Loading...
HomeMy WebLinkAbout17047 EMP_Approval 1900 Continental 2016083018/30/2016 4:53 PM Little, Geof From:Little, Geof Sent:Tuesday, August 30, 2016 3:44 PM To:'Matt Bramblett'; Eckard, Sharon Cc:Hinnant, Lori; Ed Kulik; Dan Heath Subject:RE: Environmental Management Plan - Building Improvements - 1900 Continental Blvd (# 17047-13-060) Attachments:EMP Building Improvements 1900 Continental_BF_Sig.pdf Hi Matt,    Thanks for speaking with me by telephone just now.    The attached EMP is approved under the following conditions:     Fuels and lubricants stored at the site must be contained within leak‐proof secondary containment systems.   Fuel leaks must be immediately contained and captured.    The attached EMP has my signature affixed on page 14 based on the above conditions being included in the project  specifications.      [I did not see notes or references to fuels or spills in the plan sheets or EMP.]    Please let me know of any additional issues.    Thanks,    Geof    ________________  Geoffrey H. Little  Project Manager   Brownfields Program  NC‐DEQ Division of Waste Management    919‐707‐8252  Office/Fax  919‐707‐8383  Main  Geof.Little@ncdenr.gov    217 West Jones Street  1646 Mail Service Center  Raleigh, North Carolina 27699‐1646  https://deq.nc.gov/about/divisions/waste‐management/brownfields‐program         Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 28/30/2016 4:53 PM       From: Matt Bramblett [mailto:MBramblett@harthickman.com]   Sent: Wednesday, August 24, 2016 5:11 PM  To: Little, Geof <geof.little@ncdenr.gov>; Eckard, Sharon <sharon.eckard@ncdenr.gov>  Cc: Hinnant, Lori <LHinnant@wcsr.com>; Ed Kulik <ed@lrcprop.com>; Dan Heath  <Dan.Heath@foundrycommercial.com>  Subject: Environmental Management Plan ‐ Building Improvements ‐ 1900 Continental Blvd (#17047‐13‐060)    Geof and Sharon,    Please find the attached Environmental Management Plan for Building Improvements for the above site (#17047‐13‐ 060).  This is the Charlotte site that we spoke about together last week at Geof’s desk.  The good news is that the  planned subsurface work is not in known or suspected contaminated locations.    This EMP review has a very short timeline because the construction work has been awarded and the contractor is  waiting on the go ahead.  In addition, they need to meet tenant demands and lender requirements on the building  improvement schedule.  They are planning to start work at the site which could include subsurface disturbance on  8/31/16.  Therefore, if you can respond to this submittal early next week, that would be super.  We also need to sample  some import soil and the planned sampling is noted in the attached EMP.  The import soil will not be brought to the site  until we obtain lab results, which will be provided to you.    I look forward to hearing form you.  If you have any questions, please let me know.    Thanks,  Matt    Matt Bramblett, PE, Principal  Hart & Hickman, PC | 2923 South Tryon Street, Suite 100 | Charlotte, NC 28203  Direct 704-887-4620 | Mobile 704-560-8009 | Main 704-586-0007 www.harthickman.com