HomeMy WebLinkAbout19041_Davidson Depot St_Asbestos Report _2016_06-17_Revised Asbestos in Soil Survey Report Davidson Depot 301 Depot Street Davidson, North Carolina June 17, 2016 Terracon Project No. 71155040 Prepared for: Miller-Valentine Residential Development LLC Davidson Depot LLC Cincinnati, OH Prepared by: Terracon Consultants, Inc. Charlotte, North Carolina TABLE OF CONTENTS 1.0 INTRODUCTION ............................................................................................................. 1 1.1 Reliance .............................................................................................................. 1 2.0 BUILDING DESCRIPTION .............................................................................................. 1 3.0 FIELD ACTIVITIES ......................................................................................................... 2 3.1 Visual Assessment ............................................................................................ 2 3.2 Physical Assessment ........................................................................................ 2 3.3 Sample Collection .............................................................................................. 2 3.4 Sample Analysis ................................................................................................ 2 4.0 REGULATORY OVERVIEW ........................................................................................... 3 5.0 FINDINGS ....................................................................................................................... 5 6.0 LIMITATION / GENERAL COMMENTS .......................................................................... 6 APPENDIX A BORING AND ASBESTOS SOIL SAMPLE RESULTS APPENDIX B ASBESTOS ANALYTICAL LABORATORY DATA APPENDIX C DRAWINGS ·EXHIBIT A-2A BORING LOCATIONS APPENDIX D BORING LOGS Responsive ■Resourceful ■Reliable 1 ASBESTOS IN SOIL SURVEY REPORT Davidson Depot 301 Depot Street Davidson, North Carolina Terracon Project No. 71155040 June 17, 2016 1.0 INTRODUCTION Terracon Consultants, Inc. (Terracon) conducted an asbestos in soil survey of the above referenced site in Davidson, North Carolina. The survey was conducted between July 27-29, 2015 and September 9-10, 2015 by a North Carolina accredited asbestos inspector in general accordance with Terracon Proposal No. P71150239 dated July 30, 2015 and supplemental proposal numbers P71150239r1a and P71150239r2 dated August 20, 2015 and September 25, 2015 and asbestos sampling necessary to characterize the extent of asbestos contamination present at the Davidson Depot site. We understand this asbestos survey was requested due to the planned development of the above referenced site to address potential asbestos soil contamination. 1.1 Reliance This report is for the exclusive use of Miller-Valentine Residential Development LLC and Davidson Depot LLC for the project being discussed. Reliance by any other party on this report is prohibited without written authorization of Terracon and Miller-Valentine Residential Development LLC and Davidson Depot LLC. Reliance on this report by Miller-Valentine Residential Development LLC and Davidson Depot LLC and all authorized parties will be subject to the terms, conditions and limitations stated in the proposal, this report and Terracon’s Agreement for Services. The limitations of liability defined in Terracon’s Agreement for Services is the aggregate limit of Terracon’s liability to Miller-Valentine Residential Development LLC and Davidson Depot LLC. 2.0 LAND DESCRIPTION This site is located at 301 Depot Street in Davidson, North Carolina. This property includes the existing buildings, parking areas, abandoned building foundations, and a capped landfill area previous reported to contain asbestos debris. Manicured grass and asphalt parking and drive way areas also are located on the site. The site is bound by Depot Street, Sloan Street and Eden Street with a railroad right of way on the east side of the property. The site generally slopes from a high of 814 feet on the eastern portion of the site to a low of 780 feet on the western portion of the site. The landfill area is an approximate elevation of 800 feet. Asbestos in Soil Survey Report Davidson Depot ■ Davidson, North Carolina June 17, 2016 ■ Terracon Project No. 71155040 Responsive ■Resourceful ■Reliable 2 3.0 FIELD ACTIVITIES The survey was conducted by North Carolina accredited asbestos inspector Alex Manzanarez (Accreditation No. 12617). The survey was conducted in general accordance with the sample collection protocols established in USEPA 40 CFR Part 763 Subpart E 763.86, AHERA and industry practices. A summary of survey activities is provided below. 3.1 Visual Assessment Survey activities were initiated with visual observation of the property to identify areas suspected of having deposits of asbestos debris. Terracon picked different locations to test the soil inside of the area that will be developed. Areas currently planned for significant undercut by the current development plan were specifically targeted. Terracon also chose locations that were not expected to have deposits of asbestos debris for comparison. 3.2 Physical Assessment A physical assessment of each sample location of suspect asbestos-containing materials (ACM) was conducted to assess the friability and condition of the materials. A friable material is defined by the USEPA as a material which can be crumbled, pulverized or reduced to powder by hand pressure when dry. Friability was assessed by physically touching suspect materials. 3.3 Sample Collection Based on results of the visual observation of the soil borings, bulk soil samples of suspect ACM were collected in general accordance with USEPA AHERA and industry accepted sampling protocols. Please refer to the attached drawing (A-2A) in Appendix C for sample locations. The selection of sample locations and frequency of sampling were based on Terracon’s observations and the assumption that like materials in the same area are homogeneous in content. Terracon collected forty-four (44) soil samples from nineteen (19) areas of suspect ACM on the site. A summary of suspect ACM samples collected during the survey is included as Appendix B. 3.4 Sample Analysis Soil samples were submitted under chain of custody to EMSL Analytical, Inc. (EMSL) of Cinnaminson, New Jersey for analysis by ASTM D7521: Standard Test Method for the Asbestos in Soil Survey Report Davidson Depot ■ Davidson, North Carolina June 17, 2016 ■ Terracon Project No. 71155040 Responsive ■Resourceful ■Reliable 3 Determination of Asbestos in Soil. The percentage of asbestos, where applicable, was determined by weighted asbestos concentration. 4.0 REGULATORY OVERVIEW The asbestos NESHAP (40 CFR Part 61, Subpart M) regulates asbestos fiber emissions and asbestos waste disposal practices. The asbestos NESHAP regulation also requires the identification and classification of existing ACM according to friability prior to demolition or renovation activity. Friable ACM is a material containing more than 1% asbestos that, when dry, can be crumbled, pulverized or reduced to powder by hand pressure. All friable ACM is considered regulated asbestos containing material (RACM). The asbestos NESHAP regulation classifies ACM as either RACM, Category I non-friable ACM or Category II non-friable ACM. RACM includes all friable ACM, along with Category I and Category II non-friable ACM that has become friable, will be or has been subjected to sanding, grinding, cutting or abrading, or ACM that has a high probability of becoming or has become crumbled, pulverized, or reduced to powder in the course of renovation or demolition activity. Category I non-friable ACM are exclusively asbestos-containing packings, gaskets, resilient floor coverings, resilient floor covering mastics and asphalt roofing products that contain more than 1% asbestos. Category II non-friable ACM are all other non-friable materials other than Category I non-friable ACM that contain more than 1% asbestos. Category II non-friable ACM generally includes but is not limited to cementitious material such as: cement pipes, cement siding, cement panels, glazing, mortar and grouts. The OSHA Asbestos standard for construction (29 CFR 1926.1101) regulates workplace exposure to asbestos. The OSHA standard requires that employee exposure to airborne asbestos fibers be maintained below 0.1 asbestos fibers per cubic centimeter of air (0.1 f/cc). The OSHA standard classifies construction and maintenance activities which could disturb ACM, and specifies work practices and precautions which employers must follow when engaging in each class of regulated work. States which administer their own federally-approved state OSHA programs may require additional precautions. In the state of North Carolina, the Health Hazards Control Unit (HHCU) regulates asbestos activities. The NC HHCU requires that any asbestos-related activity conducted in a public building be performed by personnel licensed by NC HHCU. RACM must be removed prior to renovation or demolition activities which will disturb the materials. The owner or operator must provide the NC HHCU with written notification of planned removal activities at least 10 working days prior to the commencement of asbestos abatement activities. Removal of RACM must be conducted by a State of North Carolina licensed asbestos abatement contractor. In addition, third party air monitoring must be performed following the abatement. Asbestos in Soil Survey Report Davidson Depot ■ Davidson, North Carolina June 17, 2016 ■ Terracon Project No. 71155040 Responsive ■Resourceful ■Reliable 4 5.0 FINDINGS Asbestos was identified in soil samples of varying depths throughout the site. Please refer to Appendix A for specific borings, sample depths and sample locations. Boring logs are included in Appendix D. Based on the results of the asbestos sampling at this site, Terracon recommends that soil contaminated with asbestos, if excavated, be removed and disposed as an asbestos-containing material. Excavation and grading on the site should be performed by an experienced asbestos abatement contractor using North Carolina accredited asbestos workers and supervisors. Specific technical work procedures and an asbestos monitoring plan should be developed for this work. Terracon also recommends that once the asbestos soil removal is complete, a geotextile liner could be installed with a minimum 12” cap of clean soil. The geotextile liner would serve as a demarcation point between clean and potentially asbestos-contaminated soil. 6.0 LIMITATIONS/GENERAL COMMENTS This asbestos soil survey was conducted in a manner consistent with the level of care and skill ordinarily exercised by members of the profession currently practicing under similar conditions in the same locale. The results, findings, conclusions and recommendations expressed in this report are based on conditions observed during our survey of the land for development. The information contained in this report is relevant to the date on which this survey was performed, and should not be relied upon to represent conditions at a later date. This report has been prepared on behalf of and exclusively for use by Miller-Valentine Residential Development LLC and Davidson Depot LLC for specific application to their project as discussed. This report is not a bidding document. Contractors or consultants reviewing this report must draw their own conclusions regarding further investigation or remediation deemed necessary. Terracon does not warrant the work of regulatory agencies, laboratories or other third parties supplying information which may have been used in the preparation of this report. No warranty, express or implied, is made. APPENDIX A SOIL BORING AND ASBESTOS SOIL SAMPLING RESULTS Soil Boring and Asbestos Soil Sampling Results AUGUST 4, 2015 and AUGUST 5, 2016 Boring Locations Asbestos Sample Number Asbestos Sample Depth Analytical Results (Weighted Concentration) B1 1-1 1 – 21/2 37% Chrysotile B1 1-2 31/2 – 5 21% Chrysotile B2 2-1 1 – 21/2 19% Chrysotile B2 2-2 6 – 71/2 21% Chrysotile B7 3-1 1 – 21/2 0.68% Chrysotile B7 3-2 81/2 - 10 None Detected B5 4-1 31/2- 5 None Detected B5 4-2 181/2 – 20 None Detected B6 5-1 1 – 21/2 14% Chrysotile B6 5-2 131/2 – 15 None Detected B8 6-1 6 - 71/2 <0.25% Chrysotile B8 6-2 181/2 – 20 None Detected B4 7-1 31/2 – 5 None Detected B4 7-2 131/2 - 15 None Detected B7 8-1 131/2 – 15 <0.25% Chrysotile B7 8-2 231/2 – 25 None Detected B3 9-1 1 – 21/2 72% Chrysotile B3 9-2 31/2 – 5 72% Chrysotile B3 9-3 81/2 – 10 52% Chrysotile B3 9-4 281/2 – 30 <0.25% Chrysotile B3 9-5 181/2 – 20 1% Chrysotile Soil Boring and Asbestos Soil Sampling Results SEPTEMBER 15, 2015 THROUGH SEPTEMBER 18, 2015 Boring Locations Asbestos Sample Number Asbestos Sample Depth Analytical Results (Weighted Concentration) B15 1-1 1 – 21/2 2% Chrysotile B15 1-2 31/2 – 5 None Detected B16 2-1 1 – 21/2 32% Chrysotile B16 2-2 31/2 – 5 69% Chrysotile B16 2-3 81/2 – 10 53% Chrysotile B14 3-1 31/2 – 5 42% Chrysotile B14 3-2 81/2 – 10 82% Chrysotile B17 4-1 1 – 21/2 66% Chrysotile B17 4-2 81/2 – 10 5% Chrysotile B18 5-1 1 – 21/2 4% Chrysotile B18 5-2 31/2 – 5 57% Chrysotile B13 6-1 1 – 21/2 69% Chrysotile B13 6-2 6 – 71/2 None Detected B12 7-1 1 – 21/2 56% Chrysotile B12 7-2 131/2 – 15 5% Chrysotile B11 8-1 1 – 21/2 48% Chrysotile B-11 8-2 6 – 71/2 7% Chrysotile B19 9-1 1 – 21/2 1% Chrysotile B19 9-2 31/2 – 5 <0.25% Chrysotile B10 11-1 1 – 21/2 21% Chrysotile B10 11-2 81/2 – 10 None Detected B9 12-1 1 – 21/2 None Detected B9 12-2 31/2 - 5 None Detected APPENDIX B ASBESTOS LABORATORY ANALYTICAL DATA APPENDIX C DRAWINGS APPENDIX D BORING LOGS 797.5 787 759 2-2-2N=4 1-1-2 N=3 0-0-0 N=0 1-0-0 N=0 50/3" 17-18-19N=37 18-23-22 N=45 10-14-28N=42 26-47-48N=95 21-29-37N=66 1.5 12.0 40.0 FILL - SILT (ML), brownish red, soft FILL - CONSTRUCTION DEBRIS , pink to gray, green and white, very soft to soft WELL GRADED SAND (SW), fine to coarse grained, brown, hard, residuum Boring Terminated at 40 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 7/27/2015 BORING LOG NO. B-01 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 7/27/2015 Exhibit:B-2 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 799 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 25 30 35 40 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 At completion of drilling Cave in depth measured at 36.2 feet While drilling At completion of drilling Cave in depth measured at 36.2 feet WATER LEVEL OBSERVATIONS While drilling 796.5 789.5 785.5 767.5 1-1-0N=1 2-2-2 N=4 1-0-1 N=1 2-2-6 N=8 9-15-26N=41 10-14-21N=35 14-16-26 N=42 12-18-24N=42 1.0 8.0 12.0 30.0 FILL - SILT (ML), brownish red FILL - CONSTRUCTION DEBRIS , white, soft brown, sandy silt SANDY SILT (ML), olive brown, stiff, residuum SANDY SILT/SILTY SAND (ML), brown, hard, residuum Boring Terminated at 30 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 7/27/2015 BORING LOG NO. B-02 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 7/27/2015 Exhibit:B-3 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 797.5 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 25 30 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 26.5 feetCave in depth measured at 26.5 feet WATER LEVEL OBSERVATIONS 795.5 784.5 779 773 767 1-0-1N=1 1-0-2 N=2 2-4-5 N=9 6-5-5 N=10 3-4-6N=10 4-7-12N=19 16-21-19 N=40 29-33-37N=70 1.5 12.5 18.0 24.0 30.0 FILL - SILT (ML), brownish red, very soft FILL - CONSTRUCTION DEBRIS , pink to green, and white, soft, sandy silt mixed throughout solid debris fragments, dark gray and green SANDY SILT (ML), white and olive brown, stiff, residuum SILTY SAND (SM), fine to coarse grained, bluish green, medium dense, residuum SILTY SAND (SM), fine to coarse grained, white and brown, medium dense to dense, residuum Boring Terminated at 30 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 7/29/2015 BORING LOG NO. B-03 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 7/29/2015 Exhibit:B-4 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 797 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 25 30 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 At completion of drilling Cave in depth measured at 24 feet While drilling At completion of drilling Cave in depth measured at 24 feet WATER LEVEL OBSERVATIONS While drilling 811810.5 791.5 4-7-9N=16 5-7-8 N=15 3-5-6 N=11 5-7-8 N=15 6-7-9N=16 8-11-14N=25 0.41.1 20.0 4.5" ASPHALT 8.5" AGGREGATE BASE COURSE SILTY SAND (SM), trace mica, fine to coarse grained, white and brown, medium dense,residuum Boring Terminated at 20 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 7/29/2015 BORING LOG NO. B-04 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 7/29/2015 Exhibit:B-5 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 811.5 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 16.6 feetCave in depth measured at 16.6 feet WATER LEVEL OBSERVATIONS 805.5 802.5 795 781.5781 2-2-1N=3 6-7-7 N=14 5-5-7 N=12 3-4-5 N=9 2-3-3N=6 2-3-4N=7 2-3-4 N=7 5-6-7N=13 5.5 8.5 16.0 29.530.0 FILL - SANDY SILT (ML), brown to reddish brown, soft to very stiff SANDY SILT (ML), trace gravel, brown, very stiff, residuum SANDY SILT (ML), with mica, brown, medium stiff to stiff, residuum SANDY SILT (ML), micaceous, white and brown, stiff, some sand, residuum SANDY SILT (ML), olive brown, very stiff, residuum Boring Terminated at 30 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 7/28/2015 BORING LOG NO. B-05 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 7/28/2015 Exhibit:B-6 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 811 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 25 30 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 26.8 feetCave in depth measured at 26.8 feet WATER LEVEL OBSERVATIONS 809.5 807 802 797 785 6-13-4N=17 2-4-6 N=10 2-3-5 N=8 1-3-4 N=7 1-2-3N=5 3-4-5N=9 3-5-5 N=10 0.7 3.0 8.0 13.0 25.0 WELL GRADED GRAVEL (GW) FILL - CONSTRUCTION DEBRIS , white, very stiff, reddish brown, sandy silt intermixxed SANDY SILT (ML), trace mica, reddish brown, stiff, residuum SILT (ML), some sand, brown, stiff, some sand, residuum SANDY SILT/SILTY SAND (ML), with mica, white and olive brown, medium stiff to stiff, residuum Boring Terminated at 25 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 7/28/2015 BORING LOG NO. B-06 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 7/28/2015 Exhibit:B-7 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 810 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 25 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 22 feetCave in depth measured at 22 feet WATER LEVEL OBSERVATIONS 795.5 789 771 2-3-3N=6 5-8-10 N=18 5-7-11 N=18 4-7-7 N=14 6-8-9N=17 10-14-17N=31 9-13-15 N=28 9-14-18N=32 5.5 12.0 30.0 FILL - SANDY SILT (ML), reddish brown, medium stiff to very stiff SILT (ML), trace sand, reddish brown, very stiff, residuum SANDY SILT/SILTY SAND (ML), trace mica, white and olive brown, very stiff to hard, residuum Boring Terminated at 30 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 7/28/2015 BORING LOG NO. B-07 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 7/29/2015 Exhibit:B-8 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 801 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 25 30 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 26.2 feetCave in depth measured at 26.2 feet WATER LEVEL OBSERVATIONS 811.5810.5 807.5 801.5 791.5 3-3-3N=6 3-5-9 N=14 3-7-8 N=15 7-8-12 N=20 13-18-22N=40 10-12-13N=25 0.31.0 4.0 10.0 20.0 3" ASPHALT 9" AGGREGATE BASE COURSE FILL - SANDY SILT (ML), brown to reddish brown, medium stiff SANDY SILT/SILTY SAND (ML), fine to coarse grained, white and olive brown, very stiff, residuum SANDY SILT/SILTY SAND (ML), some mica, fine to coarse grained, brownish green to white and brown, very stiff to hard, residuum Boring Terminated at 20 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 7/29/2015 BORING LOG NO. B-08 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 7/29/2015 Exhibit:B-9 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 811.5 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 20 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 17 feetCave in depth measured at 17 feet WATER LEVEL OBSERVATIONS 779 776 774 4-5-18N=23 5-4-7 N=11 0.1 3.0 5.0 TOPSOIL, approximately 0.1 inches FILL - SANDY SILT (ML), reddish brown, very stiff asphalt encountered SILTY SAND (SM), fine grained, gray, medium dense, residuum Boring Terminated at 5 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/10/2015 BORING LOG NO. B-09 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/10/2015 Exhibit:B-10 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 779 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 1.4 feetCave in depth measured at 1.4 feet WATER LEVEL OBSERVATIONS 781 778 771 2-2-2N=4 5-10-12 N=22 7-12-15 N=27 8-14-17 N=31 0.1 3.0 10.0 TOPSOIL, approximately 0.1 inches FILL - CONSTRUCTION DEBRIS , brown, fine grained silty sand SILTY SAND (SM), fine to coarse grained, reddish brown and white with brown, medium dense to dense, residuum Boring Terminated at 10 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/10/2015 BORING LOG NO. B-10 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/10/2015 Exhibit:B-11 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 781 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 4.8 feetCave in depth measured at 4.8 feet WATER LEVEL OBSERVATIONS 797796.5 790.5 789 787 10-14-16N=30 3-3-22 N=25 2-3-6 N=9 5-6-8 N=14 0.10.5 6.5 8.0 10.0 TOPSOIL, approximately 0.1 inches FILL - SILT (ML), dark brown, dense FILL - CONSTRUCTION DEBRIS , white, stiff to very stiff wood debris encountered SANDY SILT (ML), grayish brown, stiff, residuum SILTY SAND (SM), fine to coarse grained, brown to white, medium dense Boring Terminated at 10 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-11 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-12 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 797 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 5.0 feetCave in depth measured at 5.0 feet WATER LEVEL OBSERVATIONS 797796.5 791.5 788.5 787 782 1-0-2N=2 1-3-3 N=6 1-1-2 N=3 1-3-3 N=6 3-4-6N=10 0.10.3 5.5 8.5 10.0 15.0 TOPSOIL, approximately 0.1 inches FILL - SANDY SILT (ML), reddish brown, soft FILL - CONSTRUCTION DEBRIS , white, soft SILTY SAND (SM), fine to coarse grained, dark gray, very loose, residuum no recovery SILTY SAND (SM), fine to coarse grained, gray, medium dense, residuum Boring Terminated at 15 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-12 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-13 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 797 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 At completion of drilling Cave in depth measured at 11.2 feet At completion of drilling Cave in depth measured at 11.2 feet WATER LEVEL OBSERVATIONS 802801 799 796.5 790 787 5-3-1N=4 2-2-3 N=5 2-4-8 N=12 6-8-10 N=18 11-14-15N=29 0.21.2 3.0 5.5 12.0 15.0 2" ASPHALT 12" AGGREGATE BASE COURSE FILL - CONSTRUCTION DEBRIS , white, soft FILL - SANDY SILT (ML), brown, medium stiff SANDY SILT (ML), brown, stiff to very stiff, residuum SILTY SAND (SM), with mica, brown to white, medium dense, residuum Boring Terminated at 15 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-13 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-14 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 802 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 8.3 feetCave in depth measured at 8.3 feet WATER LEVEL OBSERVATIONS 807.5807 796 793 2-2-1N=3 3-8-7 N=15 4-3-2 N=5 7-4-3 N=7 2-4-6N=10 0.30.8 12.0 15.0 3" ASPHALT 4" AGGREGATE BASE COURSE FILL - CONSTRUCTION DEBRIS , white, soft to stiff, silt soil layers intermixxed wood debris encountered SANDY SILT (ML), brown, stiff, residuum Boring Terminated at 15 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-14 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-15 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 808 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 10.5 feetCave in depth measured at 10.5 feet WATER LEVEL OBSERVATIONS 811810.5 808 806 2-2-5N=7 2-5-6 N=11 0.20.7 3.0 5.0 2" ASPHALT 6" AGGREGATE BASE COURSE FILL - SANDY SILT (ML), with sand, reddish brown, medium stiff, micaasphalt encountered SILT (ML), with coarse sand, reddish brown, stiff, residuum Boring Terminated at 5 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-15 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-16 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 811 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 5.0 feetCave in depth measured at 5.0 feet WATER LEVEL OBSERVATIONS 809808.5 800.5 797 794 2-1-9N=10 1-2-1 N=3 1-0-1 N=1 1-2-2 N=4 4-6-10N=16 0.20.6 8.5 12.0 15.0 3" ASPHALT 4" AGGREGATE BASE COURSE FILL - CONSTRUCTION DEBRIS , white, very soft to stiff wood debris SILT (ML), with sand, dark brown and gray, medium stiff, residuum SANDY SILT (ML), gray, brown and white, very stiff, residuum Boring Terminated at 15 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-16 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-17 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 809 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 8.8 feetCave in depth measured at 8.8 feet WATER LEVEL OBSERVATIONS 809808 805 801 794 6-6-5N=11 2-2-6 N=8 6-7-12 N=19 5-6-8 N=14 5-5-9N=14 0.21.1 4.0 8.0 15.0 3" ASPHALT 11" AGGREGATE BASE COURSE FILL - SANDY SILT , grayish brown and brown, sftiff, black/solid construction debris & wooddebris at 1.5 feet SANDY SILT (ML), brown, stiff to very stiff, residuum SANDY SILT (ML), gray, brown and white, stiff, residuum Boring Terminated at 15 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-17 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-18 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 809 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 15 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 9.2 feetCave in depth measured at 9.2 feet WATER LEVEL OBSERVATIONS 805804 802 799 797.5 795 1-2-1N=3 5-2-1 N=3 2-2-2 N=4 4-5-9 N=14 0.21.0 3.0 6.0 7.5 10.0 3" ASPHALT 9" AGGREGATE BASE COURSE FILL - SANDY SILT (ML), brown, soft FILL - CONSTRUCTION DEBRIS , white, soft, small glass fragment wood debris no recovery SANDY SILT (ML), brown, stiff, residuum Boring Terminated at 10 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-18 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-19 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 805 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 10 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 6.3 feetCave in depth measured at 6.3 feet WATER LEVEL OBSERVATIONS 812 807 1-1-1N=2 1-1-2 N=3 0.1 5.0 TOPSOIL, approximately 0.1 inches FILL - SANDY SILT (ML), reddish brown, soft Boring Terminated at 5 Feet Hammer Type: AutomaticStratification lines are approximate. In-situ, the transition may be gradual. GR A P H I C L O G TH I S B O R I N G L O G I S N O T V A L I D I F S E P A R A T E D F R O M O R I G I N A L R E P O R T . G E O S M A R T L O G - N O W E L L 7 1 1 5 5 0 4 0 - D A V I D S O N D E P O T . G P J T E R R A C O N 2 0 1 5 . G D T 6 / 1 7 / 1 6 301 Depot Street Davidson, NC SITE: Page 1 of 1 Advancement Method:Hollow Stem Auger Abandonment Method:Borings backfilled with soil cuttings upon completion. , Notes: Project No.: 71155040 Drill Rig: CME-75 Boring Started: 9/9/2015 BORING LOG NO. B-19 CLIENT: Miller-Valentine Residential Development LLC Davidson Depot LLC Driller: J. Turnage Boring Completed: 9/9/2015 Exhibit:B-20 See Exhibit B-1 for description of fieldprocedures See Appendix C for description of laboratoryprocedures and additional data (if any). See Appendix D for explanation of symbols and abbreviations.Elevation based on plans provided by client. PROJECT: Davidson Depot Surface Elev.: 812 (Ft.) ELEVATION (Ft.)SA M P L E T Y P E WA T E R L E V E L OB S E R V A T I O N S DE P T H ( F t . ) 5 FI E L D T E S T RE S U L T S DEPTH LOCATION See Exhibit A-2 Cave in depth measured at 1.5 feetCave in depth measured at 1.5 feet WATER LEVEL OBSERVATIONS