Loading...
HomeMy WebLinkAboutNCD980840409_19930301_Charles Macon Lagoon & Drum_FRBCERCLA CR_Preliminary Closeout Report-OCRI I I I I I I I I I I I I I I I I I I 5-CANNED FEB 2 3 2017 N.C. Superfund Section PRELIMINARY CLOSEOUT REPORT CHEMTRONICS CERCLA SITE REMEDIAL ACTION Swannanoa, North Carolina 28778 MARCH 1993 AR 2 4 i99 ~L.St.i"u ltPA -REGION IV 1-l.TI.AN'!A, GJ. I I I I I I I I I I I I I I I I I I I 1.0 2.0 3.0 4.0 TABLE OF CONTENTS Executive Summary Introduction and Background Chronological Summary of Remediation Activities Groundwater Remediation Activities Quality Management Figures Tables Figure 3.1 Figure 3.2 Table 3-1 Table 3-2 Table 3-3 Table 3-4 Appendices A B C D E F G Front Valley Well Locations Back Valley Well Locations Piezometer and Monitoring Well Construction Details Extraction Well Construction Details Piezometer and Monitoring Well Development Summary Well Abandonment Summary Remedial Action Participants Data and Documents Chronological Logs; Disposal Areas Geologic Logs Well Installation Details Handwritten Documentation Site Maps and As-Built Drawings I I I I I I I I I I I I I I I I I I I EXECUTIVE SUMMARY The Remedial Action Construction phase of the Chemtronics CERCLA Site Remediation near Swannanoa, North Carolina began in January of 1992 and ended in December of 1992. The remedial action was conducted essentially in accordance with the CERCLA Final Design Specifications dated July 1991, as approved by the United States Environmental Protection Agency (EPA) and reviewed by the North Carolina Department of Health, Environment and Natural Resources (NCDEHNR). The site remediation included both source control and installation of a groundwater interception, extraction and treatment system. The source control method specified in the design consisted of six low permeability composite caps. These were to cover twenty-three individual disposal areas that had been identified and grouped into six discrete source areas during the RI/FS phase. Exceptional weather in February and July allowed significant progress, to balance delays caused by bad weather in March, June and August. The groundwater remediation phase at the site incmporated existing wells and added seventeen piezometers, nine monitoring wells and eleven extraction wells, as well as two groundwater treatment systems. Drilling began January 23, 1992 and was completed July 12, 1992. The two groundwater treatment systems were housed in separate steel buildings due to site topography, and due to treatment requirements. Both systenis use air strippers to remove volatile organic compounds, but the Front Valley system also includes carbon adsoI]Jtion for semi-volatiles and the Back Valley system includes caustic injection for pH control. Both systems discharge to a metering manhole, and then to a Metropolitan Sewer District sewer for further treatment of the effluent at a publicly owned treatment works (P01W). Construction of the six disposal area caps and the groundwater treatment systems was essentially complete in November of 1992. The caps are currently functioning as designed. However, the protective vegetative cover was established very late in the growing season, and will be evaluated and touched up, as needed, in the spring. The groundwater treatment is currently in the First Year O & M (operation and maintenance) phase, during which flow rates and treatment procedures will be evaluated and optimized. I I I I I I I I I I I I I I I I I I I 1.0 INTRODUCTION AND BACKGROUND 1.1 INTRODUCTION The putpose of this report is to describe the remedial construction activities that were performed in compliance with an Enforcement Record of Decision (ROD) issued by the Regional Administrator, EPA-Region IV, pertaining to the Chemtronics CERCLA Site, on April 5, 1988, as amended April 26, 1989 .. The ROD, along with a Unilateral Administrative Order dated March 22, 1989, outlined the requirements for remediation of waste disposal areas on the Site. These requirements were based on the findings of the Remedial Investigation of April 1987, supplemental groundwater data in October 1987, the Feasibility Study of March 1988, and public comments. The designated remedies included source control by capping of disposal areas, and installation of groundwater interception, extraction and treatment systems downgradient of the disposal areas. 1.2 BACKGROUND INFORMATION The Chemtronics site occupies approximately 1,027 acres of rural land in Buncombe County, North Carolina, near the town of Swannanoa. The site can be divided into two geographical subsections known as the Front Valley and the Back Valley, which is also known as Gregg Valley. The property was first developed as an industrial facility in 1952 and has been owned/operated by several coiporations since that time. The primary products manufactured on site were explosives, incapacitating agents and chemical intermediates. Chemical wastes were disposed in buried drums, open trenches and a drainfield. Twenty-three individual disposal areas have been identified and grouped into six discrete source areas requiring remediation. These source areas are designated as disposal areas DA-6, DA-7/8, DA-9, DA-10/11, DA-23 and the Acid Pits Area. Disposal Area-23 and DA-10/11 are located in the Front Valley, and the remaining units are in the Back Valley. A portion of DA-23 consisted of a lined 500,000 gallon biolagoon, which was operated post-1980. Therefore, the biolagoon falls under the provisions of the Resource, Conservation & Recovery Act (RCRA) programs of EPA and the North Carolina Department of Environment, Health, and Natural Resources. The amendment to the ROD dated April 26, 1989 specifically addressed satisfying the RCRA requirements for the biolagoon in the CERCLA remedial action. In addition, a letter from NCDEHNR to EPA-Region IV deferred all groundwater enforcement action for the noted site to CERCLA authority (Meyer to Guinyard, December 14, 1990, Appendix B to this report). I I I I I I I I I I I I I I I I I I I 2.0 CHRONOLOGICAL SUMMARY OF REMEDIATION ACTIVITIES 2.1 GENERAL The Remedial Action Construction phase of the Chemtronics Site Remediation began in January of 1992 and ended in December of 1992. The initial activities involved establishment of on-site office facilities, and 24-hour site-specific "Hazardous Waste Operations and Emergency Response" training for all personnel. Those activities were followed by construction of a decontamination pad in the Front Valley, and commencement of piezometer and well drilling activities, also in the Front Valley. The general month-to-month chronology of key remediation activities at the site is presented in the following paragraphs, and unit-specific summary logs are presented in Appendix C to this report. January 1992: Completed 24-hour site-specific Health and Safety training for 62 personnel, drilled and installed three piezometers in the P-1 cluster in the Front Valley, and began clearing brush and trees from the Acid Pits Area. Also completed a decon pad in DA-23 for decontaminating heavy equipment, transferred rainwater from the neutralization lagoon to the biolagoon at DA-23, and breached the HOPE liner in the neutralization lagoon to check for VOCs and flammables. February 1992: Exceptional weather allowed significant progress in February. Developed the piezometers in the P-1 cluster and completed installation of the MW-1 monitoring well cluster in the Front Valley. Removed and cut into sections the HOPE liner from the neutralization lagoon, cleaned it and placed the sections in a roll-off container for off-site disposal at a later date. The Erosion Control Permit was received from Buncombe County, allowing clearing and earth moving activities to proceed. Constructed a "pioneer" type access road to the Back Valley well locations and completed clearing and chipping the Acid Pits Area, DA-9, and DA-7/8. Completed clearing Borrow Area #2, began clearing Borrow Area #I, and began clearing and chipping DA-6 and DA-10/11. Abandoned wells BW-10, SW-10, X-4D and BW-9, and drained the Front Valley pond. Began well-drilling operations in the Back Valley; completed drilling P-2S, P-3, P-5S, P-6 and the saprolite portion of P-7B, and began drilling P-4B and P-7D. March 1992: Completed clearing and chipping on DA-10/11 and DA-6 and clearing Borrow Area #I, and began placing common fill on the eastern portion of the Acid Pits Area. Completed the Back Valley piezometers, including a replacement for P-2S, which was found to be defective during development. Monitoring wells MW-21, MW-3S, MW-3D, MW-4B, and MW-5S, and the saprolite portions ofMW-2B and MW-3B were completed in March. Completion of the bedrock portions of MW-2B and MW-3B, and commencement of extraction well drilling were delayed due to mechanic21 breakdown of 2 I I I I I I I I I I I I I I I I I I I the air-rotary drill rig. Due to shallow bedrock and following consultation with Jon Bornholm of EPA Region IV, the two proposed saprolite wells, MW-2S .and MW-2D, were replaced by a single monitoring well, MW-2D. Well abandonment activities continued as two scheduled wells, X-1 and X-4S, were abandoned along with 12 standpipe piezometers from the RI and RD phases. Confinnation water samples were collected from the biolagoon and submitted to a laboratory for EPA Method 624 analysis. The water was mildly acidic, but no volatile organic compounds were detected. The pH was adjusted to 6.5 so the water could be used for moisture control of compacted fill and for dust control along site haul roads. Completed 24-hour site-specific Health and Safety training for 20 additional personnel. April 1992: The initial lift of common fill was placed over DA-6, DA-7/8, DA-9 and DA- 10/11, along with most of the Acid Pits Area. A portion of the Acid Pits Area was left open for disposal of drill cuttings and decontamination fluids. The northeast boundary of DA-7 /8 was extended about 24 feet, following discovery of some packaging materials in the buffer zone. The replacement culvert was completed beneath the road between DA-9 and DA-7/8. Sieve analyses were perfonned on soil samples from completed wells, and filter pack and screen design completed for the extraction wells. Two additional RI piezometers were abandoned, and concrete pads and protective casings were installed at existing monitoring wells and background wells. May 1992: The Quality Assurance/Quality Control Plan for cap construction was approved by the EPA on May 5, 1992. The initial lift of common fill was compacted on all disposal areas, except for the decon pad portion of the Acid Pits Area, and low penneability fill was placed on DA-6 and DA-9. The areas where common fill was complete were no longer designated as exclusion zones requiring Level C PPE. Common fill placement continued on all disposal areas, except DA-23. The biolagoon was drained and the liner removed in sections. The liner segments were cleaned with a pressure washer and placed in roll-off shipping containers pending test results. The leachate detection system beneath the biolagoon was grouted, and the sewer line from Building 117 was rerouted around the cap at DA-23. Contractor submittals were approved for electrical, data acquisition and the steel building contractors. More suitable locations were negotiated with the current operating contractor for the groundwater treatment buildings and site preparation initiated. Utility trenching and road crossings essentially completed in the Front Valley with the pressure main and electrical conduit installed. Completed the tap to the MSD manhole and installed the stilling manhole and the metering manhole. 3 I I I I I I I •• I I I I I I I I I I I June 1992: Drilling activities were nearly completed in June with EW-3 drilled to bedrock on June 30. Began step drawdown tests in the extraction wells. Earth moving activities were rained out from June 4 through June 16, 1992. · Decommissioned the Front Valley decon pad and began clearing, chipping and grading at DA-23. Began placing and compacting common fill on DA-23 and completed the low permeability soil layers on DA-7/8, DA-9 and DA-10/11. Completed utility trenching and road crossings from the Back Valley wells to the Back Valley treatment building location. Completed piping and electrical conduit from the Front Valley treatment building to the metering manhole, and began trenching from the metering manhole toward the Back Valley treatment building. July 1992: Completed all scheduled drilling activities in July by installing the screen in saprolite and drilling the open hole in bedrock in EW-3. Completed developing and specific capacity testing of all extraction wells. Completed site preparation at both treatment building locations, and poured footers for the Back Valley building. Completed common fill and the low permeability soil layer on DA-23. Placed common fill on the decontamination pad area of the Acid Pits Area following completion of drilling activities in the Back Valley. Completed common fill and the low permeability soil layers on all disposal areas except the Acid Pits Area in July. Accepted delivery of liner materials on July 13, 1992. QA/QC personnel inventoried and sampled HOPE liner and submitted samples for laboratory conformance testing. Prepared the surface of the low permeability layer on each cap by roto-tilling, moisture conditioning, and recompacting with a smooth-drum vibratory roller to eliminate desiccation cracks. Completed liner installation on DA-6, DA-9, DA-10/11, DA-23 and DA-7 /8 in July. The cap limits were extended on DA-I 0/ 11 and DA-7 /8 when suspected waste was encountered during excavation of the liner-anchor trenches. Installed biotic barrier at DA-6 and DA-9, and began installation at DA-10/ 11. August 1992: Installed telescoping screens in P-2B and MW-3B where caving problems were encountered in the bedrock. Installed pumps in all extraction wells and began installing conduits and mounting brackets at the wellheads. Completed biotic barrier installation at DA-10/11, and select fill at DA-6, DA-9 and DA- 10/ 11. Select fill was essentially completed at DA-23, except for the south liner-anchor trench where a bubble was noted beneath the HOPE liner. Inclement weather allowed only three days of earth moving activity after August 13th, so the low permeability soil layer was completed on only 85 % of the Acid Pits Area. Consequently, installation of HOPE liner on the Acid Pits Area was deferred to September. 4 I I I I I I I I I n I I I I I I I I I Vendor submittals were completed and approved for the ground water treatment facilities, and procurement initiated. Site preparation, and the concrete portions of both treatment buildings were essentially completed, except for the pedestals for the stripper towers. Potable water lines were installed, and trenching continued on an intermittent basis from the metering manhole toward the Back Valley treatment building. September 1992: Wellhead equipment installation was essentially completed for all extraction wells. Treatment building walls were erected, and epoxy coating of the floors begun. Ground-water treatment equipment was delivered to the site. Repaired the bubble in the liner at DA-23 and installed the biotic barrier at DA-23 and at DA-7/8. Completed select fill and top soil layers at all disposal areas except the Acid Pits Area. Installed HDPE liner at the Acid Pits Area. October 1992: Wellhead facilities were essentially completed at all extraction wells. Concrete pads were constructed at eight previously existing monitoring wells where access had been blocked by construction activities. Installed major ground-water treatment components and completed the roofs and roll-up doors at the treatment buildings, to enclose those spaces. Cap construction activities were completed with installation of the biotic barrier, select fill and top soil layer at the Acid Pits Area. Fertilized, Hydroseeded and mulched all caps, and placed erosion control matting where needed. Set fence posts in concrete and installed top rails and bracing at all disposal areas. Began installing chain-link fence fabric. The fencing contractor accidentally drilled three fence post holes through the HDPE liner at the north end of the cap at DA-23. The damaged areas were repaired and inspected October 17, 1992, in accordance with approved QA/QC procedures. Prepared subgrade and placed stone on all access roads to wells and disposal area caps. Inspected paved roads and delineated areas to be repaired. November and December 1992: Continued installation of groundwater treatment equipment during November and December. Used potable water for testing and calibration of the system components. Completed inspection and corrective action at treatment buildings. Extended inclement weather slowed fence installation and required extensive erosion control measures during November and December. Installation and inspection of fences and gates at the disposal areas was completed November I I, 1992. A fence was installed around the metering manhole and Isco sampler on November 16th. Installed sub-drains under the access road to DA-6 to eliminate soft spots. Completed repair and re-paving of damage to paved roads at the site November 30, 1992. Completed baseline sampling of monitoring wells and background wells December I I, 1992, in preparation for initiating ground water extraction and treatment. Begin pumping 5 I I I I I I I I I I I I I I I I I I I individual extraction wells December 15th to calibrate pressure transducers, and to pressure test wellhead assemblies. Defer pre-final inspection and start-up of the system until after the Holidays due to late delivery of a pressure gage for the Front Valley treatment system, and some minor corrective action items outstanding. January 1993: Conduct post-construction inspection with the EPA Region IV Project Manager, Jon Bornholm on January 6, 1993. Started up the systems, pending minor corrective actions, and began shake-down. Continued intermittent operation through the month of January in order to adjust and calibrate system components. The Front Valley system was fully operational by the end of January, but the Back Valley system was still under manual control due to difficulty in adjusting effluent pH. Well EW-2 is immediately downgradient from the Acid Pits Area, and the pH is much lower than anticipated. Consequently, EW-2 must be pumped intermittently until the pH adjustment system can be modified. Wells EW-lS and EW-ID, also designated as STW-2 and DTW-2, are in the same vicinity and also contribute highly acidic groundwater to the system. February 1993: A certificate of substantial completion was issued to Canonie, and the Front Valley treatment system operated on a nearly continuous basis. Continue to adjust and calibrate the Back Valley system. The pH appears to be rising in wells EW-2, EW-1 S and EW-ID immediately below the Acid Pits cap, indicating that the cone of depression from pumping is beginning to extend to areas beyond the highly acidic ground-water. This, in turn, indicates that the pH adjustment problem may be solved by temporarily operating the acidic wells on an intermittent basis with a timer, rather than installing high capacity pH adjustment equipment that might not be needed after a few months. Reprogram the Factory Link computer control system 2/24/92 to allow the O & M operator to vary pumping times as needed for wells EW-2, EW-IS and EW-ID. 6 I I I I I I I I I I I I I I I I I I I 3.1 3.0 GROUNDWATER REMEDIATION ACTIVITIES INTRODUCTION The Chemtronics Site remediation included both source control and installation of a groundwater interception, extraction and treatment system. The CERCLA Final Design Specifications, as approved, incorporated existing wells at the site and added 17 piezometers, nine monitoring wells and eleven extraction wells. Drilling for the groundwater remediation system began January 23, 1992 and was completed July 12, 1992. The drilling subcontractor was Environmental Monitoring and Testing Corporation from Raleigh, North Carolina. The drill rigs included a Mobile B61 truck-mounted auger rig, and a DrillTech 480K combination air and mud rotary rig. Hollow-stem augers were used to install piezometers and monitoring wells in saprolite, and air and mud rotary drilling methods were used primarily for installations in bedrock and for extraction wells. Drill rigs and drilling equipment were decontaminated between borings at designated decontamination pads. Decontamination pads were constructed at DA-23 in the Front Valley and at the northeast corner of the Acid Pits Area. Investigation derived wastes such as drill cuttings, purge and development water and abandonment materials were also placed beneath the caps in those areas. An important aspect of the drilling program was the sequence in which borings were completed. The bedrock piezometers and monitoring wells were drilled and installed frrst in order to determine depth to bedrock and to plan screen settings in the adjacent shallow and deep saprolite wells. Upon completion of the piezometer and monitoring well systems, the boring logs were used to develop cross sections, potentiometric maps and bedrock surface contour maps. Split spoon soil samples from the deep saprolite wells were submitted to a geotechnical laboratory for particle size analyses. The data accumulated were then used in the screen and filter pack designs and selection of screen depths for the 11 extraction wells in the Back Valley. Three extraction wells had previously been installed; DTW-1 and STW-1 in the Front Valley, and DTW-2 in the Back Valley. Well installation details for these wells are presented in Appendix E-1. Periodic air monitoring was performed by Canonie Health and Safety personnel using an Hnu P.I.D. or OVA F.I.D. for organic vapors, a hydrogen cyanide monitor and a dust monitor. Drilling was initiated in Level B PPE with supplied air, but was down graded to modified Level C for the majority of the work. Conditions at extraction well EW-2 required Level C with full face respirators due to acid fumes. Augering was performed in Tyvek coveralls and poly-coated Tyvek was used for mud-rotary and other drilling activities performed in wet conditions. 3.2 WELL INSTALLATION Piezometers, monitoring wells, and extraction wells were installed during the remedial action construction phase. Piezometers were installed for the purpose of providing the water-level data 7 I I I I I I I I I I I I I I I I I I I necessary to monitor capture zone development. Monitoring wells were installed to monitor both water quality and water levels. In general, saprolite piezometers were constructed with 2- inch diameter PVC casing and screen, bedrock piezometers with 4-inch diameter carbon steel casing seated in bedrock, and a minimum 20-foot open hole in bedrock. Monitoring wells were constructed with stainless steel casing and screen; 2-inch diameter in saprolite and 4-inch in bedrock. The extraction wells combined screens in the saprolite with open hole in bedrock. Typically, a 6-inch diameter stainless steel wire wrapped screen was placed in the saprolite immediately above the bedrock with a 7-foot long carbon steel blank installed in a socket in the bedrock below the screen. A 6-inch diameter open hole was then drilled a minimum of 20 feet into bedrock or to water-producing fractures. A 6-inch carbon steel riser was installed above the screen to the surface. A piezometer cluster and a monitoring well cluster were installed in the Front Valley to monitor water levels and groundwater quality in the vicinity of extraction wells STW-1 and DTW-1 below DA-23. Front Valley well locations are shown on Figure 3.1. Shallow bedrock was encountered at a depth of 22 feet at the MW-I cluster and, consequently, a deep saprolite well was deleted and replaced with an intermediate bedrock well designated MW-!BI. These details are shown on Table 3-1, Piezometer and Monitoring Well Construction Details. Fourteen piezometers, seven monitoring wells, and eleven extraction wells were drilled and installed in the Back Valley. The Back Valley wells were relocated relative to the design drawings when it was determined that an existing contaminated well was not located as shown on the plans. New survey data indicated that well X-3 was located downgradient from the proposed line of extraction wells. Accordingly, the model was adjusted to reflect the new data and the wells relocated as shown on Figure 3.2. Piezometers included four clusters and two separate, fully penetrating piezometers. The piezometers in clusters were open to specific intervals within the saprolite or bedrock. A 2-inch PVC screen was installed in the open bedrock portion of piezometer P-2B due to unstable formation material. The Back Valley monitoring wells include two clusters and two separate wells. The MW-2 and MW-3 monitoring well clusters were installed downgradient from the extraction well system and were designed to include three wells each. Monitoring wells MW-4B and MW-5S are single wells installed between the extraction wells and the Acid Pits Area. Geological logs for these wells are presented in Appendix D and well installation details in Appendix E. The shallow saprolite well was deleted from the MW-2 cluster due to the low water level and shallow bedrock surface. Caving formation materials were encountered in MW-3B, and a 2-inch stainless steel Channel Pack screen was installed in the bedrock portion. The annular space between the 2-inch screen and 4-inch casing was partially filled with filter sand and topped off with grout to the surface. Extraction wells were designed and materials ordered following analysis of data accumulated during installation of piezometers and monitoring wells. Extraction wells EW-1 S (also designated STW-2) and EW-2 were closest in proximity to the Acid Pits Area, and were constructed of all stainless steel due to low pH groundwater. The remaining extraction wells 8 I I I I I I I I I I I I I I I I I I I were constructed with stainless steel screens and carbon steel casings. Extraction well details are shown on Table 3. 2 and geologic logs and installation details are presented in Appendices D and E respectively. The installation details for previously existing wells that were incorporated as extraction wells are presented in Appendix E-2. The saprolite portions of all extraction wells were installed by mud rotary drilling. Drilling fluid was monitored with a Marsh funnel, Baroid filter press and Baroid sand content gauge to reduce the build up of filter cake in the screen zones. Bedrock drilling was accomplished with the DrillTech 480K rig utilizing a 37/8-inch air hammer. Air drilling was performed after the casing and screen had been installed in the saprolite and the .grout allowed to cure. The screens were protected by inserting 4-inch diameter CP core pipe down to bedrock prior to drilling in bedrock. Use of the CP core pipe also was accepted as verification of alignment of the casing and screen in each well. Plumbness of each extraction well was determined by the standard A WW A plummet procedure. Plumbness was recorded at specific intervals in the wells as distance of the plummet line from the center of the top of the casing. 9 I I I I I I I I I I I I I I I I I I I 3.3 WELL DEVELOPMENT All piezometers and wells were developed to remove drilling mud and accumulated cuttings from the casing, screen and filter pack. This allows the wells to flow more freely and also protects the pumps. Development of piezometers and monitoring wells was accomplished using a combination of surging, pumping and reverse airlift. In the bedrock wells, submersible pumps were temporarily suspended just above bedrock after reverse air techniques were used to remove accumulated cuttings from the bottom of the borings. P-4B and MW-4B were bailed with a 3- inch bailer due to low yield. The development by air lifting was accomplished with a header assembly to divert purge water into drums. Development was continued until water was sand free and relatively clear. Water from most of the wells remains cloudy due to very fine suspended mica. Extraction wells were developed by using horizontal jetting with surge block and by pumping with a submersible pump. The screens were flushed with potable water immediately after installation of the saprolite portions of the extraction wells to remove drilling fluids and accumulated silt or clay from the screen and filter pack. Performing this action prior to drilling the open holes in bedrock appeared to reduce development time required. Specific capacity tests were performed by pumping each extraction well at varying flow rates following development to estimate yield. A submersible pump was used to pump out all introduced water and begin stressing the aquifer. Specific capacity testing indicated that wells EW-5 and EW-6 required further development to increase efficiency, and this was performed by surging and pumping. 3.4 WELL COMPLETION Wells were completed by installing protective casings and concrete pads, and Grundfos stainless steel pumps were installed in the extraction wells. Piping, electrical and data lines were installed to the treatment buildings in the respective valleys, and the pumps and associated wellhead assemblies are controlled by central processing units in the treatment buildings. Pump flow rates must be adjusted manually by valves at each wellhead, but pump cycling is controlled electronically. The central processing units also monitor pumping pressures and flow rates, and depth to water in the extraction wells and in selected piezometers. 3.5 GROUNDWATER TREATMENT The Front Valley groundwater treatment system includes an air stripper and carbon adsorption for removal of both volatile and semi-volatile organic compounds. No semi-volatile organic compounds were found in the Back Valley, so carbon adsorption was not required. However, a caustic injection system was installed in conjunction with an air stripper due to low pH groundwater down gradient from the Acid Pits Area. The effluent from the treatment buildings is pumped through a metering manhole and then discharged to a sanitary sewer for further treatment at a PO1W. The MSD Permit requires that pH be raised above 6.0 prior to discharge 10 I I I I I I I I I I I I I I I I I I I to the sewer. Routine monitoring of the groundwater extraction and treatment facilities will be a part of ongoing operation and maintenance (O&M) of the site remediation system. O&M will also include periodic sampling and analysis of the groundwater in the monitoring wells, as well as the effluent from the treatment buildings and at the metering manhole. 11 I I I I I I I I I I I I I I I I I I I 4.0 QUALITY MANAGEMENT 4.1 ENGINEERING OVERSIGHT The potentially responsible parties (PRPs) under CERCLA retained SEC Donohue of North Carolina, PA as consultant and to serve as Oversight Engineer for monitoring "Remedial Action Phase Construction". The duties of the Oversight Engineer included providing an experienced Resident Engineer to observe the progress and quality of the remediation activities, and to determine, in general, if the work was proceeding in accordance with the contract documents. SEC Donohue provided technical oversight for closure activities in general. The Resident Engineer, Charles B. Travis, PE, PG has MS degrees in geotechnical engineering and water resources, as well as materials testing and hydrogeology experience. In addition, hydrogeologists and geotextile materials technicians provided specialty oversight, as needed, for well drilling and installation activities, and for installation of geosynthetic liners and drainage media. The Engineer had authority to disapprove or reject work believed to be defective, and also had authority to require special inspection or testing of the work. Additional duties of the Engineer included review of qualifications of prospective contractors and proposed vendors and of submittals and shop drawings. Upon completion of closure activities, the Engineer was to make a final inspection of the work with the PRPs and the Contractor, and prepare Certification of Closure and a Closure Report. 4.2 PRIME CONTRACTOR The second step in assuring quality in the completed Remedial Action was to engage an experienced environmental services firm as prime contractor. Canonie Environmental Services, Inc., King of Prussia, Pennsylvania was selected as Prime Contractor after extensive review of qualifications and bid documents submitted by eleven bidders. The Prime Contractor was required to subcontract independent laboratory and inspection services for selected activities, such as installation of geosynthetic materials. Remedial Action Participants are listed in Appendix A, along with their principal activities. The Prime Contractor was also required to provide documentation of conformance to contract and quality standards for vendor-supplied items, and these are included in Appendix B to this report. 4.3 QUALITY MANAGEMENT ACTIVITIES Daily activities for well drilling and installation activities were recorded in bound notebooks with numbered pages. A bound daily log was also maintained by the prime contractor for all cap construction activities. Photocopies of these handwritten logs are presented in Appendix F to this report. 12 I I I I I I I I I I I I I I I I I I I In addition to the general technical oversight provided by SEC Donohue, the contract required Canonie to engage the services of independent quality control subcontractors to inspect and document such key activities as compaction and moisture control of compacted soil during cap and road construction, and all aspects of geosynthetic procurement and installation. These services were provided by Law Engineering of Greenville, South Carolina and Asheville, North Carolina under the direction of George W. Scott, PE, Principal Engineer. Due to the voluminous nature of the QA/QC documentation, Canonie found it advantageous to maintain computer spreadsheet summaries of QA/QC records. These spreadsheets simplified review and audit of activities accomplished versus those required, as well as providing an overview of quality control activities. Summary reports of QA/QC inspections are presented in Appendix B to this report. These include summaries of tests of compacted fill for compaction and moisture control, as well as field and laboratory tests of flexible membrane liner fabrication and installation. Photocopies of the original hand written test reports and other back up data are presented in Appendix F. Weekly Progress Meetings at the site provided a forum for review of over-all progress and for resolution of issues and conflicts, as well as discussion of quality issues. These meetings were attended by the PRP Coordinator and the Community Relations consultant, the SEC Donohue Construction Manager and the Resident Engineer, the Canonie Superintendent and the Project Engineer, and, as appropriate, QA/QC and Health and Safety personnel and selected subcontractor representatives, along with EPA contract oversight personnel. The minutes of those meetings are also presented in Appendix B. 13 I I I I I I I I I I I I I I I I I I C\ !-· ·, :r~'r ·, ' : --,'\ I , i1,. . .,,-. .1..._1 L " ,1 7· ,r "'~. ,..,,.. . .. , .. :.;-.c::, ;. ,j.ll ---' , ~ -. : ' \ " -' ,: f -~-. .. J ' ..... --.c':::!. rr,c' l fl ,c, ,c-,_ .... , . .,j• '"v ,_ j· .. q, __;,.-...J I J , • -,_,.,,, .•,-,_. -~-.,r ,:· 1 ,c-"', v---, ~-111 --.-Ji !f '<-·'' -·-"1 i', r :\ t~~ . /tL_~f ~, 1,,,:)\\\ '··-----..J . ./ I ~ ----◄----<1$>--<!C:::::S::"""""'!: z Ot::===50f::==::li0:'0==:::il 50 SCALE l N FEET '- I I I / I ! / I ' ' ! I FIGURE 3. 1 I \ I I i \ I FRONT VALLEY WELL LOCATIONS CHEMTRONICS SITE REMEDIATION Swonnonoo, North Carol ino I ' N:~Gt600/16000M04,DGN I I I \ I I \ I I I I I I I I I I I ~·-· -; ·,-~'.,,... ___ -- --------- \ ~ -~ "'-~- '" >--,_ -,. -_~'(-..... ,_ ~- ). ' , ___ ,-! l.·. ... '--\. ~~ '>-i-.... ,,_...,__ ___ .. ~,..,·;:,~,1..:'. .. / \ / I i ot:::==':sco==:::!'±0~0==::1:i' so SCALE IN FEET j -~,,' .i . ' ( J j· \ _/ / / / / \ \ .-~_,., i / / \ \ \ ' ·, ', \ Ew-c/ -~ f' ' / i , ··--. I f / I ____ _,,,,,.,,. FIGURE 3.2 \ \ \ \ ?/ f _{'1 / / BACK VALLEY WELL LOCATIONS CHEMTRONICS SITE REMEDIATION Swonnonoo, Norlh Carol ino N:/G1600/16000M03.DGN I I I I I I I I I I I I I I I I I I I Well Installation Dale . No. Installed P-1S 1/23192 P-10 1/24192 P-18 213/9"2 _P-2S(A) 3f2/92 P-2D 3/12/92 P-2B 2/21192 P-3 3/4/92 P-4S 3/13/92 P-4D 3/9192 P-4B 315192 P-5S 2/28192 P-5D 3/18192 P-5B 3/5/92 P-6 2128192 P-7S 315192 P-7D 3/5/92 P-7B 2/27192 P-2S 4/1192 MW-lS 2/12/92 MW-181 2/11/92 MW-lBD 2/13192 MW-2B 3/12/92 MW-21 3/19192 MW-3S 3/24192 MW-3D 3/24192 MW-3B 3/17192 MW-4B 3/19/92 MW-SS 3117192 NOTES: G.S. = Ground Surlace SAP = Saprolite Ground Surface Elevation (fl above MSL) 2275.39 2275.10 2275.49 2368.17 2367.02 · 2368.08 2359.97 2341.03 2341.80 2341.29 2348.27 2347.74 2348.10 2350.77 2350.20 2351.17 2351.19 2368.17 2269.79 2269.69 2270.23 2341.93 2341.52 2344.79 2344.71 2345.03 2356.75 2350.07 TOG = Top of PVC Casing BGS = Below Ground Surface MSL = Mean Sea Level Drilling Method 6 114 HSA 6 114 HSA 9 7 /8 air hammer 6 114 HSA 6 114 HSA 9 7 /8 mud rotary 61/4 HSA 61/4 HSA 61/4 HSA 9 7/8 mud rotary 61/4 HSA 61/4 HSA 9 7/8 mud rotary 6 114 HSA 61/4 HSA 6 114 HSA 9 7/8 mud rotary 61/4 HSA 61/4 HSA 9 7/8 air rotary 9 7/8 air rotary 9 7/8 mud rotary 61/4 HSA 61/4 HSA 6 114 HSA 9 718 mud rotary 9 7/8 mud rotary 61/4 HSA Boring Bottom of Diameter Exploration SAP/Rock (IL below Unit (in.) G.S.) Screened 10 I 28.5 shallow 10 I 58.5 deep 1013 718 124 bedrock 101 55.5 shallow 10 I 69.5 deep 10 13 718 107 bedrock 10 I 83.5 fully penetrating 101 24 shallow 10 I 35.5 deep 1013 718 92.33 bedrock 101 30 shallow 10 I 65 deep 1013 718 102.1 bedrock 10 I 88.5 fully penetrating 10 I 30.05 shallow 10 I 59.9 deep 1013 718 102.74 bedrock 101 50.5 shallow 10 I 25.0 shallow 1013 718 71 intermediate bedrock 1013 718 121.5 deep bedrock 1013 718 76.9 bedrock 10 I 36.33 · intermediate saprolite 10 I 30_ shallow 10 I 54 deep 1013 718 78 bedrock 1013 718 94.,, bedrock 101 28 shallow TABLE 3-1 PIEZOMETER AND MONITORING WELL INSTALLATION DETAILS CHEMTRONICS REMEDIATION PROJECT SWANNONOA, NORTH CAROLINA PROJECT No. G-1600 Depth to Depth lo Depth to Depth of Bottom of Top of Static Bedrock Surface Bedrock Casing/ Bentonite Water Surface Casing Socket Casing/ Screen Seal Level (IL below (IL below (IL below Screen ID (IL below (TOC/BGS) G.S.) G.S.) G.S.) Material Qn.) G.S.) 9.761 NIA NIA NIA Sch 40 PVC 2 3 10.54/ NIA NIA NIA Sch 40 PVC 2 36 8.141 63 71 8 Carbon Steel 4 NIA 37.591 NIA NIA NIA Sch 40 PVC 2 25.9 40.12/ NIA NIA NIA Sch 40 PVC 2 56.5 39.071 77 83 107 Carbon Steel 4 NIA 34.26/ NIA NIA NIA Sch 40 PVC 2 23.7 16.28/ NIA NIA NIA Sch 40 PVC 2 3.2 17.82/ NIA NIA NIA Sch 40 PVC 2 21.87 22.12/ 39 52.9 52.9 Carbon Steel 4 NIA 13.101 NIA NIA NIA Sch 40 PVC 2 2 15.631 NIA NIA NIA Sch 40 PVC 2 51 18.88/ 77 83.1 83.1 Carbon Steel 4 NIA 16.491 NIA NIA NIA Sch 40 PVC 2 18.2 11.41/ NIA NIA NIA Sch 40PVC 2 2.0 12.22/ NIA NIA NIA Sch 40 PVC 2 46 13.301 75.5 82.76 82.76 Carbon Steel 4 NIA 34.781 NIA NIA NIA Sch 40 PVC 2 22 7.241 NIA NIA NIA Stainless Steel 2 1.5 11.01 22 38.8 38.8 Stainless Steel 4 NIA 11.61/ 25.2 89.5 89.5 Stainless Steel 4 NIA 28.2 40 46.41 46.41 Stainless Steel 4 NIA 23.52 NIA NIA NIA Stainless Steel 2 7.2 18.32 NIA NIA NIA Stainless Steel 2 3.06 19.12 NIA NIA NIA Stainless Steel 2 26.50 19.3 50 54.91 54.91 Stainless Steel 4 NIA 13.86 64 68.76 88.76 Stainless Steel 4 NIA 14.7 NIA NIA NIA Stainless Steel 2 2 Depth lo Top of Filter Screened Depth to Screen Type Length Pack Interval Screeo Bottom of Slot of of Open Stickup (IL below (IL below Length Well (IL Size Filter Bedrock above G.S.) G.S.) (IL) below G.S.) Qn.) Pack (IL) (IL) 5.8 7.75-27.81 20.06 28.39 0.010 FX50 NIA 2.33 41.9 46.9-56.91 10.01 58 0.Ql0 FX50 NIA 2.66 NIA NIA NIA 124 NIA NIA 53 2.66 29.1 34.88-54.92 20.04 55.5 0.010 FX50 NIA ABANDONED 59.6 63.9-68.92 5.05 69.5 0.010 FX50 NIA 2.83 NIA NIA NIA 107 NIA NIA 24 2.70 i 26.5 31.62-81.82 50.2 82.4 0.010 FX50 NIA 2.08 6.5 8.14-23.2 15.06 23.78 0.010 FX50 NIA 1.78 24.5 29.87-34.97 5.05 35.5 0.010 FX50 NIA 3.08 NIA NIA NIA 92.33 NIA NIA 39.43 2.41 4.3 7.3-27.92 20.08 28.5 0.010 FX50 NIA 2.83 54.2 59.39-64.42 5.03 65 0.010 FX50 NIA 2.79 NIA NIA NIA 102.1 NIA NIA 19 2.66 21.15 26.94-87. 12 50.18 87.7 0.010 FX50 NIA 2.97 5.2 9.39-29.47 20.08 30.05 0.010 FX50 NIA 2.0 49 54.27-59.32 5.05 59.9 0.010 FX50 NIA 2.7 NIA NIA NIA 102.74 NIA NIA 19.98 2.58 25 30-50 20.02 50 0.010 FX50 NIA 3.12 3.5 4.5-24.5 20 24.72 0.010 FX50 NIA Flush Mount NIA NIA NIA 71 NIA NIA 32.2 Flush Mount NIA NIA NIA 121.5 NIA NIA 32 Flush Mount NIA NIA NIA NIA NIA 1.75 11.6 16.13-36.13 20 36.33 0.010 FX50 NIA 2.83 5.69 9.90-29.41 19.98 29.68 0.010 FX50 NIA 2.75 29.90 36.81-51.65 15.04 51.93 0.010 FX50 NIA 2.75 NIA NIA NIA NIA NIA NIA 2.66 NIA NIA NIA 94.11 NIA NIA 25.35 2.5 5.1 7.5-27.4 20 27.6 0.010 FX50 NIA 2.58 ------------------- ··wELL .SCREEN.ti LENGTH cc FT EW-1S 24.8 EW-1D 25.6 EW-2 39.7 EW-3 55 EW-4 29.7 EW-5 10 EW-6 39.7 EW-7 54.5 EW-8 39.6 EW-9 49.6 EW-10 59.5 EW-11 62.4 TABLE 3-2 EXTRACTION WELL CONSTRUCTION DETAILS SC:REENSLC:JT SCREEN DEPTH > CASING* .. ··.·•··.·.· .. · ..... JYPE OF. {}DEPTH TO ···SIZE ,.: IN. FT •· •···LENGTH+ FT CASING/BLANK WATER Z FT 0.012 37.3-62 38.8 / 5 STAINLESS 26.9 MORIE00 0.010 62.6-88.2 64.1/7 CARBON 34.4 MORIE00 0.012 29.2-68.8 30.7 /7 STAINLESS 22.3 MORIE00 0.012 40.4-94.9 41.9 /7 CARBON 38 MORIE00 0.012 33.1-62.8 36.7 / 7 CARBON 29.1 MORIE00 0.012 22-32.1 23.5 I 7 CARBON 18.7 MORIE00 0.012 23.7-63.4 25.2/7 CARBON 13.0 MORIE00 0.012 22-76.5 23.5 /7 CARBON 11.9 MORIE 00 0.012 23.7-63.4 25.2/7 CARBON 15.5 MORIE 00 0.012 25.9-75.4 27.4 /7 CARBON 20.7 MORIE00 0.012 20.3-79.8 21.8 / 7 CARBON 11.7 MORIE00 0.012 15.8-78.1 17.3/7 CARBON 11.2 MORIE00 7/20/1992 /DEPTH TO· ·••BEDROCK-FT NA 90 72 100 65.3 34.7 67 76 64.5 77 82 82 I I I I I I I I I I I I I I I I E I I TABLE 3-3 CHEMTRONICS REMEDIATION PROJECT SWANNONOA, NORTH CAROLINA PROJECT No, G-1600 PIEZOMETER AND MONITORING WELL DEVELOPMENT SUMMARY Well No. P-1S P-1D P-18 P-2S(~). P-2D P-2B P-3 P-4S P-4D *P-4B P-5S P-5D P-5B P-6 P-7S P-7D P-7B P-2S MW-1S MW-1BI MW-1BD MW-2D MW-2B MW-3S MW-3D MW-3B * MW-4B MW-5S Surface Date Completion Develooed YES 2/7/92 YES 2/7/92 YES 2/10/92 A B A N D YES 3/25/92 YES 4/8/92 YES 3/27/92 YES 3/25/92 YES 3/25/92 YES 4/7/92 YES 3/30/92 YES 4/1/92 YES 4/6/92 YES 3/31/92 YES 3/30/92 YES 3/31/92 YES 4/8/92 YES 4/2/92 YES (FM) 2/19/92 YES(FM) 2/18/92 YES (FM) 2/17/92 YES 3/27/92 YES 4/22/92 YES 3/27/92 YES 3/31/92 YES 4/16/92 YES 4/9/92 YES 4/1/92 • Low producing well (FM) flush mount Total Final Gallons pH/Sp. Discharaed Cond. ~25 7.26/186 ~95 6.65/0070 ~90 11.94/1080 0 N E D ~95 6.48/0704 ~605 6.83/0070 385 6.60/0010 14 6.39/0060 40 6.49/0020 120 6.85/0150 55 5.83/0170 70-80 6.48/0600 200 5.14/1920 400 6.79/0510 75 5.49/1830 40 6.85/1340 380 6.52/0180 30 6.87/0080 21 7.19/0330 70 8.52/0240 420 7.84/0250 45 6.48/0140 185 5.93/0090 55 6.10/0070 135 6.42/0210 495 5.67/0060 140 7.17/0110 50 5.15/0060 I I I I I I I I I I I I I I I I I I I Abandonment Well Date No. Abandoned X-1 3126/92 X-4D 2/20/92 X-4S 3125/92 SW-10 2/7192 BW-10 2/7192 BW-7 2/14/92 SW-14 2/19/92 BW-8 2/20/92 MW-1 3/31/92 MW-2 3131/92 MW-3 3131/92 MW-4 3/31/92 MW-5 3131/92 MW-6 3131/92 MW-7 3131/92 MW-8 3131/92 DA-9-2 3131/92 DA-6-1 3131/92 DA-23-4 3131/92 DA-718-3 3131/92 P-2S/Al 411/92 PVC polyvinyl chloride c/ casing removed TABLE 3-4 CHEMTRONICS REMEDIATION PROJECT SWANNONOA, NORTH CAROLINA PROJECT No. G-1600 WELL ABANDONMENT SUMMARY Footage Footage Drilled Grouted 40 40 32 32 15 15 NIA 50 NIA 70 NIA 144 NIA 22 NIA 113 el NIA 25.2 NIA 25.0 el NIA 25.0 el NIA 26 els NIA 25 els NIA 25 els NIA 17 els NIA 18 els NIA 24.5 c/s NIA 24.4 c/s NIA 13.2 els NIA 26 NIA 55 SS Stainless Steel els casing & screen Total Well Deoth ~38 32 15 50 70 144 22 113 25.2 25.0 25.0 26.4 25 25 17 18 24.5 24.4 13.2 26 55.5 Abandonment (ID, Type) Report Caslna Date 2" PVC 411192 2" PVC 2/20/92 2" PVC 3125/92 2· ss 2/7192 4• ss 2/7192 4• ss 2/14/92 2"SS 2/19/92 4• ss 411192 2" PVC 3131/92 2" PVC 3131/92 2" PVC 3131/92 2" PVC 3131/92 2" PVC 3131/92 2" PVC 3131/92 2" PVC 3/31/92 2" PVC 3131/92 2" PVC 3131/92 2" PVC 3131/92 2· PVC 3131/92 2" PVC 3131/92 2" PVC 411192 I I I I I I I APPENDIX A I REMEDIAL ACTION PARTICIPANTS I I I I I I I I I I I I I I I I I I I I I I I I I I I I I I APPENDIX A REMEDIAL ACTION PARTICIPANTS The following organizations and key personnel were involved in the Site Remediation at the Chemtronics site in Swannanoa, NC. The United States Environmental Protection Agency, Region IV 345 Courtland Street, N.E. (404) 347-7791 Atlanta, GA 30365 Jon K. Bomholm, Project Manager EPA OVERSIGHT CONTRACTOR: CDM Federal Programs Corp. 2030 Powers Ferry Road, Suite 490 Atlanta, GA 30339 Richard Hardy; Project Manager, EPA Oversight C. Robert Hines; EPA Field Oversight PRP COORDINATOR Nimmo & Co. PO Box 536; 480 Lytle Cove Rd Swannanoa, NC 28778 John F. Schultheis, C.E.P.; PRP Coordinator Rebecca S. Hunnicutt; Environmental Assistant (704) 686-4336 Don Higgins; Community Relations and Site Photography I I I I I I I I I I I I I I I I I I I OVERSIGHT ENGINEER SEC Donohue of North Carolina, PA PO Box 2400; 15 Brendan Way (29615) Greenville, SC 29616 (803) 234-3000 Terry E. Standridge; Construction Manager Charles B. Travis, PE, PG; Resident Engineer James J. Cloonan, PE; Design Project Engineer John H. Murphree, PE; Civil Engineer, Design Thomas M. Champion, PG; Senior Hydrogeologist Joseph E. Gillespie, PG; Hydrogeologist Frank H. Farmer, Jr., PG; Hydrogeologist Gregory L. Dauphin; Construction Manager CQA/CQC Burnett Pendergrass; CQA Technician SUBCONTRACTOR: Nilsson & Watts Associates 137 Center Ave., PO Box 367 Black Mountain, NC 28711 Robert C. Watts, RLS; Registered Land Surveyor Jake Dugan, RLS; Surveyor I I I I I I I I I I I I I I I I I I I REMEDIATION CONTRACTOR Canonie Environmental Services Corp. 500 North Gulph Road -Suite 315 (215) 337-2551 King of Prussia, PA 19406 James R. Semple; Project Manager Nelson F. Pelletier; Project Superintendent John O'Toole, PE; Project Engineer Jim Armor; Electrical Engineer Curt DeWolf; Mechanical Superintendent SUBCONTRACTORS: Perry M. Alexander Construction Swannanoa, NC 28778 Billy Carroll; Project Superintendent, Clearing and Earthwork Environmental Monitoring and Testing Corporation PO Box 1752 Burlington, NC 27216-1752 Matthew Lowe; Business Development Representative Dave Boggs; Drilling Superintendent Driller Registration Number: 1121 Carter and Crawley Inc. PO Box 5069 Greenville, SC 29606 Robert Dill; Design Engineer, Data acquisition Johnston, Inc. 132 Corporate Blvd., PO Box 580 Indian Trail, NC 28079 Curtis Helms; Technical Representative, Isco Sampler I I I I I I I I I I I I I I I I I I I Groundwater Recovery Systems, Inc. 299B National Rd., Exton, PA 19341 Mike Reppetto, Electronics Engineer Law Engineering Four Interchange Boulevard Greenville, SC 29607 George W. Scott, PE; Principal Engineer Corey L. Garyotis; Project Engineer, Liner QA/QC Tim LaBounty; Project Engineer, Liner QA/QC Tom Reel; Soils Technician Craig Brown; Materials Technician, Liner QA/QC Hayes & Lunsford Electrical Contractors, Inc. 226 Hilliard Avenue, P. 0. Box 2399 Asheville, NC 28802 D. W. Cordell, Electrical Engineer Larry Chatterton, Supervising Electrician Allison Fence Company Charlotte, NC Ray Hoover; Field Supervisor Attala Lining Systems, Inc. PO Drawer 1138, High 12 East Kosciusko, MS 39090 Eddie Newell; Field Supervisor Tim Miller; QC Supervisor I I I I I I I I I I I I I I I I I I I Southern Bell 79 Woodfin Place, Rm 215 Asheville,NC 28801 James A. Nabers, ID; Engineer -BICS Western Carolina Land Surveying, P.A. 1500 North Main Waynesville, NC 28786 Keith J. Plemmons, R.L.S.; Surveyor Laidlaw Environmental Services Hazardous Waste transport to GSX Landfill PO Box 255 Pinewood, SC 29125 • I I I I I I I APPENDIXB DATA AND DOCUMENTS I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT I V/f-6 I FIELD TRIAL SEAMS I !TEST i WELDER! DATE !TIME MACHINE !MACHINE PEEL - : ii ' j NUMBER i TEMP. BREAK SHEAR -BREAK RE_SUL T' (P/F) I I I I I I I I I I I I I I 1 BK :7 /14/921 9:20 307 . 360 2 BK 17/14/92 11:15 305 761 3 BK i7 /14/92 i :35 307 358 I ~ .. - , ·-• 4 DH ,7 /14/92 3:00 406 400 5 DH [7 /15/92 8:55 406 515 . FTB FAIL IN SEAM FTB FTB 157 FTB FAIL IN SEAM FTB FTB 144 p '' F p p p I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 6 FIELO SEAMING REPORT SEAM! DATE :TIME. PANEL • SEAMING # 'NUMBERS METHOD 1 -2 7 /14/92: 9:50 1 / 2 FUSION 1 -2 7/14/92112:05 1 / 2 FUSION 2 -3 7/14/92:12:20 1 2 / 3 FUSION i . / I I I I I I I I I I I I I I I I I I I I I I / I I I SEAM MACHINE :wELDER LENGTH NUMBER . 41' 307 BK 153' 307 BK 66' 307 BK .... -.. - TEMPERATURE, - - -. . . -. - MAC:_HINE/AIR ; 360 / 86 ~7? / BB 372 / 88 I I I I I I I I I I I I I I I I I I I I I I I I .. I ......... ! .. I I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 6 PANEL PLACEMENT REPORT TIME PANEL DATE -ROLL NUMBER PLACED NUMBER 9:00 1 7/14/92 7933 9:40 2 7/14/92 7933 10:15 3 7/14/92 7933 I I I LENGTH iilmllAGE/coMMEi-its (FT) 194 185 -66 I I I I I I I I I I I I I I I I I I I CANON IE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 6 NON DESTRUCTIVE TEST REPORT .. -·-. . . ·- l AIR TEST RESULTS ' . SEAM_ I SECJION DATE iTECH. TEST .. III~E . !PRESSURE :srARTI -~----NUMBER !OF SEAM METHOD jSTAFn END END 1 -2 i 0 -42 7 /14/92' TM AIR i 1:35 2:04 29 i 26 1 -2 14?. -150 7/14/~? TM AIR 2:07 2:14 30 29 -. 1 -2 1150 -194 7/-14/~2 TM AIR 2:17 2:24 30 29 2 -3 IO -END 7/15/92 TM AIR 8:24 8:29 31 30 I ' ' •• •. •.• I j RESULT• I . . . . . . . !DIFF. 3 p 1 p 1 p 1 p I I I I I I I I I I I I I I I I I 1· I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 6 DESTRUCTIVE TEST REPORT TEST # DS 1 .. -. SEAM # 1 - 2 DATE 7/14/92 · LOCA noi~ ! R~A~c:irr FOR TEST 150 I ROUTINE I i I I ! i ! WELDER I MACH_I_Nj , NUMBER I -----BK I 307 I FiELD i LAB ! TE_ST I TEST ! P I P I I I. - --·----·--. -· ---I I ' 1 I I I I i I I I i ' ' I I I ,. ' I I I I I I I I ' ' I I I ' ' I ----- IHOHIE EHUIROHHEHTAL SERUICES CORP. IEMTROHICS SITE REHEDIATIOH t/QC SUMHARV REPORT -------- REPA IP. SEAM LOCRTI 0~1 DESCR I PT! ON HUMBER HUMBER OF DAMAGE ·-·----· P.1 1 -2 42 AT R2 1 -2 150 DS 1 P.3 1 -2 0 E~T. OF PAHEL R~ 2 -" CORHER SKIRT COUER -.. illlill iiiil REPAIR REPORT SIZE OF !REPAIR REPA II: 1WELl)ER I HACH I HE TEST TEST TECH. RESULT REPAIR METHOD DATE HUMBER :METHOD :DATE 2S'"l:26 .. PATCH 7 /14/92 DH 406 UB 7/14/92 CR p 32");7 r." PATCH 7/14/92 DH i,116 UB 7/14/92 CR p 9 'X1 O' PATCH 7/14/92 DH i,06 UB 7/14/92 CR p 39"X7 O" PATCH 7/15/92 DH .. 116 UB 7/15/92 TM p .- 1 I I I I I I I I I I I I I 1.i lj I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 7/8 T.E:ST WELDER # 1 BK 2 DH 3 DH 4 RP FIELD TRIAL SEAMS DATE TIME MACHINE MACHINE -·--------.. --·-------··- -_ _ _ __ l'lU!'.'l_~ER _ Tl;~__P. 7 /24/92 _ 2: 10 _ ~Q?: __ --~-?~--- 7 /27 /92 8:00 ~Q~_ _ _5_~ 5_ _ --_ 7 /27 /'J2 12:45 -~Q~ _ 5-!Q 7 /2~/~2 ]:5_5 _ --4Q~-----~13_6__ 1--------------- ···--·-------·---··----------------··-·-·------------ I I ~ i u D 0 E I m ~ ~ I I I ~ I I I CANON IE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 7/8 TIME 2:30 ---·-----··-- 2:35 -·---------2:40 ··-···-·-·-·--·. 3:30 -----------. 3:35 --··-----···· 3:50 4:15 i 4:35 . ' PANEL PLACEMENT REPORT PANEL --· .. -------- NUMBER 1 2 3 4 5 6 7 8 DATE ROLL LENGTH --· ----·--·-----------------···--...... -------· ~LI\C:_~I) _ _ N_UM!)_E_R___ (FT) 1 /24/92 _ _ _§!59L__ __ ~! .. __ 7 /24/92 _ _ __§!S~g______ _ ____ !:!_1 __ _ ?,tg,y~g _ . _ --· §!§~g_ __ ---_ 101 -?,'g,y!:lg -J31~---·-J QQ . 7 /24/92. . . -· Z.~1~--____ 11 '!_ . ?,'g1,'!:lg. 7.~1~---__ 1J__5 7 /24/92 _ _ __ !g~~--_ --99 7/24/92 9592 83 DAMAGE/COMMENTS ____ _ ·····----------------------1 ---·--·--------------··-----------------------1 I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 7/8 FIELD SEAMING REPORT sE;M DATE lnME N~~ii~s t\\trgg i.tti~H ~t;tJ~f wELoER TEMPERATURE • . -I . . . --·--··· ... --.... ··-· . .. -···--MACHINELAIR. 1 ::-.. ? U'.?4t'.!!? ?:~§ ! / ? f:LJ§!QN . J~I .. . .. ~QL. BK... ._355./ 84·-··· ? .:: 3 I/?4/!!? ?:§Q ? / 3 ELJ§!Q1-L .. .9_5_ ~QI . BK ... __ 357J so .... . ~ :::.4 It'.?4t'.!!? 3:~!i .~. / 4 ... ELJ§!QN ... 1Q7_ . ~QI BK ...... _357 j 84 ... . 4 :: § I/?4/~? 4:0Q . 4/ § .ElJ.§!QI'.-! ... !1.3~§. .. ~QI BK ..... _ .. 362./.82_ .. !i :: § I/?4/!!? 4:g; § I .E?. ElJ.§!Qr-J .. 115_ ... . ~QI ... SK... ._358.J 82 . § :: I I/?4t'.!!? 4:~Q § / I. ELJ§!QN _Jl§.,§. ~QI. . BK ....... _354.J 79 .. . 7.:-._8 7/24/92 4:50 7 /8. FU.$JQ_l'L .... -8.3... . 307 BK_. __ .356./ eo .. . I .. . . .. ........ ...... . . . .. ······-·-· ···-····--_1. -····· .-/ . ··-.. ···········--··-··-·· .. -··----/ ···-···· / . . -. . . -·-· ·---·· t'. ···-· I .......... ·-··· ./ . . .. . I.. . .. ···················· .... . ............. _____ .. / ····-·-··· ./. . .. ...... ........... ...... ... .... .. . .. ··-······-··•--.. -/ ..•..••...... . J ··-·····-···· .. .... . ( .! ······················-···· ·······················(. . I .. ················ ··-·····-·J ·········· I . . ....... ··············· . . ·······--·--·-/ -·-·- ····· / .. . .. ····-····-········ .. . . ... ··········--'-----/ ···-·· / ···-····· ·-·-····/ ··-··-. J ···········-···· .... .. . ..... -··· ·--L. ···-. I. ........ ········-···· ..... .. ·······-·· ···----·_/ ···-··-.. I ................... -········· .... . .. ········-·-···-·-·l ···--··· I.. . ......... ········-· .. . ········-··· ·--·---/ --·-- ... / .......... ·······-·· ·······--·-·•······. ·······--·· __ / ··-·· ... / -.... . ........... ·········-···· ·-···-.... . ... ······-'----/, __ I_ ....... ··········-···················--··· ··········-·-···-·--···1 ....... _ .. . . .. . ,. / .......•..... ···-··· ··-····· ···-· -········ ... •·····-··-__ / -·-·-·---··· ····· · .. ·····-··· / ............... •·-·-·-···-···--...... ··-··-·-··-·'---1 ·-·-·-· ........ I-····················-·•· ·······-···--.. .. ······-·· ·--······__1········-···· ...... ./ ......... ·········· ················-·· . . .... .... .... ···--'----I I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 7/8 NON DESTRUCTIVE TEST REPORT AIR TEST RESULTS -···-······-· -➔ • -------···-----·------------•••• -------·---····---·-·-·····-·-'"' --·----·----- -SE~t,,1. S_ECJJON • DATE TECH. __ }:l;_~I-J!_~I;__ . PRESSURE ________ ..... .fl_E_$_lJLT Nl)_t.1B_l;_R Of $E_~M _ ___ __ . M_l;_J_tl9J) ~_IARJ END. START .. END_ DIFF •..... _ ·-_ . J . .::? 0.-22_ 7_/?U.~? _ _9_~ .J3J,~.1.FL_____ ··-·----·------· . __ P .. 1 - 2 ??. :_0_2 U?7_/~? ,:t,,1 ... f.J~ _ J:32 _ .. 7:40 30 ---~·Q·-· -·-CJ __ .E 1 - 2 8?-EN_D 7/27/92 _CB .... R3,4 __ ----·· ... ··----·-·····-·--__ ._P ___ _ .. ? :.J .. 0 -5_ 7 /27 /92 ... CB .... __ R9J 10 .. --·--_ .... __ _ -·---·-·· ·-----·-___ f_ ___ . ? ::-~ ?. -.. 91 7/27/92 .. TM_ .. AIR ___ _7:35_ 7:42 30 -~9-.. ___ ()_ _ _e_ .?.-:. 3 94-END 7_/?U~? .... .9~ ... 81!L_ --· · I . --------·-········ __ E _ .. ~ ... :-4 . 0 - 1 7 /27 /92 . CB . R17_ _ ____ ···-__ . _ ·-· P __ . 3 -4 4 ::-JO? 7 /27 ;92 TM _ AIR -· _7_:3.J 7:45 30 --· . 30. ____ o__ _ .. _E_._ ~ -~ 102-END 7-/?!/~? . g~ 1318:-_2() ..... E ..... . ·L:-? . o -: -~ .. 7_/?7_/~? g_B ... 13.2-.1,.?2__ -··-··--···-_ ...... E __ . 1 :-15 5_ :-1 Q.8,§ 7-/?7_/~? T.t.A _~II!_ !;?? ' a:oii 30 30 o .E 4 -5 10~.5-E.ND 7_/?7_/~? _.g§ .. 8~1.~?-___ ·----. --· _ .. E 5 - 6 0 - 4 7/27/92 CB R36,37 P . ; = : 1 ti~-~~g Jt;!t~~ t~ . ~fl~g :~:01 8:08 30 -~o-: -·--~ ... ;. . _JL:7_ .o -.?. U?U~? . .9.~ 13~? .. -·-·--···· _ --····-_____ --·--·-----E __ .. t:i-: 7__ 5 __ -_109 U?!I~? It.A_ ... !\Jf! __ 7:55 0:02 30 --~o ..... o .. _E 6 - 7 109-END 7 /27 /92 CB R43 44 P ·--·-----·-. -. -------------... , .. ,_ ·'-··---·--------····---·-.... _________ --·---·-·--· ·---L: !l .o -_5. 7_/?7_/~? .9J! .. ·-13~§ ____ -· ... -·--·--·--···· __ .E_. __ .!..:-.~ §_.-_79_ 7/27/92 TM __ ._AIR .. !3;!1_ 8:19 30 .}Q _______ Cl. ____ E ... 7 -0 79-END 7/27/92 .. c.a _R.48-:-_51 ·-.. -·--· -··············--· .P .. ··-·· ----1---1----1 . ___ ,_,,_ -----~-------~--- ' I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 7/8 DESTRUCTIVE TEST REPORT I SEAM . # - 4 / 5 DATE 7 /27 /92 . LOCATION REASON .. ----··---·--·------- -FOR_ TEST 48.5 ROUTINE .. ---·------------ WELDER MACHINE FIELD .. LAB_ NUMBER_. TEST __ TEST B_K_ _ 307 P P ------------------- CAHOHIE EHUIROHMEHTAL SERUICES CORP. CHEHTROHICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 7/8 HEPA IR REPORT REPAIR SEAM LOCATION DESCRIPTION SIZE OF HEPA IR HEPA IR ! WELDER MACHINE TEST TECH. RESULT HUMBER HUMBER OF DAMAGE REPAIR NETH OD DATE HUMBER DATE R1 1 - 2 0 SEAH DAMAGE 22· EXT 7 /27 /92 • DH 4116 7/28/92 CB F R1R 1 -2 0 REWELD 22' REWELD : 7/29/92 · RP 4118 7/29/92 CB p R2 1 -2 22 AT 1s··x1s·· I PATCH ; 7127 /92 ' DH 4116 7/28/92 CB p R3 1 -2 81 ! AT 18""X13"" I PATCH ! 7 /27 /92 ' DH 416 ' 7/28/92 CB ' p R4 1 -2 ! 82 i SEAH DAMAGE ' 3"X5" I PATCH ! 7 /27 /92 ! DH 4116 7/27/92 TL I p RS 1 -2 ! 811 R 4 i PUNCTURE 18""X18"" I PATCH ! 7 /27 /92 i DH 4116 ' 7/28/92 CB ; p R6 1 2 47 R 8 PUNCTURE 18""X18"" I PATCH , 7 /27 /92 • DH 4116 7 /28/92 CB P R7 1 2 48 R 111 PUNCTURE ! 7 /27 /92 ' 7 /28/92 CB P 12··x1s--I PATCH DH 4116 3"" !EXT. DH 4116 ' 7 /27 /92 ' 7 /28/92 CB P 2 -3 4' 1EXT. DH 4116 0 SEAM DAMAGE 7 /27 /92 7 /28/92 CB P 2 -3 15""X15"" I PATCH DH 4116 4 SEAM DAMAGE : 7 /27 /92 , 7 /28/92 CB P 2 3 16""X16"" !PATCH DH 4116 5 AT . 7 /27 /92 ' 7 /28/92 CB P 2 3 15""X15"' I PATCH DH 4116 94 AT · 7 /27 /92 : 7 /27 /92 TL P 2 -3 1. IEXT. DH 4116 4 L 1 PUNCTURE , 7 /27 /92 ' 7 /28/92 CB P 2 -3 15""X15"" 1PATCH DH 4116 89 SEAN DAMAGE 7 /27 /92 7 /28/92 CB P 2 3 1' 'EXT. DH 4116 911 SEAM DAMAGE • 7 /27 /92 ' 7 /28/92 CB P 2 -3 18""X4' .. I PATCH DH 4116 91 SEAM DAMAGE , 7 /27 /92 · 7 /27 /92 TL P 3 -4 18""X15"" I PATCH DH 4116 4 AT · 7 /27 /92 , 7 /28/92 CB P 3 -4 18""X26"" 'PATCH DH 4116 ' ' 101 AT · 7 /27 /92 · 7 /28/92 CB P --------------------------~--------------------------3 -4 1' iEXT DH 4116 1112 SEAM DAMAGE 7 /27 /92 7 /28/92 CB P -----------~-~------------~~----------3 -4 15""X15"" !PATCH DH 4116 1 II 3 .5 SEAM DAMAGE · 7 /27 /92 • 7 /27 /92 TL P --------llilil iiliil --liiil iiiil CAHOHIE EHUIROHMEHTAL SERUICES CORP. CHENTROHICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 7/8 REPAIR SEAN LOCATION DES CR I PT ION HUMBER HUMBER OF DAMAGE R21 " -5 0 SEAN DAMAGE R22 4 -5 5 AT R23 .. -5 6 ... L 111 PUNCTURE R21J " -5 5 L 8 PUNCTURE R25 " -5 8 L 9 PUNCTURE R26 " -5 111 L 7 PUNCTURE R27 " -5 "L 12 PUNCTURE R28 4 5 " L 211 PUNCTURE R29 4 -5 211 L 5 PUNCTURE R311 " 5 48.5 DS 1 R31 " -5 1117 .5 AT R32 4 -5 108.5 SEAN DAMAGE R33 4 -5 711 L 9 PUNCTURE R31J 4 -5 IJ4.5 L 8 PUNCTURE R35 .. -5 25 L 5 PUNCTURE R36 5 6 ll SEAN DAMAGE R37 5 -6 4 AT R38 5 -6 1119 AT R39 5 -6 110 SEAN DAMAGE R40 5 -6 109 l 6 PUNCTURE REPAIR REPORT SIZE OF ,REPAIR REPAIR WELDER MACHINE REPAIR !METHOD DATE HUMBER 18"X4' !PATCH 7 /27 /92 DH IJll6 \15"X18" 1PATCH . 7 /27 /92 : DH ""6 16"X15" I PATCH ' 7 /27 /92 : DH IJll6 15"X14" I PATCH ; 7 /27 /92 , DH IJll6 15"X15" I PATCH i 7 /27 /92 ! DH ... 116 15·•x15" I PATCH ! 7 /27 /92 i DH ... 116 3" (2) !EXT. , 7 /27 /92 ; DH IJll6 3•· (2) iEXT. ! 7 /27 /92 : DH ... 116 4•• IEXT. . 7 /27 /92 : DH IJll6 211"X5' I PATCH • 7 /27 /92 DH IJll6 1s··x24•• ,PATCH : 7/27/92 · DH IJll6 5· i EXT. • 7 /27 /92 ' DH 4116 6'X4' !EXT. :7/27/92. DH IJll6 6"")(4" ;EXT. :7/27/92• DH ... 116 3•• 'EXT. . 7 /27 /92 ' DH IJll6 4' 'EXT. , 7/27/92 DH IJll6 15""X15" 'PATCH · 7/27/92 DH ... 116 12··x12·· '.PATCH . 7/27/92 DH IJll6 5' tEXT. 7/27/92 DH 406 12""l:24" :PATCH · 7 /27 /92 DH 1Jll6 liiil - TEST TECH. RESULT DATE 7/28/92 CB p 7/28/92 CB p 7 /28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/27/92 TL p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/28/92 CB p 7/27/92 TL p 7/28/92 CB p CAHOHIE EHUIROHMEHTAL SERUICES CORP. CHEMTROHICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 7/8 REPAIR SEAN LOCRTIOH DESCRIPTION HUMBER HUMBER OF DAMAGE Rli1 5 - 6 97.5 SEAM LEAK Rli2 6 -7 4 PRHEL EXTH. Rli3 6 -7 1119 RT R .. li 6 -7 111 .5 SEAM DAMAGE Rli5 6 -7 111.5 R .. PAHEL EXTH. R .. 6 6 - 7 25 R 2D PAHEL EXTH. Rli7 7 -8 II SEAM DAMAGE R .. 8 7 8 77 RT Rli9 7 8 811 SEAM DAMAGE RSII 7 -8 81 SEAM DAMAGE R51 " -5 103 L 3.5 PUHCTURE R52 " -5 98 L 12 WRINKLE R53 II -5 87 L 12 lfR IHKLE RSI! II -5 , 88 WRINKLE .. -. HEPA IR REPORT SIZE OF REPAIR REPAIR ;WELDER MACHINE TEST TECH, RESULT REPAIR METHOD DATE HUMBER DATE 16'"X16'" 'PATCH 7/27/92 DH lill6 7/28/92 CB p 5'X2II' ;PATCH · 7 /27 /92 DH .. 116 7/27/92 CB p 15'"X15"' !PATCH • 7 /27 /92 ' DH .. 116 7/28/92 CB p ... I PATCH : 7 /27 /92 ; DH .. 116 7/27/92 TL p 5·x211· I PATCH i 7 /27 /92 ' DH lill6 7/27/92 TL p 8'X211' I PATCH l 7 /27 /92 : DH .. 116 7/28/92 CB p 3'X12' I PATCH '7 /27 /92 : DH .. 116 7/28/92 CB p 2'X3' I PATCH : 7/27/92' DH .. 116 7/28/92 CB p 1. !EXT. 7/27/92 · DH .. 116 7/27/92 TL p 2'X3' !PATCH · 7 /27 /92 , DH lill6 7 /27 /92 TL p 28"'X26 .. iPRTCH · 7 /29/92 . RP lill6 7/29/92 CB p 5•xs· ,PATCH . 7 /29/92 . RP lill6 7'/29/92 CB p 13""X1S"" 1PATCH · 7/29/92 , RP "116 7 /29/92 CB p 9' >EXT. , 7 /29/92 • RP .. 116 7/29/92 CB p I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 9 FIELD TRIAL SEAMS !TEST WELDER i DATE ! it ' . i 1 I 6 - 4 2 BK DH DH 7/14/~2 !/14/~? 7/15/92 -... TIME MACHINE MACHINE 3:00 3:00 8:55 NUMBER 307 .. - 406 406 TEMP. 359 400 515 PEEL -BREAK SHEAR -BREAK .RESULT: (LB/!N) (L~/iNi ! (P/F) ' 108 FTB i P FTB FTB P 157 144 P I I I ' I ' I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QI\/QC SUMMARY REPORT I DA 9 I PANEL PLACEMENT REPORT I I I I I I I I I I I I I I I TIME 2:45 3:10 ... ,. 3:25 3:30 PANEL NUMBER 1 2 3 3A DATE ROLL ... -. ·--. PLACED NUMBER 7/14/92 7268 7/14/!}2 7268 7/14/92 7268 7/14/92 7268 LENGTH DAMAGE/COMMENTS --·· FT 108 111 56 57 I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 9 ! SEAM ! DATE ' TIME ' # . i 1 - 2 i7/14/92i 3:10 :2 -3,i/14/92! 3:30 2 -3A f;i4;ij:i I 3:40 3 -3A 7 /14/92 4:10 PANEL NUMBERS 1 / 2 _2 / _3 2 /_ 3A 3 / 3A I_ I I I I I I I I I I I I I I I I I I I I I I I I_ I FIELD SEAMING REPORT • SEAMING' SEP,~ i MACHINE METHOD '. LEN_GTH: NUMBER FUSION 108 307 ---·--·-·--·- FUSION 56 307 . . ------. . ---· '"' FUSION 57 307 -· --.. -------- FUSION 9 406 WELDER . ... BK BK si< DH rEivlP~R~fu_RE, MA_C:HINE/1\IR : ~§1 / ~6 ~§1 / ~6 ~§! /_ ~4 400 I 84 I I I I I_ I I I I I_ I I_ I_ I I_ I I_ I ... ·--·· I I_ I I I I_ -I l I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 9 NON DESTRUCTIVE TEST REPORT AIR TEST RESULTS SEAM SECTION DATE TECH. TEST !TIME iP~ESSURE .. -I. NUMBER OF SEAM METHOD ,ST ART: END ,START: END 1 -2 0 -END 7/14/92 TM AIR i 4:02 4:07 30 30 2 -3A 0 -14.5 !/14/!32 JR VB 2 -3A 14.5-END 7/14/f:!2 JR AIR 4:12 4:17 30 28.5 2 -3 0 - 7 7/14/!32 JR VB - 2 -3 7 -42 !/14/!3? JR AIR 4:03 4:10 30 30 --'' --~- 2 - 3 42 -f:ND 7/14/1!? JR VB 3 -3A 0 -END 7 /14/92 JR VB 'iiii=F. 0 1.5 0 I I I ! RESULT· p p p p """ p p I I, I' I I I I I I I I 11 I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 9 DESTRUCTIVE TEST REPORT TEST # DS 1 • SEAM # • 2 / 3A' I l I ' DATE 7/14/92 · LOCATION i REASON • i=oR TEST: 11 i ROUTINE i WELDER i MACHINE ! FIELD; LAB i i-iuj,i_~ER I TEST TEST i BK 307 . P p I iiiiiil -. ---- -.... llill -lliiil ; iilil NONIE EHUIROHMEHTAL SERUICES CORP. EMTROHICS SITE REMEDIATION /QC SUMMAR~ REPORT 9 REPAIR REPORT ·------------------------------·-· ··-----------. ----------·------:EPArn SEAM LOCATIOH DESCRIPTIOH SIZE OF 1RE!'AI~ REPA IF 'WELDER ---·-··----------------= l~M_ll~R __ HUMBER-----------··--·--··--OF __ .DAMAGE ___ ···-REPA.1 R __ METHOD __ DATE··--- DH P.1 ~ -n 27 (l 4~"R PUMPTURE 0" EXT. 7/14/92 •' 0 -----------------------------------···-· ----------... ·----·--------r. 2 -2 89 (l 3r"R CUT 0" EX':'. 7 /14/92 " -----·-DH R3 2 -3 52 CROSS TEE 21""):17"' PATCH 7 /14/92 DH R4 2 -3 42 AT 14"X17"' PATCH 7/14/92 DH RS 2 -3 6.3 AT 14"X14"' PATCH 7 /14/92 DH R6 2 -3 C -6.3 SEAM DAMAGE Cl_ 3' EXT. 7/14/92 DH R7 ~ 2 1 03 @ 3 ff" R HOLE -----------15""X18"' PATCH 7/14/92 DH ·-·----------····---------- !MACHINE HUMBER 406 406 406 406 406 406 406 406 406 406 406 406 -iliil TEST TEST TECH. RESULT ;METHOD 'DATE UB 7/14/92 JR p UB 7/14/92 JR p UB 7 /14/92 JR p UB 7/14/92 JR p UB 7/14/92 JR p UB 7/14/92 JR p UB 7/14/92 JP. p UB 7/14/92 JR p UB 7/14/92 JR p UB 7/15/92 JR p UB 7 /15/Y2 JR p UB 7/15/92 JR p I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 10/11 PANEL PLACEMENT REPORT TIME PANEL DATE ROLL ... ---... NUMBER PLACED NUMBER .. --· .. --.. ---. -. --. -8:50 1 7/1§/9? 7919 9:10 2 ?/1§/fJ? 7919 9:40 3 7/1§/fJ? 7919 10:35 4 7/15/()2 7918 .. 1:20 5 7/1§/92 7918 2:05 6 7/1!5/fl? 7918 2:20 6A 7/1§/()2 7364 3:05 7 7/1§/fJ? 7364 3:25 8 7/15/fl? 7364 3:50 9 7 /1 !,/fl? -9501 12:55 10 7/16/!)2 9501 1: 15 11 7/16/()2 9490 2:10 12 7/16/fl? 9490 2:40 13 7/1~/!3? 9490 3:50 14 7/1~/!3? 7921 . . 4:05 15 7/1~/!32 7921 4:25 16 7/16/()2 9501 4:50 17 7/16/92 9501 1 :15 18 7 /17 /92 9063 1:25 19 7/17/92 9063 1 :40 20 7/17/92 9063 1:50 21 7/17/()2 7921 2:15 22 7/17/92 7921 LENGTH DAMAGE/COMMENTS (FT) 112 118 122 131 139 110 35 145 145 147 143 136 131 126 117 ... 107 97 86 73 63 51 44 44 I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 10/11 FIELD TRIAL SEAMS TEST WELDER DATE. TIME MACHINE MA<::HilllE ... "' ... --# NUMBER TEMP. 1 BK . !/1§/§l? 9:35 307 359 2 BK 7/1§/§l? 1 :15 307 359 '3 QH .. !!'1§/§1? 1 :40 406 §QQ 4 C:R. !/1!!/§l? 11 :30 305 773 5 QR. !IH!I!!? 1;Q§ 3Q§ 77:} 6 DH 7/17/§l? 8:20 406 §1§ 7 CR 7/17/§l? 1 :15 307 365 8 DH 7/1!/~? 1:35 40!! §1§ 9 BK 7/1! /§!? 2:10 305 773 10 JM 7/1~/~? 9:05 406 515 11 JM 11rn1~? 1:00 406 §1§ 12 DH 7/?Q/§l? 7:40 406 515 12R DH 7/?Q/§l? 7:55 406 515 13 DH 7 /?QI~? 12:55 406 520 14 JM 7/?Q/~? 1:05 406 520 PEEL-BREAK SHEAR-BREAK 'Rl:~lJL, T ... ·-· .. (LB/IN) (LB/IN) (P/F) FTB FTB p FTB FTB p FTB FTB p 124 144 p 1§1 157 p 138 164 p 13B 147 p 105 144 p 138 144 p 138 157 p 111 170 p F 131 141 p 138 144 p 115 157 p I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT I DA 10/11 FIELD SEAMING REPORT I I I I I I I I I I I I I I I I SEAM # 1-2 2-3 3-4 4-5 §-!?A §-El 6A-7 6-7 7-8 8-9 El-!l 9-10 10-11 11-12 12-13 p-1~ 14-15 1§-11;3 16-17 17-18 18-19 19-20 ?Q:-?.1 21-22 DATE TIME 7/1§/!l? 9:50 7/1§/!l? 10:15 7 /1§/!l? 11,Q§ 7/1§/1:!? 1 :08 7 /1 §/!l?. 1:30 !/1§/!l? ?:Q§ 7 /1§/1:!? 2:25 7/1§/!l? 3:08 7/1§/!l? 3:30 7 /1§/92 4:10 7/1El/!l? 11 :40 7 /1El/!l?. 1:35 7/16/92 2:00 7/1El/!l2 2:45 7/l!l/!l? 3:25 7/l!l/92 3:50 7 /1!!/!l? 4:25 7 /H?f!l2 4:50 7/11,l/!l? 5:20 7/17/!l? 2:00 7/17/!l? 2:30 7 /17 /!l? 2:45 7/17/!l? 3.:Q6 7/17/1:12 3.:?Q PANEL SEAMING SEAM MACHINE NUMBERS METHOD LENGTH NUMBER ...... -· . 1 I 2 FlJSIQ!'J 115' 307 2 I 3 FUSION 120' 307 . -----. -. 3. I 4 FlJ§!Q!'J 127' 307 4 I 5 FUSION 135' 307 . . ------.. 5 I 6A FUSION 33' 307 -. ----. -5 I 6 FlJ§!Q!'J 1 Q!l,fi' 307 6A I 7 FUSION 35' 307 6 I 7 FUSION 109' 307 7 I 8 FUSION 145' 307 8 I 9 FUSION 20' 307 El I 9 FU!:lIO!'J 128' 305 9 I 10 FUSION 146' 305 10 I 11 FUSION 140' 305 11 I 12 FUSION 133' 305 12 I 13 FUSION 1?!l,5' 305 13 I 1,i I FUSION 122' 305 1 !i i FlJ~tQN .... ,. 14 I 112' .305 15 I 16 ! FUSION 102.5' 305 16 I 17 i FUSION 92' 305 17 I 18 I FUSION 80' 305 ----I -------18 I 19 , FUSION f;l!l, §' 305 19 I ?O I FUSiON 58.5' 305 20 I 21 FU$IQ!'J 44' 305 21 I 22 FUSIQ!'J 44' 305 I I I I I I WELDER TEMPERATURE MACHINE/AIR El~ 359 I 85 BK 359 I 85 ElK 3.§!l I El§ BK 359 I 89 BK 3§6 I 90 ElK 356 I !lQ BK 356 I 90 BK 359 I 88 BK 359 I 86 BK 359 I 86 CR 770 I 86 CR 770 I 86 CR 770 I 90 CR 769 I 92 CR 764 I !lQ CR 770 I 88 CR 773 I 85 CR 774 I 83 CR 772 I 83 BK 772 I 86 BK 770 I 84 BK 774 I 84 BK 772 I Elf,l BK 774 I El4 I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT I DA 10/11 I I I I I I I I I I I I I I I I SEAM . ---··-···· NUMBER . -.... -----. - 1 -2 2 -3 2 -3 3 -4 3 -4 3 -4 4 -5 4 -5 5 -6 5 -6 5 -6A 6 -7 6A -7 7 -8 8 -9 8 -9 8 -9 8 -9 9 -10 9 -10 9 -10 10 -11 10 -11 11 -12 11 -12 11 -12 6 -6A 12 -13 12 -13 12 -13 . -. \ SECTION -· --. -. OF SEAM 0 -ENO ... . ... -.... 0-107 -· .. ---... 107-END . -. . . -'•• . 0 -106 -. -- 109-ENO . ---. --. -- 1 Q\l'."El-!0. 0 -6 6 -END 0 -1 1 -ENO 0 -ENO 0 -END 0 -ENO 0 -END 0 -9 !:l -45 45 -115 115 -ENO 0 -9 9 -140 140-ENO 0 -3 3 -ENO 0 -7 7 -128 12 -END o -!:NP 0 -5 5 -125 1?1?-!:1-!P DATE TECH. 7/1§/\l? TM 7/1§/\l? TM 7/1~/\l? TM 7 /1§/\l? TM 7/1§/1:1? TM 7/1~/\l? TM. 7 /1§/\l? TM 7 /15/92 TM -I •• ----· 7/17/1:1? CB 7/1§/\l? TM 7 /1§/\l? TM 7 /1§/\l? TM· 7/1§/\l? TM 7 /1§/\}2 TM 7/17/1:!2 CB 7 /1§/\l? TM 7 /1§/\l? TM 7/17/\l? CB 7 /17 /\l? CB 7/1§/\}2 TM 7 /17 /\J?, CB 7 /17 /\12 CB 7 /1f?/1:12 TM 7/17/1:1? CB 7 /1§/\l? TM 7/17 /\l? CB 7 /1§/1:1? TM 7 /17 /1:1? CB 7/17/1:1? TM 7/1!/9? CB NON .DESIRUCTD/£ TEST REPORT TEST TIME METHOD ST ART VB AIR TEST RE$1JL, TS PRESSURE ENO START END AIR 1 :50 1:55 VB AIR 1 :49 1 :54 AIR 1 :50 1 :55 VB VB AIR 1 :58 2:03 R19 AIR 8:00 8:10 AIR 7:52 7:59 AIR 7:46 7:55 AIR 7:40 7:48 AIR 8:04 8:15 R 28, 30 AIR 1:12 1:20 AIR 1:15 1:25 R3~. R34-36 AIR 2:30 2:40 R38 R39 AIR 2:40 2:50 R40 AIR 3:05 3:15 R 41 VB R42 AIR 9:31 ' 9:36 R43 30 30 30 30 32 31 32 32 31 30 32 30 32 31 31 28 30 20 28 32 30 31 31 31 30 30 30 32 29 31 i 'RESULT DIFF . p 2 p p 0 p 10 F p p 2 p p 0 p 1 i P 1 p 1 p 0 p p 0 p 2 p p p 0 p 0 2 0 p p p p p p p p p p I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE, REMEDIATION QA/QC SUMMARY REPORT I DA 10/11 I NON DESTRUCTIVE TEST REPORT AIR TEST RESULTS .. ---. --SECTION --· ..... -.. TEST TIME PRESSURE -.. --· ·-... -I I I I I I I I I I I I I I I SEAM NVMEll:~ p -14 13 -14 1'3 -14 13 -14 13 -14 14 -15 14 -15 15 -16 15 -16 16 -17 16 -17 16 -17 16 -17 17 -18 17 -18 18 -19. 18 -19 19 -20 19 -20 20 -21 20 -21 20 -21 OF SEAM 0 - 5 DATE TECH. !/17/9_? CB 7/17/9_? TM 7/1?/f:I? TM 7/17/9_? TM r.11:THQD §TART R44 END START END DIFF. 5 -42 42 -85 85 -117 117-END 0 -7 7 -END 0 - 5 5 -END 0 -32 36 -92 36 -46 50 -78 0 - 9 9 -END 0 - 5 5 -ENO 0 - 5 5 -END 0 - 5 5 -39 39 -END !/17 /f:I? CB 7/17/f:I? CB 7/17/f:I? TM 7 /??19_? CB 7 /17 /!!? TM 7/17/9? TM 7/17/f:I? TM 7/17/9? TM 7/17/9_? TM 7 /?2/9_? CB 7 /17 /!I? TM 7 /??/9? CB 7/17/9? TM 7 /17 /92 CB 7 /17 /§l? TM 7/??/9? CB ?/??/9_? CB 7 /?2/9_2 CB AIR AIR AIR R49 VB 10:02 10:10 11:10 10:09 10:20 11: 15 AIR 10:15 10:25 R66 AIR AIR AIR AIR AIR Rll9, 7Q 11 :35 2:18 2:00 2:55 2:50 11 :45 2:28 2:01 3:03 3:04 AIR 3:55 4:00 R71 AIR 3:56 4:01 R 72 AIR 4:10 4:15 R75, 7tl VB R79,llQ 31 30 30 30 30 30 30 30 30 30 30 31 29 30 30 30 28 0 30 30 29 29 30 I 29 0 1 0 0 0 2 30 0 0 1 RESULT • p p p p p p p p p p F p p p p p p p p p p p I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 10/11 DESTRUCTIVE TEST REPORT ... TEST SEAM DATE LOCATION REASON WELDER MACHINE ... -·---· -# # F.QR JE:~T NUtv1~ER OS 1 4 -5 7/1~/~2 50 ROUTINE BK 307 -----. -·--OS 2 7 -8 7/l!l/~? 40 ROUTINE BK 307 OS 3 9 -10 7 /1§/~2 30 ROUTINE CR 305 ... ------. -·-OS 4 16 -17 _ 7 /1§/~? 32 ROUTINE CR 305 . ·----·-··•. -DS4A 14 -15 7/18/~? 40 RETEST CR 305 I - FIELD LAB TE:ST TEST p p p p p p F F p p • --........ -----lliil----- CRHOHIE EHUIROHHEHTAL SERUJCES CORP. CHEMTROHJCS SITE REMEDIATION OA/OC SUMMARV REPORT DA 10/11 REPA JR SEAM LOCAT! OH DESCP.! PT !OH HUHBEF. HUMBER OF DAMAGE ----·-· R1 1 -2 s.s SEAM DAMAGE r.2 -; -2 33.0 SEAM DAMAGE R3 1 -2 41. ll SEAM DAMAGE R4 1 -2 60 SEAM DAMAGE RS 1 -2 73 SEAM DAMAGE R6 1 -2. 75.5 BURN OUT R7 1 -2 65.5 L 8 PUNCTURE R8 1 -2 81 WRINKLE R9 1 -2 86.5 L ll.8 WRINKLE R10 1 -2 86.5 L 8.5 CUT R1"i n -3 107 AT L R12 3 -.. 2 AT R13 3 -" 1 Ill! SEAM DAMAGE R14 3 -4 1111 AT R15 4 -5 1 SEAM DAMAGE R16 4 -5 6.5 AT R17 4 -5 5 ll DS, R18 4 5 103 L 3 PUNCTURE R19 5 -6A 32.5 AT ;:. ,, SEAM R211 5 -6 3, L 1-: • 5 PUNCTURE REPAIR REPORT SHEET 1 OF 5 SIZE OF ;REf'A!R REPAIR •WELDER :MACHI HE TEST REPAIR METHOD DATE HUMBER DATE --------· 1.t; .. ~;14•• PATCH 7 /15/\12 DH "06 7 /17 /92 14'");32'" PATCH 7 /15/92 : DH "116 7 /17 /\12 1l!"X18" PATCH 7 /15/92 · DH "116 7/17/92 2J;"X6 O" PATCH 7/15/92 DH .. 116 7/17/92 9" EXT 7 /15/92 ' DH .. 116 7/17/92 6 .. EXT · 7 /15/92 · DH 4116 7/17/92 1 l!"'X1 ll" PATCH 7 /15/92 · DH 4116 7 /17 /92 ~. v-,.. PATCH 7/15/92 DH 4116 7/18/92 L n, 8' EXT 7/15/92 DH 4116 7/18/92 11"X16" PATCH 7/15/92 DH 406 7/18/92 14"X16" PATCH . 7 /15/92 DH 406 7/18/92 19"X36" PATCH 7/15/92 DH 406 7/18/92 7" EXT 7/15/92 DH 406 7/18/92 1l!"X46" PATCH 7/15/92 DH 4116 7/18/92 1R""X48"' PATCH 7/15/92 DH 406 7/18/92 12"X16" PATCH 7/15/92 DH 406 7/18/92 · 2:l"X5' PATCH 7 /15/92 DH 406 7 /18/92 19••:;24" PATCH ?/"'!5/92 DH 4116 7/18/92 2' X1 . 7' PATCH 7/17/92 DH 4116 7 /18/92 1z··x12·· PATCH 7/17.'92 DH 406 7/18/92 liiil IECH. RESULT BP p BP p BP p BP p BP p BP p BP p CB p CB p CB p CB p CB p CB p CB p CB p CB p CB p CB p CB p CB p ---11!!11] .. --liiiil liiiil liill iiill liill liiil -liill CAHOHIE EHU IRIJNHEHTAL SERUICES CORP. CHEMTROHICS SITE REHED !AT !OH QA/QC SUHHARV REPORT DA 10/11 REPAIR REPORT SHEET 2 OF 5 REPAI!l SEAH LOCATIOH DESCP. IP: !OH SIZE OF --··--·------·--REPAIP. REPA IP. WELDER :MACHINE TEST TECH. RESULT HUHBEH HUl'IBER OF DAMAGE REPAIR HETH OP DATE HUMBER DATE fl'>" ~, 5 -6A 19 L 19 ------• PUNCTURE 12""X16"' PATCH 7/17/92 DH 406 7/18/92 CB p R22 6A -7 0. D · SEAM DAMAGE 14""X14"" PATCH 7/17/92 DH 4116 7/18/92 CB p R23 6A -7 311.5 PUNCTURE 18 .. X12 .. PATCH 7/17/92 DH 4116 7/18/92 CB p R24 6A -7 32.5 X SEAM 1 s··x1 s·· PATCH 7 /17 /92 DH 4116 7 /18/92 CB p R25 7 -8 38.5 DS 2 2"X4' PATCH 7/17/92 DH 4116 7 /18/92 CB p R26 7 -8 19 L 21 PUNCTURE 4·• EXT 7 /17 /92 DH 4116 7 /18/92 CB p R27 7 8 29 L 15 PUNCTURE 6"" E);T 7 /17 /92 DH 4116 7/18/92 CB p R28 8 -9 0 SEAM DAMAGE 2"X4" PATCH 7 /17 /92 DH 4116 7/18/92 CB p R29 8 -9 6.5 L 1 PUNCTURE 12··x12·· PATCH 7 /17 /92 DH 406 7 /18/92 CB p R36 8 -9 9 AT 12··x15•· PATCH 7/17/92 DH 406 7 /18/92 CB p R36 8 -9 4 -9 PATCH EXTN. 4' EXT. 7/17/92 DH 406 7 /17/92 CB p R31 8 -9 45 AT 12··;,;15•· PATCH 7/17/92 DH 406 7/18/92 CB p R32 8 -9 62 L 4 PUNCTURE 3"X5' PATCH 7 /17 /92 DH 406 7/18/92 CB p R33 8 -9 114 SEAM PATCH 1·;;34· PATCH 7 /17 /92 DH 406 7 /18/92 CB p R34 9 -111 0 SEAM DAMAGE 2 ";,;4' PATCH 7 /17 /92 DH 4116 7/18/92 CB p R35 9 -16 4 SEAM DAMAGE 15·•;,;24•· PATCH 7/17/92 DH 406 7 /20/92 CB p R36 9 -10 9 AT 1s··~;1s·· PATCH 7/17/92 DH 406 7 /2 0/92 CB p R37 9. 16 36 OS 3 2"X4.S-' PATCH 7/17/92 DH 4116 7 /20/92 CB p R38 9 -10 140 PUH~TURE 1z··:-:1 s-·· PATCH 7/17/92 DH 406 7 /20/92 CB p ~39 1U -11 0 AT 15"~\1~" PATCH -------· 7 /17 /92 Dli 406 7 /2U/92 CB p .. ------------· ···---R4C 1, -: L 5 AT 1,··::15·· PATCH 7/17/92 DH 4116 7/20/(]2 CB p CAHOHIE EHIIIROHHEHTAL !:ERUICES CORP_ CHEHTROHIC$ SITE REHEDIATIOH QA/QC SUHHARY REPORT DA 1 0/11 REPAIR SEAM LOCATIOH DESCR I PTIOH HUMBER HU.MB ER OF DAMAGE R41 11 -12 127.ll SEAM DAMAGE R42 12 -13 4.5 AT R43 12 -13 124.5 SEAM DAMAGE R44 13 14 5 AT R45 13 -14 42 AT R46 13 -14 63 SEAH DAMAGE R47 13 -14 68.5 SEAM DAMAGE R48 13 -14 85 AT R .. 9 13 -14 116 AT R50 1'1 -15 7 AT R51 15 -16 93 SEAM DANAGE R52 15 -16 5 AT R53 15 -16 6 PUHCTURE R54 15 -16 5 L 1.5 PUHCTURE R55 2 -3 0 AT R56 5 -6A 0 AT R57 7 -8 0 AT R58 11 -12 ll PRHEL E~;T. R50 12 -13 ll L 15 PRHEL E~:T. R6ll 16 -17 0 -EHD CAP REPAIR REPORT SHEET 3 OF 5 ------. ·-. SIZE OF REPAIR REPAIR WELDER HACHIHE TEST TECll. RESULT REPAIR METHOD DATE HUMBER DATC: 11··x13·· PATCH 7 /17 /92 DH 406 7 /2 0/92 CB p 12'"X15" PATCH 7/17/92 DH 406 7 /20/92 CB p 1ll"X13" PATCH 7 /17 /92 · DH 406 7 /2 0/92 CB p 15"':(15"' PATCH 7/17/92 DH .. 06 7 /20/92 CB p 15"'X15" PATCH 7/17/92 DH .. 06 7 /20/92 CB p 1 ff .. X12"" PATCH 7 /17 /92 • DH .. 06 7/20/92 CB p 13");36" PATCH 7 /17 /92 DH .. 06 7 /20/92 CB p 12""X15" PATCH 7/17/92 · DH 406 7 /20/92 CB p 12"X12" PATCH 7/17/92 DH 406 7 /20/92 CB p 15"X15" PATCH 7/17/92 DH 406 7 /20/92 CB p 12"X15" PATCH 7 /17 /92 · DH .. 06 7 /20/92 CB p 12"'X42" PATCH 7/17/92 DH 406 7 /20/92 CB p 8" DIA. PATCH 7/17/92 DH 406 7 /20/92 CB p 111" X 1 ll" PATCH 7/17/92 DH .. 06 7 /20/92 CB p 8 .. X13 .. PATCH 7/18/92 JH 406 7/18/92 CB p s--;.;13•• PATCH 7/18/92 JH 406 7/18/92 CB p S"X1 ll" PATCH 7/18/92 JH 406 ·7/18/92 CB p : • XI.:. PATCH 7/16/92 JM 406 7 /2 0/92 CB p .t;' i~1~' PATCH 7/18/92 JH 406 7 /2 ll./92 CB p CAP CAP 7/18/92 JH 406 7 /22/92 CB p iiiil --- l!!!!!!l!!l 1!11!1 CANOHIE ENUIROHHENTAL SERUICES CORP. CHEMTRONICS SITE REHEDIATIOH QA/OC SUMMARY REPORT DA 10/11 REPAIR SEAM LOCATION DESCRIPTION HUNBER HUMBER OF DAMAGE R61 PANEL 1 PANEL 1 A.T. EXTH. R62 1 -2 15 R 3 PUNCTURE R63 14 -15 4 L 16 PUNCTURE R64 14 -15 11 II L 15 PUNCTURE R65 14 -15 40 -END SEA11 DAHAGE R66 15 -16 ll -END SERI'! DAMAGE R67 16 -17 II -4ll SEAi'! DAMAGE R68 16 -17 40 -END SEAM DRNRGE R69 17 -18 4 SERI'! DAMAGE R70 17 -18 8 AT R71 18 -19 5 AT R""~' ,_ 19 -20 0 SEAM DAt1AGE R73 19 -20 6 AT R74 19 -20 49-5 AT R75 20 -21 0 SEAM DAMAGE R76 20--21 5 SEAM DAHACE R77 20 -21 · 27 .5 SEAM DAMAGE R78 211 -21 28 .5 SEAM DAHAGE R79 20 -21 37 SEAM DAMAGE RB~ 20 -21 39 SEAM DAMAGE . ~ iiiiiil (iii) -liiil -- REPAIR REPORT SHEET 4 OF 5 SIZE OF 'REPAIR REPA IP. \iELDER '11ACHIHE TC'I:'.,.. L" • TECH. RESULT REPAIR 11ETHOD llATE HUMBER DATE H/A PANEL 7/18/92 JH 406 7 /18/92 CB p 8001'8" PATCH 7/18/92 JH 4ll6 7/18/92 CB p 111--i:12·· PATCH 7 /211/92 DH 4116 7/26/92 CB p .... E1'T 7 /211/92 DH 4116 7 /26/92 CB p CAP CAP 7 /211/92 DH 4116 7 /20/92 CB p CAP CAP 7 /211/92 DH 4116 7 /26/92 CB p CAP CAP 7 /211/92 DH 4116 7/22/92 CB p CAP CAP 7 /26/92 · DH 4116 7 /22/92 CB p 15··;,;3" PATCH 7 /2 0/92 DH 4116 7/22/92 CB p 1 o··i:12·· PATCH 7/28/92 DH 4116 7/22/92 CB p 15··;.;15•· PATCH 7 /20/92 DH 4116 7/22/92 CB p 2·x2.s· PATCH 7 /2 0/92 DH 4116 7 /22/92 CB p 1 c--::15•• PATCH 7 /20/92 DH 4ll6 7/22/92 CB p 15··x1s·· PATCH 7 /2 0/92 DH 11116 7 /22/92 CB p 1.s·x2· PATCH 7 /20/92 JH 4116 7 /22/92 CB p 1::-··x12·· PATCH 7 /2 0/92 DH 4ll6 7 /22/92 CB p """'' EXT 7 /2 0/92 DH .. 4116 7 /22/92 CB p 6 .. D:T 7/26/92 DH 406 7/22/92 CB p s·· EXT 7/20/92 DH 406 7 /22/92 CB p 1:··x-::·· ·PATCH 7 /? fl/92 DH 406 7/2'2/92 CB p CAHOHIE EHUiROHMEHTAL SERUICES CORP. CHEHTROHICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 111/11 REPAIR HUNBER R 81 R 82 SEAM HUMBER 20 -21 2ft -21 LOCATION DES CR I PTI OH OF DAMAGE 37 R 8 PUNCTURE 37 R 12.5 PUNCTURE REPAIR REPORT SIZE OF 'REPAIR REPAIR METHOD 3'" El:T 4'" El:T SHEET 5 OF 5 REPAIR 'I/ELDER 'MACHI HE TEST TECH. RESULT DATE HUMBER DATE 7 /211/92 · DH loll6 7 /22/92 CB p 7 /211/92 DH 4116 7/22/92 CB p I I CANONIE ENVIRONMENTAL SEHVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT I DA 23 I I I I I I I I I I I I I I I I TIME 8:20 -·--------. 8:40 8:50 9:05 9:20 9:35 10:05 10:30 10:40 11 :15 11 :40 1:05 ···----.. 1:20 1:40 1:55 2:20 2:40 PANEL PLACEMENT REPORT PANEL NUMBER 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 DATE ROLL LENGTH .. ···---. PLI\_C_EQ . N~_~!)_ER (F_T) 7 /21/92 ~Q~} _ J_Q4_ . U?Y~? . . . . . !l4!l1 ... . 1 Q~-~ 7 /21 /92 ..... !l<l~1 .. 7/?1/!l? . . ~4!1! . I !(21 /~? . . ~~Q~ . 7/21/92 9606 t/?1 i~? . ~~6~ U?1 /!l? . ~~4} U?1/!l2 8943 I/?1 /!l? . ~!l43 U?1 /!l2 . !l4!l4 . I/?1/!l? 9494 I/?1/!l2 9494 !(21/!l? !l4~!l 7/21 /!l2 9489 !/21/!l? 9489 7 /21192 9489 109.5 113.5 ... ·--·---·-. - 117 120 121 123 122 119 --.. - ---. 116 -----,. 113 110 106 101.5 84.5 ··--------- 69 I I i ! i I DAMAGE/CQ_fll1f:,1_Ef:JT_S I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 23 FIELD SEAMING REPORT .. SEAM DATE TIME PANEL # - 1. -2 u21 /!:12 !3=~§ 2 - 3 Z/21 /!:l2 !l:Q0 3 - 4 !/?1 /!:12 !!:2Q ' 4 - 5 7 /21/92 9:40 1·· ... ··-. . ..... . 5 - 6 17/?1/92 10:?Q 6 -7 I/21/~? 19:~§ 7 -8 !/?1/~2 J1:QQ 8 - 9 7/?1/£12 1.1:30 9 -10 I/21/!:12 1:1Q 10.-11 I/?1/!!? 1:3Q 11 -1? U?1/~2 1:50 · 1? "'." 13 !/21/~? 2:19 1 ~ :: 14 ?/?1 /9? ?:3Q 11 -:-1§ 7/?1/!:l? 2:4§ 1§ -:-16 I/21/9? ~:!Q 16 -17 7/21/92 3:25 .. -. -·· -·-·---NU M 8 E RS 1/? ? I 3 3 / 1 1 / § .. s. / ~ 6 / Z ! I !3 .a I 9 9. / 10 10 / 11 11 / 12 1? / 13 13 / 11 11 / 1§ 15. / !6 16 / 17 / ! . .! j .... I .!. j .! ! I ! ! ! I SEAMING ------------· METHOD -·· ------ FUSION --------·· FUSION ---------FUSION --· -------. FUSION FUSION --·· -----· .. FUSION -··· ------FUSION --------FUSION FUSION ---------- FUSION -·-------- FUSION ... -·-----. FUSION -' --~ ----- FUSION FUSION . ---------· FUSION --· ,, _____ _ FUSION SEAM -----... LEN_G.TH JQ~ 107 112 115 -. ·---. 119 -----. J2JJa5 122 123.5 J?Q,§ 117.5 115 111 . JQ!:l .. 103 ·-· ---. 100 69 . .•...... 1·· ·-· -·•-· --···----· ·-· MAC.H_I_N_E : W.Ei,, D_EFI TE!vl_P I:_~.~ TlJ _R_E NUME!_ER I MA_~_H_IN.E/t\IR 307 I BK 354 / 71 ~Q7 i BK ~§Q/}2 30! BK ~§!:! I Z1 . 3QI !:II<. . ~S.!3 L!! .~oz. .. !!~... ~1!:1./ .Z!3 30!. BK ~§6 /!3Q ~Q! BK . . . . ~5.4 / !33 307 . !!~ .. ~!3! / !31 307 BK . ~§!3/ !3!3 307 BK ...... ~S.! / ~1 307 BK . ~§!:! / ~9 307 . ~K J§Q /~1 307 BK ..... 353/ 87 307 BK ... -· 353/ 91 . 307 . !!I< . .. 352/ .90. 307 BK ...... ~!55./ 9? -···········-· -----··-·-I-······-···· ....... ·········----·-·--•-. ./. __ .... ····-··--·---·--·---/ .•.. ·······-· ... ···------··-·--··-··· I ····--·-· ..... ··-·---,--! -·-·- ·--·-···-·l--.. ·- .--.I·---·-··-·--·-----·----! -· ··-· . ··-·-·---··-··-·--·-·· I ···-·-· . -·-· ---.. -···-······-I···-···---· I ./_ ---· --·- ··· · ·-•-···---·······-... / ......•..... . . ... ... -.... -·-------···· ... / .... ···-···· ..... ·----·· ----I ···--·-· I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 23 SEAM _9_E:C_TJON I DATE TECH. _ # _ OF SEAM ! _ _ _ 1 - 2 0 -END 17/21/92 TM 2 - 3 0 -END 07/~1(~2 TM 3 - 4 0 - 5 7/?! /9_? Q 13 . ~ -4 5_ -7_0 !/?1/9_? TM . ~ .. :: 4. JO -85_ U??/!:l? CB 3 - 4 85_ -107_ 7/21/92 TM 3 - 4 107 -END 7/?U!:!? CB .4 ::-_5_ 0 -23 ?/?7/9_? CB 4 -5_ .2;3 -_7_6 7/?1/9_? TM 4-: 5_ _77 -110 7/?1./9_? TM 4 - 5 111 -END U??/9_? CB 5_ -!'i . . 0 _ - 1 _14 7 /21 /92 TM 5_ -ll 114 -END 7/27/9_? CB 6 - 7 0 - 5 ?/?7 /9_? CB !'i -? 5_ -11E3.5_ ?/?1/9_? TM 6 - 7 5 ::-_11_6_.5 7 /22/92 TM _!'i ::-L 116.5-END 7/27/92 CB ?. -: ~ O -_!5 _ ?/?.!/9__?. CB 7 - 8 5 -66.5 ?/??/!:!?_ . TM . ! :: ~ !Q,5_ -117 ?_/??/lil? TM _?_ ::. !'i __ 70~5 -11X !/?!/9_? TM 7' -_ ~. 117 -END U?!/9_? CB ~ ::-9_ . .. 0 -. 5_ _ !/?! /9_? CB -~ -:: 9_ . 5_-:_ 11B0 5_ ?./??/9_?_ TM 8 -_9 118,5 -END,!/?!/9_? CB 9 -JQ O -5 17/?!/9_? CB 9_ -1Q 5 -119 7/??/9_? .. IM. _9 __ ::_J_Q 119-Er:,ID U?'U9_? . C:B 1 Q - 1 1 _ 0 - 6 7/?4/9_? CB 19 .-:: .. 11 6_ ::. 1JQ,5_ ?/?;U9_? . I~ 1Q.::J1110.5 -END7/27/9_2. CB NON DESTRUCTIVE TEST REPORT AIR TEST RESULTS TEST TIME .. -------·-----.,,,____ -. -----------. ----· ---·· ------· -·-----. PRESSURE RESULT METHOD START END ----·-----------.............. ,. START END DIFF. • • + ----•••• ,. ---·-·----·----. ·----·· --·--. -AIR 9:41 9:46 . ----.. ··--------· 3Q ?8_ _2 ; p _ AIR .. 9:42_ 9__:47 30 28.5 1.5 p p R:3Q,~t __ _ _ti.JR . _ 9:58_ Jq_:06 . ~:3,_4 -----.. ···--- AIR 10:02 10:08 R5,6 __ VB ... -···-----· 30 30 AIR 10:46 11:10 30 A.JcR 10:47 11:12 30 R9 AIR 11:15 11:22 30 R:3_4,;35 R38 ! AIR . r:,ll~ [ !<J/~ 30 AIR 9:38 I 9:48 30 R39 R41 ··-------AIR AIR """'•'••--. VB R43 . --·-- -·--- _R4_-i,45 !:l:4Q _9_;50_ 9:52 10:00 30 29 _[IJR_. JO:O(l 10:15 30.5 . B41'i,4! _ . __ ... fl4f:!,_49 ·• . ~~13. _10:13 10:18 30 R51 .. -------------·-... R5_2,_53 ..... _AIR_ 10:28 _10:33 30 ........ _, ___ ····-···- 29_ 28 30 28 29 25 30 1 0 2 1 5 0 --------·--· . ------·--··--·--· p ··--·--·-· p p p p p p p p p p F p p p 30 0 P -··--------·--..... --------------· ·- 19 10 F 30 28 2 p p ---·---·-p p .... , ---.. , •.... p p p p . -·-·--p ---. --·--·- 28 . _2 P p _fl5_4,55 .. ... . .... --... ------------------------------ I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 23 i SEAM i SECTION i . # .. • OF SE}\tv1 11 -12 6 -46.5 - - - -· 11 -12 0 - 6 -. . -· 11 -12 6 -11.5 -·-.. ------ - 11 -12 11.5 -40 .. -. -. ---... . --· 11 -12 40 -:' 4~-? 11 -12 46.5-50.5 ---. ··-- 11 -12 50.5 -109 11 -12 109 -ENO 12 -13 0 - 5 -·-- - -'" 12 -13 5 -105 --· .. ---I -... -... - 1? -13( 10~ -~ND 13 -14 0 - 5 -------. 13 -14 5 -104 -·-- - - ----. --- 13 -14 104 -END . . . 14 -15 0 - 6 14 -15 6 -98 --. -------·-- ~.4.-: 1§: 98 -ENO 15 -16 0 - 6 ---. ----- 1 § -1~ 6 -9!5 15 -16 95 -END . -. 16 -17 0 - 5 -----· ---- 16 -17 5 -64 ----·----. -- 16 -17 64 -END DATE ?!??Iii? 7/27/92 !!?I/Ii? 7/27/92 7/27 /92 7/27/92 !!??Iii? ?l?U'l? 7/?I/li2 ?!??!~? ?!?II~? ?/??/11? ?1??111? 7/?I/11? 7/27/92 17 /22/92 ii/ii/92. ij i21 /92 Il??/11? ?/?4/11? . 7 /24/92 7/?:3/11? 7/27/92 NON DESTRUCTIVE TEST REPORT TECH. TEsT · riME ArR TE!IE~iD~~fs· IREsui_ r . METHOD STAiffl END srti._Rf Jfjj:i _o~i=F.:. -- TM . AIR 10:45 \ 10:50 30 26 4 F ca· ·i'l10,11 · · · · 1 · ·· · p ··----····"----·----· \ CB .... R12, 13_ ' CB VB . ---·---· ··----·----- CB_ R5~57 _ <;:B .. B?I. TM AIR ------·--· <;:E3 . 13?8,§!! . CB R14-16 10:43 10:55 ! fi,,, _ Ai~-11:15 • 1i:22 CB Bl?Q,'?1 CB _R_~7,JlL . ,:~ __ AJB__. 11:34 11:42 913 .. 1319,?Q .. CB . R?1,_?2 TM AIR 11:35: 11:42 ------ CB R23,24 i I i CB R(!4,§!5 ...... . TM _f',_I13__. 11:45 ! 1:45 CB . R~9J?Cl TL R71 .. ---········ TM AIR 7:20 7:30 -··--·-- CB __ f3:7<1,?_§_ . _ .... 31 31 30 30 ··-----0 0 p p p p p p p p p p 30 ... ;30 ....... Q ........ E 30 30 30 30 30 30 0 0 0 p p p p p p p p p p I I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 23 DESTRUCTIVE TEST REPORT TEST JL .... !?~! DS2 . ""• --·-- DS3 . - - ---- DS4 i SEAM .# 3 - 4 7 - 8 11 -12 . ---16 -17 DATE I/21/9-? I/?1/9-? ?/?1/9-? 7/21/92 -·-------··1------LOC:/l,JIQ.~ _ 8~A.~9N _ ___ ··--FOR. TEST JJ._5_ ... 8QlJDN~ 67 ROUTINE """"-•-·---------------· _. 50 .... ROUTINE 30 ROUTINE WELDER BK BK BK BK ~AC:!J.I_N ~ F_IE _L_D _L_A_B_ .NUMBER. TEST JE_SL . JQL . E 307 P .... --·---·-·-307 P .. ---· -----------·. --· . 307 P . -··· ·-·------········-..... ·--. -· p p p p CANONIE ENUIRONNENTAL SERUICES CORP. CHENTRONICS SITE RENEDIATION QA/QC SUMMARY REPORT DA 23 REPAIR REPORT REPAIR SEAN LOCATION DESCRIPTI OH SIZE OF REPAIR REPAIR WELDER HACH I HE TEST TECH. RESULT II II OF DAMAGE REPAIR METHOD DATE HUMBER DATE R1 1 !l -19 63 PANEL EXTH. 2.s·x2· PATCH 7/21/92 DH 406 7/22/92 CB p R2 16 -17 4.5 R 5.5 PUNCTURE 2 O""X2 O"" PATCH 7 /21 /92 DH 406 7/22/92 CB p R3 3 -4 70 DS1 8"X28"" PATCH . 7 /23/92 RP 408 7/27/92 CB F R3R 3 -4 7D REWELD 2' EXT. · 7 /27 /92 DH 406 7/28/92 CB p R4 3 -4 8" AT 18""X3 O"" PATCH 7 /23/92 · RP 408 7/27/92 CB p RS 3 -" 108.5 AT 16""X28"' PATCH I 7 /23/92 : RP "DB 7/27/92 CB p R6 3 -" 109 PUNCTURE 18""X24'" PATCH ' 7 /23/92 · RP "08 7/27/92 CB p R7 " 5 75 AT 12--x20--PATCH i 7 /23/92 , RP 408 7/27/92 CB p R!l 4 -5 1 DB .5 R 3 PUNCTURE :2.s·x3_5• PATCH . 7 /23/92 • RP "D8 7/27/92 CB p R9 4 5 111 SEAM DAMAGE 4' EXT. 7/23/92 RP 41111 7/27/92 CB p R10 11 -12 0 SEAM DAMAGE 5' EXT. 7/23/92 DH 406 7/27/92 CB p R11 11 -12 5 AT 2 O""X12" PATCH 7 /23/92 · DH 406 7/27/92 CB p R12 11 -12 11.5 SEAM DAMAGE 16""X16" PATCH 7/23/92 DH 406 7/27/92 CB p R13 11 -12 6 SEAM DAMAGE 5· EXT. 7 /23/92 · DH 406 7 /27 /92 CB p R14 12 -13 ' 0 SEAM DAMAGE 3. EXT. . 7 /23/92 DH 406 7 /27 /92 CB p R15 12 -13 3 SEAM DAMAGE 15"X12"" PATCH 7/23/92 DH 406 7/27/92 CB p R16 12 -13 5 AT 18"X18" PATCH 7 /23/92 DH 406 7/27/92 CB p R17 13 -14 5 AT 16"X16" PATCH 7/23/92 DH 406 7/27/92 CB p R18 13 -14 0 SEAM DAMAGE 5' EXT. 7 /23/92 DH 406 7/27/92 CB p R19 13 -14 103 AT 27"X16" PATCH 7/23/92 RP 408 7/27/92 CB F R19R 13 -14 103 REWELD 5' EXT. 7/27/92 DH 406 7/28/92 CB p R20 13 -14 105 SEAM DAMAGE 4' EXT. . 7 /23/92 RP 408 7/27/92 CB p CAHOHIE EHUIROHMEHTAL SERUICES CORP. CHEMTROHICS SITE REMEDIATION QA/QC SUMMARY REPORT DA 23 REPAIR SEAM LOCATION DESCH I PTI OH HUMBER HUMBER OF DAMAGE R21 111 -15 II SEAH DAMAGE R22 111 -15 7 AT R23 111 -15 97 AT R211 111 -15 98 SEAM DAMAGE R25 2 3 3 L 2.5 DEHT R26 2 -3 5 R 1 PUNCTURE R27 2 - 3 9 L 3 DEHT R28 2 -3 13.5 L 2.5 DEHT R29 2 3· 22 L 2.5 DENT R311 3 -" 1.5 SEAM DAMAGE R31 3 -" 5 AT R32 4 -5 16 SEAH DAMAGE R33 4 -5 211.5 AT R311 5 - 6 11.li AT R35 5 - 6 115 SEAH DAMAGE R36 3 -" 1118 SEAH DAMAGE R37 3 - 4 111 SEAH DAMAGE R38 6 - 7 5 AT R39 6 - 7 114.5 AT R411 7 - 8 66 DS2 REPAIR REPORT SIZE OF REPAIR REPAIR ;WELDER MACHI HE TEST TECH. RESULT REPAIR METHOD DATE HUMBER DATE 7. EXT. · 7 /23/92 • DH 4116 7/27/92 CB p 16'"X15"' PATCH · 7 /23/92 DH 4116 7/27/92 CB p 1ll'"X15"' . ; PATCH • 7 /23/92 ; RP 4118 7/27/92 CB p 5' EXT. • 7 /23/92 ; RP 4118 7/27/92 CB p 1.li'"X16"" PATCH : 7 /24/92 i DH Jill6 7/27/92 CB p 15'"X17" PATCH i 7 /2.li/92 ! DH Jill6 7/27/92 CB p 111""X15"" PATCH i 7 /2.li/92 ! DH Jill6 7/27/92 CB p 3"" EXT • 7 /24/92 ' DH 4116 7/27/92 CB p 3"' EXT · 7 /2.li/92 ' DH 4116 7/27/92 CB p 16""X3' PATCH 7 /2.li/92 · DH Jill6 7/27/92 CB p 16'"X16"' .PATCH . 7 /2.li/92 · DH 4116 7/27/92 CB p 12'"X12"' PATCH 7 /24/92 : DH Jill6 7 /27 /92 CB p 15"'X.li' PATCH · 7 /2.li/92 ' DH 4116 7/27/92 CB p 12'"X12"' PATCH 7 /2.li/92 ' RP 4118 7/27/92 CB p 4' EXT. 7 /24/92 • RP 4118 7/27/92 CB p 1' EXT. 7 /24/92 . DH Jill6 7/27/92 CB p 1. EXT. · 7 /24/92 DH 4116 7/27/92 CB p 16'"X1.li'" PATCH 7/2.li/92 · DH 4116 7127 /92 CB p 12'"X15'" PATCH 7 /24/92 · RP 4118 7/27/92 CB p 5.5'X2' PATCH 7 /24/92 RP i, 118 7/27/92 CB p CAHOHIE EHUIROHHEHTAL SERUICES CORP. CHEMTROHI CS SITE _REHED I ATIOH QA/QC SUMMARY REPORT DA 23 REPAIR SEAM LOCATION DESCR I PTIOH NUNBER HUMBER OF DANA GE R41 7 -8 5 AT R4:! 7 - 8 116 AT R43 7 - 8 117 SEAM DAMAGE R44 8 -9 0 AT RIIS 8 -9 ll SEAN DAMAGE Rll6 8 9 116.5 AT R"6R 8 -9 116.5 REIIELD R .. 7 8 -9 121.5 SEAN DAMAGE R .. 8 9 111 0 SEAH DAHAGE R .. 9 9 -111 4 AT R51l 9 -111 114.5 AT R51 9 -10 115 .5 SEAH DAHAGE R51R 9 -10 115.5 REWELD R52 111 11 0 SEAM DAHAGE R53 111 -11 6 AT R54 111 -11 11U.5 AT R5 .. R 10 -11 110.5 REWELD R55 111 -11 111.5 SEAH DAMAGE R56 11 -12 .. u SEAH DAHAGE R57 11 -12 .. 7 .5 DS3 R58 11 12 109 AT R59 11 -12 110 SEAM DAHAGE Ro II 12 -13 1 II .. AT R60R 12 -13 104 RE WELD REPAIR REPORT SIZE OF REPAIR REPAIR :WELDER IHIICHIHE TEST TECH. RESULT REPAIR NETHOD DATE HUMBER DATE 12'"X15 .. PATCH 7 /24/92 · DH 11116 7/27/92 CB p 12 .. X15"" PATCH 7/24/92 RP 11118 7/27/92 CB p 5' EXT. 7 /24/92 RP 11118 7/27/92 CB p 15'"X15"" PATCH . 7 /24/92 : DH 11116 7 /27 /92 CB p 1.5" EXT. • 7 /24/92 : DH 11116 7/27/92 CB p 4"X5" PATCH : 7 /2 .. /92 : RP .. 118 7 /27 /92 CB F 1. EXT. • 7 /27 /92 i DH .. 116 7/28/92 CB p 2· EXT. ' 7 /2 .. /92 : RP 11118 7/27/92 CB p 4' EXT. ; 7 /24/92 : DH .. 116 7/27/92 CB p 1s··x211·· PATCH • 7 /24/92 : DH .. 116 7/27/92 CB p 15'"X15"" PATCH 7 /24/92 : RP .. us 7/27/92 CB p 5' EXT. ; 7 /2 .. /92 • RP .. 118 7/27/92 CB F 1. EXT. 7/27/92. DH .. 116 7/28/92 CB p 6' EXT. 7/2 .. /92 DH .. 116 7/27/92 CB p 1O'"X14"" PATCH 7 /24/92 · DH .. 116 7/27/92 CB p 15 .. X13"" PATCH : 7 /24/92 RP 11118 7/27/92 CB F 3'" EXT. 7/27/92 DH .. u6 7/28/92 CB p 6' EXT. , 7 /24/92 . RP .. 118 7 /27 /92 CB p · 12 .. x1s·· PATCH : 7 /24/92 DH .. 116 7/27/92 CB p 3"X5.5' PATCH 7/2 .. /92 DH .. 116 7 /27 /92 CB p 12'"X15"" PATCH 7/24/92 RP .. 118 7/27/92 CB p 5' EXT. 7/24/92 RP 411~ 7 /27 /92 CB p 15'"X15"" PATCH 7 /24/92 . RP 4118 7/27/92 CB F :]"· EXT. 7/27/92 DH 406 7 /28/92 CB p CANOHIE EHUIROHMEHTAL SERUJC!:S CORP. CHEMTROHICS SITE REMEDIATIOH QA/QC SUMMARY REPORT DA 23 REPAIR SEAM LO CATI OH DESCRIPTIOH HUMBER HUMBER OF DAMAGE R61 12 -13 1115 SEAM DAMAGE R62 11 -12 611 L 9.5 PUHCTURE R63 14 -15 .... R 23.5 PATCH R64 15 16 II SEAM DAMAGE R65 15 16 5 AT R66 15 -16 4 R 2.5 PUHCTURE R67 15 -16 90 L 13 PUHCTURE R68 15 -16 4 L 2 SEAM DAMAGE R69 15 -16 94 AT R71l 15 -16 95 SEAM DAMAGE R71 16 -17 0 EXTH. R72 16 -17 311 DS4 R73 16 -17 6>i L 7 PUNCTURE R74 16 17 64 AT R75 16 -17 65 SEAM DAMAGE' R76 PAHEL 17 311 -611 PAHEL EXTH. 1!77 14 -15 911 L 15 PUHCTURE R78 111 -11 5 R 18 DEHT R79 10 -11 5 R 1n DEHT REPAIR REPORT SIZE OF REPAIR REPAIR WELDER HACH I HE 'TEST TECH. RESULT REPAIR METHOD DATE HUMBER iDATE 6' EXT. . 7 /24/92 . RP 4118 7 /27 /92 CB p 16"":X:111 .. PATCH . 7 /24/92 RP 4118 7/27/92 CB p · 3'X23.5' PATCH . 7 /24/92 , DH 4116 7/27/92 CB p 5' EXT. ; 7 /24/92 : DH 4116 7/28/92 TL p 15""X15 .. PATCH ; 7 /24/92 ; DH 4116 7/27/92 CB p 16"X14" PATCH : 7 /24/92 ; DH 406 7 /27 /92 CB p 12 .. x12° PATCH • 7 /24/92 i RP 408 7/27/92 CB p 2.5' EXT. • 7 /24/92 . DH 4116 7 /27 /92 CB p 15"X18°0 PATCH 7 /24/92 . RP 4118 7/27/92 CB p 5' EXT. . 7 /24/92 . RP 4118 7 /27 /92 CB p 5'X6' PATCH . 7 /24/92 DH 406 7 /24/92 TL p 2·x5· PATCH 7 /24/92 · DH 406 7 /27 /92 CB p 16"'X24"" PATCH 7/2'4/92 DH 406 7 /24/92 TL p 16'"X24"" PATCH . 7 /24/92 · DH 4116 7/27/92 CB p 4 . EXT. · 7 /24/92 • DH 4116 7/27/92 CB p 5'X311' PATCH 7 /24/92 · DH 4116 7/24/92 TL p 15"X15" PATCH 7/27/92 DH 4116 7 /27 /92 CB p 4" EXT. 7 /27 /92 · DH 4116 7 /27 /92 CB p 2" EXT. 7/27/92 DH 4116 7/27/92 CB p I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT I ACID PIT SHEET 1 OF 2 I FIELD TRIAL SEAMS I Tl;§T Wl;L,Ql;R. QAH: · T!M; tv1,c,,gr1rn1; Me-f;H!l'!s 13R.~, P;sLI 13R.K., §H!:AR I I I I I I I I I I I I I I . # ... 1 MILLER 9/10/92 10:00 2 KERN __ 9/10/92 _ 1:20 3 DOTSON 9/10/92 __ 1:50 :4 ____ MIL_LER 9/j 1/92 _7:50_ 5 _ tv1!!-,h!:R. 9/11(9g ~::4§ 6 JOHNSON 9/11 /92 _ 8:50 7 JOHNSON 9/11/92 8:50 _!) KERN __ 9/11 /92 10:00 9 K.E;RN _ 9/11/9? 1Q;QQ 10 DOTSON 9/11 /92 11 :00 11 K.sR.N 9/11/9? :3:QQ 12 K.i;RN 9/11 /9? :3:QQ 13 QQT§QN 9/11/9? :3::3Q 14 DOTSON 9/11 /92 3:30 15 QQT§QN 9/11/9? :3::3Q 16 DOTSON_ 9/11 /92 3:30 17 I l<l;flN. _ 9/1 ?/9? _ ?:3-Q rn 1 1 K.;RN 9/1?/9? 1:§Q 19 K.!:R.N ___ 9/1 ?/9? _9::47 20 ·_KERN __ 9/12/92 12:55 ?1 MH,L,i;R 9/1:4/9? _ ?;§;i 22 PAYNE _ 9/14/jl2 _8:10 23 f'AYNi; 9/H/9? 13::3§ . ?:4 f'AYNs 9/H/9? !l;§Q 25 QQT§QN. 9/H/9? .1: 1 § 26 M!!:!:!:R 9/1:4/9? J:1§ ?! M!!:hl;R. 9/1:4/9? 1;:39 28 PAYNE __ 9/14/92 3:05 29 PAYNE 9/14/92 _3:30 30 K.!:R.N _ 9/1§/9? ?:99 ) ! -I I l'Jlltvl131;fl Tl;tvlP, (!:,!3/!N.) f (L13/IN) ___ :4Q§ § 1 § --_ J :43-, 7 1 1 §§, 1 ----:3Q7 _ 3-§9 _ _135,§ _ i _ 13-1,1 30§ :3§Q _ _ J:4§,:3 _ 1113,§ :4Q§ :4?!L ----- 406 485 -------- 3-Q§ 3-§Q. 3-Q§ 3-§Q ---. :3()7 _ ~§9 _ :3()7 :39.9 :3Q§ :3§Q :3()7 :3§9 3-97 :3§9 3-Q§ :3:4§ 305 345 ' 305 3-:4§ 305 345 307 359 307 :3§9 307 :3§9 307 359 :4Q§ §1 Q 408 §113 408 517 <IQ§ §?Q 305 662 406 _ 510 406 515 408 480 408 510 :40§ 520 ······-- 1 §13,:4 --__ 158.4 J?Q,13 1 ??,:3 -- 147 1:3?,? 1?:4 132.2 135.5 1:4? 1 :37, 1 1:3§,§ 130.6 119,? 1:37, 1 -- 119, 2 156.7 160 1§Q,?. 1 :37, 1 1 :37, 1 133.9 173- 137.1 150.2 137.1 156.7 1§:3,:3 143.7 174.7 1§9,13 153.5 153.5 173 flE~lJ LT (P /F) p p p F F p p p p F p p p p p p F p p p p F F p p F p F F p I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION_ QA/QC SUMMARY REPORT ACIO PIT SHEET 2 OF 2 FIELD TRIAL SEAMS TEST WELDER DATE . ···--. ---------·-·-----# T!t.11: M~!::firr-.JE MAl::H!Ni: ElRK, Pl:l;Li ElRK, §Hi:AR _ 31 __ PAYNE_ 9/15/92 8:00 _ 32 _ PAYNE 9/15/92 1:00 · 33 ___ MILLER_9/15/92 _1:00 __ ;34 ___ f'BYNf !U1§/9g 1 ;49 _35 _ PAYNE -19/15/92 _2:05 . ;3§. f'BYNi: 9/1§/9g g;Q§ __ ;31 J~i:RN ___ ,9f1§f9g 4:§Q ;3§ C:~RHiR 9f1§f_9g 4:§§ ;39 K!cRII! 9f1§/9g §:1 § 40 _ MILLER 9/16/_92 _8:25 41 Ki:RN 9/1§/9g 9:4§ 4g M!lJ,1:R 9/1§/9g 9:§Q 4;3 Ki:RN 9/1§/9g ;3:15 44 MILLER 9/16/92 J:?Q i 4§ Ki;Rll! 9/1§/9g 3:35 46 MILLER 9/16/92 3:40 47 Ki:Rll! 9/1? /9g 8:oo 4§ Ki;RN. 9/1?/9g 9:30 49 M!kkl;R 9/1!:l/9g ?:§Q §Q Mikk!cR 9/1§/9g §l:go §1 MH-ki;R 9/1!:l/9g 1Q:Q15 §g _ MH-kl;R 9/1§/9g JQ:10 _ §;3 ,:JQHN§Qll! 9/1!:1/9g 1Q:?Q §4 Mit-,t,,i:R 9/1!:l/9g ;3:;3Q §§ Mikkl:R 9/19/9? §:Q§ §El Mit,.t,.i:R 9/19/9g 1:Q§ §7 Mit,.ki:R 9/?1/9g §:QQ §!:I Mikt,.i:R 9/g1/9? 1:Q§ §9 Mit,.t,.l:R 9/??/9g 1 Q:1§ _ElO MILl,,l:R 9/gg/9? 1Q:§Q Ell Mikl,.i:R 9/?4/9g _ 9:Q§ Elg M!kk;R 9/?4/9? 9:45 11!1,JMEli;R Tl:MP, (l,,El/Ir,,J) (!--ElnN) ___ 4Q§ ___ §1Q 14§,;3 1El9,!! 408 510 ···---·· ·-·-·· 406 520 ---··· . --- 4Q!:I §1 Q 408 510 ·----·-· . _ 49§ §1Q 4Q§ §gQ 49!:I §1Q 406 §10 49§ §1 Q 408 514 ·-. -·---. ··-408 514 -----· --. --408 §14 408 514 -------·- 4QEl §14 40§ §14 4QE! §14 · 40§ §14 405 515 . -. --· -· ---406 510 ------. --406 510 ··----··--406 510 ··-----. 4QEl §1 Q 4QEl §1 Q 4QEl §1Q 406 510 .. , .. ,. --. - 406 510 ----·--. ---406 510 406 510 . -- --------406 510 406 525 . ---------- 406 525 -· ----·---- 120.8 1Q4,§ 137.1 151.8 132.2 120.8 125.7 135.5 150 129 121 134 157 124 157 150 147 134 130.6 161.6 166.5 173 168.1 168.1 150 142 147 147 170 150 167 144 144 170 RESULT . -----·. (P/F) p F F F F F p F p p p p F F p F F p F F p p p p p p p p F p F p I I CANONIE ENVIRONMENTAL SERVICES CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT CORP. I ACID PIT I I I I I I I I I I I I I I I I TIME 1:25 .. --. ---•.--·-. 1:50 2:15 4:00 ... 9:00 -----.,. 111:00 ·····--.. 11 :25 12:35 1: 15 1 :50 . --------·-~=?§ .. 4:13 5:05 5:30 7:30 9:10 9:20 9:30 9:35 9:45 10:00 10:05 10:40 10:55 11 :00 PANEL PLACEMENT REPORT SHEET 1 OF 2 PANEL DATE ROLL .. ·---·--· -····--·· ·-----i NUMBER PLACED NUMBER ... ---------·--···-·--·----·· . ------------ 1 __ 9/10/92 7278 -· .. ------.. 2 9/10/92 6782 -- 3 9/10/92 6770 .. 4 .. 9/10/92 6817 5 _ §/11/§? 7293 ------. 6 §/11/§l? 7270 7 §l/11/§l? 6808 8 . §/11/~? 7917 - 9 _9/11/92 6795 - 10 _§l/11/§l? 7249 ---. -------11 .. §/11/§l? 7280 12 §l/11/§)2 9481 13 §l/11 /§l? 9497 14 §l/11 /§)2 9496 15 ~/1 ?/§l? 8942 16 §l/1?/~2 7281 17 .... 9/12/92 7281 18 __ 9/12/92 7281 ---- 19 .. 9/12/92 7281 .. 20 §l/1 ?/!ii? 6771 21 §l/1 ?/!ii? 6771 22 _§l/1?/§l? 6771 23 §l/1?/§l? 6771 24 §)/1?/§l? 6891 25 .. §l/1?/§l? 7281 LENGTH Qll.fvl/\Qlc/COlvHv1 le I'! TS . --.. --·--. -. 400 ----··---.,. 401 400.5 384 369 385 400 400 400 396 ····---. 394 399 403 400 396 65 68 .. 74 77 79 85 92.5 99.5 106.5 33.5 I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT TIME --------- ···-.. 1:10 . -·-·--·---1:20 -· .. -------- PANEL PLACEMENT REPORT SHEET 2 OF 2 -.. ··--· -------. -----·-· PANEL DATE ROLL ··-··-------· ------·· ----. --NUMBER f'~~C:1:1) NUMBER -·----------. . ------·-------26 .. 9/12/92. 6891 ······ 27 .. 9/12/92" 6891 ···-·--·------·· LENGTH 134 77 ... --·---·· 2:00 28 _ 9/12/92 6818 115.5 .. -----...... . .. . ... 2:10 29 . -9/12/92. 6818 119 ---•--··· -----·· ---·-.,. ---· 2:25 30 .. 9/12/92 6818 121 ... -----·-. ----·-·---2:45 31 . 9./1 ?/9.? 6769 129 3:05 32 .. 9/12/92 6769 122 ------.•... --··----------... 3:20 33 . 9/12/92 6769 109 1 :12 34 •· !:)/14/92 6794 41 1 :20 35 . 9/14/92 6794 40 1:35 36 . 9./14/92 6794 39 2:15 37 . 9./1 :4(9.? 6794 66 2:40 38 9./1<1/9.2 6794 135 3 50 39 .9./1<1/9.2 6794 61 -. 4 25 40 . !:!/1Y9.? 6794 51 4 45 41 .. 9/14/92 6794 31.5 .. 5 35 42 . §1/1<1/9.? 6794 51 -. [ ' [)J\fv11\<31:/C:Qfv1fv1 E II! TS I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. QHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT SHEET 1 OF 3 FIELD SEAMING REPORT . -,.. - -. - SEAM_ QATI=: T!MI=: PANEL # . . # 1 / ? §l/1 Q/§l? _ ~:~§ .. 1 / ? §!:ll.M!i'!G ! M!:Tt-iQQ FUSION . -·--------- FUSION .1 /.2 .. 9/10/92 _2:05. 1 /_ 2 ? I ~-§l/1Q/§l? ?;?§ ? I ~ ~ I 4 JU1Q/§l? 4:1Q ~ / 4 ··-·-------- 4 L § . §!/11 /§!? 1 Q:4§ 4 / § -4 L § §!/11/~? 1Q:QQ 4 / § § I § §!/11/.§!? J1:gQ § I § _ El / 7 . §!/11 /§l? 11 :~Q El / 7 7 I El (§l/11/§l? 1 :QQ 7 / § El / §l t§l/11 /§l? 1 :?Q El / 9 §l / 1 Q i§l/11 /§l? g:g§ §l / 1 Q 1Q / 11 l§l/11 /§lg ~::3Q 1 Q / 11 1Q / 11 :§l/11 /§lg ?:4§ 1 Q / 11 i 11 / 1? 1§1/11 /§l? 4:?§ 11 / 1? 1? / 1~ i§l/11/§l? §:1§ 1? / p q I 14 1§1/11/§l? §:411~ / 14 14 / 1§ !§l/1?/~? 7:50 14 / 1§ 1 § / 17 !§l/1 ?/~? §l:?! 1§ / 17 17 / 1 El !§l/1 ?/§l? 9:35 17 / 1 El 1!! / 1§li§l/1?/§l? §l:471§ / 1§l 1§l / ?Q 1 1§1/1 ?/§l? 1 Q:Q7 1§l / ?Q ?Q I ?1 §111 ?!§l? JQ:?Q ?Q / ?1 ?1 l ?? §l/1 ?!§l? 1 Q:4Q ?1 / ?? II ?? / ?~ §l/1 ?/§l? 11 ;Q§ ?? I ?:3 ?~ I ?4 §l/1 ?l§l? 11 :?4 ?~ I ?4 , 1§ / ?§ §l/1 ?/§l? 1: 17 1§ / ?§ ?§ I ?! §l/1 ?/§l? 1 :4Q ?§ I U . FUSION -""" -----.... -- FUSION -. -. ------ FUSION -' ---·· ---·. -_FUSION FUSION FUSION . --------- FUSION -------· -FUSION . --.... -. - FUSION ----·· --·· - FlJ§IQr--J FUSION ----------FUSION ----· ·-·-· - FlJ§!Qr--J FUSION - -------. -FUSION -.... ··--·- FlJ$IQN FUSION -. .. ---·. - FUSION . -------. - .flJ§IOr--J FUSION - -----·· -- FUSION ------·-· -FUSION ---------·- FlJ§!QN FlJ§IQN FlJ§IQr--J §E;AM ~1=:N~Tf-1 0 -219 -•.. , ---- 222 -401 ---·---. 400.5 400 Q .:: ?§~ 283 -368 ~!Q 400 400 400 399 0 -247 .. ..._. 247 -392 --. ----- 395 4Q~ 403 :3§16 §§ 70.5 77 77 81 §§l §l§ 1Q} 1§4,§ 1Q~ I Mll.C:f-1!1'!1=: IWE;LDER I NlJM!!E;R ; 305 DOTSON --···-----· -. ·-·--··· 307 KERN ---. ------. --- 305 DOTSON -----·------.--305 DOTSON ------------·-·- }Q7 ~!:RN 305 <JOHNSON --· 1 · . -. 305 <JOHNSON 3Q7 [·-~~IN. 307 KERN ----- -·-· ... - 305 OHNSON 3()7 [ KE·R·N 307 i KERN 305 : DOTSON --··-J ----. ----·· 307 ! Kl=:RN 305 1 DQT§ON 307 KERN 307 ' KERN ~Q7 307 307 307 307 307 307 307 307 ~97 K'=Rr--J KERN KERN ~!:RN K!:RN K!:RN KERN KERN KERN ~'=RN T !:MP !:RAT 1,/ R!: M ll. g H m !: 1 /l, rn §§4 I§? ~§~ I §§ §§g I §4 §§? I §Q ]§§l I !!Q ~§QI !!Q ~§o I 77 3§~ I 77 }§9 I §g ~§0 I§§ ~§§l I§§ }§§l I§§ ~§0 I§§ ~5§1 I §5 §75 / 77 }§§l I 7§ ~§~ I §1 ~!i§l / §1 ~§§l I §1 ~§§l I §1 ~§§l I§? ~§~I§? ]§§l I§? 3§9 I§? ~§§l I 7§ ~§§l I 7§ ~§§l I 7§ I I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT SHEET 2 OF 3 FIELD SEAMING REPORT •• + -·----... SEAM __ DATE TIME PANEL i SEAMING 1 SEAM MACHINE ; -... --..... - . - I ....... ------t! # 'METHOD LENGTH NUMBER . ·-·. .. ------. --------. ---. .. --. .. ··-·-.. 24 /?!l §l/1?/!l? 2:16 ?'!/ ?8 FUSION 110 307 ?§ L?§l !ll1?/!l? g,:i_Q 28/ 29 _ FUSION 121 307 ?!l / :i_Q l§l/1 ?Ill? ?:§§ ?!l I 30 FUSION 117.5 307 . ------·---:3Q l :31 !l/_1 ?/!3? 3:10 :i_Q/ 31 fLJ§!QN 124 307 :i_1 l :i_g 1!l/1?/!l? 3:30 31 I 32 FUSION q:i_,§ 307 :3? I :3:i_ 1§)/1?,l§l? 4:05 32 I 33 FLJ§IQN 111 307 32 / 34_9/14/92 1:40 32 I 34 FUSION 35 305 -----·----15 I :3§ §l/14/!l? ?:?Q 15 I 36 FUSION 39 305 1§ I 35 !l/H/!l? g,:i_Q rn I :3Ei Fl,HHQN 40 39:i 33 I :3_7 9/14/92 3:12 33 I 37 FUSION 66 305 ~a ------·----I 33 9/14/92 3:00 38 I 33 FUSION 88 305 34 I 38 !l/H/!l? ?;§Q :34 I :3!3 Fl,J§IQN 47 305 1 I 41 !l/14/!l? 5:00 L/ 41 FUSION 47 -78.5 305 -·-----..... -1 I 40 !l/14/!l? 5:05 1 ( 40 FUSION 51 305 -·---... --27 I 4? !l/H/!l? §:4§ ?? I 4? Fl,J§IQN 51 :3Q5 38 I :J.!l 9/14/92 3:50 38 I 39 FUSION 61 305 " -----.. ----25 I 6 :!l/14/!l? 5:30 25 I 6 EXT. 370-403 408 -. -------25 I 5 !!l/H/!l? §:4Q ?§ I (i l:)(T, 24 408 25 I 4 :!l/1 §/!l? 8:25 25 I 4 EXT. 367-401 408 -------. 1 I 16 i!l/1 §/!l? 10:05 1 I 16 EXT. 0-:?1 408 2 I 16 !ll/1 §/!l? JQ:?Q 2 I 16 EXT. 21-23 408 2 I 17 !!l/1§/!l? 1Q:?§ 2 I 17 EXT. 23-44 408 3 I 17 !!l/1 §/!l? JQ:'!Q 3 I 17 EXT. 44-46 40!3 3 I 18 :!l/1 §/!l? 10:42 3 I 18 EXT. 46-67.5 408 26 ( ?_7 1!l/1 §IQ? 11 :07 26 I ------·· ---27 EXT, 92-END 406 4 I 18 i!l/1 §/!3? 11:1Q 4 I 18 EXT. E37,§ -§9,§ ! 408 ·---4 I 19 !l/1§/!l? 11 :20 4 I 19 !:)(T. §!3.§:-!31 4Q!l 25 ( 19 !l/1§/!3? 2:35 25 ( 19 EXT. 91-93 408 ?5 I 20 §l/1§/!l? ?:§Q 25 I 20 E)(T, !3:3-:114,§ 408 6 I 20 !l/1§/!3? 2:55 6 I 20 EXT. 114.5-116 408 6 I 21 !l/1§/!3? 2:56 6 I 21 ! EXT. 11§:1:3!3 408 7 ( 21 !3/1§/!l? 3:15 7 I 21 EXT. 138-140 408 W!:~PER 1T!:MPI;RATYRI; MAgHINi;/ A!R KERN 359 ( 75 K!:RN :i_§§l I 75 KERN 359 I 77 KERN 359 I 77 K!:RN :3§Q I 77 K!:RN 359 I 77 DOTSON 350 I 73 -. --· --- --·-DOTSON 350 I 73 ---.... ----- PQT§QN :3:iO I 7:3 DOTSON 350 I 76 -----.. --DOTSON 350 ..... -----I 76 PQT§QN 350 I 76 DOTSON ----· -----609 I 85 DOTSON 609 --··-. ·--·-I 84 PQT§QN §Q!3 I 80 PQT§QN 350 ( 77 PAYNE 510 I 80 ....... --· PAYNE §10 I 80 PAYN!; 510 ( 57 PAYNE 510 I 70 PAYNE §10 I 70 PAYNE §1Q .. -. ---I 70 I PAYNE §1Q I 70 .. --.... PAYNE 510 I 72 KERN 522 I 72 PAYNE 510 . ·-- - --·-I 72 PAYN!: 510 I 72 PAYNE 510 . -.. -.,. I 74 PAYN!: 510 I 74 PAYNE 510 I 80 PAYNE 510 I 80 PAYNE 510 I 80 I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT SHEET 3 OF 3 FIELD SEAMING REPORT SEAM ()ATE: T!Mf P~NE:1,. i §!.=AMING i §!.=AM # . .. .. # . M!:TI-JQQ i b!:N~Tl-j 7/ ?? '9/15/92 _3:49 II??' E:1(:T. 1140-161.5 a I 22 9/15/92 3:47 f.l L?? . E:1(:T, 1§1,§-:-1§~ 8 /.?~. 9/15/92 _3:53. 8_ / 23 EXT. 163-184.5 9 /. ?~ !l/1§/§!? 4:Q~ 9 I?~ EXT. 184.5-186 §!. / ?4 §!/1§/§!? 4:05 §! / 24 E:J<T, 186-208 1 Q / ?4 9/15/92 ~~r~ · 1.·.~-.11. ~-·.!_·_ [ ~~+: .. ~~~=~!~ 1Q / ?f.l §!/1§/§!? 11 / ?f.l [§!/1§/§!? 3:15 11 / ?f.l1 EXT. 232-233.5 I 11 / ?§! !§!/1§/!l? 3:20 11 / 29 I EXT. 233.5-254.5 I 12 / ?§! l§!/1§/§!? 3:45 it/ ?~I EXT. 254.5 R 7 1, 1? l :3Q §!/1 §/§!? 3:47 1? I 30 / !:)<T, }§1;gi1,§ ! 1 :3 1 :3Q i§!/1§/§!? t~~ H1 1 ~--.~. ·1· ~~+: 1, ?JJa~f~f§? ! 13 / ~1 §!/1§/§!? 14 / 31 §!/1§/§!? 4:15 14 / :31 i EXT. i 301-303.5 , 14 / 32 §!/1§/§!? 4:20 14 / 3?i EJ<T. i 303.5-325 ' I 15 / 32 !l/1 §/§!? 4:30 15 / 32: EXT. . 325-327.5 , 15 / 33 9/15/92 4::g 15 / 33j EXT. '32';-:s.::-347"_-5 36 / ~i ~/1§/~? 4:40 :3§ / 33i EXT. • ~47":§-j!jgjj 36 / 37 !l/1§/§!? 4:42 :31.l / :371 EXT. • :3§Q,§-:-:3§7,§ 33 / :34 !l/1§/§!? 4:4Q :3:3 / ;3-t I E:J<T · ?§' 40 / 41 !l/1§/§!? 4:45 4Q / 41 !I EXT. 5' 35 / 36 !l/1§/!l? 1:?Q ~§ / ;3§ EXT. 8.5' 36 / 37 §!/11U§!? 1 :45 ~§ / ~7 EXT. 4' 37 / :3§ !l/1§/!l? 2: 1 o :37 / 38 E:J<T. 25' I L. fo,1,ll,C::1-j!N!_: NlJMl_:l!:R 408 408 4Q!l 408 408 '!Q§ 406 406 406 406 406 4Q§ 406 406 406 406 406 406 4Qf.l 4Q!l 408 406 406 406 WELDER ----.. --··· ·- CARTER --·-... --. -CARTER --------· ... C::ART!:R C::ART!.=R Q,A.RT!.=R t.libbE:R Miblc!.=R MILLER MILLER MILLER --·--· ..... . "1ILL,ER t.lll.,L!.=R , "1Il,.LE:R , MILLER : t.lil,LER I MILLER I . , · MILLER ' MILLER CARTER ------. ---KERN KERN i Mitt~: I t.lI(,,Lt:R I ' TE:t.lf'ERA Tl,JR!.= "11\C::HINl::/Jl!R §1Q / 80 510 / 78 §1Q / 78 510 / 78 510 / 78 520 / 80 520 / 78 520 / 78 520 / 78 520 I 78 520 / 78 §?QI 71.l 520 / 78 520 / 78 520 / 78 520 / 78 §20 / 78 §20 / 76 §1() / 76 §1Q I 77 510 / 77 510 / 78 510 / 77 510 / 77 I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT SHEET 1 OF 6 NON DESTRUCTIVE TEST REPORT AIR TEST RESULTS §!,:Aiv! SECTION ()AT~ : TEGH, TEST TIME -iPREssu"Ri: --!R!:SlJI., T i§TARiTE.NQ I! OFSEAM _ I METHOD STARTi !:CIJ() 'DIFF,' ' ' ~lH/~~i -----. -------\ ....... ' -1 o:ss·, ' 1 l.? ., Q_:Jl1& TM AIR 11 :Q? 38 I 36 i 2 p 1/ 2 81.5-221.5 _ TM AIR -----I 7:§7 34 34 i 0 p _/__/ __ 7:45 . • ---! ' 1 [_? _ 221.5-223.5 _ §!L.151§1? R! I p I 11 _g ... 223.5-256 .,, §!11.1 /§!? TM AIR 7:4Q _7:§7 37 35 1, 2 p 1 _/ 2 ---256-273 --§!/.1~/§!? R!l, R§! I p 1 I? __ 273 _-399 ___ §!/1Q/§!? TL A!R 4;~4 4:~7 31 20 i 11 F 1 L? 273 _-398 ____ 9/10/92 TL AIR 4:50 4:§7 34 33 I 1 p i ? L~ 0 -183.5 9/11/92 TL AIR 11 :00 11 :08 35 34 ' 1 p ------------. ----------' ?I 3 _183.5-184.5 _ §!/14/§!? R14 I p 2 /'.J _ 184.5-199.5_ 9/11/§!? TI., A!R . 11:Qg I 11 :Q9 37 ~!l 1 p ? !.~ 199.5-335 §!/11/§l? TL AIR 11 :04 I 11: 11 35 34 1 p -------------· ? I ~ 335-353 §!/14/§!? R17, 10 ! p ------·----. ? L~ _ 353-400.5 --9/11/92 T~ AIR 11 :20 i 11 :?7 37 37 0 p 3 /.4 0 -5 §l/1§/§l? R164 I p ______ ,, -- 3 I l1 5 -§!,§ §!/1§/§!? Rrn7 p -,. .. ,. ' 3 I §l,§ -1Q,§ . §l/14/§l? R?O p -3 I 4 :, 10.5-48.5 §l/11/§l? TL AIR ---·-· ---·---12:55 1 :Q? 34 ' 33 1 p 3 I 4 48.5-124.5 §l/11/§l? TL AIR 12:4§ 12:55 35 ' 34 1 ' p 3 I 4 1 ?'!,§: 17?,§ _ §l/11 /§l? TL A!R 1:00 1 :07 34 34 0 p 3 I 4 172.5-393 §l/11/!l? TL AIR ··---------11 :42 : 12:30 35 33 2 I p 3 I 4 393 -400 §l/1§/§l? R1 Ei1 p -------·--· 4 I§ 0 -22 §!/14/§l? TL . -----· ·------AIR 8:40 !):§2 36 35 p 4 I 5 22 -27 §l/14/§l? R32 p ---. ----4 I 5 27 -104 §l/14/§l? TL AIR 8:27 !3:37 34 32 2 p -. --. ., ---4 I 5 104-126.5 .. §l/15/§l? R?!.l,?§l p 4 l. 5 _ 126.5-238 --§l/11 /§l? Tl AIR 1 :19 1 :?6 33 33 0 p 4 I 5 238 -240.5 §l/15/§l? R27 p 4 I 5 _240.5-282 §l/11 /§l? TL AIR 1:43 1 :50 34 34 0 p 4 I 5 282-284 §l/1 :Y§l? R2!l p -----·-----4 I 5 284-305 §l/11 /§l? TL AIR 1 50 1 §fl 32 32 0 p '. 4 I 5 305-367 §l/11/§l? TL AIR ------. ----1 55 2 05 32 31 1 p I ' I I I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT . ACID PIT SHEET 2 OF 6 NON DESTRUCTIVE TEST REPORT AIR TEST RESULTS 1NB~i~R §~gT!Qt-! DATE jTEgH. 1 T~S.T T!M~ END ·!i'R~$·s.u/·81: REs.u1= T ! .. §./'§. o£~Ei; ~!~!!~~' JJs 1Mf:JiioQ S.J~~Ti §:§:3 '§T~RT f:~Nl '[)~;F, : , _§/_§ --... __ L__/ __ ··--·· § I § §§ ::: §!Q §!/H/§!? Tl,. ~!R . §:§Q §!:QQ ;3§ :34 1 § / § ... §!Q : JQQ. §!/H/§!?. R:3§ .. § I § 1 QQ:: 1 ?Q §!/14/§!? TI,. AIR § / § 1 ?Q:--1 ?4 . §!/14/§!? R.:37 § /.§ 1?4_-:171,§_ !:l/14/!:l? J1= AIR § I § 171,§::1 !§ §!/H/!1? 1 R.:3§ § / § 17§,Q::3§!:l. !:l/11/§!2! Tl,. . AIR ~ ~ ~ sQ -~ls · ~~~:~~~! R+E§! § I 7 ~?~§~-§§,§ ~11!3/~gj R45 § I 7 §§,§ .-:: ?!? !:l/1§/!:l? I C P 1 6 / 7 ?1?::?!§ §!/H/!:l?[ R.47 § I 7 ?7§~:3!:l§ §!/11 /§!? J TL 7 I 8 Q -!:l §!/H/§!?i R50 7 / § §! :: 171,§ !:l/1'!/§!?! TL 7 I 8 171,§:1!4 !:l/14/§!?! R53 ,7 I § 174~:3§§,§ §!/1-U§!?i TL § I §! . Q ::: §,§ . §!/J 4/§!?f R54 § / §! §,§:: 1§?,§ . !:l/14/§!? i TL § / !:l . 1§?,§-::1§!:l _ !:l/14/!:l2i R56 8 / 9 . 1§§!:?Q? !:l/H/!:l?i TL 8 / 9 . ?9?::?Q§ !:l/H/!:l?: R59 8 /.9. 205-237.5_9/14/92i TL § I !:l 237.5-238.5 9/14/92; R60 § I !:l ?:3§,§::?§!,§ !:l/H/!:12; TL § I §! ?§!,§-:-?7§ . §!/14/§!? R.§1 ::§:3 § I §! ?7§-:-?§!§ .. §!/H/!:12' Tl,. § I §! ?!:l§::;3Q1_ !:l/H/!:l? R§4 § I !:l :3Q1 :::3§1 §!/14/!:12 T 1= 8 I §! :3§1-:3§§ !:l/14/!:12 R65 § I §! :3§§::4QQ §!/14/!:12 TL AIR AIR AIR AIR AIR AIR AIR AIR AIR AIR 9:03 9:10 8:17 8:27 9:20 9:29 8:23 8:30 9:12 9:15 9:23 9:52 9:57 9:58 10:03 j 10:05 10:10 I . . . ' 10:10 10:15 10: 16 : 10:22 10:18 10:23 30 28 2 36 34 2 32 32 0 35 35 0 31 30 32 32 0 35 32 3 34 33 1 32 32 0 32 31 34 34 0 34 32 2 36 35 30 29 1 32 31 1 p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p p I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT SHEET 3 OF 6 NON DESTRUCTIVE TEST REPORT SEAM I SECTION DATE :TECH. ----·----. -·-----·- I AIR TEST R~§l,!1,, T§ TEST ITIME 'PRESSURE RESULT M~tRci[) !i=rr~RT ~NR ili'~Ri' -~~R roIFF. 9 }11Q ~FQ ~~fM_ §!/11/§!? R§§ f1. /_1Q ?_:__g?§,§_ 9/14/92 TL AIR I 10:43 1 Q:-4§ 34 32 2 @ I 10 g?§,§ :: g?§ ~IHI@? R§7 9 /10_ 276 -_362_ 9/14/92 TL 9 / JQ 362 -366.5 f!/1~/§!g R156 9 / 10 366.5 -398 9/14/92 TL -·-· .-------1 1Q /Jl ... Q_:: ?4§ f!/H/@gi TL 1Q /.J 1 ?4§ :: g49 §1/1~/§!g R69 1Q / 11 g4§!:-g?4 9/14/92 TL 10 / 11 g?4:g?§ 9/14/92 R ·75 10 / 11 276-389_ 9/14/92 TL 1 Q / 11 ~§§! .. :. ;t-!Q §!/1 §/§lg R§!l 11 / 12 Q :: . 7 f!/1 §/§lg I R97 11 / 12 ? :: 4g .. !1/H/§!gl TL 11 / lg 4g :. -47,§. §1/1§/~?i R§!8 11 / lg 47,§:1§7,§ §1,'14/~?i TL 11 / 12 187.5-192 . ~/1§/§!gf R99 AIR AIR AIR AIR AIR AIR 11 / 12 rn?:~QQ @/14/§!?1 TL : AIR 11 / 12 ~§§:~§Q §1/1§/~?'. RlQO i 11 / 12 360-395 9/14/921 TL : AIR 12 / 13 ci::--f( l9/15/92 1R107,108 12 / 13 fl : §1 '~/j~/~:? TL : · AIR 12 / 13 §1 :: 7Q .. !1/1§/§1? R1Q§, ]QI> lg / 13 ?Q :-1§§ §1/14/§1? TL, i AIR 12 / 13 186-190 9/15/92 R104 ! 1 g / 13 190-321.ff !1/14/§1? TL ! AIR 1? / 13 ~gl,§:<Jg~ . f!/1§/§!g R103 i 12 / 13 323-356.5 9/14/92 TL AIR 12 / 13 ~§§,§::~§g !1/1§/f!? RlQ? 1? / 13 362-399. 9/14/92 TL 10:33 1Q:~§ 10:26 I 10:31 10:561 ii:Qi lQ:§§ 11:Q~ 11:37 11:42 1 :15 1:23 I 11:35 11:4Q 11:rn 11:24 11:14 11:19 1:45 1 :30 1:56 2:00 2:12 1 :54 1:~8 ?:0§ 2:07 32 32 29 34 I 32 34 34 34 35 36 34 3? 35 32 32 33 -32 33 33 32 35 33 2 3 2 1 2 I 2 2 2 3 0 0 0 1 f'. p p p p p p p p p p p p p p p p p p p p p p p p p p p p p I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT SHEET 4 OF 6 NON DESTRUCTIVE TEST REPORT §;~M SECTION DATE TECH. NUMBER OF SEAM 1~ /.J~ 0 -357.5 9/14/92i TL 13 / 14 357.5-363 11/1§/11?. .R1Q9-,i~ /J~ _ 363-400 .. 9-/H(!i!? TL 14 /1§ Q :J§L 11/1~/!i!?. TL 14j_ 15 181 -_ 182 9/15/92 R113 H_IJ§ 182_-371 11/H/!l?. TL H / 1§ 371-376 !i!/1§/!l?. R11? J~ j_ 1§ ~7§ : J9-1 !:l/14/92 TL 1§ / ~§ .Q :: ~§ . 11/111/!l?. c: 8-15 / ~6 __ 36 -_ 44 __ 1111§/9-?. R?.?.§ TEST TIME M;TI-IQ() §TART 1 ~!R 2:40 AIR AIR AIR AIR VB 2:27 3:25 .~:~Q 3:52 J§j ~§ 44 -48 fi!/19-/9-?. CB VB 15 / ~§ 48 : §~ 11/1§/!i!? R??.§, R?.?7 15 /_~§ 53 : §Q_ 11L1§l/!i!? CB -VB 15 _,I 36 60 : 62 !:l/1 §/fi!? R229 1 § / ~§ §?. : 7?. !1/1§1/!l?. CB 1 § / ~§ !?. :-n,§ !l/1 §/11?. R?.~O i 15 / 36 73.5-END 9/19/92 CB 1§ / 17 -Q-:_ "ijf ~/1§/~? CP 17 / 18 0 -69 11/1§/11?. CP 18 / 19 0 -50 9/1§/!l?, CP rn 1. rn I 50 -§1 !l/1§/!l.2 Rno 1 rn I rn 51 -14 !i!/1§/!l?. cp , 19 / 20 / 0 -75 9/15/92 CP I 20 / 21 0 -44 9/15/92! CP [ ?Q / 21 44 -80 ~/1§/~2i CP . -I I VB VB AIR AIR AIR AIR AIR AIR AIR § §0 9 00 9 11 9-:13. 10 30 10 17 : 1 ii 15 AIR TE§T R;§~LT§ iPRESSURE ;I-JI) (sfii:iff . E.ND 2:47 j"" :iii -29 g:~§ ! 30 ~:~§ \ 32 8 §7 32 () 97 32 9 18 30 9:21 32 10 38 33 10 27 32 10 25 30 29 31 32 32 31 32 29 31 33 31 29 'RESULT . ----. ---. ; [)I FF. ' 1 I p p 1 p 1 p p 1 p p 1 p p p p p p p p p p 1 p 0 p p p 1 p 0 p p p I I I I I I I I I I I I I I I I I I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT SHEET 5 OF 6 NON DESTRUCTIVE TEST REPORT SEAM SECTION-QAT~ f'.!UM§~fl QF §~~M .. ·---· ·----... g1 ( gg O -88.5 9/15/92 CP gg / g~ Q ::. § .. §l/113/§lg R 172 gg I g~ § :: §14 _ §l/1§/§lg C P g~ I g4 . Q :: 1QQ_ §l/1§/§lg C::P 1§ / g§ Q:: §. §l/1§/§l? R??§A 1 § I g§ § . :: J Q§ §l/14/§lg .. TL, AIR AIR AIR AIR 9:30 1 Q:~§ 10:45 5:02 1§ I g§ 1Q§:11L §l/1§/§lg fl11§l i 1§ / g§ 111::H~_§l/14/§lg. TL i AIR 4:58 1§ / ?§ 14~ -1§4 §l/1§/§lg,fl1?Q, fl121, fl1?? 24 / 28 0 -107 9/15/921 CP i AIR i 10:50 ?§ 1 g'l Q :: ~;i .. ~1H1~?' rL i Aili §:go ?§ I ?! ~4 :: ~! §l/1§/§lg R1 ?7 ! 5:18 §l:~~ 1Q:4~ 1Q:§3 §:1Q §:0§ 10:57 5:27 5:25 8:07 8:14 , 10:05 10: 12 I --·- ' 30 ~? 32 ~4 33 33 34 34 33 32 g§ / g7 ~7 :: §lg. §l/H/§lg TL, ! Ii.IR g13 I ?7 §lg :: ~NC! §l/1§/§l?,R1?9, RPQ ?7 / _4? Q :: §g .. §l/1§/§lgl c;p • AIR ?§ / ?§l Q :: §7,§ §l/1 §/§lg C::P AIR ?§ I ?§I §?,§ :: §Q §l/113/§lg fl175 ?§ / ?§l §Q : 11§) §l/1§/§lg C::P ?§l I ~Q Q -117 §l/1 §/§l? c:: P AIR AIR , 11:00, 11:28 ! 31 io:02: io:11 · 32 ---·~----· ~Q / ~1 Q -§ .. §l/1§/§l? R176 ~R I ~1 § -1?~ §l/1§/§l? CP AIR 10:22 10:32 32 ·30 31 32 32 32 33 33 33 32 30 32 31 ' i IR~§UL, T ! QffF • ' 0 p p 1 p 0 p p 0 p p p p 1 p 1 p p 1 p p 0 p 0 p p 1 p 0 p p 1 p I I I I I I I I I I I I I I I I I I I CANON IE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT SHEET 6 OF 6 NON DESTRUCTIVE TEST REPORT AIR TEST RESULTS SEAM SECTION DATE iTECH. TEST TIME .. IPRg§§U R:E .. .. I NUMBER OF. SEAM METHOD §TART END §TART END :31 / :3g Q .-:: .. §,§ . §l/Jfi/§lg Rl!! .. -~1 / ~g 8.5 -132 §l/1§/§l? CP AIR 10:24 10:34 34 33 ·-·-··-· ...... --. . . :3g l ~~ . 41 _. -64.5 .. §l/1§/§l?1 CP AIR _ 1g:4§ 1?:§2 30 30 32 l :3:3 . 64.5-67.5 . §l/1§/§l?I RgB 32 / :3:3 67.5-148 §l/1§/§l?i CP AIR 10:27 10:37 34 33 ------. ---... ; 32 / :34 Q:: :3§. §l/1§/§l?: CP A!R 1g:47 12:55 30 29 33 I :37 .. 92-109.5 ... §l/1§/§lgl CP AIR _g;14 2:23 32 32 33 ( 37 109.5-114.5 9/18/92! R232 -----------·------------1 :3:3 I 37 114,§::1§? 9/15/92! CP AIR 1 Q::3g 1Q:44 30 :3Q ------·-:3:3 / :3!) 45.5 -so. §l/1§/§lg: R?Q§ 33 I :3~ 50 -88 §l/1§/§l?: CP ---. -. ---• AIR 1:25 1:37 31 30 :34 I :3§ 0 -7 §l/1§/§l?i R215 --. --......... 34( 38 7 :-:: 4§,§ .. §l/1§/§l?i CP AIR 12:50 12:59 33 32 35 I 36 Q -§,§ 9/19/92! CB VB ------' :3!) I 39 0 -§1 9/15/921 CP AIR 2:42 2:49 32 31 .. -'·-·--· 1 I 40 0 -45.5 §l/1.4/§l? TL AIR 5:45 5:52 34 33 ... 1 ( 40 45.5 -51 §l/1§/§l? R159 1 I 41 46 -77 §l/14/§l? TL AIR §:47 5:54 30 30 40 I 41 0 -5 . §l/1§/§l?' CB VB I i iRESULT i I -. ' I DIFF. i I ....... I p I 1 I p 0 p p 1 p 1 p 0 p p 0 p p 1 p p 1 p p 1 p 1 p p 0 p p I I CANONIE ENVIRONMENTAL SERVICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT I ACID PIT I DESTRUCTIVE TEST REPORT SHEET 1 OF 1 I I I I I I I I I I DATE 9/10/92 §_l/11/§.l? §_l/11/!l? . _§.l/11/!l? §_l/11/§.l? §_l/11/§.l? . §_l/1 ?/!!? . §_l/1 ?/!!? .. §/1?/§.l? §_l/1?/§.l? §/lg/§.l? §_l/1 ?/!!? _§_l/1.Y§.l? §_l/1~/§.l? §_l/1.Y§.l? §_l/1~/§? §_l/1.i/§.l? §_l/1§/§.l? §_l/1§/§.l? §_l/113/§.l? §!/113/\J? §_l/17 /\J? §_l/1 !¼/§_12 §/?1/\l? _§.l/?~/§.l? _ 9/23/92 i I LOCATION; R;A§Q_N 'FOR TEST I· ..•••• ---. 31§,fi : ROUTINE 296 : ROUTINE I·----.----- 1~() I ROUTINE 1------. ----- 172 I ROUTINE 273 I ROUTINE ~1:37 ! RQlJH_N; 362 I ROUTINE 362 t • ---· --- - - - -- ! ROUTINE 355 i RciuTINE 1------ 356.5 I ROUTINE 359 I RouTiNE 372 I R.OVTi~~ 359 , WELDER 44 : RQ0fii·iE 57.5 • F<QlJTI_Nt: El4. fi RQ\JH_NE 110 , f<()lJTI_NI: 4§.5 RQLJH_NI: 169.5 WELDER . . --" --·. - 235.5 ViEl..,1)1:F< 260.5 RQLJT!_NE: 375.5 WELDER -.. ,. ---·' - 282 WELDER ---.... ·••'• 130 REPAIR . --. ----. 394 RETEST .. ·-. ---. 134 RETEST WELDER , MACHINE I FIELD ---. --- .N0~~~-fi l T\ST KERN DOTSON 305 P ---- - ----. -, 307 . KERN p JOHNSON 305 p KERN 307 p KERN I ~()7 p •.••..••.• l ~()1-i_N!';()_N\ 305 p l<;R_N 307 p l<;R_N 307 p DOTSON 305 p ---. ---·- KERN 307 p KERN 307 p . JQl-i_N§Cl_N i 305 p I KER_N 307 , p I l<l:RN 307 p I C:AF<Tt:R 307 p I QQT!';()_N 305 p PAYNE 4()13 p ... ,. --. --·· CARTER 408 p -·--. --. --.. lvlILLl:R 406 p KERN 406 p PAYNE: 408 F PAYNE 408 p lvlIL,L,ER 406 p lvlIL,L;R 406 p MILLER 406 p LAB TEST p p p p p p p p p p p p p p p p p F p p p N/A p F p p ---.. .. -.. llilill liiil iiiil liiil iilil iliiil liiil ---.. CRHOHIE EHUIRONMENTRL SERUICES CORP. CHEMTROHICS SITE REHEDIATIOH QA/QC SUMMARY REPORT ACID PIT REPR IR REPORT -·-·--·--·-·-·--·----ccc=-,----=········· ..... ··-·-····--·•··-····--··-····-···--······ ..... ··-=--c-.cc----cc--,-==----= .~c---==-c----c==-=--REPA Ir. ~ERM LO CAT !OM DESCr. I PT Ill~ SIZE O, REPA ][r, REPA Ifi il-/ELDER 1HRCHI HE TESl TECH. RESULT -·-·-................... ---· ......... ----=-=-···· ········---·--·--···-··•-···-·. . . ............ ·-···· --~~-=---,--=cc-------~~-=-- --_I_·-·-·-~·······-·--· . ·---·-··-·~F _DAMAGE BEPAIR METHU_D_. __ DATE··-··-·-·--·=---H-,U..,N=-Bc-E_r._-,c-,-D,-fl,...T~[=-=-__ -= -·-.B~. __ 1_ '..2 ____ 3i> ______ B_uc.K.LE ... 2t. 1' ;; 1' PATCH 9/10.'92 MILLER 486 9/11/92 TL p R1r1 1 / 2 7.5 I\_J;_· ____ P_UN_CTURE 6" EXT. 9/14/92 MILER 406 9/15/92 GD P R2 1 / 2--1-4.5 R 4 PUNCTURE I;" EXT. ·c9:-/:-1:c4-/cc9cc2c--cM:-:I:cL:-cE=:R:----4:-:c-8-;-6---::-9-:/-:-1:c5-:/:c9-::-2---;Cc:Dc-----::-P-- R3 1 / 2 8C BAD SEAM 3' ;; 1.5' PATCH · 9/14/92 MILER 4116 9/15/92 CD P RI; 1 ' 2 110 R 111 PUNCTURE 1;·· EXT. 9/14/92 MILER 4116 9/15/92 CB P RS 1 / 2 147 BAD SEAM 2' X 1.5' PATCH '9/14/CJ2 PAYNE 4118 9/15/92 GD F --,R,.,5c-R __ 1~'--=2 ____ 1~4~7 _____ c..Bc..A_u~W=-E=-Lc..D ___ 2~' _Xe..' _1'-"'.5'-' --'PATCH 9/16/92 HILLER 4118 9/16/92 CB P R6 1 ' 2 180 BAD SEAM 24°' ;; 1G" PATCH 9/14/!12 MILER 4H 9/15/92 GD P "-'--~'-'--"-=-~===----'-=',----=.c..c..c...c.-=---,,------'---R7 1 1 2 22~ AT S' ;; 2' PATCH · 9/14/92 MILER 486 9/15/92 GD P -----------~-,,----~-- -·-··R8_ ._1_.'.2 .. -···--X>S.~5.. A" 1 SEAM 11.5' ,. 2' PATC_H __ 9~/~14/!12 MILER 4116 9/15/92 CD p 1 2 266 ----AT :6.r.' ;, -1ccl'cc,-, -PAlfCH 9/14/!12 MILER 4116 9/15/92 GD P R9 R1 P R11 R12 ---· ---~-----· 1 / 2 :115.5 DS 1 s· .. 2.o' PATCH 9/14/92 MILER 486 9/15/92 CD P 2 / 3 4 R 3 PUNCTURE 15" ;; 15" PATCH 9/14/!12 MILER 4116 9/15/92 GD P . 2 3 5 R 5 .5----=-pu=HCTURE 1F." ~ 1F." PATCH---,-9~/~1~4~/·9:-=-2--ccMcclc-LccE=-R----4~11~6---9~/,...1-'5~/:-:9~2~--=-Gc-D----p-- --;R:-1:-:3c--2-:-,~, -3-=----1c-,c-, ...,r.,..., -,(;-----,p"u=Hc TUR E 1 S.' 15 .. PATCH 9 / 14 / 9 2 MI LE R , 4 06 9 / 15 / 9 2 GO P R14 2 I 3 182 ------AT 4' ;; 2' PATCH 9/14/92 MILER 41hi 9/15/92 CD P ----,:-,c--,,--~,---~==-~~~c-=---cc:cc-c-c-----.,-,'--:----:--'-c-C-: ·-·•·-·---=---------·~°!_5 ____ ~_/_3. 199 Ai 2' l: 1.5' PATCH 9/14/92 MILER 406 9/1_5{9_2 ____ GD·_· ___ .,..P __ R16 2 {_?···-·--·2·95._ DS _ . __ s_· _._, .. :,..._s_· __ P...,ATCII 9/14/9.2_ ...... M.1.'=.E.-=R----,4=-o-:-6---9~/.,...15!92 ___ CD P R17 2 / 3 335 .5 BAii SEAM 15 .S' E),T 9/14/92 MILEP. 4116 9/15/92 GD P ·------··•-·· ------c =---,:-,,-,,---,cc--~ ··-··--·· R1f "I 3 J3Z.5 BAIi SEAN 2' .. 1.5' PATCII 9/14/92 MILER 486 9/15/n GD P --=--=-,---c--c=------,-, =---~~~.=--cccc-'c=-.·---~~--~c-'-'-·-----· .. Al 2 . 5 ' ~ .. ] 0 _5_.'.._P_A TC_H_~9~/_14/9 ~2--ccM71_L-=E7R ____ 4~8~6 __ --:9~/,...1~5~/9 2 GD P 3 ,. " ___ ~_-_,_· _____ B_ONE. A, .. -.-z .. r.' ;,; 16" PATC_H __ 9~/14/92 MILER 486 9/15/92 SD P 2 3 351 ---1111 - CAHOHIE EHU!ROHHEHTAL SERUICES CORP. CHEHTROHICS SITE REHED!ATIOH QA/QC SUHHARY REPORT ACIV PIT iiiil liiil iiiil iiiil iiiil - REPAIR REPORT -· -------------------.... ···--·----··-. -·------------------------------------------ liill -1111111 - _ _l!E!~ I_r __ :;EA_t:l ____ L_!I_C~_T_!_O_I'__ DES:C RI PT! 01\ SIZE OF IR[PA If.· ___ ccR=-E f'~I ~ __ JfEccL=-D=-E'-'-P.---'I H.c.cAc.cCc.cHc.clc.cH.c;Ec__ ___ Tc..=ES, -'-T-=E-=-C'-'H-'-.---'R=E~S-'-U=Lc..T_ t ___________ :____________ ----=-OF'--DA"1A_G_E _______ R=--E_P_A_!I_: ____ _tl~_T'=H'"'Oc.c~ __ ...cDATE HUMBER DAT[ P.2c 3 1 4 4f. AT "i .5' X 16" PATCH 9/14/92 PRYHE 4118 9/15/92 CD P ------------------"'--'-------'"-R22 ~ I ,; 124 AT 2' X 2' PATCH 9/14/92 PRYHE 4118 9/15/92 GD P R23 3 ,-,.'-. ---1'"'7=-~'-, --------,8-=-0HE -----'z'--· X ~1'=5.,....,---,-P'-'-R=-Tc=--H~-9'--/~1'--=-4'-/'--9=-2-~P'-'-AC..YC,CH"-E---~4-=-ll-=-8---'9-'-/-1~5-=-/~9-"2'----"G'-'-D-----=p-- 1:21; • 1 5 305 RT 1.5' X 16" PATCH • 9/14/92 PRYHE 4118 iPATCII CAPPED R25 -4 / 5 365 JUHCTIOH 2' X 2' PATCH · 9/14/92 PRYHE 4118 I PATCH CAPPED R2c 4 ' 5 281 RT 4' X 2. PATCH '9/14/92 PAYNE 1118 I PATCH CAPPED R27 4 t 5 236 .5 AT 4 .5' X 2' PATCH · 9/14/92 PRYHE 1118 9/19/92 CB P --,'-:,.,..---~~----"-~'--"--------c-=-----,-=---cc-=--cc-,----,R'c2-c8 __ 4_· ~-"5'--____ 1~0'--3'---------A_T-=--____ 1_11 .5' ;; 2 .5' PATCH 9/14/92 PAYNE 418 9/16/92 CD P R29 4 5 117 .5 DS 3 16' X 2.!'· PnTCII 9/14/92 PRYHE 4118 9/16/92 CD P __ R3 r, ____ s __ '.__ 5 --2 :rn _H __ <> ____ P_R_HEl DR.-cllcc __ R...,_i;~_E==-----~:__;; _2'"" __ --,5c'c,---P=--A--TC H 9 / 14/_9c..2 __ P_A'-Y-=-H_E ____ 4_11_8 ___ 9_/~1_9 / 92 -=c-=o----=p-----~ 2_:, _______ ,._, 5 23~.5 r. 1C.5 PRHEl DAMAGE 4' ,, 2.5' PATCII 9/14/92 PAYHE 4118 9/19/9~ _C_E ____ P __ < 1 5 ___ 2_1 ________ A_T 6' ,: 15"' PATCH 9/14/92 MILLER 11116 9/15/92 CD P R33 • ' S 8 I\ 16 PUNCTURE 18" X 15"' PATCH 9/14/92 MILLER 406 9/15/92 GD P --------------------------------------~~--5 __ 6 __ 4_r._. _2_::'. __ • 5 _______ D_E_H_7 ________ 6_"_' _____ E_X_l ___ 9_/_1_4_/_9_2 __ M_I L_L_E_R ____ 4_11_6 ___ 9_/_15/92 _G_D ____ P __ R3S 5 6 56 .5 AT "; .5' ;; 16"' PATCH 9/14/92 MILLER 1106 9/15/92 CD P ---------------------------------R36 S l b 90 AT' 11.5' /; 2' PATCH 9/14/92 HILLER 4116 9/15/92 CD P -~-------------·------·---------R37 S 1 6 12r. RT 4.5' X 2' PATCH 9/14/92 PAYHE 40E 9/16/92 er, P ---·-----------R3f' 5 (, 17,.S ______ ~s e ___ 5' .. 2._5_' ___ P_ATC_H ___ 9/14/9? __ P_l!~li_E 40r. 9/19/92 _c_~ ____ P __ R3\' ,, 6 35G .5 DS 1:, 5' i; 2 .5' PATCH 9/14/92 PAYHE 40B 'PATCJ; CAPPED -------------------------------------------------------_R_':.!'.__ _ _'.: _____ ,, ______ 363 .S BAf SEAM ___ R_'_~_-_?_' ___ PATCP:.._ __ 9/14/92 PAYH[ ____ 4_0_6 ___ ·P_A_T_C_H CRPPE_I, ______ _ --------. ----- --.. .. .. .. CANONIE ENUIRONHENTAL SERUICES CORP. CHEHTRONICS SITE REHEDIATION OA/OC SUHHARY REPORT ACID PIT llliil .. lilil iiiil -lilil liiil REPA If REPORT --•---. -------------------------------··---------------------------------REPfi Ir, SEAM LO CAT JOH DESCR I PT] ON SIZE OF •REf'AIH HEPAII: :!•/ELDER -----------------·---------·--------t. t De DAMAGE REPAIP. HETHOll DATE -----··-----·-------.. ···-·····----------R!+! __ 2~ __ / s 37,, r 24 BUTT WEL~ 24' EXT. 9/14/92 PAYNE R42 25 I 6 372 BAD SEAM 29.S' EXT. 9/14/\12 PAYNE -----·----R43 25 I 6 385 L 3 PUNCTURE ,. ;,; 1' PATCH 9/14/\12 PAYNE R44 6 I 7 5.5 AT , .5. ;,; 16" PATCH 9/14/92 MILLER R45 6 I 7 62.5 AT 3.5' X 7.5' PATCH · 9/14/\12 MILLER R46 6 I 7 86.5 R 23.S PUNCTURE 6" EXT. 9/14/\12 MILLER R47 6 7 272 0$ 5 s· X 2.s· PATCH · \1/14/\12 PAYNE ----------R46 ~ I 8 5 &; 5 PUNCTURE 2 c; ' :: 2' PATCH \1/14/\12 HILLER ' ------------·-R49 7 , 8 5 ~ 111 PUNCTIIRE 1' ;,; 2 ~ 5" . f'ATCH 9/14./92 MILLER --··--------------· ·---------------·-----· P.S ~ 7 8 1, SKIRT 9' :: 1 ~· PATCH 9/14/92 MILLER -------------·-·· ·····-----------R51 7 i E 1r, R S~S PUNcTURE 1 S" ;,; 10" PATCH 9/14/92 MILLER ----·------·-P.52 7 8 11 ~ 8 PUNcTURE 1 Z" :; 2' PATCH 9/14/\12 MILLER ----·------· R53 7 B 171.5 AT 18" X 2~" PATCH 9/14/92 PAYNE .... --· ···--R51' 8 i 9 r, Sl(IRT 3C' D:T 9/14/92 MI LLEn R55 C ! 9 22 BA[, SEAM r." El:1 9/14/92 MILLER R56 8 9 152~5 Al 6' ); 2. PATCH 9/14/92 MILLER R57 8 9 152.5 n 2.5 WR J Hl{LE 1.5' ., 1' PATCH 9/14/92 MILLER liiil .... .. 1HACHIHE TEST TECH. HUMBER DAE ------. -· --··--· 488 :PATCII CAPPEf• 468 I PATCH CAPPED 418 IPATCll CAPPED 406 9/16/92 CB 466 11/16/\12 CB 466 9/16/\12 6D ... 8 I PATCH CAPPH "06 9/16/92 en 406 9/16/92 en 406 9/16/92 en "116 9/16/92 en "66 9/16/92 CB 468 9/19/92 CB "06 9/16/92 CB --------·------406 9/16/92 CB "06 9/16/92 en ---------. --·--------"406 9/16/9: -en -------------------. --·------·· --·-------·--------------··---~ --· -·--· -· --P.Sf 8 I 9 155 .5 r. 1.5 GA,. UH/, 3' X 3' PATCII 9/14/92 Ml LLEn 406 9/16/9'! c1: -----·---------------. ----------·-----· --------------. -----.. R5~· f 9 202 Al 3' X i.o· PATCH 9/14/92 MI LL Eli 406 9/19/92 cu ... ·-------------------------R6r: 8 9 237.S OAP SE At'. 1.5' ;: 1.s· PATCII 9/14/92 MILLEJ: "0(, 9/19/9~ Cr, 1111 - RESULT p p p p p p p p r p p r p p p r -.. lillil CAHOH!E EHUIROHMEHTAL SERUICES CORP. CHEMTROHICS SITE REMEDIATIOH QA/QC SUMMARY REPORT ACIV PIT lilil -liiil liil iilil liiiiil iillll .. REPA Ill REPORT -------, .. --·-·-----·-··-·--·-·-----·-·-------------------------------~------ - --------·--··-REPA 11: SEA~: LOCATIO~, DESCP.IPTION SIZE OF REPAIR REPA!r. ;WELDEII IMRCHIHE TE:;T TECH. -----------------------. -------·--· -----·---··----·-------------. -. --. --. ·----·-------·-·--·--------·----------------··-. ----------------------------HUNB El: HUMBEi) or DAMn~, P.EPnlf: NETHOll DATE HUMBER -DATE --·---------------------------, .. ·-·-···-·--·-----··--------. -----------·---------------·-· ·---------------·----R6"1 ________ f~/__9_ _______ ~~!__ _ __ Al ________ '-1..:_li ___ ~,·~---PATCH 9/14/92 MILL_E_R ________ _ 406 9/19/n CB R62 f; / 9 272 AT 4' X : ' PATCI! 9/14/92 Ml LLER . -----------------------;;~;;-::---::-':-:::-c'-~-~:=-:'--:c;:--------;':;::----:':-'e-::e;;-'-;-c R63 S / 9 274 R 2 UEHT PIPE 3' ); 3' PATCH 9/14/'12 MILLER ----'='------'------'--'------"--'-----'------'-'------'-'------== ------------------------~cc'-,,--=c------'--'------'-'~'-------'-'=-=-=-"-----~~--~-'--:~~ R6'1 S / 9 21JS.5 AT 1.5' X 1.5' PATCH IJ/14/'12 MILLER ----,cc-=,-------'------'--'-------'==-------,----C~ ------'-cc--~'--~--==='-------,-'-----,--c---'--',,--,---'~ R65 S / 9 361 OS 7 5 .5' l: 2' PATCH 9/14/'12 PAYHE ---~-'---'--....C.---c--,--,----~---'~-'---~~c=,----,-----'---,-------'-----'---"--'-~ R66 9 / 1C C SKIRT 1' X 6' PATCH · IJ/14/'12 MILLER 406 IJ/19/'12 CB 406 9/19/'12 CB 4116 IJ/19/'12 CB 406 I PATCH CAPPED 4116 9/16/'12 CB R67 9 / 10 275 Al 1' ,; 1.5' PATCH IJ/14/'12 MILLER 4116 9/19/92 CB RESULT p p p p p p __ R_6_r, __ 111 / 11 232 • 5 R 21 P UHC TU R_E __ ~1~5_"~_X__c1~5_"_--cP---cA--=T--=C--cH_----clJ~/,-,1_4~/,.,IJ...,2_~M~I L=L~E.,..P. ___ ,----,-,-----~c--cc~-c----~..-___ __ __c,-----_-__ -_-:_-~ t-.----~-:-~-~ ~-~ ------2_;~9~~ 5~_R~: 5 ~1-6~~~====-P~u-_ H-_ ~-~Ull_-=~--__ -___ -_...,_; ~ :~); /_.;~;~ -::~ ~~----:-5~·t5:~ --,c:-:~~~~~~:-=-:---:-::-,---------,-'-,--,--,-'- 4116 IJ/19/'12 CB p 406 9/19/92 CB p 406 IJ/19/91' CB p __ __ll.?:i___ ___ 11, _/ __ 11_ 25 __ 0_._5_H_3_._5 ____ D_E_H_~_, _______ ,,_ .. _ __E_X_T ___ IJ~/_14/'12 MILLER _ __ll_I:'.____ Hi 11 267 r. 11> PUNCTURE 15" :; 15"' PATCII IJ/14/IJ:::2---c-:M-,-IL:-c-L·=:E::-P.--------,:-::-,-----::----;:-c--:-: R?:; 111 11 2 7 0. 5 R 6 • 5 PUHc"fiiiiE------i .-·x~1-;---_P_A_T-CH ---::IJ:-c/c:1:-:-4~/c::IJc::2---c-:M-,-I Lc-L:--::-E::-R--------,:-::-,-----::----;:--;-::----;::-:;----~:c--------c,-----------·-------···--·-·--·-·-·-·-·-··------- 406 IJ/19/g7 cs p --·-------406 9/19/92 CB p 406 IJ/19/92 CB p R7>: 111 / 11 270.5 r, 6 PUNCTURE 15"' X 15"' PATCH IJ/14/'12 MILLER 4116 IJ/19/92 CB p A 1 ~ · 1: 15"' PAT C 1: 9 / 14/.-:IJ:-:2:---;--:M::-l-c-L-c-L:cE:::r.---:--::-:---::-:-:-:::---::c-;c---:c::----------,,----~---------------··--------------------PUNCTURE 15"' X 1,;·· PATCH 9/15/'12 KERH R?S H: / 11 27>: -~-'----'----'--.c... -'--'---------'C..:....'--__ ll_!i~ ___ 1~'-' / 11 29{, R 17 40G 9/19/9~ CE p 406 IJ/1'1/92 CB p PUNCTURE ·-15" X 15" PATCH IJ/15/'12 KERH -----,-,-,-,-----····-------"-'-----,-,---~~~C~---'--'-----..-___ __ ~!~----1 0 / 11 29E P. 15 PUHC_1:U_ll~ _____ ___:1_5''. ,; _ 1_5'.'. PATC1i _____ _9_/_1_5_/_9~ _____ ~_E_R_H ___ --c--c __ R_?_ll__ _ __ 10 /_ 11 _____ 308 _ B_9 ______ PUHCTUlli _____ _:!_:__ __ l; _ _:;_: _____ ~A__:r_(:_li__ __ _9_115/ ~.,..9.,..2 __ K...,E...,R:-:-H ___ --,----,-,----,-~ RBe 11, / 11 316 P. 7 PUNCTURE 15" ); 15" PATCJ: 9/15/'12 KERH __ R_?L ____ 111 /_~~--21Ji, r. __ 15 -406 IJ/19/g2 CB p 406 IJ/19/92 cs p ---------··-·· 406 IJ/19/92 cs p 40{, IJ/19./92 C6 p -------------····---------···---·--------------- -------------- 1111 -- CAHOHIE EHUIROHHEHTAL SERUICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT -liiil liiiiiil liiiil liilil liiiil liiiiil --.. lilll REPA Ir: REPORT --······· . ·-·-·· ----····---··--····· ········-·····-... -----······ -----------··------······-----REPAJE SEAM LOCATJOH DESCF:JrTIOH SIZE OF :REPAIR REPArn :WELDER I HACH I HE TEST TEC,:. RESULT --····-·······--·•-····· .. --==-~-'-'------'===----'-'--===c.....-------·-··---·-· !" r. OF UAMIIGE REPAir. METHOI• DATE NUNBER DATE _________ ,, __ -------· -----------·----------------·----·· ·-=---------------------·-·-·-· .. -----81 1f, i 11 31i, f; 1S PUNCTURE 1' .-, 2' PATCH 9/15/92 KERH 406 9/19/92 CB P -··-·-· -····------· .. --···-···----_-=--------'------'---"'-~-----'-"-'-"-'-'------'"--=-'-''---==---_;_=--_;_'---'--'---'--=--=-=-----------'--62 ·111 / 11 351 r. ~ PUNCTURE 2' ",.<;· PATCH 9/15/92 KERH 406 9/21/92 CB P ····-.... -----=~'--_;_'c-,-,------'-'-'c-"-'---"--'--=,c,--'--''---==-------'-=-----'--'-=-'--'--"--"------''-=------''--- 83 ·1c / 11 347 .5 r: 16 PUNCTURE 30" :; 15" PATCH 9/15/92 KERH 4116 9/21/92 CB P II~ ·1C / 11 361 R 15 .5 DENT G" EXT. 9/15/92 KERH 4116 9/21/92 CB P -----~---~ 85 '10 / 11 363 R 16 DENT 6"' EXT. 9/15/92 KERH 4116 9/21/92 CB P 86 :10 / 11 36~.5 R 7 PUNCTURE 12""X12" PATCH 9/15/92 KERN 406 9/21/92 CB P __ 8_7 __ . 1_0.......c,_' _1_1c__ __ 3_6_F _:R:_, ...,:1c_ __ __:P=-U7N:.:C::,T=-U"'Rc'-E=-----'1'-c2'-c"".:Xc:1.,c2c:"' ___ Pc_AccT=-Cc"H"---9','/C,1-"5','/':-:9c'2"---"K'ccEc.::Rc:.H,._ __ ....:::4c,:ll;,c6 __ _!9__c/,=2'-'1-'-/c-'9-"2'---'C'--'B'-------'-p __ __ 8_t __ ·1_~.......c;_· _1_1 ___ 3_6_F_R __ 9 ____ 1'_U_NCTURE 12""X18"' PATCH 9/15/92 KERH 406 9/21 /92 CB P __ _!!\: ___ _:!_~_../ ___ !__1 __ 3_?:: _f:_1_1 ____ PUNCTURE ___ c:_3_' X ~c...' ·---·~-~_Tc:_~ __ 9_/15/92 ICERH 406 9/21 /92 CB P 9~ ·10 i 11 375.''. F: 6 PUNCTURE 1' /'. 1~" PATCH 9/15/92---,lcctE"'Rc-H,,----4-11~6,----9~/7 2c--1-/7 9c--2'---~C~B---~p-- ---------------··---------------------· --------··· ____ 9_, _____ _:!_~ ___ ( 11 3 H 9 A 1 12" ; : 1 2.. PAT CH __ 9_/_15/92_-"M-c-I ,,L_:c.L=-E c'-R __ _c4:...0c"l::.• ---=-9 'c/:c-2 ..:.1 c,/','9 =.2 ---=C:,:B ___ ...:P,--- -__'!_2 __ :!f _' ___ "1_1 ___ :ii:_:{_ ~ 2. 5 ___ PU_N:TUR_~ ___ 1_2"_'. ..'.'_ ~-"-___ __P_~T-::-C:-:-ll_-=-9'c/-:-1 ::C-5':/9;:-2=-----'M-':l:.::Lc.,L'-cE'cR'-. ---'4'=0:;:6 __ _!9'-'/:-c2c'1'-'/c-'9cc2'-----'cc"c::------'cp---·--9-"--·· 111 11 __ 38_9_ L :z,_5 PUNCTURE 12" ,: 12'_'_----'P-'-A'-'T'--'C"H'-------'9'-'/_1cc5~/-'9~2'-_:__:M..:.I:cL:cL:cE:.cR ___ 4..:.0=.o::.· __ __:_9'--/21/92 CB P __ 9_,_· __ :_:!_r. __ 11 381 ~L....:.8 ____ PUN~TIIRE 12" .. 12" PATCc.Hc..__9~/15/92 MILLER 4116 9/21/92 CB P 95 ·1~ 11 391 l 12.5 PUN~TURE 12" .. 12" PATCll 9/15/92 MILLER 40/, 9/21/92 CR P -~c,---~-c---'--'--=--=--~---.......... --------------------~ -~---'-'---"-'c----"'---'--"'-=='--------'"----~-=---'-'---'-=-----'-''-------'---- ---9-6 __ ·1_~ _! 11 381 l 8 HR I NKLE 1 r' EXT. 9/15/92 Ml LLER 406 9/21 /92 CB P ---------... --------~-~--=--........c=c=c..c....---=------'"--'=--'-''---=--=-----'---__ 9_7 __ 11__c._1_;_ ______ 11 ________ Si-!Ri 7' x 5' SKIRT 9/15/92 ltERH 406 9/17/92 Cl< P __ 9_!< __ 1°'. _ _i__ 1_2 _____ ,.,. r., __ 1_.s · ~:c:. __ 70~·=-_-__ ---' __ P-:.:_A'--'_r'-"c'"'_Hc..'_::::::::""'_9'-'_,-_"!..'"'5'-'/c-'9'--'_2~-::_-:=_=--""~E-"R~:..:"~---_-_-_-_-_-_4~"'0'--'"";,~~----_-_-'-9'--'"--1~1..:.7.:...(2.~-=-2_-_-__ -_..'.c'-'r.:... ___ -__ -_-_-_'-'..cr~-:=_-:=_-=_ __ 9I ___ 11 _____ 1_2~---16:·.s f•• 18";,; ~-5' PATC_H ____ 9_r'._"!_?J9_2 __ ~_ERH 406~---~/1_9_1~2_ CB P 1 or. D" ,-5.5' ,; 2.5' PATCH 9/15/92 KERN 406 9/19/92 er P ----------·-------·-----·------'-----~-----------··------'---- ------------------ - ---.. .. liiiiiil liiiil -liiiil liiiil --.. CRHOHIE EHUIROHHEHTRL SERUICES CORP. CHEMTROHICS SITE REMEDIATION QR/QC SUMMARY REPORT ACIL• PIT REPA IP. REPORT REPAJI: ·····-··--··-··--·-------·-··-· ·---·-·· ···------·•------------,,----~--~,--------,=~~- SEA_f' _______ ~(ICAT l~O-"l' __ ____cDccEc.cSc.c~F: IP Tl OH SIZE O'-F __ icc.RE.PA If: __ .. ___ _!l_E PA J_r. __ ,~E_LD_~~--tMACII I HE -----'-TES: _T-'E'-'C~H-'.--'R-'E'-S_U-=L'-T- 1-OF DAMAGE REPAIH METHOP DAE HIIMBEP. DATE ···--·· ·······-----·-----·---------'----= ··--·--------·--·--··------~==c.__-~~'-=~-~-,-----=--- 1~ ~~ 395 JUH:TIOt! 15" :: 18" PATCH 9/15/g2 KERI! 406 9/21/92 CB P ·-···-·-----·-·--·------' -------··--··· -····------····--·---=='---~~--~=~--~c.__------:c-- R10:: 1:C 13 356.5 DS 11\ 2.5' .. 5.5' PATCH 9/15/92 KERI! 406 9/19/92 CB P I R10,: 12 13 321.5 Al 1.5' X 2' PATCH 9/15/'12 KERH 406 9/19/92 CB P --=P.-1-=0~'1--1cc2~~,-. -1-=3c---1-,-8~c'-·_ ~------,-Alce. --------,1"'2"""~:;c-c-'1-,'----=-pccA-ccTccC-,-H---=-9~/.,.1=-5'-/=-9=-2-----,KccEccRccH,-------,-4-=11--:6------:9:-/cc1-=9~/-=9-=2c-------cCccBc-----ccp-- R105 ·12 / 13 61 BAD SEAM 15"' :-; 6" PATCH 9/15/92 KERH 4116 9/19/92 CB P R106 ·12 / 1_3 ____ 6_,_· ______ Al 15"' X 3' PATCH 9/15/92 KERH 4116 9/19/92 CB P -~~_117 ·12 / 13 9 Al 2' X 1.5" PATCH 9/15/92 KERH 4116 9/19/92 CB P R10E: ·12 13 0 BAL• SEAM 9' EXT. · 9/15/92 KERH 4116 9/19/92 CB P ___ R_1_0\'_ ___ 1_3 __ ,_ 1'1 357.5 D_,,_:1_1__ 3.5' .. _s_._s_· __ P_A_TCH 9/15/92 KERI! 4116 9/19/92 C_B ____ P __ ___ _P._1_:1_1, __ }':_/ __ 'l_o: _____ ~~?__ Al _____ 1F"' :: 15"' PA!_!:P, __ 9/15/92 ___ K_E_R_t __ l ___ 4116 9/21/_9_2 ____ CB ___ P R11'. 1~ i 15 393.5 L 1 WHIHKLE '.'' HT. 9/15/!12 KERtl 406 9/21/92 CB P --·-------·--·---------------------------------------------------- ___ 11',1_:1_~ .. _1_~_j_ 15 371 DS 12 _____ 3_' .. 5' PATCII 9/15.1'12 KERtl 486 9/19/_92 _____ CB P __ _P._1_:1_:, ___ 1l/_/ _15 __ 181 Al 3 .5' ;: 15"' PATCH ___ ~,'_1-?_[9_2 -~M-=-l=L=L=Ecc.R ____ 4=66'------'--9~/19/92 CB P R11~ ·1• i 15 170 BAD SEAM 12"' •. 12"' PATCH 9/15/IJ2 MILLER 4116 9/19/92 CE P -------· -------1 _'1 __ .....c3c..\l.c.9..c·.=.s ____ ~PUH::TURE ".5' :; 11:·· PATCH 9/15/92 MILLER 466 9/2_1/_9_2 __ CB ___ ~r __ R116 13 / 1'1 4112 L2 WRINKLE· ~ .S' Hl .. __ .c.9-=-/~15/9.2=------'M-'lc'Lc'L-=-EccR ____ 4..c6.,.6 __ ......,9~/_21/92_----'C-'B ____ P __ _ --R1-1·-.. 1c, ,' 2~6--,c-, R1-, ---DEuT, •·•• ---E''T .-~ P , n , ~ 9/15/92 ______ K_E_!l_ti _____ ."66 ---c-9/1~/9_2 __ GD ____ ~-- -----··--·----~---c---'--------ATcc------~c-c--c,---=,----~ 466 -P P.11 r __ _:1__~_/__26 ___ 7 ____ 1-=-:-c--.. ,. ;~z,...··---=P~A~_t:_H __ ~,'._1_5/92 ·· KERtl-'-'---~ __ ......,.9/16/9_2 ____ G~C• ______ _ _ R_1:J: .. 15 2i• ___ 16~ A, 12"' ,; 3' PA!Cf:..._ __ ~(1_5/9_? ___ K_E!l_~ ______ 4_1hi ____ 9/17/9_~_ C~ P R11:. 13 R,21' 15; 26 143 BAI• SEAi-i 15"' :; 13' PATCH 9/15/92 KERH 466 9/17/'12 CB P -----------------····-··-·-·-·-·----------------------- --iilil -- CAHOHIE EHUIROHHEHTAL SERUICES CORr. CHEHTROHI c:; S !TE REHED I AT! OH QA/QC SUHHARY REPORT ACID PIT REPAIR REPORT lilil .. iiiil liiiiil lilll liiil •. = REYn J r· . . s(11}( -·i·o GAT ICCOCCN-C-====~D_ESC f; J rl, 1-=o~N---s0-=-1 Zcclcc. -o:-r=-. ·--: R-EP~ D:=:_--_)~fli)~·,wfli,tr. I MA CII I HE T [ s T ... TE[ =-:·"-1;'" :..·-_-_-.c.c=-R~E~S:::U=-.,.L=-c;-T'--_ t t or L•RMIIGE REPA IP. ME THUD DATE HUMBER DIIT[ 1s ,-26 156 ········---iiiio si:iiti·---6·-c-··:;·1-s·'--·-··rilrc11···-· iihs/92·····-·KERti. ---4116 ____ 9_/_1_7_tri2-·-c=-B----=r:-- _..:.R:..1c::2c.:c::'--_·1.:.c,;:....c1c.'..c2=-6=----..:.1-=6-2. ____ -=-.BAD SEAM 2.5' 15"' PATCH 9/15/92 KERH 406 9/17/92 CB P R12,: ·15 ,' AT 164.5 PANE~ D,TH 2.5' X 7' PATCH · 9/15/92 KERH 4116 9/17/92 CB P _ _cRc..c1:_:2:_:4c.__·1.:.C5:....C,'-, ..cA:..T:....... _ _:1_::7..c1..:..-=-5'-'----'P..:.A:.:..::HEc El:TH 7' EH ."---~9-':/c:1~5-':/-;:;9-:;2----;Kc;;E~R"'N-;.----,4':ll;-';6----:9:-'/:c1:-C7:-'/:-:9;-';2;---c;Cc;B----:;p:-- R12S ·1>, 15 270 L 24 BAD SEAM 1' .. 3' PATCH 9/15/92 KERH 4U6 9/18/92 CB P R12i, ·15 / 26 131 L 13 .5 DEHT 6"' EH. · 9/15/92 KERH 4116 9/17 /92 CB P --"-'=-.....:..:'--'--'C.C:..-=-'--'=--=:_:c.-----=-=-R127 :2.; / 27 34 Al 15•· X 3' PATCH 9/15/92 KERN 406 9/17 /92 CB P --"-'=-=:.......:_,:c.:c. __ _:·..c... _____ _ R12!: :2,; /2 __ 7 ___ 82 R 9 PUH::TURE 15"' 1; 15"' PATCH, _ _:9_.,_/c.1c::5..:./..:.9..:.2c......_KccE=..RccN"-----4:..U:..6:......._-..c9'-'/'-1'--7'-/'-9'-'2=--_..:.C..:.B ___ ..:.P __ -· =~}::---;~ <··--~-:;---1 9 0 2 5 -----:::: ~:-:-::--- 1 -:-. •.· ;: ~'.' · ::rnc---1~H1-=-~--=;--~:: .. ":-'-:----:..:.:-=-:----':-';'-~C.C;-';-'~-=-:'---~'-:=------'-:-- ·-·-···-········-·· ··--·-··· . ········-·--······· ·····----······ ·············--····~---'--'="-'-'----'-'-'---'-'--'-'-'-'-'--...C..:.-----'---ft13·, ·15 26 112 PAHEl El.TN. S' EXT. 9/15/92 KERN 406 9/17 /92 CB P _ P,_:1 J.:~ ···-·~.:.1_5 ____ 3_0_1 ______ S KIP. T 6 ' 1; 3 8 ' PAT C II 9 /15 /9 =-2-~H~l~Lc...L·~E'-R----4-,0~6---"9-'-/--'1-'9-'-/-'9..:.2 __ C~B~---'-p--------------__ R.1_3:~-···· f' 15 280 SKJR, 6' ;, 21 · PATCH 9'-/1-'5'-.'-'9=-2~_,"'ccl-'L~L~EccR ___ C-4CCDC-6 __ ~9c../..c.1..:.9c../..:.9..c.2_--,c~B,.--__ ~P __ R131; f' 15 257 .5 SKIRT ---,6 · ;; 22 .5' PATCH 9/15/92 HILLER 4U6 9/19/92 CB P '-----~-~='----cccccc-=-·~-~=~,.---,,='--=-c,-c-----,-ccc----'-~'-'-C....:.----ccc---------R1:!S ·13 .-14 4A~.5 L ~ JUN::TIOt: 0 • 1: 3' PATCH 9/15/92 MILLER 406 9/21/92 CB P ---·····-··----·--- R13i, ·12 / 13 4~0-'0 ____ ~J'-U'-H::T I 01{ 5 · ;: 5' PATCc...H __ 9'-/'-15/92 --'KccECCRCCN~---.,..4..,0..,6 __ ~9-'-/--=2..:.1c../.c.9..,2 __ c=cBc--__ -'..r __ _ R]J! .. _1:./ 3 _ 40~ L 3 PUHCTUR~·---....... _4·"-,~--~E_X=-T~.--9'-/~15/92 KERN 4116 9/21/92 CB p ......B.!~BP,_ .. " .. / 1 C 297 R1 ____ PUN::TURE 1 s-:· . .i: .. :1.~·~ __ PATc.1.1 __ .9(1_5/9~ __11_1.L!:!:R __ -c44Doo"· __ 99=-',.,.22·11//99~ CC~P P _P..:!J!'.._, · 1_~--39;, _____ l·IRIHl<Lc __ .:: .. 5' EX.! ... __ 9_/_1_5/.92 HILLER _L ___ ., _____ _ -·· -.. ·········-· ····--------------. ····--··-· --- CANOHIE ENUIRONHEHTAL SERUICES CORP. CHEHTROHICS SITE REHEDIATIOH OA/OC SUHHARY REPORT ACJ[1 PIT -iilil lilil liiiiiil liiiil liiiil - REPA IP. REPORT . ----------------·---------·-----. ·---------------REP Alf SEAi,; LOGATIO" DESCF:IPHOri SIZE OF REPAII: REPAIE WELDEF. -----------•----------------------------------~--~ ·c--c-----------------------------------~-~~--!: t O, DAMAGE RE!'A II: M!::THOI> DRTE HACH I HE TES:i TECE. ------------HUHBER DATE ----------------- - - ----------------- - - -~------cc~~.,~,-------------------------------=------~-=------cc--f<14[: ? i fl 39~ L • PUN~TURE ~· :-: 2.5' PATCH 9/15/92 CARTER ----------------------------,-------~----=--=--'--------=-=·=--_f!.~"-~---? ( I: 393.5 WRINl(LE 5.5' PATCH 9/15/92 CARTER JJDII 9/21 /92 cc 400 9/21/92 CB P.1>i;-7 C 385 DS n 6' ,; 2.5' PATCH 9/15/92 PAYNE R-1~'1~3'-------~6-/'------7~---'-3~9~6-JUH::TI OH 2' X 3 .5' PATCH -9/15/92 CARTER ----------------,-----"--~-------=~-~-=------~=----=------,--=----===c----=~----==,---------:=--------,,--:-'=-c'-:~ R14~ 5 / 6 397 L 1 PUNCTURE 18" X 18" PATCH 9/15/92 PAYNE 408 :PATCH CAPPED 4118 9/21/92 CB 408 I PATCH CAPPED 408 I PATCH CAPPED 408 I PATCH CAPPED 4118 !PATCH CAPPED 401! !PATCH CAPPED 4011 ·PATCH (:APPEil 40P. !PATCH CAPPEi> 4011 'PATCH CAPPED 408 ·PATCH CAPPEP ----------------·-------- 406 9/19/9:? er. 406 9/21/Y;' Cf: ---· -------406 9121 iv:· C[i ---------. -------406 9/17/Y~ GP lliiill RESULT p p p p p p p --··--· ·---------408 9/16/97 cc p ---------408 9/16/9;' C8 p liiil CANONIE ENUIRONHENTAL SERUICES CORP. CHEHTROHICS SITE REHEDIATIOH OA/OC SUMMARY REPORT ~ I 3 P.16~ 3 / h R164~ 3 / " R164C 2 R 2C ~ / 8 ! R165 " i 5 2 R 2C 6 / 7 UOill lilll -lliiil iiiil REPAIR REPORT _9~1'-'f~: 0 _4 ____ ~PUHC TIJRE~----G.. ___ EXT . 9 /16 / 92 MIL L_,Ec,R,-----,''---cOcc8 __ ------c9~/,...1,---6~/IJ_::._ __ C_B ____ P __ R16\'____________ 9 R 20 ____ PUHCTIIR_E ___________ h':__ __ -,---------cEXl. ____ 9_/_1Y92__ ___ M__!_L_l,ER 408 9(!_~92 __ C_B ____ P __ P.161: 5 / 6 7 j' 8 __ R_1_71; ____ 1_!;_( 19 Sil ____ -,-_AT _________ 3 ' __ ::,---:~-~· ,--------cpc-Accl_C_H__ 4118 'PATCII CAPPEC< P.17•, 2C / 21 44 D,. 1 ~ ____ 4_"_li Z. 5' PATCII 4118 'PATCII CAPPED · "ti"17::· ---z::;-;:·23·----r,--------,SccKIRl 6 .5 'li"''6~,,..., -----cPc-AccTc-cCH 408 9/21/92 CB P 9/15/92 PAYNE 9/15/92 PAYNE 9/16/92 KERN ------___ R_1_7~ __ 2_,_i 23 17 R 1 • r, PUHCT_U_R_E ______ 8_ .. ____ P_A_T_C_H __ ~ __________ 4_11_8 ___ 9_/_2_1~/9_2 __ C_B _____ P __ 9/16/92 KERN R174 ___ 2_3 __ ( 2_4 ____ 1_2 ____ B_A_r_, SEAM 16"X15" PATCH 4118 9/21/92 CB P 9/1ii/92 KERH _ R175 __ 26 i_29___ 5_7_._5 _____ DS 15 4' :; :l' PATCH 4116 9/21/92 9/16/92 KERH CB P R17i, 30 / 31 ll AT 2 .5' :; 6' PATCH 406 9/21/92 9/16/92 KERH CB P ------------__ f!_1_7,: ____ 3_._, _,: __ 3~ ~ A, ___ 1_!''...'.___:_: 2_' PATCH 9/1_Y_9:?_ ___ KERH 406 9/2_1/IJ_:> ___ Cl!.__ ____ P __ ___ R_1Jf: ___ 3_1 _____ 3~--15_ r _1_0_. ____ P_UHC_TIJR_E_ 12 .. ;; 12"' PATCl_!__ ___ 9/_11\_/92 ___ K_E_R_l'l_' ____ 4_U8 ___ 9/21f1J_? ___ ~B___ P __ R_1?~----3_:i_,: _3_2 ____ 1_6_R_1_B_._5 _____ D_Etl1"_ __________ h.. EXT. 9/16/_92 KERN 408 9/21 /92 __ (,E P R179fi 7 / E 14 P. 5.5 PUNCTURE (,.. EXT. 9/16/92 MILLER 406 9/18/92 CB P ------~----,------------------------------------------------------------R1RI' uorr, ----------------- ---.. -.. CRHOHIE EHUIROHMEHTAL SERVICES CORP. CHEMTROHICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID PIT -liiil iiiiil liiiil REPAIR REPORT . ----------·-··· =---,,=-=-·----·-··-------=c--=-c--,--=-~-=~ -.. R:!:PA JI: SEAM LOCOTI o~: DESCE I PT! OH SIZE UF 'REPA IF: REPII IR ,WELDH ----·----·-----------------------·· -·--· . ····---~c-'c'~c-c----'-ccc'==c---···----------~~-"'=-c----~ HIJIIBEJ: HUNBEP. OF l)AlfAGE REPOIP. IIETHor, DAIE iMACH I HE TESl HUNBEP. DATE - - -----------· -. ·----------------. --. ---------------·---·--------R18i UOID -·--· ·-.. -----,-,-,-cc---"C"CC···-·-·-----·-··· . - . - . R182 12 / 13 6 3 L 1 B Afi S_E_A_l1_, ___ 1_s_··_x_1_&_" __ P_A_T_C_H __ 9/17/92 KERN 40S 9/17/92 9/17 /92 R183 12 / 13 63 L 1.5 WRIH_K_L_E _____ 6_' ____ E_X_T_. __ _ KERN 41!5 9/17/92 R18~ 12 / 13 60 L 10.5 PUHCTURE 3' ~ 1.5' PATCH 9/17/92 KERN 41!5 9/17/92 R185 6 / 7 62 L 5 WRIHKLE 2C"X5'6" PATCH 9/17/92 KERN 4115 9/17/92 R186 6 / 7 2 L L5 PUH::TURE 6" EXT. · 9/17 /92 KERN 41!5 9/17/92 R187 3 / ~ ~ H/A H/A H/f1 N/A H/A H/A 9/17/92 9/17/92 KERN 485 9/17/92 9/17/'12 KERN 465 9/17/92 9/16/92 111 LLER 40f1 9!17 /\12 9/17/92 KERN 405 9/17/92 9/17/92 KERN 405 9/17/92 TECH. CB CB CB CB GP GP CB CB CB cc CB ·----9/17/92 KERH 405 9/17/92 CB ------------------------------------------------------•----------- RESULT p p p p p p p r p p p p l!Al SEAi•: ----·------------· ---. ·--------------------------------GAf· R19!: f. _: (I . -1: L .t; P.19~· {. / ; s_· _:_; _:_· · ___ PA_T Cll__ ___ 91_]_71_~ ~---•_CER~ ____ 4_0S --·-9 /1 7 I 92 _ ---cc,,,c ___ ----,,P __ (,' ); __ ,1_· ___ P_ATCH 9/17/92 KERN 405 9/17/92 CB P ---------------------------- BAI· UELI> ---------·-· R2P:t ~ ,: ~ ---------------------------------~--·-· __ EXT. 9116/92 11I LLrn 406 9/18/9~ CC P . --------------- .. ---.. CANON!E ENUIRONNENTAL SERUICES CORP. CHEMTRONICS SITE REMEDIATION QA/QC SUMMAR\' REPORT ACID PIT liliiil REPAIR REPORT --------. -·-·. -·--------------······-------·----- liiil liiiil iiiil REPAIJ: SEAM LOCllTIO~I DESCP.!Plf!ON SIZE OF iflEPA!R REPAIJ: 11/ELOEI: - !MACHINE TEST TECH. ... ·-------------------------------------------------------· NUNBEf: NUIIBEP. OF DAMIIGE REPAIR NETH OD DATE HUHBH Dl!TE ----· ----· -------------------·---· ·---------------------------------···-•R.?._ll', ___ !;_j. 9 ____ •c.· -'L'-s'-• -----'BA~ SEAi! 5' 1: 2 .5_' __ PA.!£11_·-· 9/_1'-'7-'/-'9-'2'--==-----'-=-----'-'--~'-'--KERti 4115 9/17/\12 CB ll21l~ i' / 6 1~ H 6 PUNCTURE 15" " 15" PATCH 9/14/92 =----'-=--"--'-=----'-'-'-'-'--'---~--"-"-''--'-===-"-----'-=----'-'-'--=-', R2DZ i I E 2U H 9 PUNCTURE 12" ,: 3' PATCH 9/14/\12 HILLER 406 9/17/\12 CB HILLER 406 9/17/\12 CB R20!; 7 / E 25 R 5 PUNCTURE 'i" EXT. · 9/16/92 NILLER 408 9/18/\12 CB R205 7 / 6 12 R 6 PUNCTURE 12" ,: 16" PATCH . 9/16/\12 HILLER 406 9/18/\12 CB R206 34/38/32 N/A JUNCTIOH 5',: 2' PATCH 9/16/\12 KERN 408 11/21/\12 CB CB RESULT p p p p p p p R207 15 / 26 122 L 1ll DENT 6" El:T. 9/15/92 ll20f. UO IV --------------~--'--''--=~-----'-----'-~---·-------KERH 406 9/18/\12 R2fl9 ---uoi,...D __________ _ -·-·-·-·----· . ----------ll21 l1 UO It• ···-··· ...... ·-··-·-···· c----,--c------···-······----······--··-·---·----····-·-·· .. ---·-·=c----c-=--~=~ ==---------___ R2~-~----2/16/17 ~{~-----JUN;:_!_J_Q~ ______ 2 ' ___ :~_=?' =-===---c-cc=c'=~---cc=c-------c-,,,---,c-ccc-c-=c---=-c------=----PATCH 9/15/\12 PAYNE 408 'PATCH CAPPED ···-·ll·?.1:C. .. -· 12/29/3[;·-.. N/A ____ J.U_N_C!fll_H ___ l _.5_' _.;,_· _1_1_.~5-·-------~---~---------~-'-----------PATCH 9/15/\12 KERN 406 9/21/\12 CB p R21:i BUTT 281 L 1.5 PUNCTURE 'i" El:T. 9/15/\12 KERN 406 9/21/\12 CB p ---R21!! 32 ;" 33 {)!. DS 1li 2.s·xs· PATCH 9/16/\12 KERN 408 CB p 9/21/\12 ------------------------------------------~------------.. _1:?.1.? ···--3'1 /. 38 ___ .... o_. BAV SE_A_t: ____ 7_·_1:_:r_· ___________ _ PATCH 9/16/\12 KERN 408 9/21/92 CB r _1!~1.io .... 32/33/34 H/R . J.l!_tlC.lJ.!)_H __ '._2_._5_'_X_4_._5_' ____________________ ~------------PATCH 9/16/92 KERN 4116 9/21/\12 CB p R217 UOW -~=----------·--·-·--·-·---------------R21f: BUTT 26C D< ~·• •· ;; 2.5' PATCH 9/16/\12 . ·-----------·-----··------------------------R21 C· ·--.ll~_TT 25c.5 B.11_11. SEflt: 11.s· ): 2.5' PATCH .9J...)_6_(\1_2_. __ f:ll2.I' -... -B.~TT ___ 4;. ____ JuN::T I o~-----•. -.----EXT 9/16/92 KERN KERN KERN 4116 406 406 9/21/92 9/21/\12 •PATCH CAPPED ·-·-·-------------- CB p CB p ------.. -.. ---.. iiiiil -llliil .. aii) CAHOHIE EHUIROHMEHTAL SERUICES CORP. CHEMTROHICS SITE REHEDIATIOH QA/QC SUHHARV REPORT ACrn PIT REPAIR REPORT -----·--------·----------·--------- REPA 11: SEAt: LOCAT!OH llES~P.JPTIOH SIZE OF REPIIIr. REPAlf. WELDER MACHINE TEST TECI\. ---------·----------------------------------------------------- ---------- HUNBEI: HUl'IBEf: OF DAMAGE REPA Jr. METHO~ llAT!'. HUMBEP. Df!TE ------·--··------------------------. ·-------·------------· ·------------·----------·--·------·----------- R221 BUT1 49 OS 1~ 2' ;; 4.5' PATCl1 9/16/92 KERH '>118 9'/22/92 CB ---·------------ ·--------- ----------------- ___ BJ~? _______ _ll_UTI _______ H .5 B_lli: ___ s_E_AII ~.. EXT. 9/16/92 KERH '>IIS 'PATCH CAPPH _ _B_:'.2_:) BUTT 169 D S 19 : 2 ' l: 4 . 5 . PAT CH 9 /16 / 92 __ K_E_R~H ____ '>_ll_8 _______ _ R22l\ BUTT 235. 5 OS 2 ~ . 2' ); 4. 5. PATC_~_ 9/16/92 ___ ccK.=EccRccH ____ '>.cll=.8=----'-'---=-'-c.c..=-- R225 15/35/3ii 36 JUH::T!Ott 2' ); S' PATCH · 9/18/92 MILLH '>116 9/21/92 CB 9/21/92 CB 9/19/92 CB R225A 15 / 26 U BAO SEAi'\ :3 .5' ;; 7. PATCH · 9/16/92 KERH '>118 c-'---~~~--=~=----"-=---~-,--'-C..C.=-- R22 o 1o• / 36 '>8 BAO SEA11 15"' ;; 5 · PATCH · 9/18/92 MILLER '>116 9/18/92 CB 9/19/92 CB __ R_:'.27 15 / 36 53 PU_!l_'.'..TUJlE 1' i; 1' PATCH · 9/18/9c-2=-_M:-cl~L_,L-=E:-cR ___ -,-'-.cll.,.6 __ -c~~~-- ___ B_:!2_ft _________ 1_<:~J___3_i. ____ _5_:l_~-~-WR! Hl(LE 1' ...,... __ _Eln. ____ 9/18/92 ___ MILL-=E:-cR ___ ,..'>.,.11 7 6 __ -c~~--- R229 15· / 3(, 6~ Bfll) SEAl·I 2' 1: 1' PATCH 9/18/92 MILLER '>11(, 9/19/92 CB 9/19/9:! CB 9'/19/92 CB ----------------·------------·---------------------- ___ !(_2_<!_1< ________ ~_':.__,: __ _:J_~ 7"2 BRI, SEAl~---~..:.:~~;_· ___ P_l1_:1:~II_ 9/18/92 __ MILLER ____ '!_116 9/19/92 CB 9'/21/92 R2!<_, . ----32 /_3::___ 1i.s .5 _r.__2_ ________ D!:H1 5"' ----~_i;_!_, ___ 9..c/_1_8..c,_'9_2 __ M_I_L_L __ E_P. ____ .. _11_6 ___ ~~---CB 9/21/92 _____ R23_:2_ ______ 3::_ i _37 ___ 109 _____ D, 1-~---.2.5' l: 5' PAT_l:H_~1_8~/_9_2 __ M_l_L_L_E_R ___ '>_ll_o_· ---~~---CB R233 3:: / 3f 7(, r. 17 DEHT 9"' EXT. 9 /18/92 Ml LLER '>116 9 /21 /92 CB 9·/21/92 __ B23':. _____ 3~ / 3f. ______ 6,!_i _ _2_r. ______ S~l_!lT _____ 1: · i: 6 · PATC __ l_l __ 9_/_1_8 __ /_9_2 __ M_I_L_L_E_R ___ '>_ll<, _____ ~---CB _ _!l2_~ 33 / 3f 55 L 5 .5 PUHCTURE · 2' :S 2' PATCH 9/18/92 MILLER '>116 ------------------ -~R~2~3_t, ____ 1 ~--_/ __ .:1_~_ r. ______ C_~_f'__ : 2 ' ); I.. 5 · PAT C"H---'-9-'-/-'1-=8-'-/-'-9-=2--'M-"I'-'L°'L°'E°'R'-----'-'-'1 1 ' - ' 6 - - - - ' ' - ' - ' - = - ' - " ' - - R237 1_<:0 /__1_". _________ l:_ _______ CA_f ______ :.C2' ;; ___ L_,_5_: __ P_!ITCI! ____ 9/18/_92 MI LLEccRc___ ___ '>ccllcci, __ ___c. 9/21/92 CB 9'/18/92 CB 9L1_y_92 CB 9' /1_8/92 R23f 2i'._/. 2_7 ____ 111_(,_~-~---------l!Al· SEflM _____ .S'_l:~_.5 PAT_C:l_l _9/18/92 MJLLE.ccR ___ ..c'-.11~-'-6 __ ._c.-'--' co 9/18/92 R23~ 2_i'..J ___ 2_7 ____ i!:__L_ 23 BAP SE_Al'c ________ ~_: _____ EXT .___ 9 /18/92 __ "1_!_~_L_E~R ____ '-ccll_o ___ --'-'--CB R241', 1,: ,' 21, 112 L 2~ BRI' SE Rt: 2' EXT. 9/18/92 MILLER '>116 ---------.... ------=---~----~--'-9' /18/9'.' co iiiill RESULT p p p p p p p p p p p p p p r p p p r p --------.. liiil CAHOHIE EHUIROHMEHTAL SERUICES CORP. CHEMTROHICS SITE REMEDIATION QA/QC SUMMARY REPORT ACID rn REPAIR REPORT -------·----· ---·· .. ------------------·-----·------------ ll~PAJI: SEAN LOCAT IO~ DESCR I PT! OH SIZE OF --·----· ... ·-----------·-·------------HUHBEI: HUMBER OF DAMAGE REPAIR ------------------------------------------------------ R24"1 2{r / 27 108 BAL• SEAM 15" X 2.5' -----. R242 15 / 26 163 BAO SEAM .,. u ---· R243 15 I 2;; 153 BAV SEAM 1.5' R244 UOID R245 UOIV R246 UOID R247 uorn R246 UOI[, R?49 UIIIP ---------------------R2:5 l1 "t / L 14:J BAil SEAM ,, .. -------------------R25~ .,, 3'' n IIAI> SEAM (,.' , .. , < ---------------·----------------------------- R25~ 37/38/33 H/A JUH::TIOH 2' X 4' ---------------------------R25:i UOIP R25~ 1 ! 5 304 CAP ., . X ., , -< R2S5 1, I 5 28C CAr 6.~· X ,, , -~--R25i• t: / 9 316 R '22 CAP 6" ·------·----., . R2S7 BUTT r. BAD SEAM 49' :; L r.~sc BUTT 53 BAO SEAM 2~· ,. ., . " L -------------------------R2S~ f. / ~ 27S R 3 GA:; UEH, 5.5' 0 s· ------·--------------------R26t BIITT 77 CAP 61 _ 5 X 15" --· --------· ·-----------------···-------·----·--· --------------------- REPA IP. METHOD PATCH EXT. EXT. E1-T. E1'1. EXT. CAP CAP CAP CAP CAP BOOT CAP -liiilll liiil --iiiil liiiil REPAIP. WELDER MACHIHE TEST TECH. RESULT DATE HUMBER DATE 9/18/92 MILLER 4116 9/18/92 CB p · 9/18/92 MILLER 4116 9/18/92 CB r 9/18/92 Ml LLER 4116 9/18/92 CB p '9/16/92 MILLER "ll8 9/19/92 CB p 9/18/92 MILLER 4116 9/21/92 CB p 9/18/92 MILLER 4116 9/21/92 CB p '9/19/92 MILLER 4116 9/19/92 CB p • 9/19/92 MILLER "ll6 9/19/92 CB p · 9/19/92 MILLER "'" 9/19/92 CB p 9/19/92 MILLER 4116 9/22/92 CB p 9/19/92 MILLER .. 0(, 9/22/92 CB p 9/19/92 MILLER 1106 9/19/92 CB p 9/21/92 MILLER .. 116 9/22/92 CB p --.. --.. -.... CANON![ ENUIRDNMENTAL SERUICES CORP. CHEHTRONICS SITE REMEDIATION OA/OC SUMMARY REPORT ACJr. PIT OF DAMAGE lt9 CAP lt9 CAP 2': / 24 65 BAD SEAM BUTT 14~ BAD SEAM R265 25 / 6 393 CAP 114 CAP R~7ci -------R277 --------------------R~7t: REPAIR REPORT SIZE OF REP fl rn ~-~ 2.5' 5' X q, ., 4" 4" 1 C' X 4· 24' X 3.5" ·----------------- ------..... -------------- .. liiill iiiil .. -iiill - REPA Iii REPAIR WELDER MACHINE TEST TECH. RESULT HETHOP DATE HUMBER DATE CAP 9/21/92 MILLER ltll6 9/22/92 CB p CAP 9/21/92 MILLER 4ll6 9/22/92 CB p EXT. 9/21/92 HILLER 4116 9/22/92 CB p EXT. 9/22/92 HILLER 4116 9/22/92 CB p CAP 9/24/92 MILLER 4ll6 9/24/92 CB p CAP · 9/24/92 MILLER 4116 9/24/92 CB p I I I I I I I APPENDIX C I CHRONOLOGICAL LOGS FOR I DISPOSAL AREAS I I I I I I I I I I I I I I I I I I I I I I I I I I I I I DATE 2/21/92 2/24/92 2/26/92 2/28/92 4/2/92 4/27/92 4/30/92 5/1/92 5/28/92 7/8/92 7/14/92 SUMMARY LOG CAP CONSTRUCTION DA-6 ACTIVITY Preconstruction survey; Two drums and a battery noted. Site meeting; Discuss significance of drums. Apparently from maintenance shop; JRC accepts for disposition. Begin clearing. Chipping: Disposal Area cleared; chipping vegetation. Baseline Topo; Initial baseline topographic survey. Common fill; Place common fill on DA-6. One layer of common fill sufficient to establish grade. Compaction; Conduct tests as part of initial effort to determine compactive effort necessary to achieve satisfactory compaction. Tests were performed with the sand cone and with the nuclear density gage. Law Engineering personnel monitor soil moisture and compaction. The SEC Donohue Resident Engineer, an experienced geotechnical engineer, observed all tests and participated in Proctor curve selection. Initial test results confirm that the nuclear density gage method is not suitable for use at this site due to high mica content of the soils, as anticipated. Test results also indicated that equipment presently on site can not achieve satisfactory compaction. Retests: Reevaluating Proctor curve selection. All test results unacceptable. Retests; Dynapac CA-151 single-drum, pad-foot vibratory roller on site; achieves specified compaction. DA-6 approved for placement of low permeability layer. Low permeability soil layer; Red clayey silt from the Back Valley treatment building location placed as the first lift of the low permeability layer. Law Engineering continues to monitor soil moisture and compaction. First lift of low permeability soil on DA 6 approved. Complete second lift with soil from Borrow Area 2 and check thickness. Surface preparation; Begin surface preparation of the low permeability soil layer on DA 6. Surface cracked due to desiccation. Adding moisture and grading surface fails to correct the problem. Utilize roto-tiller and smooth-drum vibratory roller 7/13/92 to prepare surface. Excavate liner-anchor trench in preparation for deploying HOPE. HOPE liner; Attala Lining Systems, Inc. deploys 60-mil textured HOPE panels and begins welding the seams. Law Engineering personnel provide independent I I I I I I I I I I I I I I I I I I I 7/16/92 7/17/92 7/30/92 9/15/92 9/18/92 9/26/92 10/2/92 QA/QC oversight and documentation, and experienced SEC Donohue personnel monitor all aspects of HDPE installation. HDPE welding and inspection complete 7/15/92. Drainage media: Deploy Tensar Geogrid synthetic drainage media over the HDPE on DA 6. Backfill liner-anchor trench as sewing of the Tensar proceeds. Backfill placed and compacted with a Case 580 with a vibrating-plate tamper on the backhoe boom. Sewing and trench backfill complete on 7/17/92. Select fill: Begin placing select fill on DA 6 from Borrow Area 3 behind Building 134. Complete toe drains and select fill 7/22/92. Biotic barrier: Install 60-mil HDPE biotic barrier in a 60-in. deep trench outside the liner-anchor trench. Top soil: Place the top soil layer on DA 6 and grade the cap and the surrounding area. Settlement markers: Install three settlement monuments in the cap at DA 6. Seeding: Prepare cap surface with a roto-tiller and apply fertilizer and seed with a Hydro-seeder. Apply and crimp mulch. Fence: Allison Fence Co. begins drilling fence post holes at DA 6. Heavy rains delay setting posts until 10/12/92, when holes re-dug and concrete poured. All fencing complete, gates adjusted, etc. 11/11/92. I I I I I I I I I I I I I I I I I I I DATE 2/19/92 2/21/92 2/28/92 3/26/92 4/7/92 6/2/92 SUMMARY LOG CAP CONSTRUCTION DA-7/8 ACTIVITY Clearing: Begin clearing buffer zone at DA 7/8. Encounter apparent surface contamination; Stop all activity until exclusion zone can be better delineated. Pre-construction survey: Re-delineate exclusion zone, extend cap boundary at the northeast end of DA 7 /8 to cover waste in that area previously hidden by vegetation. Continue clearing and chipping in Level C. Agree at a meeting 2/24/92 to excavate a shallow trench at the proposed cap boundary to better delineate extent of contamination prior to placing common fill. Initial baseline topographic survey. Test pit: Alexander Construction mobilizes a large trackhoe to DA 7/8. Carefully excavate an exploration trench along the northeast end of the disposal area. Encounter two pits with plastic bags, trash can, etc.; agree to extend the cap boundary to cover that area. Common fill: Place common fill on access road and in buffer zone at DA-7/8. Due to steep slopes, it is necessary to establish horizontal ramps across the upper portion of the disposal area for the dump trucks. The piles of fill material are later pushed down the hill with bulldozers to completely cover the cap area 4/10/92. Elect to pre-excavate liner-anchor trench along northeast comer of the cap to check for waste prior to completing fill to rough grade limits. Encounter shipping materials, canisters, unused plastic bags and protective coveralls in a pit to the east of the disposal area. This material was apparent! y disposed of following closure of a government contract in 1969. The material did not appear to be hazardous waste. Spread the excavated material over the northeast end of the area to be capped and covered with common fill. The excavation was then backfilled with clean fill and the cap extended, again, to cover that area. Complete first lift of common fill and drain to grade 4/15/92. Return to compact common fill with DynaPac padfoot roller on 6/1/92. Law Engineering personnel perform QA/QC services during placement, moisture conditioning and compaction of soil. The SEC Donohue Resident Engineer, an experienced geotechnical engineer, reviews test results and Proctor curve selection for all lifts prior to placing of subsequent lifts. Test reports by Law Engineering are presented in Appendix B to this report. Common fill completed and approved for placement of the low permeability layer 6/2/92. Low permeability soil layer: Place first lift of the low permeability soil layer on DA 7/8. Law Engineering continues to monitor soil moisture and compaction. First lift approved and begin second lift 6/3/92, complete 6/8/92 after heavy rains. DA 7/8 approved for HOPE after thickness check 6/29/92. I I I I I I I I I I I I I I I I I I I 7/17/92 7/24/92 7/29/92 8/5/92 9/14/92 9/16/92 9/18/92 9/25/92 10/13/92 Surface preparation: Begin surface preparation of the low permeability soil layer on DA 7/8. Add moisture to minimize the incidence of desiccation cracking. Utilize roto-tiller and smooth-drum vibratory roller 7/24/92 to complete surface preparation. Begin excavating liner-anchor trench in preparation for deploying HDPE. Minor amounts of waste encountered at two locations at northeast corner of cap. Backfill liner-anchor trench, and extend cap to cover that area. HDPE liner: Attala Lining Systems, Inc. deploys 60-mil textured HDPE panels and begins welding the seams. Law Engineering personnel provide independent QA/QC oversight and documentation, and experienced SEC Donohue personnel monitor all aspects of HDPE installation. HDPE welding and inspection complete 7/29/92. Drainage media: Deploy Tensar Geogrid synthetic drainage media over the HDPE on DA 7 /8. Backfill liner-anchor trench as sewing of the Tensar proceeds. Backfill placed and compacted with a Case 580 with a vibrating-plate tamper on the backhoe boom. Sewing complete on 7/30/92. Toe drains and liner-anchor trench backfill complete on 8/4/92. Select fill: Begin select fill 8/5/92. Select fill complete on DA 7/8 on 9/14/92. Biotic barrier; Install 60-mil HDPE biotic barrier in a 60-in. deep trench outside the liner-anchor trench. Top soil: Place the top soil layer on DA 7/8 and grade the cap and the surrounding area. Settlement markers: Install three settlement monuments in the cap at DA 7/8. Seeding: Prepare cap surface with a roto-tiller, apply fertilizer and seed with a Hydro-seeder. Apply and crimp mulch, and install erosion control matting on steeply sloping areas. Complete 9/26/92. Fence: Allison Fence Co. begins drilling fence post holes at DA 7/8. All fencing complete, gates adjusted, etc. 11/11/92. I I I I I I I I I I I I I I I I I I I DATE 2/3/92 2/11/92 2/20/92 2/27/92 4/3/92 4/27/92 4/30/92 5/1/92 5/28/92 SUMMARY LOG CAP CONSTRUCTION DA-9 ACTIVITY Preconstruction survey: Establish exclusion zone. Clearing: Begin clearing buffer zone at DA 9. Complete clearing and chipping in the disposal area in Level C on 2/18/92. Drums: Excavate cluster of drums exposed near the stream west of DA 9. Canonie and SEC Donohue CIHs provide oversight. Drums already crushed and apparently placed at that location for disposal. No VOCs or contaminants noted. Soil samples collected and submitted for laboratory analysis. Drums placed on DA 9 to be covered by the cap. Lab results 4/8/92 reported no contaminants detected in the soil sample. Covered the area where drums removed with clean soil and graded. Initial baseline topographic survey. Common fill: Place common fill to rough grade on DA-9. Compaction: Conduct tests as part of initial effort to determine compactive effort necessary to achieve satisfactory compaction. Tests were performed with the sand cone and with the nuclear density gage. Law Engineering personnel monitor soil moisture and compaction. The SEC Donohue Resident Engineer, an experienced geotechnical engineer, observed all tests and participated in Proctor curve selection. Initial test results confirm that the nuclear density gage method is not suitable for use at this site due to high mica content of the soils, as anticipated. Test results also indicated that equipment presently on site can not achieve satisfactory compaction. Retests: Reevaluating Proctor curve selection. All test results unacceptable. Retests: Dynapac CA-151 single-drum, vibratory padfoot roller on site. Achieved specified compaction and DA-9 approved for placement of the low permeability soil layer 5/4/92. Low permeability soil layer: Place first lift of the low permeability soil layer on DA 9. Law Engineering continues to monitor soil moisture and compaction. First lift approved and second lift placed 6/1/92 after a rain on 5/29/92. Compaction tests indicate compaction adequate, but moisture content not within the range specified. Add water and rework the area. DA 9 approved for HOPE after thickness check 6/29/92. I I I I I I I I I I I I I I I I I I I 7/8/92 7/14/92 7/17/92 7/17/92 7/31/92 9/1/92 9/19/92 9/24/92 10/2/92 Surface preparation: Begin surface preparation of the low permeability soil layer on DA 9. Severe desiccation cracking noted. Adding moisture and grading surface fails to correct the problem. Utilize roto-tiller and smooth-drum vibratory roller 7/13/92 to complete surface preparation. Excavate liner-anchor trench in preparation for deploying HOPE. HOPE liner: Attala Lining Systems, Inc. deploys 60-mil textured HOPE panels and begins welding the seams. Law Engineering personnel provide independent QA/QC oversight and documentation, and experienced SEC Donohue personnel monitor all aspects ofHDPE installation. HOPE welding and inspection complete 7/15/92. Drainage media: Deploy Tensar Geogrid synthetic drainage media over the HOPE on DA 9. Backfill liner-anchor trench 7 / 18/92 as sewing of the Tensar proceeds. Backfill placed and compacted with a Case 580 tractor with a vibrating-plate tamper on the backhoe boom. Sewing complete on 7 / 18/92. Toe drains and liner-anchor trench backfill complete on 7/22/92. Select fill: Complete toe drains 7/22/92 and begin select fill 7/23/92. Select fill complete on DA 9 on 7/27/92. Biotic barrier: Install 60-mil HOPE biotic barrier in a 60-in. deep trench outside the liner-anchor trench. Top soil: Place the top soil layer on DA 9 and grade the cap and the surrounding area. Settlement markers: Install three settlement monuments in the cap at DA 9. Seeding: Prepare cap surface with a roto-tiller and apply fertilizer and seed with a Hydro-seeder. Apply and crimp mulch. Fence: Allison Fence Co. begins drilling fence post holes at DA 9. Heavy rains delay setting posts until 10/12/92, when holes re-dug and concrete poured. All fencing complete, gates adjusted, etc. 11/11/92. I I I I I I I I I I I I I I I I I I I DATE 3/2/92 3/4/92 4/8/92 4/14/92 4/29/92 5/28/92 6/23/92 7/2/92 SUMMARY LOG CAP CONSTRUCTION DA-10/11 ACTIVITY Pre-construction Survey. Clearing and chipping: Working in Level C; chipper down from 3/17 to 3/23. Complete chipping 3/26/92. Baseline topographic survey. Common fill: Begin placing common fill in buffer zone to the northeast of the Disposal Area. No fill activities from 4/15 to 4/23 due to rain. Resume placing common fill 4/24/92. Attempting to compact with rubber-tired frontloader. · Compaction: Begin compacting common fill with DynaPac CA-1500, vibratory, pad-foot roller 5/4/92. Complete first lift of common fill on DA-10/11. Area now covered with protective layer of clean fill, so Level C no longer necessary. Continue stockpiling common fill until Cap QA/QC Plan approved. Conduct compaction tests as part of initial effort to select Proctor curves and to determine compactive effort necessary to achieve compaction. Initial compaction test results indicate the DynaPac roller achieving satisfactory compaction, except on steep slopes. The contractor begins placing soil in lifts along the bottom of the slopes and compacting parallel to the slope. Law Engineering personnel perform QA/QC services during placement, moisture conditioning and compaction of soil. The SEC Donohue Resideryt Engineer, an experienced geotechnical engineer reviews test results and selection of Proctor1curves for each lift prior to placing of subsequent lifts. Test reports from Law Engineering are included in Appendix B to this report. Rough grade: Complete placing common fill on DA 10/11 and grade to rough grade limits. Low permeability soil ·layer: Begin placing low permeability soil layer on DA 10/11 following satisfactory grading and compaction of common fill. Law Engineering personnel continue to monitor soil moisture control and compaction. Thickness check: Drill IO auger holes at DA 10/11 to determine thickness of the low permeability soil layer. Two areas at the southeast comer of the cap too thin. Complete corrective action 7/8/92 and retest. All auger holes backfilled with a blend of auger cuttings and Quik Gel Bentonite powder to assure integrity of the low permeability layer at test locations. I I I I I I I I I I I I I I I I I I I 7/14/92 7/14/92 7/16/92 7/20/92 7/23/92 8/3/92 9/17/92 9/26/92 Surface prep: Begin surface preparation of the low permeability soil layer with a rototiller and labor crew to pick rocks. Cover the exposed surface with filter fabric and use Hydroseeder to keep filter fabric wet and reduce the incidence of desiccation cracking prior to placing HOPE. Liner-anchor trench: Begin excavating liner-anchor trench around DA 10/11 in preparation for deployment of HOPE liner. Encounter objects that appear to be shipping canisters near the northwest comer of the cap during excavation. After review by all parties, backfill trench and extend cap over that area. Encounter what appears to be a stainless steel drum in the anchor trench near the northeast comer of the cap 7/16/92. Backfill the trench and extend the cap again. HOPE Liner: Remove wet filter fabric and touch up surface of low permeability soil layer. Attala Lining Systems, Inc. deploys 60-mil HOPE panels and begins welding the seams. Law Engineering personnel provide independent QA/QC oversight and documentation, and experienced SEC Donohue personnel monitor all aspects of HOPE installation. QA/QC testing revealed one seam defective due to an erratic welder, which was then removed from service. The extent of the erratic weld was determined and the seam capped. HOPE welding and inspection complete 7 /21 /92. Drainage media: Begin deploying Tensar Geogrid synthetic drainage media over the HOPE at the west end of DA 10/11 as testing and repair of HOPE progresses toward the east end of the cap. Inspect the HOPE in the upper liner-anchor trench and line the trench with Tensar in order to backfill with select fill and seal against potential infiltration. Tensar in the trench sewed to Tensar on the surface of the cap after QA/QC inspection of HOPE complete. Place and compact the backfill in the trench with a Case 580 with a vibrating-plate tamper on the backhoe boom. Continue back-filling the liner-anchor trench around the cap as deployment and sewing of the Tensar progresses. Complete deploying Tensar 7/22/92. Encounter delays in sewing Tensar as portable sewing machines require repair. Complete sewing Tensar on DA 10/1 I on 7/27/92. Select fill: Begin placing select fill over the Tensar drainage media at the west end of the cap as sewing of the Tensar progresses. Begin installing toe drain along east end and south edge of cap as backfilling continues. Complete placing select fill on DA 10/11 on 8/3/92. Biotic barrier: Install 60-mil HOPE biotic barrier in a 60-in deep trel)ch outside the liner-anchor trench around DA I 0/ 11. Continue placing select fill. Complete biotic barrier 8/4/92. Top soil: Place top soil layer on DA 10/11 from 9/17/92 to 9/21/92. Grade and dress the cap and surrounding areas. Settlement markers: Install seven settlement monuments in the cap at DA 10/ 11. I I I I I I I I I I I I I I I I I I I 9/29/92 10/1/92 Seeding: Prepare surface of cap. Apply fertilizer and Hydroseed and mulch 9/30/92. Defer installation of erosion-control matting along the lower slope of the cap until fence posts can be set in that area. Complete erosion-control matting and mulching at DA 10/1 I on 10/10/92. Fence: Allison Fence Co. begins installing fence post holes around the cap. Heavy rains delay fencing activities until 10/8/92, when remainder of posts set. All fencing complete, gates adjusted, etc. on DA 10/11 on 11/11/92. I I I I I I I I I I I I I I I I I I I SUMMARY LOG CLOSURE ACTIVITIES AND CAP CONSTRUCTION DA-23 GENERAL This section presents a chronological summary of construction activities associated with the closure of the biolagoon in conjunction with CERCLA remediation of DA-23. These activities are combined in the summary, because each impacted the schedule of the other. DATE 1/31/92 2/11/92 2/12/92 3/16/92 4/30/92 5/12/92 5/13/92 ACTIVITY Breach neutralization lagoon liner: Breached the existing HOPE liner in the neutralization lagoon. Personnel in Level B with CIHs present from SEC Donohue and from Canonie. Used OVA and explosimeter to monitor for volatile organic compounds and flammable or explosive gases at four openings in the liner; two at top and two at bottom of lagoon. None detected. Begin liner removal: Began using a backhoe around the top of the neutralization lagoon to expose the edge of the HOPE liner. Cut liner into manageable sections, steam cleaned at decon pad, and placed in a roll-off container. Grout inlet and outlet pipes: Pumped two cubic yards of fluid groutinto the overflow weir and the inlet and outlet pipes to the biolagoon. Water sample: Collected a sample of accumulated water in the biolagoon for analysis. Test results received on 3/26/92 confirmed this water was uncontaminated rain water, as anticipated. Adjusted pH in biolagoon to 6.5 and used water to control moisture in compacted fill and for dust control on site roads in accordance with Section IV of the approved Closure Plan. Completed draining the biolagoon 4/29/92. Breach biolagoon liner: Breached the ex1stmg HOPE liner in the biolagoon. Initial VOC readings of 15 ppm at perforations; VOC levels dissipated immediately. Sand around leachate detection system was dry and dusty, indicating no leaks in HOPE liner. Liner removal complete 5/6/92. Cut liner into manageable sections, steam cleaned at the decon pad, and placed in a roll-off container. Note: no concrete pad bases for surface aerators were found. Sewer relocation: Began relocating the Building 117 sewerline away from DA- 23. Manhole inverts poured and finished 5/21/92 to complete the sewer relocation. Grout leachate detection system; Pumped fluid non-shrink grout into the leachate detection system piping. A total of 160 sacks of Portland Type I cement were required to completely fill the system. I I I I I I I I I I I I I I I I I I I 5/14/92 6/4/92 6/4/92 6/5/92 6/12/92 6/17/92 6/18/92 6/22/92 7/2/92 Baseline topographic survey of DA-23: Manholes: Began filling manholes and related piping within and around the area to be capped with high-slump concrete. Filled to top, or to one foot below projected rough grade on 6/5/92. This included the former sewer line from Building 117, which was rerouted along the road. Grading: Began excavating berm around the biolagoon down about seven feet and spreading and compacting soil from the berm in the lagoon. Concrete overflow and inlet weirs that were above rough grade were crushed and placed in the lagoons along with personal protective equipment (PPE) accumulated during clearing of vegetation from Front Valley disposal areas. Clearing: Cleared and chipped vegetation along east side and along the gully in the northeast corner of DA-23. The chipped vegetation was spread over the disposal area to be covered by the cap. Divert culvert: Excavated to the culvert under the road between DA-23 and Building 113. Unable to completely remove old culvert, which was encased in · concrete, so broke it up with a "head-ache" ball and filled with high-slump concrete. Removed other piping to preclude water access beneath the cap from that direction. Rerouted culvert to the east of the cap and reconstructed road. Common fill: Completed cutting berms down below rough grade, decontaminated construction equipment and began placing common fill. Compaction: Test results approved for the first lift of common fill at DA-23. Continued placing and compacting common fill to the specified 95 % standard Proctor density as weather and culvert re-route work permitted. Soil compaction was accomplished with a DynaPac vibratory pad-foot roller. Law Engineering geotechnical personnel performed QA/QC services during placement, moisture conditioning and compaction of soil. The SEC Donohue Resident Engineer, an experienced geotechnical engineer, reviewed test results and selection of Proctor curves prior to placing subsequent lifts. Law Engineering test reports are presented in Appendix B to this report. Evaluation of liner-anchor trench location: Prior to beginning cap construction, the area around the northwest margin of the disposal area between the road and the designated cap boundary was excavated to confirm that waste did not extend into that area. Soil from the excavation was placed on the area to be capped, and the excavation backfilled with clean soil. Contours: As construction progressed and new survey data became available, it became apparent that it. was not feasible to route all surface drainage from the cap toward the east as intended. That would require excessive elevation of the southwest corner of the cap, and result in interference with the road to the west I I I I I I I I I I I I I I I I I , I I 7/8/92 7/18/92 7/21/92 7/27/92 8/1/92 8/14/92 and the building to the south of the cap. A shallow drainage swale was constructed along the south-central portion of the cap, draining to the south. Low permeability soil layer: Began placing the low permeability soil layer on DA-23 following satisfactory grading and compaction of common fill. Law Engineering continued to monitor soil moisture and compaction. Completed the low permeability soil layer 7/16/92. Dressed the surface of the layer with a roto- tiller and rolled it with a smooth-drum vibratory roller. Temporarily covered the surface with non-woven filter fabric and used the Hydro-seeder to keep filter fabric wet and reduce the incidence of desiccation cracking prior to placing HDPE. Liner-anchor trench: Excavated liner-anchor trench around DA-23 in preparation for deployment of HDPE liner. No visible contamination or VOCs noted during excavation. HDPE Liner: Removed wet filter fabric and touched up surface of low permeability soil layer. Attala Lining Systems, Inc. deployed 60-mil textured HDPE panels and began welding the seams. Law Engineering personnel provided independent QA/QC oversight and documentation, and SEC Donohue geotextile technicians monitored all aspects of HDPE installation. HDPE welding and inspection complete 7 /27 /92. Drainage media: Began deploying Tensar Geogrid synthetic drainage media over the HDPE at the upper end of DA-23. Backfilled the upper liner-anchor trench after sewing Tensar in that area. Placed and compacted the backfill in the trench to the specified 95 % standard Proctor density with a Case 580 with a vibrating-plate tamper on the backhoe boom. Continued back-filling liner-anchor trench around the cap as sewing of Tensar progressed. Select fill: Began placing select fill over the Tensar drainage media at the north end of DA-23. Began installing toe drain along east edge of cap. As select fill progressed, a "wrinkle" developed in the HDPE liner ahead of the fill where the drainage swale crosses the liner-anchor trench at the south end of the cap. Select fill and toe drain installation deferred in that area until Attala can return to the site and complete a repair in accordance with approved QA/QC requirements. Select fill and top soil placed and graded over the remainder of D A-23, and stockpiled near the area to be repaired. Biolagoon liner: Test results on the sections of HDPE liner removed from the neutralization lagoon and the biolagoon reviewed and accepted by SCDHEC and by GSX prior to disposal. Crews from Laidlaw Environmental Services transported two roll-off containers off site for delivery to GSX Landfill in Pinewood, South Carolina. I I I I I I I I I I I I I I I I I I I 9/10/92 9/12/92 9/26/92 9/28/92 10/13/92 10/17/92 Wrinkle repair: Attala returned to the site 9/10/92, after several weather delays; began repair of wrinkle at south liner-anchor trench at DA-23. Repair completed 9/11/92; backfilled the liner-anchor trench and completed toe drain installation. Biotic barrier: Installed 60-mil HDPE biotic barrier in a 60-in deep trench outside the liner-anchor trench around DA-23. Continued placing select fill and top soil and grading and shaping the cap. Settlement markers: Installed six settlement monuments in the cap at DA-23. Seeding: Placed rip rap in the drainage swale along the east edge of the cap, fertilized and Hydroseeded the cap, and installed erosion-control matting along the slopes of the cap. Completed erosion-control matting and mulching on DA-23 on 9/29/92. Fence: Allison Fence Co. began installing fence post holes around the cap as staked by the surveyor. They followed a straight line between two stakes at the north end of the cap, rather than following the curve of the road, and penetrated the HDPE liner with the tip of the power auger in three post holes. Relocated the three fence post holes and continued installing fence; all fencing complete, gates adjusted, etc. on 11/11/92. Liner repair: Attala returned to the site 10/16/92. Evaluated damage to liner at DA-23 from power auger. Cut out damaged portions of liner 10/17/92 and patched liner and drainage media in accordance with approved QA/QC procedures. . Personnel from Law Engineering provided QA/QC inspection oversight and repairs were observed by personnel from Nimmo & Co., SEC Donohue and Canonie Environmental. Replaced select fill and top soil, and reseeded and mulched the damaged area 11/20/92. Further inspection of the cap revealed that erosion had occurred on the south slope of the cap before protective vegetation could become established. Repairs were completed and accepted 12/16/92. Note: The prime remediation contractor, Canonie Environmental Services, Inc. has agreed to further evaluation of erosion-prone areas along the south slope of the cap in the spring of 1993, after vegetation is established. Additional repairs or erosion control measures may be necessary at that time. However, unless severe winter weather prevents vegetation from becoming established in the repaired areas, it is anticipated that any further corrective measures would be primarily cosmetic in nature. The cap is currently functioning as designed and, once protective vegetation is well established, routine operation and maintenance (O&M) activities should prove sufficient to maintain the cap. 0 & M requirements are specified in the O & M Plan which has been submitted to the EPA for approval. Ground-water monitoring of the biolagoon area will be conducted under the CERCLA program, per agreement between EPA and NCDEHNR (Letter: Meyer to Guinyard, December 14, 1990 in Appendix B to this report. I I I I I I I I I I I I I I I I I I I DATE 1/28/92 1/28/92 2/27/92 3/31/92 4/2/92 4/6/92 4/27/92 7/17/92 ACTIVITY SUMMARY LOG CAP CONSTRUCTION ACID PITS AREA Pre-construction Survey. Clearing and chipping; Working in Level C. Experiment with food coloring and dye in herbicide to mark stumps. Food coloring does not work, as it is absorbed by wood. Establish Back Valley decon pad at NE corner of Acid Pits area 2/12/92. Clearing delayed until a satisfactory dye procured. Baseline topographic survey. Common fill: Begin placing common fill on the Acid Pits area. Leave decon pad area and area for drill cuttings open until Back Valley drilling activities complete. Completely cover the Acid Pits cap area with common fill 7/21/92 upon completion of drilling activities in the Back Valley. Compaction: Conduct tests as part of inllial effort to determine compactive effort and moisture control necessary to achieve specified compaction. Law Engineering geotechnical personnel perform QA/QC services during placement, moisture conditioning and compaction of soil. The SEC Donohue Resident Engineer, an experienced geotechnical engineer, reviews test results and selection of Proctor curves. Tests were performed with the sand cone and with the nuclear density gage. Initial test results indicate that, as anticipated, the nuclear density gage method is not suitable at this site due to high mica content of the soils. Test results also indicated that equipment presently on site can not achieve satisfactory compaction. Gas vents: Install lower gas vent (southern) in the common fill at the Acid Pits area. The second gas vent was installed 6/23/92. Retests: Reevaluate Proctor curve selection. One passing test in the common fill on the Acid Pits Area. DynaPac CA-151 vibratory padfoot roller, on site 4/29/92, begins achieving consistently satisfactory compaction. Law Engineering personnel continue to monitor soil moisture conditioning and compaction. The SEC Donohue Resident Engineer reviews test results and Proctor curve selection for each lift prior to placing of subsequent lifts. Low permeability soil layer; Begin placing low permeability soil layer on the southeast portion of the Acid Pits Area while placing and compacting common fill on the area previously reserved for drill cuttings and the decontamination pad. The Acid Pits Area is sufficiently large at about 5 acres for the two fill operations I I I I I I I I I I I I I I I I I I I 9/9/92 9/9/92 9/10/92 9/17/92 9/21/92 to proceed simultaneously. Law Engineering personnel continue to monitor soil moisture control and compaction. Common fill essentially completed to rough grade limits, and the last area surveyed 8/11/92. Inclement weather allowed earth moving operations to proceed during only three days from 8/13/92 until 8/31/92. A small sinkhole, about 2 feet across and 4 feet deep, was noted in the drainage swale outside the boundary of the cap near the west corner 8/25/92. The hole appeared to contain waste, so it was backfilled with high-slump concrete and the cap extended over that area 8/26/92. Surface prep: Begin surface preparation of the low permeability soil layer with a rototiller and labor crew to pick rocks. Continue to place low permeability soil along the northeast side and haul road areas of the cap while preparing west side of the Acid Pits cap area for deployment of HOPE. Wet weather impacts schedule, but no desiccation cracking occurs. Liner-anchor trench: Begin excavating liner-anchor trench along the northwest and southwest sides of the Acid Pits Area in preparation for deployment of HOPE liner. Continue the liner-anchor trench in increments as deployment of HOPE proceeds. HOPE Liner: Attala Lining Systems, Inc. begins deploying and welding textured 60-mil HOPE panels at the west corner of the Acid Pits cap. Law Engineering personnel provide independent QA/QC oversight and documentation, and experienced materials testing personnel from SEC Donohue monitor all aspects of HOPE installation. HOPE welding and inspection complete 9/24/92. The QA/QC procedures were tested and proved to be adequate when a technician welded about 150 feet of seam without first qualifying on the welder. A review of production records and subsequent field tests of his seam revealed unsatisfactory welds. Test results from the laboratory confirmed this, and the seam was capped. Drainage media: Begin deploying Tensar Geogrid synthetic drainage media over the HDPE at the upper end of the cap as testing and repair of HOPE progresses. Place and compact the backfill in the liner-anchor trench as sewing and inspection of Tensar permits. Compaction accomplished with a Case 580 with a vibrating- plate tamper on the backhoe boom. Complete deploying and sewing Tensar on the Acid Pits cap 9/24/92. Select fill: Begin placing select fill over the Tensar drainage media at the upper end of the cap as sewing of the Tensar progresses. Adjustment of surface contours to assure minimum 4 % slope for drainage off the cap results in the need for more toe drains. Work Directive Change 9/ 19-1 issued to add about 100 ft of 4-in toe drain on the NE side of the cap from A-6 to A-5, and about 360 ft of 4-in toe drain on the SW side of the cap from D-6 to D-2 on Drawing No. C-07. Begin installing toe drains along east and west sides of cap as backfilling continues. Complete placing select fill on the Acid Pits cap on 10/13/92. I I I I I I I I I I • I g D D I I I 10/13/92 10/13/92 10/19/92 10/19/92 10/19/92 Biotic barrier; Install 60-mil HOPE biotic barrier in a 60-in deep trench outside the liner-anchor trench around the Acid Pits cap. Continue placing select fill. Complete biotic barrier 10/17/92. Top soil; Place top soil layer on the Acid Pits cap from 10/13/92 to 10/16/92. Complete toe drains and grade and dress the cap and surrounding areas. Settlement markers; Install eighteen settlement monuments in the cap at the Acid Pits Area. Seeding; Prepare surface of cap. Apply fertilizer and Hydroseed and mulch. Defer erosion-control matting along the lower slope of the cap until fence posts can be set in that area. Complete erosion-control matting and mulching on the Acid Pits cap 10/20/92. Fence; Allison Fence Co. begins installing fence post holes around the cap. All fencing complete, gates adjusted, etc. on 11/11/92. Note: Inspection of the Acid Pits cap by the Resident Engineer and the PRP Coordinator 11/18/92 revealed relatively severe erosion outside the fence along the south slope of the cap. The erosion was caused by severe weather that occurred before protective vegetation could become established and was masked from casual inspection by the erosion control matting. Temporary repairs were completed 12/1/92 and the prime remediation contractor, Canonie Environmental Services, Inc. has agreed to further evaluation and permanent repair of erosion- prone areas along the south slope of the cap in the spring of 1993, after vegetation is established . The cap is currently wet and soft and construction equipment needed to complete permanent repairs during the winter might damage the liner. However, unless severe winter weather prevents vegetation from becoming established in the repaired areas, it is anticipated that any further problems or corrective measures would be primarily cosmetic in nature. The cap is currently functioning as designed and, once vegetation is properly established, routine operation and maintenance (O&M) activities should prove sufficient to maintain the cap. I • I I I I I I I APPENDIXD · GEOLOGICAL LOGS I I a I u 0 u I I I I I , I I I I I I I APPENDIXE WELL INSTALLATION DETAILS I I I I I I I I I I I I I I I I I 0 D I I I I I D u I SIRRINE ENVIRONMENTAL CONSULTANTS SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: --~C:.:H-,,E:,M,,_T,_,R.,_,O:.,N.,,l::C::S_,,S,.,_IT,.,E'-'R"'E"'M"'-E"'D"'l""Ae:LceA,.,C,_,Tl.,_,O:.:N.,_ _____ _ JOB NO _____ .,,G,::•1,_,6,,0"'0"'.2"'2~- INSTALLA TION NO_~P_-~1 S=------ LOCATION: __ ~S~W'-'-A=N=N=A,,_N,.,O'-"A."'-"N,.,O'-'-RT=H'--'C""A-"R-'-'O"'L"'IN,.,_A'-'--------- CLIENT: ---~N=l=M=M~O~A~N=D~C~O=M=P~A=N~Y~----------- CONTRACTOR: _..,,E..,N,.,V.,,IR.,_,O:.:N.,,M,eE,,,NT"-'-'A"'L'-'M"'-"O'-'N.,_,IT..,,O:.,.R,,_,INc,;G,,_,,A..,N,,D'--'T'-"E,.,S,.,_T,,_IN,.,Ge..::C::O.,_,R,:_P~. _ BORING NO. ____ ,_p_-1,.,S,_ ___ _ TYPE OF INSTALLATION: SHALLOW [xi DEEP □ ~~~'.~RA TING □ LOCATION: DRILLER: ---=B~. C=A=B=IT~ ___ CERTIACATION NO: 1121 FRONTVAUEY[Xj BACKVAUEY □ FIELD REPRESENTATIVE: JOEY GILLESPIE INSTALLATION DATE 1-23-92 SURVEY DATUM: GROUND ------- SURFACE ELEV ATION:.__,22.,,_..75,.,,,c341...._ ~---TOP OF PROTECTIVE CASING (CAP OR LID OPEN) EL. 2278,44 STICKUP 3,] ft, 2~NCH PVC VENTED CAP--------... STEEL PROTECTIVE CASINO WJTH LOCKING CAP ..,_ ______ &-INCH I.D. TOP OF WELL CASING ---------~i~-=-~-TOTAL LENGTH ___ 5"-"ft"-. ---- 22n 64 2 3 ft .... I------DRILLED WEEP HOLE IN PROTECTIVE CASING EL. • STICKUP • • GROUND SURFACE 1-J __ _...i:;----4 FT. X 4 FT: X 4 IN. CONCRETE PAD RtsER CASINO 2~NCH I.D. PVC MIN. 3FTI MIN. 5FT1 E:::3~f-----BOTTOM OF PROTECTIVE CASINO EL. 2273.44 DEPTH 1.9 ft. ~►-----GROUT: CEMENT/2% BENTONITE t;:::,::i-,,11-----APPROXIMATE DIAMETER OF BOREHOLE 10 In. ~----TOP OF BENTONrTE SEAL EL. 2272.34 DEPTH 3 ft. ... I-----BENTONITE PELLET SEAL 1.,,,'i-"" ... ----TOP OF FILTER PACK EL. 2269.49 DEPTH 5.8 ft. bfi!it------TOP OF WELL SCREEN EL. 2267.59 DEPTH 7.75 ft. TYPE OF WELL SCREEN SCREEN GAUGE OR SLOT SIZE INSIDE DIAMETER SCH.40 PVC 0.010 In. 2.0 In. flMEl@t---11---FILTER PACK: WASHED SILICA SAND MANUFACTURER Brainard-Kilman FILTER PACK GRAIN SIZE ------- MANUFACTURER"S DESIGNATION FX 50 BOTTOM CAP -------------ii;J;;iffjt------BOTTOM OF WELL SCREEN 2-INCH I.D. PVC EL. 2247 .53 DEPTH 27,81 ft, BOTTOM OF EXPLORATION ------➔-'""'""'- EL. 2246.84 DEPTH 28.5 ft. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 10.85 ft. + 20.06 ft. LENGTH OF RISER CASINO LENGTH OF SCREEN + '-----BOTTOM OF WELL EL. 2246.95 DEPTH 28.39 ft. 0.58 ft. 31.49 ft. = LENGTH OF BOTTOM CAP TOTAL LENGTH I I I I I I I I I I I I I I I I I SIRRINE ENVIRONMENTAL CONSULTANTS SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: ___ C~H"'E,,,M:.T.,_,R"'O,,,N:.:,l:.::C:.::Sc.,S<:.IT.,_,E,,_,_,R.,_EM=E""D"'IA,.L,..,A::.:C"-'T'-'-I0=.,N _____ _ ~BNO ____ _,G~-~16~0~0w.2~2,__ INSTALLATION NO _ _,_P_-1.,_,D,,__ ___ _ LOCATION: __ --=S-"W'-'-A=-N=-N=-A=.N:..:O:..:cA.::....:;N:..:0,_,_RT=H:...:Ce.:A::.:R.,_,0,,_,L=IN,_,_A:::_ _______ _ eoR1No No. ___ _,P..:·.1.l D.._ ___ _ CLIENT: ---~N~l~M~M~O'--A,_,_N,_,_D=-..=Cc:O'-"M"-'P-'-A"-N'-'Y'-------------TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW □ DEEP Ix) :~~i~RATING □ LOCATION: DRILLER: ___ :B~-C"-'A""B"-'IT~ ___ CERTIACATION NO: 1121 FRONTVALLEY[X) BACKVALLEY □ INSTALLATION DATE 1-24-92 to 1-27-92 FIELD REPRESENTATIVE: JOEY GILLESPIE SURVEY DATUM: ______ _ GROUND SURFACE ELEVATION: 2275.1 2~NCH PVC VENTED CAP -----~-. RISER CASINO 2-INCH 1.0. PVC ~---TOP OF PROTECTIVE CASING (CAP OR LID OPEN} EL. 2278.0 STICKUP 2.9 ft. STEEL PROTECTIVE CASING WITH LOCKING CAP 1::314-----BOTTOII OF PROlECTIVE CASINO EL. 2273.0 DEPTH 2.1 ft. ~•-----GROUT: CEMENT/2% BENTONITE ~j....,t-----APPROXIMATE DIAMETER OFBOREHOLE ____ 1.,_,0'--l"-'n"-.-- ../----TOP OF BENTONITE SEAL EL. 2239.1 DEPTH 36.0 ft. l-llf-----BENTONITE PELLET SEAL b.j-.,t-----TOP OF FIL TEA PACK EL. 2233.2 DEPTH 41.9 ft. MIN.3~ MIN. 5FT1 ib~l------TOP OF WELL SCREEN TYPE OF WELL SCREEN SCREEN GAUGE OR SLOT SIZE INSIDE DIAMETER SCH.40 PVC 0.010 In. 2.0 In. MANUFACTURER Bralnerd•Kllman EL. 2228. 2 DEPTH 46. 9 ft. ----FILTER PACK: WASHED SILICA SAND FILTER PACK GRAIN SIZE ------- MANUFACTURER'S DESIGNATION FX 50 BOTTOM CAP -----------1~1zl8!if------BOTTOM OF WELL SCREEN 2~NCH 1.0. PVC EL. 2218.19 DEPTH 56.91 ft. BOTTOM OF EXPLORATION ---------""'"'""°' EL 2216 6 DEPTH 58.5 ft. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 49.4 ft. 10.01 ft. + LENGTH OF RISER CASING LENGTH OF SCREEN + '-----BOTTOM OF WELL EL. 2217.1 DEPTH _..:5:.:8:..:ftc.::·c..._ 0.58 ft. 59.99 ft. = LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I I I I I I I I I I I I I SIRRINE ENVIRONMENTAL CONSULTANTS BEDROCK PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: __ __,C,,_,H_,,E.,M,,_T,_,R_,,O:c,N:,,l"'C:,,S_,,S,,_IT,_,E,_R,,_EeeM=ED"'le::Ae,,Lc,:A:,oC'-'Tc,:IO"'N"--------JOB NO _____ -"G'--1'-'60=0.=22=--- LOCA TION: ___ S,,_W=A,,.,N,,.,Ne::A,,.,N.,,Oc,:A,._, .,_,N,,,O,cRTu..uHc,C«A,,_R.,_,O,_,Ll,,,N"'A"---------INSTALLATION NO __ -'--P--'·1c.:B:......_ __ CLIENT: NIMMO AND COMPANY CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: __ J::.,Ac:;C::.,Kc:...=O.=Ll'-'V'-=E"-R'-___ CERTIFICATION NO: 1121 FIELD REPRESENTATIVE: JOEY GILLESPIE TUM: SURVEY DA GROUND SURFACEE LEVATION: 2275.49 TO P OF WELL CASINO EL. 22TT.99 STICKUP '\.\\// GROUND SURFACE ----~~ ~ ISERCASINO R • CA INCHI.D . RBONSTEEL RBONSTEEL CA s TRAP CENTRALIZER EL. 2247.49 DEPTH CA s RBONSTEEL TRAP CENTRALIZER EL. 2215.99 DEPTH X X •. ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 73.5 ft. 2-511. I 28 ft. 60 ft. MIN. 5FT1 MIN. 20 FT. -- + --- • I . .V / X 53 ft. BORING NO. ____ ~P--1~8~-- LOCATION: FRONT VALLEY@ BACK VALLEY □ INSTALLATION DATE 1-27-92 to 2-3-92 TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL. 22ZS~ll STICKUP 3H STEEL PROTECTIVE CASINO WITH L OCKINOCAP 8-INCH I.D. TOTAL LENGTH 5 ft. 4-INCH CARBON STEEL VENTED CAP DRILLED WEEP HOLE IN PROTECTIVE C ASINO 6 FT. X 8 FT. X 4 IN. CONCRETE PAD ~~ - ~ BOTTOM OF PROTECTIVE CASINO EL. 2273.49 DEPTH 2 ft. OROVT: CEMENT/2% BENTONITE APPROXIMATE DIAMETER OF BOREHOLE 10 In. TOP OF BEDROCK SURFACE EL. 2212.49 DEPTH 63 ft. BOTTOM OF ROCK SOCKET EL. 2204.49 DEPTH 71 ft. OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER X BOTTOM OF EXPLORATION EL. 2151.49 DEPTH 124 ft. 126.5 ft. = LENGTH OF RISER CASINO LENGTH OF OPEN BEDROCK HOLE TOTAL LENGTH I I I I I I I I I I I I I I I I I I I SIRRINE ENVIRONMENTAL CONSULTANTS SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: -------'C"'H'-"E=MT=R-"O"-'Nc::lc:C_,,S..,Se..lT:..:E'-'R"'E:::M:::.E:::D:::le:A,,,Lc,:A:,:,CT=IO:::N"------- LOCATION: __ ~SW=A=-N=-N"-A"-N'-"O'-'-A,"-'-'N-"O-"RT"-'-'H-"C'-'-A"-R'-'O:..:L,,,IN"'A"--------- ~B~-----~G~-1~680~0~.2~2~- INSTAUA TION NO _ _,_P_,-2.,S'---- BORING NO. ___ _,_P_,-2.,S'---- CLIENT: NIMMO AND COMPANY TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW I!) DEEP □ ~~~'e~RA TING □ LOCATION: DRILLER: ___ .,,B~. C~A"'B~IT~ ___ CERTIFICATION NO: 1121 FRONT VAUEY □ BACK VAUEY 00 FIELD REPRESENTATIVE: JOEY GILLESPIE INSTALLATION DATE 3-2-92 SURVEY DATUM: -------GROUND SURFACE ELEVATION: 236817 ,r---TOP OF PROTECTIVE CASING (CAP OR LID OPEN) EL. 2371.17 STICKUP 3,0 fl 2~NCH PVC VEIITED CAP ------...._ STEEL PROTECTIVE CASING WITH LOCKING CAP ..... t-----8-INCH I.D. TOP OF WELL CASING --:-::-:~---:,t~ -T --r..-TOTAL LENGTH __ _:c5.,,,0_,_ft:.. --- EL. 2371.42 STICKUP 3.25 fl •"""1-----DRILLED WEEP HOLE IN PROTECTIVE CASING GROUND SURFACE 1-J __ .... :;---4 FT. X 4 FT. X 4 IN. CONCRETE PAO RISER CASING 2-INCH I.D. PVC MIN. 3FTI MIN. 5FT1 TYPE OF WELL SCREEN SCH. 40 PVC SCREENGAUGEORSLOTSIZE 0.010 in. INSIDE DIAMETER 2.0 In. MANUFACTURER Brainard-Kilman BOTTOM CAP 2~NCH I.D. PVC BOTTOM OF EXPLORATION ------•-li EL 23)2 67 DEPTH 55.5 ft. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 40.68 ft. + 20.04 fl LENGTH OF RISER CASINO LENGTH OF SCREEN ~14-----BOTTOM OF PROTECTIVE CASING EL 2366 1Z DEPTH 2.0 ft. ~•-----GROUT: CEMENT/2% BENTONITE ~i--,,1-----APPROXIMATE DIAMETER OF BOREHOLE 10 In. _,,..----TOP OF BENTONITE SEAL EL. 2342.4 7 DEPTH 25. 7 fl. ~I-----BENTONITE PELLET SEAL ~ .... I-----TOP OF FIL TEA PACK EL 2339,07 DEPTH 29.1 ft. i'Jiiit------BOTTOM OF WELL SCREEN EL. 2313.25 DEPTH 54.92 ft. '-----BOTTOM OF WELL EL. 2312.67 DEPTH 55.5 ft. + 0.58 ft. = 61.3 ft. LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I I I I I I I I I I I I SIRRINE ENVIRONMENTAL CONSULTANTS SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: --~C~H~E=MT=R~O=N~l~C~S-=S~IT=E'-R=E:M=ED=l~A~L=A~CTl=O=N"-------~BNO _____ ~G'-·1~6~0~0~.2~2~- INSTALLA TION NO _ _,_P....,-2.,D,_ __ _ LOCATION: __ ~S~W~A=N=N=A=N=O=A=N=O=RT=H~C=A=R~O=L=l=N=A _______ _ BORING NO. ___ _,_P.:,•2.,D.._ __ _ CLIENT: ___ _,Nc,,l:M::.:M,_,O,_A"'N=D-=Cc::O,,,M::.:P_,A,,N.:.cY'-------------TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW □ DEEP 00 ~~~'.~RATING □ LOCATION: DRILLER: ___ ,cBcc. C,,,,A"'B""IT"-___ CERTIFICATION NO: 1121 FRONTVAUEY □ BACKVALLEY[X] FIELD REPRESENTATIVE: JOEY GILLESPIE INSTALLATION DATE 3-12-92 SURVEY DATUM: ______ _ GROUND SURFACE ELEVATION: 2367.02 ~---TOP OF PROTECTIVE CASING (CAP OR LID OPEN) EL. 2370 02 STICKUP 3 0 ft 2~NCH PVC VENTED CAP ------~ STEEL PROTECTIVE CASINO WITH LOCKING CAP i-,.,.-----II-INCH I.D. ~---TOTAL LENGTH ----"5.,,,0_,_ft:,.. __ _ TOPOFWELLCASNG---------,11..,.....,I EL. 2370.62 STICKUP ..... 1-----DRILLED WEEP HOLE IN PROTECTIVE CASNG GROUND SURFACE 4 FT. X 4 FT. X 4 IN. CONCRETE PAD RISER CASINO 2~NCH I.D. PVC TYPE OF WELL SCREEN SCREEN GAUGE OR SLOT SIZE . MIN. 3FTI MIN. 5FT1 SCH.40PVC 0.010 In. 2.0 In. INSIDE DIAMETER MANUFACTURER Brainard-Kilman i:314-----BOTTOM OF PROTECTIVE CASNG EL. 2365 02 DEPTH 2.0 ft. l<:.-------GROUT: CEMENT/2% BENTONITE ~r"'---'----APPROXIMATE DIAMETER OF BOREHOLE 10 In. ./----TOP OF BENTONITE SEAL El. 2310,52 DEPTH 56.5 ft . .... I------BENTONITE PELLET SEAL ◄-----TOP OF FILTER PACK EL. 2307.42 DEPTH 59.6 ft. b&;i!f------TOP OF WELL SCREEN EL. 2303.12 DEPTH 63.9 ft. E:!ffilli....t---FIL TEA PACK: WASHED SILICA SAND FIL TEA PACK GRAIN SZE MANUFACTURER Foster Dlxlana BOTTOM CAP -----------JMigilf!t------BOTTOM OF WELL SCREEN 2~NCH I.D. PVC EL. 2298.1 DEPTH 68.92 ft. BOTTOM OF EXPLORATION --------== EL. 2297.52 DEPTH 69.5 fl • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 67.5 ft. + 5.021l LENGTH OF RISER CASINO LENGTH OF SCREEN + '------BOTTOM OF WELL EL. 2297,52 DEPTH 69.5 ft. 0.58fl 73.1 ft. = LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I I I I I I I I I I I I I BEDROCK PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: __ __,C,.,H.,,E""M"'T,_,R.,_,O,.,N.,,l:C:S..=S"'IT'-"E'-'R'-"E:::M:E:::D:::I:::Ae:L..<A,::CTl=O:::Nc,__ _____ _ JOB NO G-1600.22 -----~=='--- LOCATION: __ ~S=W~A=N=N=A=N=O'-'A=N=O~RT=H~C,.,A~R-'-'O'-'U=N~A~-------- INSTAUATION NO ___ P_-_28 ___ _ CLIENT: NIMMO AND COMPANY BORING NO. _____ Pc..·..=2c::B __ _ LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: -~J~A=C=K~O=U~V=E=R~ ___ CERTIACATIONNO: #1121 NC FRONT VALLEY □ BACK VALLEYIK) INSTAUA 110N DA TE _.=2,_,·2ec1c.c·9,.,2'---- FIELD REPRESENTATIVE: JOEY GILLESPIE N10220.495615 SURVEY DATUM: E11587.516790 GROUND SURFACE ELEVATION: 2368.08 RISER CASINO 41NCHI.D. CARBON STEEL CARBON STEEL STRAP CENTRALIZER EL. 2329.73 DEPTH 40.14 ft. CARBON STEEL STRAP CENTRALIZER EL. 2285.58 DEPTH 82.5 ft. X X • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 83 ft. MIN. 5FT1 MIN. 20 FT. + ;r---TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL 2371.08 STICKUP 3 0 ft, STEEL PROTECTIVE CASINO WITH LOCKING CAP ..... t------II-INCH LD. TOTAL LENGTH _ __,5,..0,,_,_,ft~. __ ~~----BOTTOM OF PROTECTIVE CASING EL. 2366.08 DEPTH 2.0 ft. B8i.-----GROUT: CEMENT/2% BENTONITE ~f,,,111----APPROXIMATE DIAMETER OF BOREHOLE 10 In. ~---TOP OF BEOROCK SURFACE EL. 2291.08 DEPTH 77.0 ft. !""I◄(----BOTTOM OF ROCK SOCKET EL. 2286.08 DEPTH 83.0 ft. !-111-----OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER X L..1◄1-----BOTTOM OF EXPLORATION EL. 2261.08 DEPTH __ 10_7_.0_ft_. X 24 ft. 107 ft. = LENGTH OF RISER CASINO LENGTH OF OPEN BEDROCK HOLE TOTAL LENGTH I I I I I I I I I I I I I I I I I I I SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: __ ___:C,c,HceE..,M,,_T'--'R-"O"'N_,,l_,,C_,,S_,,S,,_IT,_,E~RceE,,,M.,_E,,,D,,,le,A,,,L"'A"'CTl'-'-"O"'N"--------~BNO ____ ___:G~-~1~60~0~.2~2;__ INSTAUA TION NO _ __,__P--=·3:..._ ___ _ LOCATION: SWANNANOA NORTH CAROLINA BORING NO. ___ _,_P...,-3._ ___ _ CLIENT: NIMMO AND COMPANY TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW □ DEEP □ ~~~~~RATING Ix] LOCATION: DRILLER: ----"'B-'---. -"C'--'A=-B'--'IT ____ CERTIRCATION NO: #1121 NC FRONTVALLEY □ BACKVALLEY(X] FIELD REPRESENTATIVE: JOEY GILLESPIE N10133.307595 SURVEY DATUM: E11593.866053 GROUND SURFACE ELEVATION: 2359.97 2~NCH PVC VENTED CAP-----~._ RISER CASINO 2~NCH I.D. PVC IIIN. 3FTI IIIN. 5FT1 TYPE OF WELL SCREEN SCH. 40 PVC SCREEN GAUGE OR SLOT SIZE ---=0c.;;.0,_,1,:0...,l~n-~_ INSIDE DIAIIETER 2.0 In. MANUFACTURER BRAINAR~ILMAN BOTTOIICAP -----------i 2~NCH I.D. PVC BOTTOM OF EXPLORATION------- EL 2276 97 DEPTH 83.5 ft. ' ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 34.12 ft. + 50.2 ft. LENGTH OF RISER CASING LENOTI-1 OF SCREEN INSTAUATION DATE 3-4-92 .r---TOP OF PROTECTIVE CASING (CAP OR LID OPEN) EL. 2362.97 STICKUP 3.0 ft. STEEL PROTECTIVE CASING WITH LOCKING CAP t::314-----BOTTOII OF PROTECTIVE CASING EL. 2357 97 DEPTH 2.0 ft. *-----GROUT: CEIIENT/2% BENTONITE -::t--•----APPROXIIIATE DIAIIETER OF BOREHOLE _____ 1,._,0,_,l,_,n~. _ .,,----TOP OF BENTONITE SEAL EL. 2336,27 DEPTH _ __,2r.;3w7Lful- .... ~----BENTONITE PELLET SEAL ◄-----TOP OF FILTER PACK EL. 2333.47 DEPTH 26.5 ft. -----TOP OF WELL SCREEN EL. 2328 35 DEPTH 31 62 ft ----FILTER PACK: WASHED SILICA SAND FILTER PACK GRAIN SIZE ~EuX~s~o~--- IIANUFACT\JRER Foster Plxleoa -----BOTTOII OF WELL SCREEN EL. 2278.J 5 DEPTH 81 82 ft '-----BOTTOII OF WELL EL. 2277,57 DEPTH 82.4 ft. + 0.58 ft. = 84.9 ft. LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I I I I I I I I I I I I I SAPROLITE PIEZOMETER . , WELL CONSTRUCTION DETAIL PROJECT: ___ C"'H~E=M~T,._,R~O=N'-"lc:Cc:S_,S,.,_IT,._,E._R,_,E=M=ED:;l::cA=Lc.::A,.,CTl=O=N"-------~e~-------'G~-~1~so~o~.2~2.__ INSTALLATION NO_~P-'-4c:S'----- LOCATION: SWANNANOA. NORTH CAROLINA BORING NO. ___ ~P..c-4e,Se..... __ _ CLIENT: NIMMO AND COMPANY TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW (XI DEEP O ~~~~~RATING 0 LOCATION: DRILLER: ____ B_. _C_A_B_IT ____ CERTIACATION NO: #1121 NC FRONTVAUEY □ BACKVALLEY(xl FIELD REPRESENTATIVE: N9971.814210 SURVEY DATUM: E11610,601530 GROUND SURFACE ELEVATION: 2341.03 JOEY GIUESPIE 2-INCH PVC VENTED CAP ------......_ RISER CASING 2-INCH 1.D, PVC MIN, 3FTI MIN. SFTl TYPE OF WELL SCREEN SCH. 40 PVC SCREENQAUQEORSLOTSIZE 0,010 in. INSIDE DIAMETER 2.0 In. MANUFACTURER Brainard·Kilman BOTTOM CAP ------------l 2-INCH I.D. PVC SOTTOII OF EXPLORATION ------~ El 2317 03 DEPTH 24 ft • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 10.04 ft. + 15.06 ft. LENGTH OF RlSER CASINO LENGTH OF SCREEN INSTALLATION DATE 3-13·92 ~---TOP OF PROTECTIVE CASING (CAP OR LID OPEN) EL. 2344.03 STICKUP 3.0 ft. ~------BOTTOM OF PROTECTIVE CASINO EL. 2339.03 DEPTH 2.0 ft. -----APPROXIMATE DIAMETER OF BOREHOLE 10 In. ..,----TOP OF BENTONITE SEAL EL 2337,83 DEPTH 3.2 ft. .... 1-----BENTONITE PELLET SEAL ◄-----TOP OF FILTER PACK EL 2334 53 DEPTH 6 5 ft, 1------TOP OF WELL SCREEN EL. 2332.89 DEPTH 8 14 ft FILTER PACK: WASHED SILICA SANQ. FILTER PACK GRAIN S12E FX 50 MANUFACTURER Foster Dlxlane BOTTOM OF WELL SCREEN EL 2317 83 DEPTH 23,2 f), '-----BOlTOII OF WELL EL. 2317.25 DEPTH 23 78 ft + 0.58 ft. = 25.68 ft. LENGTH OF BOTTOM CAP TOTAL LENOTH I I I I I I I I I I I I I I I I I I I SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: __ _,,C"-'H,.,E,,,Mc,_T,:,RO~Nl,.,C,,aSc;;S!!.IT~Ee..!R[!!E.!M!!.!E~D!!,1A~L!,_A!!:CTI!!.!.!!,!O!!N _____ _ ~B~ ____ __,G~-~,6~080~.2~2,__ INSTALLATION NO_....:...P-4....:..:D:..._ __ _ LOCATION: SWANNANOA NORTH CAROLINA BORING NO. ___ ....:...P-4.=D:..._ __ _ CLIENT: NIMMO AND COMPANY TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW □ DEEPOO ~~~i1RATINO □ LOCAllON: DRILLER: ___ .=B.:.... C:=cAc:B=IT:..:_ ___ CERTIACATION NO: #1121 NC FRONT VALLEY □ BACK VALLEY IX] AELD REPRESENTATIVE: N9982. 732764 SURVEY DATUM: Ell&Q4 &00358 GROUND SURFACE ELEVATION: 2341,B JOEY GILLESPIE 2~NCH PVC VENTED CAP------- INSTALLAllON DATE 3-9-92 ----TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL 2344.8 STICKUP 3.D ft. STEEL PROTECTIVE CASINO WITH LOCKING CAP i.-.,._ ____ ~ LO. TOP OF WELL CASINO ---:-:------~-~~• -T -........ -TOTAL LENGTH __ ,a.5.:-=0-'ft."'---- EL.2344.609 STICKUP'--'=.:.::..-l-olll-----DR1LLED WEEP HOLE IN PROTECTIVE CASING GROUND SURFACE 1-1--.11111.~--4 FT. X 4 FT. X 4 IN. CONCRETE PAD RlSER CASINO 2-INCH 1.0. PVC MIN. 3FTI MIN. 5FT1 TYPE OF WELL SCREEN SCH. 40 PVC SCREENGAUQEORSLOTSIZE 0.010 in. INSIDE DIAMETER 2.0 In. MANUFACTURER Bra1nard-K1iman BOTTOM CAP __________ _, 2-INCH I.D. PVC BOTTOM OF EXPLORATION ------- EL. 2306.3 DEPTH 35.5 ft. ' ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 32.67 fl. + 5.05 ft. LENGTH OF RISER CASINO LENGTH OF SCREEN -----BOTTOM OF PROTECTIVE CASINO EL. 2339,8 DEPTH 2.0 ft. ~-----GROUT: CEMENT/2% BENTONITE ::;i..,,.. ____ APPROXIMATE DIAMETER OF BOREHOLE 10 In. • .-----TOP OF BENTONITE SEAL EL. 2319.93 DEPTH 21.87 ft. , .... ._ ____ BENTONITE PELLET SEAL """I-----TOP OF FILTER PACK EL. 2317.3 DEPTH 24.5 ft. f------TOPOFWELLSCREEN EL.2311.93 DEPTH 29.87 ft. FILTER PACK: WASHED SILICA SAND. FILTER PACK GRAIN SIZE FX 5D MANUFACTURER Foster Dlxlana ------BOTTOM OF WELL SCREEN EL. 2306.83 DEPTH 34.97 ft. '-----BOTTOM OF WELL EL. 2306.3 DEPTH 35.5 ft. 0.58 ft. 38.3 ft. + = LENGTH OF BOTTOM CAP TOTAL LENGTH I I I I I I I I I I I I I I I I I I I BEDROCK PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: --~C~H~E~M~T~R~O~N=IC=-S=-=S"-'IT'-=E'-'R""E,,,M~E=D~l"'A=L~A~C~Tl-'-'O~N~------JOB NO _____ ~G~-1~60=-0~.2,,,2,__ __ LOCATION: SWANNANOA. NORTH CAROLINA INSTALLATION NO ___ P_-4_8'---- CLIENT: NIMMO AND COMPANY BORING NO. ____ __,_P_-4-'-'B"--- LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: -~J~A~C~K~O=U~V=E=R~ ___ CERTIRCATION NO: #1121 NC FRONTVALLEY □ BACKVALLEY[!j INSTALLATION DATE 3-3-92 to 3-5-92 FIELD REPRESENTATIVE: JOEY GILLESPIE N9974.308324 SURVEY DATUM: EJ1596.408347 GROUND -~====~ SURFACE ELEVATION:. __ 2_34_1.29 __ ,r---TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL. 2344.29 STICKUP 3.0 ft. STEEL PROTECTIVE CASINO WITH LOCKING CAP .... I-----IHNCH LD. TOTAL LENGTH --=-5.'-'0-'ft=·-- TOP OF WELL CASINO -------_.l~~~ _ .,.i,.•.-_-_-_-_-_-_-_--~HNCH CARBON STEEL VENTED CAP EL. 2343. 79 STICKUP 2 5 ft , , DRILLED WEEP HOLE IN PROTECTIVE CASINO GROUND SURFACE ,-----&-+-+~---.,...-6 FT. X 6 FT. X 4 IN. CONCRETE PAD RISER CASINO 41NCHI.D. CARBON STEEL CARBON STEEL STRAP CENTRALIZER EL. 2331.05 DEPTH 10.24 ft. CARBON STEEL STRAP CENTRALIZER EL. 2289.67 DEPTH 51.62 ft. X X • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 55.40 ft. IIIN. 5FT1 IIIN. 20 FT. + ~~----BOTTOM OF PROTECTIVE CASINO EL. 2339.29 DEPTH 2.0 ft. ~------GROUT: CEIIENT/2% BENTONITE ◄----APPROXIMATE DIAMETER OF BOREHOLE ~---TOP OF BEDROCK SURFACE EL. 2302.29 DEPTH !'""i◄I----BOTTOII OF ROCK SOCKET 10 In. 39 ft. EL. 2288.3 DEPTH 52.90 ft. i...1------OPEN BEDROCK HOLE 3 7/IHNCH DIAMETER L..~1------BOTTOM OF EXPLORATION EL. 2248.91 DEPTH X 39.43 ft. = X 92.33 ft. 94.83 ft. LENGTH OF RISER CASINO LENGTH OF OPEN BEDRoa( HOLE TOTAL LENGTH I I I I I I I I I I I I I I I I I I I SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: __ __,C,.,Hc,,E,,,MT,,_,_,R_,,O"'N"'l:.:C:,,Sc,Se,_IT,_,E=-R"E"'ll"'-'=-ED,ele,:A,,,L'-"A:,,CTl'-'-"O"'N"--------JOB NO ____ __,G.,;·:,J,e60,,0,..2.,2;____ IHSTALJ.ATION NO_-'-P--S~S'----- LOCATION: __ ___.:SW=A"'N"'N"'A"'N:.:O:..::A,._,.,_,N:.:O"-'RT=Hc.:C:..::A:::.R!.:O:..:LI:::Nc,,A:,_ _______ _ BORING NO. ___ -'-P~-5'-'S'---'--- CLIENT: ---~N~l~M~M~O=A,.,N:cD..=C:..:0,.,11:.eP...,AN=Y'------------- CONTRACTOR: _.,,E,..,N"-V,,_IR,.,0,,_Nr,M,,.,E,,,NT.u.,:A,..L,.,11,.0"'N..,_IT,_,_,,O"'R"'IN.,_,G,,_,,AN'-""D-'T-"E"'S"-T"'IN,.,,G:.;C,.;O,:.RceP,:_,.'--- TYPE OF INSTALJ.ATION: SHALLOW (!I DEEP □ ~~~'.~RATING 0 LOCATION: DRILLER: ---~B~. ~C~A~B~IT ____ CERTIRCATION NO: #1121 NC FROHTVALLEY □ BACKVALLEYOO FIELD REPRESENTATIVE: JOEY GILLESPIE IHSTALJ.ATION DATE 2-28-92 N9971.983866 SURVEY DATUM: El 1453,099995 GROUND SURFACE ELEVATION: 2348.27 ,----TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL 2351.27 STICKUP 3.0 ft. 20NCH PVC VENTED CAP ------....._ STEEL PROTECTIVE CASINO WITH LOCKING CAP i-...1------II-INCH LO. ~---TOTAL LENOTH __ ,::5:::.0c.:ft:.::·c.._ __ TOPOFWELLCASINO--,....,..,-,----➔~~ EL. 2350.49 STICKUP 2.22 IL ..... t-----DRILLED WEEP HOLE IN PROTECTIVE CASING OROUNO SURFACE 4 FT. X 4 FT. X 4 lN. CONCRETE PAD ~~ RlSER CASINO 2SNCH 1.0. PVC IIIN. 3FTI MIN.5~ TYPE OF WELL SCREEN SCH. 40 PVC SCREENGAUOEORSLOTSIZE 0.010 In. INSIDE DIAMETER 2.0 in. MANUFACTURER Brainard-Kilman BOTTOM CAP __________ _, 2-INCH 1.0. PVC BOTTOM OF EXPLORATION--------" EL. 2318.27 DEPTH 30 ft. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 10.04 ft. 20.1 IL + LENGTH OF RISER CASING LENGTH OF SCREEN t:814-----BOTTOM OF PROTECTIVE CASINO EL.2346.27 DEPTH 2.0 ft. '-"-----GROUT: CEMENT/2% BENTONITE ~------APPROXIMATE DIAMETER OF BOREHOLE ____ 1.:.cO:.l:::nc... __ TOP OE BEtrulNITE SEAL EL.2346.27 DEPTH _ _;2:::·;:.0.:.;ftc... _ i...t-----BENTONITE PELLET SEAL ◄-----TOP OF FILTER PACK EL.2343.n DEPTH __ 4_.~3~ft_._ ----TOP02:J1lil:~FEEN EL. • DEPTH 7.82 ft. FILTER PACK: WASHED SILICA SA~ SO FIL TEA PACK GRAIN SIZE --==---MANUFACTURER Foster Dlxlana !J:i#iil------BOTTOM OF WELL SCREEN EL.2320.35 DEPTH 27.92 ft. ......_ ____ BOTTOM OF WELL EL.2319.n DEPTH 28.5 ft. 0.58 ft. 30.72 ft. + = LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I I I I I I I I I I I I I SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: __ __;C,eHceE,,,MT=Rc,:O,e,N,,,l,,,C:,,Sc,S,,_IT,_,E:..!!ReeEM"'-'=-E""Dl,:,:A,,,L,_,A,,CTl"-'-"O"'N'-'-------- LOCATION: __ _:S.:.,Wc.::A::;N::;N:::A"'N"'O'-"A.,._,._,N,,,O'-"RT'-'-'-'H'-'C«A:,,R_,,O<.!LI.,,N'-"A"'--------- ~B~ _____ _,,G~-1~6~0~0~.2~2~- INSTAUATION NO_--'-P-'-5'-=D'---- BORING NO. ___ ....,_P-'-5'-'D'----- CLIENT: NIMMO AND COMPANY TYPE OF INSTAUATION: CONTRACTOR: _ _,,E..,N"V..,.IR.,O..,_N,,M,,.,E,,,NT.,_,_,,A,.L,_,M,,_O,cN,..,_,rr.,.o:,;R..,INc,:G.....,,AN...,.D...,Tu,Ee,;S:.,_T..,.IN..,G"-"'C"'O"'R"-P • .___ SHAtLOW □ DEEP (!J i~~~1RATING □ LOCATION: DRILLER: ---~B~-~C~A~B~IT ____ CERTIACATION NO: #1121 NC FRONTVAUEY □ BACKVALLEYOO FIELD REPRESENTATIVE: N9994.5780186 SURVEY DATUM: E11448 303463 GROUND SURFACE ELEVATION: 2347.74 JOEY GILLESPIE 2~NCH PVC VENTED CAP-----~~ RISER CASING 2-INCH I.D. PVC MIN. 3FTI MIN. 5FT1 TYPE OF WELL SCREEN SCH. 40 PVC SCREEN GAUGE OR SLOT SIZE 0.010 in. INSIDE DIAMETER 2.0 In. MANUFACTURER Bra1nard-K1iman BOTTOMCAP -----------i 2-INCH 1.0. PVC BOTTOM OF EXPLORATION ------•.£la EL. 2282.74 DEPTH 65 ft. ' ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 61.88 ft. + 5.04 ft. LENGTH OF RISER CASING LENGTH OF SCREEN INSTAUATION DATE 3-18-92 ~---TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL. 2350.74 STICKUP 3.0 ft. STEEL PROTECTIVE CASINO WITH LOCKING CAP f;S,loll,-----BOTTOM OF PROTECTIVE CASINO EL. 2345.74 DEPTH 2.0 ft. B511------GROUT: CEMENT/2% BENTONITE ~i....t-----APPROXIMATE DIAMETER OF BOREHOLE ____ 1,.,;0:..:I::.cnc:... __ ------TOP OF BENTONITE SEAL EL. 2296.74 DEPTH --'5'-'1'-'fc:;t•c.,_ roll------BENTONITE PELLET SEAL -----TOP OF FILTER PACK EL. 2293.54 DEPTH 54.2 ft. dl!it------TOP OF WELL SCREEN EL 2288,36 DEPTH 59.38 fl. ----FIL TEA PACK: WASHED SILICA SAND FILTER PACK GRAIN SIZE ------- MANUFACTURER FX 50 !ill------BOTTOM OF WELL SCREEN EL. 2283.32 DEPTH 64.42 ft. '-----BOTTOM OF WELL EL. 2282.74 DEPTH --'6~5~1=1.'-- 0.58 ft. 67.50 fl. + = LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I I I I I I I I I I , I I I BEDROCK PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: ___ C~H=E;M=T,_,R~O"'N'-"1-=C-=S-=S,,_IT,_,E,_R,_,_E=M=-E=D"'l"'A"'L"-A,.,CTl'-'-"O"'N~------JOB NO _____ ..=Gcc·1c:60.:;0e:..2::2:..._ __ LOCATION: __ ~SW=A"'N"'N"'A"'N"'O"'A,._,_,NO=RT=H-=C«A,,_R,.,O,_,U,,,Nc..Ac,_ _______ _ INSTALLATION NO ___ P_-s_e __ _ CLIENT: NIMMO AND COMPANY BORING NO. ____ __:_P_;·S:.:B:_ __ LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: -~J=A~C=K~O=U=V=E=R~ ___ CERTIACATION NO: #1121 NC FRONTVAUEY □ BACKVALLEYl!:j INSTALLATION DATE 2· 19-92 to 3-5-92 FIELD REPRESENTATIVE: JOEY GILLESPIE SURVEY DATUM: E11462.5D68D1 GROUND SURFACE ELEVATION: 2348.10 RISER CASINO 41NCHI.D. CARBON STEEL CARBON STEEL STRAP CENTRALIZER EL. Ni A DEPTH Ni A CARBON STEEL STRAP CENTRALIZER EL. Ni A DEPTH Ni A X X • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 85.26 ft. LENGTH OF RISER CASINO MIN. 20FT. + ,,----TOP Of' PROTECTIVE CASINO (CAP OR LID OPEN) EL 2351.1 STICKUP 3 ft. STEEL PROTECTIVE CASINO WITH LOCKING CAP .... I-----&-INCH LD. TOTAL LENGTH __ _:5..:11..::__ -----------~✓--✓~---~ ~ ~~ i:::::!lj,olll-----BOTTOU OF PROTIECTIVE CASINO EL. 2396.1 DEPTH 2 ft. ~------GROUT: CEMENT/2% BENTONITE ~-------APPROXIIIATE DIAMETER OF BOREHOLE ____ 1O_1n_. _ ---TOP OF BEOROCK SURFACE EL. 2271.1 DEPTH 77 ft. ~1-1----BOTTOM OF ROCK SOCKET EL. 2265.0 DEPTH J.41-----OPEN BEOROCK HOLE 3 7/8-INCH DIAMETER L..J...ot------BOTTOU OF EXPLORATION X EL. 2246.0 DEPTH 19.0 IL = LENGTH OF OPEN BEDROCK HOLE 83.1 ft. X 102.10ft. 102.10 ft. TOTAL LENGTH I I I I I I I I I I I I I I I I I I I SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: --~C=H~E=M~T~R~O=N.,,l.:C.:S..,,S,.clT,..,E,_,R'-"E::,M:E::,D::,lec,A,,,L..cA,,,CTl=O=N.,_ _____ _ ~B~ _____ ..,,G~-~,6~0~0~,2~2~_ INSTALLATION NO_....:..P_,-6'------ LOCATION: --~SW=A~N~N~A~N-"Oc..A=N-=O~RT=H~Cc..A=R"'O-"U=N~A.,_ _______ _ BORING NO. ___ ....:..P_,-6'------ CLIENT: ---~N~l~M~M~O~A~N~D~C~O=M=P~A=N~Y ___________ _ TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW □ DEEP □ ~~~'ie~RA TING I&) LOCATION: DRILLER: ____ B_. _C_A_B_IT ____ CERTIACATION NO: #1121 NC FRONT VALLEY □ BACK VALLEY IX] FIELD REPRESENTATIVE: JOEY GILLESPIE N9982.466367 SURVEYDATUM:._~E~l~l3c6~2~.2~0~68~8u1_ GROUND SURFACE ELEV ATION:_23...:..cSO"-."-TT'--_ 2SNCH PVC VENTED CAP-----~..._ INSTALLATION DATE 2-28-92 ~---TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL 2354.27 STICKUP 3.5 ft. STEEL PROTECTIVE CASINO WITH LOCKING CAP .... I------&-INCHI.D. TOP OF WELL CASINO _________ --111,il.T-_-,-!-TOTAL LENGTH --~S~ft=·---- EL. 2353.93 STICKUP·_c,.,_..,,__.,~ ..... 1-----DRILLED WEEP HOLE IN PROTECTIVE CASING GROUND SURFACE 4 FT. X 4 FT. X 4 lN. CONCRETE PAD RISER CASINO 2·1NCH 1.0. PVC MIN. 3FTI MIN. 5FT1 TYPE OF WELL SCREEN SCH. 40 PVC SCREEN GAUGE OR SLOT SIZE _ _.0.i,0'-!1,"!0,-11IDu.,~- INSIDE DIAMETER 2,0 In, MANUFACTURER BRAINARD-KILMAN BOTTOM CAP 2-INCH 1.0. PVC SOTTOII OF EXPLORATION --------- EL. 2262.27 DEPTH 88.S·ft. ' ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 30.1 ft. + 60.18 ft. LENGTH OF RlSER CASINO LENGTH OF SCREEN ~------BOTTOM OF PROTECTIVE CASINO EL. 2349.27 DEPTH 1.5 ft. 1------GROUT: CEMENT/2% BENTONITE ~:i--1-----APPROXIMATE DIAMETER OF BOREHOLE ____ __,_1,._0_,,ln,,._ .-,,----TOP OF BENTONITE SEAL EL 2332.57 DEPTH 18.2 ft. .... I-----BENTONITE PELLET SEAL ◄1-----TOPOFFILTERPACK EL. 2329.62 DEPTH 21.15 ft. 1------TOP OF WELL SCREEN EL. 2323.83 DEPTH 26.94 ft. FILTER PACK: WASHED SILICA SANll.X Q FILTER PACK GRAIN SIZE F -5 MANUFACTURER Foster Dlxlana •-----BOTTOM OF WELL SCREEN EL 2263 65 DEPTH 87 .12 ft. '-----BOTTOM OF WELL EL. 2263.07 DEPTH 87.7 ft. 0.58 ft. 90.86 fl. + = LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I I I I I I I I I I I I I SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: __ _____cC,cHceE,,,M,,_T_,_,Rc,:O:<,N"'l'-"C"'Sc,S,,_IT,_,E:..!!R-'=-EM"'-'=E""D"IA,.Lc,A:,,CTl"-'-"O"'-N'-'------- LOCATION: __ __,,S-'-'W'-"A"'N"'N"'A"'N,,O,,:A"'-"N'-"O"-RT=H,_,C«A,,R.,_,O"-'U""N'-"A"'--------- CLIENT: ---~N~IM~M=O~A"'N.,_,D=--.=Cc..:OccMe.,P~A"'N-'-Y'-------------- JOB NO ____ __,G,a:·:.!.16,,,0,,,0s,.2;,;2~- INSTALLATION NO_.....c.P_-7'-'S'----- BORING NO. ___ .....c.P_-7'-'S'----- TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW [l! DEEP D ~~~~~RA TING D LOCATION: DRILLER: __ _____cB=.c·...:CccAccB"'IT:...._ ___ CERTIRCATION NO: #1121 NC FRONT VALLEY □ BACK VALLEY [!I INSTALLATIONDATE _ _:3:_;·S-::....:::92=-----FIELD REPRESENTATIVE: JOEY GILLESPIE SURVEY DATUM: GROUND ------- SURFACE ELEVATION: 2350.2 ~---TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL 2353.2 STICKUP 3.0 ft. 2-INCH PVC VENTED CAP -----~~ STEEL PROTECTIVE CASINO WITH LOCKING CAP .... I------~ LO. ~---TOTAi. LENGTH ___ 5_.0_ft_. __ _ TOPOFWELLCA~NO---------t61-.--.J EL 2353 4 STICKUP 3.20 ft. ei...t-----DRILLED WEEP HOLE IN PROTECTIVE CASINO GROUND SURFACE 4 FT. X 4 FT. X 4 IN. CONCRETE PAD RISER CASINO 2-INCH I.D. PVC MIN. 3FTI MIN. 5FT1 TYPE OF WELL SCREEN SCH. 40 PVC SCREEN OAUOE OR SLOT SIZE ~0c;,.0,_1.-'0.-'l~n~. __ INSIDE DIAMETER 2.0 in. MANUFACTURER Brainard-KIiman BOTTOM CAP ------------l 2~NCH 1.0. PVC BOTTOII OF EXPLORATION--------= EL, 2320.15 DEPTH 30.05 ft. ' ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 12.59 ft. + 20.08 ft. LENGTH OF RISER CASINO LENGTH OF SCREEN t::3i.-----BOTTOM OF PROTECTIVE CASINO EL. 234&.2 DEPTH 2 ft. ~lit------OROUT: CEMENT/2% BENTONITE i:::g ..... t-----APPROXIMATE DIAMETER OF BOREHOLE ____ ___c1-=.0.cc)nc.c._ TOP OF B.ENTO~ITE SEAL EL.-=2348:c.:.:::::·.2:__DEPTH 2.0 ft. i....1-----BENTONITE PELLET SEAL TOP OF l'ILTJ;R PACK EL. 2345.0 DEPTH 5.2 ft. -----TOP OF WELL SCREEN EL. 2340.81 DEPTH 9.39 ft. ----FIL TEA PACK: WASHED SIUCA SAND FILTER PACK GRAIN SIZE ------- MANUFACTURER FX 50 -----BOTTOM OF WELL SCREEN EL. 2320.73 DEPTH 29.47 ft. '-----BOTTOM OF WELL EL. 2320.15 DEPTH 30.05 ft. 0.58 ft. 33.25 ft. + = LENGTH OF BOTTOM CAP TOTAL LENGTH I I I I I I I I I I I I I I I I I I I SAPROLITE PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: -------'C"'H"'E,,,M,,_T,.,Rc::O:,N"'l""C"'Sc,Se,_IT,_,E=-R,::,_E,,,M,,,_,,_ED"'l"'A"'L'-"A"'CT"-'-"IO_,,N"--------JOB NO _____ .,,G,...-1,.,6,,.0c,,0,..2,.,2 __ INST ALLA TlON NO_-'--P--'-7-=D:..._ __ _ LOCATION: -----=S.,,Wc:::A::;N::;N:::A::;N:.::O:..::A::,_1.:.,N:.,:O:,_RT,_,_,_,Hc.,C:..::A:::.R,.,O,.,U,,,Nc:,A::,_ _______ _ BORING NO. ___ __,_P_-7:..:D::._ __ _ CLIENT: ---~N-'-'l~M~M~O'"'A"'N"'D:....:Cc:Oc:M,.,_P-"A"-N,.,Y ___________ _ TYPE OF INSTALLATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. SHALLOW □ DEEPOO ~~~~~RATING □ LOCATION: DRILLER: ---~B~-C.c.cAcc.BcclT"---___ CERTIACATION NO: #1121 NC FRONT VALLEY □ BACK VALLEY 00 FIELD REPRESENTATIVE: N9874.461591 SURVEYDATUM: E11144244830 GROUND SURFACE ELEVATION: 2351.17 JOEY GILLESPIE 2-INCH PVC VENTED CAP -------.... INSTALLATION DATE 3-5-92 ,,----TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) EL 2354.17 STICKUP 3.0 ft. STEEi. PROTECTIVE CASINO WITH LOCKING CAP .... I-----II-INCH I.D. """"'I,__ TOTAL LENGTH ___ 5_.o_ft_. __ _ TOPOFWELLCA~NO------------~--.J EL. 2353.67 STICKUP 2.5 ft. • .... I-----DRILLED WEEP HOLE IN PROTECTIVE CASINO QROUNO SURFACE 4 FT. X 4 FT. X 4 IN. CONCRETE PAO RISER CASINO 2-INCH I.D. PVC MIN. 3FTI MIN. 5FT1 TYPE OF WELL SCREEN SCH. 40 PVC SCREEN GAUGE OR SLOT SIZE ~0 ... bc.,.1,..0..cin:.:;. __ INSIDE 04AMETER 2.0 in. MANUFACTURER Brainard-Kilman BOTTOM CAP --------------i 2-INCH I.D. PVC BOTTOM OF EXPLORATION _______ ..,_ EL. 2291.27 DEPTH 59.9 ft. ' ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 56.77 ft. + 5.05 ft. LENGTH OF RISER CASING LENGTH OF SCREEN t::gl4-----BOTTOM OF PROTECTIVE CA~NO EL. 2349.17 DEPTH 2.0 ft. *-----GROUT: CEMENT/2% BENTONITE f::8i---1-----APPROXIMATE DIAMETER OFBOREHOLE _____ 1,._,0'-'l"'n,_._ ,.,,----TOP OF BENTONITE SEAL EL. 2305.17 DEPTH __ 4.:..:6:__;ft:.:;.'- l-olf-----BENTONITE PELLET SEAL ◄-----TOP OF FILTER PACK EL. 2302.17 DEPTH 49 ft. -----TOP OF WELL SCREEN EL. 2396.9 DEPTH 54.27 ft. ----FILTER PACK: WASHED SILICA SAN'FX 50 FILTER PACK ORAIN SIZE ------- MANUFACTURER Foster Dlxlana -----BOTTOM OF WELL SCREEN EL. 2291.85 DEPTH 59.32 ft. '-----BOTTOM OF WELL EL. 2291.27 DEPTH 59.9 ft. + 0.58 tt. = 62.40 tt. LENGTH OF BOTTOM CAP TOTAL LENGTH I I I I I I I I I I I I I I I I I I I BEDROCK PIEZOMETER WELL CONSTRUCTION DETAIL PROJECT: -------'C"'H""E"'M,,_T,_,R=O,,,Nc,:lc::C.::S_,,S::;IT,_,E::cRc,;E:e:M:::.E:D"'l:.::A::Lc::A,,CTl=O"-'N'-'-------JOB NO _____ =G_,-1cc60,::0"'.2"'2'--- LOCATION: __ _,,S'-"W'-'A"'-N"'-N""A,,_N.,O.,A,.__.N,,,O"'RT'-'-"H'-'C"'A"'R"'O"'U""'N"'A _______ _ INSTAUATION NO __ -=--P-..:.7.=B __ _ CLIENT: NIMMO AND COMPANY BORING NO. -----'-P-'-7-'B'--- LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: --'J=A=C=K~O=LI,.,V~E=R~ ___ CERTIRCATION NO: #1121 NC FRONT VALLEY O BACK VALLEY Ix) INSTALLATION DATE __ 2-_2_7-_9_1 __ FIELD REPRESENTATIVE: JOEY GILLESPIE 7 SURVEY DATUM: E11158.945807 GROUND . SURFACE ELEVATION: 2351.19 RISER CASINO 41NCHI.D. CARBON STEEL CARBON STEEL STRAP CENTRALIZER EL.2313.24 DEPTH 37.95 fl CARBON STEEL STRAP CENTRALIZER EL.2271.13 DEPTH 80.06 fl X X • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 84.TTft. LENGTH OF RISER CASINO MIN. 20FT. + ~---TOP OF PROTECTIVE CASINO (CAP OR LIO OPEN) EL. 2354.19 STICKUP 3.0 ft. STEEL PROTECTIVE CASINO WITH LOCKING CAP .... 1-----II-INCH I.D. TOTAL LENGTH __ 5_.o_fl __ _ -----BOTTOM OF PROTECTIVE CASINO EL. 2349.19 DEPTH 2.0 ft. ~------GROUT: CEMENT/2% BENTONITE ~j..,.t----APPROXIMATE DIAMETER OF BOREHOLE ---TOP OF BEDROCK SURFACE 10 In. EL. 2275.69 DEPTH 75.5 ft. ~1-1-----BOTTOM OF ROCK SOCKET EL. 2268.43 DEPTH 82. 76 fl . .... 1------OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER X Ui.olll------BOTTOM OF EXPLORATION X EL. 2248.45 DEPTH 102.74 ft. 19.98 ft. 104.75 ft. = LENGTH OF OPEN BEDROCK HOLE TOTAL LENGTH I I I I I I I I I I I I I I I I I I I SAPROLITE MONITORING WELL CONSTRUCTION DETAIL PROJECT: __ __,C:!!HceE:,M!!.T,_,R:,,O:!!N~l:!,:,C!!S..eS!!.IT!..!E""R~E:,M.,_E,eD-,,l,,,A.,,Lc,A:,,CTl,.,_,,O:!!N"-------JOB NO _____ .:,G::.-1:.::60:,cO,c:•:e:23'--- INSTALLA TION NO_-"M"-'W"---'1'-=S'--- LOCATION: __ _,,S..,.W...,Aa,Nc.N1.1AaN..,.O.,A......,N,.O"'RTLJ.JJHwC.,.A,.,Ru;O...,.U"'Nu:A,._ _______ _ BORING NO. ___ _:_MccWc.;_;-1c:Sc.._ __ CLIENT: ___ _,N.,_,1,,,M""M'-'-O'-'A"'N"'D"-"C"'O"'M'-'-P-"AN"-'-'Y ___________ _ TYPE OF INSTALLATION: CONTRACTOR: _..,,E"--'N'-'-V.,,_IR.,_,O<-'N.,M,.,E.,NT=A,,L,_,M,,_O"'N,.,_IT..,...,,O"'R"'IN~G=AN=D_,T..,,E=S,.,_Tl.,,_N.,_,G~C~O=R,_P.~- SHALLOW 00 DEEP □ LOCATION: DRILLER: -~B=L=A=K=E~C=A~B=IT~ ___ CERTIRCATION NO: #1121 NC FRONT VALLEY 00 BACK VALLEY □ RELD REPRESENTATIVE:· J, GILLESPIE N7090.162399 SURVEY DATUM: E10Z10 243061 GROUND SURFACE ELEVATION: 2269.79 INSTALLATION DATE _ __,2:_--"12:_-:::92=--- ----TOP OF PROTECTIVE CASINO (CAP OR OPEN LID) a.. 2270,29 ST1CKUP around surface STEEL PROTECTIVE CASINO WITH LOCKINO CAP .... I-----&-INCH LD. 1.0 ft. 2-INCH VENTED STAINLESS -------..i-r-7 STEEL THREADED CAP '-r-r~------TOP OF WELL CASINO TOTAL LENOTH ~OROUNDSURFACE ~ ~*~--~ RISER CASINO 2·1NCH I.D. STAINLESS STEEL IIIN. 3FT. IIIN. 5 FT. TYPE OF WELL SCREEN ST AIMLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT saE. 0 010 ID, INSIDE DIAMETER 2.0 In. MANUFACTURER Brainard KIiman BOTTOII OF SCREEN ----------, EL. 2245 29 DEPTH 24.5 BOTTOII OF EXPLORATION -------i~ EL. 2244.79 DEPTH 25.0 • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 5.0 + 20 LENGTH OF RISER CASINO LENGTH OF SCREEN + EL. 2269,79 STICKUP flush • ~ 4 FT. X 4 FT. X 4 IN. CONCRETE PAO ~ ~!1---------BOTTOII OF PROTECTIVE CASINO EL. 2269.29 DEPTH .5 It. ~~f-----OROUT: CEIIENT/2% BENTONITE ,-----TOP OF BENTONITE SEAL EL. 2268.29 llEPTH _ ____,.,1.:::;5 __ "1-oe-----3 FT. BENTONITE PELLET SEAL ------TOP OF FILTER PACK EL. 2266.29 DEPTH 3.5 ------TOP OF WELL SCREEN EL. 2265.29 DEPTH 4.5 It. FILTER PACK: WASHED SILICA SAND t---FILTER PACK ORAIN SIZE FX 50 MANUFACTURER Foster Plxlana BOTTOIICAP .._ _____ 2-INCH 1.0. ·STAINLESS STEEL f------TOTAL DEPTH OF WELL EL. 2245.07 DEPTH 24.72 .22 25.22 = LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I I I I I I I I g g I PROJECT: CHEMTRONICS SITE REMEDIAL ACTION LOCATION: SWANNANOA NORTH CAROLINA CLIENT: NIMMO AND COMPANY BEDROCK MONITORING WELL CONSTRUCTION DETAIL JOB NO G-1600 23 INSTALLATION NO MW-1BI BORING NO. MW-1BI LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. FRONT VALLEY [!j BACK VALLEY □ DRILLER: JA!.K QUlr'.EB CERTIFICATION NO: ltl 121 ti!. INSTALLATION DATE 2-11-92 FIELD REPRESENTATIVE: JOEY GILLESPIE N7087 -295875 STEEL PROTECTIVE CASINO WITH LOCKING CAP . SURVEY DATUM: El !!Z23,liZ!l! I-INCH LD. GROUND TOTAL LENGTH 1.0fl ' SURFACE ELEVATION: 2269.69 TOP OF ~Ol[CTIVE CASINO (CAP OR LID OPEN) EL. 7 .19 STICKUP .5 ft. - TOP OF WELL CASINO I ~H STAINLESS STEEL VENTED CAP EL. 2269.69 STICKUP Ground Surface • GROUND SURFACE I I-8 FT. X 8 FT. X 4 IN. CONCRETE PAD Flush with Ground Surface RISER CASINO Sloplng away from Manhole Cover 41NCHI.D. BOTTOM OF PROTECTIVE CA~NO STAINLESS STEEL EL. 2269.19 DEPTH .5 ft. MANUFACTURER Brainard KIiman GROUT: CEMENT/2% BENTONITE ST AIMLESS STEEL STRAP CENTRALIZER EL. 2219.69 DEPTH 50 ft. APPROXIMATE CNAIIETER 90Inch OF BOREHOLE - STAINLESS STEEL STRAP CENTRALIZER I TOP OF BEDROCK SURFACE 2233.69 DEPTH 36 fl EL. 2247.69 DEPTH 22.0 ft. EL MIN. 5FT. ~ --~ BOTTOM OF ROCK SOCKET EL • 2230.89 DEPTH 38.8 • MIN. 20 FT. OPEN BEDROCK HOLE 3 7/II-INCH DIAMETER • X --BOTTOM OF EXPLORATK>N • ALL DEPTHS ARE REFERENCED EL. 2198.69 DEPTH 71.0 ft. TO GROUND SURFACE X X X 38.8 32.2 71 + = LENGTH OF RISER CASINO LENGTH OF OPEN BEDROCK HOLE TOTAL LENGTH I I I I I I D D I I I D D I I S_APROLITE MONITORING WELL CONSTRUCTION DETAIL PROJECT: ___ C=H=E=M=-T~R~O=N=l~C~S~S~IT~E~R~E=M=ED=l~A=L~A=CTl=O=N~------JOB NO _____ ~G~-1~60=0~.2=3'--- INSTALLATION NO _ __,M"-W'-'--'-2=Dc..... __ LOCATION: --~S.,,WucA"'N"'N"'A"'N,.,,O"'A,._,_.,N..,.O,..RTu.uHuCe<A,,_R..,O,_,L .. IN...,A"---------BORING NO. MW-2D --------- CLIENT: ---~N.,,l~M=M~O~A~N~D~C~O~M~P~A~NuY ___________ _ TYPE OF INSTALLATION: CONTRACTOR: -~E~N~V=IR=O~N=M=E=NT=A~Lull:O=N~IT=O=R=IN.,,G=AN=D~T~E=S~Tl=N=G~C=O=R~P-~- SHALLOW □ DEEP □ LOCATION: DRILLER: --=B:.=L::..A::..K:::Ec.:C:.:A.::B:.:IT.,_ ___ CERTIFICATION NO: #1121 NC FRONTVAUEY □ BACKVALLEY[]j FIELD REPRESENTATIVE: 1 SURVEY DATUM: E11747.138841 GROUND SURFACE ELEVATION: 2341.52 J. GILLESPIE IHSTALLA T10N DATE 3-1&-92 ------ ~---TOP OF PROTECTIVE CASING (CAP OR OPEN LID) EL. 2344.52 STICKUP 3.0 ft. STEEL PROTECTIVE CASINO WITH LOCKING CAP f-,ot-----&-INCH I.D. 2~NCH VENTED STAINLESS -------➔f{:;::;JU------TOTAI. LENGTH STEEL THREADED CAP TOP OF WELL CASINO 5.0 It. ~GROUND SURFACE ~* RISER CASINO 2~NCHI.D. ST AIMLESS STEEL TYPE OF WELL SCREEN IIIN. 3". IIIN. 5". STAINLESS STEEL WIRE WRAPPED 0 OJQ In, 2.0 In. SCREEN GAUOE OR SLOT SlZE INSIDE DIAMETER MANUFACTURER Brainard KIiman BOTTOM OF SCREEN ---------- EL. 2305,39 DEPTH 36.13ft. BOTTOII OF EXPI.ORATlON -------i► EL. 2305.19 DEPTH 36.33 ft. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 20 + 20 LENGTH OF RISER CASING LENGTH OF SCREEN + EL. 2344,02 m1CKUP_~2-:::5~ft.~ ~ 4 FT. X 4 FT. X 4 IN. CONCRETE PAD ~ ,:ll------BOTTOII OF PROTECTIVE CASING EL. 2339.52 DEPTH 2 ~'tolr-----GROUT: CEIIENT/2% BENTONITE ~~I-----APPROXIIIATE DIAIIETER OF BOREHOLE .83 It. / 10 Inch ~----TOP OF BENTONITE SEAL EL. 2334.32 DEPTH __ 7_.2 __ 1-,,, ... ----3 "· BENTONITE PELLET SEAL ◄-----TOP OF FIL TEA PACK EL. 2329.92 DEPTH 11.6 ------TOP OF WELL SCREEN EL. 2325,39 'lEPTH __ 1_5_. l_3_ FILTER PACK: WASHED SILICA SAND ---FILTER PACK GRAIN SIZE FX 50 MANUFACTURER _.JEctO,:sute.,,ruD..ulLJ<XwlAlDO ... a __ BOTTOIICAP _____ 2..j,NCHI.D. STAINLESS STEEL -----TOTAi. DEPT1i OF WELL EL. 2305,19 llEPTll 36.33 .20 40.2 = LENGTH OF BOTTOM CAP TOTAL LENGTH I I I I I I I I I n D D I I I I BEDROCK MONITORING WELL CONSTRUCTION DETAIL PROJECT: __ _____cC,c,HceE::M::.T,_,R-"O:c,Nc:lc:C,:S_,S::.IT,_,E=-R:..:.E:eM=ED:c,l:.::A::Lc.::A~CTI=O=,N"--------JOBNO _____ ~G~-l~6=0=0=.2=3'-_ LOCATION: __ ~S=W~A=N=N~AN=O=A,=N=O=RT=H~C=A=R=O=U=N=A"--_______ _ INSTALLATION NO MW-2B -~=~~-- CLIENT: NIMMO AND COMPANY BORING NO. ___ ._M~W~-2~8'--- LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. FRONT VALLEY □ BACK VALLEY (]I DRILLER: -~J~A~C~K~o~w~ve~e~ ___ CERTIACATION NO: #1121 NC INSTALLATION DATE __ 3_-1_2_-9_2 __ _ AELD REPRESENTATIVE: FRANK H. FARMER N9916,768378 SURVEY DATUM: E11758,152393 GROUND SURFACE ELEVATION: 2341.93 STEEL PROTECTIVE CASING WITH LOCKINO CAP 1-----t:-----IHNCH LD. TOTAL LENOTH 5.0 ft. '-----TOP 01' PROTECTIVE CASING (CAP OR LID OPEN) EL 2344 93 "TICKUP 3.0 ft. TOP OF WELL CASING -------~l,[;:::;Jt-------4-INCH 8TAINLES8 STEEL VENTEO CAP EL. 2343. 72 STICKUP 1. 79 -----;:::==-1...1 I-''-----,.--6 "· X 6 "· X 4 IN. CONCRETE PAD Flush with OROUND SURFACE RISER CASINO 4 INCHI.D. STAINLESS STEEL MANUFACTURER Atlanta Stalnless STAINLESSSTEEL _______ _.,_ STRAP CENTRALIZER EL. 2326.63 DEPTH 15.3 ft. Ground Surface Sloping away from Manhole Cover ~if,,111-----BOTTOM OF PROTECTIVE CASING EL. 2339.93 DEPTH 2.0 ft. ~t-------OROUT: CEMENT/2% BENTONITE ~1-.------APPROXIMATE DIAMETER 10 Inch OFBOREHOLE ______ _ STAINLESS STEEL ---------~8:1 ~---TOP OF BEDROCK SURFACE STRAP CENTRALIZER EL. 2304.73 DEPTH 37.2 ft. MIN. 5 FT. X MIN. 20TT. X X • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 48.49 + LENGTH OF RISER CASINO EL. 2299.93 DEPTH 40.0 ft. ~,._._ ____ BOTTOM OF ROCK SOCKET EL. 2295.52 DEPTH OPEN BEDROCK HOLE ,..,._ _____ 3 7/8-INCH DIAMETER L-,._.1------SOTTOM OF EXPLORATION EL. 2265.03 DEPTH X X 30.49 = LENGTH OF OPEN BEDROCK HOLE 46.41 ft. 76.9 ft. X 78.98 TOTAL LENGlH I I I I I I g 0 0 I I I I I I 0 SAPROLITE MONITORING WELL CONSTRUCTION DETAIL PROJECT: ___ C=H=E=M~T~R=O=N~l~C~S~S~IT~E~R~E=M=ED=l~A=L~A~CTl=O=N~------JOB NO G-1600.23 -----~=='--- 1 NS TA UA TION NO _ __,Me.;W,.:....:-3c,,Sc._ __ LOCATION: ---"'SW=A,,,N..,No,:A,,,N.,,OccA.......,N.,.O:.eRJu..uHc,Cu:A:u.R.uOuLI,.N..,A"---------BORING NO. MW-3S ----~~'--- CLIENT: NIMMO AND COMPANY TYPE OF INSTALLATION: CONTRACTOR: -~E~N~V~IRuO~N~M"'E=NT=A~L~M~O~N~IT=O"-'R~IN~G=AN=D~T~E~S~Tl,,,N~G~C~O~R~P~.'-- SHALLOW (!I DEEP □ DRILLER: _ .... e .. L.,A,..K,.E..:C,.A,.e .. rr._._ ___ CERTIRCATION NO: FIELD REPRESENTATIVE: FRANK H. FARMER N9881.351733 SURVEY DATUM: E11501,806560 GROUND SURFACE ELEVATION: 2344.79 ~GROUND SURFACE~ ~~~L--"JE: RISER CASINO 2--INCHI.D. ST AIMLESS STEEL TYPE OF WELL SCREEN MIN. 3 FT. MIN. 5 FT. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SIZE O 010 ID INSIDE DIAMETER 2.0 In. MANUFACTURER Brainerd KIiman BOTTOM OF SCREEN ---------- EL. 2315.65 DEPTH 29.14 ft_ BOTTOM OF EXPLORATION -------i► EL. 2314.79 DEPTH 30 P ft. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 12.50 + 19.98 LENGTH OF RISER CASINO LENGTH OF SCREEN + LOCATION: #1121 NC FRONT VALLEY □ BACK VALLEY [xj INSTALLATION DATE 3-24-92 --~~~- ,----·TOP OF PROTECTIVE CASINO (CAP OR OPEN LID) EL. 347. 79 STICKUP 3 0 fl • --4 FT. X 4 FT. X 4 IN. CONCRETE PAD ~ ,31-•----BOTTOM OF PROTECTIVE CASINO EL. 2342. 79 DEPTH 2.0 fl. ~----TOP OF BENTONITE SEAL EL. 2341.73 DEPTH 3.06 fl . ...., ______ 3 FT. BEHTONITE PELLET SEAL ◄-----TOP OF FIL TEA PACK EL. 2339.1 DEPTH 5.69 fl. ------TOP OF WELL SCREEN EL. 2334.89 DEPTH 9.90 fl. Fil TEA PACK: WASHED SILICA SANO ---FILTER PACK GRAIN SIZE FX 50 MANUFACTURER Foster Dlxfuria BOTTOUCAP _____ 2-INCH I.D. ST AIMLESS STEEL -----TOTAL DEPTH OF WELL EL. 2315.11 DEPTH 29.68 ft. 0.2 32.68 = LENGlH OF BOTTOM CAP TOTAL LENGTH I I I I I I I g n D R I I I I SAIPROLITE MONITORING WELL CONSTRUCTION DETAIL PROJECT: __ __,C,,.,H.,,Ee,M,,;T,_,R_,,O,,,N_,,l><C><S_,,S"-'IT,_,E,_,R,.,,E,,,M,eE:,D"'l"'A.,k_,i;N-=.,TI.,,O,,.,N.,__ _____ _ JOB NO G-1600.23 ------~=~-- 1 NS TA LLA Tl ON NO ___ M_W_-_3_D __ _ LOCATION: __ ~SW=AwNwN~AN....,.OccA,._,,.,Nc,eO,.,RT......,H..,.CccA ... B~O~LiwN.uA,_ _______ _ BORING NO. MW-3D --------- CLIENT: ---~N=l~M=M~Oe.-A~N,.,,D~C=O=M=P-'A~N~Y~-----------TYPE OF INSTALLATION: CONTRACTOR: -=E=N~V=IR'-"O=N=M=E=NT=A=L~M=O=N=IT=O=R=IN=G=AN=D~T=E=STl=N=G~C=O=R=P~--- SHALLOW □ DEEP [!] LOCATION: DRILLER: _ ____cBc..cLccA.c.KccEc...Cc.cA..cBcclT..c...-___ CERTIACATION NO: #1121 NC FRONT VALLEY □ BACKVALLEY[!j FIELD REPRESENTATIVE: FRANK H. FARMER INSTALLATION DATE 3/24/92 N989&.3n687 SURVEY DATUM: E1148Q 892361 GROUND ~---TOP OF PROTECTIVE CASINO (CAP OR OPEN LID) El.. 2347,71' STICKUP 3.0 ft. SURFACE ELEVATION: 2344.71 STEEL PROTECTIVE CASINO WITH LOCKING CAP .... t-----8-INCH LO. 5.0 ft. 2-INCH VENTED STAINLESS --------.1..r-7 STEEL THREADED CAP ,--,~------TOP OF WELL CASINO TOTAL LENGTH ~GROUND SURFACE~ ~*-:!!:.J--~ RISER CASINO 2-INCH I.D. STAINLESS STEEL Brainard KIiiman TYPE OF WELL SCREEN MIN. 3 FT. MIN. 5 FT. STAINLESS STEEL WIRE WRAPPED SCREEN OAUOE OR SLOT SIZE INSIDE DIAMETER MANUFACTURER Q.D]Q ID, 2.0ln. Brainard KIiiman BOTTOM OF SCREEN ---------- EL. 2293.06 DEPTH 51.65 ft. BOTTOM OF EXPLORATION --------,► El.. 2290.71 DEPTH __ 54_ft_._ ' ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 40.08 15.04 + LENOTH OF RISER CASINO LENGTH OF SCREEN + El.. 2347.21 STICKUP_~2=.5~ft=-~ • ..,_ 4 FT. X 4 FT. X 4 IN. CONCRETE PAD ~ ,:!!------BOTTOM OF PROTECTIVE CASINO EL. 2318-21 DEPTH 2 ft. ~~~----GROUT: CEMENT/2% BENTONITE ~~------APPROXIMATE DIAMETER 10 Inch OF BOREHOLE ______ _ ~---TOP OF B~!fi<aTt SEAL EL. • DEPTH __ 2_6_.5_0_ft_ • .... .-----3 FT. BENTONITE PEI.LET SEAL ◄-----TOP OF FILTER PACK EL. 2314.81DEPTH 29.90 ft. ------TOP OF WELL SCREEN EL. 2307 .9 DEPTH __ 3_6_.8_1_11_. FILTER PACK: WASHED SILICA SAND ---FILTER PACK GRAIN SIZE FX 50 MANUFACTURER ...... Fo""a"1-'-er~0~1rx~1a~n~.- BOTTOM CAP _____ 2-INCH 1.0. ST AIMLESS STEEL -----TOTAL DEPTH OF WEI.L EL. 2292.78 DEPTH _ _,5'-'-1'-",9.:.3 _ 0.21 55.33 = LENGTH OF BOTTOM CAP TOT AL LENGTH I I I I I I I B D m I I I I I BEDROCK MONITORING WELL CONSTRUCTION DETAIL PROJECT: __ __,C=.,H..:,E::M::.T:..:R.:.:O=.,N.=l.:C.:S..:,S::.IT:..:E'-'R'-"E:::M:::.E:::D:::l:::A::,Lc.::A:::CTl=O:::Nc:..._ _____ _ JOB NO _____ .,,G,::·J,_,6,,o.,.o,..2.,3c__ LOCATION: --~SW=A=N=N=AN=O~A~N=O~RT=H~C~A=-R~O~LI~N~A~-------- INSTALLATION NO MW-3B --~~~-- CLIENT: NIMMO AND COMPANY BORING NO. ____ M_W_-3_8 __ _ LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: -~J~A~C=K~O~W-Y-E~R ____ CERTIACATION NO: AELD REPRESENTATIVE: Frank H. Farmer SURVEY GROUND SURFAC DATUM: E11489.100623 E ELEVATION: 2345.03 T OP OF WELL CASINO R • s EL. STICKUP GROUND SURFACE ISERCASINQ INCHI.D. T AIMLESS STEEL 1.72 I M ANUFACTURER Brainard KIiman s s T AINLESS STEEL TRAP CENTRALIZER EL. 2313.33 DEPTH T AIMLESS STEEL s s TRAP CENTRALIZER EL 2298.03 DEPTH 31.7 ft. 47.0 It. MIN. 5FT. - X MIN. 20FT. X X -~ --• ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 56.64 + \. r, • ~ X 24.08 #1121 NC FRONTVAUEY □ BACKVALLEY~ r INSTALLATION DATE __ 3_-_1_7-_9_2 __ _ STEEL PROTECTIVE CASINO WITH LOCKING CAP ~LD. TOTAL LENGTH 5.0 It. TOP OF 1~ CASINO cc3P Oft LI EL STICKUP .0 OOPEN) 4alNCH STAINLESS STEEL VENTED CAP 8 FT. X 6 FT. X 4 IN. CONCRETE PAD Fl ush with round Surface G Slopl ng away from nhole Cover Ma BOTTOM OF PROTECTIVE CASINO EL. 234l.03 DEPTH 2.0 ft. OROUT: CEMENT/2% BENTONITE APPROXIMATE DIAMETER 10 Inch OF BOREHOLE TOP OF BEDROCK SURFACE EL. 2295.03DEPTH 50 ft. BOTTOM OF ROCK SOCKET EL. 2290.11 DEPTH 54.92 ft. OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER BOTTOM OF EXPLORATION EL. 2267.03 DEPTH __ 7_8_.0_lt_. X X 78 = LENGTH OF RISER CASINO LENGTH OF OPEN BEDROCK HOLE TOTAL LENGTH I I I I I a D D D I I I I I g PROJECT: CHEMTRONICS SITE REMEDIAL ACTION LOCATION: SWANNANOA, NORTH CAROLINA CLIENT: NIMMO AND COMPANY BEDROCK MONITORING WELL CONSTRUCTION DETAIL JOB NO G-1600.23 INSTAUA TION NO MW-4B BORING NO. MW-4B LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. #1121 NC FRONT VALLEY □ BACK VALLEY~ DRILLER: JACKOLIYEB CERTIACATION NO: 3/19/92 INSTAUATION DATE FIELD REPRESENTATIVE: FRANK H. FARMER nn"•· STEEL PROTECTIVE CASINO WITH LOCKING CAP SURVEY DATUM: E11115.611339 ~NCHLD. GROUND 1, TOTAL LENGTH 5.0 ft. SURFACE ELEVATION: 2356.75 TOP OF PROTECTIVE CASINO (CAP OR LID OPEN) El 2359,75 STICKUP 3.0 ft. TOP OF WELL CASINO ,--, 4..iNCH STAINLESS STEEL VENTED CAP EL. 2358.2 STICKUP 1.45 ft. • GROUND SURFACE I ~ 6 FT. X 6 FT. X 4 lN. CONCRETE PAD Flush with Ground Surface RISER CASING Sloping away from Manhole Cover 4 INCHI.O. BOTTOII OF PROTECTIVE CASINO STAINLESS STEEL IIANUFACTURER Atlanta Stalnle99 EL. 2354.75 DEPTH 2.0 ft. GROUT: CEIIENT/2% BENTONITE STAINLESS STEEL STRAP CENTRALIZER EL. 2330.45 DEPTH 26.3 ft. APPROXIMATE DIAIIETER OF BOREHOLE 10inch STAINLESS STEEL TOP OF BEDROCK SURFACE STRAP c2~iifER 61.7 ft. EL. 2292.75oePTH 64.0 ft. EL. DEPTH .-- IIIN. 5FT. = BOTTOII OF ROCK SOCKET -- EL. 2287.87 DEPTH 68.88 ft. X IIIN. 20 FT. OPEN BEDROCK HOLE 3 7/8-INCH DIAIIETER X X --BOTTOII OF EXPLORATION • ALL DEPTHS ARE REFERENCED EL. 2262.64 DEPTH 94.11 ft. TO GROUND SURFACE X X X 70.21 25.35 95.56 + = LENGTH OF RISER CASINO LENGTH OF OPEN BEDROCK HOLE TOT AL LENGTH I I I I I D u I I n R I I D I I SAPROLITE MONITORING WELL CONSTRUCTION DETAIL PROJECT: -----'C~H~E~M~T,_,_R.,_,O~N"'-l=C=S-=S~IT,_,E'-'R""E~M=E=D::.:l~A~L~A=C,_,_T~IO::.:N~------JOB NO _____ ~G~-1:.:60~0~.2::.:3c_ __ INSTALLATION NO __ M_W_-5_s __ _ LOCATION: __ _,.S"'WccAoeN,.N .. A,.N,.,,O,..A,.,...,N.,,Ou.BILLJ.JHuC.,A,.R..,O..,U_.N~A.,_ _______ _ BORING NO. MW-5S --------- CLIENT: ___ __,_,N,,,IM,,,M=O_,A,,N"'D"-"C"'O"'M"'P_,A,,N.,_Y,.._ ___________ _ TYPE OF INSTALLATION: CONTRACTOR: --=E~N,_,_V=IR.,_,O~N"'-M=E~NT=A~L~M=O=N.,_,IT-=O~R=IN=G=AN=D~T,_,E=S,_,_TI=N.,_,G~C=O=R~P·~- SHALLOW I!] DEEP □ LOCATION: DRILLER: ----'B::.:L=A.::K.::E=..C::.A:.:B::.l:.:T ___ CERTIRCATION NO: #1]2] NC FRONTVAUEY □ BACKVALLEY[!) FIELD REPRESENTATIVE: J. GILLESPIE N10088.092752 SURVEY DATUM: E11465 806424 GROUND SURFACE ELEVATION: 2350.07 ~OROUNDSURFACE ~ ~~"'"--.JL--~ RISER CASINO 2•NCHI.D. STAINLESS STEEL IIIN. 3FT. IIIN. HT. TYPE OF WELL SCREEN ST AIMLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SIZE 0,0]0 ID, IN~DE DIAMETER 2.0 In. MANUFACTURER Brainard Kilman BOTTOII OF SCREEN ---------- EL. 2322.67 DEPTH 27 .4 fl BOTTOII OF EXPLORATION -------1► EL. 2322.07 DEPTH 28.0 fl • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 10.02 + 20.02 LENGTH OF RISER CA~NG LENGTH 0~ SCREEN + INSTALLATION DATE 3-17-92 ~---TOP OF PROTECTIVE CASINO (CAP OR OPEN LID) EL 2353.07 STICKUP 3.0 ft. ~ 4 FT. X 4 FT. X 4 IN. CONCRETE PAO ~ ~~1-----0ROUT: CEIIEl<T/2% BENTONITE ~~-------APPROXIIIATE OIAIIETER OF BOREHOLE .83 ft./10 Inch ,----TOP OF BElfl"ONITE SEAL EL. 2348.07 DEPTH __ 2._0_ft_._ -----TOP OF FILTER PACK EL. 2344.97 DEPTH 5.1 ft. ------TOP OF WELL SCREEN EL. 2342.57 DEPTH __ 7_.5_11_._ FILTER PACK: WASHED SILICA SAND 1---FILTER PACK GRAIN SIZE FX 50 MANUFACTURER Foster Dlxiana BOTTOIICAP _____ 2•NCH I.D. STAINLESS STEEL -----TOTAL DEPTH OF WELL EL. 2322.47 DEPTH 27.6 ft. .2 30.24 = LENGTH OF BOTTOII CAP TOT AL LENGTH I I I I I u I I I g D D I I RIKT ENVIRONMENT& INFRASTRUCTURE SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: _ ___;C:cH..:.:E::.,M::..TR:..:..:..,O,_,_N;;.IC:,;;S=S.:..:ITE.=-.-,R.:.:E:::;M::.:E:.:D'-'-IAL:.=..:..:A.:cC-"TI"'O""'N'------ LOCATION: -~S~W~A=N=N=A=N=O=A,_, ,_,_NO~RT-"H~C=A=R=O-=L=IN=A'-------- JOBNO ___ --=G~-1~6~0~0~.2~4,__ __ INSTALLATION NO EW-1S (STW-2) CUENT: --~N~IM~M=O~A=N=D_C~O~M~P~A~N~Y __________ _ BORING NO. ____ _.E_W=-1-"S.._ __ _ LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: ---=J-'-. O=Ll'-'V-=E"-'R'--___ CERTIFICATION NO: EMTC 1121 FRONT VALLEY □ BACK VALLEY [8J INSTALLATION DATE -~5~/2_1~/9_2 __ FIELD REPRESENTATIVE: N. 10316.345284 SURVEY DATUM: E 11534 4ago15 GROUND SURFACE ELEVATION: 2365 942 RlSERCASING 6 INCH 1.0. CARBON STEEL GROUND SURFACE CARBON STEEL STRAP CENTRALIZER EL 2329 692 DEPTH 36 25 ft J. GILLESPIE MIN.3FT. NOTE: A~ erlradion J>UfTll was installed in OIICh wel along Mil associated wa!« """" c:ontrok. wiring, and risor ~ Tho web ..,. --.led III lho s!A'faoe with a unuty seal. At the surface an extraction wol-hM,d -mourned and no. di reeled In sn ~ dnction thtough buried pipelines. The wel ard weft-head -~ c:o.-e,ed wth a lockable fib&,glass OO'VfK • ......_ ____ TOP OF WELL CA~NG EL. NIA STK:KUP N/4 R:,------GROUT: CEMENT/2% BENTONITE ~g..------APPROXIMATE DIAMETER oF eoREHOLE 12 locb ~----TOP OF BENTONITE SEAL EL. 2336 762 OEPTI-1 29 18 ft " ..., .. ____ BENTONITE PELLET SEAL . .. tse,t-,•----TOP OF FIL TEA PACK EL. 2333 762 DEPTH 32 18 ft TYPE OF WELL SCREEN =fl!!(lilt------TOP OF WELL SCREEN ------------fi,1 EL.2328 692 DEPTH 37 25 ft 6 INCH 1.0. STAINLESS STEEL WIRE WRAPPED SCflEENGAUGEORSLoTslZE 0121nch TOTAL LENGTH 24 75 CARBON STEEL STRAP CENTRALIZER EL 2300 942 DEP11i 65 0 ft • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 39 76 ft + 2475 ft LENGTH OF R~ CASINO LENGTH OF SCflEEN + 5 0 ft ALTER PACK: WASHED SILICA SAND E+if----0RA1N SIZE 0Es10NAT10+1· #00 Well Gravel MANUFACTURER: Macie Sand Cn ,------BOTTOM OF WELL SCREEN El. 2303 942 DEPTH 62 Q ft fil,c;=~----BOTTOM OF BLANK CASING 5 FT. EL. 2298 602 DEPTH 67 34 ft ~----BOTTOM OF EXPLORATlON EL. 2297 942 DEPTH 68.0 ft. + 34 ft = 69 65 ft LENGTH OF BLANK CASING LENGTH OF BOTTOM CAP TOTAL LENGTH I I I I I I I I I I I D D D R I .... ... ENVIRONMENT & 1'-U>I INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: _ ___::C_;_Hc::E.:c.Mc.cTR.:..:..::.O.:..:N.:..:IC:..:S:...:S::.:ITE-=-.:..:R=-EM=ED:::.l:.:..Al=-:.A.:..:C:...:TlccO:..:N-'--------JOB NO G-1600.24 ---~~~=~---- LOCATION: -~S~W_;_A_N_N_A_N_O:..:A~,~N.:..:O=R.:..:T-'-H~C=A~R.:..:O:..:L=IN=A~-------INSTALLATION NO __ E:W=-3=---- NIMMO AND COMPANY CLIENT: BORING NO. ----------EW-3 LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: --'---"J~. O=Ll'-"V-"E"-'R'--___ CERTIACATION NO: 1121 NC FRONT VALLEY O BACK VALLEY [xj INSTALLATION DATE ---'-7'-/6"-/9-'-2"---- FIELD REPRESENTATIVE: J. GILLESPIE N. 10182.44659 SURVEY DATUM: E. 11630.29TT83 GROUND SURFACE ELEVATION: 2365.842 GROUND SURFACE RISER CASING 6 INCH I.D. ----------11, CARBON STEEL CARBON STEEL STRAP CENTRALIZER El 2327 842 DEPTH ~3-B~ft~- TYPE OF WELL SCREEN 61NCHI.O. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SIZE .a0 ... 1u2'-~ TOTAL LENGTH ~54=5il3.._ __ _ CARBON STEEL STRAP CENTRALIZER EL 2266.842 DEPTH 99.0 ft. MIN. 7FT. MIN. SFT. MIN. 20 FT. • ALL DEPTHS ARE REFERENCED. TO GROUND SURFACE 42 84 ft. + NOTE: A 1ubmttnible extraction pl,nl> was installed in MCf'I wel along wth assoc:imod watflf lo¥OI CDntro1t.. wiring, and MM PP, The web we 1ealed Ill the at#fam with a sanbty seal. Al the surlaoe an extraction weM-head wu mounted and flow directed in an IIR)topriato dwectioo throogh buried pipe,lnM. Tho well and wel-head -CO'Tl)k,C.ely ~ with a lockable fberglass o:rver. ,-,_,._ _____ TOP OF WELL CASING EL. N/ A STICKUP N/ A . ~-------GROUT: CEMENT/2% BENTONITE APPROXIMATE DIAMETER ~t-""f-----OFBOREHOLE 12-1/4 Inch .,r-----TOP OF BENTONITE SEAL EL. 234 9.41 ) DEPTH 30.0 ft. ',lol------BENTONITE PELLET SEAL ttl,1--------TOP OF FIL TEA PACK EL. 2331 342 DEPTH 34 5 ft _,,------TOP OF WELL SCREEN ''-J"'"" EL. 2325 482 DEPTH 40.39 ft. FILTER PACK: WASHED SILICA SAND DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTURER Marie Sand C-0 ~----BOTTOM OF WELL SCREEN EL. 2270 922 DEPTH 94.92 ft. BLANK CASING ~1;1--------6-INCH 1.0., CARBON STEEL ,-----TOP OF BEDROCK SURFACE EL. 2268.842 DEPTH 97.0 ft. GROUT: CEMENT/2% BENTONITE/ 2"' CALCIUM CHLORIDE ""'.,.. _____ BOTTOM OF BLANK CASING EL. 2263.642 DEPTH 102 2 ft ~----BOTTOM OF ROCK SOCKET EL. 2263 642 DEPTH 102 2 ft J--,t------OPEN BEDROCK HOLE 3 Jm-,NCH DIAMETER '-'"""f------BOTTOM OF EXPLORATk)N EL. 2248.842 DEPTH 117 ft. 7 3 ft + 14 8 fl = 119 52 ft LENGTH OF RISER CASINO _J54a.,,5,.3.Lft..___ + LENGTH OF SCREEN LENGTH OF BLANK CASING LENGTH OF OPEN BEDROCK TOTAL LEHGTH I I I I I I u D u I I I I I I D RIKT ENVIRONMENT& INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: _ ___::;C.:..:H.:::E=M..:..TR:..:.0-=..:..cNl'-'C-=S....:S:..:.ITE.:..:::..R:..:.E:::;Mc.:E:::;D::clc...A.:::L..:..Ac..cCc..cTI.:..;Oc..cN-'-------- LOCATION: _....:S....:W.:..;A....:N....:N....:A~N.:..;O~A~,~N....:O~R.:..:T.:..;H....:C:..:.A....:R.:..:O....:L=IN....:A~------- JOB NO ___ ....:G=-·~1=60"-'0'--'.2=-4-'------- INSTALLATION NO EW-4 -------- BORING NO. EW-4 CUENT: __ .:..:N.:..:IM....:M~O~A....:N....:D....:C....:O.:..:M....:P....:A....:N.:..:Y __________ _ ---------- LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. FRONT VALLEY □ BACK VALLEY [xj DRILLER: __ ..:Jee • ..:Oc:LcclV'-'E"'R"--___ CERTIFICATION NO: 1121 NC FIELD REPRESENTATIVE: J. GILLESPIE SURVEY DATUM: GROUND N. 10078.985754 E. 11637.183949 SURFACE ELEV A TION: __:2:c.c35C:.50-'.4CC5:..:.7_ GROUND SURFACE RtsER CASlNG 6 INCH 1.0. CARBON STEEL CARBON STEEL STRAP CENTRALIZER EL 2323.347 DEPTH 32.11 ft. TYPE OF WELL SCREEN &INCH 1.0. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT StzE _.0.._1,.2 ...... _ TOTAI..LENOTH ~2~9~.7~---- CARBON STEEL STRAP CENTRALIZER EL 2289.857 DEPTH 65.6 fl MIN. 7 FT. MIN. 5FT. MIN. 20 FT. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 44.17 ft. LENGTH OF R~ CASING + -~29=.7~ft=-~--+ LENGTH OF SCREEN INSTALLATION DATE _~5~1~19~/9=2 __ _ NOTE: A~ extraction Pl#fl> was nst.Jled in each-• along with associated walor level controls. wiring, and riser~-The -a.-• soalod Ill tho sl.riaoe with a unuty Mal. Al the suriaoe an extradion -'"head .as mounted aod flow cil9ded in an "R)l'opriato diredion through buried pipelines. Tho well and -'-hoad was 00fTl)letely OCMN'ed \IWCh a \ock.iblo liberglau ttN'fllt, r-1-.------TOP Of WELL CASING El. NIA STICKUP NIA ~it------GROUT: CEMENT/2% BENTONrTE ~!-t-----APPROXIMATE DIAMETER ""-Of BOREHOLE ~1=2~I~n=ch~---- .,-----TOP OF BENTONITE SEAL EL. 2330.457 DEPTH 25.0 ft. ',toll------BENTONITE PELLET SEAL "'"'~.-----TOP Of FIL TEA PACK El. 2327 457 DEPTH 28 0 ft _.,-----TOP OF WELL SCREEN EL. 2322.347 DEPTH 33.11 ft. FILTER PACK: WASHED SILICA SANO DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTURER Morie Sand Cg ~----BOTTOM OF WELL SCREEN EL. 2292.657 DEPTH 62.8 ft. BLANK CASING ~•------6-INCH I.D., CARBON STEEL ~----TOP OF BEDROCK SURFACE EL. 2290.167 DEPTH 65.29 ft. GROUT:CEMENT/2% BENTONITE/ 2% CALCIUM CHLORlOE l"iilfc------BOTTOM OF BLANK CASING EL. 2285.657 DEPTH 69 8 ft. ~----BOTTOM OF ROCK SOCKET El. 2284 457 DEPTH 71 0 ft, ._.,_ _____ OPEN BEDROCK HOLE 3 7~NCH DIAMETER ._...,I-------'-BOTTOM OF EXPLORATION EL. 2263.457 DEPTH 92.0 fl 7.0 ft. + 21.0 ft. = LENGlM OF BLANK C~SINO LENGTH OF OPEN BEDROCK 101.87 ft. TOTAL LENGTH I I I I I I I D D I I I I I I u I ENVIRONMENT & INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: ---"C-'-'H-=EccMc:.T.:..:R.::.O.:..:N.:..:IC:..::S:...;S::.:ITE~.:..:R-=Ell=ED=-I"-Al=-'-A.:..:Cc..cTI.c..OccN--'------JOBNO ___ ~G=-·~1.::.60~0=·=--24..:.....· __ _ LOCATION: -~S~W_A_N~N~A~N-'-0"-'A~,~N.:..:O.:..:R.:..:Tc:.H.:..:C=A~R-'-'O.:..:L~IN_A _______ _ INSTALLATION NO EW-5 ----~--- CLIENT: NIMMO AND COMPANY BORING NO. ___ E_W_-5 _____ _ LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: ---=J.,_. O=Ll'-'V-=E"-'R'--___ CERTIRCATION NO: 1121 NC FRONT VALLEY □ BACK VALLEY [xj INSTALLATION DATE _....;6,.,,12,,,5/"'9,,,_2 __ FIELD REPRESENTATIVE: J. GILLESPIE SURVEY DATUM: GROUND N. 10005.718616 E. 11649.294427 SURFACE ELEV A TION: ....c234=-c.:c5·c:.430::c:.._ GROUND SURFACE RISER CASING NOTE: A ~ extraction purf1l was installed in each well along with associated wahw le-..l CX>fltm, wiring. and riaet ~-The web-• &ealod a the surlaoo with a .war)' seal. AJ. !he .urfaoe an extraction well-head was mounted and !low cireded in an 'Wfopriale di'eetion through buried ~ines. The well and~ was ~oly C<MKed wilh a \ockoole fiberglass cr:TVOf. ,-, ... ._ _____ TOP OF WELL CASING EL. N/ A STICKUP N/ A ~-------GROLIT: CEMENT/2% BENTONITE 6 INCH 1.D. ----------iii~ CARBON STEEL APPROXIMATE DIAMETER CARBON STEEL STRAP CENTRALIZER EL. 2324.43 DEPTH 21.0 ft. TYPE OF WELL SCREEN 6 INCH I.D. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SIZE ~0~1u2~- TOT AL LENGTH ~9~.93=----- CARBON STEEL STRAP CENTRALIZER EL. 2310.43 DEPTH 35.0 ft. MIN. 7 FT. IIIN. SFT. IIIN. 20 FT. ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 27.6 ft. + 9.93 ft. LENGlH OF RlSER CASING LENGTH OF SCREEN + ~:i-------OFBOREHOLE 121/4 Inch _,,-----TOP OF BENTONITE SEAL EL. 2333.63 DEPTH 11.8 fl. ',i,,-------BENTONITE PELLET SEAL ~i-""------TOP OF FILTER PACK EL. 2329 63 DEPTH 15 8 ft, .-,,-----TOP OF WELL SCREEN J....l,-EL. 2323.23 DEPTH 22.2 ft. FILTER PACK: WASHED SILICA SAND DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTIJRER Morie Sand Co ~----BOTTOM OF WELL SCREEN EL. 2313.3 DEPTH 32.13 ft. BLANK CASING -f!!ji-------6-INCH 1.D., CARBON STEEL ~----TOP OF BEDROCK SURFACE EL. 2310. 73 DEPTH 34.7 fl. GROUT: CEMENT/2% BENTONITE/ 2% CALO UM CHLORIDE i""'._.. _____ BDTTOII OF BLANK CASING EL. 2306.03 DEPTH 39A ft, ..._ ____ BOTTOM OF ROCK SOCKET EL. 2306 03 DEPTH 39 4 ft. f-,-------OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER l...J ..... t------'-BOTTOM OF EXPLORATION EL. 2285.83 DEPTH 59.6 ft. 7.3 ft. + 20.2 ft. = LENOTH OF BUNK CA~NG LENGTH OF OPEN BEOROQC 65.03 ft. TOTAL LENGTH I I I I I I D D I I I I I I I'll ... ENVIRONMENT & l•U>I INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: _ ____.c.C.ccH.ccE=M-'--T'-'-RO.::..:..;;Nc.:ICc.::Sc...:S:.c.lTE.:..::...:..;cRE:=cM;:;.E:=cD::.clc...A.ccL..c.A--'C~Tl~O~N-· ____ _ JOBNO ___ __cG~·.c..1~60~0~.2~4.:.... __ _ LOCATION: ---'S~W-'-'A-'-N-'-N~A~Nc...O~A~,-'-N--'O-'--R--'Tc...Hc...:C=A=R~O~L=IN-'-A~-------INSTALLATION NO EW-6 ----~--- BORING NO. EW-6 CLIENT: NIMMO AND COMPANY ---------- LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP •. DRILLER: ---=J.,_. O=Ll"'V-=E~R'--___ CERTIACATION NO: 1121 NC FRONT VALLEY □ BACK VALLEY [xj INSTALLATION DATE __ 6~123=19=2 __ FIELD REPRESENTATIVE: J. GILLESPIE SURVEY DATUM: N. 9968.675027 E.11517.256017 GROUND SURFACE ELEV ATION:__c234=.c.5c.c.nc.c..c3_ GROUND SURFACE RISER CASING 61NCHI.D. CARBON STEEL MIN. 3 FT. CARBON STEEL STRAP CENTRALlZER MIN. 5 FT. EL. 2321.973 DEPTH 24.0 ft. TYPE OF WELL SCREEN &INCH 1.0. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SIZE ~0~Ju2~- TOT Al. LENGTH ~3~9~,Z~l~--- CARBON STEEL STRAP CENTRALIZER EL 2278.973 DEPTH 67.0 fl MIN. 7 FT. MIN. 5FT. MIN. 20 FT. ' ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 27.05 ft. LENGlH OF RtsER CASING + -~3=9=.7~1~ft=·--+ LEHOTI-t OF SCREEN NOTE: A sobmersibl& ntraaioo PIJrTl) was in$talb:I io each -a along wih auociatod watOf level controls, wiring, and riMr we,. The web wore sealed al the 1urfa011 with a sanbty seal. At the 11Urfaoe an ertradion wel-head -mountod aod Oow diroclod in an aw,opri;do da-ec:tion thtoUgh buried pipelines. The well and -R-head was corrpletely O'J¥'ered with a lodl.ible fbe1glass «:Net. r-, ...... -----TOP OF WELL CASING EL NIA STICKUP N/A ~-------GROUT: CEMENT/2% BENTONITE APPROXIMATE DIAMETER txi--11------OF BOREHOLE 12 1/4 inch .,------TOP OF BENTONITE SEAL EL. 2331.683 DEPTH 14.3 fl. ',1-111-------BENTONITE PELLET SEAL ~ .... I-----TOP OF FIL TEA PACK EL 2328 373 DEPTH 17 6 ft !~-------TOP OF WELL SCREEN •L...J,..,.-EL 2322.323 DEPTH 23.65 ft. FILTER PACK: WASHED SILICA SAND DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTURER Morie Sand Co _,-----BOTTOM OF WELL SCREEN EL. 2282.613 DEPTH 63.36 fl. BLANK CASING -fl!W-------6-INCH 1.0., CARBON STEEL ~----TOP OF BEDROCK SURFACE EL. 2278.973 DEPTH 67.0 II. GROUT:CEMENT/2% BENTONITE/ 2% CALCIUM CHLORIDE '""'~-----BOTTOM OF BLANK CASING EL. 2373. n3 DEPTH 72,0 ft. ~----BOTTOM OF ROCK SOCKET EL. 2373 TI3 DEPTH 72,0 ft J-t-------OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER '--'◄I------BOTTOM OF EXPLORATION EL. 2253. n3 DEPTH 92.0 fl. --~7-=35~ft~-----+ LENGTI-t OF BLANK CASING 20.00 ft. LENGTH OF OPEN BEDROCK = 94.11 fl. TOT AL LENGTH I I I I I I a 0 D u I I I I ...... ENVIRONMENT& l~U>I INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DET All PROJECT: -----=Cc..:H:.=E.:.::M:..:.T.:..:R-=-O.:..:N.:..:IC:..:S:...:S:::IT.:.cE::....:..:R=-EM=E=-Dl"--A=L-'-A.:..:C:...:T.:.:I0:..:N.:.._ ____ _ JOBNO ___ ~G=·~1~6=00=·:24.,__ __ _ LOCATION: __ S~W~A~N~N~A~N-=0-'-A"--'-'N-=O-'-R'--'T-'-H'--'C=A-"R-'-O~L=l:..:.N:..:.A _______ _ INSTALLATION NO ___ E_W_-2 ___ _ , CLIENT: NIMMO AND COMPANY BORING NO. ___ E_W_-2 _____ _ LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP .. DRILLER: ---=J-'-. -=0-=Lc..lV:..:.E=R"-___ CERTIFICATION NO: 1121 NC FRONT VALLEY □ BACK VALLEY [Kl INSTALL.A TION DA TE -~5"-/1-'-6"-/9-'-2~-- FIELD REPRESENTATIVE: J. GILLESPIE N. 10401.734102 SURVEY DATUM: E. 11459.554043 GROUND SURFACE ELEVATION: 2368.311 GROUND SURFACE RISER CASING 6 INCH 1.0. CARBON STEEL NOTE: A submersiblo o,ct1adion ~ was in$lalled in oach -• abng with assoeial&d water liwet conlrols, wiriog. and Mer pipe. Tho welt wore soalod at the _surlace with a sanitary seal. At the surtace an e~ractioo -11-hoad was moun1ed and !low direcied in ar, awi-opria1e difoc:tioo through b.iriod pipi,lines. The well a/'ld weft-h&ad was C0!1l)lelely oove1ed with a lockablt1 lberglass oover. ,-,---------TOP OF WELL CASING EL. NIA STICKUP NIA i:;::;-------GAOUT: CEMENT/2% BENTONITE . _,------TOP OF BENTONITE SEAL MIN. 3FTT AA EL.2349.411 DEPTH 18.9 fl. ,,..I------BENTONITE PELLET SEAL (..;4_,._ _____ TOP OF FIL TEA PACK CAR BON STEEL STRAP CENTRALIZER MIN. 5 FT. EL. 2338.811 DEPTH 29,5 ft. TYPE OF WELL SCREEN 6 INCH 1.0. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SIZE .-,0,..1u2..__ TOTAL LENGTH 39.68 ------- CARBON STEEL STRAP CENTRALIZER EL. 2294.811 DEPTH 73.5 fl. MIN. 7 FT. MIN. SFT. MIN. 20 FT. ALL DEPTHS ARE REFERENCED . TO GROUND SURFACE 32.36 ft. + 39.58 ft. LENGTH OF RISER CASING LENGTH OF SCREEN + EL. 2343.311 DEPTH 25.0 fl. ~-----TOP OF WELL SCREEN EL.2339.151 DEPTH 29.16 ft. FIL TEA PACK: WASHED SILICA SANO DESIGNATION GRAIN SIZE, #00 Well Gravel MANUFACTURER Morie Sand Co .,.------BOTTOM OF WELL SCREEN EL. 2299.471 DEPTH 68.84 ft. BLANK CASING ------6-INCH 1.0., CARBON STEEL ~----TOP OF BEDROCK SURFACE EL. 2296.311 DEPTH 72.0 fl. GROlJT: CEMENT/2% BENTONITE/ 2% CALOUM CHLORIDE ~i-------BOTTOM OF BLANK CASING EL. 2292.491 DEPTH 75.82 ft. '-----BOTTOM OF ROCK SOCKET EL. 2290.811 DEPTH 77.5 fl. 1.,.._ ______ OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER ~ .... l-------BOTTOM OF EXPLORATION EL. 2267.711 DEPTH 100.6 ft. 7,0 tt + 22 5 ft, 101 44 ft LENGTH OF BLANK CASING LENGTH OF OPEN BEDROCK TOTALLENOTH I I I I I I I I I I I I I I I I RIKT ENVIRONMENT & INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: -~C~H:_::Ec::M:..:.TR!.!!::O.:..:N.:..:IC~S:'...!S~l..:.:TE=R.::E~M.::E~D'..'.:IA!!:Lc.!A~C::..:T~IO~N'..!._ ____ _ JOB NO ___ _cG:.·..:1c::6.::.00,c·c:24_,__ __ _ LOCATION: _ _:S,::.:W:..:..::::A::..:N::..:N:::::A::..:Nc,:O:::.A,.,_1.:..:Nc,:0:.:.R:..,T.:..:Hc..:C,c:A:o:R.:..:O,e:L:::l.:..:N:::::A'--------INSTALLATION NO --~E'-'W-"---1'-'1'--- CLIENT: NIMMO AND COMPANY BORING NO. ___ E_W_-1_1 ____ _ LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP •. DRILLER: __ _,J"-"-"O"'L'-'IV,_E,,_R,_,___ ___ CERTIFICATION NO: 1121 NC FRONT VALLEY O BACK VALLEY [xj INSTALLATION DATE __ _,,6,.,/5,,_/9,,,2,__ __ FIELD REPRESENTATIVE: F. FARMER· N. 703132.141396 SURVEY DATUM: E. 979467.676104 GROUND SURFACE ELEVATION: 2352.560 GROUND SURFACE RISER CA~NG NOTE: A swmet'li>la extraction PlJfTl> was insta/le,d in each well abng wth aaociatedw•erleYelex>ntrols.wirir,g,andriser~ Thewob_. .-led a! the 1urfaoe with• 1anb:ty seal. Af. the aurface an extraroon weU-head -mounted and flow directed in an aw,oprillle di'~ ~h boned pipelines. The well ar,d wel-hoad WU ~ely COifet9d Mh a lockable lib&rgbss cav« . .-,-------TOP 01' WELL CASING EL. N/A STICKUP 2.39 ~-------GROUT: CEMENT/2% BENTONrTE & INCH 1.0. ----------Ii,~ CARBON STEEL APPROXIMATE DIAMETER CARBON STEEL STRAP CENTRALIZER EL. 2340.06 DEPTH 12.5 ft. TYPE OF WELL SCREEN 6 INCH I.D. STAINLESS STEEL WIRE WRAPPED SCAEENGAUOEORSLOTSIZE 012 TOTAL LENGTH _.;64=,.,,37,__ ___ _ CARBON STEEL STRAP CENTRALIZER EL. 2269.06 DEPTH 83.5 ft. MIN. 7 FT. Note: QTZ Ledge Producing Angular Milky White Gravel From: 88 -90 ft. MIN. 20 FT. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 18.16 ft. LENGTH OF RISER CASING + _ _,,64=.3c,.7..,_ft.,_.__ + LENGTH OF SCREEN ~◄-----OF BOREHOLE 121/4 Inch ,-----TOP OF BENTONITE SEAL EL. 2344.46 DEPTH 8.10 ft. ,,l,o1------BENTONITE PELLET SEAL ~4------TOP 01' AL TEA PACK EL. 234] 20 DEPTH ] ] 36 fl ~-----TOP OF WELL SCREEN EL. 2336 79 DEPTH 15.77 ft. FILTER PACK: WASHED SILICA SAND DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTURER Morie Send Co ~----BOTTOM OF WEU SCREEN EL. 2272 36 DEPTH 80.20 ft. 1fif"""::jiiJ ______ BLANK CASING &-INCH 1.0., CARBON STEEL -----TOP 01' BEDROCK SURFACE EL. 2270 56 DEPTH 82.0 ft. GROUT: CEMENT/2% BENTONITE/ 2% CALCIUM CHLORIDE ~i--~---BOTTOM OF BLANK CASING EL. 2265,]2 DEPTH 87 44 ft, '-------BOTTOM OF ROCK SOCKET EL. 2265.]2 DEPTH 87,44 fl, OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER BOTTOM OF EXPLORATION EL. 2245.56 DEPTH 107.0 ft. 7.30 ft. + 19.56 ft. = 109.39 ft. LENOlH OF BLANK CASINO LENGTH OF OPEN BEDROCK TOTAL LENG111 I I I I I I I I I I g I I u .. _..ENVIRONMENT& l~U:J) I INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: __ C_H_E_M_TR~O_N.:..:IC--'-S'--'S""'ITE=-..:..:R.:cE;;;cM.:cEcc.Dl"-A"'L--'-A-'C'--'TI_Oc..N _____ _ JOB NO G-1600.24 ------~---- LOCATION: __ S_W_A_N_N_A_N_O_A~1_N.:..:O~R_T--'-H~C~A_R--'-O~LI_N_A _______ _ 1 NS TA L LA TION NO --~E~W~-7'----- NIMMO AND COMPANY CLIENT: BORING NO. ----------EW-7 LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: --~J~·~O~L~IV~E=R~ ___ CERTlFlCATlON NO: 1121 NC FRONT VALLEY □ BACK VALLEY (Kl INSTALLATION DATE ---'6"'/..,_19,,,/9=2 __ FIELD REPRESENTATIVE: F. FARMER SURVEY DATUM: GROUND N. 9995.256313 E. 11405.0093o7 SURFACE ELEVAT1ON:_2_35_0_._o7_1_ GROUND SURFACE RISER CASING 61NCH 1.0. CARBON STEEL CARBON STEEL STRAP CENTRALIZER EL. 2328.171 DEPTH 22.5 ft. TYPE OF WELL SCREEN 6 INCH 1.0. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SI.OT SIZE _.,Q._1._.2'-- TOT Al. LENGTH ~54=.4,,6'------ CARBON STEEL STRAP CENTRALIZER EL. 2271.211 DEPTH 79.46 ft. IIIN. 7 FT. UIN. SFT. MIN. 20 FT. ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 25.64 ft. LENGTH Of RISER CASINO + _...,54=.4.,6...,ft,..__ + LE.NOTH OF SCREEN NOTE: A ~ oictrad:ion ~ was nstalled in each we1 &mg ..ti auocialed water eve! oontrols, tMring. and riMf ~. The -a.-• IJea1od • the ,urlaoe with• sanlary seal. Al the surface an erlnad.ion -'-head was mounted end flow citeded in an aw,c,pria!o di'ec:tion through buried pip&lines. The well and -I-head was OOITl)lotely covered with a lcx::ksb'8 fb&rglass OOWJ/(. r-,◄ ... -----TOP OF WEU CASING EL N/ A STICKUP N/ A 1:8...------GROUT: CEMENT/2% BENTONITE APPROXIMATE DIAMETER ~:!--... -'---OF BOREHOLE 121/4 Inch .,r-----TOP OF BENTONITE SEAL EL. 2338.641 DEPTH 12.03 ft. ,,..I------BENTONJTE PELLET SEAL lt,f--o ... ----TOP OF AL TEA PACK EL. 2334 7J ) OEPTH 15 88 ft __,-----TOP OF WELL SCREEN l-l'!!ffl' EL. 2328.671 DEPTH 22.00 ft. ALTER PACK: WASHED SILICA SAND DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTURER Morie Sand Co ,-----BOTTOM OF WELL SCREEN EL 2274.211 DEPTH 76.46 ft. BLANK CASING ------6-INCH 1.0., CARBON STEEL ~----TOP OF BEDROCK SURFACE EL. 2274.671 DEPTH 76 ft. GROUT: CEMENT/2% BENTONITE/ 2% CALCUM CHLORtDE I""--------BOTTOM OF BLANK CASING EL. 2267.211 DEPTH 83.46 ft, '------BOTTOM OF ROCK SOCKET El 2267 171 nEPTH 83 50 ft, ,◄._ _____ OPEN BEDROCK HOLE 3 7/8-INCH DIAMETER l....J"'-1------'-BOTTOM OF EXPLORATION EL. 2247.671 DEPTH 103 ft. 7.36 ft. + 19.50 ft. = 106.96 ft. LENGTH OF BLANK CASING LENGTH OF OPEN BEDROCK TOTAL LENGTH I I I I I I I I I I I I I I I I I I I RIKT ENVIRONMENT& INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: _.......;:C.:.;Hc::E.:cMc.:.TR.:..:..:cO;..:Nc.:IC:..:S:..:S::.:ITE.:..:c..c..:R::cEM=E::.Dl:.:..Al=..:.Ac.:Cc..:Tic.cO:.cN-'------____ _ JOB NO G-1600.24 ----~~~~---- LOCATION: -~Sc..:W.:.;A~N=N=A~N-'--O"-'A-"1~N~O,_,R.:.;T-'--H'--'C::.:A.ccR.:.;O::.:L=IN=A~-------INSTALLA llON NO --~E-'--W'-•8=----- NIMMO AND COMPANY CLIENT: BORING NO. ----------EW-8 LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP •. DRJUER: ---=J.,_. O=Ll,.,V-=E~R,__ ___ CERTIACATION NO: 1121 NC FRONT VALLEY □ BACK VALLEY [xj INSTALLATION DATE -~6=1~12/=9=2 __ FIELD REPRESENTATIVE: F. FARMER SURVEY DATUM: N. 9969.524217 E. 11326.420504 GROUND SURFACE ELEVATION:_2_354 __ .89_9_ GROUND SURFACE RISER CASINO 61NCHI.O. CARBON STEEL MIN. 3 FT. CARBON STEEL STRAP CENTRALlZER MIN. 5 FT. EL. 2332.899 DEPTH 22.0 fl TYPE OF WELL SCREEN 6 INCH 1.0. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SIZE _.0.._1.,2..__ TOTAi. LENGTH ~3~9~.64=---- CARBON STEEL STRAP CENTRALIZER EL. 2289.399 DEPTH 65.5 ft. MIN. 7 FT. MIN. 5FT. MIN. 20 FT. • AU DEPTHS ARE REFERENCED TO GROUND SURFACE 26.24 ft. LENGTH OF RISER CASING + _.,,3c,o9,e,:64,._,_.ft,_. --+ LENGTH OF SCREEN NOTE: A aubmoru>lo oxtradion ~ was installod in each-• aJoog with associated waler l8vel oontroh., wiring, and riser pip,,, The -as- Hllled al the st.wiaoe Mth • aanilaly seal. At the aurfaoe an extradion well-head was mounted and flow din,cted in an aw,opriato direction through buried pip,,1.-. The well and -·-head wu ooirpletely covered with a lockable lberglass OOWlf. r-,..,. ... _____ TOP OF WELL CASING EL. N/ A STICKUP N/ A APPROXIMATE DIAMETER J;::c;~ ... ----OF BOREHOLE 12114 Inch ./-,-----TOP Of BENTONITE SEAL EL. 2340.089 DEPTH 14.81 ft. ... 1------BENTONITE PELLET SEAL t,,,t""' ... ----TOP OF FILTER PACK EL. 2335 689 OEPTH 19 21 ft 1--------TOP OF WELL SCREEN 1....-,,-EL. 2331.159 DEPTH 23. 7 4 ft. FILTER PACK: WASHED SILICA SANO DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTURER Morie Sand Co ~----BOTTOM OF WEU SCREEN EL. 2291.519 DEPTH 63.38 ft. ~f":liii-------BLANK CASING IHNCH I.D., CARBON STEEL ~----TOP OF BEDROCK SURFACE EL. 2290.399 DEPTH 64.5 ft. GROUT: CEMENT/2% BENTONITE/ 2% CALCIUM CHLORlOE i""'~-----BOTTOM OF BLANK CASING EL. 2284.139 DEPTH 70 76 ft ~----BOTTOM OF ROCK SOCKET EL. 2283 899 OEPTH 7J O ft ..., ... _____ OPEN BEDROCK HOLE 3 7f8..INCH DIAMETER '-' .... I------BOTTOM OF EXPLORATION EL. 2263.899 DEPTH 91.0 fl 2.3 ft. + 20.0 ft. = LENGTH OF BLANK CASING LENGTH OF OPEN BEDROCK 93.18 ft. TOTAL LENGTH I I I I I I I 0 I I I I I I I II ..... ENVIRONMENT& l~U:»I INFRASTRUCI1JRE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: __ C_H_E_M_T_R_O_N~IC~S_SITE~_R_E_M_E_D_IAL_A_C_TI_O_N _____ _ JOBNO ____ G=·~1~6~00=·=2~4 __ _ LOCATION: -~S'-W~A~N~N=A~N~O=Acc,1cc.NC-'O'--'RC-'T.c.Hc....C=A-"R~O'-L"'-IN~A~-------INSTALLATION NO __ E=W~-9~--- BORING NO. EW-9 CLIENT: NIMMO AND COMPANY ---------- LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. FRONT VALLEY □ BACK VALLEY ~ DRILLER: __ ..:Je... _,,Oc.:LeclV,..,E:.,R_,_ ___ CERTIFICATION NO: 1121 NC FIELD REPRESENTATIVE: J. GILLESPIE SURVEY DATUM: GROUND N. 9927 .443490 E. 11269.364864 SURFACE ELEVATION:_2_35_9._57_0_ GROUND SURFACE RISER CASINO 61NCH 1.0. CARBON STEEL CARBON STEEL STRAP CEHTRALIZER EL. 2334.57 DEPTH 25.0 fl TYPE OF WELL SCREEN 6 INCH 1.D. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SIZE ~0~1u2-- TOT Al. LENGTH _4~9~.5:.,5~---- CARBON STEEL STRAP CENTRALlZER EL. 2283.12 DEPTH 76.45 ft. MIN. 7 FT. MIN. 5FT. MIN. 20 FT. ' All DEPTHS ARE REFERENCED TO GROUND SURFACE 29.48 ft. LENGTH OF RISER CASING + _...,4 .. 9.,,..5a,5..,_ft,,_.__ + LENGTH OF SCREEN INSTALLATION DATE __ 5~/2~1/9~2 __ _ NOTE: A~ extraction purp was installed in eadi-' alot,g with aMOci;ded wate, illWII mmrok, wiring, and riNr ~-The -a.-• so;ued Ill the 11.riaoe with a aanlal)' seal Al the wrlace an extradion wol-hoad was mounted and flow direded in an appropriale di-ec:tion th~ buried pip&!.--. Tho well and wol-hoad was oortl)letoly cotered M.h a lock.t>le IOC'Kglass ~er. ,--,◄-------TOP OF WEU CASING EL. NIA STICKUP N/A ~-------GROUT: CEMENT/2'% BENTONITE ~~I-----APPROXIMATE DIAMETER OF BOREHOLE _1,.,2,..,1"-'n"'c,.,_h ___ _ .,-----TOP OF BENTONITE SEAL EL. 2343.42 DEPTH 16.15 ft. .,.,.1------BENTONITE PELLET SEAL i"-r------TOP OF FILTER PACK EL 2339 72 DEPTH 19 85 ft __,-----TOP OF WELL SCREEN EL. 2333.69 DEPTH 25.88 ft. FILTER PACK: WASHED SILICA SANO DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTURER Morie Sand Co ~----BOTTOM Of WELL SCREEN EL 2284.14 DEPTH 75.43 ft. ffif--i:iil------BLANK CASING &-INCH 1.0 •• CARBON STEEL r-----TOP OF BEDROCK SURFACE EL: 2282.57 DEPTH 77.0 ft. GROUT: CEMENT/2% BENTONITE/ 2% CALOUM CHLORIDE i,;,,,1:------BOTTOM OF BLANK CASING EL 2276.84 DEPTH 82.73 ft '-----BOTTOM OF ROCK SOCKET EL. 2276 84 DEPTH 82.73 ft. ....,._ _____ OPEN BEDROCK HOLE 3 7'8-1~ DIAMETER ._..., .... _____ BOTTOM OF EXPLORATION EL 2250.57 DEPTH 109.0 ft. 7.3 ft. + 26.27 11. = 112.6 ft. LENGTH OF BLANK CASING LENGTH OF OPEN BEDROCK TOTAL LENGTH I I I I I I I u D u I I I I D u I I'll _..ENVIRONMENT & l~U>I INFRASTRUCTURE BEDROCK/SAPROLITE EXTRACTION WELL CONSTRUCTION DETAIL PROJECT: __ C_H_E_M_TR~O_N--'IC--'S_S~ITE-=-'-'R"'E"'M"'E-"-0"-IA"'L'--'-A--'C~TI_O~N _____ _ LOCATION: ---'S=-'W"-'A:..:;N:..:;N:..:;Ac.:cNc.:.cO=.:Ac.:,1'-'-N'-'O'-'R-'--'T'-'-H'---'C=.:A_::R..:.;O=.:L::.:.IN:..::A:._:_ ______ _ INSTALLATION NO EW-10 ----=--- CLIENT: NIMMO AND COMPANY BORING NO. ___ E_W_-_1_0 ____ _ LOCATION: CONTRACTOR: ENVIRONMENTAL MONITORING AND TESTING CORP. DRILLER: --~J~. ~O~L~IV~E=R~ ___ CERTIFICATION NO: 1121 NC FRONT VALLEY O BACK VALLEY [Kj FIELD REPRESENTATIVE: F. FARMER SURVEY DATUM: GROUND N. 9908.376132 E.11196.584831 SURFACE ELEVATION:_2_3_54_._70_6_ GROUND SURFACE RISER CASING 61NCHI.O. CARBON STEEL CARBON STEEL STRAP CENTRALIZER El. 2334.70 DEPTH 20.0 fl. TYPE OF WELL SCREEN 6 INCH 1.0. STAINLESS STEEL WIRE WRAPPED SCREEN GAUGE OR SLOT SJZE _.o.._1._.2.__ TOTAL LENGTH ~5~9-.4~6~--- CARBON STEEL STRAP CENTRALIZER El. 2271.708 DEPTH 83.0 ft. MIN. 7 FT. MIN. SFT. MIN. 20 FT. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE 21.05 ft. + LENGTH OF RISER CASING LENGTH OF SCREEN ' INSTALLATION DATE __ 6~/~1~01~9~2 __ _ NOTE: A~ ol113dion purTl) Wi1$ nstaliod in emdi wel abng wilh ~ w.der .,.... controls, wiring, and Moer ~. The -a.-• socuod 11111 tho •...-taco with a aanitlilfY -.J. At tho .urfaoo an extraction -'-bead -mount.cl 11M flowt dit9cied in a,, appropriate direction through buried pipelnN. The well and ---head was ~ely c:on,n:,,d Mb a ~ fberglass OOYl!II" • .-,-rt------TOP OF WEU. CASING EL. N/ A STICKUP N/ A ~-------GROUT: CEMENT/2"4 BENTONITE APPROXIMATE DIAMETER 1:8}-irt-----OFBOREHOLE 121/4 Inch .,,------TOP OF BENTONITE SEAL EL. 2343.276 DEPTH 11.43 fl. S,1,ot------BENTONITE PELLET SEAL ft,,f--ort-----TOP OF FIL TEA PACK EL 2339 756 DEPTH 14 95 ft ~-----TOP OF WELL SCREEN EL. 2334.366 DEPTH 20.34 fl. FILTER PACK: WASHED SILICA SANO DESIGNATION GRAIN SIZE: #00 Well Gravel MANUFACTURER Morie Sand Co ,-----BOTTOM OF WEU SCREEN EL 2274.906 DEPTH 79.80 fl. BLANK CASING ------6-INCH LO., CARBON STEEL ~----TOP OF BEDROCK SURFACE EL 2272. 766 DEPTH 82.0 fl. GROUT:CEMENT/2% BENTONITE/ 2% CALOUM CHLORIDE .,.. ________ BOTTOII OF BLANK CASING EL 2267.926 DEPTH 86 78 ft '-----BOTTOII OF ROCK SOCKET El. 2267 706 DEPTH 87.0 ft, f-rt------OPEN BEDROCK HOLE 3 7~NCH DIAMETER '-...... 1------BOTTOII OF EXPLORATION El. 2247.70 DEPTH 107.0 ft. 6.98 fl. + 20.0 ft. 107.49 ft. LENGTH OF BLANK CASINO LENGTH OF OPEN BEDROCK TOT AL LE NOTH I I I I I I I APPENDIX E-1 D INSTALLATION DETAILS FOR D PREVIOUSLY EXISTING WELLS D INCORPORATED AS EXTRACTION WELLS m I I I I I u D I I ~!!)~ms IRR IN E I tY~l!!ENVIRONMENTAL flfiill!icoNSULTANT·s GROUND WATER MONITORING INSTALLATION DETAIL I I I I I I I 0 D I I I I I I I PROJECT: GROUND WATER CHARACTERIZATION JOBNO __ ~G~-~9.,_16~9::__ ___ _ LOCATION: _ _:S:.:W..::A..::N..::N..::A..::N..::O:.:A.2•:..:.N:.:O:..:.R:..:TH.:..:...:C:..:.A.::.R:..:O:.:U::.:N....:A_;_ ______ _ INSTALLATION NO _...:De.,TW:...:..:,-:.,1 __ CLIENT: CHEMTRONICS _ _:_:.:.:::..:..:..:..:..::..:..:.:..:....: ______________ _ TYPE OF INSTALLATION ___ _ CONTRACTOR: GRAVES WELL DRILLING, INC. TEST WELL (BEDROCK) BORING NO. DRILLER: J. HALL CERTIFICATION NO: 1060 NC ----''------- ---------- SEC FIELD REPRESENTATIVE: _ _,,J"-'. G::::;le:L,::LE,,,S,.,_P..:.:IE=--------- L OC AT 10 N __ D:;_Acc·...c2;.;;3..:.A.:.cR.:.cE=:A.:__ INSTALLATION OATE 10/9/89 SURVEY DATUM ___ M_S_L _____ _ I~ TOP OF PROTECTIVE CASING (CAP OPEN) EL NIA STICKUP --'-'Nl'-'A:,_ __ GROUND SURFACE ELEVATION: 2275.79 TOP OF WELL CASINO OR RISER PIPE r, ...... 1---EL. _ _.=;22::.;7c.;;8c::.2:.:9___;_STICKUP· _2!c,•e,5.,_ft,.,_. __ _ w ...J < u en 0 I- I-0 ~ Blotlte Schist - very severely weathered en ...J < w en C 46.0 z < ...J ...J Clayey Slit (ML) u.. :,.: u < al 60.0 ui z 0 Slit (ML) E C z 0 U 96.0 ...J 0 en w N ii: < ::;; Bedrock ----- Neat Cement Grout 62.5 Bentonlte Seal 65.0 Sand Pack 97.0 Bentonlte Seal 98.0 Grout 104.0 ---- ::;; Open Borehole ::> en L _____ ..J.:1..:2::4-.:_0-====L!::::!.~t--- • FIGURES ABOVE REFER TO DEPTH IN FEET 72.95 ft. • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE . 25.56 ft. 27.99 ft. TYPE Of SURFACE SEAL THICKNESS OF SURFACE SEAL TYPE OF PROTECTIVE CASING INSIDE DlAMETER TOTAL LENGTH BOTTOM OF PROTECTIVE CASING Neat Cement Grout 62.5 ft. NIA NIA NIA EL. _..:Nl=A'--__ oEPTH _ __,_Nl"'A'-'---- TYPE OF WELL CASINO OR RISER PIPE 6" Carbon Steel l~OE DlAMETER 6 1/4 In • APPROXIMATE DIAMETER OF BOREHOLE 12 1/4 In. TOP OF WELL POINT EL. __ 22_0_5_.3_4 __ DEPTH 70.45 ft. TYPE Of WELLPOINT SCREEN GAUGE OR SIZE OF OPENINGS INSIDE OtAMETER Stainless Steel 0.0201n. 61/4 In. TYPE OF BACKFILL AROUND POINT BOTTOM OF WELL POINT EL. 2179.78 Blank casing Length 7.0 ft. BOTTOM OF BOREHOLE EL. 2151 .79 Morie Sand #1 DEPTH 96.01 ft. OEPTH_--'1=.24-""-"-0-'-ft"-"-- LENGTH OF CASING + LENGTH OF SCREEN + LENGTH OF CORE HOLE : 126.5 ft. TOTAL BENTONITE SEALS I I I I I I I I I m u D u I I I I I Mllft111S IRR IN E tliift11J ENVIRONMENT AL rll!!J!llcoNsu LT ANT.S GROUND WATER MONITORING INSTALLATION DETAIL PROJECT: GROUND WATER CHARACTERIZATION STUDY JOB NO G-9169 LOCATION: SWANNANOA, NORTH CAROLINA INSTALLATION NO STW-1 CLIENT: CHEMTRONICS TYPE OF INSTALLATION TEST WELL CONTRACTOR: GRAVES WELL DRILLING SHALLOW (SAPROLITE) DRILLER: J. HALL CERTIFICATION NO: BORING NO. 1060 NC 2 LOCATION• DA 23 AREA SEC FIELD REPRESENTATIVE: J. GILLESPIE INSTALLATION DATE 10/18/89 SURVEY 1 ~ TOP OF PROTECTIVE CASINO (CAP OPEN) DATUM MSL I NIA EL. N/ A STICKUP GROUND TOP OF WEU CASING OR RlSER PIPE SURFACE ELEVATION: 2275.89 EL 2278.39 DEPTH 2.5ft. w Sandy Clay (CL) TYPE OF SURFACE SEAL Neat Cement Grout _J Neat <( 10.0 THICKNESS OF SURFACE SEAL 23.0 ft. u Cement (/) Grout 0 t-TYPE OF PROTECTIVE CASING NIA t-~ INSIDE DIAMETER Rill: 0 TOT Al LENGTH NIA z -(/) _J <( . BOTTOM OF PROTECTIVE CASING UJ EL. NIA DEPTH NIA (/) 0 z <( Sandy Slit (ML) 23.0 I:/ ~ TYPE OF WELL CASING OR RISER PIPE Black Steel _J ~ INSIDE DIAMETER 6 i/4 In. _J Bentonlte ~ IL ~ ~ t'L u <( ai APPROXIMATE DIAMETER OF BOREHOLE 12 1/4 In. ui 26.5 z 0 E Sand Pack TOP OF WELL POINT 0 EL. 2245.62 DEPTH 30.27 ft. z 0 u TYPE OF WELLPOINT Stalnless Steel _J SCREEN GAUGE OR SIZE OF OPENINGS 0.010 In. 0 INSIDE DIAMETER 6 1/4 In. (/) TYPE OF BACKFILL AROUND POINT FX-50 sand UJ !::! a: <( ::;; BOTTOM OF WELL POINT ::;; . 57.0 EL. 2220.62 DEPTH 55.27 ft . ::) (/) Cuttings BOTTOM OF BOREHOLE • AGlJRES ABOVE REFER -EL 2216.39 DEPTH 59.5 ft. • ALL DEPTHS ARE REFERENCED TO DEPTH IN FEET TO GROUND SURFACE 32.20 ft. 25.00 ft. 57.77 ft. ~A LENGTH OF CASINO + LENGTH OF SCREEN = TOTAL BENTONITE SEALS I I I I I I I I I g I 0 D GROUND WATER MONITORING INSTALLATION DETAIL JOBNO __ ~G~-~9~1~69e.._ ___ _ PROJECT: GROUND WATER CHARACTERIZATION LOCATION: SWANNANOA, NORTH CAROLINA -------'------------------INSTALLATION NO -~D~TW~-~2__;_ CLIENT: CHEMTRONICS ---------------------TYPE OF INSTALLATION ___ _ CONTRACTOR: GRAVES WELL DRILLING INC. TEST WELL (BEDROCK) BORING NO. 3 DRILLER: J. HALL CERTIFICATION NO: 1060 NC ---''------------------LOCATION ACID PITS AREA --------SEC FIELD REPRESENTATIVE: --=J.,_. G=:l=.LL=:E=-=S"-P"'IE'--------- INSTALLATION DATE 10-20-89 SURVEY MSL DATUM _________ _ I~ TOP OF PROTECTIVE CASINO (CAP OPEN) EL. N/A STICKUP -'-'N/"-A'--- TOP OF WELL CASINO OR RISER PIPE GROUND SURFACE ELEVATION: 2364.71 r,◄J----EL. __ 2=:3:.:67:.:.:.:.2:.:1__;_STICKUP__;2::;•.a.5..a.ftaa.·--- Lean Clay (CL) w J <( U 15.0 -----I en 0 I- I-0 ~ Sandy Lean Clay (CL) 20.0 ~ SIity Sand (SM) <( W 25.0 en C z <( J J u:: :.:: (.) <( Sandy Clay (CL) al 89.0 ui z 0 j::: ci z 0 (.) J 0 en w !::! a: <( :E :E :::> en Bedrock • FIGURES ABOVE REFER TO DEPTH IN FEET Neat Cement Grout 54.0 Benlonlte Seal 58.0 Sand Pack 89.5 Bentonlte Seal 90.5 Grout 95.17 ----+-J Open Borehole 115.1 • ALL DEPTHS ARE REFERENCED TO GROUND SURFACE TYPE Of SURFACE SEAL THICKNESS OF SURFACE SEAL TYPE OF PROTECTIVE CASING INSIDE DIAMETER TOT AL LENGTH BOTTOM OF PROTECTIVE CASING Neat Cement Grout 54.0 ft. NIA NIA EL. __ Ni_A ___ DEPTH_-'-N"-1'-'A __ _ TYPE OF WELL CASING OR RISER PIPE Black Steel INSIDE DIAMETER 6 1/4 In. APPROXIMATE DIAMETER OF BOREHOLE 12 1/4 In. TOP OF WELL POINT EL._~2::;3:,:0;.:2"'.1'-'1 __ DEPTH_~6"-'2"".6"-"ft'-. __ TYPE OF WELLPOINT SCREEN GAUGE OR SIZE OF OPENINGS INSIDE DIAMETER TYPE OF BACKFILL AROUND POINT BOTTOM OF WELL POINT Stainless Steel 0.020 In. 6 1/4 In. Mone Sand #1 EL. 2276.54 DEPTH 88.17 ft. Blank Casing Length 7.0 ft. BOTTOM OF BOREHOLE EL. 2249.61 DEPTH __ 1.,_1!.:5::_.1.,__,.,ft'-. __ --,-=6:,:5,:-:.1-::0:=ft-::.==-+ ---"'25,c,.,,_57:....uft~, --+ 26,93 ft, = __ 1.c..17c..c·c..6ccft.c... - LENGTH OF CASINO LENGTH OF SCREEN LENGTH OF COREHOLE TOTAL BENTONITE SEALS ~ /2'.3 I I I I I I I APPENDIXF HANDWRITI'EN DOCUMENTATION • I I I • I n u n D n B I I I I I I I , APPENDIXG SITE MAPS I AND i I AS-BUILT DRAWINGS I I . D •u D m I I I I -------• -- - -- - ------------------ l:f;fcl~,Ji, e ZWWZS:C&iil uaas.2,2 .. eUIM,..s,.fVGAJ.KWWWU:Jif!!J-t&&e .{R-·•·· !ll!SSN-''• £4 1, ..... -Jlllilftlll!l.iL &IAiiiU .. " -- ---·------------ ,. ________ .. ·------------------------------------------------------------------------------ T, _________ .,;sa __ .. ,., .. t01, ........ _::11 ..... ,,...J,. ________ t11t••-•··-·"·'"·"'''"blllh"' .......... ..,,.,.,,.._ • .,..tll,i .. &&ION& .... .,,.. .. 1, .. :.■w,r41.--- ---_____ , ___________________________________ ....;_ _______________________________________________ ,. CHEMTRONICS SITE RE"i\1EDIATION SW ANN,l~NOA, NOR"fH CAROI ... INA • l ' ! I ' t ,,. ' ' i r ' .1i .I. f I -' ' -' ' CJ t' l ir1 I I l ' ' l ! ·i l -· C ( :• l !. ·, , __ I .j , . ' ' ~1 I ! -If r, i; I , ', ' 1 I I 1'.--- ' I : i l ' I (' _I { I ' ' i i ' I . - - I ___ I I 7 :• I I ' IA [L Pl SPQSf.l..._ARF;AJ OJ_U ( l l ' l D FXTRUSION fill LAB TEST 0 CAP STRIP C) SEAN REPAIR Q PANEL REPAIR I 0 I) I SPO~A L AR,HU,L3, • VENT PENETRATION <:;TPll(TIIPf .,---~-------. .I....-• I f] • i ACID PIT '"'~~~:max $JSt.:Oa&.½J eaz.44,0114 I 21 A 4.111¥.ll A441A>ii4R4@W!JC P Ji ,A441ZJ4J# il$3..iii ,,,, .ZU)UtdtiiiW I IU"t& ••• 4144_,_..,.. ___ -il"""------------------------- Jt\TTALA LINING SYSTEMS, PHONE ._.,-.. -., ,---.,, ., ,' ·-, P.O. BOX 1138 K0SCIU~;K0. MS. :59090 601--289--1 f)~q I NC. ' j,.-.. (v-PAN[L II) ANCHOR TRENCH DISPOSAL AREA 9 --------· - - . . ----SCALE-1" =40' OWNER N.011;__!_;_ Syrnbol,, repn•s;;n1 location ,)r;ly, notactu::il size NO T_E 2 . Anchc,r tr<-n(r, 1s 1 · \.'-1 x 3' [1 NOTLJ~ T1•,is revi,.i,,n c,or,t31ns the f,)flow1ng ch::i.nges ,A,(Jd•~d the fin:~ I drawir;q for the !',cld Fit 2 Expar,tJe•'1 the trench wl(!tr, to sr1•)Wa flat Yiew. ' The CA.R ti's that b"'91n with• denotes tr1ose repairs 1r1at W"r~ cap,:,,,,d. Ct-lEMTRONICS POTENTIALLY RESPONSIBLE PARTY (PRP) GROUP Drawing Mo. AB-92 10 Drawn By C./1. PAYTON ENGINEER SIRRINE ENVIRONMENTAL CONSULTANTS Checked E-1 SA_ CHEEK Apprc,v,d ey CANNONIE= ENVIRONMENTAL DBte I 0111219,2 Ii--~--·-----· ....... ,,... ............ -----ill I