 17. PLYWOOD SHEATHING, UNLESS OTHERWISE NOTED, SHALL BE 1/2" C-D EXTERIOR GRADE WITH SHEET PERIMETER AND ALL BEARING POINTS NAILED AT SIX INCHES ON CENTERS AT SHEET PERIMETER AND TWELVE INCHES ON CENTERS AT OTHER BEARING POINTS WITH 1 OD GALVANIZED NAILS OR APPROVED EQUAL. 18. GYPSUM SHEATHING CONFORMING TO A.S.T.M. C79 OR C473 OR WALL BOARD CONFORMING TO A.S.T.M. C36 SHALL BE USED FOR DIAPHRAGM ACTION AS SHOWN OR LISTED ON THE DESIGN DRAWINGS. NAIL OR SCREW PATTERNS SHALL BE AT SIX (6) INCHES ON CENTERS UNLESS OTHERWISE NOTED. 19. WOOD TRUSSES SHALL BE PRE-ENGINEERED AND PREFABRICATED. TRUSS DESIGNS SHALL BE SEALED BY AN ENGINEER LICENSED IN THE STATE OF NORTH CAROLINA. COPIES OF SEALED, APPROVED SHOP DRAWINGS MUST BE ON JOBSITE FOR INSPECTOR'S REVIEW, PRIOR TO DELIVERY TO JOBSITE. LATERAL BRACING TO COMPLY WITH IBC. 20. 21. GOVERNING CODE: NCSBC 2018 DESIGN LOADS: WIND ZONE: 115 M.P.H. EXPOSURE: "B" SEISMIC ZONE: SOIL CLASSIFICATION D ROOF LOADS: DEAD LOAD= 20 P.S.F. LIVE LOAD= 20 P.S.F. SNOW LOAD= 1 0 P .S.F. TOTAL ROOF LOAD= 50 P.S.F. FIRST FLOOR LOAD DEAD LOAD= 75 P.S.F. LIVE LOAD= 125 P.S.F. TOTAL FIRST FLOOR LOAD= 200 P.S.F. REVISION DA TEo 04/25/'l[J}JJ PROJECT No. 16-019-A DRAWN BY• GCM APPROVED BY• GCM SHEET UNIT HEATER SCHEDULE lA ARK LOCATION SERVICE VENT INPUT VOLT PHASE HZ MOCP MCA IAFG. &: MODEL AFUE NET WEIGHT DIAMElER BTU ~~ENDED STORAGE REZNOR UEAS 180 UH-1,2,3,4,5 ...-~;;·;··~ AREA 1 4 175,000 120 1 60 15 7.9 &A~Ef.J'~G), GRAVITY VENTED N/A 245 LBS . FAN SCHEDULE MARK LOCATION SERVICE CFIA S.P. AMPS RPM VOLT PHASE DRIVE REMARKS EF-1,2,3 SIDEWALL WAREHOUSE 3,061 .125" 3/4 860 120 1 DIRECT WAll MOIIIlEO FAN GREEN HECK HP SE-36-607 OR EQ. OUTSIDE AIR CALCULATION -2015 SC MECHANICAL CODE (TABLE 403.3) Vbz = RpPz OCCUPANCY TYPE: SF I OF OCCUPANTS O.A. CFIA PER O.A. CFIA PER O.A. CFIA REQUIRED (Vbz) (Az) (Pz) PERSON (Rp) SF (Ra) WAREHOUSE 21,600 - -0.06 1,296 INTAKE LOUVERS TOTAL CFIA REQUIRED 1.296 TOTAL O.A. CFIA FURNISHED 9,813 + RaAz EXHAUST CFIA REQUIRED - TOTAL EXHAUST REQUIRED - TOTAL EXHAUST FURNISHED - Coastal Plains Engineering, P .A. 1'11111 f C-211611 R E ROBERT E. MOORE A R C H I T E C T 100 N. SUTHERLAND AVENUE MllNRilE, NC 28110 704.283.1196 rMoore@reMorchitect.coM MAC) L.L.C. 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 May 04, 2020 SHEET TITLE REVISIIlNS MARK DATE DESCRIPTIIlN PRilJECT Nil' 2020-002 MllDEL FILE' DRAIJN BYI CSL CHK'D BYI SF DATE llF ISSUE 1?.1?.2020 M1 1" CW TO I£W 3/4" IE1ER PROVIDE BACKFLOW PRE'IEN1ER PER AUlHORilY HAVI JJRISDICTION NG 4"TOSI1E~ • 'l'""'- ( ~ 134 I 11 ~ I I ~ I I I if~ ~ f- ~ I .""CW"Y/ fnv ~ I '--" P-3 ~ I \ ,,~ ~ ~""'" .. a ~ E • I h 1\3" t-"'-E N • P-1 r· i ['-1/2" cw 'w'C 3"--- -V2T1lii LE ..._ / T r2" / I I I I I -J---1' I I p 2 1'-, Y'-1 -TOILE T I i r~ 1\3" ~1/2" HAC -~ . EYE P +'WASH SPRINKL ~3" R ROOM r1 ENLARGED PLUMBING PLAN SEE 1/P1 FOR ENLARGED PIWIIBING PLAN lHIS 1/4"=1'-o" .{ KnpiAN PLUMBING FIXTURE SCHEDULE SYMBOL MANUFACTURER MODEL I F'IXTURE DESCRIPTION ACCESSORIES P-1 270AA.001 CADET 3 RIGHT HEIGHT ELONGATED TOILET CHURCH 295C ELONGATED SEAT AMERICAN STO. VITREOUS CHINA, 1.6 GPF OPEN F'IRONT LESS COVER P-2 AWERICAN STD. 0490.011 LAVATORY, WALL-TYPE AMERICAN STANDARD 2385.400 FAUCET P-3 FlAT DL1 MOLDED STONE SINGLE 727402000-DL1 HARDWARE PACKAGE, BOWL LAUNDRY TUB, WALL MOUNTED A1-4"FAUCET 1111H CP BLADE HANDLES P-4 BRADLEY S192240CFW WALL WOUNTED E'i~CE WASH STAINLESS STEEL B AND DUST COVER ~;:ER~~y THERMOST~~~" MIXING VALVE P-5 EU<AY EZSTLBLC BI-LEVEL ADA WATER COOLER - WH-1 STATE OR EO. EN8-50-DORT 80 GALLON, ELECTRIC, 4500W, 240V, 1 f 3/4" T & P REUEF VALVE WASTE RISER N. T.S. VACUUW BREAKER-...._ ---HOT WATER UNE GATE VALVE------......... FULL SIZE RELIEF PIPE TO EXTERIOR OF BLDG. TEWP./PRESS. REUIT VAILVE ----...1 DRAIN VALVE /AIR GAP WATER HEATER DETAIL N. T.S. SUPPLY 3/4" c.w. 1/2" H.W./C.W. :1r .W./C.W. Y.~ H.W./C.W. 1/2"c.w. 1" H.W./C.W. WASTE VENT REIIARI<S 3" 2" 2" 1-1/2" PROVIDE TRUEBRO LAV GUARD 2 UNDERSINI< PIPING COVERS 3" 1-1/2" 3" 1 1/2" 2" 1-1/2" --SEE PLAN FOR LOCATION ALL IIDlK SHALL BE DONE IN ACCORDANCE WllH lHE LAlEST EDIDON OF lHE STA 1E CODE AS 1IELL AS ALL LOCAL AND OlHER APPUCABLE CODES. ALL IIDlK SHALL BE PERFORIIED BY EXPERIENCED AND SKILLED CRAFTSMEN. WAlER UNES BELOW GRADE SHALL BE TI'PE "K" COPPER (NO JOtiTS BELOW GRADE) AND ABOVE GRADE 1YPE "1." COPPER SUPPORlED AS RECIJIRED AND SHALL BE H'IDROSTAllCALL Y lESlED FOR l'Ml HCIJRS AT 100 PSI. ALL WAlER PIPING AT WA 1ER AXlURES SHALL BE PROVIDED 1111H 1 a• AIR DIAMBERS OR SHoa< ABSilRIERS. STOPS SHALL m: PROVIDED DN HOT AND COlD WAlER UNES HOT WillER PIPING SHALL BE tiSULA lED 1111H 1" CLOSED CELL RUIIIER. lHE ENllRE WA 1ER SI'SlEM SHALL m: DISINFEClED PRIOR TO PLACNG IN SERVICE CPVC/PEX MAYBE SUBSllTUED FOR COPPER SANTARY SEWER UNES SHALL BE PVC. PROVIDE PRESSURE REDUQNG VALVE IF Sl1ET WAlER EXCEEDS BD PSI GAS PIPING WILL BE SDIEDULE 40 ll.ACK SlEEL WllH BLACK MALLEABLE RON SCREW-lYPE ATllNGS. lHE PLUMBING CONTRACTOR SHALL PROVIDE ALL OPENINGS RECIJIRED FOR lHE PWUBING WORK AND SHALL INSTALL ARE RAlED SLEEVES WHEREVER PIENETRAllONS OF RATED WALLS OR FLOORS ARE IIADE lHE PATCIING SHALL BE BY lHE PIWIIBING CONTRACTOR. lHE PWMBING CONTRACTOR SHALL REVIEW ALL UllUlY SllE PLANS AND ARDlllECTURAL SllE PLANS FOR l\ORK BY OlHERS. AND WAlER UNES. IIANHOLES ETC.) lHAT ARE TO BE IT SHALL BE lHE RESPONSIBIUlY OF lHE PWMBING LOCAllONS AND MAKE lHE ANAL CONNECTION AS ALL FLOOR DRAtiS SHALL BE PROVIDED WllH !RAP PRIMERS PLUMBING NOTES N. T.S. Coastal Plains Engineering, P .A. 1'11111 I c-211111 2811 l<lekloor Rd P.O. Bolt 1117 Pem-, RC 28372 Vah>o 810-621-7218 -~ R E ROBERT E. MOORE A R C H I T E C T 100 N. SUTHERLAND AVENUE MONROE, NC 28110 704.283.1196 rMoore@reMo.rchltect.coM 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 May 04, 2020 SHEET TITLE REVISIONS MARK DATE PROJECT NOI MODEL FILEI DRA'JN BYI CHK'D BYI DATE OF ISSUE 1?.//.2020 DESCRIPTION 2020-002 CSL SF P1 4f1CUf6G ir:TRICIL MmR ( RUNS 4f600 CU 3/0 GND PANEI.-PP2 I 1200A 2n/4PIJV ~PH 4W 0 MSB PADIIOUNT 'IRANSFCRMER BY UliUTY AVHL FAULT 75 KVA lCFUR 21,433A 4BOV DELTA 120/2118 WYE 3PH I I SEC<»>DARY _L -:15 GND ELECTRICAL RISER N. T.S. TYPICAL GROUNDING P1 ROOM VOLTS 480Y /277V 3P 4W AIC 22,000 MOUNTING FLUSH BUS AMPS 1200 MAIN BKR 1200 FED FROM UTILITY NEUTRAL 100:!1: LUGS STANDARD NOTE CKT CKT LOAD KVA CKT CKT II BKR CIRCUIT DESCRIPTION A B c II BKR CIRCUIT DESCRIPTION 1 20/1 LIGHTING 1.18 2 20/3 DISC 1 3 20/1 LIGHTING 1.17 4 I 5 20/1 LIGHTING 0.979 6 I 7 20/1 LIGHTING 0.989 8 60/3 DISC 2 9 20/1 SPACE 0 10 I 11 20/1 SPACE 0 12 I 13 20/1 SPACE 0 14 125/3 DISC 3 15 20/1 SPACE 0 16 I 17 20/1 SPACE 0 18 I 19 20/1 SPACE 0 20 20/1 EF-1 21 20/1 SPACE 0 22 20/1 EF-2 23 20/1 SPACE 0 24 20/1 EF-3 25 20/1 SPACE 0 26 20/1 SPACE 27 20/1 SPACE 0 28 20/1 SPACE 29 20/1 SPACE 0 30 20/1 SPACE 31 20/1 SPACE 0 32 20/1 SPACE 33 2D/1 SPACE D 34 20/1 SPACE 35 20/1 SPACE 0 36 20/1 SPACE 37 20/1 SPACE 0 38 20/1 SPACE 39 20/1 SPACE 0 40 20/1 SPACE 41 20/1 SPACE 0 42 20/1 SPACE TOTAL CONNECTED KVA BY PHASE CONN KVA CALC KVA CONN KVA CALC KVA LIGHTING 4.32 5.4 (125:!1:) LARGEST MOTOR 99.8 24.9 MOTORS 171 171 TOTAL LOAD 202 BALANCED 3-PHASE AMPS 242 AVAIL FAI.lT 4,89JA. PANEI.-PP2 200A 120/208V ~PH 4W MS8 4 13/0 CU. 16 G GROUNDING ELECTRODE DETAILS GROUNDING ELECTRODE CONDUCTORS SHALL BE 11/0 BARE COPPER. OTHER MATERIAL AND INSTALLATION PER NEC G) CONNECT TO t.IETAUC WATER PIPE AS REQ'D. 0 #A COPPER GROUND PLACED TO BLDG SliEEL A-#3/0 CU PP1 A=f6 CU PP2 P2 0 3/4"x10' LONG COPPER CLAD GROUNDING ROD W/ #A COPPER GROUND. CONJRACTOR SHALL COORDINATE WITH LDCIL UliUTY FOR SERw:E. A COMPLETE AND WDRKING SYSTEM IS REQIIRED FOR CCMPUANCE IMTH THESE DOCUMEN'B DmRMINE THE POINT OF CONNECliON TD THE UliUTY IMTH THE UliUTY REPRESENTAliVE AND PROVIDE ACCDROINGL Y FOR A COMPLETE WORKING SYSTEM. WIRE AND CABLE SHALL BE INSULA lED, TYPE THYIII OR THHN, 600 VOLTS, 'MTH COI'PER C<»>OUCTDRS. CONDUCTOR SIZES NO. 8 AWG AND LARGER MAY BE S'IRANDED. CONDUCTORS SIZES NO. 10 AWG AND SMALLER MAY BE SOUD OR STRANDED. NO RCMEK PERMITtED. EMT SHALL BE GALVANIZED STEEL TUBING, 1/2-INCH MtiiMllot SI2E. EQUAL TD EI.ECTRUNITE BRAND OR APPROVED AND USED ONLY IMTH HEKAGCNAL All STEEL COMPRESSION FilliNGS. PLASliC C<»>OUIT SHALL BE RIGID, 3/4-INCH MINIMUM NON-METALUC. HEAVY OUTY, HIGH IMPACT, POL YVtiYLCHLORIDE (PVC), TYPE I WILL BE USED FOR CONCRETE ENCASEMENT. FilliNGS SHALL BE THE SAME MAlERIALS AND MANUFACTURER AS THE PLASliC CONDUIT. FLEJIIBLE METAL CONOUIT SHALL BE 1/2-INCH MINIMUM SINGLE STRIP, STEEl, HOT DIPPED GALVANIZED INSIDE AND OUTSIDE. MAXIMUM LENGTH 72 INCHES FOR UGHliNG AND 36" FOR MOTORS. FLEJIIBLE METAL CCNOUIT SHALL BE UCUIDliGHT OR WATERliGHT WITH PVC JACNET YfiERE USED IN DAMP, WET OR OUTSIDE AREAS, AND UOUIDliGHT DR WATERliGHT CONNECTORS SHALL BE USED. NO RECEPTACLES OR TEL OUlLETS TD BE IICUNlED BACK TD BACK, KEEP AT LEAST 2 INCHES BrniEEN RECEPTACLES AND TEL CUTLE'B All CONDUCTOR SHALL BE COI'PER WITH A MINIMUM SIZE OF f12 AWG EKCEPT FOR FIRE ALARM. THESE CONOUCTCRS SHOULD COMPLY WITH NFPA. CONJRACTOR SHALL AUGN FIXTURES, SMOKE DETECTORS, CEJUNG DIFFUSERS ETC. AS REOURED TD PROVIDE A UNFORM PRESENTAliON. AT NO liME WILL AN IONIZAliON DETECTOR BE LOCAtED WITHIN 3'-G" OF A SUPPLY OR RETURN AIR GRILLE CIRCUIT BREAKERS AND WIRE ARE SIZED FOR SPECIFIC EQUIPMENT. BEFORE ORDERING WIRE. BREAKERS AND CONDUIT FOR THIS PRO.ECT THE CONTRACTOR SHALL COORDINATE WITH THE OTHER C<»>TRACTORS ON THE JOB AND VERFY THE ELECTRICAL DATA FOR THE EQUIPMENT WHICH WILL ACTUALLY BE INSTALLED, RECOMPUliNG WIRE AND BREAKER SIZES IF REQUIRED BY THE NEC. ALL CONDUIT TERIINAliNG IN THE CEILtiG CAVIliES IS TD BE LABELED. All CONDUIT SHALL BE COLOR COIDED WITH 1/2" \\IJE TAPE. 10'-0" ON CENTER tl ACCORDANCE 'MTH STANDARD tiOUSTRY PRACliCE. THE MOUNliNG HEIGHTS AND LOCAliONS OF ALL WALL MOUNtED OUlLETS AND .liiCliON BOXES SHALL BE REVIEWED AND CODROINATED liTH THE ARCHITECT AND OYIIIER, PR10R TD INSTALLAliON, FOR USE WITH ACTUAL EQUIPMENT. EACH CONTRACTOR IMLL PROVIDE HIS OWN SIJ'PORT OF ALL DEVICES AND EQUIPMENT PROVIDED BY HIM AND SHALL SUPPORT SUCH EQUIPMENT PER APPROVED GOVERNING CODES OR PER APPROVAL OF THE ENGINEER/ARCHITECT. UNACCEPTABLE WORKMANSIIP OR MATERIALS SHALL REPLACED AT THE REQUEST OF THE ENGINEER/ARCHITECT AT THE CONTRACTORS EXPENSE. THE CONTRACTOR SHALL REFER TD THE ARCHITECTURAL PLANS FOR FILDOR PLAN DIMENSIONS. THE CONTRACTOR SHALL COORDINATE ANY AND All ll1lRK YI1TH OTHER TRADES INVOLVED IN THIS PRO.ECT PRIOR TD THE INSTALLAliCN OF HIS EQUIPMENT, SO AS TD AVOID CONFUCTS DURING CONSTRUCliON AND ALLOW FOR OPliMUII WORKING SPACE AND MAINTENANCE. ALL FUSES DISCONNECT SWITCHES AND BREAKER SIZES SHOWN FOR MECHoiNCAL EQUIPMENT SHALL BE VERIFIED BEFORE PURCHASE AND INSTALLAliON OF SAID EQUIPMENT WITH THE EQUIPMENT SUPPUER AND MECHANICAL CONTRACTOR. WHERE EQUIPMENT PENETRATES EKlERIOR WALL OR ROOF THEY SHALL BE PROPERLY SEALED 'MTH METHODS APPROVED BY THE ARCHITECT/ENGINEER. All WORK IS TD BE DONE IN STRICT COMPUANCE 'MTH THE LATEST VERSION OF THE NEC AND APPUCABLE STATE OODES RECESSED FIXTURES INSTALLED IN HAlED ASSEMBUES SHALL BE INSTALLED WITH AN ENCLOSURE SO AS TD MHNTAIN THE HAliNG OF ASSEMBLY ELECTRICAL NOTES N. T.S. ROOM VOLTS 208Y/120V 3P 4W AIC 10,000 MOUNTING FLUSH BUS AMPS 200 FED FROM UTILITY NEUTRAL 100:!1: NOTE LOAD KVA CKT CKT LOAD KVA A B c I BKR CIRCUIT DESCRIPTION A B 5.54 1 20/1 RECEPTACLE 1.26 5.54 3 20/1 RECEPTACLE 1.08 5.54 5 20/1 RECEPTACLE 16.6 7 20/1 RECEPTACLE 0.9 16.6 9 20/1 RECEPTACLE 0.36 16.6 11 20/1 EF4, EF5, LIGHTING 33.3 13 20/1 SPACE 0 33.3 15 20/1 SPACE 0 33.3 17 20/1 SPACE 1.66 19 20/1 SPACE 0 1.66 21 20/1 SPACE 0 1.66 23 20/1 SPACE 0 25 20/1 SPACE 0 0 27 20/1 SPACE 0 0 29 20/1 SPACE 0 31 20/1 SPACE 0 0 33 20/1 SPACE 0 0 35 20/1 SPACE 0 37 20/1 SPACE 0 0 39 20/1 SPACE 0 0 41 20/1 SPACE 59.2 58.3 58.1 CONN KVA CALC KVA (25:!1:) LIGHTING 0.122 0.153 (125:!1:) (1 00:!1:) LARGEST MOTOR 0.948 0.237 (25:!1:) MAIN BKR 200 LUGS STANDARD CKT CKT c II BKR CIRCUIT DESCRIPTION 2 15/1 UH-1 4 15/1 UH-2 1.08 6 15/1 UH-3 8 15/1 UH-4 10 15/1 UH-5 0.163 12 20/1 UH-6 14 20/1 SPACE 16 20/1 SPACE 0 18 20/1 SPACE 20 20/1 SPACE 22 20/1 SPACE 0 24 20/1 SPACE 26 20/1 SPACE 28 20/1 SPACE 0 30 20/1 SPACE 32 20/1 SPACE 34 20/1 SPACE 0 36 20/1 SPACE 38 20/1 SPACE 40 20/1 SPACE 0 42 20/1 SPACE TOTAL CONNECTED KVA BY PHASE CONN KVA CALC KVA MOTORS 4.78 4.78 RECEPTACLES 4.68 4.68 HEATING 1.5 1.5 TOTAL LOAD 11.4 BALANCED 3-PHASE AMPS 31.5 LOAD KVA A B 0.948 0.948 0.948 0.948 0 0 0 0 0 0 0 0 0 0 4.06 3.34 (100:!1:) (50:!1:>10) (100:!1:) c 0.948 1.5 0 0 0 0 0 3.69 Coastal Plains Engineering, P .A. 1'11111 I c-20111 215 IMJdeer ld P.O. lloJ: 1117 Pemhrob, NC28S'I2 Volcr. tiG-1121-7213 ...... ~ ...... R E ROBERT E. MOORE A R C H I T E C T 100 N. SUTHERLAND AVENUE MllNRilE, NC 28110 704.283.1196 rMoore@reMnrchltect.coM MAC) LL.C. 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 May 04, 2020 SHEET TITLE REVISIIlNS MARK DATE DESCRIPTIIlN PRilJECT Nll1 2020-002 MllDEL FILEI DRAIJN BY: CSL CHK'D BY' SF DATE llF ISSUE ?1.?1.2020 E1 \IALK/IXJCK P2-1 \OIFY LOCA~ Of DISCON~ClS Willi I{ND ISC 1 '14 r--.,p1-2, 4,6 ~ DISC 2 ~ P1-8,10,12 1"C,3#4,#1 OG P2-12 r- p -14,16,18 1-1/ c;;lfl /0.#6G '--~ p iSC 3 ..-- P2-7 P2-B P2-5 ELECTRICAL PLAN 1/B"=1'-o" UH-2 [' P2-4 P1-24 -1 -20 -2 P1-22 Pembrab, NC 28372 VDice: 8111-U.l-7213 ...... ~ ....... R E ROBERT E. MOORE A R C H I T E C T 100 N. SUTHERLAND AVENUE MONROE, NC 28110 704.283.1196 rMoore@reMQrchitect.coM MAC) L.L.C 2021 EAST ROOSEVELT BLVD MONROE, NC 28212 May 04, 2020 SHEET TITLE REVISIONS MARK DATE DESCRIPTION PROJECT NO• 2020-002 MODEL FILE: DRA\v'N BY• CSL CHK'D BY• SF DATE OF ISSUE 17.17.2020 E3 , .. I I '· !! ~: . z 0 (f) (f) :::;: 0::: w 0.. z w [::: 0::: 3: (f) 0::: w w z Cl z w w I I- I- ::::J 0 I 1- 3: 0 w 0.. 0 u 0::: 0 0 w (f) ::::J w aJ ~ ~ 1- 0::: if 0 z ..J <( 0::: w 0 w LL fo 0 w 1-u w 5 0::: 0.. (f) w (f) ::::J 0 w N 0::: 0 I 1-::::J <( z ::::J 0::: 0 _j ::::J LL ~ z ::::J 0::: w w z Cl z w w I I- >-aJ 0 w I- I Cl 0::: >-0.. 0 u w 0::: <( (f) Cl z ~ 0 w (f) w I I- © VICINITY MAP NOT TO SCALE H!ISPITAL ~~-F-~t----!ILF_ N79-38' -29'E 1.= 86.85' BEFORE YOU DIG STOP """ "-.... IF S85-13' -15'W L.=301.23' "-.... """ l EX. SEWER "-.... MANHOLE C\l co l'- 10 .... l I VERIFY ELEVAT ONS FOR NEW 4" I I SERVICE I.JNE I I OWNER: MAC LLC PARCEL I.D. 09117004 D.B. 6438 PAGE 058 N74-53' -12'E L.= 808.30' HASTY STREEY 60' R/W DB 6140 PG 453 EX. ASPHALT TO REMAIN NO WORK THIS AREA EX. BUILDING TO REMAIN NO WORK THIS AREA; . E EX. ASPHALT PARKING TO REMAIN NO WORK THIS AREA II ...:l I I . >-< EX. ASPHALT TO BE REMOVED 2100 +/-SQ. FT. PROPOSED BUILDING 1/ ~OP v "-I I EX. BUILDING TO REMAIN : ~ 1:5 -.~1 L NO WORK THIS AREA ~ ~ v I-+-~ --~--------------~~==~-=--~~--~~~----------------~--i~~~~··_.~FR~o;~~~T~SE~T~B~A~C~K ~~-=~~~~~~=t~:·/~~Z:2·:2~~:::i~· ~.L~~~ ~I . I ~SE3~~N~EwER J>Vr fj·~ r ~ EX. ASPHALT TO 83:/ Z;:!: L I Ii'lat Cab. H. REMOVED File: 0517 I 2100 +/-SQ. FT. R '''' --R/W -+-IF I s R=8958. 78' 1=835.04' I" I CHORD= S75-07' -27'W 1.= 834. 73' _jiF R/Vi E JP EOP G) "' EX. WATER MAIN EX. TO REMAIN F.H. SECTION 03.01.04 CITY OF MONROE STANDARD SPECIFICATIONS CONSTRUCTION SEQUENCE: 1. OBTAIN APPROVAL LEITER FOR EROSION CONTROL AND SCHEDULE PRE-CONSTRUCTION MEETING ON-SITE WITH THE CITY OF MONROE ENGINEERING EROSION CONTROL SPECIAIJST. ALL APPROVED PLANS AND REQUIRED PERMITS WILL BE ISSUED AT THE MEETING PRIOR TO ANY LAND DISTURBING ACTIVITY. 2. INSTALL ALL EROSION CONTROL MEASURES AS SHOWN ON APPROVED PLAN. 3. SUBMIT CERTIFICATION FORM 1-01, PRIMARY EROSION CONTROL INSPECTION FORM, TO THE EROSION CONTROL SPECIAIJST DURING THE INSPECTION OF INSTALLED EROSION CONTROL MEASURES. 4. PROCEED WITH GRADING. 5. CLEAN SEDIMENT BASINS WHEN ONE-HALF FULL. CHECK AFTER EVERY RAIN EVENT. MAINTAIN RAIN GAUGE AND RECORD KEEPING PER NPDES PERMITTING REQUIREMENTS. 6 SEED AND MULCH DENUDED AREA IMMEDIATELY AFTER FINISHED GRADES ARE ESTABLISHED. 7. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL A PERMANENT GROUND COVER IS ESTABLISHED. 8. ADDITIONAL MEASURES MAY BE REQUIRED BASED UPON ACTUAL SITE CONDITIONS. 9. SUBMIT CERTIFICATION FORM 1-06, FINAL EROSION CONTROL ACCEPTANCE FORM, TO THE EROSION CONTROL SPECIALIST TO SCHEDULE A FINAL ON -SITE INSPECTION. 10. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS UPON APPROVAL OF CERTIFICATION FORM 1-06. II. SUBMIT CERTIFICATION FORM 1-07 WHEN THERE IS AN INTERMEDIARY REMOVAL OF EROSION CONTROL MEASURES • 12. SUBMIT CERTIFICATION FORMS 1-04.A & 1-04.B AT APPROPRIATE PHASE OF CONSTRUCTION. SITE NOTES: 1. 2. 3. 4. OWNER/ADDRESS: MAC LLC P.O. BOX 985 2012 E. ROOSEVELT BLVD. MONROE, NC 28112 PHONE (704) 282-4424 TAX #: 09117004 D.B. 6438 PAGE 058 NO POINT ON THE EXISTING OR PROPOSED BUILDINGS ARE GREATER THAN 600' FROM A FIRE HYDRANT. EXISTING HYDRANTS ARE LOCATED IN U.S. HIGHWAY 74 RIGHT-OF-WAY. GENERAL CONTRACTOR-TO BE DETERMINED 5. ALL INFORMATION TAKEN FROM SURVEY INFORMATION PREPARED BY JEFF GORDON P.L.S. AND COUNTY RECORDS. 6. STORMWATER CONTROL PROVIDED BY DRAINAGE OUTLET AT NORTHEAST SIDE OF PROPERTY. 7. CONTACT PERSON RESPONSIBLE FOR MAINTENANCE - MR. BILL MACTAGGERT 704-282-4424 EMAIL: bill@rppmfg.com 8. CIVIL ENGINEER-GCM3 ENGINEERING PLLC 3031 SPRING FANCY LANE INDIAN TRAIL,N.C. 28079 PHONE 704-821-4205 EMAIL: GCM3@WINDSTREAM.NET 9. PROPERTY WILL BE USED BY OWNER FOR GENERAL OFFICE/ BUSINESS 10. SOIL TYPE CLASSIFICATION-BAb 2 TO 8 PERCENT SLOPES FROM USDA WEB SOIL SURVEY. 11. PERMISSIBLE USE-COMMERCIAL/GENERAL BUSINESS I I I I I I 12. AUTOMOBILE ASPHALT PARKING AREA TO BE MINIMUM 1-1/2" I-19.0C ------------------------------------7'---,--------_l_--L----------:-----------------~ ASPHALTIC PAVING OVER 8" SABC BASE COURSE OVER COMPACTED : FILL (100% STD. PROCTOR) I I I EX. SEWER MANHOLE VERIFY ELEVATIONS FOR NEW 4" SERVICE I.JNE U.S. HIGHWAY 74 R/W VARIES --····· ·---·· , TRUCK AND DRIVEWAY AREAS TO BE MINIMUM 2" I-19.0C ASPHALTIC PAVING OVER 8" SABC BA)SE COURSE OVER COMPACTED FILL (100% STD. PROCTOR SHEET INDEX I C-1 EXISTING SITE PLAN C-2 SEDIMENT & EROSION CONTROL PLAN C-3 GRADING PLAN C-4 BUILDING & PARKING PLAN C-5 UTILITY PLAN C-6 LANDSCAPING PLAN C-7 SITE DETAILS C-8 SITE DETAILS 13. THE DEVELOPER MUST REQUEST ANY DEVIATION FROM THE CITY OF MONROE DETAIL MANUAL IN WRITING ALONG WITH JUSTIFICATION FOR REVIEW AND RECOMMENDATION BY STAFF. 14. CONTRACTOR IS TO CALL NC ONE CALL AT 811 PRIOR TOEXCAVATION ACTIVITIES. ANY CONFLICT WITH UTILITIES MUST BE RESOLVED PRIOR TO COMMENCEMENT OF THE WORK. THE OWNER WILL BE RESPONSIBLE FOR COST TO PROTECT CITY FACILITIES AS DETERMINED NECESSARY BY THE CITY. 15. THE DEVELOPER MUST OBTAIN THE WRITTEN PERMISSION OF THE ADJACENT PROPERTY OWNER(S) FOR ANY OFF-SITE GRADING OR CONSTRUCTION PRIOR TO CONSTRUCTION PLANS APPROVAL. 1 EXISTING SITE PLAN CJi) SCALE 1" = 40.0' REVISION DATE< 04/25/']JJ]D PROJECT No. 16-{)19-A DRAWN BY• GCM APPROVED BY• GCM SHEET ''.·1' ' i ! I '' ~·''" ---~-···"---- z 0 (f) (f) 2 0:: w o_ z w I= 0:: $: (f) 0:: w w z 0 z w w I I- I- :::J 0 I I- S: 0 w o_ 0 0 0:: 0 0 w (f) :::J w [D ~ 2 1-0:: <( o_ 0 z _j <( 0:: w 0 w LL.. >-[D 0 w 1- 0 w 1-0 0:: o_ (f) w (f) :::J 0 w N 0:: 0 I 1- ::J <( z :::J 0:: 0 _j :::J LL.. ~ z :::J 0:: w w z 0 z w w I I- >-[D 0 w 1-:r: 0 0:: >-o_ 0 0 w 0:: <( (f) 0 z ~ 0:: 0 w (f) w I I- @ If t~-----Jic_F _ N79-38' -29'E L.= 86.85' BEFORE YOU DIG STOP CALL 1 800 632-4949 N.C. ONE -CALL CENTER t\l <0 z:.-l(.) ...-< II ~ ll= z:.--I t\l 0 I ~L IF s EX. BUILDING TO REMAIN NO WORK THIS AREA R=8958.78' L=835.04' CHORD= S75-07'-27'W L.= 834.73' U.S. HIGHWAY 74 RIW VARIES N74-53' -12'E L.= 808.30' HASTY STREEY 60' RIW DB 6140 PG 453 --.---...,IF C':l ...-< <0 ...-< .... II • ~ 0 I ""' ;... ,... -...-< t\l I EX. ASPHALT TO REMAIN NO WORK THIS AREA lO t\l I EX. BUILDING TO REMAIN NO WORK THIS AREA R "" fh E St.O+OO BEGIN TEMP. SILT FENCE DISTURBANCE/ I 10,200 SQ. FT. I 0.23 ACRES EX. TREELINE TO REMAIN C':l ...-< St.1+51 rn NO WORK THIS AREA TURN TEMP.""' SILT FENCE ~"ra·-o·l I _I I LIMITS OF I EX. ASPHALT PARKING TO REMAIN I I I DISTURBANCE ----.__,_1-o l SAWCUT AND REMOVE~ : V~F ITS NO WORK THIS AREA --R/W -+-- I LIMITS OF / DISTURBANCE./ 1 0,200 SQ. FT. 0.23 ACRES 1 I I I I I I I EX. PAVEMENT ~ IE DP DISTURBANCE PROPOSED>~ BUILDING WALL EX. ASPHALT TO REMAIN UNTIL BACKFILL OPERATION I I LIMITS OF I I /S\.3+51 DISTURBANCE---..._ ; _ _ _ . _ _ _ J / TURN TEMP. ,------_:::-::: "-...,~·bl============~.l-/ SILT FENCE St.4+83/ END TEMP. SILT FENCE EX. TREELINE TO REMAIN NO WORK THIS AREA • 0 I ~ 3'-0 -L---<IF EJP EOP (;) TOT EX. F.H. EX. WATER MAIN TO REMAIN SECTION 03.01.04 CITY OF MONROE STANDARD SPECIFICATIONS CONSTRUCTION SEQUENCE: 1. OBTAIN .APPROVAL LETTER FOR EROSION CONTROL AND SCHEDULE PRE-CONSTBUCT!ON MEETING ON-SITE WITH THE CITY OF MONROE ENGINEERING EROSION CONTROL SPECIALIST. ALL .APPROVED PLANS AND REQUIRED PERMITS WILL BE ISSUED AT THE MEETING PRIOR TO ANY LAND DISTURBING ACTIVITY. 2. INSTALL ALL EROSION CONTROL MEASURES AS SHOWN ON .APPROVED PLAN. 3. SUBMIT CERTIFICATION FORM 1-01, PRIMARY EROSION CONTROL INSPECTION FORM, TO THE EROSION CONTROL SPECIALIST DURING THE INSPECTION OF INSTALLED EROSION CONTROL MEASURES. 4. PROCEED WITH GRADING. 5. CLEAN SEDIMENT BASINS WHEN ONE-HALF FULL. CHECK AFTER EVERY RAIN EVENT. MAINTAIN RAIN GAUGE AND RECORD KEEPING PER NPDES PERMITTING REQUIREMENTS. 6. SEED AND MULCH DENUDED AREA IMMEDIATELY AFTER FINISHED GRADES ARE ESTABIJSHED. 7. MAINTAIN SOIL EROSION CONTROL MEASURES UNTIL A PERMANENT GROUND COVER IS ESTABIJSHED. 8. ADDITIONAL MEASURES MAY BE REQUIRED BASED UPON ACTUAL SITE CONDmONS. 9. SUBMIT CERTIFICATION FORM 1-06, FINAL EROSION CONTROL ACCEPTANCE FORM, TO THE EROSION CONTROL SPECIALIST TO SCHEDULE A FINAL ON -SITE INSPECTION. 10. REMOVE SOIL EROSION CONTROL MEASURES AND STABILIZE THESE AREAS UPON .APPROVAL OF CERTIFICATION FORM 1-06. 11. SUBMIT CERTIFICATION FORM 1-07 WHEN THERE IS AN INTERMEDIARY REMOVAL OF EROSION CONTROL MEASURES. 12. SUBMIT CERTIFICATION FORMS 1-04.A & 1-04.B AT .APPROPRIATE PHASE OF CONSTRUCTION. NOTES: 1-TOTAL DISTURBED AREA 0.23 +I-ACRES. I 10,200 SQ. FT.= 2-EXISTING IMPERVIOUS AREA IN PARKING AREA= 60,400 SQ. FT. +I- 3-FINAL IMPERVIOUS AREA= 58,300 SQ. FT. NET REDUCTION= 2,1 00 SQ. FT. 4-TEMPORARY SILT FENCE REQUIRED=483 LF AS SHOWN ON PLAN. 5-CONTRACTOR SHALL SUBMIT FORM 1-04A AND FORM 1-04B AT APPROPORIATE STAGES OF THE PROJECT. I LEGEND: )( )( TEMPORARY SILT FENCE LIMITS OF DISTURBANCE EXISTING GRADE FINAL GRADE TEMPORARY CONSTRUCTION ENTRANCE Sediment & Control @Erosion tr SCALE 1" = 30.0' ~~-----------·-----. --------------------·--··-·---· --·-··------------------~~~~--~~~~~~~- REVISION DATE• 04/'}5f}lf}J) PROJECT No. 16-019-A DRAWN BY• GCM APPROVED BY• GCM SHEET CC=2 . z 0 (f) (f) ::;;;: 0::: w 0.. z w ~ 0::: 3: (f) . 0::: w w z (? z w w I f- f-:::::> 0 I f- 3: 0 w 0.. 0 0 0::: 0 0 w (f) :::::> w [lJ ~ ::;;;: f-0::: <( 0.. 0 z _j Ci. w 0 w LL >-[lJ 0 w tJ w f-0 0::: 0.. (f) w (f) :::::> 0 w N 0::: 0 I f- ::::l <( z :::::> 0::: 0 _j :::::> LL ~ z :::::> 0::: w w z (? z w w I f- fu 0 w f-I (? 0::: >-0.. 0 0 w 0::: <( (f) (? z ~ 0::: 0 w (f) w I f- @ IF ·~-~t--.....!!.IF_ N79-38' -29'E 1.= 86.85' BEFORE YOU DIG STOP C\l co r--ID ..... II ~ r--..... I C\l 'T ~L IF s N74-53' -12'E 1.= 808.30' HASTY STREEY 60' R/W DB 6140 PG 453 EX. BUILDING TO REMAIN NO WORK THIS AREA ... R=8958.78' 1=835.04' CHORD= S75-07'-27'W 1.= 834.73' U.S. HIGHWAY 74 R/W VARIES -------· ...... ------·-·· EX. ASPHALT TO REMAIN NO WORK THIS AREA E EX. BUILDING TO REMAIN NO WORK THIS AREA 56~' 56'&0~ R ''" rn EX. ASPHALT PARKING TO REMAIN NO WORK THIS AREA >-< 569 <z....._ 1 ~ < '"59n o· 6 :> :::!1 -....::: ....__ 1 F .F. >-<r.q 5 ~"' ....__ a-....__ L---iffi ,vi"F'-r-----, ::< 0 f'ilE-< --R/W -+- EbP EOP " 571.0' R/N ' ..... C\l I lD C\l I C') ..... Ul _jiF Gl "" EX. WATER MAIN EX. TO REMAIN F.H. ·-· ·----...... -- NOTES: I 1-TOTAL DISTURBED AREA=10,200 SQ. FT.= 0.23 +/-ACRES. NO PERMIT REQUIRED. 2-0WNER WILL MAINTAIN SILT FENCE/ STORMWATER CONTROL MEASURES IN ACCORDANCE WITH THE NC DEQ STORMWATER DESIGN MANUAL. LEGEND: )( )( TEMPORARY SILT FENCE LIMITS OF DISTURBANCE EXISTING GRADE FINAL GRADE TEMPORARY CONSTRUCTION ENTRANCE Plan ~ \!]~ ~~i; ~~ ~~~u ~~ ~~~~ ~~ REVISION DA TEl 04{1.5/1I111.) PROJECT No. 16-019-A DRAWN BY• GCM APPROVED BY• GCM SHEET C=J ·-----· --·-··------·-------------··---------------- ,, . ~---·"' -- . z 0 U1 U1 ::::;;: Ct: w (]__ z w I= Ct: 3: (f) Ct: w w z CJ z w w :r:: I- I-::> 0 :r:: 1-- 3: 0 w (]__ 0 0 Ct: 0 0 w (f) ::> w CD ~ ::::;;: l-et: <( (]__ 0 z _J <( Ct: w 0 w u.. >-CD 0 w 1-- 0 w 1--0 Ct: (]__ (f) w (f) ::> 0 w N Ct: 0 :r:: 1--::> <( z ::> Ct: 0 Ct: w w z CJ z w w :r:: 1-- >-CD 0 w 1--:r:: CJ Ct: >-(]__ 0 0 w Ct: <( (f) CJ z ~ Ct: 0 w U1 w :r:: I- @ If t~--IJLF_ N79-38' -29'E 1.= 86.85' BEFORE YOU DIG STOP CALL 1 800 632-4949 N.C. ONE-CALL CENTER Cll <D 1'- lD ...... II ~ is= r--...... I Cll 0 I 2L IF ~~~ --~------ s EX. BUILDING TO REMAIN NO WORK THIS AREA N74-53'-12'E L.= 808.30' ~--~-- HASTY STREEY 60' R/W DB 6140 PG 453 EX. ASPHALT TO REMAIN NO WORK THIS AREA EX. BUILDING TO REMAIN NO WORK THIS AREA E EX. ASPHALT PARKING TO REMAIN NO WORK THIS AREA '·-'T 'b I "' ":. ~ 'b is=~ ~ -14--ONC. AMP 1:12 -,------~IF PROPOSED BUILDING F.F. 571.0' • 7 il I)") .... <D ...... -.!' II ~ r£1 . .... C\l I . lD C\l I I)") .... rf.l ~ ::.1 v b", ~ r£1 1/ '-----Joor>------...., '=l ~ fU=.Jm U_l__l_-9u3f========±=L ' .c.vr :>< 0 r£1E-< R=8958.78' L=835.04' CHORD= S75-07'-27'W L.= 834.73• U.S. HIGHWAY 74 R/W VARIES R "'" ~~· 197' a· ----R/W --+- EOP IOP 120'-0" 25' 0" 'R:" .,fW---'------_j IF G) "' EX. WATER MAIN EX. TO REMAIN F.H. & PLAN ~ ~~ ~~~AA m~ u.~ ~ ~~ i~~~ ~~ REVISION DAm 04/2S/2CY}[J PROJECT No. 16-019-A DRAWN BY• GCM APPROVED BY• GCM SHEET z 0 Vl Vl ::::;;: 0::: w o_ z w ~ 0::: 3: Vl . 0::: w w z C) z w w :r: I- I-:::J 0 :r: 1- 3: 0 w o_ 0 0 0::: 0 0 w (/) :::J w m ~ ::::;;: I-n:: <( o_ 0 z ---' <( 0::: w 0 w l.J_ in 0 w ti w t-o 0::: o_ Vl w (/) :::J 0 w N 0::: 0 :r: 1-:::J <( z :::J 0::: 0 0::: w w z C) z w w :r: 1- >-m 0 w 1-:r: C) 0::: >-o_ 0 0 w 0::: <( Vl C) z ~ 0::: 0 w Vl w :r: 1- @ IF '\;---...Jlt-F _ N79-38' -29'E 1.= 86.85' BEFORE YOU DIG STOP CALL 1 800 632-4949 N.C. ONE-CALL CENTER IF "-. "-.._ I N . EX. 30' Sfi:WER ~ EASEMENT I r- ID ..... II ~ ~t $. +00 1VP NECT TO 5<. GRAVI1Y ~I_ IF s .. qX. 30' SEWER EfASEMENT St.0+16 c.o. EX. BUILDING TO REMAIN NO WORK THIS AREA ·----···---·· .. "•·-·-· .. ·---.. -····------------------------------ St.3+00 c.o. CONT. 4" SEWER N74-53' -12'E L.= 808.30' HASTY STREEY 60' R/W DB 6140 PG 453 EX. ASPHALT TO REMAIN NO WORK THIS AREA EX. BUILDING TO REMAIN NO WORK THIS AREA E EX. ASPHALT PARKING TO REMAIN NO WORK THIS AREA St.7+19 c.o. TURN SEWER >--~z ~~ ~r"'l St.7+42 C.O. END 4" SEWER St.1+62 END 6"DJP -RJ Sewer7+00 St.1+52 90 ELBOW 6"G.V. 1-1/2"G.V. St.6+16 ~ 1 25 ~ 1 00 I ~ • 0 I ;., ... (") ..... co ..... '<!' II ~ r"'l ..... C\l I lD C\l I (") ..... [f.l p . CONT. 4"L,~--------------------------------~------------------------------.-~ ..:..: c.o. U1 0 U1 SEWER ~ offi ~ 03: ... +w ~UJ 0 0 + "' R=8958.78' L=835.04' 4" SS PVC CHORD= S75-07'-27'W 1.= 834.73' U.S. HIGHWAY 74 R/W VARIES 0 0 + "' • 0 0 0 I b + " .... R , ... Jh :xio -:.,. 0 0 r"'lE-< + "' 0+5 St. 0+40 BEGIN VAULT W/ RPZ DETECTOR ASSEMBLY SEE DETAILS ---R/W -+-RPZ St. 0+34 6X6X2 DIP TEE 6" G.V. · R/vV _jiF E P OP St. 0+34 " m domestic BEGIN DOMESTIC SERVICE Be in ii" Copper Service co nect w/ Saddle & orp. Stop 1YP. Se Details St. 0+00 EX. ' ---=--=--------<' F.H. r-65'-0" . Wet Tap Ex. ????? Water Main w/ Saddle & Tapping Valve Begin 6" DIP-Restrained Joint Typ. (Use Mueller H615 Tapping Sleeve or Approved Equal) EX. WATER MAIN TO REMAIN 1 C5 UTILITY NOTES: 1-ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH NCDOT PERMITS AND SPECS. 2-ALL WORK TO BE PERFORMED IN STRICT ACCORDANCE WITH CITY OF MONROE SPECS. SEE DETAILS. 3-SANITARY SEWER SERVICE TO BE PROVIDED FROM EXISTING SEWER MAIN. CONTRACTOR TO VERIFY ALL REQUIRED ELEVATIONS. 4-POTABLE WATER SERVICE TO BE PROVIDED BY ONE (1)- ~" METERS AT R/W AS SHOWN ON PLUMBING PLANS THE NEW METER IS BE PROVIDED WITH BACKFLOW PREVENTION. SEE DETAILS. 5-CONTRACTOR TO PROVIDE GUTTERS AND DOWNSPOUTS FOR CONNECTION TO STORMWATER PIPELINE SYSTEM. Utility Plan SCALE 1" 40.0' ----------·-··-.. -··· ·-·····--- REVISION DA TE• 04/25/2I11JJ PROJECT No. ltH)19-A DRAWN BY• GCM APPROVED BY• GCM SHEET CC=5 . z 0 UJ UJ 2 0:: w Q_ z w t= 0:: 3::: UJ 0:: w w z (.') z w w I I- I-::J 0 I 1- 3::: 0 w Q_ 0 (.) 0:: 0 0 w UJ ::J w m ~ 2 1- 0:: <{ Q_ 0 z _j <{ 0:: w 0 w LL. >-m 0 w tJ w 1-0 0:: Q_ UJ w UJ ::J 0 w N 0:: 0 I 1- ::J <{ z ::J 0:: 0 _j ::J LL. ~ z ::J 0:: w w z (.') z w w I I- >-m 0 w I-I (.') 0:: ~ 0 (.) w 0:: <{ UJ (.') z ~ 0:: 0 w UJ w I I- © If t----JI!,':_F_ N79-38' -29'E L.= 86.85' BEFORE YOU DIG STOP CALL 1 800 632-4949 N.C. ONE-CALL CENTER ~ !:'-...... I t\l 0 I ~b-. IF EX. BUILDING TO REMAIN NO WORK THIS AREA U.S. HIGHWAY 74 R/W VARIES N74-53' -12'E L.= 808.30' EX. ASPHALT TO REMAIN NO WORK THIS AREA HASTY STREEY 60' R/W DB 6140 PG 453 E -~--r I I t') I ;;; -I "<!' I II ,_j I ::; t\l I ~ I 'f t') I lf.l I I® Landscaping Notes: I 1. PARKING LOT LANDSCAPING: EXISTING ASPHALT TO REMAIN. NO WORK THIS AREA. 2. SIDELINE SCREENING BUFFER: MIN. 20' WIDE TO ADJACENT EAST PROPERTY. EX. TREELINE TO REMAIN. 3. STREETSCAPE BUFFER: MIN. 8'-0" WIDE ALONG ROAD FRONTAGE. EX. TREELINE TO REMAIN EX. BUILDING TO REMAIN NO WORK THIS AREA ~· ~-----,----------~----~11 0 EX. ASPHALT PARKING TO REMAIN NO WORK THIS AREA ••• 11111111 -~----------- 10 I Ex. Treeline to Remain I ® No Work This Area 10 I I® I Q "' EX. WATER MAIN EX. TO REMAIN F.H. LEGEND: I 0 SHRUBBERY {!f) SMAUL MA TIJRING TREE ® EXISTING TREE TO REMIAN 0 EVERGREEN TREE 1 LANDSCAPING @SCALE 1" = 40.0' ------..... ---------- PLAN REVISION DA TEo 04/25/]J:J}D PROJECT No, 16-019-A DRAWN BY• GCM APPROVED BY• GCM SHEET ! ! i z 0 VJ VJ ::::;; 0:: w 0... z w I= 0:: s: UJ . 0:: w w z Cl z w w :r: I- I-:;:) 0 :r: I-s: 0 w 0... 0 0 0:: 0 0 w UJ :;:) w ill ~ 2 1-0:: ct. 0 z _j ~ w 0 w u_ in 0 w 1-0 w b 0:: 0... UJ w UJ :;:) 0 w N 0:: 0 :r: 1- :::J <( z :;:) 0:: 0 0:: w w z Cl z w w :r: 1- >-ill 0 w 1-:r: Cl 0:: >-0... 0 0 w 0:: <( VJ c..? z ~ 0:: 0 w VJ w :r: 1- @ ~· I, CONTRIICTO!t5 1!115TillLING NEW GR<\VITYMAIN5 5111\tJ. HAV~ Tlif OrT!ON Of USING 5UP .lO!NT 501M5 PVC 1"Ee WIT1i 4' 5CH, 40 BRANCH OR MAKING TAF5 ~ 5HOWN ON Tllf Ol'TAlL WITH :'>EWER SADDLE 2-. CONTRACTOR OR art 0~ MONRO~ nR50NNEL 5HALLIN5TAU-Trlf CL.fAN-OLJl' 2_ fl'fr ~Vt: GRDI.JND WITH A 4' ><*!" • b' 5UFro!rr fOBf AllUTTING TO GRAPE AND THf FOST REMOVW BYTH~ PWM6ER UPON CONNECTION TO TMf TAF. THe IN:JTALLATION Of Tlif 4" X 4' POST SHALL BE WANED FOR EX~TING fll.lll.DING$ AND EIUII.PJNG5 UNOER COOSTIWCTION. 3. PWMBER ~11A!.l HAVE ntf OPTION TO ltGTAt.L I'.OH~ PlfCf 4" 5CH. 40 COMBINATION IV'rf I /3 BEND TO MINIMIZE T~NCii D~PTH OR IN5f ALL Tl1f SEWER 5fRVlCE tATE!IAL I'R.OM THE 4" STUB OUT. COMMERCIAL A!<D JNOIJ5TI<IAL BUILDINGS R!'QUIRJI>IG SAMPUNG OFTiie WA51!WATER D15CI1ARGE SMAll 5E RfQUirfD TO IN5TM.L l'l.UMBII>/G fiTTINGS IN ACCORDANCE WITH THE CONDITIONS USTI:D ON TNE OOILDING FUMIT, A, Ttl~ OFfNI~G IN Tl1f PIPE SliAU. BE CUT WITt! A T/>i' MACHINt: ONLY. 5. b' OR LAAGER SEWER LATERAL TAl"$ SHALl.~ INSTALlfD INTO Ttie NfAII.I5f 5ANITAR'f 5~\'JtR MANHOLE DOWN5mEAI\l Of TKI! 6UIWING OR A M!W' MANHOI.t CONSTRLICTt:D 0\lfR 1'111'. Sewf!!. MAIN (SEE "D0GHOIJ5E' M/\111110t.E DtTAA..) 6 All CON5TIWC110N l>'f FWMa!:R, EmiER OPTION I OR OfTIDN 2, SHAU. 6f 1!<5PECT!:D AND N"f'ROV!'O 6'f A 6lJilDING IN5ffCT0R UNDlR A. VAUO l't.RMiT. 7. CONTAACTOR OR CITY OP MONRO!" FfRSONNfl MAY 1\DJUST SERVICE LAT~ El.f\IATlON WIT11 ffiTINGS IF ADfQUATf GRAD!:' 15:1STS. t!i. LATERAl. SHALL HAVE 4" SIJfiEJASE Of 1"7 WASHfO STONE TO A lEVI"L OF 4' i'IY::Nf. THE TOP OF THE Plrf. ~. BAA$5 CM' TO 6E l~'5TAt.l.fD PER DeTAIL Afl"fll. 6UilDING CONNecTION. JO. CU:ANOUTS SMAll NO\" 8E PI.AC~D IN LON l\1NG ARE.I6. OR. IN AA£16 WHW fLOODING OR IWN Off MAY OCCUR. ro--''"''"~nooc RfMO\IfD AFP-R CONNOCTlON -TO etJ•LOING PUJMeiNG SEE NOTE 2, ~ 4" PVC PEMAJ.f ADWTERW! 6RA55 F'LUG. TO 6E 116TI\U.EO AfTERE.\LIILJ;lNG CONNECTION. 4"1\eo\/E G!WIJ~D CL&AN OUT E:(TEIJ510N TO & LOI\'Ef':eo AfTER CONNECTION TO 6\JILDmG f'I.UMaiHG 5eE 0101e 2. FINISH~D GRADE TO 6UilDING 6Yf'I_UMBER OPTION I OPTIONAl 4" 5Cti. 40 COM61NATION WYE AND 118 6END ONE PIECE 4' MAX 2' MIN 4' 5CH. 40 PVC NIFF'LE LfNGTti VAAJI5 DEPENDING ON DePTH OF 3fWfR MAIN TO . MINIMIZE AODIT!ONAL tleN05 .4' SCtl . .ol(l COMBINATION Wl'f AND lf/J efND owe ~fa TO Elf IN$TALLfD 81' eUilDERS PlUM6ER.lf ADEQUATE GRADe fX151'5 TO 6l.IILDING'5 FLOOR ElfVATION 5f.f Non:: 3. # REVISED I/2G/17 # REVISED I/2G/17 # RfVISED I 4/11/2008 2 I 0/29/2015 3 I/2G/20 17 4' fAJ> MADE A.f'PROX. A5" A30V!' SPRING IJNE OF 5fWfR. MAIN 4" 5CH. 40. !)e. &NIJ GlUE JOiNT CONNECTION (rYP.) GRAVITY SI!WI"R MAIN 5DR·35 f'VC OR C~ 350 DIP fOR NEW CO~'ST!WCT:ON. CITY Of MONI"..E 5HALL MM.:' TAPS ON ACTIV!' 5EW!'R MAoN5. lJNLE55 5l'!:CifiCAU.Y AI'!'ROVW OTHEII.WI5f. DATE' 7/1/04 SCALE' NONE STANDARD DETAIL WATER. RESOURCES DEPARTMENT CITY OF MONROE, NC DRAWN BY' SPT CHECKED BY' DSW APPROVED BY' RGC SEWER LATERAL DETAIL 12.13.00 OIV. <0. 12 ·--~· ... ~ FOR DIP < 20' BURY FOR DIP BURY > 20' FOR PVC C900 DR-25 3' < BURY < 20' 5EL.teli5AO'f'" NO ROCKS OR OI<GANIC MAITIIJI<I. HM-ID Pv..c:;fM~NT IN,; III{;H UFJ:I COMPACTION TO $1~'!1. PI<DCTOR TYPE I FOR DIP BURY > 30' 'I' TO~IliN Ol'l' STREET !WI CITY S'fl!,fi!T 5TA.NOAR00 IN ~ iJW S"\fCT 5ACFJ'IU. NO ROCI<S ::> 3/ol FOOT IN 011\. NO O"""'NIC MATt:I'JAI. PI.ACtM~~ IN J 2' U:"rn COMPACTION 10 95~ ~ 5El.ECTBJ\C<..91.1. NOROQ:.SORO~ I,IATeiiJ/oJ. HAND ~00 IN G·>NCH UrT9 COMPAGHO~ TO 515'!1. PROCTOR NOTES• I '"" TYPE II FOR PVC SDR-35 3' < BURY < I 2' 1 . A MINIMUM OF 12" Ff"..OM OUTSIDE DIAMENTER. OF F'IFE TO SIDE OF TRENCH MUST BE ALLOWED FOR COMF'ACTION OF Fill MATER!Al. sruocr eAC.:t~Ll NO J!D0:5 OR Q1!1;AMC MAT~RlAl HAND l'lACIOMrnT IN b·INCM Ul'l!i COM!'ACHO~ TO ()5'l0 PROCTO~ ~ "'-i 2. BACI>.F!UING Of TRENCHES SHAll. BE ACCOMF'USHED IMMEDIATELY AfTER THE PI F'E IS LA!D. 3. UNDER NO CIRCUMSTANCES SHALL WATER BE PERMITTED iO RISE IN UNBACKFILLED TRENCHES AFTER THE PIPE HAS BEEN PIJI.CED. COMPACTION R.EOUIR.EMENTS SHALL BE ATIA!NeD BY TNE USE OF MECHANICAL iAMPS ONLY. EACH AND EVERY lAYER Of BACKFIU. SHALL BE PLI\CED LOOSE AND THOROUGHLY TAM FED INTO PlACE. 4. Ail PIFE GRADES SHALL BE AS SHOWN ON AF'FR.OVED F'LANS OR N3 DIRECTED BY ENGINEER. 5. ANY OVER EXCAVATION BELOW GRADE SHOWN SHALl. fiE BACI(fiUW WI NO. G7 STONE R.EGAR.DLE55 Of T'l't'E Of BEDDING. G. WHERE ROCKY SOIL CONDITIONS ARE ENCOUNTERED ReQUIRING B~TING. TYPE HI BEDDING SHALL BE USED REGARDLESS Of PIPE MATERIAL fER SPECIFICATIONS. TYPE Ill DATE' 7/1/04 5CALE' NONE DRAWN BY, JFH CHECKED BY' DSW AFPROVED BY' DSW .. . .. STANDARD DETAIL SEWER FIFE BEDDING DETAIL TOP VIEW r~ooo 00000 or 1 rnooooooooo 24" [])000000000 £]000000000 1]000000000 IJIODOOOOOOO FINAL GRADE .l 1 , •. WATER M)A=IN========Li=:.!)(k--,..!Lf-W-l-~ DATE' 3!15/08 SCALE' NONE DRAWN BY' DSW CHECKED BY' RKS AfPROVED BY' RK5 SIDE VIEW STANDARD DETAIL 3/4" AND I" METER PROTECTION DETAIL FILl: <O WATER RESOURCES DEF'ARTMENT CITY Of MONROE, NC 12.09.00 DIV. NO. STREET 12 SEE STANAIW 5F'ECIFICATION5 AND DeTAI!.S MANUAL fOR LOCAL RESIDENTIAL STREET DETAIL WITH CORRESPONDING f?IW FOR WATER METER AND 5~ lATERAL LOCATIONS FROM !3ACK Of CUM. ~ I. FOUR. (4) 3' STffL "T" FENCE POSTS SHALL E3f INSTALLeD AROUND THE WATER METE~ BOX 12' BELOW GRADE, WITH 24" ABOVE GRADE. 2. ORGANGE CONSTg,UCTION FeNCING SHALL Bt: USED TO WfW' AROUND THE fOUR (4) STEEL 'T' FfNCf POSTS 3. THf DEVELOPER'S SURVfYOR SHALL IDENtiFY AND STAKe Ttll: Ct:NTI::R LINE OF EACH t.OT • 4. ALL WATER. METER BOllES AND SANrrARY SEWER lATERAlS SHALL BE IN5T ALI.ED IN Tl1E RJGHT·OF-WAY, CI::NTER OF THE LOT, WITH NO MORE THAT 2' OF 5EFERATION ru:nNEEN THE WATER METER BOX AND5AN!TARY9EWER lATERAL, UNLESS FfRMmED BY THE WAT!:R R.ESOURct:S DJ:fARTMENT OR ITS RfPI<fSENTATlVE. 5. 5HAU NOT BE APF'UCABI£ TO LOTS ON CUL·DE-SAC5. WATER RESOURCES DEPARTMENT CITY OF MONROE, NC ""' 110. I 0.08.0 I DIV. <O. 10 . --. ·~~·-·-.. ... . 5C11EDUl~ Of' MATfRIAl5 RfOUCW PRESSURE ;<ONt ~ Pl'.fV~R< 2''-il" WAlT!". '>!ODft 009. 4'·1 0" WATTS MOD~L 957. ~ i>l'PROVW ~-fQUAL. f"lpt, PRf55URt CL.o\55 S5D DUCTTIL JIWN PIPe 5ATI5fl'llo/G THE cnY Of MONRO!! STANDARD 'POCJACIITIOM. """- flTHNG5: 5TAUOIIRD 1251 rLANGfD DUCTIU: IIWN Pll'J: ~-.... ALL F'IJ'e AND FlTTINGS 5!1ALI.foE PI\INTfD IMfH AN Al'Pf:OVfO COATING 5\'BTtM {rneM~C POTP,.POJ( OR 1\FPROVW eQUAJJ MfTfRR!:M~ IW'.IIO READ• 5HAI.L MEfTTl1f OJ~NT fiSCAL~ !ljD 5PECWICATION. AVAILA!ll.f AT TliE OffiGe OF Ttlf WAHR. R1'50URCE5 ENGINEfi<IN& M~NAHit. TilE 8PECifiCATION 15 .._ $4'>Mtf<Ofl.Ofl: ~0- TOP VIEW NO ENCLOSURE ~ .. IIDPZA. 5t1AU tl~ I)JSTAI.J..fD ONL'r fOR. CU5T0Mtl': A!'l'UCATION~ APPROVED 6'f THE WATEJ!. Re'>OU~ mGIN!":~Il CliY SIDE P~VATESIDt 2. THf CONTAAC'I'ORSHI\Utle R.5PON51!'ll.f fOROOi'AINING All. NfGeSSAAY P!"l!MIT5 ANO IN51'ECTIONS. L $, T~f COI>ITAAC1'0J!. :!HALl& R.!:'SPONSitltfTO TESTT11e RP2EIF AND PiW\flo.E \'oMIEN aRTIPICATION SIGNED 3\' A CEKI'ifiEO leiTER Of PRQP!'R. OP!;RATION. 4. R.DPZI. SHAI.C I'll': LOCA11:D AWA'tOR5UPFICIENn.YFROT!CTED fl!.OM \lf:HICU\.AR W.AffiC, !.AWN MIJio\'eRS OR OTHER ~·=w·,~~ ~ FORE5f~ OCCURRENCES ON TI'1E PROPI:RTY TliA.T COULD CAUSE DAMAGE TO Tl1f 5TI<UCTURE. ' eNCC~U~ :3HALL6E AWMINLIM 'HOT IY.JX" CA!'Ael.f Of MAINTAINING A40' fAI'\RENHfiT INTfRIOJ!.AM6100 <'<lO<GP.«..., 5 TtMPfAA1UR.E AS MANUFACTURf::J 6Y HU66EU. POVolfJ!. ORAFPJ!.OVW fQUAL t1~TING UNIT{5) 1\ND CON\IeNIE~G!': ~· OUTI£TIS)TO Bf PROVIDtO EWTHe MANI.JfACT\!Ri:R. '· DIMENSIONS Of"HO! OOX' CO~'Tli<GENT UPON U:NGTH OF IMfl<OVI'Mr:lff. V~RH'Yi51Zf OF "HOT OOX' I'OR. WLIIPMENT ,.-? PROVIDED P~OR TO OIIJJERING . .o.DWUATt CllAAANO: l'i<.OM ~LOOI!.Si, CfiUI<IGS, AND WAU.S MU!li Elt PR.ClVIOfD/>6 5/'ECifiE!J EIEI.DW• """""""''"~s= r""'~ ' Ali A55fMBUf5 SHAll !lE INSTALLWWITH A CeNl'lRUNf HEIGHT F'IWM SQ.INCHE$ (MIN.) A!lOVf Tlif AOOVf THf FLOOR. -:!l~,"l--~·'T' '· J\i.L RI"Z DeVICES MUST HAve M1 Jl)..tNCH MINIMUM COEARANCE BETWEEN Tt1~ OOTTOM Ofll1E REliEf Vi>J..\It. AND TH~ fL.OQR, <=.= F=J+ '· A MINIMUM Of ! 2·1NCMr;o; Of CLEAR 5PACE5!1AIJ. &MAINTAIN!:D AeOVt' TK~ ASS:':Mel.Y 0. A MI~IMUM Of SO.INCH05 OF Clt:AA 5PACE 5l1illl tot MA1~1'AINEO llE'I\\'EEN THe FROWT SIDE 0~ f!1:E DE\IICf 1\.r·.,... M'O TH~ ~!!MfST WALl. , '"""""o<AIW<I. .. A MINIM LIM Of fJ.JI!CHES SHAlllle MAAITAINEO moM TM~ llACi<. 51DC OnHt OI!VIa TOT11f NfAF.f5T WIIU. ~ ~ 7. ENCLOSVR.f 5t1AU COME rURNI~ECI \\'ITI1 VIV\TMEI< PROOr' DAAIN f'OR.T5 SlJFriClEMTLYSIZI:'O TO HANDLE F\Jll FLOW """"-+~ Df$CHARGe rROM THE R.DI'ZA IU:Ut'l' VN.>Jr DRAIN. TO l>f SUfPUEO f)'($1\Mf MANlJri\CTIJRfR. ... t!J. ALl. MI\TEI<IALS ANO JN5TAU.ATION OF EleCTRICAl WOR1'.5HAU. BE IN ACCORDANQ''MTH Tl'l~ NE':C MD THE OT'l'Of ~~~--" MONR.OI: C0Dt:5. PROFILE NO ENCLOSURE # REVISED DATE' 4/14/08 STANDARD DETAIL I 11/1/2013 SCALE' NONE WATER RESOURCES DEPARTMENT CITY Of MONROE, NC 2 I 1/5/2015 DRAWN BY' DSW 3" 10" RPZBF DETAIL 3 1/2G/20 17 CHECKED BY' RK5 -j•v. "" 10. AFPROVED BY' RK5 <O. WATER Mt:n:R PER CURRENT fiSCAl YeAR SPWFICATION LIFTING HOLE 15.00 "0 10 514" X 4" BRASS FIFE (fl\JMEIERCONNECT5 TO MAle ll11ttAD OlJT51De MfTER OOX {S~e NOTE 4 eeLOW) "CITY OF MONROE' AND "WATER'' TO BE ENGRAVED ON TOP OF UD 24-' MIN. COVER # REVISED 4/1 1/2008 2 I/2G/2017 # REV15ED DATE' 7/1/2004 SCALE' NONE DRAWN BY' SPT CHECKED BY' RK5 APPROVED BY' RK5 3'MIN. COVER WATER. MAIN SERVICE SADDLE DATE' 3/27/20 I 7 SCALE' NONE DRAWN BY' RK5 CHECKED BY' RK5 APPROVED BY' RK5 4'MIN. [ WA5HSTONf l =meeRJcK. TO CU5T0Mf11. tiiQTe5' I. \\lATER MeTER TO 6E INSTAUfD ElY CITY Of' MONROE. 5fEClfiCATION IS IWAILABlllJFON RtQIJE5T THROUGH H1f WATER Rl!SOURCE5 DEPARlMENT. STANDARD DETAIL 3/4" AND I" WATER METER DETAIL FINISHED GRADE CORPORATION STOP ~@MIN.) 2. CO fiT~ OR SHALL USE ONE CONTINUOUS ROlL Oi" COPPER FroM TAf' TO Mtl'ER.. 1.10 5PlJCING SHAI.L Elf f'e:li:.MITTW. 3. fOR 5U6D!VISlON5 \'liTH SIDEWAl..l\5, THE CONTI1ACTOR SHALL OOEND COPPeR TV61NG AfTER THE METER liD)( 2 fEET BEYOND AlL PROfOSEO 51DEWA!.KS. 4. ALL METER 60Xf5 SHAll. STRADDLE SERVICE liNE, NO DRIUfD I10t.f5 ARE ACCEFTABLf. "" NO. WATER RESOURCES DEPARTMENT CITY OF MONROE, NC I 0.08.00 DIV. NO. 10 f (MIN) COPPER SERVICE F!F'E (TYFE K) WITH COMPR.E5510N flTTING5 STANDARD DETAIL TYPICAL WATER SERVICE CONNECTION ""' ,0. WATER RESOURCES DEPARTMENT CITY OF MONROE, NC IO.OG.OO DIV. <O. 10 ~~~·-~--····---~ ~~~~~------·----- CONCRETe PAD TYP. FINISHED GRADE IN UNPAVED N<V5 VALVE BOX ~lPED BACKfiLL TAMPED BAC<flll / # REVISED I I 1/1/2013 2 11/1/2015 3 I/2G/2017 . PtA5TIC COATED STRANDED TRACER WIRE I 2 GAUGE COPPE"R WIRe (TAPED TWICE PER JOINT) ~ MJ WEDGE ACTION RETAINER. GLAND OR Alf'HA ENDS TAMF'ED BACI>.FILL ~ DATE' 7/I/D4 SCALE' NONE DRAWN BY' D5W CHECKED BY' RK5 APPROVED BY: RK5 ~SOLID CONCRETE BLOO. ~ (MIN.4'X8'XIG•) """"NO. G7 STONE OR UNDISTURBED EARTH STANDARD DETAIL GATE VALVE SETTING DETAIL 2" LOOPING OF WIRE 1'--..,FORiTER MAIN EXPANSION I v "' L/ TOF OF FIFE 3 "WIDE BLUE NON-METALLIC TAPE ~ MARKED "BURIED WATER LINE" 1 ~ #I 2 GAUGE PLASTIC COATED-----~o STRANDED COPPER WIRE # RfVISED DATE' 7!1/04 STANDARD DETAIL 11/1/2013 SCALE' NONE I 1/5/2015 DRAWN BY' DSW COFFER TRACING WIRE DETAIL CHECKED BY: DSW APFROVED BY• D5W - 2' FLAN NOTES: I. VALVE BOXES SHALL 8E SCREWTYFE. VALVE BOXES LOCATED IN lAWN AREA SHALL BE INSTALLED WITH CONCffiE DOUGHNUT PADS. 2. # 12 GAUGE STRANDED COPPER WIRE SHALL BE BROUGHT THROUGH VALVE BOX AND HOOKED TO BOLT5 ON VALVE. 3. VAlVE SHALL BE CENTERED IN BOX AND LEVELED F'WM6 BEfORE BACKfiLL. 4. VALVE SHALL NOT SUPPORT VAI..VE BOX. 5. VALVE BOX'E'5 SHALL BE NO HIGHER THAN 114" IN ROADWAY AND NO MORE THAN f' IN RIGHT Of WAYS. . ""' NO. WATER RESOURCES DEPARTMENT CITY OF MONROE, NC 10.05.00 10 ·---------------·. --.~-- WIRE SHALL BE DUCT TAPED TO TOP Of PIPE AT EVERY JOINT. I !'--... u L/ # 12 GAUGE PLASTIC COATED STRANDED COPPER WIRE. WATER RESOURCES DEPARTMENT CITY OF MONROE, NC ""' 10.04.00 jw 10 NO. ,0. -~--·----~-· ·~-~ TRENCH UNDER OTHER. !>REA TRENCH UNDER. OR WITHIN ANGLE OF RI:POST OF NCDOT OR CITY OWNED ROAD # RfVISED 4' COMPACTED TOF'SOIL If UNDER lAWN AREA CONCRETE ASPHALT DRIVEWAY!PARI<JNG LOT DATE' SCALE, COMF'ACTED SUITABLE EXCAVATED BACI(f!lL 8/4!20 17 RK5 DRAWN BY' RK5 CHECKED BY' RK5 APPROVED BY' RK5 l_ EXISTING GRADE FULL 5AWCUT DEPTtl Of ASF'HALT FULL ''"G"' T NON-DETEGTAElLE J I TAPE 12' BELOW I FINAL GRADE UNDISTUR.BfD EARTH OR ROCK OOTIOM I TRACER WIRf I WATER MAIN STANDARD DETAIL TRENCH DETAL SA\'ICUT AND MilL ASFHAI.T TOP. APPLY tACK COAT TO ALL fXPO::>EO cur SURFACES. REQUIRED ON ALL PRIORITY STREETS 1>5 DEFINED BY CITY OF MONROE ENGINEERING DEPARTMENT L EXISTING PAVEMI:NT \,_ IUNO'ISTIIRE>IEO EARTH NCDOT ABC STONE NCDOT WA511ED NO.G7 STONE WATER RESOURCES DEF'ARTMENT CITY Of MONROE, N.C. 10.01.00 DIV. <O. 10 • REVISION DATE! 04/2Sf}IY1D PROJECT No. 1~1~~ DRAWN BY• GCM APPROVED SHEET C=1 'i z 0 (f) (f) :::;: 0::: w ()_ z w ~ 0::: 3: (f) . 0::: w w z 0 z w w I I- I- :=l 0 I I- 3: 0 w ()_ 0 u 0::: 0 0 w (f) ;:) w rn ~ :::;: I-0::: <( ()_ 0 z ~ ! ' _j ! I! <( ,, 0::: ' w ! 0 w u... >-rn 0 w I-u w I-0 0::: ()_ i (f) ! w (f) ::::J 0 w N 0::: 0 I I- ;:) <( z ;:) 0::: 0 _j ;:) u... ~ z :=l 0::: w w z 0 z w w :r: I- >-rn 0 w I-:r: 0 0::: >-()_ 0 u w 0::: <( (f) 0 z 3: <( 0::: 0 w (f) w I I- @ II GENERAl NOTES• 1 FENCE FABRIC SHALL BE A MINIMUM OF 24" ABOVE GROUND SURFACE AND . SHALL HAVE A MINIMUM OF 6 LINE WlRES WITH 6" STAY SPACING. 2. F'ILTER FABRIC SHALL BE MIRAFI 100 FABRIC OR EQUIVALENT. 3. BURLAP CANNOT BE USED WHERE Sll T FENCE IS TO REMAIN FOR A PERIOD Of MORE THAN 30 DAY5, 4. STEEL POSTS SHALL BE 5'-0" IN HEIGHT AND BE OF' lHE SELF' -FASTENER ANGLE STEEL TYPE. 5 ORANGE SAFETY FENCE IS REQUIRED AT BACK OF SILT FENCE WHEN • GRADING IS ADJACENT TO STREAMS OR WETLANDS. THE COLOR ORANGE IS RESERVED FOR VISUAL IDEN11FICA liON OF' ENVIRONMENTALLY SENSITIVE AREAS. 6.00 NOT INSTALL SEDIMENT FENCE ACROSS STREAMS, DITCHES, WATERWAYS, OR OTI-lER AREAS OF CONCENTRATED Fi..OW. 7.DRAINAGE AREA CAN NOT BE GREAiER THAN 1/4 ACRE PER 100 FT OF FENCE FOR SLOPES LESS THAN 2%. 8.SLOPE LENGTHS CAN NOT EXCEED CRITERIA SHOWN IN TABLE 6.62A NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. -l-rf~~;;~ POST FlL TER F' ABRIC WIRE FENCE ALL 1-----VARIABLE AS DIRECTED BY ENGINEER ( 8' MAX ) MIN. 10 GA. UNE WIRES. SEE NOTE NO. 17 DETAIL 03.16.01 MAINTENANCE: EPAIRS INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL MAKE ANY REQUIRED R IMMEDIATELY. IT SHOULD THE FABRIC Of A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE. OR BECOME INEFFECTIVE, REPLACE PROMPTLY. NO TO REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN A REDUCE PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE IT AFTER THE CONTR!BUllNG DRAINAGE AREA HAS BEEN PROPERLY STABIUZED. CITY OF MONROE SILT FENCE INSTALLATION /INIONCOIIN'Tr MIN. 14 GA. STEEL INTERMEDIATE WIRES WITH A MAX. MESH SPACING Of 6 \N • ENGINEERING DEPARTMENT DETAIL 03.01.01 NO. --------------·----·-·-- A. FLOW TO THE REAR B. FLOW TO THE F'RONT c. FLOW TO THE LEFT r*" f' )( l( • )( "¥ ~ ¢::::::' u EJ ~ EJ EJ ~ :gogo ~ 0o 0o 0000 u 0o-0 o o~o-g oOoO 0 o0 o ¢::::::' 0000 oooo t o-ooo 0o0 o 00 00 oooo oOoO I I 0 o0 o o-00 0 0o 0o 0000 gogo 0o 0o 0o 0o D. FLOW TO THE RIGHT E. FLOW TO THE FRONT & REAR ...... t lE l( )( :;. "* u LEGEND ~ EJ EJ SILT FENCE ~rooooo~~j CONSTRUCTION ~ 00000000 0000000 ENTRANCE ~ 00000000 0000 0 o0 o ~ ~ 0000 c:=:::> oooo 0000 DIRECTION OF oooo 0 00 0 0000 0000 FLOW oooo oooo ~ I oooo 0000 0o 0o 0000 I VEHICLE BARRIER APPROVED DATE REViSIONS • CITY OF MONROE DATE DESCRll"TlON EROSION CONTROL OPTIONS /J///Q/1 COI!NtY NORm CAJ-Of./N.I "'' FORMAT FOR LESS THAN ONE ACRE PREP.t/IU) ~Y.· ENGINEERING DEPARTMENT SEEDING PREPARATION AREAS TO BE SEEDED SHALL BE THOROUGHLY LOOSENED AND WORKED TO A MINIMUM DEPTH OF AT LEAST 5 INCHES. THE AREA SHALL THEN BE RACKED OR OTHERWISE CLEARED OF ROCKS, LARGER THAN 2 INCHES IN DIAMETER, STICKS OR OTHER DEBRIS. FOR LATE WINTER AND EARLY SPRING: SEEQING MIXTIJBE• RYE (GRAIN) -120 LS/ACRE ANNUAL LESPEDEZA (KOBE) -50 LS/ACRE (OMIT ANNUAL LESPEDEZA WHEN DURATION Of TEMPORARY COVER IS NOT TO EXTDID BEYOND JU~ SffPlNG OATES: JAN, 1 -IMY 1 FOR SUMMER: SffOINQ MI)(]IBE• GERMAN MILLET -40 LB/ACRE (A SMALL-STEMMED SUDANGRASS MAY BE SUBSTITVTEO AT A RATE OF" .50 LS/ACRE) SfEDING pt.Tfl!· MAY 1 -AUG. 15 FOR FALL: SffPINQ MIXTIIBf· RYE (GRAIN) -120 lB/ACRE SfEDINQ DAlfS• AUG. 15 -DEC 30 son AIJFNDUftf!'S· FOLLOW RECOMMENDAT10NS OF SOIL TESTS OR APPLY 2,000 LB/ACRE GROUNO AGR!ClJL1\IRAL UMESTONE AND 750 L9/ACRE 10-IQ-10 rERTIUZER """"'"' APPLY .... 000 LB/ACRE srRAW. ANCHOR STRAW BY TACKING WITH ASP!W.T, NEniNO, OR A MULCH ANCHORING TOOL. A DISK WITH BlADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL NtiJNlfNANCR• REFER11UZE If GROWTH IS NOT FUU.Y ADEQUATE. RESEED, FERTIUZE AND MULCH IMMEDIATELY FOLLOWING EROSION OR OTHER DAMAGE SOli AIAfrtP!1!EtUS: FOLLOW RECOMMENDATIONS Dr SOIL TESTS OR APPLY 2,000 LS/ACR£ GROUND AGRICULTURAL Ut.IESTONE AND 7.50 lB/IICRE 10-10-10 FERTIUZER """""' APPLY 4,000 LB/ACRE 'fm<AW. ANCHOR STRAW BY TACI<!NG WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STAAIGHT CAN BE USED PS A lo!lJLCH ANCHORING TOOL MAJNIENANCE• REFERTUJZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, fERTIUZE AND MULCH JMt,jEtliATaY F'Ol.i.OWING EROSION OR OTHER DAMAGE SOU WFND!,!Eh!I5: FOLLOW RECOMMENDAT10NS Of SOIL TESTS OR PPPLY 2,000 LS/ACRE GROUND AGRICULTURAL UMESTONE AND 1,000 LB/ACRE 10-10-10 FERTIUZER Ml.lillt APPLY 4,000 LB/ACRE S!RAW. ANCHOR STRAW BY TACKING WITH ASI>tW.T, NEmNG, OR A UULCH ANCHORING TOOL A DISK WITH BLADES SEJ' NrARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL WtJNiftJANCB', REPAIR AND REFERTIUZE OAUAGEO ARE:AS IMMEDIATElY. TO!'ORESS WITH 50 LS/ACRE OF NITROGEN IN MA.RCH. IF IT IS NECESSARY TO EXTEND lEMPORARY COVER B£YONO JUNE 15, ovtRSEEO WITH 50 LB/,o.cRE KOBE LESPEOEZA IN LATE FEBRUARY OR rARL'f MARCH.. fOR AllO!TIONAL INfORMATION, REFrn TO NCOEJtiR EROSION AND SEI:l1MENT CONTROL PlANNING AND DESIGN MANUAL (fSCPOM), S£CTION 6.10. FOR PE~ENT SEEDING SP£CIF1CATIONS, INCLUDING SEED BED PRE!", SEASONAL UMITAnONS FOR SEEDING OPEAATIONS. 1HE KINDS OF GRADES OF' FERTlUZERS, THE KINOS OF S£ED, AND 11-!E RATES OF APPUCATlON OF UMESTONE, FERTIUZER, AND SEED, REFER TO NCDENR ESCPDM SECTION 6.11 PLEASE CONSULT THE NATURAL RESOURCES CONSERVATION SERVICE FOR ADDITIONAL AI.TERNATNES FOR VEGETATING OENUDEO AREAS. Q) SEEDBED PREPARATION & 0 CITY OF MONROE TEMPORARY SEEDING Pi1F.PAReiJJJY. ENGINEERING DEPARTMENT f!L~' l:N<w_JIMopo;-ilO!IJil•'ll<111Llllt~ DRAWN BY: JAM I DATE: 0~07-01 CHECKED BY: JNL I SCALE: N.T.S. DETAIL 03.06.01 ' ·~ l -----------··----·----------- --· ·-------------- ~ ~~ ~~i~ ~~ ~~~u ~~ ~~::>~ ~~ REVISION DATE• 04(l5/]U}[J PROJECT No. l(H)l9-A DRAWN BY• GCM APPROVED BY• GCM SHEET Attachment D Figure 4 Rogers Callcott April 2019 Report 10 ·100 100 ·1,000 1,000 • 10,000 \ \RC-VMSRI.I03\Projects\14\93-12J\.ro18\RPT.S\Annuol Report\2018 Annual Reportdocx ... . ·t 't. ~RMER R. P. SC.HERER / --------. CHELSEA LABS r_, FACILITY t' \ Vf' ~\' ~ ·~ ,.. t . tJ, 't ' ' ~ t- Page 14 of27 Rogers & Callcott ENVIRONMENTAL FIGURE 4 TOTAL VOC ISOCONICENTRATION MAP OCTCJBER 2018 CATALENT PHARMA SOLUTIONS FORMER R. P. SCHERER/ CHELSEA lABS FACILITY 2021 E. Roosevelt IBivd., Monroe, North Carolina • RECOVEIRY WELL LOCATION 6) MONITCtRING WELL LOCATION PIEZOMIETER LOCATION 14 TOTAL VOC CONCENTRATIONS IN ~g/l (NO " NtOT DETECTED) (64.S) MW·3A IS SCREENED IN LOWER AQUIFER AND IS NOT USED FOR CONTOURING ·W/f:d$-f-1 INFILTR~ITION GALl~RY (Permit 1~ W0.0010607) 0 FORMEFl NPOES OUTFALl (Permit 1~ 0084344) =-=-=-CULVER1r @ SEWER MAN·HOLE (POTW l•ermlt n LP-001) L OUTPARCH Contour lines are extrapolated based on data at the sample locations. ·rhese lines ~re approximate as conditions betweet~ locations may vary. so 100 200 Feet Refttencts: 201S Ol«ltol orthopho•:os,.ph from North Ceroll~• On~ Map. DAAINN SV: MAl l/4/'l019 CHEGKEO 8~ JHF APPIOOVEO 8V: SW<l Friday, J.-lni.IJ!"\1 4, 2019,1J:lJ:40 AM C:\GIS\PROJ£CTS\C.t.OI•nt\93·121\Maos\18\fle4 vex:. Oct.mxd rogersandcallcott.com an employee-owned company Attachment E Table 3 Harmon Environmental, PA February 2015 Sub-Slab Vapor Report LEGEND 0 BUILDINGS AND ON-SITE STRUCTURES APPROXIMATE LOCATION OF PROPER"IY BOUNDARY • SS-6 APPROXIMATE LOCATION OF ROADS AND HIGHWAYS APPROXIMATE LOCATION OF SUB-SLAB VAPOR SAMPLING POINT CONCRETE AND ASPHALT APPROXIMATE SCALE IN FEET 0 100 200 SOURCE: UNION COUN"IY GIS DEPARTMENT FIGURE 2 HARMON ENVIRONMENTAL, PA SUB-SLAB SAMPLE LOCATIONS MAP 615 BRUCE THOMAS ROAD MAC, LLC PROPERTY ~ MONROE, NORTH CAROLINA 2021 EAST ROOSEVELT BLVD. ~ L_ ______ <_704--)-76_+_5_6_9_4_P_H_O_N_E_&_F_AX ________ ~------M-O __ N_R __ OE._N_o_R_T_H_c_A_R_o_L_IN_A------~~ µg/