Loading...
HomeMy WebLinkAbout22074_Gathing Motor_EMP 20190425Former Gathings Motor Company Charlotte, North Carolina Environmental Management Plan CONTENTS Completed EMP Template Form TABLES Table 1a Historic Soil Data Table 1b Historic Soil Data Table 1c Historic Soil Data Table 2 Historic Soil-Vapor Data Table 3a Historic Groundwater Data Table 3b Historic Groundwater Data Table 3c Historic Groundwater Data Table 3d Historic Groundwater Data Table 4 Summary of Soil Analytical Results (Brownfields Assessment) Table 5 Soil-Gas Analytical Results (2019) Table 6 Summary of Detected Constituents in Groundwater (2019) Table 7 Summary of Volatile Organic Compound (VOC) Analytical Results (Beneficial Reuse Assessment) Table 8 Summary of Composite Soil Sample and Leachability Analytical Results (Beneficial Reuse Assessment) FIGURES Figure 1 NCBP Diagram for Temporary Containment of Imported or Potentially Impacted Soil Figure 2 Historic Soil Data Figure 3 Historic Proposed Soil-Vapor Data Figure 4 Historic Groundwater Data Figure 5 Soil Sample Locations (2019) Figure 6 Soil-Gas Sample Locations (2019) Figure 7 Groundwater Sample Locations and Elevations (2019) Figure 8 Sampling Grid Figure 9 Sampling Grid on Cut/Fill Plan APPENDICES Appendix A Overall Site Plan + Development Summary Appendix B Demolition Plans Appendix C Grading Plans Appendix D Cut/Fill Analysis Appendix E Construction Schedule 1 EMP Version 2, June 2018 NORTH CAROLINA BROWNFIELDS PROGRAM ENVIRONMENTAL MANAGEMENT PLAN This form is to be used to prepare an Environmental Management Plan (EMP) for projects in the North Carolina Brownfields Program at the direction of a Brownfields project manager. The EMP is a typical requirement of a Brownfields Agreement (BFA). Its purpose is to clarify actions to be taken during the demolition and construction at Brownfields properties in an effort to avoid delays in the event of the discovery of new contamination sources or other environmental conditions.The EMP provides a means to document redevelopment plans and environmental data for each applicable environmental medium to inform regulatory-compliant decision-making at the site.As much detail as possible should be included in the EMP, including contingency planning for unknowns.Consult your project manager if you have questions. Prospective Developers and/or their consultants must complete and submit this form and all pertinent attachments, see checklist below,to their Brownfields project manager prior to any earthmoving or other development-related activities that have the potential to disturb soil at the Brownfields Property, including demolition.For the resultant EMP to be valid for use, it must be completed, reviewed by the program, signed by all parties working on the project, and approved by the Brownfields project manager.Failure to comply with the requirements of the EMP could jeopardize project eligibility, or in the event of a completed agreement, be cause for a reopener So that the EMP provides value in protecting brownfields eligibility and public health,the preparer shall ensure that the following steps have been completed prior to submitting the EMP for review.Any EMP prepared without completing these steps is premature. ☒Site sampling and assessment that meets Brownfields’objectives is complete and has been reviewed and approved by the Brownfields Project Manager. ☒Specific redevelopment plans, even if conceptual,have been developed for the project, submitted and reviewed by the Brownfields Project Manager. 2 EMP Version 2, June 2018 Please submit,along with the completed EMP form, the following attachments, as relevant and applicable to the proposed redevelopment: ☒A set of redevelopment plans, including architectural/engineering plans, if available; if not conceptual plans may suffice if updated when detailed plans are drafted. ☒A figure overlaying redevelopment plans on a map of the extent of contamination for each media. ☒Site grading plans that include a cut and fill analysis. ☐A figure showing the proposed location and depth of impacted soil that would remain on site after construction grading. ☐Any necessary permits for redevelopment (i.e. demolition, etc.). ☒A detailed construction schedule that includes timing and phases of construction. ☒Tabulated data summaries for each impacted media (i.e. soil, groundwater, soil gas, etc.)applicable to the proposed redevelopment. ☒Figures with the sampling locations and contamination extents for each impacted media applicable to the proposed redevelopment. ☐A full final grade sampling and analysis plan, if the redevelopment plan is final. ☐If known, information about each proposed potential borrow soil source, such as aerial photos,historic site maps, historic Sanborn maps, a site history,necessary for brownfields approval. ☐Information and, analytical data if required, for quarries, or other borrow sources, detailing the type of material proposed for importation to the Brownfields Property. ☐A work plan for the sampling and analysis of soil to be brought onto the Brownfields Property.Refer to Issue Resolution 15 in Brownfields Program Guidelines. ☒A map of the Brownfields Property showing the location of soils proposed for export and sampling data from those areas. ☐If a Vapor Mitigation System is required by the Brownfields Program,the Vapor Intrusion Mitigation System (VIMS)plan will be signed and sealed by a NC Professional Engineer.The VIMS Plan may also be submitted under separate cover. 3 EMP Version 2, June 2018 GENERAL INFORMATION Date:4/25/2019 Revision Date (if applicable):Click or tap to enter a date. Brownfields Assigned Project Name:Gathings Motor Company Brownfields Project Number:22074-18-060 Brownfields Property Address:1100 –1200 South Tryon Street,Charlotte, Mecklenburg County, North Carolina Brownfields Property Area (acres):Approximately 4.9 Acres Is Brownfields Property Subject to RCRA Permit?.......................☐Yes ☒No If yes enter Permit No.:Click or tap here to enter text. Is Brownfields Property Subject to a Solid Waste Permit….……..☐Yes ☒No If yes, enter Permit No.:Click or tap here to enter text. COMMUNICATIONS A copy of this EMP shall be distributed to all the parties below as well as any contractors or site workers that may be exposed to site vapors, soil, groundwater, and/or surface water. Additionally, a copy of the EMP shall be maintained at the Brownfields Property during redevelopment activities.NOTE, THE EMP DOES NOT TAKE THE PLACE OF A SITE-SPECIFIC HEALTH AND SAFETY PLAN. Prospective Developer (PD):Tryon Investors, LLC Contact Person:Mr. Jason Fish Phone Numbers: Office:704.338.3212 Mobile:704.502.5556 Email:jfish@spectrumcos.com Contractor for PD:McGuireWoods, LLP Contact Person:David A. Franchina Phone Numbers: Office:704.343.2297 Mobile:Click or tap here to enter text. Email:dfranchina@mcguirewoods.com Environmental Consultant:Wood Environment & Infrastructure Solutions, Inc. Contact Person:Rob Foster Phone Numbers: Office:704.357.5530 Mobile:704.641.1141 Email:rob.foster@woodplc.com Brownfields Program Project Manager:Carolyn Minnich Phone Numbers: Office:704.661.0330 Mobile:704.661.0330 Email:Carolyn.minnich@ncdenr.gov 4 EMP Version 2, June 2018 Other DEQ Program Contacts (if applicable,i.e.,UST Section,Inactive Hazardous Site Branch, Hazardous Waste, Solid Waste): UST Section, Division of Waste Management, NCDEQ Mooresville Regional Office, Mooresville, North Carolina The following NC UST Release Incidents are associated with the properties: Incident #40680 Gathings Motor Company, NCDEQ issued NFA on March 15, 2017. Incident #40460 Top Gas & Oil, release from gasoline and diesel storage tanks remains in “Open Status”. NOTIFICATIONS TO THE BROWNFIELDS PROGRAM Written advance Notification Times to Brownfields Project Manager:Check each box to accept minimum advance notice periods (in calendar days) for each type of onsite task: On‐site assessment or remedial activities:……………………………………….……10 days Prior ☒ Construction or grading start:……………………………………….……………………….10 days Prior ☒ Discovery of stained soil,odors,USTs,buried drums or waste,landfill,or other signs of previously unknown contamination:……………………………….…………………………………….Within 48 hours ☒ Implementation of emergency actions (e.g.dewatering,flood or soil erosion control measures in area of contamination,ventilation of work zones):…………….……….………Within 48 hours ☒ Installation of mitigationsystems:………………………….………………….………..10 days Prior ☒ Other notifications as required by local, state or federal agencies toimplement redevelopment activities: (as applicable):……………………….…………………………………………..…Within 30 days ☒ REDEVELOPMENT PLANS 1)Type of Redevelopment (check all that apply): ☐Residential ☐Recreational ☐Institutional ☐Commercial ☒Office ☒Retail ☐Industrial ☒Other specify: Redevelopment plans include demolition of the existing structures and pavement and construction of two office buildings and a parking deck.A hotel may be included in the redevelopment plans. 2)Check the following activities that will be conducted prior to commencing earth‐moving activities at the site: ☒Review of historic maps (Sanborn Maps, facility maps) ☐Conducting geophysical surveys to evaluate the location of suspect UST, fuel lines, utility lines,etc. 5 EMP Version 2, June 2018 ☐Interviews with employees/former employees/facility managers/neighbors 3)Summary of Redevelopment Plans (MANDATORY:attach detailed plans or conceptual plans, ifdetailed plans are not available.EMP review without such information would be premature): Provide brief summary of redevelopment plans,including demolition,removal of building slabs/pavement, grading plans and planned construction of new structures: The property, now referenced as the Gathings Motor Company Brownfields Property, consists of six tax parcels encompassing approximately 4.9 acres is presently occupied by an office building (1100 South Tryon Street) and two small brick structures to the south. The existing structures include a 4-story office building constructed in 1988 (63,818 square feet), single story service garage constructed in 1946 (1,320 square feet) and a small single-story retail building constructed in 1960 (252 square feet). These three buildings will be demolished including foundations. The land will be redeveloped with mixed use in the following expected manner: Two 11-story office buildings will be constructed facing West Carson Boulevard.The first floor of the office buildings will include retail tenant space. A parking deck will be built on the southwestern portion of the property bounded by South Tryon, West Catherine and Winnifred Streets. A hotel may also be constructed above the parking deck. The ground level perimeter of the parking deck will include retail tenant space. 4)Do plans include demolition of structure(s)?: ☒Yes ☐No ☐Unknown ☒If yes, please check here to confirm that demolition will be conducted in accordance with applicable legal requirements, including without limitation those related to lead and asbestos abatement that are administered by the Health Hazards Control Unit within the Division of Public Health of the North Carolina Department of Health and Human Services.If available, please provide a copy of your demolition permit. 5)Are sediment and erosion control measures required by federal, state, or local regulations? ☒Yes ☐No ☐Unknown ☒If yes, please check here to confirm that demolition will be conducted in accordance with applicable legal requirements. If soil disturbance is necessary to install sediment and erosion control measures, they may not begin until this EMP is approved. 6)Which category of risk‐based screening level is used or is anticipated to be specified in the Brownfields Agreement?Note: If children frequent the property, residential screening levels shall be cited in the Brownfields Agreement for comparison purposes. ☐Residential ☒Non‐Residential or Industrial/Commercial 7)Schedule for Redevelopment (attach construction schedule): a)Construction start date:4/30/2019 b)Anticipated duration (specify activities during each phase): 6 EMP Version 2, June 2018 Site work, including “stripping”,grading and construction of sediment basins in the northern and southwestern corners of the property, is anticipated to begin in mid to late April 2019 and be completed in December 2019,(with landscape/hardscape work completing in February 2021). PD estimates initiation of foundation construction for the first planned buildings in June 2019. Demolition of the existing facilities is expected to be initiated in August 2019 and be completed by September 2019. c)Additional phases planned?☐Yes ☐No If yes,specify the start date and/or activities if known: Start Date:Click or tap to enter a date. Planned Activity: A hotel may be constructed at the property, but the schedule is to be determined. Start Date:Click or tap to enter a date. Planned Activity: Click or tap here to enter text. Start Date:Click or tap to enter a date. Planned Activity: Click or tap here to enter text. d)Provide the planned date of occupancy for new buildings:12/31/2020 CONTAMINATED MEDIA 1)Contaminated Media on the Brownfields Property Part 1.Soil:……………………………………….…………….☒Yes ☐No ☐Suspected Part 2.Groundwater:.……………………….……..…….☒Yes ☐No ☐Suspected Part 3.Surface Water:.……………...……..……………☐Yes ☒No ☐Suspected Part 4.Sediment:.……………...……..……………………☐Yes ☒No ☐Suspected Part 5.Soil Vapor:…..…………...……..………………….☒Yes ☐No ☐Suspected Part 6.Sub‐Slab Soil Vapor:……...……..……………..☒Yes ☐No ☐Suspected Part 7.Indoor Air:...……..………………………………….☐Yes ☒No ☐Suspected 2)For the Area of Proposed Redevelopment on the Brownfields Property, attach tabulated data summaries for each impacted media and figure(s) with sample locations. 7 EMP Version 2, June 2018 PART 1. Soil –Please fill out the information below, using detailed site plans, if available, or estimate using known areas of contaminated soil and a conceptual redevelopment plan. Provide a figure overlaying new construction onto figure showing contaminated soil and groundwater locations. 1)Known or suspected contaminants in soil (list general groups of contaminants): Between 2006 and 2016, multiple phases of soil assessment were completed at the site. Soil analytical tables and figures depicting the results are included with this EMP. In summary, VOCs: 1,2-Dichlorobenzene, 1,4-Dichlorobenzene, Naphthalene were identified at concentrations exceeding either the Protection of Groundwater (PoG) or Health Based Residential PSRGs. SVOCs:Benzo(a)pyrene and 2-Methylnaphthalene were identified at concentrations that exceeded the PoG PSRGs. RCRA Metals:Total arsenic was identified at concentrations that exceeded the Residential Health Based PSRG.Total Chromium (III)was identified at concentrations that exceeded the PoG,Health Based Residential and Industrial/Commercial PSRGs.Chromium (VI) was identified at concentrations that exceeded the Health Based Residential PSRG.The chromium (III and VI)and arsenic is likely representative of naturally-occurring or anthropogenic arsenic and chromium in soil. Other VOCs and SVOCs were identified at concentrations that did not exceed an applicable PSRGs. 2)Depth of known or suspected contaminants (feet): 1 to 20 feet below ground surface. 3)Area of soil disturbed by redevelopment (square feet): PD anticipates that nearly the entire 4.9-acre area of the site will be disturbed by redevelopment. 4)Depths of soil to be excavated (feet): Wood understands that the pavement and possibly sub-grade pavement base material will be removed during the “stripping” operations that will precede the mass grading.The depth of soil to be excavated across the property to achieve the proposed grade elevation will range from 0.5 to 5.0 feet. In addition, review of the grading plan (Appendix C)indicate that construction of the “deep” foundation system will involve removal of soil and weathered bedrock during drilling of “shafts”to depths ranging from 50 to 75 feet below grade. 5)Estimated volume of soil (cubic yards) to be excavated (attach grading plan): According to the cut/fill analysis, about 6,600 cubic yards of soil will be excavated across the property to achieve the proposed grade elevation.In addition, approximately 7,300 cubic yards of soil will be generated by the drilling of piers for the foundations of the proposed structures. The sum of these estimated quantities equals approximately 13,900 cubic yards. Partially weathered rock (PWR) as defined for engineering purposes, as residual material with standard penetration resistance values in excess of 100 blows per foot was encountered during Wood’s 8 EMP Version 2, June 2018 geotechnical exploration (2018) between depths of 43 and 68 feet below existing grade at the subject properties. 6)Estimated volume of excavated soil (cubic yards) anticipated to be impacted bycontaminants: Approximately 10 to 15 percent (660 to 1,000 cubic yards) of the soil to be excavated across the property to achieve the proposed grade elevation is anticipated to be affected by contaminants. Of the approximate 7,300 cubic yards to be generated by the drilling of shafts for the foundations of the proposed structures, no volume estimate is available at this time, but will be determined. 7)Estimated volume of contaminated soil expected to be disposed of offsite,if applicable: Some volume of the 13,900 cubic yards described above will be used as fill soil at the subject property.PDAffected soil will be placed beneath impervious surfaces such as concrete structures or clean fill soil.The remaining soil (either excavated or generated during foundation drilling) may be transported to another brownfields property for beneficial reuse following receipt of approval from the Brownfields Program.Based on analytical data obtained during the Beneficial Reuse Soil Assessment, soil that meets the Beneficial Fill Rule may be relocated to non- brownfields properties following receipt of approval from the Brownfields Program. A limited volume of soil may be disposed of at a permitted facility with the approval of the Brownfields Program. Part 1.A. MANAGING ONSITE SOIL If soil is anticipated to be excavated fromthe Brownfield Property,relocated on the Brownfields Property, or otherwise disturbed during site grading or other redevelopment activities,please provide a grading plan that clearly illustrates areas of cut and fill (approximate areas & volumes are acceptable, if only preliminary data available). 1)HAZARDOUS WASTE DETERMINATION: a)Does the soil contain a LISTED WASTE as defined inthe North Carolina Hazardous Waste Section under 40 CFR Part 261.31‐261.35?.......................................☐Yes ☒No ☐If yes,explain why below,including the level of knowledge regarding processes generating the waste (include pertinent analytical results as needed). Click or tap here to enter text. ☐If yes,do the soils exceed the “Contained‐Out”levels in Attachment 1 of the North Carolina Contained‐In Policy?.................................................☐Yes ☐No b)NOTE:IF SOIL MEETS THE DEFINITION OF A LISTED HAZARDOUS WASTE AND EXCEEDS THE CONTAINED‐OUT LEVELS IN ATTACHMENT 1 TO THE NORTH CAROLINA CONTAINED‐IN POLICYTHE SOIL MAY NOT BE RE‐USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITHDEQ HAZARDOUS WASTE SECTION RULES AND 9 EMP Version 2, June 2018 REGULATIONS. c)Does the soil contain a CHARACTERISTIC WASTE?....................................☐Yes ☒No ☐If yes,mark reason(s)why below (and include pertinent analytical results). ☐Ignitability Click or tap here to enter text. ☐Corrosivity Click or tap here to enter text. ☐Reactivity Click or tap here to enter text. ☐Toxicity Click or tap here to enter text. ☐TCLP results Click or tap here to enter text. ☐Rule of 20 results (20 times total analytical results for an individual hazardous constituent on TCLP list cannot, by test method, exceed regulatory TCLP standard) Click or tap here to enter text. ☒If no,explain rationale: Soil analytical data did not indicate detections capable of exceeding toxicity characteristic leaching procedure (TCLP) criteria using the Rule of 20.Select soil samples were analyzed for by the TCLP method for metals. No concentrations were identified that exceeded the appropriate regulatory levels. d)NOTE:IF SOIL MEETS THE DEFINITION OF A CHARACTERISTIC HAZARDOUS WASTE, THE SOIL MAYNOT BE RE‐USED ON SITE AND MUST BE DISPOSED OF IN ACCORDANCE WITH DEQ HAZARDOUSWASTE SECTION RULES AND REGULATIONS. 2)Screening criteria by which soil disposition decisions will be made (e.g., left in place, cappedin place with low permeability barrier, removed to onsite location and capped, removedoffsite): ☐Preliminary Health‐Based Residential SRGs ☒Preliminary Health‐Based Industrial/Commercial SRGs ☒Division of Waste Management Risk Calculator (For Brownfields Properties Only) ☐Site‐specific risk‐based cleanup level.Please provide details of methods used for determination/explanation. Click or tap here to enter text. Additional comments: Click or tap here to enter text. 3)If known impacted soil is proposed to be reused within the Brownfields Property Boundary, please check the measures that will be utilized to ensure safe placement and documentation of same. Please attach a proposed location diagram/site map. ☒Provide documentation of analytical report(s) to Brownfields Project Manager 10 EMP Version 2, June 2018 ☒Provide documentation of final location, thickness and depth of relocated soil on site map to Brownfields Project Manager once known ☐Geotextile to mark depth of fill material. Provide description of material: Click or tap here to enter text. ☒Manage soil under impervious cap ☒or clean fill ☒ ☒Describe cap or fill: Structures and paved areas (i.e., roads, sidewalks, parking areas, etc.) and/or 2 feet of clean fill. ☒Confer with NC BF Project Manager if Brownfield Plat must be revised (or re‐recorded if actions are Post‐Recordation). ☒GPS the location and provide site map with final location. ☐Other. Please provide a description of the measure: 4)Please describe the following action(s) to be taken during and following excavation and management of site soils: Management of fugitive dust from site ☒Yes, describe the method will include: Large areas of affected soil are not expected to be encountered or disturbed during redevelopment activities based upon soil analytical data and the preliminary grading plan. The grading contractor will consider conditions such as wind speed, wind direction and moisture content of soil during soil grading and stockpiling activities to minimize dust generation. If conditions are favorable to generation of chemically-affected dust, the grading contractor will use typical construction measures involving a water truck spray as necessary to address visible dust. However, because the constituents of concern are primarily organic VOCs and SVOCs that typically vaporize rather than posing a dust problem, PD does not propose any additional dust management measures. ☐No,explain rationale: Click or tap here to enter text. Field Screening of site soil ☒Yes, describe the field screening method, frequency of field screening, person conducting field screening: Wood’s Beneficial Reuse Soil Assessment Report (dated April 3, 2019) summarized the field screening/sampling and analytical methods for a large portion of the subject property. The portion of the property not assessed includes a large portion of the existing paved parking lot in the northwestern part of the property and the area occupied by the existing office building. The majority of the paved parking area lies at an elevation that will require fill soil placement, rather than soil export. Wood recommends that soil beneath the existing office building be assessed following demolition of the building later Click or tap here to enter text. 11 EMP Version 2, June 2018 in August/September 2019 to evaluate alternatives for soil export in this area. Furthermore, during mass grading activities, such as excavation of the sediment basins, soil to be disturbed or excavated at the Site will be monitored by the on-site contractor via human sensory observations, including for staining, odors, debris, or other indications of contaminants. If indications of affected soil are detected, then the on-site contractor will be instructed to contact Wood personnel for further evaluation. During drilling of the piers for foundation construction, soil samples should be collected by an environmental professional or environmental technician for the purpose of field screening. One soil sample will be collected from the drill “cuttings” at a five-foot depth interval between the existing grade and the termination depth of the drilled pier. The soil sample will be collected manually using a new pair of nitrile gloves and “split” by the environmental professional or technician.A representative portion of one-half of the sample will be placed directly in VOC sample containers and a representative portion of the remaining half will be placed in a re-sealable plastic bag to be screened in the field using an Organic Vapor Analyzer (OVA) equipped with a Flame Ionization Detector (FID) with a charcoal filter.The environmental professional or environmental technician will screen the headspace vapors in each bag using the instrument to evaluate VOCs versus naturally-occurring methane gas. The purpose of the screening is to assist with segregation of the soil and to select a depth interval to collect a “discrete” soil sample for analysis of VOCs.Samples that exhibit a field screening FID reading (methane excluded) exceeding 10 parts per million (ppm)will be considered for laboratory testing. To select up to one “discrete” sample per drilled pier that will be retained for analysis of VOCs,the results of the field screening will be recorded by field personnel.The soil sample representing the depth interval from each drilled pier that exhibits the highest FID reading will be selected as the one “discrete” sample per drilled pier to be retained for laboratory analysis for VOCs using EPA Method 8260. ☐No, explain rationale: Click or tap here to enter text. Soil Sample Collection ☒Yes, describe the sampling method (e.g.,in‐situ grab,composite,stockpile,etc.): Soil sampling methods relative to VOCs are described above (Item 4, Field Screening of Soil). Soil sampling methods relative to SVOCs, metals and TPH are described below (additional details regarding stockpiled soil). ☐No, explain rationale: Click or tap here to enter text. If soil samples are collected for analysis,please check the applicable chemical analytes: 12 EMP Version 2, June 2018 ☒Volatile organic compounds (VOCs) by EPA Method 8260 ☒Semi‐volatile organic compounds (SVOCs) by EPA Method 8270 ☒Metals RCRA List (8)(arsenic, barium, cadmium, chromium,mercury,lead, selenium and silver):Specify Analytical Method Number(s): Click or tap here to enter text. ☐Pesticides:Specify Analytical Method Number(s): Click or tap here to enter text. ☐PCBs:Specify Analytical Method Number(s): Click or tap here to enter text. ☒Other Constituents &Respective Analytical Method(s)(i.e. Hexavalent Chromium, Herbicides, etc.):Specify Analytical Method Number(s): Total Petroleum Hydrocarbons (TPH), Gasoline and Diesel Range Organics (Method 5030/3550/8015). Selected samples may be additionally analyzed for hexavalent chromium (EPA Method 7199) to evaluate alternatives for export. ☒Check to confirm that stockpiling of known or suspected impacted soils will be conducted in accordance with Figure 1 of this EMP. Stockpile methodology should provide erosion control,prohibiting contact between surface water/precipitation and contaminated soil, and preventing contaminated runoff.Explain any variances or provide additional details as needed: ☒Final grade sampling of exposed native soil (i.e.,soil that will not be under buildings or permanent hardscape).Select chemical analyses for final grade samples with check boxes below (Check all thatapply): ☒Volatile organic compounds (VOCs) by EPA Method 8260 ☒Semi‐volatile organic compounds (SVOCs) by EPA Method 8270 ☒Metals RCRA List (8)(arsenic, barium, cadmium, chromium,mercury,lead,selenium and silver):Specify Analytical Method Number(s):Click or tap here to enter text. ☐Pesticides: Specify Analytical Method Number(s):Click or tap here to enter text. The drill cuttings generated during foundation construction (see Field Screening of site soil (above)) will be segregated and stockpiled at the subject property according to the results of the field screening described above.Samples that exhibit a field screening FID reading (methane excluded) exceeding 10 parts per million (ppm) will be stockpiled separately from those that did not exhibit readings exceeding 10 ppm.One composite samples of soil will be collected for every approximate 1,000 cubic yards of stockpiled soil. The composite soil samples will be analyzed for SVOCs and RCRA metals.Each composite sample will also be analyzed for Total Petroleum Hydrocarbons (TPH), Gasoline and Diesel Range Organics, in the event that it would become necessary to dispose of the soil stockpile at a landfarm permitted to receive petroleum-affected soil. 13 EMP Version 2, June 2018 ☐PCBs:Specify Analytical Method Number(s):Click or tap here to enter text. ☐Other Constituents &Respective Analytical Method(s)(i.e. HexavalentChromium, Herbicides, etc.):Click or tap here to enter text. Please provide a scope of work for final grade sampling, including a diagram of soil sampling locations,number of samples to be collected, and brief sampling methodology. Samples should be collected from 0-2 ft below ground surface, with the exception of VOCs which should be taken from 1-2 ft below ground surface.Alternatively, a work plan for final grade sampling may be submitted under separate cover. Following completion of the soil disturbance activities planned for redevelopment (i.e. after grading and utility construction), an environmental professional will be contracted by the PD to assess the Site for areas that are not covered with building foundations, sidewalks, asphalt or concrete parking and/or driveways or other similar impervious areas. If such areas exist, a final grade sampling plan will be prepared and submitted to DEQ for approval. If no such areas exist, documentation will be provided to the DEQ Brownfields Project Manager. ☐If final grade sampling was NOT selected please explain rationale: Click or tap here to enter text. Part 1.B. IMPORTED FILL SOIL NO SOIL MAY BE BROUGHT ONTO THE BROWNFIELDS PROPERTY WITHOUT PRIOR APPROVAL FROM THE BROWNFIELDS PROGRAM.According to the Brownfields IR 15, “Documenting imported soil (by sampling,analysis, and reporting in accordance with review and written approval in advance by the Brownfields Program), will safeguard the liability protections provided by the brownfields agreement and is in the best interest of the prospective developer/property owner.” Requirements for importing fill: 1)Will fill soil be imported to the site?................................................☐Yes ☒No ☐Unknown 2)If yes, what is the estimated volume of fill soil to be imported? Click or tap here to enter text. 3)If yes, what is the anticipated depth that fill soil will be placed at the property?(If a range of depths, please list the range.) Click or tap here to enter text. 4)Provide the source of fill, including:location, site history, nearby environmental concerns, 14 EMP Version 2, June 2018 etc.Attach aerial photos, maps, historic Sanborn maps and a borrow source site history: Click or tap here to enter text. 5)PRIOR TO ITS PLACEMENT AT THE BROWNFIELDS PROPERTY,provide a plan to analyze fill soil to demonstrate that it meets acceptable standards applicable to the site and can be approved for use atthe Brownfields property. Review of a current analysis of cut/fill for the subject project indicate that importing fill soil will not be needed during redevelopment.In the event it becomes necessary to import fill soil, the PD will contact the DEQ Brownfields personnel prior to importing soil to the Site and the procedures outlined in Items #6 and #7 below will be implemented. 6)Please check the applicable chemical analytes for fill soil samples. (Check all that apply): ☒Volatile organic compounds (VOCs) by EPA Method 8260 ☒Semi‐volatile organic compounds (SVOCs) by EPA Method 8270 ☒Metals RCRA List (8)(arsenic, barium, cadmium, chromium, mercury,lead,selenium and silver):Specify Analytical Method Number(s):EPA 6020/7471 ☐Pesticides: Specify Analytical Method Number(s):Click or tap here to enter text. ☐PCBs:Specify Analytical Method Number(s):Click or tap here to enter text. ☐Other Constituents &Respective Analytical Method(s)(i.e. HexavalentChromium, Herbicides, etc.):Click or tap here to enter text. 7)The scope of work for import fill sampling may be provided below or in a Work Plan submitted separately for DEQ review and approval.Attach specific location maps for in-situ borrow sites. If using a quarry, provide information on the type of material to be brought onto the Brownfields Property. If the PD plans to import fill material (gravel or other materials) from the Vulcan Materials Company quarry located near Pineville, NC or from the Martin Marietta quarry locate on Beatties Ford Road in Charlotte, NC, no samples of the virgin import material will be collected as adequate analytical data is available in NCDEQ Brownfields database to demonstrate material from these facilities is suitable for use as structural fill at a Brownfields property. If fill soil is obtained from an off-site property that is not a known permitted quarry, a sampling plan will be developed and submitted for DEQ review. DEQ approval of the sampling plan and analytical results will be obtained prior to transporting import soil to the site. The specific sampling rate will be outlined in the aforementioned sampling plan. However, if the proposed borrow source has not been previously developed (i.e. virgin land), soil samples will be collected for the laboratory analysis indicated above at a general rate of one per 500 to 1,000 cubic yards.If the borrow source property has been previously developed, soil samples will be collected for 15 EMP Version 2, June 2018 laboratory analysis indicated above at a general rate of one per 400 cubic yards. Fill soil will be considered suitable for use at the site if it does not contain compound concentrations above DEQ IHSB PSRGs for Residential Use or typical metals concentrations which are consistent with background levels identified at the Site. Part 1.C. EXPORTED SOIL NO SOIL MAY LEAVE THE BROWNFIELDS PROPERTY WITHOUT APPROVAL FROM THE BROWNFIELDS PROGRAM. FAILURE TO OBTAIN APPROVAL MAY VIOLATE A BROWNFIELDS AGREEMENT CAUSING A REOPENER OR JEOPARDIZING ELIGIBILITY IN THE PROGRAM, ENDANGERING LIABILITY PROTECTIONS AND MAKING SAID ACTION POSSIBLY SUBJECT TO ENFORCEMENT.JUSTIFICATIONS PROVIDED BELOW MUST BE APPROVED BY THE PROGRAM IN WRITING PRIOR TO COMPLETING TRANSPORT ACTIVITIES.Please refer to Brownfields IR 15 for additional details. 1)If export from a Brownfields Property is anticipated, please provide details regarding the proposed export actions.Volume of exported soil,depths,location from which soil will be excavated on site, related sampling results, etc.Provide a site map with locations of export and sampling results included. Due to the volume of soil likely to be generated as drill “cuttings” during installation of the drilled pier foundation, it may be necessary to export soil drill cuttings off-site. The drill cuttings would likely be excavated from within the footprint of the proposed structures at depths ranging from existing grade to about 50 to 70 feet below grade. The volume to be exported is yet to be determined but could be in the range of 7,300 cubic yards. The drill cuttings may be useful as fill at the subject property or another Brownfields property. 2)To what type of facility will the export Brownfields soil be sent? ☐Subtitle D/Municipal Solid Waste Landfill (analytical program to be determined by landfill) ☒Permitted but Unlined Landfill (i.e. LCID, C&D, etc.) Analytical program to be determined by the accepting Landfill; ☒Landfarm or other treatment facility ☒Use as fill at another suitable Brownfields Property –determination thata site is suitable will require,at a minimum,that similar concentrations of the same or similar contaminants already exist at both sites, use of impacted soil willnot increase the potential for risk to human health and the environment at the receiving Brownfields property, and thata record of the acceptance of such soil from the property owner of the receiving site is provided to Brownfields.Please provide additional details below. ☒Use as Beneficial Fill off-site at a non-Brownfields Property -Please provide documentation of approval from the property owner for receipt of fill material.This will also require approval by the DEQ Solid Waste Section.Additional information is provided in IR 15.Please provide additional details below. 16 EMP Version 2, June 2018 3)Additional Details:(if transfer of soil to another property is requested above, please provide details related to the proposed plans). The environmental consultant will contact the DEQ Brownfields program to obtain DEQ Brownfields and DEQ Solid Waste Section approval prior to exporting soil to a non-Brownfield property.Some additional characterization of soil planned for export may be necessary.The Charlotte Douglas International Airport may be willing to accept soil that does not contain contaminants at concentrations that exceed the PoG PSRGs on a case-by-case basis. Part 1.D. MANAGEMENT OF UTILITY TRENCHES ☐Install liner between native impacted soils and base of utility trench before filling with clean fill (Preferred) ☒Last out, first in principle for impacted soils (if soil can safely be reused onsite and is not a hazardous waste), i.e., impacted soils are placed back at approximately the depths they were removed from such that impacted soil is not placed at a greater depth than the original depth from which it was excavated. ☒Evaluate whether necessary to install barriers in conduits to prevent soil vapor transport, and/or degradation of conduit materials due to direct impact with contaminants? ☐If yes,provide specifications on barrier materials: Click or tap here to enter text. ☒If no, include rationale here: Results of the preliminary vapor intrusion assessment (2017)did not identify contaminant concentrations that exceeded the DEQ Non-Residential Soil-Gas Screening Levels (SGSLs). As such, the installation of vapor barriers in utility trenches does not appear to be warranted at this time. In the unlikely event contaminated soil vapors are encountered during redevelopment activities, the area will be evacuated and appropriate safety screening of the vapors will be performed. If results indicate further action is warranted, appropriate engineering controls (such as use of industrial fans) will be implemented. The need for barriers in utility trenches will be further evaluated if noticeable soil vapors are encountered in utility trenches. Other comments regarding managing impacted soil in utility trenches: In the unlikely event contaminated soil and/or vapors are encountered in utility trenches during redevelopment activities, the trench will be evacuated and appropriate safety screening of the soil and/or vapors will be performed to protect workers. If results indicate further action is warranted in response to vapors to protect workers, appropriate engineering controls (such as use of industrial fans) will be implemented. 17 EMP Version 2, June 2018 The contractor and workers will observe soil for potential impacts during utility installation activities. Evidence of affected soil (such as distinct unnatural color or odor, chemical odor, or filled or previously disposed materials of concern (i.e. chemicals, tanks, drums, etc.)). If the above is noted during utility work, the contractor will be instructed to contact the environmental consultant to observe the suspect condition. If the environmental consultant determines the material may be affected, the procedures outlined in Managing On-Site Soil section will be implemented. In addition, the environmental consultant will contact the Brownfields Program Project Manager within two business days to advise that person of the condition. PART 2. GROUNDWATER –Please fill out the information below. 1)What is the depth to groundwater at the Brownfields Property? Recent assessment data (2019)suggests the depth to groundwater at the subject property ranges from approximately 10 to 18 feet below the existing grade. 2)Is groundwater known to be contaminated by ☒onsite ☐offsite ☐both or ☐unknown sources? Describe source(s): Documented release(s) of petroleum at the former service station (Top Gas &Oil) that occupied the northeastern portion of the property near the intersection of W. Carson Boulevard and S. Tryon Street is the source of petroleum-related VOCs and SVOCs. The compounds identified in groundwater at concentrations in 2019 exceeding the NC 2L standards include: benzene,tert- Butyl alcohol (TBA), 1,2-dichloroethane, xylenes, naphthalene,1-methylnaphthalene and total chromium. In 2014,1,2-dibromoethane (EDB)was identified at a concentration that exceeded the NCDEQ’s Gross Contaminant Level (GCL) for that compound. 3)What is the direction of groundwater flow at the Brownfields Property? Wood’s evaluation of the February 25, and March 8, 2019 groundwater elevation measurements suggested that the shallow groundwater flows across the site from the west toward the east. This is not consistent with the topography of the site and surrounding properties. A topographic high or small knoll is shown in the area of the existing office building sloping toward the northwest, west and southeast. If more groundwater elevation data points were available, it is Wood’s opinion that the shallow groundwater flow would be toward the northwest, west and southeast.The shallow groundwater at the subject property is estimated to flow toward the west-northwest. 4)Will groundwater likely be encountered during planned redevelopment activities? ☒Yes ☐No If yes, describe these activities: Wood understands that shafts will drilled using augers for the foundation of the proposed structures.The drilled shafts will extend below the groundwater.However, the concrete or cement will be pumped through the hollow stem of the auger as the auger flights are removed from the borehole. Therefore,groundwater will not be encountered by construction personnel during foundation construction.Furthermore, it will not be necessary to extract groundwater from the drilled shafts. 18 EMP Version 2, June 2018 Regardless of the answer;in the event that contaminated groundwater is encounteredduring redevelopment activities (evenif no is checked above), list activities for contingentmanagement of groundwater (e.g., dewateringof groundwater from excavations orfoundations,containerizing,offsite disposal,discharge to sanitary sewer, NPDES permit, orsampling procedures). Groundwater will not be extracted from the subsurface (i.e. drilled shafts)during foundation construction.Therefore, it will not be necessary to store, treat or discharge groundwater. However, in the unlikely event groundwater extraction is deemed necessary,samples of the groundwater will be collected and analyzed for VOCs and SVOCs. Pending completion of analytical testing, the extracted groundwater will be stored in an on-site vessel. Following receipt of analytical data,a vacuum truck will be mobilized to the property to remove the groundwater from the storage vessel(s) and transport the water to a permitted disposal facility. 5)Are monitoring wells currently present on the Brownfields Property?.................☒Yes ☐No If yes, are any monitoring wells routinely monitored through DEQ or other agencies?..................................................................................................................☐Yes ☒No 6)Please check methods to be utilized in the management of known and previously unidentified wells. ☒Abandonment of site monitoring wells in accordance with all applicable regulations. It is the Brownfields Program’s intent to allow proper abandonment of well(s)as specified in the Brownfields Agreement, except if required for active monitoring through another section of DEQ or the EPA. ☐Location of existing monitoring wells marked ☐Existing monitoring wells protected from disturbance ☒Newly identified monitoring wells will be marked and protected from further disturbance until notification to DEQ Brownfields can be made and approval for abandonment is given. 7)Please provide additional details as needed: Please note, disturbance of existing site monitoring wells without approval by DEQ is not permissible. If monitoring wells are damaged and/or destroyed, DEQ may require that the PD be responsible for replacement of the well. PART 3. SURFACE WATER -Please fill out the information below. 1)Is surface water present at the property?☐Yes ☒No 2)Attach a map showing the location of surface water at the Brownfields Property. 3)Is surface water at the property known to be contaminated?☐Yes ☒No 4)Will workers or the public be in contact with surface water during planned redevelopment Click or tap here to enter text. 19 EMP Version 2, June 2018 activities?☐Yes ☒No 5)In the event that contaminated surface water is encountered during redevelopment activities,or clean surface water enters open excavations,list activities for management of such events (e.g.flooding, contaminated surface water run‐off, stormwater impacts): Click or tap here to enter text. PART 4. SEDIMENT –Please fill out the information below. 1)Are sediment sources present on the property?☐Yes ☒No 2)If yes, is sediment at the property known to be contaminated:☐Yes ☒No 3)Will workers or the public be in contact with sediment during planned redevelopment activities?☐Yes ☒No 4)Attach a map showing location of known contaminated sediment at theproperty. 5)In the event that contaminated sediment is encountered during redevelopment activities,list activities for management of such events (stream bed disturbance): Not applicable due to the absence of natural drainage features at the property. PART 5. SOIL VAPOR –Please fill out the information below. 1)Do concentrations of volatile organic compounds at the Brownfields property exceed thefollowingvapor intrusion screening levels (current version)in the following media: IHSB Residential Screening Levels: Soil Vapor:………..☒Yes ☐No ☐Unknown Groundwater:.….☒Yes ☐No ☐Unknown IHSB Industrial/Commercial Screening Levels: Soil Vapor:………..☐Yes ☒No ☐Unknown Groundwater:…..☒Yes ☐No ☐Unknown 2)Attach a map showing the locations of soil vapor contaminants that exceed site screening levels. 3)If applicable, at what depth(s) is soil vapor known to be contaminated? The 2017 soil-vapor testing performed about six inches beneath the floor slab in the existing office building (1100 S. Tryon Street) identified minor concentrations of contaminants in the soil-vapor. However, none of the identified concentrations exceeded the applicable Non-Residential Soil-Gas Screening Levels (SGSLs). 20 EMP Version 2, June 2018 4)Will workers encounter contaminated soil vapor during planned redevelopment activities? ☐Yes ☒No ☐Unknown 5)In the event that contaminated soil vapor is encountered during redevelopment activities (trenches,manways,basements or other subsurface work,)list activities for management of such contact: In the unlikely event contaminated soil vapors are encountered during future redevelopment activities, the area will be evacuated and appropriate safety screening of the vapors will be performed. If the results indicate further action is warranted, appropriate engineering controls (such as the use of industrial fans) will be implemented. If conditions warrant, the PD will provide trained environmental and safety-conscious professionals to monitor ambient air quality with field instrumentation during the sub-grade excavation work. Conditions that suggest accumulation of vapors in the work zones will be managed by more intensive monitoring, removal of personnel from areas with elevated atmospheric readings, and more aggressive monitoring by industrial hygiene professionals to assure that explosive vapors or concentrations of impact above OSHA permissible exposure limits are not exceeded. Such conditions will be managed with the project Environmental Health and Safety Plan and/or Construction Safety Plan. PART 6. SUB‐SLAB SOIL VAPOR –Please fill out the information below if existing buildings or foundations will be retained in the redevelopment. 1)Are sub‐slab soil vapor data available for the Brownfields Property?☒Yes ☐No ☐Unknown 2)If data indicate that sub‐slab soil vapor concentrations exceed screening levels,attach a map showing the location of these exceedances. 3)At what depth(s) is sub‐slab soil vapor known to be contaminated?☒0‐6 inches ☐Other,please describe: In 2017, minor concentrations of contaminants were identified in the soil-vapor beneath the existing office building, but these did not exceed the applicable Non-Residential SGSLs.When the current tenant of the ground floor of the office building vacates the premises, and prior to the initiation of demolition activities, two additional sub-slab vapor samples will be collected for analysis. 4)Will workers encounter contaminated sub‐slab soil vapor during planned redevelopment activities?☐Yes ☒No ☐Unknown 5)In the event that contaminated soil vapor is encountered during redevelopment activities,list activities for management of such contact No subsurface work is anticipated until the current site is razed and new construction begins. The PD will provide trained environmental and safety-conscious professionals to monitor ambient air quality with field instrumentation during the sub-grade excavation work. Conditions 21 EMP Version 2, June 2018 that suggest accumulation of vapors in the work zones will be managed by more intensive monitoring, removal of personnel from areas with elevated atmospheric readings, and more aggressive monitoring by industrial hygiene professionals to assure that explosive vapors or concentrations of impact above OSHA permissible exposure limits are not exceeded. Such conditions will be managed with the project Environmental Health and Safety Plan and/or Construction Safety Plan. PART 7. INDOOR AIR –Please fill out the information below. 1)Are indoor air data available for the Brownfields Property?☐Yes ☒No ☐Unknown 2)Attach a map showing the location(s)where indoor air contaminants exceed site screening levels. 3)If the structures where indoor air has been documented to exceed risk‐based screening levels will not be demolished as part of redevelopment activities,will workers encounter contaminated indoor air during planned redevelopmentactivities?☐Yes ☒No ☐Unknown 4)In the event that contaminated indoor air is encountered during redevelopment activities,list activities for management of such contact: VAPOR INTRUSION MITIGATION SYSTEM –Please fill out the information below. Is a vapor intrusion mitigation system (VIMS)proposed for this BrownfieldsProperty? ☐Yes ☐No ☒Unknown If yes,☐VIMS Plan Attached or ☒VIMS Plan to be submitted separately If submitted separately provide date: Following completion of the additional sub-slab soil-gas testing (described in Part 6, item 3 (above)),a vapor intrusion mitigation system plan will be developed, if necessary. VIMS Plan shall be signed and sealed by a NC Professional Engineer If no, please provide a brief rationale as to why no vapor mitigation plan is warranted: Click or tap here to enter text. CONTINGENCY PLAN –encountering unknown tanks,drums,or other waste materials In this section please provide actions that will be taken to identify or manage unknown potential new sources of contamination.During redevelopment activities, it is not uncommon that unknown tanks, drums, fuel lines, landfills, orother waste materials are encountered. The existing buildings will be demolished as part of redevelopment. 22 EMP Version 2, June 2018 Notification to DEQ Brownfields Project Manager, UST Section, Fire Department, and/or other officials, as necessary and appropriate, is required when new potential source(s) of contaminationare discovered. These Notification Requirements were outlined on Page 1 of this EMP. Should potentially impacted materials be identified that are inconsistent with known site impacts,the DEQ Brownfields Project Manager will be notified and a sampling plan will be prepared based on the EMP requirements and site-specific factors. Samples will generally be collected to document the location of the potential impacts. Check the following chemical analysis that are to be conducted on newly identified releases: ☒Volatile organic compounds (VOCs) by EPA Method 8260 ☒Semi‐volatile organic compounds (SVOCs) by EPA Method 8270 ☒Metals RCRA List (8)(arsenic, barium, cadmium, chromium,mercury,lead, selenium and silver) Click or tap here to enter text. ☐Pesticides:Specify Analytical Method Number(s): Click or tap here to enter text. ☐PCBs:Specify Analytical Method Number(s): Click or tap here to enter text. ☐Other Constituents & Analytical Method(s)(i.e. Hexavalent Chromium, Herbicides, etc.) Please note, if field observations indicate the need for additional analyses, they should be conducted, even if not listed here. Click or tap here to enter text. Please provide details on the proposed methods of managing the following commonly encountered issues during redevelopment of Brownfields Properties. During construction activities, contractors my encounter unknown subsurface environmental conditions (i.e. tanks, drums, or waste materials) that if encountered, will require proper management. Prior to beginning site work, Wood will attend a pre-construction kick-off meeting with the PD and the redevelopment contractors to discuss the DEQ-approved EMP and various scenarios when it would be appropriate and necessary to notify Wood personnel of the discovery of unknown subsurface features or potentially affected media at the site. In the event such conditions are encountered during site development activities, the environmental actions noted below will be used to direct environmental actions to be taken during these activities and sampling data for potentially affected soil and the disposition of affected soil will be provided to DEQ when the data becomes available. Underground Storage Tanks: In the event a UST or impacts associated with a UST release are discovered at the Site during redevelopment activities (apart from the known UST releases associated with Gathings Motor 23 EMP Version 2, June 2018 Company (Inc. # 40680) and Top Gas & Oil (Inc. # 40460)), the UST and/or UST-related impacts will be addressed through the Brownfields Program.The Brownfields Program will assert jurisdiction over known UST release incidents mentioned above. If a UST is encountered and does not require removal for geotechnical or construction purposes, it will be abandoned in-place and construction will proceed.Unknown or “orphan”USTs may be encountered beneath the existing office building during demolition.Where appropriate, the bottom may be penetrated before backfilling to prevent fluid accumulation. If the UST is found to contain residual fluids, the fluids will be removed and sampled for VOCs, SVOCs, and RCRA metals and transported off-site for disposal at a suitable facility based on the analytical results. Affected soil will be managed in accordance with the Managing On-Site Soil section outlined in this EMP. Sub-Grade Feature/Pit: Because auto repair businesses formerly occupied the subject property, there is a possibility of encountering a sub-grade feature or pit. If the feature or pit does not require removal for geotechnical or construction purposes,it will be filled with soil or suitable fill and construction will proceed. Where appropriate, the bottom may be penetrated before backfilling to prevent fluid accumulation. If the pit is found to contain waste, the waste may be set aside in a secure area and will be sampled for waste disposal purposes for TCLP VOCs, TCLP SVOCs, and TCLP metals and disposed off-site at a permitted facility or the waste will be managed in accordance with the Managing On-Site Soil section outlined in this EMP, whichever is most applicable based on the type of waste present. If the pit must be removed and the observed waste characteristics indicate the concrete may be potentially contaminated, the concrete will be sampled and analyzed by methods specified by the disposal facility. Buried Waste Material: If excavation into buried waste or grossly affected soil occurs, the contractor is instructed to stop work in that location and notify the environmental consultant. The environmental consultant will review the materials and collect samples if warranted. In this event, confirmation sampling will be conducted at representative locations in the base and the sidewalls of the excavation after the waste or grossly-affected soil is removed. The confirmation samples will be analyzed for VOCs, SVOCs, and the RCRA metals. Areas of suspected affected soil that remain at the site after excavation is complete above the DEQ IHSB Industrial/Commercial PSRGs will be managed pursuant to this plan and incorporated into the Brownfields plat. Re-Use of Impacted Soils On-Site: Please refer to the description outlined in the Managing On-Site Soil section of this EMP. If unknown, impacted soil is identified on-site, management on-site can be considered after the project team provides the necessary information, outlined in Part 1.A. Item 11, for Brownfields Project Manager approval prior to final placement on-site. If other potential contingency plans are pertinent, please provide other details or scenarios as needed below: 24 EMP Version 2, June 2018 Click or tap here to enter text. POST‐REDEVELOPMENT REPORTING ☒Check this box to acknowledge that a Redevelopment Summary Report will be required for the project.If the project duration is longer than one year, an annual update is required and will be due by January 31 of each year, or 30 days after each one-year anniversary of the effective date of this EMP (as agreed upon with the Project Manager). These reports will be required for as long as physical redevelopment of the Brownfields Property continues, except that the final Redevelopment Summary Report will be submitted within 90 days after completion of redevelopment.Based on the estimated construction schedule, the first Redevelopment Summary Report is anticipated to be submitted on 1/22/2021 The Redevelopment Summary Report shall include environment-related activities since the last report, with a summary and drawings, that describes: 1.actions taken on the Brownfields Property; 2.soil grading and cut and fill actions; 3.methodology(ies) employed for field screening, sampling and laboratory analysis of environmental media; 4.stockpiling, containerizing, decontaminating, treating, handling, laboratory analysis and ultimate disposition of any soil, groundwater or other materials suspected or confirmed to be contaminated with regulated substances; and 5.removal of any contaminated soil, water or other contaminated materials (for example, concrete, demolition debris) from the Brownfields Property (copies of all legally required manifests shall be included). ☒Check box to acknowledge consent to provide a NC licensed P.G. or P.E. sealed,Redevelopment Summary Report in compliance with the site’s BrownfieldsAgreement. APPROVAL SIGNATURES Brownfields Project Number: 22074-18-060 Brownfields Project Name: Gathings Mot or Compa ny Prospective Developer: Tryon Investors, LLC Printed Name/Tit le/Company: Jason Fish, VP of Development Consultant: Wood Environment & Infrastructure Solutions, Inc. Printed Name/Title/Company: Robert C. Foster, LG, Associate Geologist ri ~ anager: Carolyn Minnich 25 EMP Vers ion 2, June 2018 Date 4/25/2019 Date 4/25/2019 it Date lick or tap to enter a date. 26 EMP Version 2, June 2018 Former Gathings Motor Company Charlotte, North Carolina Environmental Management Plan TABLES Constituent T-1 Bottom T-1 South T-1 East T-1 West BD-4 BD-5 S-1 S-2 S-3 S-4 S-5 Depth Sampled (feet bgs)13 7-8 7 7 6 6 11 6 6 6 6 Date Sampled 1/10/07 1/10/07 1/10/07 1/11/07 1/17/07 1/17/07 9/30/16 9/30/16 9/30/16 9/30/16 9/30/16 Acetone <0.002 < 0.002 0.028 <0.0017 <0.0016 <0.0016 0.020 J 0.0099 J 0.031 J 0.020 J 0.0099 J 25 12,000 140,000 Aliphatics, C5-C8 <2.59 <2.09 <2.15 <2.25 <2.74 <2.84 <25 <22 <24 <21 <25 --110 460 Aliphatics, C9-C18 5.49 2.47 J 2.65 J 4.09 J <2.74 <2.84 <59 <54 <58 <57 <56 19 20 93 Aliphatics, C19-C36 <4.84 <4.99 <4.58 <4.24 <2.74 <2.84 <34 <32 <34 <36 <31 16,000 47,000 700,000 Aromatics, C9-C22 <7.74 <7.98 <7.33 <6.79 <2.74 <2.84 <38 <35 <37 0.53 J <37 2.4 22 130 Sec-Butylbenzene 0.0011 J <0.0011 0.0046 J <0.00096 <0.00092 <0.00092 <0.0077 <0.0062 <0.0063 <0.0069 <0.0062 4.1 1,600 23,000 Tert-Butylbenzene <0.0011 <0.0011 0.0014 J <0.00096 <0.00092 <0.00092 <0.0077 <0.0062 <0.0063 <0.0069 <0.0062 3.1 1,600 23,000 Ethylbenzene <0.0012 0.0170 J <0.001 <0.0011 <0.001 <0.001 <0.0077 <0.0062 <0.0063 <0.0069 <0.0062 13 6.10 27 Fluorene <0.016 0.0429 <0.015 <0.016 <0.015 <0.015 <0.44 <0.42 <0.44 <0.47 <0.41 110 480 6,000 Prepared By:AJF 2/5/19 Notes:Checked By:RPD 2/5/19 Concentrations shown in milligrams per kilograms (mg/kg) J = J-flag, estimated value identified at a concentration above method detection limit but below reporting limit. Bold font indicates concentration exceeded Protection of Groundwater (PoG) PSRG. Bold font and Shaded cell indicates that concentration exceeded Residential PSRG. Bold font, shaded cell, and underline indicates concentration exceeded Industrial/Commercial PSRG. NCDEQ Protection of Groundwater (PoG) PSRGs = North Carolina Department of Environmental Quality, Protection of Groundwater Preliminary Soil Remediation Goals (dated February 2018). NCDEQ Residential Health-Based PSRGs = North Carolina Department of Environmental Quality, Residential Health-Based Preliminary Soil Remediation Goals (dated February 2018). NCDEQ Industrial/Commercial Health-Based PSRGs = North Carolina Department of Environmental Quality, Industrial/Commercial Health-Based Preliminary Soil Remediation Goals (dated February 2018). -- = No standard (PSRG) established. PoG PSRGs Residential Health Based PSRGs Industrial/ Commercial Health Based PSRGs Table 1a: Historic Soil Data Former Gathings Motor Company Charlotte, North Carolina 1100-1200 South Tryon Street Brownfields Project #: 22074-18-060 Constituent T-3 Bottom T-3 North T-3 South T-3 East T-3 West Depth Sampled (feet bgs)15 8 8 8 8 8-10 13-15 18-20 Date Sampled 1/24/07 1/24/07 1/24/07 1/24/07 1/24/07 4/10/07 4/10/07 4/10/07 Sec-butylbenzene <0.0012 0.0016 <0.062 <0.001 0.25 ND ND ND 4.1 1,600 23,000 Chlorobenzene <0.0017 0.0045 <0.094 <0.0015 <0.084 ND ND ND 0.68 58 280 1,2-Dichlorobenzene <0.0011 0.15 2.6 0.0019 <0.052 ND ND ND 0.39 380 2000 1,3-Dichlorobenzene <0.0015 0.024 0.46 <0.0013 <0.073 ND ND ND ------ 1,4-Dichlorobenzene <0.0017 0.078 1.7 0.0031 <0.084 ND ND ND 0.12 2.8 12 Ethylbenzene <0.0013 0.012 <0.069 <0.0011 0.51 ND ND ND 13 6.10 27 Isopropylbenzene <0.00092 0.0028 <0.050 <0.0008 0.21 ND ND ND 2.3 410 2,100 MTBE 0.003 <0.00042 <0.025 <0.0004 <0.022 ND ND ND 0.09 49 220 Naphthalene 0.0032 0.026 1.8 <0.0012 5.7 ND ND ND 0.39 4.1 18 n-propylbenzene <0.0012 0.0072 <0.062 <0.001 0.49 ND ND ND 2.6 780 5,100 Toluene <0.0016 0.0092 <0.087 <0.0014 <0.078 ND ND ND 8.3 990 9,700 1,2,4-Trimethylbenzene 0.0024 0.072 0.39 <0.0014 5.5 ND ND ND 12 63 370 1,3,5-Trimethylbenzene <0.0017 0.024 <0.094 <0.0015 1.2 ND ND ND 11 56 320 Total Xylenes <0.0033 0.099 <0.180 <0.0029 1.7 ND ND ND 9.9 120 530 Acenaphthylene <0.018 <0.017 0.082 <0.017 0.24 ND ND ND 16 720 9,000 Benzo(a)pyrene <0.033 0.056 <0.032 <0.031 <0.310 ND ND ND 0.12 0.11 2.1 Benzo(b)fluoranthene <0.031 0.07 <0.030 <0.029 <0.290 ND ND ND 1.2 1.1 21 Benzo(g,h,i)perylene <0.031 0.061 <0.030 <0.029 <0.290 ND ND ND 15,600 ---- Benzo(k)fluoranthene <0.038 0.038 <0.036 <0.035 <0.350 ND ND ND 12 11 210 Chrysene <0.014 0.062 <0.014 <0.013 <0.130 ND ND ND 36 110 2,100 Fluoranthene <0.014 0.085 0.087 0.033 <0.130 ND ND ND 670 480 6,000 Fluorene <0.018 <0.016 0.098 <0.016 0.22 ND ND ND 110 480 6,000 2-Methylnaphthalene <0.016 0.037 3.7 0.02 10 ND ND ND 3.1 48 600 Phenanthrene <0.018 0.053 0.27 <0.017 0.55 ND ND ND 134 ---- Pyrene <0.020 0.098 0.24 0.06 0.36 ND ND ND 440 360 4,500 Total Chromium 17 45 28 67 19 38 23 6.3 3.8 0.31 6.5 Total Lead 7.4 33 9.8 20 11 15 4.8 6.2 270 400 800 Aliphatics, C5-C8 <2.16 <2.14 2.24 <1.91 <2.5 2.6 <3.2 <2.9 --110 460 Aliphatics, C9-C18 2.3 2.4 62.7 4.52 78.98 ND ND ND 19 20 93 Aliphatics, C19-C36 <4.37 151 755 255 789 470 <45 <47 16,000 47,000 700,000 Aromatics, C9-C22 <6.99 <7.23 117.5 56.6 255 140 <45 <47 2.4 22 130 Notes:Prepared By:AJF 2/5/19 ND = Not detected Checked By:RPD 2/5/19 Concentrations shown in milligrams per kilograms (mg/kg) J = J-flag, value above method detection limit but below reporting limit, value estimated Bold exceeds Protection of Groundwater PSRG Bold and Shaded exceeds Residential PSRG Bold, shaded, and underlined exceeds Industrial/Commercial PSRG NCDEQ Protection of Groundwater PSRGs = North Carolina Department of Environmental Quality, Protection of Groundwater Preliminary Soil Remediation Goals, dated February 2018 NCDEQ Residential Health-Base PSRGs = North Carolina Department of Environmental Quality, Residential Health-Base Preliminary Soil Remediation Goals, dated February 2018 NCDEQ Industrial/Commercial Health-Base PSRGs = North Carolina Department of Environmental Quality, Industrial/Commercial Health-Base Preliminary Soil Remediation Goals, dated February 2018 -- = No standard/PSRG/SGLS (as applicable) established PoG PSRGs Residential Health Based PSRGs Industrial/ Commercial Health Based PSRGs OWS Table 1b: Historic Soil Data Former Gathings Motor Company 1100-1200 South Tryon Street Charlotte, North Carolina Brownfields Project #: 22074-18-060 Constituent SB-1 SB-2 SB-4 SB-5 P1, P2, P3, P4, P5, P6 Depth Sampled (feet bgs)13-15 21-23 5-7 9-10 3-8 TPH, GRO ND 23 ND ND NA TPH, GRO ND ND ND ND NA VOCs NA NA NA NA ND Notes:Prepared By:RPD 2/5/19 ND = Not detected Checked By:AJF 2/5/19 NA = Not Applicable Concentrations shown in milligrams per kilograms (mg/kg) 1100-1200 South Tryon Street Charlotte, North Carolina Brownfields Project #: 22074-18-060 Table 1c: Historic Soil Data Former Gathings Motor Company Constituent SG-1 SG-2 SG-3 SG-4 Sample Date 7/19/17 7/19/17 7/19/17 7/19/17 Acetone 91 160 140 110 2,700,000 Benzene 0.47 0.91 1.0 1.1 1,600 Benzyl Chloride 0.28 J <0.52 <0.52 <0.52 88 Bromodichloromethane <0.67 <0.67 1.3 0.66 J 330 2-Butanone (MEK)3.8 J 5.4 J 3.8 J 6.6 J 440,000 Carbon Disulfide 2.9 J 1.9 J 0.76 J 3.4 61,000 Chloroform 2.1 1.3 4.4 2.1 530 1,3-Dichlorobenzene 1.1 1.8 1.7 1.6 -- 1,4-Dichlorobenzene 2.5 2.1 1.7 1.1 1,100 Dichlorodifluoromethane (Freon 12)660 64 280 64 8,800 Ethanol 130 110 94 52 -- Ethylbenzene 11 20 22 20 4,900 4-Ethyltoluene 6.4 9.6 9.1 9.9 -- Heptane 0.61 1.4 1.7 1.8 35,000 Hexane 0.77 J 1.5 J 1.7 J 1.7 J 61,000 2-Hexanone (MBK)<0.41 0.8 0.79 0.91 2,600 Isopropanol 240 180 150 40 18,000 m&p-Xylene 62 100 110 100 8,800 o-Xylene 16 27 28 27 8,800 Methylene Chloride <3.5 0.6 J <3.5 <3.5 53,000 4-Methyl-2-pentanone (MIBK)0.43 1.7 0.57 0.52 260,000 Naphthalene 4 4.1 4 4.1 260 Propene <6.9 <6.9 <6.9 2.0 J 260,000 Styrene <0.43 0.32 J 0.40 J 0.36 J 88,000 Tetrachloroethylene 0.85 0.49 J 0.57 J 1.6 3,500 Toluene 9.3 17 20 19 440,000 Trichloroethylene 0.46 J 0.93 0.83 0.54 180 Trichlorofluoromethane (Freon 11)1.4 J 1.4 J 1.4 J 1.4 J -- 1,1,2-Trichloro-1,2,2-trifluoroethane (Freon 113)<3.1 <3.1 0.54 J <3.1 440,000 1,2,4-Trimethylbenzene 21 30 32 31 5300 1,3,5-Trimethylbenzene 4.4 6.7 7.6 6.8 5300 Prepared By:AJF 2/5/19 Notes:Checked By:RPD 2/5/19 Concentrations shown in micrograms per meter cubed (µg/m3). J = J-flag, estimated value identified at a concentration above method detection limit but below reporting limit. -- = No standard (SGSL) established. Division of Waste Management (DWM) Non-Residential SGSLs = Division of Waste Management Non-Residential Soil-Gas Screening Levels (dated February 2018) DWM Non- Residential SGSLs Table 2: Historic Soil-Vapor Data Former Gathings Motor Company 1100-1200 South Tryon Street Charlotte, North Carolina Brownfields Project #: 22074-18-060 Constituent MW-Tank 3 MW-OWS Date Sampled 4/18/07 4/18/07 Sec-Butylbenzene 1.3 0.60 70 NSL NSL Tert-Butylbenzene 0.50 <0.50 70 NSL NSL 2-Chlorotoluene 4.4 <0.50 100 NSL NSL Dibromomethane (Methylene bromide)2.4 0.56 5 25 100 1,2-Dichlorobenzene 1.1 <0.50 20 530 2,200 1,3-Dichlorobenzene 0.55 <0.50 200 NSL NSL 1,4-Dichlorobenzene 1.4 <0.50 6 26 110 1,2-Dichloroethane 2.2 1.1 0.4 22 98 Ethylbenzene 2.7 0.99 600 35 150 Isopropylbenzene 1.3 <0.50 70 180 750 p-Isopropyltoluene 2.8 4.5 25 NSL NSL Methyl tert-butyl ether (MTBE)6.9 1.8 20 4,500 20,000 Methylene chloride 0.96 0.52 5 940 4,000 Naphthalene 4.9 1.8 6 35 150 n-Propylbenzene 2.4 <0.50 70 490 2,000 1,2,4-Trimethylbenzene 51 8.3 400 50 210 1,3,5-Trimethylbenzene 10 0.73 40 35 150 Xylenes (total)17.6 9.2 500 77 320 Ethyl Acetate 59 ND 3,000 2,700 1,100 VPH, Aliphatic (C5-C8)59 <30 400 1.7 7.1 VPH, Aliphatic (C9-C18)500 298 700 0.15 0.63 VPH, Aromatic (C9-C22)370 158 200 32 130 Total Chromium 5.2 6 10 NSL NSL Notes:Prepared By/Date:AJF 2/5/19 Concentrations shown in micrograms per liter (µg/L)Checked By/Date:RPD 2/5/19 Bold values exceeded North Carolina 2L Standards GWSLs = NCDEQ Division of Waste Management, Vapor Intrusion Groundwater Screening Levels, dated February 2018. Shaded cell indicates value exceeded Residential GWSLs. Underlined values exceeded Non-Residential GWSLs. NSL = No Standard Listed J = J-flag, estimated value identified at a concentration above method detection limit but below reporting limit. NC 2L Standards = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Groundwater Quality Standards, dated April 2013. IMACs = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Interim Maximum Allowable Concentrations, dated April 2018 Former Gathings Motor Company Table 3a: Historic Groundwater Data Residential GWSLs Non-Residential GWSLs Brownfields Project #: 22074-18-060 Charlotte, North Carolina 1100-1200 South Tryon Street NC 2L Standards/ IMACs Constituent TW-1 TW-2 TW-3 Date Sampled 1/2/07 1/2/07 1/2/07 Chloroform 18 7.9 0.49 J 70 8.1 36 Toluene 0.99 <0.5 <0.5 600 3,800 16,000 Tetrachloroethene <0.5 <0.5 0.31 J 0.7 12 48 Notes:Prepared By:AJF 2/5/19 Concentrations shown in micrograms per liter (µg/L)Checked By:RPD 2/5/19 Bold values exceeded North Carolina 2L Standards GWSLs = NCDEQ Division of Waste Management, Vapor Intrusion Groundwater Screening Levels, dated February 2018. Shaded cell indicates value exceeded Residential GWSLs. Underlined values exceeded Non-Residential GWSLs. NSL = No Standard Listed J = J-flag, estimated value identified at a concentration above method detection limit but below reporting limit. NC 2L Standards = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Groundwater Quality Standards, dated April 2013. IMACs = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Interim Maximum Allowable Concentrations, dated April 2018 1100-1200 South Tryon Street Former Gathings Motor Company Table 3b: Historic Groundwater Data Residential GWSLs Non- Residential GWSLs NC 2L Standard Brownfields Project #: 22074-18-060 Charlotte, North Carolina Constituent TW-1 TW-2 Sample Date 8/20/14 8/20/14 VOCs by SM 6200B 1,2,4-Trimethylbenzene 1,900 3,000 400 50 210 1,2-Dibromoethane <0.50 260 0.02 1.8 7.7 1,2-Dichloroethane <0.50 34 0.4 22 98 1,3,5-Trimethylbenzene 530 760 400 35 150 4-Isopropyltoluene 5.2 11 25 NSL NSL Acetone 110 82 6,000 4,500,000 19,000,000 Benzene 230 2,100 1 16 69 Bromomethane 2.1 2 10 3.5 15 Ethylbenzene 3,900 3,700 600 35 150 Isopropyl Ether <0.50 7.5 70 1,400 5,900 Isopropylbenzene (Cumene)85 270 70 180 750 Methyl Butyl Ketone (2-Hexanone)270 E 180 E 40 1,600 6,900 Methyl Ethyl Ketone (2-Butanone)200 E <5.0 4,000 450,000 1,900,000 Methyl Isobutyl Ketone (MIBK)86 39 100 110,000 470,000 Methyl-tert-Butyl Ether (MTBE)<1.0 11 20 4,500 20,000 Methylene Chloride 2.2 <2.0 5 940 4,000 Naphthalene 830 1,300 6 35 150 n-Butylbenzene 21 51 70 NSL NSL n-Propylbenzene 260 420 70 490 2,000 sec-Butylbenzene 7.8 21 70 NSL NSL Toluene 3,900 19,000 600 3,800 16,000 Xylenes, total 14,000 16,000 500 77 320 SVOCs by EPA 625 1-Methylnaphthalene 44 76 1 NSL NSL 2-Methylnaphthalene 80 160 30 NSL NSL Naphthalene 290 670 6 35 150 Lead by EPA 6010 Total Lead <5 32 15 NSL NSL EPH/VPH by MADEP Aliphatics, C5-C8 6,800 30,000 400 1.7 7.1 Aliphatics, C9-C18 8,200 16,740 700 0.15 0.63 Aromatics, C9-C22 5,190 8,510 200 32 130 Notes:Prepared By:AJF 2/5/19 Concentrations shown in micrograms per liter (µg/L)Checked By:RPD 2/5/19 Bold values exceeded North Carolina 2L Standards GWSLs = NCDEQ Division of Waste Management, Vapor Intrusion Groundwater Screening Levels, dated February 2018. Shaded cell indicates value exceeded Residential GWSLs. Underlined values exceeded Non-Residential GWSLs. NSL = No Standard Listed J = J-flag, estimated value identified at a concentration above method detection limit but below reporting limit. E = Estimated concentration above calibration range NC 2L Standards = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Groundwater Quality Standards, dated April 2013. IMACs = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Interim Maximum Allowable Concentrations, dated April 2018 Residential GWSLs Non- Residential GWSLs Table 3c: Historic Groundwater Data Former Gathings Motor Company 1100-1200 South Tryon Street Charlotte, North Carolina Brownfields Project #: 22074-18-060 NC 2L Standards/ IMACs Notes:Prepared By:AJF 2/5/19 ND = Not detected Checked By:RPD 2/5/19 Constituent Sample Date VOCs by EPA 8260B SVOCs by EPA 8270D TW-3 8/20/14 ND ND Table 3d: Historic Groundwater Data Former Gathings Motor Company 1100-1200 South Tryon Street Charlotte, North Carolina Brownfields Project #: 22074-18-060 Constituent GP-1 (0-2)GP-1 (6-8)GP-2 (4-6)GP-2 (10-12)GP-3 (2-4)GP-3 (10-12)GP-4 (0-2)GP-4 (6-8)GP-5 (2-4)GP-5 (10-12)BG (2-4) BG (10-12)DUP-1 Depth Collected 0-2 6-8 4-6 10-12 2-4 10-12 0-2 6-8 2-4 10-12 2-4 10-12 4-6 Metals (Total)Range Mean Arsenic 1.5 0.58 1.9 0.59 0.33 0.39 1.5 0.43 2.7 0.47 0.95 1.0 1.4 0.68 3.0 5.8 1.0-40*NE Barium 100 21 16 76 44 220 16 23 14 160 11 13 13 3100 47000 580 50-1000 356 Cadmium <0.42 <0.41 <0.46 <0.44 <0.38 0.048 J <0.46 <0.43 <0.42 <0.47 <0.38 <0.41 <0.42 14 200 3 0.01-7.0*NE Chromium 88 13 18 11 26 13 51 10 110 5.7 J 19 22 23 0.31 6.5 3.8 7-300 65 Chromium, Hexavalent 1.2 <0.83 NA NA <0.78 <0.85 NA NA NA NA <0.82 <0.80 NA 0.31 6.5 3.8 NE NE Lead 5.9 9.5 9.8 12 3.6 4.7 9.2 9.9 12 51 6.0 8.8 8.4 400 800 250 2-200*NE Mercury 0.40 <0.032 0.023 J <0.035 <0.031 <0.032 0.087 <0.035 0.022 J <0.036 0.029 J 0.016 J 0.045 2.3 9.7 1.0 0.03-0.52 0.121 Selenium 0.26 J 0.090 J 0.38 J <0.97 <0.85 <0.93 0.29 J <0.95 0.38 J <1.0 <0.84 <0.90 <0.92 78 1200 2.1 <0.1-0.8 0.42 Silver 0.080 J 0.015 J 0.024 J 0.019 J 0.029 J 0.025 J 0.027 J 0.011 J 0.049 J 0.025 J 0.028 J 0.032 J 0.042 J 78 1200 3.4 NE NE Semi-Volatile Organic Compounds (SVOCs) Benzo(a)anthracene <0.23 <0.22 <0.25 0.20 J <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 1.1 21 0.35 Benzo(a)pyrene <0.23 <0.22 <0.25 0.21 J <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 0.11 2.1 0.12 Benzo(b)fluoranthene <0.23 <0.22 <0.25 0.35 <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 1.1 21 1.2 Benzo(g,h,i)perylene <0.23 <0.22 <0.25 0.18 J <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 NE NE 15600 Chrysene <0.23 <0.22 <0.25 0.31 <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 110 2100 36 Fluoranthene <0.23 <0.22 0.15 J 0.78 <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 480 6000 670 Indeno(1,2,3-cd)pyrene <0.23 <0.22 <0.25 0.20 <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 1.1 21 3.9 Phenanthrene <0.23 <0.22 <0.25 0.41 <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 NE NE 134 Pyrene <0.23 <0.22 <0.25 0.57 <0.21 <0.23 <0.25 <0.23 <0.22 <0.25 NA NA <0.22 360 4500 440 Benzene <0.0022 <0.0025 <0.0027 <0.0023 <0.0028 <0.0020 <0.0026 <0.0023 <0.0022 <0.0027 NA NA <0.0022 1.2 5.4 0.01 Tetrachloroethene <0.0022 <0.0025 <0.0027 <0.0023 <0.0028 <0.0020 <0.0026 <0.0023 <0.0022 <0.0027 NA NA <0.0022 17 82 0.0063 Trichloroethene <0.0022 <0.0025 <0.0027 <0.0023 <0.0028 <0.0020 <0.0026 <0.0023 <0.0022 <0.0027 NA NA <0.0022 0.87 4.0 0.021 Notes: 1. Concentrations shown in milligrams per kilograms (mg/kg) relative to the Reporting Limit (RL).Prepared By/Date:RPD 3/7/19 2. Samples collected on February 23, 2019.Checked By/Date:AJF 3/7/19 3. Depths shown in feet below ground surface (bgs). 4. North Carolina Department of Environmental Quality (NCDEQ) Inactive Hazardous Sites Branch (IHSB) Preliminary Soil Remediation Goals (PSRG) dated February 2018. 5. Only detections above laboratory reporting limits and J-flagged results are shown. 6. J = Indicates that compound was detected at a concentration below the Reporting Limit (Lowest Calibration standard). Therefore, result is an estimated concentration. 7. NA- Not Analyzed. 8. NE- Not established. 9. Bold font indicates identified concentration exceeded Residential PSRG. 11. Underlined value indicates concentration exceeded Industrial/Commercial PSRG. 13. DUP-1 collected from GP-2 (4-6) location/depth. (1) Range and mean values for "Background Metals for North Carolina Soils" taken from Elements in North American Soils by Dragun and Chekiri, 2005. *Typical Range of "Native Soil Concentrations of Various Elements" as taken from The Soil Chemistry of Hazardous Materials, Dragun, James, 1988. Table 4: Summary of Soil Analytical Results (Brownfields Assessment) Former Gathings Motor Company Charlotte, North CarolinaWood Project: 6228-18-0495 10. Shaded gray cell indicates concentration exceeded Protection of Groundwater (PoG) PSRG. 12. Bold font and shaded green cell indicates concentration exceeded Industrial/Commercial and Protection of Groundwater (PoG) PSRG, the concentration is below or within the range of "naturally occurring" metals in soil. Not Applicable Regional Background Metals in Soil(1) NCDEQ IHSB Residential Health Based PSRG NCDEQ IHSB Industrial/ Commercial Health Based PSRG NCDEQ IHSB Protection of Groundwater PSRG Volitile Organic Compounds (VOCs) Not Applicable Constituent SG-1 SG-2 SG-3 SG-4 SG-5 SG-6 SG-7 SG-8 Dup-2 Date Collected 2/24/2019 2/24/2019 2/24/2019 2/24/2019 2/24/2019 2/24/2019 2/24/2019 2/24/2019 2/24/2019 Acetone 15 J 14 J 17 J 13 J 29 20 J 21 31 20 2,700,000 Benzene 14 3.8 9.3 1.2 9.3 7.6 10 16 1.9 1,600 1,3-Butadiene 9.8 8.7 8.5 3.4 7.0 <1.1 15 12 <0.44 180 2-Butanone (MEK)5.6 J 4.8 J 6.6 J 4.0 J 6.6 J 22 J 7.4 J 8.9 J 5.3 J 440,000 Chloroform 27 110 13 26 <0.98 <2.4 <0.98 5.4 140 530 Cyclohexane <0.69 <0.69 <0.69 <0.69 <0.69 47 <0.69 <0.69 <0.69 530,000 Dichlorodifluoromethane (Freon 12)2.0 4.4 <0.99 <0.99 <0.99 <2.5 <0.99 <0.99 <0.99 8,800 Ethanol 13 J 8.0 J 7.5 J 12 J 7.7 J <38 7.5 J <15 6.8 J NSL Ethylbenzene 15 0.75 J 9.2 <0.87 13 4.5 10 22 <0.87 4,900 4-Ethyltoluene 9.9 <0.98 4.0 <0.98 9.7 <2.5 8.9 20 <0.98 NSL Heptane 24 3.9 17 <0.82 17 19 16 22 2.4 35,000 Hexane 27 J <1.2 25 J <28 23 J 64 J 27 J 27 J <28 61,000 2-Hexanone (MBK)<0.82 <0.82 5.1 <0.82 <0.82 <2.0 <0.82 <0.82 <0.82 2,600 Isopropanol <20 <20 <20 <20 <20 4.3 J <20 <20 <20 18,000 Methylene Chloride 2.2 J 16 <6.9 <6.9 0.88 J <17 <6.9 1.8 J 18 53,000 4-Methyl-2-pentanone (MIBK)7.6 4.8 8.4 <0.82 6.8 7.3 5.8 6.5 2.8 260,000 m&p-Xylene 51 2.0 30 <1.7 46 14 37 80 1.6 J 8,800 o-Xylene 16 0.76 J 9.3 <0.87 15 7.9 14 27 0.57 J 8,800 Propene <14 <14 85 <14 <14 <34 <14 <14 <14 260,000 Tetrachloroethylene 35 <1.4 24 <1.4 27 110 23 37 <1.4 3,500 Toluene 130 4.6 85 2.2 97 31 75 160 4.6 440,000 Trichlorofluoromethane (Freon 11)3.4 J 1.9 J 1.9 J 3.0 J 1.8 J <11 1.7 J 2.2 J 2.1 J NSL 1,2,4-Trimethylbenzene 8.7 0.9 J 2.8 <0.98 10 <2.5 11 23 <0.98 5,300 1,3,5-Trimethylbenzene 2.8 <0.98 <0.98 <0.98 3.0 <2.5 3.2 6.6 <0.98 5,300 Notes:Prepared By/Date:RPD 3/5/19 1. Concentrations shown in micrograms per meter cubed (µg/m3)Checked By/Date:DRH 3/5/19 2. DWM Non-Residential SGSLs = Division of Waste Management Non-Residential Soil-Gas Screening Levels, dated February 2018 3. NSL = No screening level established 4. J = Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit 5. Samples analyzed for VOCs via EPA Method TO-15 6. Helium used as leak-check and was added to shroud surrounding the sample train prior to collection the sample. Helium was analyzed in the field using a MGD-2002 Multi-Gas leak (di-electric) detector 7. Values shown as less than (<) reference the reporting limits (RLs) 8. Dup-2 collected from SG-2 location Table 5: Soil-Gas Analytical Results (2019) DWM Non-Residential SGSLs Wood Project: 6228-18-0495 Charlotte, North Carolina Former Gathings Motor Company Constituent MW-1 MW-2 MW-3 MW-OWS MW-Tank 3 DUP-3 Trip Blank NC 2L Standards/ IMACs Residential GWSLs Non-Residential GWSLs Benzene <1.0 <1.0 5.5 <1.0 NS <1.0 <1.0 1 16 69 tert-Butyl Alcohol (TBA)<0.50 <0.50 350 <20 NS <20 <20 10 NSL NSL sec-Butylbenzene <1.0 <1.0 2.2 J <1.0 NS <1.0 <1.0 70 NSL NSL Chloroform 23 1.6 J <10 <2.0 NS 1.6 J <2.0 70 8.1 36 1,2-Dichloroethane <1.0 <1.0 1.4 J <1.0 NS <1.0 <1.0 0.4 22 98 Ethylbenzene <1.0 <1.0 150 <1.0 NS <1.0 <1.0 600 35 150 Isopropylbenzene (Cumene)<1.0 <1.0 12 <1.0 NS <1.0 <1.0 70 180 750 p-Isopropyltoluene (p-Cymene)<1.0 <1.0 2.2 J <1.0 NS <1.0 <1.0 25 NSL NSL Methyl tert-Butyl Ether (MTBE)<1.0 <1.0 7.5 <1.0 NS <1.0 <1.0 20 4,500 20,000 Naphthalene <5.0 <5.0 45 <5.0 NS <5.0 <5.0 6 35 150 n-Propylbenzene <1.0 <1.0 30 <1.0 NS <1.0 <1.0 70 490 2,000 Toluene <1.0 <1.0 110 <1.0 NS <1.0 <1.0 600 3,800 16,000 1,2,4-Trimethylbenzene <1.0 <1.0 150 <1.0 NS <1.0 <1.0 400 50 210 1,3,5-Trimethylbenzene <1.0 <1.0 150 <1.0 NS <1.0 <1.0 400 35 150 Xylenes, total <2.0 <2.0 630 <2.0 NS <2.0 <2.0 500 77 320 1-Methylnaphthalene <5.2 <5.2 19 <5.2 NS <5.3 NA 1 NSL NSL 2-Methylnaphthalene <5.2 <5.2 17 <5.2 NS <5.3 NA 30 NSL NSL Naphthalene <5.2 <5.2 33 <5.2 NS <5.3 NA 6 35 150 Arsenic NA <0.4 0.54 NA NS NA NA 10 NSL NSL Barium NA 80 400 NA NS NA NA 700 NSL NSL Cadmium NA <0.50 0.61 NA NS NA NA 2 NSL NSL Chromium NA 3.1 50 NA NS NA NA 10 NSL NSL Lead NA <1.0 0.36 J NA NS NA NA 15 NSL NSL Mercury NA 0.047 J 0.063 J NA NS NA NA 1 0.18 0.75 Selenium NA <5.0 3.8 J NA NS NA NA 20 NSL NSL Notes:Prepared By/Date:RPD 3/5/19 1. Concentrations shown in micrograms per liter (µg/L).Checked By/Date:AJF 3/5/19 2. Samples collected on February 25, 2019. 3. Samples analyzed for VOCs, SVOCS and Metals via EPA Method 8260 and 8270, only detections above laboratory reporting limits are shown. 4. NC 2L Standards = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Groundwater Quality Standards, dated April 2013. 5. GWSLs = NCDEQ Division of Waste Management, Vapor Intrusion Groundwater Screening Levels, dated February 2018. 6. Bold values exceeded NC 2L Standards. 7. Shaded values exceeded Residential GWSLs. 8. Underlined values exceeded Non-Residential GWSLs. 9. NSL = No Standard Listed. 10. DUP-3 collected at MW-2 location. 11. J = Estimated concentration above the adjusted method detection limit and below the adjusted reporting limit. 12. NA = Not Analyzed. 13. NS = Not Sampled, well obstructed at time of sampling. 14. IMACs = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section 0.0202, Interim Maximum Allowable Concentrations, dated April 2018. Charlotte, North Carolina Former Gathings Motor Company Table 6: Summary of Detected Constituents in Groundwater (2019) Metals Semi-Volatile Organic Compounds Volatile Organic Compounds Wood Project: 6228-18-0495 Block ID Block 1 Block 2 Block 3 Block 4 Block 5 Block 6 Block 7 Block 8 Block 9 Block 10 Sample ID 1-3 2-5 3-7 4-7 5-10 6-6 7-10 8-3 9-1 10-6 Sample Depth 0-3.5 0-2.5 0-3.5 0-3.5 0-2.5 0-2.5 0-3.5 0-4.5 0-2.5 0-4 Date Sampled 3/9/2019 3/9/2019 3/9/2019 3/10/2019 3/10/2019 3/10/2019 3/10/2019 3/9/2019 3/9/2019 3/9/2019 Acetone 0.045 J 0.052 J 0.052 J <0.099 0.031 J <0.10 <0.11 0.024 J <0.10 <0.11 12000 140000 25 Benzene <0.0019 <0.0023 <0.0021 <0.0020 <0.0018 <0.0020 <0.0021 <0.0019 <0.0021 <0.0022 1.2 5.4 0.01 Tetrachloroethene <0.0019 <0.0023 <0.0021 <0.0020 <0.0018 <0.0020 <0.0021 <0.0019 <0.0021 <0.0022 17 82 0.0063 Trichloroethene <0.0019 <0.0023 <0.0021 <0.0020 <0.0018 <0.0020 <0.0021 <0.0019 <0.0021 <0.0022 0.87 4 0.021 Notes:Prepared by/Date:RPD 3/21/19 1. Concentrations shown in milligrams per kilogram (mg/kg)Checked by/Date:DRH 3/21/19 2. Depths shown in feet below ground surface (bgs) 3. Constituent concentrations identified above reporting limits shown, see laboratory analytical report for complete list of constituents. 4. NCDEQ = North Carolina Department of Environmental Quality 5. IHSB = Inactive Hazardous Sites Branch 6. PSRG = Preliminary Soil Remediation Goals, dated February 2018 7. J = Indicates that compound was detected at a concentration below the Reporting Limit (Lowest Calibration standard). Therefore, result is an estimated concentration. Brownfields Project No.:22074-18-060 Former Gathings Motor CompanyTable 7: Summary of Volatile Organic Compound (VOC) Analytical Results (Beneficial Reuse Assessment) NCDEQ IHSB Industrial/ Commercial Health Based PSRG NCDEQ IHSB Protection of Groundwater PSRG NCDEQ IHSB Residential Health Based PSRG Charlotte, North Carolina Wood Project No.: 6228-18-0495 Block ID Block 1 Block 2 Block 3 Block 4 Block 5 Block 6 Block 7 Block 8 Block 9 Block 10 Sample ID 1-Comp 2-Comp 3-Comp 4-Comp 5-Comp 6-Comp 7-Comp 8-Comp 9-Comp 10-Comp Sample Depth 0-3.5 0-2.5 0-3.5 0-3.5 0-2.5 0-2.5 0-3.5 0-4.5 0-2.5 0-4 Date Sampled 3/9/2019 3/9/2019 3/9/2019 3/10/2019 3/10/2019 3/10/2019 3/10/2019 3/9/2019 3/9/2019 3/9/2019 Range Mean Acenaphthene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 720 9000 16 Acenaphthylene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 NE NE 41 Anthracene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 3600 45000 1300 Benzo(a)anthracene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 1.1 21 0.35 Benzo(a)pyrene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 0.11 2.1 0.12 Benzo(b)fluoranthene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 1.1 21 1.2 Benzo(g,h,i)perylene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 NE NE 15600 Benzo(k)fluoranthene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 11 210 12 Chrysene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 110 2100 36 Dibenz(a,h)anthracene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 0.11 2.1 0.38 Fluoranthene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 480 6000 670 Fluorene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 480 6000 110 Indeno(1,2,3-cd)pyrene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 1.1 21 3.9 1-Methylnaphthalene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 18 73 0.11 2-Methylnaphthalene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 48 600 3.1 Naphthalene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 4.1 18 0.39 Phenanthrene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 NE NE 134 Pyrene <0.22 <0.24 <0.23 <0.22 <0.22 <0.23 <0.23 <0.21 <0.23 <0.23 360 4500 440 Arsenic 1.6 2.1 2.5 2.9 2.7 1.8 1.9 2.6 1.2 1.6 0.68 3 5.8 1.0-40**NS Barium 190 41 150 75 69 16 12 68 7.4 J 52 3100 47000 580 50-1000 356 Cadmium 0.028 J <0.45 0.11 J 0.041 J 0.039 J <0.41 <0.41 <0.40 <0.42 0.046 J 14 200 3.0 0.01-7.0**NS Chromium 83 78 57 39 35 52 31 28 15 23 0.31 6.5 3.8 7-300 65 Lead 43 17 76 56 55 9.4 12 46 7.5 52 400 800 270 2-200**NS Mercury 0.19 0.18 0.20 0.32 0.17 0.19 0.059 0.16 0.022 J 0.13 2.3 9.7 1.0 0.03-0.52 0.121 Selenium <0.92 <0.98 <0.95 <0.91 <0.89 0.63 J 0.65 J 0.53 J 0.44 J 0.47 J 78 1200 2.1 <0.1-0.8 0.42 Silver 0.084 J 0.044 J 0.11 0.075 J 0.079 J 0.019 J 0.017 J 0.054 J <0.098 0.051 J 78 1200 3.4 NS NS Hexavalent Chromium 1.8 1.9 N/A N/A N/A N/A N/A N/A N/A N/A 0.31 6.5 3.8 NS NS Regulatory Levels1 (mg/L)NC 2L2 (µg/L) Barium 0.77 NA NA NA NA NA NA NA NA NA 100 700 Cadmium 0.002 J NA NA NA NA NA NA NA NA NA 1.0 2.0 Lead 0.0079 J NA NA NA NA NA NA NA NA NA 5.0 15 Notes:Prepared by/Date::RPD 3/21/19 1. Depths shown in feet below ground surface (bgs)Checked by/Date:DRH 3/21/19 2. mg/kg = milligrams per kilogram 3. mg/L = milligrams per liter 4. NCDEQ = North Carolina Department of Environmental Quality 5. IHSB = Inactive Hazardous Sites Branch 6. PSRG = Preliminary Soil Remediation Goals, dated February 2018 7. NA = Not analyzed 8. NE = Not established 9. NS = Not specified 10.Bold font and shaded gray cell indicates concentration exceeded Residential PSRG. These concentrations reflect "naturally occurring" metals in soil. 11.Bold font and shaded orange cell indicates concentration exceeded Residential, Industrial/Commercial and Protection of Groundwater (PoG) PSRGs. These concentrations reflect "naturally occurring" metals in soil. * Range and mean values for "Background Metals for North Carolina Soils" taken from Elements in North American Soils by Dragun and Chekiri, 2005. **Typical Range of "Native Soil Concentrations of Various Elements" as taken from The Soil Chemistry of Hazardous Materials, Dragun, James, 1988. (1) Maximum Concentration of Contaminants for the Toxicity Characteristic (40 CFR 261.24), dated 2006, reported in mg/L. (2) NC 2L Standards = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Groundwater Quality Standards, dated April 2013. Table 8: Summary of Composite Soil Sample and Leachability Analytical Results (Beneficial Reuse Assessment) Not Applicable Regional Background Metals in Soil* Charlotte, North Carolina Semi Volatile Organic Compounds (SVOCs) (mg/kg) NCDEQ IHSB Protection of Groundwater PSRG NCDEQ IHSB Industrial/ Commercial Health Based PSRG NCDEQ IHSB Residential Health Based PSRG Wood Project No.: 6228-18-0495 Not Applicable Brownfields Project No.:22074-18-060 Former Gathings Motor Company Metals (Total) (mg/kg) Toxicity Characteristic Leaching Procedure (TCLP) Metals (mg/L) FIGURES 26 EMP Version 2, June 2018 !!!!!!!!!!NC Center for Geographic Information & Analysis Historic Soil Data Former Gathings Motor Company1100-1200 South Tryon StreetCharlotte, North CarolinaBrownfields Project #: 22074-18-060 PROJECT NO.:FIGURE NO.:6228-18-0495 2Reference: Development Plan from Land Design dated December 21, 2018Document Path: F:\AMEC_Projects\2018\6228-18-0495\MXD\Samples_2 -soil.mxd Prepared By: LMM 1/28/19; Checked by RCF 1/28/19 0 60 120 180Feet ¯ ND= Not detected !Approximate Floor Drain Soil Boring Locations (2007). Confirmation Soil Samples (2007/2016). Approximate Soil Boring Location by Others (2014).! VOCs NDP1, P2, P3, P4, P5, P6 (3-8') SB-4 SB-2 SB-1 SB-5 Constituent T-3 Bottom T-3 North T-3 South T-3 East T-3 West Depth Sampled (feet bgs) 15 8 8 8 8 8-10 13-15 18-20 Date Sampled 1/24/07 1/24/07 1/24/07 1/24/07 1/24/07 4/10/07 4/10/07 4/10/07Sec-butylbenzene <0.0012 0.0016 <0.062 <0.001 0.25 ND ND ND 4.1 1,600 23,000Chlorobenzene<0.0017 0.0045 <0.094 <0.0015 <0.084 ND ND ND 0.68 58 2801,2-Dichlorobenzene <0.0011 0.15 2.6 0.0019 <0.052 ND ND ND 0.39 380 20001,3-Dichlorobenzene <0.0015 0.024 0.46 <0.0013 <0.073 ND ND ND -- ----1,4-Dichlorobenzene <0.0017 0.078 1.7 0.0031 <0.084 ND ND ND 0.12 2.8 12Ethylbenzene<0.0013 0.012 <0.069 <0.0011 0.51 ND ND ND 13 6.10 27Isopropylbenzene<0.00092 0.0028 <0.050 <0.0008 0.21 ND ND ND 2.3 410 2,100MTBE0.003 <0.00042 <0.025 <0.0004 <0.022 ND ND ND 0.09 49 220Naphthalene0.0032 0.026 1.8 <0.0012 5.7 ND ND ND 0.39 4.1 18n-propylbenzene <0.0012 0.0072 <0.062 <0.001 0.49 ND ND ND 2.6 780 5,100Toluene<0.0016 0.0092 <0.087 <0.0014 <0.078 ND ND ND 8.3 990 9,7001,2,4-Trimethylbenzene 0.0024 0.072 0.39 <0.0014 5.5 ND ND ND 12 63 3701,3,5-Trimethylbenzene <0.0017 0.024 <0.094 <0.0015 1.2 ND ND ND 11 56 320Total Xylenes <0.0033 0.099 <0.180 <0.0029 1.7 ND ND ND 9.9 120 530Acenaphthylene<0.018 <0.017 0.082 <0.017 0.24 ND ND ND 16 720 9,000Benzo(a)pyrene <0.033 0.056 <0.032 <0.031 <0.310 ND ND ND 0.12 0.11 2.1Benzo(b)fluoranthene <0.031 0.07 <0.030 <0.029 <0.290 ND ND ND 1.2 1.1 21Benzo(g,h,i)perylene <0.031 0.061 <0.030 <0.029 <0.290 ND ND ND 15,600 ----Benzo(k)fluoranthene <0.038 0.038 <0.036 <0.035 <0.350 ND ND ND 12 11 210Chrysene<0.014 0.062 <0.014 <0.013 <0.130 ND ND ND 36 110 2,100Fluoranthene<0.014 0.085 0.087 0.033 <0.130 ND ND ND 670 480 6,000Fluorene<0.018 <0.016 0.098 <0.016 0.22 ND ND ND 110 480 6,0002-Methylnaphthalene <0.016 0.037 3.7 0.02 10 ND ND ND 3.1 48 600Phenanthrene<0.018 0.053 0.27 <0.017 0.55 ND ND ND 134 ----Pyrene <0.020 0.098 0.24 0.06 0.36 ND ND ND 440 360 4,500Total Chromium 17 45 28 67 19 38 23 6.3 3.8 0.31 6.5Total Lead 7.4 33 9.8 20 11 15 4.8 6.2 270 400 800Aliphatics, C5-C8 <2.16 <2.14 2.24 <1.91 <2.5 2.6 <3.2 <2.9 -- 110 460Aliphatics, C9-C18 2.3 2.4 62.7 4.52 78.98 ND ND ND 19 20 93Aliphatics, C19-C36 <4.37 151 755 255 789 470 <45 <47 16,000 47,000 700,000Aromatics, C9-C22 <6.99 <7.23 117.5 56.6 255 140 <45 <47 2.4 22 130 PoG PSRGs Residential Health Based PSRGs Industrial/ Commercial Health Based PSRGs OWS Concentrations shown in milligrams per kilograms (mg/kg) J = J-flag, value above method detection limit but below reporting limit, value estimated Bold exceeds Protection of Groundwater PSRG Bold and Shaded exceeds Residential PSRG Bold, shaded, and underlined exceeds Industrial/Commercial PSRG -- = No standard/PSRG/SGSL (as applicable) established NCDEQ Protection of Groundwater PSRGs = North Carolina Department of Environmental Quality, Protection of Groundwater Preliminary Soil Remediation Goals, dated February 2018 Tank 1 Tank 3 Tank OWS Proposed Building Footprint PPPP NC Center for Geographic Information & Analysis Historic Soil-Vapor Data Former Gathings Motor Company 1100-1200 South Tryon Street Charlotte, North Carolina Brownfields Project #: 22074-18-060 PROJECT NO.:FIGURE NO.:6228-18-0495 3Reference: Development Plan from Land Design dated December 21, 2018Document Path: F:\AMEC_Projects\2018\6228-18-0495\MXD\Samples_2 soilgas.mxd Prepared By: LMM 1/28/19; Checked by RCF 1/28/19 0 60 120 180Feet ¯ SG-1 SG-2 SG-4 SG-3 P Approximate Soil-Gas Sample Locations (2017). No analytes identified at concentrations exceeding Soil-Gas Screening Levels (SGSLs). Concentrations shown in micrograms per meter cubed (µg/m3)J= J-flag, value above method detection limit but below reporting limit, value estimated -- = No standard SGSL established Proposed Building Footprint !!!A!A!A!A!ANC Center for Geographic Information & Analysis Historic Groundwater Data Former Gathings Motor Company1100-1200 South Tryon StreetCharlotte, North CarolinaBrownfields Project #: 22074-18-060 PROJECT NO.:FIGURE NO.:6228-18-0495 4Reference: Development Plan from Land Design dated December 21, 2018Document Path: F:\AMEC_Projects\2018\6228-18-0495\MXD\Samples_2 - groundwater.mxd Prepared By: LMM 1/28/19; Checked by RCF 1/28/19 0 60 120 180Feet ¯ ! !Approximate Soil Boring and Temporary Well Locations Installed by Others (2014) !A Approximate Temporary Monitoring Well Location (2007) TW-1 TW-2 TW-3 TW-2 TW-1 ND= Not detectedConcentrations shown in micrograms per liter (µg/L)Bold font exceeds North Carolina 2L Standard--=No Standard or GWSL (as applicable) establishedE=Estimated concentration above the calibration rangeGWSLs= NCDEQ Division of Waste Management, Vapor IntrusionGroundwater Screening Levels, dated February 2018 MW-Tank3 MW-OWS Shaded cell indicates value exceeded Residential GWSLs Underlined values exceeded Non-Residential GWSLs NSL = No Standard ListedJ = J-flag, estimated value identified at a concentration above method detection limit but below reporting limit. NC 2L Standards = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Groundwater Quality Standards, dated April 2013. IMACs = North Carolina Administrative Code, Title 15A, Subchapter 2L, Section .0202, Interim Maximum Allowable Concentrations, dated April 2018 !A Approximate Location of Existing Monitoring Well (2007) Proposed Building Footprint PPP)B)BP748 746 7 5 0 744 742 740 738 752736 754756752754750750750 742 746 750752752 75074274875075 0 750752 750 746750750750742 752 BG GP-1GP-3 GP-2/MW-1 GP-5/MW-3 GP-4/MW-2 Soil Sample Locations (2019)Former Gathings Motor Company 1100-1200 South Tryon Street Charlotte, North Carolina Brownfields Project #: 22074-18-060 PROJECT NO.:FIGURE NO.:6228-18-0495 5 0 60 12030Feet ¯ LEGEND )B Sediment Basin Soil Boring Location P Soil Boring and Monitoring Well Location P BG = "background" metals soil boring location 2017 Contours (feet) PPPPPPP PSG-5 SG-1 SG-2SG-3 SG-4 SG-7 SG-6 SG-8 Soil-Gas Sample Locations (2019) Former Gathings Motor Company 1100-1200 South Tryon Street Charlotte, North Carolina Brownfields Project #: 22074-18-060 PROJECT NO.:FIGURE NO.:6228-18-0495 6 0 60 12030Feet ¯ P Soil-Gas Sample Location (collected February 24, 2019) LEGEND Proposed Building Footprint 7 4 8 746 750 744 742 740 738 752736 754756752754750750750742 746 750752752 750742748750750 7507527 5 0 746750750 75074 2 752P P P P MW-1(732.65) MW-2(734.57) MW-3(731.08) MW-OWS(733.02) Groundwater Sample Locations and Elevations (2019)Former Gathings Motor Company1100-1200 South Tryon StreetCharlotte, North CarolinaBrownfields Project #: 22074-18-060 PROJECT NO.:FIGURE NO.:6228-18-0495 7 ¯ Groundwater elevations established by Wood personnel relative to the "benchmarks" shown on this figure.The referenced elevations of the points was obtained from the Boundary Survey prepared by R.B. Pharr & Associates, P.A., dated May 21, 2018. LEGEND 0 60 12030Feet E E P Approximate Groundwater Monitoring Well LocationGroundwater Elevation (feet) as measured on February 25, 2019Groundwater Contour (feet)Estimated Groundwater Flow Direction (734.57) E Approximate locations of "benchmarks" used by Wood to establish top of casing elevations for monitoring wells MW-Tank 3P 2017 Contours (feet) !!!!! !!!!!!!!!!! !!!!!!!!! !!!!!!!!!!!!!!!!! !!!!! !!!!!! ! !!!!!!!!! ! !!!!!!!!!!!!!!!!!! !!!!!!!!!!!!!!!!PPPP P P1-1 1-2 1-3 1-4 1-5 1-61-71-81-91-102-1 2-2 2-3 2-4 2-5 2-6 2-7 2-8 2-9 2-10 3-1 3-2 3-3 3-4 3-5 3-103-93-83-73-6 4-1 4-2 4-3 4-4 4-5 4-6 4-7 4-8 4-9 4-10 5-1 5-2 5-3 5-4 5-5 5-6 5-7 5-8 5-9 5-10 6-1 6-2 6-3 6-4 6-5 6-6 6-7 6-8 6-106-9 7-1 7-2 7-3 7-4 7-5 7-6 7-7 7-8 7-9 7-10 8-1 8-2 8-3 8-4 8-5 8-6 8-7 8-8 8-9 8-10 9-1 9-2 9-3 9-4 9-5 9-6 10-1 10-2 10-3 10-4 10-5 10-6 10-7 10-8 10-9 10-10 10-11 10-12 BG GP-3 GP-2/MW-1 GP-5/MW-3 Sampling GridFormer Gathings Motor Company1100-1200 South Tryon StreetCharlotte, North CarolinaBrownfields Project #: 22074-18-060 PROJECT NO.:FIGURE NO.:6228-18-0495 8Document Path: F:\AMEC_Projects\2018\6228-18-0495\MXD\Sampling_Grid.mxd Prepared By: LMM 3/27/19; Checked by RCF 3/27/19 0 60 12030Feet ¯ LEGEND Composite Sample "Block" Area Boring Location and Designation! P Sediment Basin Boring (completed) Soil Boring/Monitoring Well (completed) "Background" Soil Boring (completed)P GP-1 GP-4/MW-2 P !!!!!!!!!!!! !!!! !!! !!!!!!!!!!!!!!!!!!!!!!!!!!!! !!!!!!!!!!! !!!!!!!!! !!!!!!!!!!! ! !!!!!!!!!!!!!!!!!!!1-1 1-2 1-3 1-4 1-5 1-61-71-81-91-102-1 2-2 2-3 2-4 2-5 2-6 2-7 2-8 2-9 2-10 3-1 3-2 3-3 3-4 3-5 3-103-93-83-73-6 4-1 4-2 4-3 4-4 4-5 4-6 4-7 4-8 4-9 4-10 5-1 5-2 5-3 5-4 5-5 5-6 5-7 5-8 5-9 5-10 6-1 6-2 6-3 6-4 6-5 6-6 6-7 6-8 6-106-9 7-1 7-2 7-3 7-4 7-5 7-6 7-7 7-8 7-9 7-10 8-1 8-2 8-3 8-4 8-5 8-6 8-7 8-8 8-9 8-10 9-1 9-2 9-3 9-4 9-5 9-6 10-1 10-2 10-3 10-4 10-5 10-6 10-7 10-8 10-9 10-10 10-11 10-12 Sampling Grid on Cut/Fill PlanFormer Gathings Motor Company1100-1200 South Tryon StreetCharlotte, North CarolinaBrownfields Project #: 22074-18-060 PROJECT NO.:FIGURE NO.:6228-18-0495 9Document Path: F:\AMEC_Projects\2018\6228-18-0495\MXD\Sampling_Gridcut.mxd Prepared By: LMM 1/28/19; Checked by RCF 1/28/19 0 60 12030Feet ¯ LEGEND Composite Sample "Block" Area Boring Location and Designation! APPENDIX A FH FH WV WVWV WV WV WV WV WV PID: 07305302B&K INVESTMENT COD.B. 09440 PG. 157PID: 07327101 MID-AMERICA PARTNERSHIP, LLC D.B. 26154 PG. 883 PID: 07327107 MAURICIO WEST DIOCESAN ADMIN. OF THE ROMAN CATHOLIC D/CHLT D.B. 09051 PG. 589 PID: 07307211GLOBAL SIGNALAQUISITIONS IV LLCD.B. 23979 PG. 978PID: 07307222CATHERINE LLCD.B. 29674 PG. 472PID: 12303101 LP CAMDEN SUMMIT PARTNERSHIP D.B. 17726 PG. 101 DN DEVELOPMENT AREA B: BUILDING WEST PROPOSED COMMERCIAL DEVELOPMENT AREA A: PARKING DECK OVERHEAD CANOPY BY ARCHITECT ROADWAY LIGHT BY DUKE ENERGY, TYP. ROADWAY LIGHT BY DUKE ENERGY, TYP. ROADWAY LIGHT BY DUKE ENERGY, TYP. WINNIFRED STREET (VARIABLE WIDTH PUBLIC R/W)WEST CARSON BLVD(VARIABLE WIDTH PUBLIC R/W)WEST CATHERINE STREET(30' WIDTH PUBLIC R/W)SOUTH TRYON STREET (VARIABLE WIDTH PUBLIC R/W) CUSTOM PROJECT/ TENANT SIGNAGE BURIED TRANSFORMER VAULT, 1 SINGLE PHASE SYSTEM 3 PHASE SYSTEM QUANTITY TBD ADA RAMP WITH TRUNCATED DOMES 2'-6" CURBAND GUTTER ADA RAMP WITHTRUNCATED DOMES 2'-6" CURBAND GUTTER ADA RAMP WITH TRUNCATED DOMES 2'-6" CURB AND GUTTER 2' CONCRETE BAND DEVELOPMENT AREA B: BUILDING EAST PROPOSED COMMERCIAL PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA PA OPEN SPACE/ LAWN PAPA PAPA PA PA 18.5' SETBACK 16' SETBACK PA PA PA PA PA PA PAPA PA PA PA PA PROPERTY LINE16' SETBACK 16' SETBACK16' SETBACKPROPERTY LINE18.5' SETBACK PROPERTY LINE 16' SETBACKPROPERTY LINE16' SETBACKOVERHEAD CANOPY BY ARCHITECT 5 BIKE RACKS (10 SHORT-TERM SPACES) 5 BIKE RACKS (10 SHORT-TERM SPACES) 5 BIKE RACKS (10 SHORT-TERM SPACES) OPEN SPACE AREA: +/- 23,989 SF ON-STREET ADA SPACE PROPOSED CATS BUS PAD ADA RAMP BACKFLOW PREVENTOR LOCATION W/ DECORATIVE METAL SCREEN ON-STREET ADA SPACE ADA RAMP TREE GRATE, TYP. TYPE II MODIFIED DRIVEWAY TYPE II MODIFIEDDRIVEWAY TYPE II MODIFIED DRIVEWAY TYPE II MODIFIEDDRIVEWAY TYPE II MODIFIED DRIVEWAY 11' SETBACK11' SETBACK11' SETBACKPROPOSED PEDESTRIAN HAWK SIGNAL CROSSWALK CUSTOM PROJECT/ TENANT SIGNAGE PEDESTRIAN REFUGE SEE SHEET L6.02 FOR PEDESTRIAN REFUGE ENLARGEMENT ALONG W CARSON BLVD. PA 50' x 50' SITE TRIANGLE NCDOT 10' x 70' SITE TRIANGLE 50' x 50' SITE TRIANGLE NCDOT 10' x 70' SITE TRIANGLE 50' x 50' SITE TRIANGE 50' x 50' SITE TRIANGE 5' x 5' PED TRIANGE PA OVERHEAD CANOPY BY ARCHITECT RETAIL LOADING DOCK/ SERVICE AREA RETAIL RETAIL RETAIL PARKING LOBBY BIKE PARKING/ STORAGE RETAIL RETAIL RETAIL RETAIL LOBBY RETAIL OFFICE LOBBY DROP OFF PA OVERHEAD CANOPY BYARCHITECT TRASH ROOM TRASH ROOM FUTURE DEVELOPMENT BY OTHERS FHFH WVWVWV WV WV WV WV WV DN KEY MAP SEAL SHEET NUMBER SHEET TITLE LANDDESIGN PROJ.# SCALE PROJECT NORTH NO.DESCRIPTION DATE REVISION / ISSUANCE ORIGINAL SHEET SIZE: 24" X 36" VERT: HORZ: CHECKED BY: DRAWN BY: DESIGNED BY: 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 TRYON S T SITE I-2 7 7MOREH E A D S T MINT S T CAR SO N B L V D SOUT H BL V D 12/21/2018LAND DEVELOPMENT1 SPECTRUM SOUTH TRYON SPECTRUM 1100 S TRYON ST. CHARLOTTE, NC 28203 1018203 OVERALL SITE PLAN + DEVELOPMENT SUMMARY N/A G1.05 12/21/2018 1:37 PM SEAN KAUFMAN N:\_2018\1018203\CAD\CONSTRUCTION DOCUMENTS\8203_PLN_LAYOUT.DWG 0 1"= 15'30'60' 30' DEVELOPMENT SUMMARY: SITE ACREAGE: +/- 4.94 ACRES TAX PARCEL ID NUMBER (PID): 073-073-01, 073-073-07, 073-073-08, 073-073-09, 073-073-10, 073-073-11 EXISTING ZONING: I-2, TOD-M PROPOSED ZONING:TOD-M(O) EXISTING USES: OFFICE/PARKING/VACANT PROPOSED USES: OFFICE, HOTEL, RETAIL/EDEE AND OTHER USES PERMITTED BY RIGHT, AND UNDER PRESCRIBED CONDITIONS IN THE TOD-M ZONING DISTRICT TOGETHER WITH ACCESSORY USES, AS ALLOWED IN THE TOD-M ZONING DISTRICT, AND SUBJECT TO THE OPTIONAL PROVISIONS BELOW DEVELOPMENT AREA A: PARKING DECK DEVELOPMENT AREA B: BUILDING WEST: OFFICE, RETAIL BUILDING EAST: OFFICE, RETAIL SETBACKS: 18.5' SETBACK ALONG S TRYON ST 16.0' SETBACK ALONG W. CATHERINE ST, WINNIFRED ST + WEST CARSON BLVD MAXIMUM BUILDING HEIGHT: A MAXIMUM BUILDING HEIGHT OF 250 FEET WITHIN DEVELOPMENT AREA A AND A MAXIMUM BUILDING HEIGHT OF 180 FEET WITHIN DEVELOPMENT AREA B AS ALLOWED BY THE ORDINANCE AND THE OPTIONAL PROVISIONS BELOW. BUILDING HEIGHT TO BE MEASURED AS REQUIRED BY THE ORDINANCE DEVELOPMENT AREA A: REQUIRED: 250' MAX PROVIDED: BUILDING HEIGHT AT STRUCTURED PARKING- TOP AT PARAPET- 121'-8" TOP AT ELEVATOR + STAIR- 130-'8" DEVELOPMENT AREA B: REQUIRED: 180' MAX PROVIDED: BUILDING WEST: -TOP AT PARAPET- 142'-0" -TOP AT MECH SCREEN- 160'-0" BUILDING EAST: -TOP AT PARAPET- 142'-0" -TOP AT MECH SCREEN- 160'-0" FLOOR AREA RATIO (FAR): 1,145,570 GSF/ 4.94 AC = 5.3 FAR OPEN SPACE REQUIREMENTS: A MINIMUM OF 20,000 SQUARE FEET OF OPEN SPACE (A COMBINATION OF ± 15,000 SQUARE FEET OF PUBLIC URBAN OPEN SPACE (AS DEFINED BY THE TOD-M ZONING DISTRICT) PLUS AN ADDITIONAL ±5,000 SQUARE FEET OF IMPROVED URBAN OPEN SPACE (AS DEFINED BELOW) WILL BE PROVIDED. THE RATIO OF PUBLIC OPEN SPACE AND IMPROVED URBAN OPEN SPACE MAY VARY FROM WHAT IS INDICATED ABOVE AS ALONG AS THE TOTAL PROVIDED SQUARE FOOTAGE EQUALS 20,000 SQUARE FEET, AND NO LESS THAN 10,000 SQUARE FEET OF PUBLIC URBAN OPEN SPACE IS PROVIDED PROVIDED OPEN SPACE: +/- 23,989 SF TREE SAVE REQUIREMENTS: N/A, EXEMPT IN TOD SERVICE AREA/ SOLID WASTE/ RECYLING: LOADING SPACES: 5 REQUIRED NON-RESIDENTIAL USES: 50,000-150,000 = 1 SPACE, ADDITIONAL 1 SPACES FOR EVERY 100,000 SF LOADING DOCK AREA WITHIN DECK: 5,335 SF BUILDING EAST OFFICE: TRASH ROOM 548 SF BUILDING WEST OFFICE: TRASH ROOM 548 SF SEE ARCHITECTURAL PLANS FOR EXACT LOCATIONS OF TRASH ROOM/ SERVICE AREA PARKING REQUIREMENTS: DEVELOPMENT AREA A: PARKING DECK PROVIDED: 1,618 SPACES DEVELOPMENT AREA B: MIXED- USE (OFFICE, RETAIL, EDEE, MF RESIDENTIAL) OFFICE REQ: MAX 1 SPACE/ 300 SF EDEE REQ: NO MIN, MAX. 1 SPACE/ 75 SF RETAIL REQ: MAX 1 SPACE/ 250 SF BUILDING WEST: OFFICE: +/- 262,487 GSF / 300 SF = 875 SPACES RETAIL: +/- 13,356 GSF / 250 SF = 53 SPACES BUILDING EAST: OFFICE: +/- 228,260 GSF/ 300 SF = 761 SPACES RETAIL: +/- 14,446 GSF / 250 SF = 58 SPACES TOTAL MAXIMUM: 1,747 SPACES TOTAL DECK SPACES PROVIDED: 1,618 SPACES TOTAL ON-STREET PARKING PROVIDED: 33 SPACES REQUIRED ACCESSIBLE ON-STREET PARKING: 1 PER 25/ BLOCK PROVIDED ACCESSIBLE ON-STREET PARKING: 2 SPACES PROVIDED ACCESSIBLE VAN PARKING: 2 SPACES BIKE PARKING: THE PETITIONER WILL PROVIDE SHORT TERM AND LONG TERM BICYCLE PARKING, AS DEFINED BY THE ORDINANCE, ON THE SITE AT THE FOLLOWING RATIOS: -SHORT TERM SPACES: ONE SHORT TERM BICYCLE PARKING SPACE PER 1,500 SQUARE FEET OF GFA OF COMMERCIAL USES, BUT NOT TO EXCEED 30 SPACES (IF THE CURRENT ORDINANCE REQUIRES MORE SPACES THEN ADDITIONAL SPACES WILL BE PROVIDED). -LONG TERM SPACES: ONE LONG TERM BICYCLE PARKING SPACE PER 6,000 SQUARE FEET OF GFA OF COMMERCIAL USES, BUT NOT TO EXCEED 50 SPACES (IF THE CURRENT ORDINANCE REQUIRES MORE SPACES THEN ADDITIONAL SPACES WILL BE PROVIDED). PROVIDED BIKE PARKING: 30 SHORT-TERM SPACES 56 LONG-TERM SPACES (IN PARKING DECK) SEE SHEET L6.01 SEE SHEET L6.02 LEGEND EX. PROPERTY LINE PROP. SETBACK/ BUFFER PLANTING AREA PA GENERAL NOTES: 1.ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF A SIDEWALK OR TRAVEL LANE MUST BE APPROVED BY CDOT AND WILL REQUIRE A R/W USE PERMIT OR R/W LEASE DEPENDING UPON THE PROPOSED DURATION OF CLOSURE. THESE APPROVALS ARE IN ADDITION TO SITE APPROVALS AND SHOULD BE COORDINATED WITH CDOT PRIOR TO CONSTRUCTION. CONTRACTOR SHALL CONTACT CDOT AT (704) 432-1562 AT LEAST 5 BUSINESS DAYS PRIOR TO BEGINNING WORK FOR IMPACTS LESS THAN 30 DAYS. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348 AS SOON AS POSSIBLE FOR IMPACTS GREATER THAN 30 DAYS. EVERY EFFORT SHALL BE MADE TO CONSTRUCT IMPROVEMENTS WITH MINIMAL IMPACT TO DRIVERS AND PEDESTRIANS. 2.RIGHT-OF-WAY CLOSURES LONGER THAN 30 DAYS REQUIRE RIGHT-OF-WAY LEASE AGREEMENT WHICH WILL INCLUDE THE SUBMITTAL OF A TRAFFIC CONTROL PLAN. TRAFFIC CONTROL PLANS REQUIRED THROUGH A LEASE AGREEMENT MAY BE DIFFERENT FROM THE ONE REQUIRED DURING THE LAND DEVELOPMENT PLAN REVIEW AND ARE SUBJECT TO REVISIONS. THE REVISED TRAFFIC CONTROL PLANS MUST BE SUBMITTED AS PART OF THE LEASE AGREEMENT PROCESS FOR APPROVAL PRIOR TO START OF RIGHT-OF-WAY CLOSURES. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348. 3.CONSTRUCTION STAGING WITHIN CITY RIGHT-OF-WAY LASTING MORE THAN 30 DAYS REQUIRES A RIGHT-OF-WAY LEASE AGREEMENT. PLEASE SEE TRAFFIC CONTROL PLAN NOTES FOR DETAILS. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-8348. 4.NON-STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAY REQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE CHARLOTTE DEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF TRANSPORTATION BEFORE INSTALLATION. FOR CITY OF CHARLOTTE MAINTAINED STREETS, CONTACT CDOT AT (704) 336-3888. 5.SIDEWALK WITHIN THE CITY'S RIGHT-OF-WAY THAT REQUIRES REPLACEMENT AS PART OF THE DEVELOPMENT AND/OR STREET IMPROVEMENTS SHOULD BE PHASED IN SUCH A WAY AS TO MINIMIZE THE DURATION OF THE SIDEWALK CLOSURE TO THE EXTENT FEASIBLE. THE DEVELOPER SHOULD MAKE EVER ATTEMPT TO HAVE SIDEWALK REPAIRED AND REOPENED FOR PUBLIC USE WITH 30 DAYS OF REMOVAL. 6.THE DEVELOPER SHALL CONTACT THE CHARLOTTE DEPARTMENT OF TRANSPORTATION (GUS JORDI, 704-336-7086) TO IDENTIFY ANY CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60- 90 DAYS WILL BE REQUIRED TO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIBLE FOR ALL RELATED RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THE CONTRACTOR/DEVELOPER. 7.DEVELOPER TO CONTACT CDOT (ANTHONY MENDEZ: 704-336-4971) DURING SITE PLAN PREPARATION TO DISCUSS STREET LIGHTING REQUIREMENTS, IF ANY, FOR THIS PROJECT. COORDINATE WITH DUKE ENERGY AND CDOT AS NECESSARY TO DETERMINE LIGHTING LEVELS, LIGHTING LAYOUT AND REQUIREMENTS FOR INSTALLATION. DEVELOPMENT AREA A DEVELOPMENT AREA B KEY MAP BUILDING WEST BUILDING EAST APPENDIX B XXXXXXXXXXXXXXXXX XXXX X X X XX XXXXXXXXXXXXXXXXXXXXXXXX X X X X X X X X X XXXXXXXXXXXXX GP GP GP GP GPGP GP GP GP GP GP GP GP GP SOUTH TRYON STREET (VARIABLE WIDTH PUBLIC R/W) WINNIFRED STREET WEST CARSON BOULEVARD(VARIABLE WIDTH PUBLIC R/W)(VARIABLE WIDTH PUBLIC R/W)WEST CATHERINE STREET30' PUBLIC RIGHT-OF-WAYWV WV WV WV WB WBMB. 50, PG. 542NCDOT MAINTAINED CDOT MAINTAINEDCDOT MAINTAINED CDOT MAINTAINEDSPECTRUM SOUTH TRYON SPECTRUM 1100 S TRYON ST. CHARLOTTE, NC 28203 1018203 DEMOLITION PLAN - PHASE 1 N/A RAK SWK SWK C1.00 12/21/2018 1:37 PM SEAN KAUFMAN N:\_2018\1018203\CAD\CONSTRUCTION DOCUMENTS\8203-PLN_DEMO.DWG 0 1"= 15'30'60' 30'                                         KEY MAP SEAL SHEET NUMBER SHEET TITLE LANDDESIGN PROJ.# SCALE PROJECT NORTH NO.DESCRIPTION DATE REVISION / ISSUANCE ORIGINAL SHEET SIZE: 24" X 36" VERT: HORZ: CHECKED BY: DRAWN BY: DESIGNED BY: 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 TRYON S T SITE I-2 7 7MOREH E A D S T MINT S T CAR SO N B L V D SOUT H BL V D 12/21/2018LAND DEVELOPMENT1 EX. 1-STORY BUILDING TO BE REMOVED EX. DRIVEWAY ENTRANCE TO BE REMOVED EX. FENCE AND UNDERGROUND CONCRETE FOOTING TO BE REMOVED EX. FENCE AND UNDERGROUND CONCRETE FOOTING TO BE REMOVED ALL EX. FENCE AND UNDERGROUND CONCRETE FOOTING ONSITE TO BE REMOVED EX. FENCE AND UNDERGROUND CONCRETE FOOTING TO BE REMOVED EX. FENCE AND UNDERGROUND CONCRETE FOOTING TO BE REMOVED EX. WALLS TO BE REMOVED EX. WALLS TO BE REMOVED EX. 1-STORY BUILDING TO BE REMOVED ASPHALT TO BE REMOVED CONCRETE/SIDEWALK TO BE REMOVED DEMO EX. CURB LEGEND BUILDINGS TO BE REMOVED DEMOLITION NOTES: 1.CONTRACTOR TO SUBMIT DEMOLITION PLAN TO THE CITY OF CHARLOTTE BUILDING STANDARDS BEFORE DEMOLITION IS TO BEGIN AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL DEMOLITION PERMITS AS REQUIRED. 2.NO DEMOLITION RESULTING IN LAND DISTURBANCE PRIOR TO PRE-CONSTRUCTION MEETING. 3.DEMOLITION AND REMOVAL OPERATIONS SHALL COMMENCE AFTER ALL EROSION CONTROL MEASURES ARE IN PLACE AND ARE FUNCTIONAL. 4.EXTENT OF SITE CLEARING IS SHOWN ON EROSION CONTROL PLANS. 5.SITE DEMOLITION WORK INCLUDES, BUT IS NOT LIMITED TO: A. CONCRETE & ASPHALT SURFACES B. SITE UTILITIES C. LANDSCAPING D. BUILDINGS 6.CONDUCT SITE DEMOLITION OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED OR USED FACILITIES. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION. 7.DEMOLITION DEBRIS, EXCEPT AS OTHERWISE NOTED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. ALL DEBRIS SHALL BE DISPOSED OF OFF-SITE BY THE CONTRACTOR IN A LEGAL LANDFILL IN A TIMELY MANNER. NO SALVAGE OR SALE OF DEMOLISHED MATERIALS ON SITE WILL BE ALLOWED WITHOUT PERMISSION FROM THE OWNER. 8.LOCATE EXISTING ABOVE GROUND AND UNDERGROUND UTILITIES IN AREAS OF WORK. IF UTILITIES ARE TO REMAIN IN PLACE, PROVIDE ADEQUATE MEANS OF SUPPORT AND PROTECTION DURING DEMOLITION OPERATION. 9.SHOULD UNCHARTED, OR INCORRECTLY CHARTED PIPING OR OTHER UTILITIES BE ENCOUNTERED DURING DEMOLITION, CONSULT PROJECT ENGINEER AND UTILITY OWNER FOR IMMEDIATE ACTION. 10.PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUT AND OTHER HAZARDS CREATED BY THE DEMOLITION OPERATION. 11.CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EXISTING CONDITIONS OR BETTER UNLESS OTHERWISE NOTED OR AS PART OF CONTINUING CONSTRUCTION ACTIVITY PER SITE DEVELOPMENT PLANS AS PERMITTED. 12.CONTRACTOR TO REMOVE ALL VISIBLE OR REASONABLY IDENTIFIABLE MATERIAL, EQUIPMENT, ETC. FROM THE SITE IF NOT NEEDED AT CONTRACTORS EXPENSE. 13.THE LOCATION OF ALL UTILITIES SHOWN ON THE PLANS HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER AND OWNER ASSUME NO RESPONSIBILITY FOR INACCURACY.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES AND ASSURING THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL NC ONE CALL (PREVIOUSLY ULOCO) AT 1-800-632-4949 FOR UTILITY LOCATING SERVICES 48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 14.ALL DEMOLITION AND CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES AND LOCAL RESTRICTIONS. THE CONTRACTOR MUST COMPLY WITH ALL OF THE CONTRACTOR REGISTRATION REQUIREMENTS OF ALL GOVERNING AUTHORITIES. 15.PRIOR TO THE COMMENCEMENT OF DEMOLITION, THE CONTRACTOR SHALL COORDINATE HIS ACTIVITIES WITH ALL UTILITY COMPANIES SERVING THIS AREA. THE CONTRACTORS TO COORDINATE FULLY WITH THE UTILITY COMPANIES ON THE EXACT LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING RELOCATION OR REMOVAL OF EXISTING PRIVATE AND PUBLIC UTILITIES AS REQUIRED. RELOCATION COORDINATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ASSOCIATED FEES SHALL BE THE RESPONSIBILITY OF THE OWNER. 16.ALL PAVING REMOVAL AND DEMOLITION SHALL BE PERFORMED AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER OR OWNER. 17.RELOCATION OR REMOVAL OF OVERHEAD OR UNDERGROUND UTILITIES SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY COMPANY. 18.ALL PROPOSED PAVEMENT CUTS SHALL BE SAW CUT ONLY. 19.CONTRACTOR SHALL PROVIDE A MINIMUM OF 72 HOURS ADVANCE NOTICE TO THE OWNER PRIOR TO STARTING DEMOLITION ACTIVITIES. 20.CONTRACTOR SHALL VERIFY AND PROTECT ALL PUBLIC UTILITIES. ANY WORK ASSOCIATED WITH SAID UTILITIES TO BE COORDINATED WITH APPROPRIATE UTILITY COMPANY. DEMOLITION OF UTILITIES WHICH ARE ACTIVE SHALL BE SEQUENCED TO ALLOW FOR INSTALLATION OF NEW OR REROUTED LINES, PRIOR TO REMOVAL OF EXISTING PORTION. REFER TO UTILITY PLANS FOR PROPOSED WORK. 21.ALL UNDERGROUND UTILITIES PREVIOUSLY SERVING EXISTING STRUCTURES TO BE REMOVED AND OR ABANDONED IN PLACE UNLESS INDICATED TO REMAIN. 22.CONTRACTOR SHALL COORDINATE STORM DEMOLITION WITH STORM DRAIN IMPROVEMENTS TO MAINTAIN POSITIVE DRAINAGE. 23.SHOULD THE CONTRACTOR ENCOUNTER ANY ADDITIONAL ITEMS THAT MAY REQUIRE DEMOLITION (FENCES, GUARD RAIL, ETC.) - THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR FURTHER DIRECTION. 24.ALL EXISTING WATER METERS SHALL BE DISMANTLED BY CHARLOTTE WATER. CONTRACTOR SHALL LOCATE, CUT, AND CAP EXISTING PRIVATE WATER SERVICES BEHIND THE METER. ABANDONMENT OF WATER METERS AND NEW SERVICES APPLICATIONS SHALL BE COMPLETED AT THE SAME TIME FOR COORDINATION OF CAPACITY FEE CREDITS. 25.DEMOLITION WITHIN ADJACENT RIGHT OF WAYS SHALL BE COMPLETED IN ACCORDANCE WITH THE TRAFFIC CONTROL REQUIREMENTS OF THE W.A.T.C.H. MANUAL. CONTRACTOR SHALL INSTALL NEW CURB AND GUTTER AND STREET PAVEMENT IMMEDIATELY FOLLOWING DEMOLITION ACTIVITIES THAT OCCUR IN THE RIGHT OF WAY PER SITE PLAN. 26.CONTRACTOR SHALL CONTACT CDOT PRIOR TO CONSTRUCTION, TO OBTAIN THE NECESSARY RIGHT OF WAY PERMITS FOR ANY CONSTRUCTION ACTIVITIES WITHIN THE PUBLIC RIGHT OF WAY AND COORDINATION OF PEDESTRIAN ROUTING WHEN SIDEWALK HAS BEEN REMOVED. GENERAL NOTES: 1.ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF THE SIDEWALK OR TRAVEL LANE FOR LESS THAN 30 DAYS REQUIRES A R/W USE PERMIT. TRAFFIC CONTROL PLANS FOR ANY SIDEWALK OR TRAVEL LANE CLOSURES MUST BE SUBMITTED AS PART OF THE R/W USE PERMIT REQUEST. TRAFFIC CONTROL PLANS MUST BE IN ACCORDANCE WITH CDOT'S WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) AND MUST BE REVIEWED AND APPROVED. CONTRACTOR SHALL CONTACT CDOT AT LEAST 5 BUSINESS DAYS IN ADVANCE OF BEGINNING OF WORK AT (704) 432-1562. 2.CONSTRUCTION STAGING WITHIN CITY R/W LASTING MORE THAN 30 DAYS REQUIRES A R/W LEASE AGREEMENT. PLEASE SEE TRAFFIC CONTROL PLAN NOTES FOR DETAILS. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-2562. 3.NON-STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE CITY R/W REQUIRES A R/W ENCROACHMENT AGREEMENT WITH CDOT BEFORE INSTALLATION, CONTACT CDOT AT (704) 336-3888. EX. 2'-6" CURB AND GUTTER TO BE REMOVED EX. VERTICAL CURB TO BE REMAIN IN PHASE 1 EX. 2'-6" CURB AND GUTTER TO BE REMAIN IN PHASE 1 EX. 2'-6" CURB AND GUTTER TO BE REMAIN IN PHASE 1 EX. 2'-6" CURB AND GUTTER TO BE REMAIN IN PHASE 1 EX. VERTICAL CURB TO BE REMOVED. ALL EX. ASPHALT ONSITE TO BE REMOVED (TYP.) EX. ASPHALT TO BE REMOVED EX. CONCRETE AREA/SIDEWALK TO BE REMOVED ALL EX. SIDEWALK TO BE REMOVED (TYP.) EX. GRAVEL LOT TO BE REMOVED PROPERTY BOUNDARYPROPERTY BOUNDARY PROPERTY BOUNDARYPROPERTY BOUNDARY EX. RIGHT-OF-WAY EX. RIGHT-OF-WAY EX. RIGHT-OF-WAYEX. RIGHT-OF-WAYTEMPORARY SILT FENCE (CLDS 30.06A) EX. FIRE HYDRANT "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.01 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. NOTES: ·CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING ANY WORK ON THE SITE AND ENSURING THAT ALL UTILITY RELOCATIONS HAVE BEEN COORDINATED PRIOR TO REMOVAL. SEE SHEET C1.01. ·THERE SHALL BE NO REMOVAL OF EXISTING SLAB DURING DEMOLITION TO PREVENT EXPOSURE OF EXISTING SOIL THAT MAY CAUSE EROSION. EX. DRIVEWAY ENTRANCE TO REMAIN IN USE EX. 1'-6" CURB AND GUTTER TO BE REMOVED EX. 1'-6" CURB AND GUTTER TO BE REMOVED (TYP.) EX. VERTICAL CURB TO BE REMOVED EX. EOPTEMPORARY SILT FENCE (CLDS 30.06A) EX. EOP EX. FENCE AND UNDERGROUND CONCRETE FOOTING TO BE REMOVEDEX. EDGE OF PAVEMENTEX. EOP "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. EX. EDGE OF PARKING EX. EDGE OF PARKING EX. 4-STORY BUILDING TO REMAIN EX. 15 PARKING SPACES TO REMAIN ACTIVE EX. 30 PARKING SPACES TO REMAIN ACTIVE PHASE LINE PHASE LINE SOUTH TRYON STREET (VARIABLE WIDTH PUBLIC R/W) WINNIFRED STREET WEST CARSON BOULEVARD(VARIABLE WIDTH PUBLIC R/W)(VARIABLE WIDTH PUBLIC R/W)WEST CATHERINE STREET30' PUBLIC RIGHT-OF-WAYMB. 50, PG. 542NCDOT MAINTAINED CDOT MAINTAINEDCDOT MAINTAINED CDOT MAINTAINEDSPECTRUM SOUTH TRYON SPECTRUM 1100 S TRYON ST. CHARLOTTE, NC 28203 1018203 DEMOLITION PLAN - PHASE 2 N/A C1.03 12/21/2018 1:37 PM SEAN KAUFMAN N:\_2018\1018203\CAD\CONSTRUCTION DOCUMENTS\8203-PLN_DEMO.DWG 0 1"= 15'30'60' 30'                                         KEY MAP SEAL SHEET NUMBER SHEET TITLE LANDDESIGN PROJ.# SCALE PROJECT NORTH NO.DESCRIPTION DATE REVISION / ISSUANCE ORIGINAL SHEET SIZE: 24" X 36" VERT: HORZ: CHECKED BY: DRAWN BY: DESIGNED BY: 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 TRYON S T SITE I-2 7 7MOREH E A D S T MINT S T CAR SO N B L V D SOUT H BL V D 12/21/2018LAND DEVELOPMENT1 EX. 4-STORY BUILDING TO BE REMOVED EX. DRIVEWAY ENTRANCE TO BE REMOVED EX. FENCE AND UNDERGROUND CONCRETE FOOTING TO BE REMOVED EX. SIGN TO BE REMOVED EX. STAIRS TO BE REMOVED EX. STAIRS TO BE REMOVED ALL EX. ONSITE WALLS TO BE REMOVED (TYP.) EX. STAIRS TO BE REMOVED EX. WALLS TO BE REMOVED EX. WALLS TO BE REMOVED ASPHALT TO BE REMOVED CONCRETE/SIDEWALK TO BE REMOVED DEMO EX. CURB LEGEND BUILDINGS TO BE REMOVED DEMOLITION NOTES: 1.CONTRACTOR TO SUBMIT DEMOLITION PLAN TO THE CITY OF CHARLOTTE BUILDING STANDARDS BEFORE DEMOLITION IS TO BEGIN AND IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO OBTAIN ALL DEMOLITION PERMITS AS REQUIRED. 2.NO DEMOLITION RESULTING IN LAND DISTURBANCE PRIOR TO PRE-CONSTRUCTION MEETING. 3.DEMOLITION AND REMOVAL OPERATIONS SHALL COMMENCE AFTER ALL EROSION CONTROL MEASURES ARE IN PLACE AND ARE FUNCTIONAL. 4.EXTENT OF SITE CLEARING IS SHOWN ON EROSION CONTROL PLANS. 5.SITE DEMOLITION WORK INCLUDES, BUT IS NOT LIMITED TO: A. CONCRETE & ASPHALT SURFACES B. SITE UTILITIES C. LANDSCAPING D. BUILDINGS 6.CONDUCT SITE DEMOLITION OPERATIONS TO ENSURE MINIMUM INTERFERENCE WITH ROADS, STREETS, WALKS, AND OTHER ADJACENT OCCUPIED OR USED FACILITIES. DO NOT CLOSE OR OBSTRUCT STREETS, WALKS OR OTHER OCCUPIED OR USED FACILITIES WITHOUT PERMISSION FROM AUTHORITIES HAVING JURISDICTION. 7.DEMOLITION DEBRIS, EXCEPT AS OTHERWISE NOTED, SHALL BECOME THE PROPERTY OF THE CONTRACTOR AND SHALL BE REMOVED FROM THE SITE. ALL DEBRIS SHALL BE DISPOSED OF OFF-SITE BY THE CONTRACTOR IN A LEGAL LANDFILL IN A TIMELY MANNER. NO SALVAGE OR SALE OF DEMOLISHED MATERIALS ON SITE WILL BE ALLOWED WITHOUT PERMISSION FROM THE OWNER. 8.LOCATE EXISTING ABOVE GROUND AND UNDERGROUND UTILITIES IN AREAS OF WORK. IF UTILITIES ARE TO REMAIN IN PLACE, PROVIDE ADEQUATE MEANS OF SUPPORT AND PROTECTION DURING DEMOLITION OPERATION. 9.SHOULD UNCHARTED, OR INCORRECTLY CHARTED PIPING OR OTHER UTILITIES BE ENCOUNTERED DURING DEMOLITION, CONSULT PROJECT ENGINEER AND UTILITY OWNER FOR IMMEDIATE ACTION. 10.PROTECT STRUCTURES, UTILITIES, SIDEWALKS, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT, UNDERMINING, WASHOUT AND OTHER HAZARDS CREATED BY THE DEMOLITION OPERATION. 11.CONTRACTOR SHALL RESTORE ALL DISTURBED AREAS TO EXISTING CONDITIONS OR BETTER UNLESS OTHERWISE NOTED OR AS PART OF CONTINUING CONSTRUCTION ACTIVITY PER SITE DEVELOPMENT PLANS AS PERMITTED. 12.CONTRACTOR TO REMOVE ALL VISIBLE OR REASONABLY IDENTIFIABLE MATERIAL, EQUIPMENT, ETC. FROM THE SITE IF NOT NEEDED AT CONTRACTORS EXPENSE. 13.THE LOCATION OF ALL UTILITIES SHOWN ON THE PLANS HAVE BEEN DETERMINED FROM AVAILABLE INFORMATION AND ARE GIVEN FOR THE CONVENIENCE OF THE CONTRACTOR. THE ENGINEER AND OWNER ASSUME NO RESPONSIBILITY FOR INACCURACY.CONTRACTOR IS FULLY RESPONSIBLE FOR CONTACTING ALL APPROPRIATE PARTIES AND ASSURING THAT UTILITIES ARE LOCATED PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. CALL NC ONE CALL (PREVIOUSLY ULOCO) AT 1-800-632-4949 FOR UTILITY LOCATING SERVICES 48 HOURS PRIOR TO COMMENCEMENT OF ANY WORK. CONTRACTOR SHALL VERIFY LOCATION AND DEPTH OF ALL EXISTING UTILITIES PRIOR TO CONSTRUCTION. 14.ALL DEMOLITION AND CONSTRUCTION SHALL COMPLY WITH ALL APPLICABLE BUILDING CODES AND LOCAL RESTRICTIONS. THE CONTRACTOR MUST COMPLY WITH ALL OF THE CONTRACTOR REGISTRATION REQUIREMENTS OF ALL GOVERNING AUTHORITIES. 15.PRIOR TO THE COMMENCEMENT OF DEMOLITION, THE CONTRACTOR SHALL COORDINATE HIS ACTIVITIES WITH ALL UTILITY COMPANIES SERVING THIS AREA. THE CONTRACTORS TO COORDINATE FULLY WITH THE UTILITY COMPANIES ON THE EXACT LOCATION OF ALL UNDERGROUND UTILITIES PRIOR TO EXCAVATION. CONTRACTOR SHALL BE RESPONSIBLE FOR COORDINATING RELOCATION OR REMOVAL OF EXISTING PRIVATE AND PUBLIC UTILITIES AS REQUIRED. RELOCATION COORDINATION SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR. ASSOCIATED FEES SHALL BE THE RESPONSIBILITY OF THE OWNER. 16.ALL PAVING REMOVAL AND DEMOLITION SHALL BE PERFORMED AS SHOWN ON THE PLANS OR AS DIRECTED BY THE ENGINEER OR OWNER. 17.RELOCATION OR REMOVAL OF OVERHEAD OR UNDERGROUND UTILITIES SHALL BE COORDINATED WITH THE APPROPRIATE UTILITY COMPANY. 18.ALL PROPOSED PAVEMENT CUTS SHALL BE SAW CUT ONLY. 19.CONTRACTOR SHALL PROVIDE A MINIMUM OF 72 HOURS ADVANCE NOTICE TO THE OWNER PRIOR TO STARTING DEMOLITION ACTIVITIES. 20.CONTRACTOR SHALL VERIFY AND PROTECT ALL PUBLIC UTILITIES. ANY WORK ASSOCIATED WITH SAID UTILITIES TO BE COORDINATED WITH APPROPRIATE UTILITY COMPANY. DEMOLITION OF UTILITIES WHICH ARE ACTIVE SHALL BE SEQUENCED TO ALLOW FOR INSTALLATION OF NEW OR REROUTED LINES, PRIOR TO REMOVAL OF EXISTING PORTION. REFER TO UTILITY PLANS FOR PROPOSED WORK. 21.ALL UNDERGROUND UTILITIES PREVIOUSLY SERVING EXISTING STRUCTURES TO BE REMOVED AND OR ABANDONED IN PLACE UNLESS INDICATED TO REMAIN. 22.CONTRACTOR SHALL COORDINATE STORM DEMOLITION WITH STORM DRAIN IMPROVEMENTS TO MAINTAIN POSITIVE DRAINAGE. 23.SHOULD THE CONTRACTOR ENCOUNTER ANY ADDITIONAL ITEMS THAT MAY REQUIRE DEMOLITION (FENCES, GUARD RAIL, ETC.) - THE CONTRACTOR SHALL CONTACT THE ENGINEER FOR FURTHER DIRECTION. 24.ALL EXISTING WATER METERS SHALL BE DISMANTLED BY CHARLOTTE WATER. CONTRACTOR SHALL LOCATE, CUT, AND CAP EXISTING PRIVATE WATER SERVICES BEHIND THE METER. ABANDONMENT OF WATER METERS AND NEW SERVICES APPLICATIONS SHALL BE COMPLETED AT THE SAME TIME FOR COORDINATION OF CAPACITY FEE CREDITS. 25.DEMOLITION WITHIN ADJACENT RIGHT OF WAYS SHALL BE COMPLETED IN ACCORDANCE WITH THE TRAFFIC CONTROL REQUIREMENTS OF THE W.A.T.C.H. MANUAL. CONTRACTOR SHALL INSTALL NEW CURB AND GUTTER AND STREET PAVEMENT IMMEDIATELY FOLLOWING DEMOLITION ACTIVITIES THAT OCCUR IN THE RIGHT OF WAY PER SITE PLAN. 26.CONTRACTOR SHALL CONTACT CDOT PRIOR TO CONSTRUCTION, TO OBTAIN THE NECESSARY RIGHT OF WAY PERMITS FOR ANY CONSTRUCTION ACTIVITIES WITHIN THE PUBLIC RIGHT OF WAY AND COORDINATION OF PEDESTRIAN ROUTING WHEN SIDEWALK HAS BEEN REMOVED. GENERAL NOTES: 1.ANY WORK WITHIN THE CITY'S R/W THAT REQUIRES CLOSURE OF THE SIDEWALK OR TRAVEL LANE FOR LESS THAN 30 DAYS REQUIRES A R/W USE PERMIT. TRAFFIC CONTROL PLANS FOR ANY SIDEWALK OR TRAVEL LANE CLOSURES MUST BE SUBMITTED AS PART OF THE R/W USE PERMIT REQUEST. TRAFFIC CONTROL PLANS MUST BE IN ACCORDANCE WITH CDOT'S WORK AREA TRAFFIC CONTROL HANDBOOK (WATCH) AND MUST BE REVIEWED AND APPROVED. CONTRACTOR SHALL CONTACT CDOT AT LEAST 5 BUSINESS DAYS IN ADVANCE OF BEGINNING OF WORK AT (704) 432-1562. 2.CONSTRUCTION STAGING WITHIN CITY R/W LASTING MORE THAN 30 DAYS REQUIRES A R/W LEASE AGREEMENT. PLEASE SEE TRAFFIC CONTROL PLAN NOTES FOR DETAILS. CONTRACTOR SHALL CONTACT CDOT AT (704) 336-2562. 3.NON-STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE CITY R/W REQUIRES A R/W ENCROACHMENT AGREEMENT WITH CDOT BEFORE INSTALLATION, CONTACT CDOT AT (704) 336-3888. EX. 2'-6" CURB AND GUTTER TO BE REMOVED EX. VERTICAL CURB TO BE REMOVED EX. 2'-6" CURB AND GUTTER TO BE REMOVED EX. 2'-6" CURB AND GUTTER TO BE REMOVED EX. 2'-6" CURB AND GUTTER TO BE REMOVED EX. VERTICAL CURB TO BE REMOVED. EX. CONCRETE AREA/SIDEWALK TO BE REMOVED ALL EX. SIDEWALK TO BE REMOVED (TYP.)PROPERTY BOUNDARYPROPERTY BOUNDARY PROPERTY BOUNDARYPROPERTY BOUNDARY EX. RIGHT-OF-WAY EX. RIGHT-OF-WAY EX. RIGHT-OF-WAYEX. RIGHT-OF-WAYTEMPORARY SILT FENCE (CLDS 30.06A) EX. FIRE HYDRANT EX. OVERHEAD UTILITIES "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.01 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. NOTES: ·CONTRACTOR IS RESPONSIBLE FOR FIELD LOCATING ALL EXISTING UTILITIES PRIOR TO BEGINNING ANY WORK ON THE SITE AND ENSURING THAT ALL UTILITY RELOCATIONS HAVE BEEN COORDINATED PRIOR TO REMOVAL. SEE SHEET C1.04. ·THERE SHALL BE NO REMOVAL OF EXISTING SLAB DURING DEMOLITION TO PREVENT EXPOSURE OF EXISTING SOIL THAT MAY CAUSE EROSION. EX. VERTICAL CURB TO BE REMOVED EX. EOPTEMPORARY SILT FENCE (CLDS 30.06A) EX. EOPEX. EDGE OF PAVEMENTEX. EOP "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. ALL EX. ASPHALT ONSITE TO BE REMOVED (TYP.) PHASE LINE PHASE LINE FH 1/2" EIR SS SS SS SS SS SS SS SS SS SS SSSSSSSSSSSSSSUGPUGPUGPUGPUGPUGPSOUTH TRYON STREET (VARIABLE WIDTH PUBLIC R/W) WINNIFRED STREET WEST CARSON BOULEVARD(VARIABLE WIDTH PUBLIC R/W)(VARIABLE WIDTH PUBLIC R/W)WEST CATHERINE STREET30' PUBLIC RIGHT-OF-WAYFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFO FOFOFOFOFOFOFOFOFO FO FO FOFOFOFOFOFOFOFO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FO FOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFOFO FO FO UGP UGP UGP UGPUGPUGP UGP UGP UGPUGPUGPUGPUGP745 74 0 745 749748 748 750 7507507 5 0 750 750 750 750 750 750750745741740 7 4 5 749745750S T S T ST ST ST ST ST ST ST ST ST ST STSTSTSTST ST ST ST STSTSTSTSTSTSTST ST STST STSTSTST ST ST STST STW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWWW W W W W W W W W W WWW W W WWWWWFH WV WV WV WV WV WV WV WV WVWWWWWWWWWWWWWWWWWW W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W W WW WWSS SS SSSSSSSSSSSSSSSSSSSSSSSSSSSS SSSSSSSSSSSSSSSSSSSSMB. 50, PG. 542NCDOT MAINTAINED CDOT MAINTAINEDCDOT MAINTAINED CDOT MAINTAINEDTD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->TD->745 749 745 744749 749 747745745744 743 745745 74 5 7 4 3 TD->TD->7457417 4 5 747 749 741 741745 741741746748 748749748 749 748 746 744 TD->TD->TD->TD->TD->749 STSTST ST ST ST ST ST ST ST ST ST ST ST STST ST ST ST ST ST750 748 746 KEY MAP SEAL SHEET NUMBER SHEET TITLE LANDDESIGN PROJ.# SCALE PROJECT NORTH NO.DESCRIPTION DATE REVISION / ISSUANCE ORIGINAL SHEET SIZE: 24" X 36" VERT: HORZ: CHECKED BY: DRAWN BY: DESIGNED BY: 223 NORTH GRAHAM STREET CHARLOTTE, NC 28202 704.333.0325 WWW.LANDDESIGN.COM NC ENG. FIRM LICENSE # C-0658 TRYON S T SITE I-2 7 7MOREH E A D S T MINT S T CAR SO N B L V D SOUT H BL V D 12/21/2018LAND DEVELOPMENT1 0 1"= 15'30'60' 30'PROPERTY BOUNDARYPROPERTY BOUNDARYEX. RIGHT-OF-WAY EX. RIGHT-OF-WAY EX. RIGHT-OF-WAYEX. RIGHT-OF-WAYEX. FIRE HYDRANT EX. FIRE HYDRANT EX. 12" WATER EX. 8" TERR SEWER EX. STORM, TYP. EX. STORM, TYP. EX. 54" WATER EX. FIBER OPTIC EX. UNDERGROUND POWER EX. 6" WATER EX. 12" WATER EX. 8" PVC SEWER EX. STORM, (TYP.) "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. EX.FIBER OPTIC "SIDEWALK CLOSED. CROSS HERE" SIGN. SIDEWALK TO BE CLOSED DURING CONSTRUCTION. SEE SHEET C1.08 FOR DETAILS. EX. EOP EX. EOP EX. 8" TERR. SEWER EX. EOP 748 BUILDING PAD ELEVATION 750 BUILDING PAD ELEVATION 750 BUILDING PAD ELEVATION 745 BUILDING PAD ELEVATION 4% SLOPE3:1 SLOPE 3:1 SLOPE EROSION CONTROL NOTES: 1. ALL STD. NUMBERS REFER TO THE CHARLOTTE LAND DEVELOPMENT STANDARDS MANUAL (CLDS). 2. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM THE ZONING ADMINISTRATOR. 2. ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION SHOWN ON THIS PLAN IS SUBJECT TO A FINE. 3. GRADING 1 ACRE OR MORE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND SUBJECT TO A FINE. 4. ALL PERIMETER DIKES, SWALES, DITCHES, PERIMETER SLOPES AND ALL SLOPES STEEPER THAN 3 HORIZONTAL TO 1 VERTICAL (3:1) SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. ALL OTHER DISTURBED AREAS SHALL BE PROVIDED TEMPORARY OR PERMANENT STABILIZATION WITH GROUND COVER AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN 14 CALENDAR DAYS FROM THE LAST LAND-DISTURBING ACTIVITY. 5. ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY THE CITY OF CHARLOTTE EROSION CONTROL COORDINATOR. 6. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10' REQUIRE ADEQUATE TERRACING. 7. ALL EMBANKMENTS MUST BE CONSTRUCTED PER SECTION 4.0.6 EMBANKMENT REQUIREMENTS IN THE BMP DESIGN MANUAL. 8. ALL ELEVATIONS ARE IN REFERENCE TO THE SURVEYORS BENCHMARK WHICH MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 9. ALL EROSION CONTROL MEASURES SHALL BE IN ACCORDANCE WITH THE CITY OF CHARLOTTE EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN STANDARDS. 10. PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION SHOULD BE CONSTRUCTED AT 2:1(HORIZONTAL TO VERTICAL) OR FLATTER. PERMANENT SLOPES OF 3:1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND AS INDICATED. IF FILL MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTE MATERIAL IS HAULED FROM THE PROPERTY THEN THE CONTRACTOR SHALL DISCLOSE THE LOCATION OF ANY ON-SITE AND/OR OFF-SITE BARROW LOCATION AND/OR WASTE BURIAL LOCATION TO THE EROSION CONTROL INSPECTOR. 11. LIMITS OF CLEARING SHOWN ARE BASED ON CUT AND FILL SLOPES OR OTHER GRADING REQUIREMENTS. 12. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES AS INDICATED PRIOR TO GRADING OPERATIONS. NO DEVICE MAY BE REMOVED WITHOUT APPROVAL OF EROSION CONTROL COORDINATOR. 13. CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY WITH EXISTING CONTOURS. 14. ALL DISTANCES ARE HORIZONTAL GROUND. DENUDED LIMIT: 5.18 ACRES NOTES 1.SEE SHEET C1.03 & C1.04 FOR EROSION CONTROL NOTES & DETAIL 2.LANDDESIGN, INC. DOES NOT INTEND FOR THE INCLUDED CONSTRUCTION SEQUENCING TO DICTATE NOR TAKE RESPONSIBILITY FOR CONSTRUCTION MEANS, METHODS, TECHNIQUES, PROCEDURES, AND SAFETY PRECAUTIONS WHICH ARE GOVERNED BY LOCAL, STATE AND FEDERAL GUIDELINES. THE CONTRACTOR IS SOLELY RESPONSIBLE FOR ALL CONSTRUCTION RELATED ACTIVITIES ASSOCIATED WITH THIS PROJECT. 3.COMMUNITY ENCROACHMENT LINE MUST BE CLEARLY MARKED PRIOR TO ANY GRADING AND THE MARKED LINE MUST BE MAINTAINED ON SITE UNTIL GRADING IS COMPLETED. CONSTRUCTION SEQUENCE 1.OBTAIN GRADING/EROSION CONTROL PLAN APPROVAL FROM THE CITY OF CHARLOTTE ENGINEERING DEPARTMENT FOR EROSION CONTROL PLAN. 2.SET UP AN ON-SITE PRE-CONSTRUCTION MEETING WITH EROSION CONTROL INSPECTOR OF THE CITY ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES. FAILURE TO SCHEDULE MEETING 48 HOURS PRIOR TO ANY LAND DISTURBING ACTIVITY IS A VIOLATION OF CHAPTER 17 ON THE CITY CODE AND SUBJECT TO A FINE. 3.PRIOR TO ANY CLEARING OR INSTALLATION OF EROSION CONTROL DEVICES, CONTRACTOR SHALL STAKE CLEARING LIMITS AND STAKE ALL TREES, STRUCTURES AND WETLANDS TO REMAIN AND BE PROTECTED. ALL BUFFERS AND WETLANDS SHALL BE CLEARLY DELINEATED IN THE FIELD TO BE PROTECTED. 4.INSTALL TEMPORARY CONSTRUCTION ENTRANCES AND PERIMETER CONSTRUCTION FENCING AND SILT FENCE. TIRE WASH MAY BE REQUIRED IF CONSTRUCTION ENTRANCE IS NOT SUFFICIENT TO RETAIN SOIL. CONTRACTOR TO BLOCK ALL POSSIBLE ENTRANCES TO SITE BESIDES APPROVED CONSTRUCTION ENTRANCE W/ FENCING AND ORANGE BARRELS. 5.INSTALL SILT FENCE, INLET PROTECTION, SEDIMENT TRAPS, COIR LOGS, TREE PROTECTION, AND ANY OTHER MEASURES AS SHOWN ON PLANS, CLEARING ONLY AS NECESSARY TO INSTALL THESE DEVICES. 6.CALL FOR ON-SITE INSPECTION BY INSPECTOR. WHEN APPROVED, INSPECTOR ISSUES THE GRADING PERMIT AND CLEARING AND GRUBBING MAY BEGIN. THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES. 7.GENERAL CONTRACTOR SHALL ENSURE THAT EROSION CONTROL MEASURES ARE IN PLACE AND FUNCTIONING PRIOR TO DEMOLITION, GRUBBING, AND GRADING OPERATIONS. 8.BEGIN DEMOLITION ACTIVITIES, INSTALLING ADDITIONAL EROSION CONTROL MEASURES AS INDICATED, AS REQUIRED, AND AS DEEMED NECESSARY BY THE EROSION CONTROL INSPECTOR. 9.FOR PHASED EROSION CONTROL PLANS, CONTRACTOR SHALL MEET WITH EROSION CONTROL INSPECTOR PRIOR TO COMMENCING WITH EACH PHASE OF EROSION CONTROL MEASURES. 10.ONCE THE SITE HAS BEEN ADEQUATELY DEMOLISHED, CLEARED, AND GRUBBED, SET UP AN ON-SITE CONSTRUCTION MEETING WITH EROSION CONTROL INSPECTOR OF THE CITY ENGINEERING DEPARTMENT TO DISCUSS EROSION CONTROL MEASURES. 11.GRADING FOR THE SITE SHALL COMMENCE. 12.CONSTRUCT RETAINING WALLS AS NECESSARY DURING GRADING AND STORM DRAINAGE INSTALLATION ACTIVITIES. 13.INSTALL INLET PROTECTION FOR STORM DRAINAGE STRUCTURES AS NECESSARY AND AS SHOWN ON PLANS. 14.THE CONTRACTOR SHALL ADJUST EROSION CONTROL MEASURES AND STABILIZE SITE AS AREAS ARE BROUGHT TO FINISHED GRADE. 15.THE CONTRACTOR SHALL DILIGENTLY AND CONTINUOUSLY MAINTAIN ALL EROSION CONTROL DEVICES AND STRUCTURES THROUGH OUT THE DURATION OF THE PROJECT. 16.STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING IS NECESSARY TO ACHIEVE EROSION CONTROL ON LARGE DENUDED AREAS AND ESPECIALLY WHEN SPECIFICALLY REQUIRED AS PART OF THE CONSTRUCTION SEQUENCE. ALL SLOPES MUST BE SEEDED AND MULCHED WITHIN DAYS. REFER TO EROSION CONTROL ORDINANCE FOR ADDITIONAL REQUIREMENTS. 17.COORDINATE WITH EROSION CONTROL INSPECTOR PRIOR TO REMOVAL OF EROSION CONTROL MEASURES. 18.NO DEVICE SHALL BE REMOVED UNTIL SITE IS STABILIZED. 19.ALL EROSION CONTROL DEVICES SHALL BE INSPECTED ONCE PER WEEK AND EVERY 0.5" OF PRECIPITATION. IF ANY FAILURES ARE FOUND THEY SHOULD BE REPAIRED AS SOON AS POSSIBLE. 20.ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, CITY OF CHARLOTTE EROSION CONTROL ORDINANCE, AND THE CHARLOTTE LAND DEVELOPMENT STANDARDS. SKIMMER SEDIMENT BASIN #1 DRAINAGE AREA: 1.78 AC SURFACE AREA REQUIRED : 1,423 SF SURFACE AREA PROVIDED: 2,218 SF VOLUME REQUIRED: 2,700 CF VOLUME PROVIDED: 4,938 CF BOTTOM ELEV: 741 SURFACE ELEV: 744 SKIMMER INVERT: 742 CLEAN OUT DEPTH: 1' TOP OF FREEBOARD: 745.5' SKIMMER SEDIMENT BASIN #2 DRAINAGE AREA: 1.71 AC SURFACE AREA REQUIRED : 992 SF SURFACE AREA PROVIDED: 1,961 SF VOLUME REQUIRED: 2,232 CF VOLUME PROVIDED: 4,451 CF BOTTOM ELEV: 741 SURFACE ELEV: 744 SKIMMER INVERT: 742 CLEAN OUT DEPTH: 1' TOP OF FREEBOARD: 745.5' START OF 2:1 SLOPE BAFFLES SPACED 10' MIN. PER CLDSM DETAIL #30.19 EX. EOP 3:1 SLOPE DOUBLE ROW OF HIGH HAZARD SILT FENCE PER CLDSM DETAIL# 30.06B RIP-RAP, TYP. LEGEND: CONSTRUCTION ENTRANCE (CLDS 30.11B) LIMITS OF DISTURBANCE TEMP. DIVERSION DITCH TD->TD->TD-> INLET PROTECTION (CLDS 30.15) ROCK CHECK DAM (CLDS 30.10A) CONSTRUCTION FENCE X X X SILT FENCE (CLDS 30.06A) DOUBLE ROW SILT FENCE TEMP. CONSTRUCTION EASEMENT TREE PROTECTION (CLDS 40.02) TEMP. STORM PIPE TBD BASIN BAFFLES DRAINAGE AREA PROPOSED MAJOR CONTOUR PROPOSED MINOR CONTOUR EXISTING MAJOR CONTOUR EXISTING MINOR CONTOUR 0 3:1 SLOPE START OF 2:1 SLOPE BAFFLES SPACED 10' MIN. PER CLDSM DETAIL #30.19 RIP-RAP, TYP. TEMPORARY DIVERSION DITCH PER CLDSM DETAIL #30.06 EX. EOP 6" PIPE TEMPORARY DIVERSION DITCH PER CLDSM DETAIL #30.06 DRAINAGE DIVIDE, TYP. SPECTRUM SOUTH TRYON SPECTRUM 1100 S TRYON ST. CHARLOTTE, NC 28203 1018203 EROSION CONTROL - PHASE 2 N/A RAK MRO MRO C1.05 12/21/2018 1:38 PM SEAN KAUFMAN N:\_2018\1018203\CAD\CONSTRUCTION DOCUMENTS\8203-PLN_EROSION CONTROL.DWG 1.24 ACRES TO BE FILTER USING DOUBLE ROW OF HIGH HAZARD SILT FENCE ALONG SOUTH TRYON STREET APPENDIX C D.B. 09440 PG. 157PID: 07327101MID-AMERICAPARTNERSHIP, LLCD.B. 26154 PG. 883PID: 07327107MAURICIO WESTDIOCESAN ADMIN. OF THE ROMAN CATHOLIC D/CHLTD.B. 09051 PG. 589PID: 07307211GLOBAL SIGNALAQUISITIONS IV LLCD.B. 23979 PG. 978PID: 07307222CATHERINE LLCD.B. 29674 PG. 472PID: 12303101LP CAMDENSUMMIT PARTNERSHIPD.B. 17726 PG. 101DNWINNIFRED STREET(VARIABLE WIDTH PUBLIC R/W)WEST CA R S O N B L V D (VARIABLE W I D T H P U B L I C R / W ) WEST CATHERINE STREET(30' WIDTH PUBLIC R/W)SOUTH TRYON STREET(VARIABLE WIDTH PUBLIC R/W)BUILDING WESTPARKING DECKBUILDING EAST747745.98 FG748.48 FG745.98 FG749.50 FG745.83 FG745.56 FG748.43 FG744.68 FG745.98 FG745.98 FG745.98 FG748.00 FG747.17 FG749.71 FG748.60 FG745.98 FG748.98 FG748.98 FG748.98 FG748.98 FG746.69 FG747.25 FG747.63 FG747.20 FG746.50FG748.83 FG748.48 FG748.48 FG748.98 FG749.13FG748.71FG745.56 FG745.81 FG748.38 FG749.98 FG749.98 FGFFE750.00FFE750.00FFE749.00FFE749.00FFE745.83FFE745.25FFE743.50FFE745.58FFE747.00FFE749.00FFE749.00FFE748.50FFE748.50FFE749.00748.48 FG747.98 FG748.00 FG747.89 LP1.5%FFE748.503.2%1.2%1.0%4.0%1.0%FFE745.831.5%1.0%3.2%1.6%1/2" EIR742743744 7 4 5 745744743742741740739742743744745746747748749749750 749 748 747746745 744 743 742 748738746 746746743746746749.98 FG748.79 FG1.0%748.68 FG748.47FG748.98 FG1.5%1.0%1.0%0.7%748.98 FG748.98 FG748.98 FG748.98 FG748.98 FG1.0%4.1%4.1%2.0%1.5%FFE748.50748.98 FG748.98 FG748.98 FG748.98 FG748.45 FG746.98 FG743.48 FG743.48 FG3.4%9.7%1.7%2.9%1.0%1.0%1.0% 1.0%1.0%748.48 FG747.98 FGRETAILLOADING DOCK/SERVICE AREARETAILRETAILRETAILPARKINGLOBBYBIKEPARKING/STORAGERETAILRETAILRETAILRETAILLOBBYRETAILOFFICELOBBYDROP OFFKEY MAPSEALSHEET NUMBERSHEET TITLELANDDESIGN PROJ.#SCALEPROJECTNORTHNO.DESCRIPTIONDATEREVISION / ISSUANCEORIGINAL SHEET SIZE: 24" X 36"VERT:HORZ:CHECKED BY:DRAWN BY:DESIGNED BY:223 NORTH GRAHAM STREETCHARLOTTE, NC 28202704.333.0325WWW.LANDDESIGN.COMNC ENG. FIRM LICENSE # C-0658TRYON STSITEI-277MOREHEAD STMIN T S T CARSON BLVDS O U T H B L V D 12/21/2018LAND DEVELOPMENT10 1"=15'30'60'30'SPECTRUMSOUTH TRYONSPECTRUM1100 S TRYON ST.CHARLOTTE, NC 282031018203OVERALL GRADING PLANN/ARPAJRPL7.0012/21/2018 1:47 PM SEAN KAUFMAN N:\_2018\1018203\CAD\CONSTRUCTION DOCUMENTS\8203_PLN_GRADING.DWGGRADING NOTES:1. REFER TO LAYOUT PLAN FOR RELATED NOTES.2. ALL CONTOURS AND SPOT ELEVATIONS REFLECT FINISHED GRADE.3. ALL FILL TO BE COMPACTED TO 98% A.A.S.H.O. STANDARD COMPACTION UNLESSOTHERWISE NOTED.4. THE PROPOSED CONTOURS SHOWN IN DRIVES, PARKING LOTS AND SIDEWALKS AREFINISHED ELEVATIONS INCLUDING ASPHALT. REFER TO PAVEMENT CROSS-SECTION DATA TOESTABLISH CORRECT SUB-BASE OR AGGREGATE BASE COURSE ELEVATIONS.5. LIMITS OF CLEARING SHOWN ON EROSION CONTROL PLANS ARE BASED ON CUT AND FILLSLOPES OR OTHER GRADING REQUIREMENTS.6. ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION SHOWN ON THE EROSION CONTROLPLAN IS SUBJECT TO A FINE.7. STABILIZATION IS THE BEST FORM OF EROSION CONTROL. TEMPORARY SEEDING ISNECESSARY TO ACHIEVE EROSION CONTROL ON DENUDED AREAS AND ESPECIALLY WHENTHE CONSTRUCTION SEQUENCE REQUIRES IT. ALL GRADED SLOPES ARE TO BE SEEDED ORLANDSCAPED: WITHIN 7 CALENDAR DAYS FROM THE LAST LAND-DISTRUBING ACTIVITY FORALL PERIMETER DIKES, SWALES, PERIMETER SLOPES, AND ALL SLOPES STEEPER THAN 3HORIZONTAL TO 1 VERTICAL (3:1); AND AS SOON AS PRACTICABLE BUT IN ANY EVENT WITHIN14 CALENDAR DAYS FROM LAST LAND-DISTURBING ACTIVITY FOR ALL OTHER DISTURBEDAREAS.8. CONTRACTOR SHALL INSTALL EROSION CONTROL MEASURES AS INDICATED ON EROSIONCONTROL PLANS. NO EROSION CONTROL DEVICE MEASURE MAY BE REMOVED UNTIL THESITE IS STABILIZED.9. ON-SITE BURIAL PITS REQUIRE AN ON-SITE DEMOLITION LANDFILL PERMIT FROM THEZONING ADMINISTRATOR.10. SLOPES SHALL BE GRADED NO STEEPER THAN 2:1. FILL SLOPES GREATER THAN 10'REQUIRE ADEQUATE TERRACING (CLDSM #30.16).11. THE CITY ENGINEERING DEPARTMENT SHALL BE NOTIFIED 24 HOURS IN ADVANCE OF THECOMMENCEMENT OF CONSTRUCTION ACTIVITY.12. NON-STANDARD ITEMS (IE: PAVERS, IRRIGATION SYSTEMS, ETC.) IN THE RIGHT-OF-WAYREQUIRE A RIGHT-OF-WAY ENCROACHMENT AGREEMENT WITH THE CHARLOTTEDEPARTMENT OF TRANSPORTATION/NORTH CAROLINA DEPARTMENT OF TRANSPORTATIONBEFORE INSTALLATION.13. PRIOR TO PLAT RECORDATION, OFFSITE R/W AND/OR CONSTRUCTION EASEMENTS AREREQUIRED TO BE OBTAINED ACCORDING TO THE GUIDELINES OF THE "OFFSITE R/WACQUISITION PROCESS". THESE NEEDED R/W AND CONSTRUCTION LIMITS ARE CLEARLYSHOWN ON THE ROADWAY IMPROVEMENT PLAN.14. THE DEVELOPER SHALL CONTACT THE CHARLOTTE DEPARTMENT OF TRANSPORTATIONTO IDENTIFY ANY CONFLICTS WITH TRAFFIC SIGNALIZATION EQUIPMENT. 60-90 DAYS WILL BEREQUIRED TO COORDINATE RELOCATION. DEVELOPER SHALL BE RESPONSIBLE FOR ALLRELATED RELOCATION COST AND/OR ANY REPAIR COST CAUSED BY THECONTRACTOR/DEVELOPER.15. IN ORDER TO ENSURE PROPER DRAINAGE, MAINTAIN MINIMUM 0.5% SLOPE ON ALL CURB.16. STORM DRAIN PIPE TO FOLLOW THE APPROVED CITY OF CHARLOTTE STANDARDSAND SPECIFICATIONS. RCP STORM DRAINAGE PIPE INSTALLED WITHIN EXISTING ORPROPOSED PUBLIC RIGHT-OF-WAY MUST BE APPROVED BY THE CITY'S INSPECTOR PRIOR TOANY BACKFILL BEING PLACED. BACKFILL MATERIAL MUST BE APPROVED BY THE CITYINSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE PUBLIC RIGHT-OF-WAY.THE CITY INSPECTOR MUST BE PRESENT DURING THE BACKFILLING OPERATION AS WELL.A)BACKFILL MATERIAL USED TO INSTALL RCP PIPE WITHIN THE STREET RIGHT-OF-WAYSHALL BE SELECT MATERIAL, CLASS II-IV, AS DEFINED BY SECTION 1016-3 OF THE NCDOTSTANDARD SPECIFICATIONS FOR ROADS AND STRUCTURES. UPON SUBMITTAL OF WRITTENCERTIFICATION OF MATERIAL SUITABILITY BY A LICENSED GEOTECHNICAL ENGINEER, NCDOTCLASS I SELECT MATERIAL MAY BE USED. ALL BACKFILL MATERIAL SHALL BE APPROVED BYTHE CITY INSPECTOR PRIOR TO PLACEMENT OF THE MATERIAL WITHIN THE STREETRIGHT-OF-WAY.17.GRADING CONTRACTORS SHALL NOTIFY AND COOPERATE WITH ALL UTILITYCOMPANIES OR FIRMS HAVING FACILITIES ON OR ADJACENT TO THE SITE BEFOREDISTURBING, ALTERING, REMOVING, RELOCATING, ADJUSTING OR CONNECTING TO SAIDFACILITIES. CONTRACTORS SHALL PAY ALL COSTS IN CONNECTION WITH THE ALTERATIONOF OR RELOCATION OF THE FACILITIES. CONTRACTORS SHALL RAISE OR LOWER TOPS OFEXISTING MANHOLES AS REQUIRED TO MATCH FINISHED GRADES.18.GRADING CONTRACTOR SHALL COOPERATE AND WORK WITH ALL OTHERCONTRACTORS PERFORMING WORK ON THIS PROJECT TO INSURE PROPER AND TIMELYCOMPLETION OF THIS PROJECT.19.THE GRADING CONTRACTOR SHALL USE WHATEVER MEASURES ARE REQUIRED TOPREVENT SILT AND CONSTRUCTION DEBRIS FROM FLOWING ONTO ADJACENT PROPERTIES.CONTRACTOR SHALL COMPLY WITH ALL LOCAL, STATE, AND FEDERAL EROSION SEDIMENTAND SILTATION ORDINANCES. CONTRACTOR SHALL REMOVE ALL TEMPORARY EROSIONCONTROL STRUCTURES UPON COMPLETION OF PERMANENT DRAINAGE FACILITIES AND NOTBEFORE ALL AREAS DRAINING INTO THESE STRUCTURES ARE SUFFICIENTLY STABILIZED.20.FOR ANY WORK ON THE STATE OR CITY RIGHT-OF-WAY, THE GRADING CONTRACTORSHALL: A) NOT STORE MATERIAL, EXCESS DIRT OR EQUIPMENT IN THE RIGHT-OF-WAY IN CASEOF MULTILANE HIGHWAYS. THE PAVEMENT SHALL BE KEPT FREE FROM ANY MUD OREXCAVATION WASTE FROM TRUCKS OR OTHER EQUIPMENT. ON COMPLETION OF THE WORKALL EXCESS MATERIAL SHALL BE REMOVED FROM THE RIGHT-OF-WAY; B) PROVIDE ALLNECESSARY AND ADEQUATE SAFETY PRECAUTIONS SUCH AS SIGNS, FLAGS, LIGHTBARRICADES AND FLAGMEN AS REQUIRED BY THE LOCAL AUTHORITIES AND IN ACCORDANCEWITH THE MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES. THE GRADING CONTRACTORSHALL BE SOLELY RESPONSIBLE FOR AND HOLD HARMLESS THE CITY OF CHARLOTTE, THESTATE OF NORTH CAROLINA, THE ARCHITECT/ENGINEER, AND THE OWNER FROM ANY CLAIMSFOR DAMAGE DONE TO EXISTING PRIVATE PROPERTY, PUBLIC UTILITIES, OR TO THETRAVELING PUBLIC; C) COMPLETE WORK TO THE SATISFACTION OF THE CHARLOTTEMECKLENBURG UTILITIES DEPARTMENT (CMUD) AND OBTAIN A LETTER FROM THEDEPARTMENT STATING THAT THE WORK IS ACCEPTABLE.21.GRADING CONTRACTOR SHALL TAKE ALL AVAILABLE PRECAUTIONS TO CONTROLDUST. CONTRACTOR SHALL CONTROL DUST BY SPRINKLING, OR BY OTHER METHODS ASDIRECTED BY ENGINEER AND/OR OWNER'S REPRESENTATIVE AT NO ADDITIONAL COST TOOWNER.22.GRADING CONTRACTOR TO COMPLY WITH ALL STATE AND LOCAL SEDIMENT CONTROLAND AIR POLLUTION ORDINANCES OR RULES.23.BEFORE ANY MACHINE WORK IS DONE, CONTRACTOR SHALL STAKE OUT AND MARKTHE ITEMS ESTABLISHED BY THE SITE PLAN. CONTROL POINTS SHALL BE PRESERVED AT ALLTIMES DURING THE COURSE OF THE PROJECT. LACK OF PROPER WORKING POINTS ANDGRADE STAKES MAY REQUIRE CESSATION OF OPERATIONS UNTIL SUCH POINTS AND GRADESHAVE BEEN PLACED TO THE OWNER'S SATISFACTION.24."AS-BUILT" DRAWINGS AND PLANS OF THE STORM DRAINAGE SYSTEM, MUST BESUBMITTED PRIOR TO FINAL INSPECTION TO THE CITY/COUNTY ENGINEERING DEPARTMENTIN ACCORDANCE WITH THE CITY/COUNTY SUBDIVISION ORDINANCE.25.CONTRACTOR SHALL REPAIR OR REPLACE IN-KIND ANY DAMAGE THAT OCCURS ASRESULT OF HIS WORK.26. APPROVAL OF THIS PLAN IS NOT AN AUTHORIZATION TO GRADE ADJACENTPROPERTIES. WHEN FIELD CONDITIONS WARRANT OFF-SITE GRADING, PERMISSION MUST BEOBTAINED FROM THE AFFECTED PROPERTY OWNERS.27. THE PURPOSE OF THE STORM DRAINAGE EASEMENT (SDE) IS TO PROVIDE STORMWATER CONVEYANCE. BUILDINGS ARE NOT PERMITTED IN THE EASEMENT AREA. ANY OTHEROBJECTS WHICH IMPEDE STORM WATER FLOW OR SYSTEM MAINTENANCE ARE ALSOPROHIBITED.28. PE SEALED SHOP DRAWINGS FOR RETAINING WALL MUST BE SUBMITTED TO CITYENGINEER PRIOR TO CONSTRUCTION.30. CERTIFICATION AND STREET CUT PERMITS ARE REQUIRED FOR UTILITY CUTS ON CITYSTREETS. ALLOW 7 DAYS PROCESSING FOR PERMIT. FOR INFORMATION CONTACTCHARLOTTE DEPARTMENT OF TRANSPORTATION (704-336-4025)BW 624.00TW 624.50TOP OF WALL, BOTTOM OF WALLSPOT ELEVATIONTOP OF CURB, BOTTOM OF CURBTOP OF STEP, BOTTOM OF STEP628.55TS 619.50TC 624.50BC 624.00BS 618.00GRADING LEGEND:TOP OF RAMP, BOTTOM OF RAMPTR 624.50HIGH POINT (FINISHED GRADE)HP 624.50DRAIN RIM ELEVATION (FINISHED GRADE)RIM 624.50BR 623.00SEE SHEETL7.02SEE SHEET L7.03HARDSCAPE AREA DRAINTRENCH DRAINLANDSCAPE AREA DRAIN4.0%654.79SYMBOLDESCRIPTIONFFEFINISHED FLOOR ELEVATIONPROPOSED MAJOR CONTOURSPROPOSED MINOR CONTOURSPROPOSED SPOT ELEVATIONPROPOSED SLOPEEXISTING MAJOR CONTOURSEXISTING MINOR CONTOURSADA PATHACCESSIBLE PATH (SLOPES <2.0%) PID: 07307211GLOBAL SIGNALAQUISITIONS IV LLCD.B. 23979 PG. 978PID: 07307222CATHERINE LLCD.B. 29674 PG. 472DNFFE748.50FFE747.00FFE745.58FFE750.001.5%FFE745.83FFE745.25FFE750.00FFE749.00FFE749.00748.98FGFFE748.50FFE748.50743.48 FG745.82 FGFFE749.00745.83 FG748.47 RIM748.98FG748.98FG748.48 FG748.48 FG748.48 FG748.48 FG748.98 FG748.98 FG748.00 FG2.2%748.48 FG748.48 FG748.00 FG747.65 FG748.31 FG748.40 RIM1.7%748.18 FG0.6%1.0%748.98 FG748.98 FG+/- 747.89 LP748.48 FG748.58FG1.0%748.23 FG1.5%FFE748.50748.48 FG747.70 FG1.7%2.3%748.41 TS747.58 BS747.34 FG1.7%745.98 FG745.98 FGWINNIFRED STREET(VARIABLE WIDTH PUBLIC R/W)WEST CATHERINE STREET(30' WIDTH PUBLIC R/W)749.50 FG748.95 FG746.77 FG746.69 RIM748.00 TS745.50 BS748.25 TS745.75 BS1.0%0.4%1.0%748.98 FG748.98FG748.98FG747.98 FG747.98 FG747.81 TW747.63 HPBUILDING WESTPARKING DECKBUILDING EAST746.65 TC746.15 BC746.84TC747.39TC746.33 TC745.83 BC745.43 TC744.93 BC744.58TC745.05TC745.69 TC745.19 BC749.14 TC748.64 BC749.66 TC749.16 BC746.45 TC745.95 BC744.87 FG744.68 FG747.64 FG744.02 FG742.85 TC742.35 BC742.51TC748.38 FG748.68 FG2.0%1.5%748.56 FG748.41 FG749.32 TC748.82 BC746.01 TC745.51 BC748.77 TS746.77 BS747.79 BR748.45 FG748.35 TR5.4%745.20 FG746.11 TC745.61 BC747.81 TW746.26 BW744.84 FG745.261.5%745.90 FG745.81 FG749.40 FG1.5%744.18743.14 FG743.48 FG742.93 FG747749.90 TC749.40 BC1.5%4.1%2.9%746.57 FG746.77FG746.98BR748.03TR7.4%FFE748.50FFE749.00745.00 FG745.71 TC745.21 BC743.94 TC743.44 BC743.37 TC742.87 BC744.28 FG745.96 TC745.46 BC744.81 TC744.31 BC744.96 TC744.46 BC743.18 FG1.5%746.89746.981.5%748.451.5%749.98 FG749.98 FG0.6%749.98 FG749.97 TC749.47 BC749.93FG1.0%749.421.0%749.98 FG749.79 TC749.29 BC748.37 TC748.87 BC748.32 TC747.82 BC748.27 TC747.77 BC749.74 TC749.24 BC1.5%748.98 FG748.25 FG748.26748.54 FG1.5%745.59 TC745.81 FG745.75 FG2.1%743.20 FG5.9%748.98 FG748.42 TC747.92 BC748.41 TC748.69 FG1.6%745.58 FG745.49 FG1.5%748.82 FG2.7%749.52 FG749.50 FG749.61 FG749.59 FG748.37 TC748.65 TC1.8%1.5% 1.1%749.91 FG748.98 FG748.47 RIM748.68 FG748.67748.25 RIM1.0%748.25 RIM748.78748.63748.69748.600.5%748.79FG748.43 FG748.69 FG1.8%1.0%748.61 FG2.4%0.5%748.63 FG748.98 FG1.0%1.0%1.4%1.2%0.9%748.98 FG1.5%1.5%1.0%748.93748.611.0%748.521.0%748.48 FG0.6%748.28 RIM1.8%748.461.0%3.2%1.0%1.5%741.98 FG742.82 FG748.69 FG748.64 FG1.3%1.1%749.98 FG749.82 FG0.5%748.98 FG748.11 LP0.7%1.4%1/2" EIRSTSTSTSTSTSTST ST ST ST ST ST ST ST ST ST ST ST ST STSTST STSTSTFFE745.83FFE743.50743.92 FG745.29 FG5.2%744.56 FG2.2%744.25 FG8.6%744.37 FG3.4%2.0%747 FG747.32 FG2.0%745.02 FG745.14 FG1.8%749.86RIM749.84RIM1.2%1.0%748.66 FG748.95 RIM749.10 FG1.5%1.0%1.6%1.8%748.57 TC748.07 BC748.77 TC748.27 BC748.45 TC747.95 BC1.0%1.5%747.99 TC747.49 BC749.38 TC748.88 BC2.4%742743744 7 4 5 749 748 747746745 744 743 742 7487467467437467461.5%748.22 TC747.72 BC745.91 TC745.41 BCALL SLOPES LESS THAN 2%MAX ON ADA PARKING SPACE745.23 BC745.45 FG744.77 BC744.99 FG1.5%1.8%ALL SLOPES LESS THAN 2%MAX ON ADA PARKING SPACE744.40 FG9.7%1.5%745.31 FG745.54 FG745.54 FG745.69 BW747.81 TW4.0%744.82 FG5.8%744.75 FG744.94 FG2.5%1.6%744.61 FG742.70 FG742.10 FG749.98 FG749.95 TC749.45 BC749.10 FG748.92 FG748.71 FG748.85 FG748.57 FG1.0%1.1%749.32 TC748.82 BC749.43 TC748.93 BC748.98 FG1.0%748.98 FG748.73 FG0.6%748.48 FG748.48 FGRETAILLOADING DOCK/SERVICE AREARETAILRETAILRETAILPARKINGLOBBYBIKEPARKING/STORAGERETAILRETAILLOBBYRETAILOFFICELOBBYDROP OFF749.32 FG749.36 FG749.58 FG749.58 FG3.0%749.05 FG749.18 FG749.24 FG1.0%749.82 BC749.32 BC0.5%749.55 TC749.05 BC749.17 FG749.24 FG749.13 FGKEY MAPSEALSHEET NUMBERSHEET TITLELANDDESIGN PROJ.#SCALEPROJECTNORTHNO.DESCRIPTIONDATEREVISION / ISSUANCEORIGINAL SHEET SIZE: 24" X 36"VERT:HORZ:CHECKED BY:DRAWN BY:DESIGNED BY:223 NORTH GRAHAM STREETCHARLOTTE, NC 28202704.333.0325WWW.LANDDESIGN.COMNC ENG. FIRM LICENSE # C-0658TRYON STSITEI-277MOREHEAD STMIN T S T CARSON BLVDS O U T H B L V D 12/21/2018LAND DEVELOPMENT10 1"=10'20'40'20'SPECTRUMSOUTH TRYONSPECTRUM1100 S TRYON ST.CHARLOTTE, NC 282031018203GRADING ENLARGEMENTN/ARPAJRPL7.0212/21/2018 1:47 PM SEAN KAUFMAN N:\_2018\1018203\CAD\CONSTRUCTION DOCUMENTS\8203_PLN_GRADING.DWGBW 624.00TW 624.50TOP OF WALL, BOTTOM OF WALLSPOT ELEVATIONTOP OF CURB, BOTTOM OF CURBTOP OF STEP, BOTTOM OF STEP628.55TS 619.50TC 624.50BC 624.00BS 618.00GRADING LEGEND:TOP OF RAMP, BOTTOM OF RAMPTR 624.50HIGH POINT (FINISHED GRADE)HP 624.50DRAIN RIM ELEVATION (FINISHED GRADE)RIM 624.50BR 623.00HARDSCAPE AREA DRAINTRENCH DRAINLANDSCAPE AREA DRAIN4.0%654.79SYMBOLDESCRIPTIONFFEFINISHED FLOOR ELEVATIONPROPOSED MAJOR CONTOURSPROPOSED MINOR CONTOURSPROPOSED SPOT ELEVATIONPROPOSED SLOPEEXISTING MAJOR CONTOURSEXISTING MINOR CONTOURSADA PATHACCESSIBLE PATH (SLOPES <2.0%) D.B. 09440 PG. 157DNFFE748.50FFE749.001.5%FFE745.25FFE750.00FFE749.00FFE749.00748.98FGFFE748.50FFE748.50745.82 FGFFE749.00748.47 RIM748.98FG748.98FG748.48 FG748.48 FG748.48 FG748.48 FG748.98 FG748.98 FG748.00 FG2.2%748.48 FG748.48 FG748.00 FG747.65 FG748.31 FG748.40 RIM1.7%748.18 FG0.6%1.0%748.98 FG748.98 FG+/- 747.89 LP748.48 FG748.58FG1.0%748.23 FG1.5%FFE748.50748.48 FG747.70 FG1.7%2.3%748.41 TS747.58 BS747.34 FG1.7%745.98 FG745.98 FGWINNIFRED STREET(VARIABLE WIDTH PUBLIC R/W)WEST CA R S O N B L V D (VARIABL E W I D T H P U B L I C R / W )745.82 FG745.82 BS748.95 FG747.82 TS746.77 FG746.69 RIM748.48 TS746.98 BS745.82 FG748.00 TS745.50 BS748.25 TS745.75 BS745.36 RIM745.55 FG745.55 FG1.8%745.82 FG1.0%748.48 FG748.48 FG748.73 FG0.4%1.5% 1.0%748.98 FG748.98 FG1.8%748.98FG748.98FG747.98 FG747.98 FG747.81 TW745.98 FG1.8%746.33 TC745.85 TC749.50 TC749.02 BC747.63 HP745.82 FG1.2%747.17 FG1.1%746.50 FG1.0%746.59FG2.2%747.17 FG3.2%747.20RIM749.71 FG747.30RIM4.0%1.0%746.48 FG0.5%1.1%748.98 FGBUILDING WESTPARKING DECKBUILDING EAST744.68 FG747.64 FG744.02 FG748.56 FG748.41 FG749.32 TC748.82 BC746.01 TC745.51 BC745.49 TC744.99 TC744.56 TC744.06 TC742.36 TC741.86 BC742.66 TC472.16 BC743.97 TC743.47 BC745.01 TC745.37 BC749.94 TC749.44 BC1.0%749.85 TC749.35 BC749.87 TC749.87 BC748.49 TC747.99 TC748.77 TS746.77 BS747.25FG747.79 BR748.45 FG748.35 TR5.4%748.09 RIM745.20 FG746.02 TC745.52 TC746.27 TC744.65 TC746.11 TC745.61 BC747.81 TW746.26 BW744.84 FG745.261.5%748.02 TC747.52 BC748.54 TC748.04 BC748.22749.08 TC748.58 BC746.96 TC746.46 BC745.90 FG745.81 FG748.88 TC748.38 BC3.5%1.5%4.1%2.9%746.57 FG746.77FG746.98BR748.03TR7.4%FFE748.50FFE749.00745.00 FG744.00 TC743.50 BC745.71 TC745.21 BC744.28 FG749.63 TC749.13 BC749.85 TC749.35 BC744.81 TC744.31 BC744.96 TC744.46 BC1.5%748.37 TC748.87 BC748.32 TC747.82 BC748.27 TC747.77 BC1.5%748.98 FG748.25 FG748.26748.54 FG1.5%748.98 FG748.42 TC747.92 BC748.41 TC748.69 FG1.6%748.82 FG2.7%748.98 FG748.37 TC748.65 TC1.8%1.5%748.98 FG748.47 RIM748.68 FG748.67748.25 RIM1.0%748.25 RIM748.78748.63748.69748.600.5%748.79FG748.43 FG748.69 FG1.8%1.0%748.61 FG2.4%0.5%748.63 FG748.98 FG1.0%1.0%1.4%1.2%0.9%748.98 FG1.5%1.5%1.0%748.93748.611.0%748.521.0%748.48 FG0.6%748.28 RIM1.8%748.461.0%3.2%1.0%748.69 FG748.64 FG1.3%1.1%748.98 FG748.11 LP0.7%WVWV748.66 FG748.95 RIM749.10 FG1.5%1.0%1.6%1.8%748.57 TC748.07 BC748.77 TC748.27 BC748.45 TC747.95 BC749.85 TC749.35 BC749.89 TC749.39 BC749.74 TC749.24 BC743.55 TC743.05 BC749.38 TC748.88 BC748.69 RIM2.4%748.95 FG741.95 FG745 745744743742741740739742743744745746747748749749 7481.5%748.28 TC747.78 BC748.38 TC747.88 BC748.22 TC747.72 BC749.92 TC749.42 BC745.91 TC745.41 BCALL SLOPES LESS THAN 2%MAX ON ADA PARKING SPACE745.23 BC745.45 FG744.77 BC744.99 FG1.5%1.8%ALL SLOPES LESS THAN 2%MAX ON ADA PARKING SPACE744.40 FG1.5%745.31 FG745.54 FG745.54 FG745.69 BW747.81 TW4.0%744.82 FG5.8%744.75 FG744.94 FG2.5%1.6%744.61 FG749.98 FG749.10 FG748.92 FG748.71 FG748.85 FG748.57 FG1.0%744.32 FG741.83 FG742.43 FG742.55 FG742.67 FG743.32 TC742.82 BC743.00 FG743.24FG743.67 BW748.00 TW1.5%5.1%743.69 FG2.6%745.00 BW748.00 TW746.00 BW748.50 TW748.98 FG1.0%748.98 FG748.73 FG0.6%748.48 FG748.48 FGLOADING DOCK/PARKINGLOBBYRETAILRETAILRETAILRETAILLOBBYRETAILOFFICELOBBYDROP OFF750.36 TS748.69 BS748.69 RIM1.5%750.28 FG750.24 FG1.5%1.5%1.5%1.5%748.22 FG748.22 FG749.00 FG748.91 FG749.11 FG748.95 FG0.6%1.0%748.68 FG748.68 FG5.4% 5.9%749.05 FG749.18 FG749.24 FG1.0%749.82 BC749.32 BC0.5%749.55 TC749.05 BC749.17 FG749.24 FG749.13 FGKEY MAPSEALSHEET NUMBERSHEET TITLELANDDESIGN PROJ.#SCALEPROJECTNORTHNO.DESCRIPTIONDATEREVISION / ISSUANCEORIGINAL SHEET SIZE: 24" X 36"VERT:HORZ:CHECKED BY:DRAWN BY:DESIGNED BY:223 NORTH GRAHAM STREETCHARLOTTE, NC 28202704.333.0325WWW.LANDDESIGN.COMNC ENG. FIRM LICENSE # C-0658TRYON STSITEI-277MOREHEAD STMIN T S T CARSON BLVDS O U T H B L V D 12/21/2018LAND DEVELOPMENT10 1"=10'20'40'20'SPECTRUMSOUTH TRYONSPECTRUM1100 S TRYON ST.CHARLOTTE, NC 282031018203GRADING ENLARGEMENTN/ARPAJRPL7.0312/21/2018 1:47 PM SEAN KAUFMAN N:\_2018\1018203\CAD\CONSTRUCTION DOCUMENTS\8203_PLN_GRADING.DWGBW 624.00TW 624.50TOP OF WALL, BOTTOM OF WALLSPOT ELEVATIONTOP OF CURB, BOTTOM OF CURBTOP OF STEP, BOTTOM OF STEP628.55TS 619.50TC 624.50BC 624.00BS 618.00GRADING LEGEND:TOP OF RAMP, BOTTOM OF RAMPTR 624.50HIGH POINT (FINISHED GRADE)HP 624.50DRAIN RIM ELEVATION (FINISHED GRADE)RIM 624.50BR 623.00HARDSCAPE AREA DRAINTRENCH DRAINLANDSCAPE AREA DRAIN4.0%654.79SYMBOLDESCRIPTIONFFEFINISHED FLOOR ELEVATIONPROPOSED MAJOR CONTOURSPROPOSED MINOR CONTOURSPROPOSED SPOT ELEVATIONPROPOSED SLOPEEXISTING MAJOR CONTOURSEXISTING MINOR CONTOURSADA PATHACCESSIBLE PATH (SLOPES <2.0%) APPENDIX D Job: AGTEK 02-14-19 Units: Ft-CY Thu Feb 14, 2019 11:44:18 Page 1 Volume Report Subgrade vs. Stripped Area Volume Comp/Ratio Compact Export Change Total Cut Fill OnGrade Cut Fill Cut Fill Cut Fill -Import Per .1 Ft OFFICE EAST 24,317 24,317 0 0 1,986 0 1.00 1.15 1,986 0 1,986 104 OFFICE WEST 28,223 1,280 24,559 2,384 26 1,021 1.00 1.15 26 1,174 -1,148 120 OFFICE Sub: 52,540 25,597 24,559 2,384 2,012 1,021 2,012 1,174 838 224 PARKING DECK 63,736 63,449 107 180 3,932 1 1.00 1.15 3,932 1 3,931 271 PRIVATE DRIVE 10,901 8,329 1,618 954 598 17 1.00 1.15 598 20 578 46 Regions Total 127,177 97,375 26,284 3,518 6,542 1,039 6,542 1,195 5,347 541 Unspecified 113,985 58,616 44,440 10,929 2,460 1,030 1.00 1.15 2,460 1,184 1,276 485 Job Total 241,162 155,991 70,724 14,447 9,002 2,069 9,002 2,379 6,623 1,026 Plane Slope Stripping Qtys Area Area Depth Volume STRIPPINGS 241,162 241,162 0.500 4,466 Plane Slope Sectional Qtys Area Area Depth Volume OFFICE EAST 24,317 24,317 1.000 901 OFFICE WEST 28,223 28,223 1.000 1,045 OFFICE Sub: 52,540 52,540 1,946 PARKING DECK 63,736 63,975 1.000 2,369 PRIVATE DRIVE 10,901 10,947 0.833 338 Sectional Total 127,177 127,462 4,653 SPECTRUM SOUTH TRYON FEB 14, 2019 0 62.9 125.8 7.50 7.00 6.50 6.00 5.50 5.00 4.50 4.00 3.50 3.00 2.50 2.00 1.50 1.00 0.50 ± .100 0.50 1.00 1.50 2.00 2.50 3.00 3.50 4.00 4.50 5.00 5.50 6.00 6.50 7.00 7.50 APPENDIX E ID Task NameDuration StartFinish99Construction OT #1 436 daysMon 5/6/19Thu 1/28/21100Mobilization5 daysMon 5/6/19Fri 5/10/19101Site375 daysMon 5/13/19Wed 11/4/20102Site Demolition15 daysMon 5/13/19Mon 6/3/19103Erosion Control Meeting1 dayMon 5/13/19Mon 5/13/19104Erosion Control 10 daysTue 5/14/19Tue 5/28/19105Utility Relocation15 daysMon 5/20/19Mon 6/10/19106Establish Office Tower Pad10 daysTue 6/11/19Mon 6/24/19107Establish Complete Parking Garage Pad15 daysTue 6/25/19Tue 7/16/19108Hardscapes40 daysWed 8/19/20Wed 10/14/20109Landscaping20 daysThu 10/8/20Wed 11/4/20110Office Tower401 daysTue 6/25/19Thu 1/28/21111Structure165 daysTue 6/25/19Fri 2/21/20112Deep Foundations30 daysTue 6/25/19Tue 8/6/19113Concrete Foundations20 daysWed 7/24/19Tue 8/20/19114Steel Erection100 daysWed 8/21/19Thu 1/16/20115Slab on Metal Decks55 daysThu 11/7/19Thu 1/30/20116Slab on Grade20 daysMon 12/2/19Thu 1/2/20117Spray on Fireproofing55 daysMon 12/2/19Fri 2/21/20OctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayQtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Spectrum Tryon South End(2) 11 Story OT and PG ScheduleMon 4/1/19 Page 1118Vertical Transportation190 daysFri 1/31/20Wed 10/28/20119Buckhoist Install5 daysFri 1/31/20Thu 2/6/20120Temporary Elevator60 daysMon 4/27/20Tue 7/21/20121Buckhoist Removal5 daysWed 7/22/20Tue 7/28/20122Elevator Installation80 daysWed 7/8/20Wed 10/28/20123Skin150 daysFri 1/17/20Tue 8/18/20124Exterior Framing and Sheathing30 daysFri 1/17/20Fri 2/28/20125Precast Erection30 daysFri 1/24/20Fri 3/6/20126Curtainwall & Storefront140 daysFri 1/31/20Tue 8/18/20127Exterior Brick60 daysMon 3/2/20Fri 5/22/20128Roofing (Temp)10 daysMon 4/13/20Fri 4/24/20129Permanent Roof30 daysTue 5/26/20Tue 7/7/20130Curtainwall & Storefront Fill in at Buckhoist15 daysWed 7/29/20Tue 8/18/20131Interiors190 daysFri 1/10/20Wed 10/7/20132Elevator Shaft Framing & Hanging40 daysFri 1/10/20Fri 3/6/20133MEP Rough85 daysMon 3/30/20Tue 7/28/20134Drywall Hanging85 daysMon 4/27/20Tue 8/25/20135Drywall Finishing85 daysMon 5/11/20Wed 9/9/20136Tenant Upfit Commencement (Rodgers)1 dayMon 5/11/20Mon 5/11/20137Tenant Upfit Commencement (Non-Base Building GC)1 dayWed 7/22/20Wed 7/22/20138Painting70 daysTue 6/30/20Wed 10/7/20139Millwork (restrooms, lobby)70 daysTue 6/30/20Wed 10/7/20140Closeout86 daysThu 9/24/20Thu 1/28/21141Punch60 daysThu 9/24/20Fri 12/18/20142Inspections & Commissioning30 daysThu 10/29/20Fri 12/11/20143Shell Certificate of Completion1 dayMon 12/14/20Mon 12/14/20144Phased Tenant Upfit Occupancy30 daysTue 12/15/20Thu 1/28/215/117/2212/14145Parking Garage375 daysWed 7/17/19Wed 1/13/21146Parking Garage375 daysWed 7/17/19Wed 1/13/21147Foundations55 daysWed 7/17/19Wed 10/2/19148Below Grade MEP Rough-In30 daysThu 9/19/19Wed 10/30/19149Slab on Grade20 daysThu 10/17/19Wed 11/13/19150CIP Structure150 daysThu 10/31/19Mon 6/8/20 ID Task NameDuration StartFinish151Retail 112 daysMon 3/16/20Thu 8/20/20152Retail Framing and Rough-In40 daysMon 3/16/20Fri 5/8/20153Retail Dry in1 dayMon 5/11/20Mon 5/11/20154Retail HTF30 daysTue 5/12/20Tue 6/23/20155Retail Finishes40 daysWed 6/24/20Wed 8/19/20156Available for Retail Upfits to Commence1 dayThu 8/20/20Thu 8/20/20157Exterior Skin120 daysMon 4/13/20Wed 9/30/20158PG MEP FP Rough-in60 daysMon 5/11/20Tue 8/4/20159Hotel Structure Commences1 dayTue 6/9/20Tue 6/9/20160Barrier Cable System30 daysTue 6/9/20Tue 7/21/20161Lobby Framing and Rough-In40 daysTue 6/23/20Tue 8/18/20162Elevator Installation90 daysWed 7/8/20Wed 11/11/20163Lobby Finishes60 daysWed 8/19/20Wed 11/11/20164Punch 40 daysThu 11/12/20Wed 1/13/21165Inspections & Commissioning20 daysThu 11/12/20Fri 12/11/20166Substantial Completion1 dayMon 12/14/20Mon 12/14/20167Construction OT #2426 daysWed 7/31/19Fri 4/9/21168Site396 daysWed 7/31/19Fri 2/26/21169**Existing Building Vacated**1 dayWed 7/31/19Wed 7/31/19170Building Demolition20 daysThu 8/1/19Wed 8/28/19171Utility Relocation15 daysThu 8/15/19Thu 9/5/19172Erosion Control 5 daysThu 8/29/19Thu 9/5/19173Establish Office Tower Pad25 daysFri 9/6/19Thu 10/10/19174Hardscapes40 daysTue 12/8/20Thu 2/4/21175Landscaping20 daysFri 1/29/21Fri 2/26/21176Office Tower375 daysFri 10/11/19Fri 4/9/218/2012/14OctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayJunJulAugSepOctNovDecJanFebMarAprMayQtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Qtr 3Qtr 4Qtr 1Qtr 2Spectrum Tryon South End(2) 11 Story OT and PG ScheduleMon 4/1/19 Page 2177Structure165 daysFri 10/11/19Tue 6/9/20178Deep Foundations30 daysFri 10/11/19Thu 11/21/19179Concrete Foundations20 daysFri 11/8/19Mon 12/9/19180Steel Erection100 daysTue 12/10/19Mon 5/4/20181Slab on Metal Decks55 daysTue 3/3/20Mon 5/18/20182Slab on Grade20 daysTue 3/24/20Mon 4/20/20183Spray on Fireproofing55 daysTue 3/24/20Tue 6/9/20184Vertical Transportation190 daysTue 5/19/20Fri 2/19/21185Buckhoist Install5 daysTue 5/19/20Tue 5/26/20186Temporary Elevator60 daysThu 8/13/20Thu 11/5/20187Buckhoist Removal5 daysFri 11/6/20Thu 11/12/20188Elevator Installation80 daysFri 10/23/20Fri 2/19/21189Skin150 daysTue 5/5/20Mon 12/7/20190Exterior Framing and Sheathing30 daysTue 5/5/20Tue 6/16/20191Precast Erection30 daysTue 5/12/20Tue 6/23/20192Curtainwall & Storefront140 daysTue 5/19/20Mon 12/7/20193Exterior Brick60 daysWed 6/17/20Thu 9/10/20194Roofing (Temp)10 daysThu 7/30/20Wed 8/12/20195Permanent Roof30 daysFri 9/11/20Thu 10/22/20196Curtainwall & Storefront Fill in at Buckhoist15 daysFri 11/13/20Mon 12/7/20197Interiors190 daysTue 4/28/20Thu 1/28/21198Elevator Shaft Framing & Hanging40 daysTue 4/28/20Tue 6/23/20199MEP Rough85 daysThu 7/16/20Thu 11/12/20200Drywall Hanging85 daysThu 8/13/20Mon 12/14/20201Drywall Finishing85 daysThu 8/27/20Wed 12/30/20202Tenant Upfit Commencement (Rodgers)1 dayThu 8/27/20Thu 8/27/20203Tenant Upfit Commencement (Non-Base Building GC)1 dayFri 11/13/20Fri 11/13/20204Painting70 daysFri 10/16/20Thu 1/28/21205Millwork (restrooms, lobby)70 daysFri 10/16/20Thu 1/28/21206Closeout60 daysFri 1/15/21Fri 4/9/21207Punch60 daysFri 1/15/21Fri 4/9/21208Inspections & Commissioning30 daysMon 2/22/21Fri 4/2/21209Shell Certificate of Completion1 dayMon 4/5/21Mon 4/5/218/2711/134/5