Loading...
HomeMy WebLinkAbout10040-Almont Shipping-Pier33-IR-20190925DWM Brownfields Inspection Report Submitted By: spwatson_ncdenr Submitted Time: 10/18/2019 5:07 PM I. Inspection Information Date & Time: 09/25/2019 10:53 AM Brownfields Staff: David Peacock, Sam Watson Location: Inspection Type: Complaint Other Personnel: Lat: 34.24596, Long:-77.95117, r hParhti �Lri�or hr"+9 Jr F a Oa kda le Cemetery P rincG - RaMkrn $1 ...Wilmington us-17.BR" i�"',',- - - - IVille 7 New Hanover County, State of North Carolina DOT, Esri, HER--- Powered by Esri Brownfields Inspection Report: Almont Shipping - New, 10040-06-065 09/25/2019 10:53 AM II. Project Information Number: 10040-06-065 Name: Almont Shipping - New Address: Between Cowan And Hanover Streets City: Wilmington County: New Hanover III. Environmental Current Use of Property: Mixed Use Structures on Property: New Structures Violation: No Summary: Pier 33 development in progress, building under construction. Two stories currently being constructed, including what appears to be commercial on the ground floor and residential on the second, which is consistent with the approved uses of the BFA. Vapor Mitigation Systems: Not Observed Vapor Mitigation Violation: No Summary: N/A Use of Surface Water or Groundwater: Not Observed Water Use Violation: No Summary: N/A Exposed Soils: Observed Exposed Soils Violation: No Summary: Site under construction. No staining, odors, or other indicators were observed or encountered to indicate any concerns at the site. Page 2 of 8 Brownfields Inspection Report: Almont Shipping - New, 10040-06-065 09/25/2019 10:53 AM Use of Basements: Not Observed Basement Violation: Summary: N/A Storage of Chemicals: Not Observed Chemical Violation: Summary: N/A Groundwater Monitoring Wells: Not Observed Monitoring Well Violation: Condition: Summary: N/A Current Exposure to Public/Public Risk: N/A Page 3 of 8 Brownfields Inspection Report: Almont Shipping - New, 10040-06-065 09/25/2019 10:53 AM IV. Inspector Comments Site visit originated from report on 9/19/2019 of "asbestos wrapped" pipes being discovered and removed during utility installation activities. Pipes had been stored near the excavation area (the pipes have subsequently been removed from the site and disposed of in accordance with the approved revised EMP). Excavation had been filled in. Subsequent information and data indicated that only 2 of the 17 pipes were wrapped in asbestos. No remnant ACM was seen on -site. V. PHOTOGRAPHS Photo 1: General view of construction Page 4 of 8 Brownfields Inspection Report: Almont Shipping - New, 10040-06-065 09/25/2019 10:53 AM Photo 2: Pipe Storage Area Photo 3: N/A Page 5 of 8 Brownfields Inspection Report: Almont Shipping - New, 10040-06-065 09/25/2019 10:53 AM :]L Photo 4: Area of excavation, pipes were temporarily stored in the area just to the right and outside of the picture area. Page 6 of 8 Brownfields Inspection Report: Almont Shipping - New, 10040-06-065 09/25/2019 10:53 AM Photo 5: From North looking South Photo 6: Looking South from North side Page 7 of 8 Brownfields Inspection Report: Almont Shipping - New, 10040-06-065 09/25/2019 10:53 AM - � I Photo 7: Looking south (zoomed) Page 8 of 8