Loading...
HomeMy WebLinkAbout05016_Southern Mfg Brownfields Project Approval to PC EmailFrom:Rob Gelblum To:rlazes@aol.com Cc:carolyn minnich Subject:Former Southern Manufacturing Site Brownfields Project Date:Wednesday, February 26, 2003 12:52:50 PM Attachments:Southern Mfg BFA 2-26-03.WPD Mr. Lazes: My client, Carolyn Minnich of the state Brownfields Program, has informed me that you would like the draft Brownfields Agreement (BFA) for this project sent directly to you, which I am doing by means of this e-mail. It is attached in WordPerfect. Let me or Carolyn know if you have any questions about it. As soon as you tell us in writing (e-mail suffices) that the BFA is satisfactory, we will prepare and send you drafts of two one-page, and one four-page, documents that we also must reach agreement on before the project may be approved to proceed to the public comment period that must last at least (and usually lasts no more than) 60 days. Rob Gelblum Asst. Atty. General N.C. Dept. of Justice 1646 Mail Service Center Raleigh, NC 27699-1646 From:Minnich, Carolyn To:Rick Lazes (E-mail) Cc:Benne C. Hutson (E-mail); Robert R. Gelblum (E-mail 3) Subject:Southern Manufacturing Site Brownfields Project Approval to PC Date:Monday, April 07, 2003 5:07:33 PM Dear Rick: Based on your acceptance of drafts of all four required brownfields documents -- the Notice of Intent to Redevelop a Brownfields Property (NI); Summary of Notice of Intent to Redevelop a Brownfields Property (SNI); Notice of Brownfields Property (NBP), which includes a document and a plat; and the Brownfields Agreement (Exhibit A of the documentary portion of the NBP) -- DENR hereby gives its approval for the subject brownfields project to proceed to the required public notice and public comment period of at least sixty (60) days. Before the public comment period can begin, the Prospective Developer must, in accordance with N.C.G.S. § 130.310.34(a): Provide a copy of the full NI, consisting of the one-page NI and the NBP with its three exhibits (the Brownfields Agreement, the survey plat, and the legal description), to all local governments having jurisdiction over the subject brownfields property; arrange for publication of the SNI in a newspaper of general circulation serving the area in which the property is located; file a copy of the SNI with the Codifier of Rules for publication in the North Carolina Register; and conspicuously post the SNI at the property. Another action the Prospective Developer must take prior to commencement of the public comment period is to provide a copy of the full NI to the local location where the SNI states it will be available for public review. Please note that, pursuant to N.C.G.S. § 130.310.34.(b), the public comment period begins on the later date of publication of the SNI in the N.C. Register or the newspaper, as described above. The N.C. Register is published every two weeks, and a link to its publication schedule and filing deadlines (which occur 2 to 3 weeks prior to the next publication date) may be found at http:/www.oah.state.nc.us/rules/. You may contact Ms. Ruby Creech, publications coordinator (919-733-2678, or postmaster@oah.state.nc.us) at the Office of Administrative Hearings, to arrange for filing of the SNI with the Codifier of Rules and the publication of it in the N.C. Register. Finally, the Prospective Developer must confirm to DENR that the above actions have been completed by promptly providing to me, at N.C. Division of Waste Management, c/o City of Charlotte, Neighborhood Development Key Business, 600 East Trade Street, Charlotte, NC 28202, the following: To confirm provision of the full NI to local governments and to the location where it will be available for public review, preferably provide a letter from each location confirming receipt of the full NI, but at a minimum provide copies of your letters transmitting the NI to each location. To confirm publication of the SNI in the newspaper, preferably provide an affidavit of publication from the newspaper, but at a minimum provide a copy of the SNI as published that indicates the name of the newspaper and the date of publication. To confirm posting of the SNI at the property, provide photographs, one close-up and one more distant, of the SNI posted at the property. To confirm publication of the SNI in the N.C. Register, provide a copy of the page or pages from the issue of the Register in which the SNI appeared, making sure that the date and name of the publication appear. Thank you for your attention to these matters. If you have any questions or require additional information, you may contact me by phone at the telephone number or e-mail address below. You may also contact me as the Manager for this Brownfields Project, at (704) 336-3499, or via e-mail at carolyn.minnich@ncmail.net. Carolyn Minnich From:Rob Gelblum To:Benne Hutson Cc:rlazes@aol.com; carolyn minnich Subject:Southern Manufacturing Brownfields Project Date:Wednesday, April 02, 2003 6:21:32 PM Attachments:Southern Mfg BFA 4-2-03.WPD Benne: Please find attached the draft Brownfields Agreeemnt (BFA), as revised by us pursuant to your proposed edits. Your only proposal that we did not adopt in its entirety was the paragraph 20 one regarding provision of copies of leases. There we left out your language implicitly approving use of "different versions of the standard form lease." As you know, as soon as we are told in writing (e-mail suffices) that the BFA is acceptable to the prospective developer, we will commence preparation of the three other short documents, agreement on which is required before we can allow the project to proceed to the public notice and comment period of at least (and probably no more than) 60 days. Rob (919) 733-2801 ext. 229 From:RLazes@aol.com To:cminnich@ci.charlotte.nc.us Subject:Re: FW: Southern Manufacturing Brownfields Project Date:Friday, April 04, 2003 9:54:30 AM I did get the document in word and I read it. It is fine. I am prepared to accept the changes Rob made so we are in complete agreement as to the wording. please ask Rob to send me the other 3 documents that we need to approve so we can button this up. thanks, i'll let you know when we start laying down the geotextile and earth fill. have a nice weekend. rick From:Minnich, Carolyn To:RLazes@aol.com Cc:"Rob Gelblum"; benne.hutson@hmw.com Subject:RE: Southern Manufacturing Brownfields Project Date:Monday, April 07, 2003 9:18:30 AM Attachments:BF NI 1-9-03 WORD.docSouthern Mfg NBP 4-3-03 WORD.docSouthern Mfg SNI 4-3-03 WORD.doc Attached are the ancillary documents Rob sent last Thursday afternoon formatted in the Word Perfect. As you requested Rick, I converted them to MS Word for your review and approval. I will forward comments on the plat this afternoon to your attention. Thank You. Carolyn Minnich Brownfields Project Manager NC Division of Waste Management c/o City of Charlotte Neighborhood Development Key Business 600 East Trade Street Charlotte, NC 28202 Office: 704/336-3499 Fax: 704/336-2527 Mobile: 704/661-0330 -----Original Message-----From: Rob Gelblum [mailto:rob.gelblum@ncmail.net]Sent: Thursday, April 03, 2003 5:07 PMTo: RLazes@aol.com; benne.hutson@hmw.comCc: carolyn.minnich@ncmail.netSubject: Southern Manufacturing Brownfields Project Gentlemen: Please find attached hereto drafts of what we call the ancillary documents. As stated yesterday, as soon as we reach agreement on these documents, and approve your plat,we can approve your proceeding to public notice, which approval will occur via an e- mail from me setting forth the requirements related to that process. I will be out tomorrow. Rob (919) 733-2801 ext. 229 RLazes@aol.com wrote: Dear Rob, Your deletion of the words in par. 20 is acceptable to me. Please prepare the three other short term documents for me and Benne to review so that we can procede expeditiously to get the public comment period over. I will have the plat map prepared to include in the package as soon as Carolyn approves the proposed form that we have submitted. Thanks for your assistance with this matter. Best regards Rick Lazes