Loading...
HomeMy WebLinkAbout18050_CENCO_L_20170830hart hickman SMARTER ENVIRONMENTAL SOLUTIONS August 30, 2017 North Carolina Brownfields Program North Carolina Department of Environmental Quality Division of Waste Management 1646 Mail Service Center Raleigh, North Carolina 27699-1646 Attn: Ms. Sarah Hardison Young Subject: Response to Request for Information and Additional Assessment Cenco, Inc. Property 609 Melynda Road Charlotte, Mecklenburg County, North Carolina Brownfields Project No. 18041-14-092 H&H Job No.: BOA-002 Dear Sarah: On behalf of Bank of America, N.A. as Agent for Cenco, Inc. (BofA) and DTJT Properties, LLC (DTJT), Hart & Hickman, PC (H&H) is pleased to provide this response letter to your referenced request dated July 18, 2017. H&H's responses to questions 1 (a) through 1 (f) and 2 (a) are provided below. Mid -Atlantic Engineering & Environmental Solutions (Mid -Atlantic) will provide responses to questions 1 (g) and 2 (b) through 2 (f) under separate cover. Your questions are repeated below in italics (not in their entirety) with our responses in bold to follow. Our response to the additional assessment and laboratory analytical portions of the request letter will be provided in a Brownfields Work Plan following your review of this correspondence, the letter prepared by Mid -Atlantic, and upon issuance of a Letter of Eligibility to DTJT. 1) Property Re -Use a) Have the production wells on the Brownfields Property been abandoned? — Currently there are two water supply wells located on the Brownfields Property. One well is 2923 South Tryon Street, Suite 100 3334 Hillsborough Street Charlotte, NC 28203 Raleigh, NC 27607 www.harthickman.com 704.586.0007 main 919.847.4241 main Ms. Sarah Hardison Young August 30, 2017 Page 2 located on parcel No. 057-123-02 and was likely a former residential supply well and one well is located on parcel No. 057-121-02 and was used to supply a boiler unit (the "boiler room located to the east of the operational area"). Both water supply wells are inactive but have not been abandoned. b) Please clarify if wells are located on this parcel, specifically, the private well No. 21 shown on the Receptor Survey Map included in the Brownfields Receptor Survey. — Parcel No. 057-123-02 is part of the Brownfields Property and contains the apparent former residential water supply well described above and identified as No. 21 in the survey completed by Mid -Atlantic in June 2017. c) What is the planned use, if any, of the following SWMUs and structures? i) Remaining concrete pad associated with former SWMU No. 3 (truck wash rack) — Metal recycling dumpster storage. ii) Abandoned trough extending from SWMUNo. 16 (truck wash area) to SWMUNo. S (sewer line) associated with SWMU No. 7 — Boat trailer storage. iii) Concrete wastewater trough associated with SWMU No. 8 — Will not be used. iv) Existing sanitary sewer line associated with SWMU No. 9 — The sewer line currently in -use at the Brownfields Property is provided on the attached figure. Above -ground cleanout lines are not present. v) Collection sump associated with SWMUNo. 12 - Will not be used. vi) Wastewater treatment building associated with SWMU No. 13 — Dry goods storage. vii) Treatment plant/sludge drying bed collection area associated with SWMU No. 14 - Will not be used. viii) Solids/sludge drying beds associated with SWMUNo. 15 - Will not be used. ix) The drain and trench system associated with SWMU No. 16 (truck wash area) has not been closed. 1) Will this system be used or closed? — Will not be used. 2) Has FSI or the PD conducted any operations other than storage in the truck hart ` hickman S:\AAA-MasterProjects\Bank of America, N.A. (BOA)\US Trust, Bank of America Private Wealth Management\BOA-002 CENCO Brownfields Activities\BrOwnfields\Brownfields Response Letter (08.30.17).doc SMARTER ENVIRONMENTAL SOLUTIONS Ms. Sarah Hardison Young August 30, 2017 Page 3 wash area (SWMU No. 16)? — Tire repair. 3) What materials or substances are stored in the truck wash area? — Tires and rims. x) The mobile trailer. — Will be removed. xi) The shed. — Was removed earlier this year and is no longer present. xii) The storage building, scale house, and former boiler building and boiler room described as being to the east of the operational area. — The storage building in the photograph is actually the former wastewater treatment building (SWMU No. 13) as discussed in vi) above. The former boiler building will also be utilized for dry good storage. The boiler room located east of the operation building will be removed and the adjacent supply well abandoned. xiii) Please clarify if the wastes, media, and containers stored and utilized on the property were removed by the time the PD and/or its affiliate operated on the property. - Yes, all items were removed by the previous tenant prior to vacating the Brownfields Property. d) Is a figure available at this time that shows cut and fill locations? — No, only limited surficial grading will be conducted. e) Are there plans to pave, repair, or re -gravel this parking lot? — Additional gravel will be added to those areas where needed. Is the pond on parcel No. 057-122-17 accessible to the public and are people utilizing the pond for recreational purposes? — The pond is not surrounded by fencing; however, the northern portion of the pond is located on an off -site property not owned or operated by Cenco, Inc. and not part of the Brownfields Property. As of August 3, 2017, no indications of recreational usage of the pond were observed. 2 FSIOperational Overview a) The report states that 10 of the ASTs on the property are scheduled for removal from the site. Has this occurred and what is the schedule? Are there any USTs remaining on the property? — The ASTs have not been removed and have not been scheduled for removal hart ` hickman S:\AAA-MasterProjects\Bank of America, N.A. (BOA)\US Trust, Bank of America Private Wealth Management\BOA-002 CENCO Brownfields Activities\BrOwnfields\Brownfields Response Letter (08.30.17).doc SMARTER ENVIRONMENTAL SOLUTIONS Ms. Sarah Hardison Young August 30, 2017 Page 4 as of this date. An Environmental Management Plan will be prepared and submitted for approval prior to conducting the removal activities. No USTs are remaining on the Brownfields Property. If you have any questions or comments regarding this response letter, please contact us at (704) 586-0007. We look forward to continuing to work with you towards the completion of a Brownfields Agreement for this site. Sincerely, Hart & Hickman, PC John D. Reuscher, P.G., RSM Project Manager Enclosure S:\AAA-MasterProjects\Bank of America, N.A. (BOA)\US Trust, Bank of America Private Wealth Management\BOA-002 CENCO Brownfields Acfivities\Bmo fields\Brownfields Response Letter (08.30.17).doc hart hickman SMARTER ENVIRONMENTAL SOLUTION;