Loading...
HomeMy WebLinkAbout20086 Chadbourn Mill VIMP Approval 201809131 Schmithorst, William L From:Schmithorst, William L Sent:Thursday, September 13, 2018 1:26 PM To:Ralph McGee Cc:czawtocki@harthickman.com; Jay Levell Subject:RE: [External] Chadbourn Mill - Vapor Intrusion Mitigation Plan Ralph,  The DEQ has reviewed the revised Vapor Intrusion Mitigation Plan dated August 24, 2018. The Plan is approved for  construction with no additional comments.    Contact me if you have any questions.      Bill Schmithorst, P.G.    Project Manager     Division of Waste Management – Brownfields  NC Department of Environmental Quality    (919) 707‐8159 ‐ Direct Line & Fax  william.schmithorst@ncdenr.gov    217 W. Jones Street     1646 Mail Service Center  Raleigh, NC  27699‐1646        **********************************************************************************    Email correspondence to and from this address is subject to the North Carolina Public Records Law and     may be disclosed to third parties unless the content is exempt by statute or other regulation.          From: Ralph McGee [mailto:RMcGee@harthickman.com]   Sent: Friday, August 24, 2018 10:12 AM  To: Schmithorst, William L <William.Schmithorst@ncdenr.gov>  Cc: czawtocki@harthickman.com; Jay Levell <jay@whitepointpartners.com>  Subject: RE: [External] Chadbourn Mill ‐ Vapor Intrusion Mitigation Plan    2 CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to  Report Spam.  Bill,    Please see the attached VIMP for the Chadbourn Mill redevelopment which has been further revised to address the  comments below.    One item of note associated with the 4th bullet.  I was mistaken during our recent conversations associated with the slab  in the area of the mill building elevator shaft.  After speaking with the GC, the slab in the area of the existing elevator  shaft will be removed for installation of a new elevator.  Water proofing and vapor barriers will be installed beneath the  slab at each new elevator shaft wall and beneath the new elevator slab.  We have included this information in the text of  VIMP.    Please confirm that you have received this email (VIMP size ~15MB) and please let us know if we have approval to  proceed with construction and installation of the VIMS.    Thank you,    Ralph    Ralph McGee, PG, Senior Project Geologist Hart & Hickman, PC 2923 S Tryon Street, Suite 100 ꞏ Charlotte, NC 28203 Direct: 704-887-4621 ꞏ Mobile: 704-840-4775 www.harthickman.com      From: Schmithorst, William L <William.Schmithorst@ncdenr.gov>   Sent: Tuesday, August 21, 2018 9:22 AM  To: Ralph McGee <RMcGee@harthickman.com>  Cc: Christie Zawtocki <CZawtocki@harthickman.com>; Jay Levell <jay@whitepointpartners.com>  Subject: RE: [External] Chadbourn Mill ‐ Vapor Intrusion Mitigation Plan    Ralph,  The NCDEQ has reviewed the revised Vapor Mitigation Plan and is providing the following comments.       Section 5.1: Leak checking prior to collection of the sub‐slab soil gas samples should include directing purged soil  gas to a tedlar bag (or similar). It’s not clear in the proposed language that the helium detector will not be  directly connected to the sampling train (only acceptable if approved by the manufacturer of the helium  detector or a backflow preventer is used).    Section 5.1: Sub‐slab soil gas sample locations are to include three (3) samples from the Power House Building  and at a minimum from the sample locations noted with blue circles on the attached screen cap of VM2  attached as a PDF.    Section 5.3: At least two indoor air sampling events must be conducted prior to DEQ making the determination  that no additional sampling is warranted for the Mill Building (with the second event taking place approximately  6‐months after). This is due to the presence of chlorinated solvents, including TCE, in the sub‐slab soil gas, that  some features (such as the elevator shafts and sumps) may not be vapor‐proofed or influenced by the proposed  VIMS (also addressed in comment below), and the fact that this proposed VIMS system is a retro‐fitted passive  system.   Drawing V100 Spec. L.1 states “the exterior below grade walls of the elevator shafts and any sumps shall be  water and vapor‐proofed.” It is our understanding based on previous conversations that because these are  existing features, it’s not possible to address vapor‐proofing. If that is accurate, additional indoor air samples (in  addition to the proposed indoor air samples) shall be collected as close to these features as possible to  3 document that these features are not acting as conduits, creating a completed vapor pathway between the sub‐ slab and indoor air.    Drawing VM1, Detail No. 7 shows a vapor sampling port that will extend beyond the exterior foundation of the  building before elbowing to the surface. We have a concern that this point may become damaged (either during  construction activities to complete the building after its installation or in the future) and that leak checking at  the surface may not reveal a leak/break present between the exterior of the foundation and the surface (see red  text notation on screen cap of detail no. 7 below). Provide a response addressing this concern, if requested we  can provide an example or two how other engineers have elected to address this concern for your information.           Please provide responses to the comments above and revise the plan accordingly.      Bill Schmithorst, P.G.    Project Manager     Division of Waste Management – Brownfields  NC Department of Environmental Quality    (919) 707‐8159 ‐ Direct Line & Fax  william.schmithorst@ncdenr.gov    217 W. Jones Street     1646 Mail Service Center  Raleigh, NC  27699‐1646      4   **********************************************************************************    Email correspondence to and from this address is subject to the North Carolina Public Records Law and     may be disclosed to third parties unless the content is exempt by statute or other regulation.                From: Ralph McGee [mailto:RMcGee@harthickman.com]   Sent: Thursday, August 9, 2018 5:36 PM  To: Schmithorst, William L <William.Schmithorst@ncdenr.gov>  Cc: czawtocki@harthickman.com; Jay Levell <jay@whitepointpartners.com>  Subject: RE: [External] Chadbourn Mill ‐ Vapor Intrusion Mitigation Plan    CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to  Report Spam.  Bill,    Please find a copy of the Chadbourn Mill VIMP which has been revised to address DEQ comments.  Please review and let  us know if you questions or require additional information.    Thanks,  Ralph    Ralph McGee, PG, Senior Project Geologist Hart & Hickman, PC 2923 S Tryon Street, Suite 100 ꞏ Charlotte, NC 28203 Direct: 704-887-4621 ꞏ Mobile: 704-840-4775 www.harthickman.com      From: Schmithorst, William L <William.Schmithorst@ncdenr.gov>   Sent: Thursday, August 2, 2018 9:27 AM  To: Ralph McGee <RMcGee@harthickman.com>  Cc: Christie Zawtocki <CZawtocki@harthickman.com>; Jay Levell <jay@whitepointpartners.com>  Subject: RE: [External] Chadbourn Mill ‐ Vapor Intrusion Mitigation Plan    Ralph,  The NC DEQ has reviewed the Chadbourn Mill Vapor Intrusion Mitigation Plan July 18, 2018 and comments are provided  in the attached document.    Please submit a final plan to the NC DEQ Brownfields Program and contact me if you have any questions.    Regards,      Bill Schmithorst, P.G.    Project Manager     Division of Waste Management – Brownfields  5 NC Department of Environmental Quality    (919) 707‐8159 ‐ Direct Line & Fax  william.schmithorst@ncdenr.gov    217 W. Jones Street     1646 Mail Service Center  Raleigh, NC  27699‐1646    **********************************************************************************    Email correspondence to and from this address is subject to the North Carolina Public Records Law and     may be disclosed to third parties unless the content is exempt by statute or other regulation.          From: Ralph McGee [mailto:RMcGee@harthickman.com]   Sent: Wednesday, July 18, 2018 3:55 PM  To: Schmithorst, William L <William.Schmithorst@ncdenr.gov>  Cc: czawtocki@harthickman.com; Jay Levell <jay@whitepointpartners.com>  Subject: [External] Chadbourn Mill ‐ Vapor Intrusion Mitigation Plan    CAUTION: External email. Do not click links or open attachments unless verified. Send all suspicious email as an attachment to  Report Spam.  Bill,    Please find a copy of the Vapor Intrusion Mitigation Plan (VIMP) for the Chadbourn Mill redevelopment attached.  The  VIMP includes treatment for the small boiler building, new construction surrounding the boiler building, and the ground  floor level of the original mill building.    As indicated in earlier correspondence, the redeveloping team is ready to start construction and would like to use the  attached VIMP to install the system(s) as soon as possible.  At your earliest convenience, please review and let us know  if you have questions or need additional information.    We appreciate your understanding and expedited review of the VIMP.    Many thanks!  Ralph    Ralph McGee, PG, Senior Project Geologist Hart & Hickman, PC 2923 S Tryon Street, Suite 100 ꞏ Charlotte, NC 28203 Direct: 704-887-4621 ꞏ Mobile: 704-840-4775 www.harthickman.com