Loading...
HomeMy WebLinkAboutSWA000058_185984-Stormwater Report with calculation book_9/27/2019STORMWATER REPORT Prepared For: PROJECT CURE SITE DEVELOPEMENT CATAWBA COUNTY, NORTH CAROLINA Prepared By: CIVIL & ENVIRONMENTAL CONSULTANTS, INC. CHARLOTTE, NORTH CAROLINA CEC Project 185-984 MARCH 2O19 North Carolina Board of Examiners For Engineers and Surveyors License No. C-3035 'iIA V Civil & Environmental Consultants, Inc. 1400 Center Park Drive, Suite A I Charlotte, NC 28217 1 p: 980-224-8104 f: 980-224-8172 1 www,cecinc.com TABLE OF CONTENTS 1.0 CONSTRUCTION NARRATIVE...................................................................................I 1.1 PROJECT DESCRIPTION................................................................................... 1 1.2 SITE DESCRIPTION............................................................................................ 1 1.3 ADJACENT PROPERTY..................................................................................... 1 1.4 SOILS..................................................................................................................... 1 2.0 CONSTRUCTION SEQUENCE......................................................................................2 3.0 PERMANENT STORMWATER MEASURES............................................................3 3.1 PROPOSED STORMWATER SYSTEM.............................................................. 3 3.2 STORMWATER CALCULATIONS..................................................................... 4 APPENDICES Appendix A — Stortnwater Drainage Calculations Civil & Environmental Consultants, Inc. Project Cure Stormwater Report March 2019 1.0 CONSTRUCTION NARRATIVE 1.1 PROJECT DESCRIPTION Project Cure consist of the mass grading, roadway, water and sewer development to support three proposed lots in the Trivium Corporate, located adjacent to Robinwood Road in Hickory, North Carolina. The proposed permanent wetpond BMP measure will receive stormwater from two future industrial building sites — Lots identified as Lot W2 and Lot W3 including all of Lutetium Circle. 1.2 SITE DESCRIPTION The site is approximately 25 acres of largely vacant farmland. The site, latitude N35°41'6.47" and longitude W81°17' 18.33", is situated in Catawba County, North Carolina. The 7.5 Minute Series USGS Topographical Map (Hickory, North Carolina) was published in 2016. 1.3 ADJACENT PROPERTY The land use in the vicinity is mainly undeveloped with some residential properties nearby. 1.4 SOILS The proj ect site soil is described as FaE3 — Fairview Clay Loam with 10% to 25% slopes, FdE2 — Fairview Soils with 10% to 25% slopes CsA — Codorus loam with 0% to 2% slopes, TmB — Tomlin Loam with 2% to 6% slopes, TmC — Tomlin Loam with 6% to 10% slopes, TmD — Tomlin Loam with 10% to 15% slopes, and ToC2 — Tomlin Clay Loam with 6% to 10% slopes. The soils are in the Hydrology Group B/D, & B respectively. See Soil Data section in Attachment A of this report. Civil & Environmental Consultants, Inc. -I- Project Cure Stormwater Report March 2019 2.0 CONSTRUCTION SEQUENCE 1. Mass grade entire site as indicated in the design plans to establish the proposed roadbed, pad for Lot WI, W2 and W3. Upon reaching rough grade of the roadway section, install storm drainage system (System A) with inlet protection. 2. Once mass grading, the proposed roadway and related utilities are complete and the entire site has been fully stabilized, the erosion control sediment basin may be converted to a permanent wetpond BMP. 3. BMP wetpond will initially serve the storm drainage from Lutetium Circle and mass grading from Project Cure and adjacent sites. 4. A future development project on Lot W2 will follow and be constructed using its own independent temporary erosion control measures with storm drainage temporarily discharging into the Lutetium Circle storm drainage system. Drainage from disturbed areas of this project may not enter the permanent stormwater measure without the use of on -site erosion control measures until the site is fully stabilized and approval from Engineer and NCDEQ has been obtained. 5. Once construction has been completed and the entire site on Lot W2 has been fully stabilized, stormwater discharge from Lot W2 may be routed to the permanent BMP Wetpond. 6. This BMP Wetpond has been sized to receive storm drainage from a portion of Robinwood Road, all of Lutetium Circle and Lots W2 & W3 with a proposed drainage area of 24.54 acres and a max impervious area of 17.18 acres (70% of total site), see attached site map figure #1. 7. If impervious from these areas are more than stated above, the wetpond will be re-evaluated and either re -designed or new BMP's will be implemented to account for the increase. Civil & Environmental Consultants, Inc. -2- Project Cure Stormwater Report March 2019 3.0 PERMANENT STORMWATER MEASURES 3.1 PROPOSED STORMWATER SYSTEM The stormwater runoff for the project, once totally built out, primarily originates from roads building roofs, parking lots and on -site grassed drainage. This project has an assumed future total impervious area for the 25 acre site of 70%. (See figure 1 in the Appendix for the lots draining into the proposed stormwater management facility) Stormwater from the above mentioned areas are directed to any one of a number of drainage structures, including but not limited to curb inlets, grate inlets, and yard inlets. Once the stormwater has entered the drainage system through the structures, it is directed by gravity flow through the stormwater drainage system to the BMP Wet Pond. For the proposed Wet Pond outfall, Hydrology analysis using TR-55 Tables provided a curve number of 69 for pre -developed area, and a curve number of 87 for post -developed area. Rainfall depth data from NOA Atlas 14, Volume 2, Version 3. The analysis demonstrates that pre - development peak discharge will decrease for both the 2-year and 10-year 24-hour storm events at the Point of Interest (POI) (see drainage area maps attached and Table 1 below). TABLE 1. SUMMARY OF PRE/POST PEAK DISCHARGES & MAX ELEVATIONS ANALYSIS POINT — WETPOND OUTFALL Storm Event Pre Development (cfs) Post -Development (cfs) Max Elevation (ft) 1-YEAR 27.77 4.84 885.68 2-YEAR 43.88 20.53 886.02 10-YEAR 93.81 82.87 887.12 25-YEAR 154.51 167.03 887.72 100-YEAR 183.67 200.57 887.92 The post -developed discharge from both the 2-year and 10-year 24-hour storm event meets the NCDEQ and City of Hickory requirements (City of Hickory Land Development Code, Henry River Conservation Overlay District, Article 4 section 4.7.4). The site outfalls to an existing Tributary to Muddy Creek. Riprap dissipaters in conjunction with matting and riprap lined channels are used to reduce flow velocities. Furthermore, after the stormwater runoff has exited Civil & Environmental Consultants, Inc. -3- Project Cure StormwaterReport March 2019 the riprap dissipators, it will flow through undisturbed existing vegetated areas, further decreasing the velocity before entering surface waters adjacent to the site. 3.2 STORMWATER CALCULATIONS Stormwater calculations were performed using the rational method to determine the peak flow through any one drainage structure. These flows were added together, proceeding downstream in the system to ensure that each subsequent pipe was capable of handling the peak flows. The rational coefficient (C) was conservatively assumed to be constant throughout the drainage area, even in areas that will be landscaped or grassed. The 25-year 24-hour storm event was used with a 5 minute time -of -concentration to yield an intensity (i) value for the storm drainage piping system. Wet Pond calculations were performed using Hydrographs while treating the 1st inch of rainfall with the outlet structure controlling the 2 & 10-year 24-hour storm events, resulting in the flows from post -development being less than the pre -development flows. The structure has been sized to be capable of handling the 10-year storm event with a max elevation of 887.12 with a peak flow of 82.87cfs before activating the emergency overflow weir. The emergency overflow weir is capable of handling the 100-year storm event with a max elevation of 887.92, which is 1.08ft from the top of berm, with a peak flow of 200.57cfs. The proposed stormwater management facility (wet pond) is designed to treat approximately 25 acres of development in the western portion of the Trivium Corporate Center (area bounded by Robinwood to the tributary to Muddy Creek on the east). Specifically Lutetium Circle, lots W2 and W3 as identified by the Trivium Corporate Center masterplan dated March 2019. The initial development of Lot W2 has been allotted 70% impervious coverage of the proposed 8.95 acre lot. If the lot yields less overall impervious upon final development, Lot W3 may utilize the remaining impervious area allotment upon development of said lot. The City of Hickory will be required to maintain the design and development records for each lot to ensure that no more that 70% impervious area coverage is provided in the future. Trivium Corporate Center will be responsible for the overall construction and future operation and maintenance of the stormwater measure. Civil & Environmental Consultants, Inc. 4- Project Cure StormwaterReport March 2019 APPENDIX A STORMWATER DRAINAGE CALCULATIONS USGS MAP IS USGS U.S. DEPARTMENT GEOLOGICAL GIICAL SURV YERIOR science for a changing world 81°22'30" 35°45' 467000mE 1 468 469 39 6000m N 395! 395' 395' 395, 42'30" 40' 3951 3s4c 394E 394( 700 OOC FEET 3s4� 394[ 394` 35°37'30" 467 1 300 000 FEET 1 468 81°22'30" Produced by the United States Geological Survey North American Datum of 1983 (NAD83) World Geodetic System of 1984 (WGS84). Projection and 1 000-meter grid: Universal Transverse Mercator, Zone 17S 10 000-foot ticks: North Carolina Coordinate System of 1983 This map is not a legal document. Boundaries may be generalized for this map scale. Private lands within government reservations may not be shown. Obtain permission before entering private lands. Imagery ................................................... NAIP, May 2014 Roads ................................ U.S. Census Bureau, 2015 - 2016 Names..........................................................GNIS, 2016 Hydrography ....................National Hydrography Dataset, 2014 Contours............................National Elevation Dataset, 2008 Boundaries ............ Multiple sources; see metadata file 1972 - 2016 Wetlands ......... FWS National Wetlands Inventory 1977 - 2014 The National Map USTopo 20' 470 i 471 477 17'30" 472 i 474 475 � g HICKORY QUADRANGLE NORTH CAROL INA-CATAWBA CO. 7.5-MINUTE SERIES 81°15' 476 1 330 000 FEET 1 477 35°45' 0 0 oR 3956 Non U INS It kit 1-OMAN nwo 10-1 ILI LA MESA,, INS -I.. 1A al 4401 ' 010 00171 • 11WAF 011 Im Ift A, Pei .1 -91 WO � o WON RAP WN ■ IEM 1 � W4 MW IIZIWWASILWW 469 M. 7° 25' 132 MILS 14 0° 11' 3 MILS UTM GRID AND 2016 MAGNETIC NORTH DECLINATION AT CENTER OF SHEET U.S. National Grid 100,000-m Square ID My Grid Zone Designation 17S 20' 470 1 471 472 473 17'30" 1 474 SCALE 1:24 000 1 0.5 0 KILOMETERS 1 2 1000 500 0 METERS 1000 2000 1 0.5 0 1 MILES 1000 0 1000 2000 3000 4000 5000 6000 7000 8000 9000 10000 FEET CONTOUR INTERVAL 20 FEET NORTH AMERICAN VERTICAL DATUM OF 1988 This map was produced to conform with the National Geospatial Program US Topo Product Standard, 2011. A metadata file associated with this product is draft version 0.6.19 475 � NORTH CAROLIN QUADRANGLE LOCATION 1 Granite Falls 1 2 3 2 Bethlehem 3 Millersville 4 5 4 Longview 5 Newton 6 Banoak 6 7 8 7 Reepsville 8 Maiden ADJOINING QUADRANGLES 3955 730 000 FEET 3954 3953 3952 42'30" 3951 3950 3949 3948 40' 3946 3945 3944 3s43000m N 476 477000m E 81°15' 35°37'30" ROAD CLASSIFICATION Expressway Local Connector Secondary Hwy Local Road — Ramp 4WD . Interstate Route US Route O State Route HICKORY, NC 2016 SOIL MAP v o 35° 41' 17" N 14 Hydrologic Soil Group —Catawba County, North Carolina (LOD) 473800 473900 474000 474100 474200 I 7 n ILA_ r ,•tom Ldi Soil Map may not he valiel at this scale. 35° 40' S0" N I =PMI 473800 473900 474000 474100 v Map Scale: 1:4,100 if printed on A portrait (8.5" x 11") sheet. o Meters N 0 50 100 200 ?00 Feet 0 150 300 600 900 Map projection: Web Mercator Conermordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 USDA Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 474300 4742M 474300 o 35° 41' 17" N 35° 40' 50" N m o 3/5/2019 Pagel of 4 Hydrologic Soil Group —Catawba County, North Carolina (LOD) MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils Soil Rating Polygons 0 A 0 A/D 0 B 0 B/D 0 C 0 C/D 0 D 0 Not rated or not available Soil Rating Lines r 0 A r 0 A/D B r B/D N 0 C r 0 C/D r 0 D r 0 Not rated or not available Soil Rating Points 0 A 0 A/D 0 B 0 B/D ❑ C 0 C/D 0 D ❑ Not rated or not available Water Features Streams and Canals Transportation — Rails ­0 Interstate Highways US Routes Major Roads Local Roads Background Aerial Photography MAP INFORMATION The soil surveys that comprise your AOI were mapped at 1:15,800. Warning: Soil Map may not be valid at this scale. Enlargement of maps beyond the scale of mapping can cause misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting soils that could have been shown at a more detailed scale. Please rely on the bar scale on each map sheet for map measurements. Source of Map: Natural Resources Conservation Service Web Soil Survey URL: Coordinate System: Web Mercator (EPSG:3857) Maps from the Web Soil Survey are based on the Web Mercator projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. This product is generated from the USDA-NRCS certified data as of the version date(s) listed below. Soil Survey Area: Catawba County, North Carolina Survey Area Data: Version 18, Sep 10, 2018 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Apr 8, 2015—Nov 28, 2017 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. USDA Natural Resources Web Soil Survey 3/5/2019 Conservation Service National Cooperative Soil Survey Page 2 of 4 Hydrologic Soil Group —Catawba County, North Carolina Iwe] C Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CsA Codorus loam, 0 to 2 B/D 0.3 0.8% percent slopes, frequently flooded FaE3 Fairview clay loam, 10 B 20.5 52.7% to 25 percent slopes, severely eroded FdE2 Fairview soils, 10 to 25 B 0.0 0.1 % percent slopes, moderately eroded TmB Tomlin loam, 2 to 6 B 2.4 6.3% percent slopes TmC Tomlin loam, 6 to 10 B 3.7 9.5% percent slopes TmD Tomlin loam, 10 to 15 B 11.2 28.8% percent slopes ToC2 Tomlin clay loam, 6 to B 0.7 1.9% 10 percent slopes, moderately eroded Totals for Area of Interest 38.9 100.0% USDA Natural Resources Web Soil Survey 3/5/2019 Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group —Catawba County, North Carolina Iwe] C Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff.- None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 3/5/2019 Conservation Service National Cooperative Soil Survey Page 4 of 4 RAINFALL DATA Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 Location name: Newton, North Carolina, USA* Latitude: 35.6851*, Longitude:-81.2879° Elevation: 958.28 ft** * source: ESRI Maps "w s 0 r m ** source: USGS " POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches)1 Average recurrence interval (years) 1 2 5 10 25 50 100 200 500 1000 0.371 0.439 0.518 0.578 0.652 0.706 0.760 0.812 0.877 0.928 5-min (0.341-0.404) (0.404-0.479) (0.475-0.565) (0.528-0.630) (0.591-0.711) (0.636-0.772) (0.678-0.833) (0.717-0.895) (0.762-0.975) (0.795-1.04) 0.592 0.702 0.829 0.924 1.04 1.13 1.21 1.29 1.39 1.46 10-min (0.545-0.645) (0.646-0.766) (0.761-0.905) (0.844-1.01) (0.942-1.13) 1 (1.01-1.23) 1 (1.08-1.32) 1 (1.21-1.54) (1.25-1.64) 0.740 0.882 1.05 1.17 1.32 1.42 1.53 1.62 1.75 1.84 15-min (0.681-0.806) (0.812-0.962) (0.962-1.15) 1 (1.07-1.27) 1 (1.19-1.44) 1 (1.28-1.56) 1 (1.36-1.67) 1 (1.43-1.79) 1 (1.52-1.94) (1.57-2.05) 1.01 1.22 1.49 1.69 1.95 2.15 2.34 2.53 2.78 2.97 30-min (0.934-1.11) (1.12-1.33) 1 (1.37-1.63) 1 (1.55-1.85) 1 (1.77-2.13) 1 (1.93-2.34) (2.09-2.56) (2.23-2.79) (2.41-3.09) (2.54-3.33) 60-min 1.26 1.53 1.91 2.21 2.60 2.91 3.22 3.55 3.99 4.34 (1.16-1.38) (1.41-1.67) (1.75-2.09) (2.02-2.40) (2.36-2.83) (2.62-3.18) (2.87-3.53) (3.13-3.91) (3.46-4.43) (3.71-4.86) 1.47 1.79 2.25 2.62 3.13 3.54 3.96 4.40 5.03 5.53 2-hr (1.35-1.61) (1.64-1.95) (2.06-2.46) (2.39-2.86) (2.83-3.42) (3.17-3.87) (3.52-4.36) (3.86-4.87) (4.33-5.61) (4.69-6.21) 1.58 1.91 2.41 2.81 3.38 3.85 4.33 4.86 5.60 6.22 3-hr (1.45-1.73) (1.75-2.10) (2.20-2.65) (2.56-3.09) (3.05-3.71) (3.44-4.24) (3.83-4.79) (4.24-5.40) (4.80-6.28) (5.24-7.02) 1.95 2.35 2.95 3.44 4.12 4.68 5.28 5.91 6.81 7.54 6-hr (1.79-2.13) (2.16-2.57) 1 (2.71-3.23) 1 (3.14-3.75) 1 (3.73-4.50) 1 (4.21-5.12) 1 (4.69-5.79) 1 (5.19-6.51) 1 (5.87-7.56) (6.39-8.43) 2.39 2.89 3.62 4.21 5.02 5.68 6.36 7.09 8.10 8.91 12-hr (2.21-2.61) (2.66-3.15) (3.33-3.95) (3.86-4.58) (4.57-5.46) (5.13-6.18) (5.69-6.93) (6.27-7.74) 1 (7.05-8.87) (7.65-9.81) 2.96 3.59 4.55 5.30 6.34 7.16 8.01 8.89 10.1 11.1 24-hr (2.75-3.21) (3.33-3.89) (4.21-4.93) (4.90-5.73) (5.83-6.85) (6.56-7.75) (7.31-8.67) (8.07-9.64) 1 (9.11-11.0) (9.93-12.0) 3.53 4.26 5.35 6.20 7.35 8.25 9.17 10.1 11.4 12.4 2-day (3.27-3.83) (3.95-4.62) 1 (4.95-5.80) (5.72-6.71) (6.75-7.95) (7.56-8.93) (8.38-9.94) 1 (9.20-11.0) 1 (10.3-12.4) (11.2-13.5) 3.75 4.52 5.64 6.51 7.69 8.61 9.56 10.5 11.8 12.9 3-day (3.48-4.05) (4.20-4.88) 1 (5.23-6.09) 1 (6.01-7.02) 1 (7.08-8.30) 1 (7.91-9.30) 1 (8.74-10.3) 1 (9.59-11.4) 1 (10.7-12.8) (11.6-14.0) 3.97 4.78 5.93 6.82 8.03 8.98 9.95 10.9 12.3 13.4 4-day (3.70-4.27) (4.44-5.14) 1 (5.50-6.38) 1 (6.31-7.34) 1 (7.40-8.64) 1 (8.25-9.67) 1 (9.11-10.7) 1 (9.99-11.8) 1 (11.2-13.3) (12.1-14.5) 4.59 5.49 6.69 7.61 8.84 9.80 10.8 11.7 13.1 14.1 7-day (4.29-4.91) (5.13-5.88) 1 (6.24-7.16) 1 (7.09-8.15) 1 (8.21-9.47) 1 (9.08-10.5) 1 (9.94-11.6) 1 (12.0-14.1) (12.9-15.2) 5.25 6.26 7.52 8.48 9.74 10.7 11.7 12.7 14.0 14.9 10-day (4.93-5.59) (5.88-6.66) 1 (7.06-8.01) 1 (7.94-9.03) 1 (9.10-10.4) 1 (9.98-11.4) 1 (10.9-12.5) 1 (12.9-14.9) (13.8-16.0) 7.00 8.29 9.79 10.9 12.5 13.7 14.9 16.1 17.6 18.9 20-day (6.62-7.41) (7.83-8.77) (9.24-10.4) 1 (10.3-11.6) (11.7-13.2) 1 (12.8-14.5) 1 (13.9-15.8) 1 (16.4-18.8) (17.5-20.1) 8.66 10.2 11.7 12.9 14.4 15.5 16.5 17.6 18.9 19.9 30-day (8.26-9.08) (9.71-10.7) (11.2-12.3) 1 (12.3-13.5) (13.7-15.1) 1 (14.7-16.2) 1 (15.7-17.4) 1 (17.9-20.0) (18.8-21.1) 45-day 10.9 12.8 14.4 15.7 17.3 18.4 19.5 20.6 22.0 23.0 (10.5-11.4) (12.2-13.3) 1 (13.8-15.1) 1 (15.0-16.4) 1 (16.5-18.0) (17.6-19.3) 1 (18.6-20.4) 1 (19.6-21.6) 1 (20.9-23.1) (21.8-24.2) 13.0 15.1 17.0 18.4 20.1 21.4 22.7 23.9 25.4 26.5 60-day (12.5-13.5) (14.5-15.8) (16.3-17.7) (17.6-19.1) (19.3-21.0) LELL22.3) (21.7-23.6) (22.8-24.9) (24.2-26.5) (25.2-27.7) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5 % . Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https://hdsc. nws.noaa. gov/hdsc/pfds/pfds_printpage. html?lat=3 5.6851 &1on=-81.2879&data... 2/4/2019 Precipitation Frequency Data Server Page 2 of 4 c 30 25 f PF graphical PD5-based depth -duration -frequency (DEW) curves Latitude: 35.6851 Longitude: -812879' C C C C a L L L L L- E • t t t L N N N rO N N N N u'7 p A CS O N A f�] u5 N �" � N � � � N A 4 � � r� O � � O O � Q � LA O rl rn lO rl N m V rG Duration on 25 c L 20 a 0 15 49 'a 10 a I NOW �—.. NO N a �E�N 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAAAtlas 14, Volume 2. Version 3 Created {GMTY Mon Feb 4 19:44-59 2019 Back to Top Average recunance interval {years) — 1 2 — 5 10 25 50 100 200 500 1000 Duration — 5-min — 2-day — 1Dmm — 3-day 15-nm — 4-day — 30-min — 7-day — 80-min — 1 0-clay — 2-hr — 20-day — 3-rr — 30-day — 8fir — 45-day — 12-hr — 60-day — 24-hr https:Hhdsc. nws.noaa. gov/hdsc/pfds/pfds_printpage. html?lat=3 5.6851 &ton=-81.2879&data... 2/4/2019 Precipitation Frequency Data Server Page 3 of 4 Maps & aerials Small scale terrain Large scale terrain Kingsport' Bristol Johnson City* 3 winston-Salem q a 4 Dul A ti Greensboro Mt mitdiell Ashedille 0 RT H C A R 0 L I N A Charlotte F+etevi •Greenville ti 711 TT4 P L) T T 114 A Large scale map ....... .. . ---King&p& JGinson City Winston-Salew Greensboro li 61 Ash Ile--- North Carolina GFe le 00 M pom i https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.685 I&Ion=-81.2879&data... 2/4/2019 Precipitation Frequency Data Server Page 4 of 4 Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questionsidnoaa.aov Disclaimer https:Hhdsc. nws.noaa. gov/hdsc/pfds/pfds_printpage. html?lat=3 5.6851 &lon=-81.2879&data... 2/4/2019 Precipitation Frequency Data Server Page 1 of 4 NOAA Atlas 14, Volume 2, Version 3 Location name: Newton, North Carolina, USA* Latitude: 35.6851*, Longitude:-81.2879° Elevation: 958.28 ft** * source: ESRI Maps "w s 0 r m ** source: USGS " POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M.Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)' Average recurrence interval (years) 1 2 5 10 25 50 100 200 5001 1000 4.45 5.27 6.22 6.94 7.82 8.47 9.12 9.74 10.5 11.1 5-min (4.09-4.85) (4.85-5.75) (5.70-6.78) (6.34-7.56) (7.09-8.53) (7.63-9.26) (8.14-10.00) 1 (8.60-10.7) (9.14-11.7) 3.55 4.21 4.97 5.54 6.23 6.75 7.25 7.72 8.33 8.77 10-min (3.27-3.87) (3.88-4.60) (4.57-5.43) (5.06-6.04) (5.65-6.80) (6.08-7.37) 1 (6.47-7.94) 1 (6.82-8.51) (7.23-9.25) 2.96 3.53 4.20 4.68 5.27 5.70 6.10 6.50 6.99 7.34 15-min (2.72-3.22) 1 (3.25-3.85) 1 (3.85-4.58) 1 (4.27-5.10) 1 (5.13-6.22) 11 (5.45-6.70) 1 (5.73-7.16) 1 (6.07-7.76) 1 (6.28-8.22) 2.03 2.44 2.98 3.39 3.90 4.29 4.68 5.06 5.56 5.94 30-min (1.87-2.21) (2.24-2.66) (2.73-3.25) (3.10-3.69) (3.54-4.26) (3.86-4.69) (4.17-5.13) (4.46-5.57) (4.83-6.18) (5.09-6.65) 1.26 1.53 1.91 2.21 2.60 2.91 3.22 3.55 3.99 4.34 60-min (1.16-1.38) (1.41-1.67) (1.75-2.09) (2.02-2.40) (2.36-2.83) (2.62-3.18) (2.87-3.53) (3.13-3.91) (3.46-4.43) 0.736 0.893 1.13 1.31 1.56 1.77 1.98 2.20 2.51 2.76 2-hr (0.675-0.802) (0.818-0.976) (1.03-1.23) 1 (1.19-1.43) 1 (1.58-1.94) 11 (1.76-2.18) 1 (1.93-2.43) (2.17-2.80) (2.34-3.11) 0.525 0.635 0.803 0.936 1.13 1.28 1.44 1.62 1.87 2.07 3-hr (0.482-0.576) (0.582-0.698) (0.734-0.882) (0.852-1.03) 1 (1.15-1.41) 11 (1.28-1.59) 1 (1.41-1.80) 1 (1.60-2.09) 1 (1.74-2.34) 0.325 0.392 0.492 0.574 0.688 0.782 0.881 0.986 1.14 1.26 6-hr (0.299-0.355) (0.361-0.429) (0.452-0.539) (0.524-0.626) (0.624-0.751) (0.704-0.855) (0.784-0.967) (0.867-1.09) 1 (0.979-1.26) 0.199 0.240 0.300 0.349 0.416 0.471 0.528 0.588 0.672 0.739 12-hr (0.183-0.216) (0.221-0.261) (0.276-0.328) (0.320-0.380) (0.379-0.453) (0.426-0.513) (0.473-0.575) (0.520-0.642) (0.585-0.736) (0.635-0.814) 0.123 0.150 0.190 0.221 0.264 0.298 0.334 0.370 0.421 0.460 24-hr (0.115-0.134) (0.139-0.162) (0.176-0.205) (0.204-0.239) (0.243-0.285) (0.274-0.323) (0.305-0.361) (0.336-0.402) (0.379-0.457) (0.414-0.501) 0.074 0.089 0.112 0.129 0.153 0.172 0.191 0.211 0.238 0.259 2-day (0.068-0.080) (0.082-0.096) (0.103-0.121) (0.119-0.140) (0.141-0.166) (0.157-0.186) (0.174-0.207) (0.192-0.229) (0.215-0.258) (0.233-0.281) 0.052 0.063 0.078 0.090 0.107 0.120 0.133 0.146 0.165 0.179 3-day (0.048-0.056) (0.058-0.068) (0.073-0.085) (0.084-0.098) (0.098-0.115) (0.110-0.129) (0.121-0.143) (0.133-0.158) (0.149-0.178) (0.162-0.194) 0.041 0.050 0.062 0.071 0.084 0.094 0.104 0.114 0.128 0.139 4-day (0.038-0.045) (0.046-0.054) (0.057-0.066) (0.066-0.076) (0.077-0.090) (0.086-0.101) (0.095-0.112) (0.104-0.123) (0.116-0.138) (0.126-0.151) 0.027 0.033 0.040 0.045 0.053 0.058 0.064 0.070 0.078 0.084 7-day (0.026-0.029) (0.031-0.035) (0.037-0.043) (0.042-0.048) (0.049-0.056) (0.054-0.062) (0.059-0.069) (0.064-0.075) (0.071-0.084) (0.077-0.090) 0.022 0.026 0.031 0.035 0.041 0.045 0.049 0.053 0.058 0.062 10-day (0.021-0.023) (0.024-0.028) (0.029-0.033) (0.033-0.038) (0.038-0.043) (0.042-0.048) (0.045-0.052) (0.049-0.056) (0.054-0.062) (0.057-0.067) 0.015 0.017 0.020 0.023 0.026 0.028 0.031 0.033 0.037 0.039 20-day (0.014-0.015) (0.016-0.018) (0.019-0.022) (0.021-0.024) (0.024-0.028) (0.027-0.030) (0.029-0.033) (0.031-0.035) (0.034-0.039) (0.036-0.042) 0.012 0.014 0.016 0.018 0.020 0.021 0.023 0.024 0.026 0.028 30-day (0.01 1-0.013) (0.013-0.015) (0.016-0.017) (0.017-0.019) (0.019-0.021) (0.020-0.023) (0.022-0.024) (0.023-0.026) (0.025-0.028) (0.026-0.029) 0.010 1 F 0.012 0.013 0.015 1 F 0.016 1 F 0.017 1 F 0.018 1 F 0.019 0.020 0.021 45-day (0.010-0.011) (0.011-0.012) (0.013-0.014) (0.014-0.015) (0.015-0.017) (0.016-0.018) (0.017-0.019) (0.018-0.020) (0.019-0.021) (0.020-0.022) 0.009 0.011 0.012 0.013 0.014 0.015 0.016 0.017 0.018 0.018 60-day (0.009-0.009) (0.010-0.011) (0.011-0.012) (0.012-0.013) (0.013-0.015) (0.014-0.016) (0.015-0.016) (0.016-0.017) (0.017-0.018) (0.018-0.019) Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90 % confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https://hdsc. nws.noaa. gov/hdsc/pfds/pfds_printpage. html?lat=3 5.6851 &1on=-81.2879&data... 2/4/2019 Precipitation Frequency Data Server Page 2 of 4 PF graphical PD5-based intensity -duration -frequency (IMF) curves Latitude: 35-6851°, Longitude: -51-2879' 100.000 10-000 r c ZI n 1.000 c --------------- 0 001 •� E r t r r t u•7 p VS O O N O O Ln v Duration 100-000 10-000 L C ZI c 1.000 m c 00011 ' ' ' I 1 2 5 10 25 50 100 200 500 1008 Average recurrence interval (years) NDAAAtlas 14, Volume 2, Version 3 Created (GMT): Man Feb 4 19.46-41 2419 Back to Top Average recunance interval {years) — 1 2 — 5 10 25 50 100 200 500 1000 Duration — 5-min — 2-day — 1Dmm — 3-day 15-nm — 4-day — 30-min — 7-day — 6D-min — 1r}eay — 2-hr — 20-day — 3-rr — 30-day — 8fir — 45-day — 12-hr — 60-day — 24-hr https:Hhdsc. nws.noaa. gov/hdsc/pfds/pfds_printpage. html?lat=3 5.6851 &ton=-81.2879&data... 2/4/2019 Precipitation Frequency Data Server Page 3 of 4 Maps & aerials Small scale terrain Large scale terrain Kingsport' Bristol Johnson City* 3 winston-Salem q a 4 Dul A ti Greensboro Mt mitdiell Ashedille 0 RT H C A R 0 L I N A Charlotte F+etevi •Greenville ti 711 TT4 P L) T T 114 A Large scale map ....... .. . ---King&p& JGinson City Winston-Salew Greensboro li 61 Ash Ile--- North Carolina GFe le 00 M pom i https:Hhdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.685 I&Ion=-81.2879&data... 2/4/2019 Precipitation Frequency Data Server Page 4 of 4 Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questionsidnoaa.aov Disclaimer https:Hhdsc. nws.noaa. gov/hdsc/pfds/pfds_printpage. html?lat=3 5.6851 &lon=-81.2879&data... 2/4/2019 STORM PIPING SYSTEMS CALCULATIONS — — — — -- *Now — Zz_ Ij -- 1 D4.36 AC. / 960 j'y C VALUE: 0.37 DA: 0.27 AC. 11 r C-VALUE0.80 77 CI AC. C-VALUE: 0.75 \ \ \ \ — / / / ��\ \ \ / / 70% IMPERVIOUS \ \ \ \ \ \ \ \/ I /' / / // / / / / / / C-VALUE: 0.72- V\ ESTIMATED THIS I�I \ \\ — \ \ \\ \ \/ DRAINAGE STRUCTURE j— %1\ \ \ \/ '\ '\ \ o \ \ \ \ \ \\T/ \� — — \/ 50 C-VALUE: 0.76 *70% IMPERVIOUS ESTIMATED THIS YI-13 / \ / / / ! DRAINAGE STRUCTURE l l I I c h I I \ \ \ x *C VALUE: 0.79 \ \ \ \ \ \ 75% IMPERVIOUS \ \ /\ \ TCI-3 DRAINAGESTRUCTURE o I \ \ \ \ \ \\ \\ \ \ \ \ \ \ \ DA- 0.05 AC. C-VALUE: 0.82 /7 / / // as 0.10 AC. ♦ , i'f i T — Z�� C—VALUE: 0.82r— \ CI-4 16 AC o C—VALUE DA: OI24 AC. 0 C-VALUE: 0.40 /DA 0.07 AC. / �C-VALUE: 0.81 \\� v �� Av A - 16 ,,� \ \ \ \ DA: 0.80 AC. C VALUE: 0 37 \ \ O \ _ C VALUE: 0.79 C_VALUE: 0.56-�\C-14 C-VALUE: 0.43 — —� a4 10.14 Ac. i�-- i DA: 0.72 AC. , J� I IIIII _ c VALUE oas C-VALUE: 0.95 � � � � --� � � ' -- CI-15 ----%- CITY OF HICKORY PROJECT CURE -- - Civil &Environmental Consultants Inc. rn HICKORY, NORTH CAROLINA 1900 Center Park Drive - Suite A -Charlotte, INC 28217 \ �\ q/� — �nr n►► fill — --� ��\ �\ % �� Ph: 980.237.0373 • Fax: 980.237.0372 STROM "A" NETWORK '�%� www.cecinacom DRAINAGE MAP O•— DRAWN BY: MRJ CHECKED BY: SWW APPROVED BY: SWW FIGURE NO.: 1 DATE: MARCH 20191 DWG SCALE: 1 "=100' PROJECT NO: 185-984 DASTORM C I Area (sqft) jArea (ac.) CI -Al I mpervious Area 0.95 9,099 0.21 Gravel/Stone 0.55 0 0.00 Lawns 0.30 2,831 1 0.06 Composite C 0.80 11,931 1 0.27 CI-A2 Impervious Area 0.95 7,144 0.16 Gravel/Stone 0.55 0 0.00 Lawns 0.30 3,799 1 0.09 Composite C 0.72 10,943 1 0.25 CI-A3 Impervious Area 0.95 1,673 0.04 Gravel/Stone 0.55 0 0.00 Lawns 0.30 418 1 0.01 Composite C 0.82 2,091 1 0.05 CI-A4 Impervious Area 0.95 1 5,954 1 0.14 Gravel/Stone 0.55 1 0 0.00 Lawns 0.30 1,168 0.03 Composite C 0.84 7,122 1 0.16 CI-A5 Impervious Area 0.95 3,428 0.08 Gravel/Stone 0.55 0 0.00 Lawns 0.30 857 1 0.02 Composite C 0.82 4,285 1 0.10 YI-A6 Impervious Area 0.95 133,406 3.06 Gravel/Stone 0.55 0 0.00 Lawns 0.30 57,174 1.31 Composite C 0.76 190,580 4.38 C Area (sqft) Area (ac.) CI-A7 Impervious Area 1 0.95 1 2,436 1 0.06 Gravel/Stone 1 0.55 1 0 0.00 Lawns 0.30 693 0.02 Composite C 0.81 3,129 1 0.07 CI -AS Impervious Area 0.95 4,854 0.11 Gravel/Stone 0.55 0 0.00 Lawns 0.30 1,602 1 0.04 Composite C 0.79 6,456 1 0.15 Storm Drainage System "A" Runoff Coefficient Calculations C Area (sqft) Area (ac.) CI-A9 Impervious Area 0.95 1,632 0.04 Gravel/Stone 0.55 0 0.00 Lawns 0.30 8,998 0.21 Composite C 0.40 10,630 0.24 CI-A10 Impervious Area 0.95 1,653 0.04 Gravel/Stone 0.55 0 0.00 Lawns 0.30 6,313 0.14 Composite C 0.43 7,965 0.18 CI -All Impervious Area 0.95 4,529 0.10 Gravel/Stone 0.55 0 0.00 Lawns 0.30 1,463 0.03 Composite C 0.79 5,993 0.14 CI-Al2 Impervious Area 0.95 1 1,729 0.04 Gravel/Stone 0.55 1 0 0.00 Lawns 0.30 1 13,510 0.31 Composite C 0.37 1 15,239 0.35 YI-A13 Impervious Area 0.95 139,050 3.19 Gravel/Stone 0.55 0 0.00 Lawns 0.30 45,323 1.04 Composite C 0.79 184,373 4.23 CI-A14 Impervious Area 0.95 3,144 0.07 Gravel/Stone 0.55 0 0.00 Lawns 0.30 12,481 0.29 Composite C 0.43 15,625 0.36 CI-A15 Impervious Area 0.95 7,027 0.16 Gravel/Stone 0.55 0 0.00 Lawns 0.30 2,269 0.05 Composite C 0.79 9,296 0.21 C Area (sqft) Area (ac.) CI-A16 Impervious Area 0.95 14,013 0.32 Gravel/Stone 0.55 0 0.00 Lawns 0.30 20,780 0.48 Composite C 0.56 34,793 0.80 YI-A17 Impervious Area 0.95 242,134 5.56 Gravel/Stone 0.55 0 0.00 Lawns 0.30 103,773 2.38 Composite C 0.75 345,907 7.94 CI-A18 Impervious Area 0.95 20,032 0.46 Gravel/Stone 0.55 0 0.00 Lawns 0.30 169,713 3.90 Composite C 0.37 189,745 4.36 CI-A19 Impervious Area 0.95 31,496 0.72 Gravel/Stone 0.55 0 0.00 Lawns 0.30 0 0.00 Composite C 0.95 31,496 0.72 1B-A20 N/A VIES-A21 N/A PIPE NETWORK A STORM DRAINAGE SYSTEM Pipe Characteristics Rational Method Calculation Q = CiA Manning's and Inlet Control Values Design Outcomes No. FROM TO STR Length (FT) Inv. Out InvIn .STR Diameter Drainage (IN) Area (AC) Runoff Coef. (C) Rainfall Intensity (IN/HR) Pipe Q25 (CFS) Material Roughness Coef. (n) Pipe Slope Headwater Available (FT) HDS-5lnlet Ref. No. Inlet Constant (c) In Constant (y) Manning's Capacity (CFS) Inlet Control Capacity Pipe Size Adequacy Comment Controlling Factor 1 CI -Al CI-A2 32 956.576 956.256 18 0.27 0.80 7.82 1.70 RCP 0.013 1.00% 4.13 1 0.0398 0.67 10.50 15.7 OK Manning's 2 CI-A2 CI-A3 57 956.056 950.378 18 0.25 0.72 7.82 3.13 RCP 0.013 10.00% 4.69 1 0.0398 0.67 33.22 17.2 OK Inlet 3 CI-A3 CI-A5 180 950.178 942.161 18 0.05 0.82 7.82 3.44 RCP 0.013 4.45% 7.06 1 0.0398 0.67 22.16 21.9 OK Inlet 4 CI-A4 CI-A5 32 942.481 942.161 18 0.16 0.84 7.82 1.08 RCP 0.013 1.00% 3.59 1 0.0398 0.67 10.50 14.3 OK Manning's 5 CI-A5 I CI-A7 95 941.9611 933.198 18 0.10 0.82 7.82 5.14 RCP 0.013 9.25% 4.11 1 0.0398 0.67 31.95 15.8 OK Inlet 6 YI-A6 CI-A7 44 936.877 935.993 24 4.38 0.76 7.82 25.83 RCP 0.013 2.00% 5.13 1 0.0398 0.67 32.00 30.7 OK Inlet 7 CI-A7 CI-A9 119 932.998 925.479 24 0.07 0.81 7.82 31.43 RCP 0.013 6.30% 7.22 1 0.0398 0.67 56.77 38.4 OK Inlet 8 CI-A8 CI-A9 32 929.000 928.680 18 0.15 0.79 7.82 0.91 RCP 0.013 1.00% 3.84 1 0.0398 0.67 10.50 14.9 OK Manning's 9 CI-A9 CI -Al 0 97 925.279 919.162 24 0.24 0.40 7.82 33.11 RCP 0.013 6.30% 7.56 1 0.0398 0.67 56.78 39.5 OK Inlet 10 CI-A10 I CI-Al2 97 918.9621 912.845 24 0.18 0.43 7.82 33.73 RCP 0.013 6.30% 8.02 1 0.0398 0.67 56.78 40.9 OK Inlet 11 CI -Al 1 CI-Al2 32 919.000 918.680 18 0.14 0.79 7.82 0.85 RCP 0.013 1.00% 3.61 1 0.0398 0.67 10.50 14.3 OK Manning's 12 CI-Al2 CI-A14 179 912.645 910.210 30 0.35 0.37 7.82 35.60 RCP 0.013 1.36% 9.96 1 0.0398 0.67 47.89 70.9 OK Manning's 13 YI-Al3 CI-A14 14 913.384 912.964 24 4.23 0.79 7.82 26.16 RCP 0.013 3.00% 6.60 1 0.0398 0.67 39.18 36.2 OK Inlet 14 CI-A14 CI-A16 137 910.010 905.889 30 0.36 0.43 7.82 62.96 RCP 0.013 3.00% 8.34 1 0.0398 0.67 71.04 63.7 OK Inlet 15 CI-A15 I CI-A16 32 1910.000 909.679 18 0.21 0.79 7.82 1.32 RCP 0.013 1.00% 5.61 1 0.0398 0.67 10.51 19.0 OK Manning's 16 CI -Al 6 CI -Al 8 139 905.689 901.158 30 0.80 0.56 7.82 67.79 RCP 0.013 3.25% 9.92 1 0.0398 0.67 73.95 70.8 OK Inlet 17 YI-Al7 CI -Al 8 19 902.460 901.510 30 7.94 0.75 7.82 46.88 RCP 0.013 5.00% 7.85 1 0.0398 0.67 91.72 61.5 OK Inlet 18 CI -Al 8 CI -Al 9 32 896.98 8895.705 36 4.36 0.37 7.82 127.23 RCP 0.013 4.00% 15.83 1 0.0398 0.67 133.40 132.0 OK Inlet 19 CI -Al 9 JB-A20 49 5 893.035 36 0.72 0.95 7.82 132.61 RCP 0.013 5.00% 17.31 1 0.0398 0.67 149.13 138.9 OK Inlet 20 JB-A20 HW-A21 68 E880.869 879.000 42 N/A 132.61 RCP 0.013 2.00% 19.13 1 0.0398 0.67 142.28 1978. OK Manning's Notes: 1. Inlet control capacities are calculated using Equation 28 located in the Federal Highway Administration publication HDS-5 - Hydraulic Design of Highway Culvert: 2. HDS-5 Inlet Reference Numbers are as follows: 1 RCP, Square edge w/headwall 2 RCP, Groove w/headwall 3 RCP, Groove End Projecting 4 CMP, Headwall 5 CMP, Mitered to Slope 6 CMP, Projecting 7 Circular, Beveled Ring, 450 Bevel 8 Circular, Beveled Ring, 370 Bevel No. FROM STR CENTERLINE ELEVATION 2% TO EOP 1" DROP TER GUTTER RIM 1 Cl-Al 961.07 960.79 960.71 960.71 2 CI-A2 961.11 960.83 960.75 960.75 3 CI-A3 957.60 957.32 957.24 957.24 4 CI-A4 946.43 946.15 946.07 946.07 5 CI-A5 946.43 946.15 946.07 946.07 6 YI-A6 942.00 7 CI-A7 940.58 940.30 940.22 940.22 8 CI-A8 933.20 932.92 932.84 932.84 9 CI-A9 933.20 932.92 932.84 932.84 10 Cl-Al 0 927.35 927.07 926.99 926.99 11 Cl-Al 1 922.97 922.69 922.61 922.61 12 Cl-Al 2 922.97 922.69 922.61 922.61 13 YI-A13 919.98 14 Cl-Al 4 918.71 918.43 918.35 918.35 15 Cl-Al 5 915.97 915.69 915.61 915.61 161 Cl-Al 6 915.97 915.69 915.61 915.61 17 YI-Al7 910.31 18 Cl-Al 8 913.18 912.90 912.82 912.82 19 Cl-Al 9 913.18 912.90 912.82 912.82 20 JB-A20 900.00 Civil & Environmental Consultants, Inc. Project Name: Project Cure CEC Project No.: 185-984 Description: Storm A Rip Rap Dissipator Runoff Discharge Information Q10 = 132.61 cfs Pipe Dia. = 42 in. Velocity = 9.62 fps A ron Sizing Length = 35 ft Width = 38.5 ft 3Do @ Pipe = 10.5 ft lRiprap Stone Sizing 00 d50 Size (Avg) = 9.6 in. Using 12in d50 Size (Max.)* 14.4 in. Jd50 size Min. Depth** = 21.6 in. * equal to L5*d50 average stone size * * min. depth no less than 15" NOTES: By: MRJ Date: 3/1/2019 Checked By: SWW Date: 3/1/2019 1.0 Riprap aprons to be sized for 10-year discharge rate from each storm pipe discharge location, including sediment basins. 2.0 Min. depth shall be equal to 1.5*d50 maximum riprap stone size, but in no case shall be less than 15" in depth. 3.0 Abbreviations: La— Length of riprap apron in feet (determined from chart)(10' min.) Do = Size of outlet pipe (discharge pipe from storm drainage system in feet or inches) W = Width of riprap apron in feet (at end furthest from outlet pipe discharge) 3Do = Width of rip rap apron in feet (at outlet pipe) d50 = Size of stone in feet 20 10 3 0 Outlet 1iW = Do + La Pipe 1 diameter (Do) La --+� T ilwater c 0.5Do iN,�- ,,�� n j � III"i iit # ##If" lump E�i����i�ll��lil,�w®�. OMEN �1 I 11 Discharge- 80 4 3 I�M�A 11 11 111 WETPOND #1 CALCULATIONS -, Ni. 1` ,. NORTH --=-------------- WETPOND TO BE MAINTAINED BY TRMUM CORPORATE CENTER \\� WETPOND OUTFALL'- 444 TRIBUTARY - �- fAN _ _ fAN —` --- TO MUDDY - `�_ _ �_� , � • � \ CREEK 0 'WETPOND POST CONSTRUCTION\CONDITIONS / ' b/ DRAINAGE AREA = 24.54 ACRES \, FUTURE MAX IMPERVIOUS = 17.18 ACRES FUTURE MAX IMPERVIOUS % = 70% *THIS BMP HAS BEEN DESIGNED TO NCDEQ STANDARDS ` FOR 70% IMPERVIOUS MAX, IF FUTURE DEVELOPMENT 'EXCEEDS THE 70% IMPERVIOUS AREA, BMP WILL BE RE-EVALUATED/REVISED OR NEW BMP WILL BE ' DESIGNED TO ACCEPT THE DRAINAGE FROM ANY INCREASE IN IMPERVIOUS AREA. = ; \ ROBINWOOD ROAD i% pi 970 --- - - ?I- ,� CHICKORY PROJECT CURE Civil & Environmental Consultants, Inc. HICKORY, NORTH CAROLINA 1900 Center Park Drive - Suite A - Charlotte, NC 28217 Ph: 980.237.0373 - Fax: 980.237.0372 POST -CONSTRUCTION DRAINAGE MAP www.cecinc.com DRAWN BY: MRJ I CHECKED BY: SWW I APPROVED BY: SWW I FIGURE NO.: NORTH CAROLINA BOARD OF EXAMINERS FOR DATE: MARCH 20191 DWG SCALE: 1 150'1 PROJECT NO: 185-984 DA P OS� JGINEERS AND SURVEYORS LICENSE NO. C-3035 \ -1 Civil & Environmental Consultants, Inc. Designed: MRJ Date: 3/1/2019 Checked: TMG Date: 3/4/2019 DETENTION BMP WETPOND SUMMARY CHART PEAK CONTROL STORM PRE -DEVELOPMENT EVENTS RUNOFF Top of Dam POST- DEVELOPMENT RUNOFF POST DEVELOPMENT WETPOND OUTFLOW ELEVATION 889.00 IOOYR-24HR 183.67 CFS 247.72 CFS 200.57 CFS 887.92 50YR-24HR 1 154.51 CFSJ 217.94 CFS 1 167.03 CFSJ 887.72 IOYR-24HR 1 93.81 CFSJ 152.34 CFSJ 82.87 CFS 1 887.12 2YR-24HR 1 43.88 CFSJ 91.79 CFS 1 20.53 CFSJ 886.02 IYR-24HR 1 27.77 CFS 69.70 CFSJ 4.84 CFS 1 885.68 Civil & Environmental Consultants, Inc. By: MRJ Project Name: Project Cure Date: 3/2019 CEC Project #: 185-984 Checked By: SWW Description: Pre BMP Wetpond Date: 3/2019 SCS "CN" Values 24 Hour Storm Event Soil Type: Rion Sandy Loam & Pacolet Sandy Clay - HSG "B" Total Drainage Area = 24.54 ac. Paved Roads/Sidewalk/Stractuw 0.00 ac. CN = 98 Wooded Area 3.28 ac. CN = 60 Good Grass (>75% coverage) 24.54 ac. CN = 61 Fair (50 to 75% Cover) 0.00 ac. CN = 86 Composite CN 69.02 Civil & Environmental Consultants, Inc. By: MRJ Project Name: Project Cure Date: 3/2019 CEC Project #: 185-984 Checked By: SWW Description: Post BMP Wetpond Date: SCS "CN" Values 24 Hour Storm Event Soil Type: Rion Sandy Loam & Pacolet Sandy Clay - HSG "B" Total Drainage Area = 24.54 ac. Paved Roads/Sidewalk/Structw 17.18 ac CN = 98 Wooded Area 0.00 ac. CN = 60 Good Grass (>75% coverage) 7.36 ac. CN = 61 Fair (50 to 75% Cover) 0.00 ac. CN = 86 Composite CN 86.90 (70% imp calculated) Civil & Environmental Consultants, Inc. Project Name: CEC Project #: Description: Western Trivium Development 185-984 BMP Wetpond #1 Dava = 3ft, 70% imp By: M RJ Date: Checked By: SWW Date: I Wet Pond Water Quality Calculations I Drainage Area Impervious Area Impervious % Estimated Avg. Depth SA/DA Ratio SA Required SA Required 24.54 ac 17.18 ac 70% 4 ft 2.09 % 0.51 ac 22,341 sf Double Interpolated SA DA Ratio Imp % Pool Depth (ft) 3.00 4.00 5.00 50% 1.79 1.51 1.31 60% 2.09 1.77 1.49 70% 2.51 2.09 1.80 "C-3 Table 1 (Piedmont and Mountain Region) (NCDEQ BMP Design Manual revised 4-18-2017) SA Provided 24,943.00 sf SA Provided 0.57 ac Pool Depth Provided 5.00 ft Rv = 0.05 + 0.9 *IA SIMPLE METHOD PER NCDEQ BMP MANUAL SECTION 3.3.1 Rv = Runoff coefficient [storm runoff (in)/storm rainfall (in)], unitless Impervious fraction [impervious portion of drainage area IA = (ac)/drainage area (ac)], unitless **V = Volume of runoff that must be controlled for the design storm (fe) RD = Design storm rainfall depth (in) (Typically, 1.0" or 1.5") A = Watershed area (ac) WQv = 3630 * RD Rv *A Rv 0.68 (1 inch) WQv 60,575 (1 inch) Permament Pool DMAX 0.5 ft Perimeterpp 685.0 ft WldthSUBMERGED 3.0 ft Provided Depth= 5.00 ft VSHELF 513.75 cf Calc Avg. Depth 4.13 OKAY Must be greater than Estimated ave. depth Vnlume Calrulatinn Stage Area Inc. Vol. Acc Vol. 878.5 14252 0 0 879 15140 7348 7348 880 16968 16054 23402 881 18864 17916 41318 8821 20826 1 19845 1 61163 8831 22852 1 21839 1 83002 883.51 24943 1 11949 1 94951 Bottom (not Sediment) Bottom of Shelf Permanent Pool Temporary Pool Volume \/nlume Calculation Stage Area Inc. Vol. Acc Vol. 883.5 32662 0 0 884 35279 16985 16985 885 37502 36391 53376 886 39765 38634 92009 887 42066 1 40916 132925 888 44408 43237 176162 889 46788 45598 221760 Assumed Stage Interval for Treatment of WQv 885.0 Interpolate 0.10 area between even stages at WQv stage Volume Calculation Stage Area Inc. Vol. Acc Vol. 885.0 37502 0 53376 885.1 37728 3762 57137 885.2 37955 3784 60921 885.3 38181 3807 64728 885.4 38407 3829 68558 885.5 38634 3852 72410 885.6 38860 3875 76284 885.7 39086 3897 80182 885.8 39312 3920 84102 885.91 39539 1 3943 1 88044 886.01 39765 1 3965 1 92009 Calc WQV Stage 885.2 Calculate Orifice Size Permanent Pool Top of Dam (allow 1 ft FB) Lower WQv stage Higher WQv Stage <-- Treatment Vol 60,921 CF 60,921 Draw Down Time 2 DAYS 5 (NCDEQ required time frame) Draw Down Time 172,800 sec 432,000 Flow (Q) 0.353 CFS 0.141 Cd 0.6 0.6 1-1/3 0.567 ft 0.567 Area of orifice 0.097 sf 0.039 Dia. 4.22 in 2.67 (Choose between two sizes) Orifice Size Used (Dia.) 1 4.00 in ICKAY Draw Down Time 1 2.19 DAYS JOKAY FOREBAY VOLUME Volume Calculation Stage Area Inc. Vol. Acc Vol. 879 2691 0 0 880 3363 3027 3027 881 4104 3734 6761 882 4913 4509 11269 8831 5791 1 5352 16621 15% Permanent Pool 14243 REQUIRED VOLUME 20% Permanent Pool 18990 Provided 16621 Okay 18 /o Bottom (not Sediment) ANTI -FLOTATION ANCHOR Riser Inside Dimensions (ft) - square conc structure only 6.00 update area calculations for rectangular or circular riser structures Riser Inside Area (sf) 36.00 Density of concrete (Ibs/cf) 150.00 Riser Outside Dimensions (ft) - square conc structure only 7.00 Riser Outside Area (sf) 49.00 Density of water (Ibs/cf) 62.40 Riser Structure Height (ft) 8.00 WEIGHT DISPLACE BY RISER (Ibs) 17,971.20 Area of concrete (sf) - assume 6" wall thickness 13.00 Anchor Dimension (n x n) (ft) 8.00 Riser Structure Height (ft) 8.00 Anchor Thickness (ft) 2.00 Volume of Riser concrete (cf) 104.00 Anchor Area (sf) 64.00 Net Displaced by the Riser (Ibs/cf) 87.60 Anchor Volume (cf) 96.00 WEIGHT OF THE CONCRETE RISER (Ibs) 9,110.40 WEIGHT OF ANCHOR (Ibs) F 14,400.00 WEIGHTOF RISER & ANCHOR vs WEIGHT DISPLACED BY RISER I OK Collar Size (ft x ft) ANTI -SEEP COLLAR 7.5 • Prateeffou agatari piping Install at least one watertight anti -seep collar with a mininnuit pr ojcaiori of 1,5 feet wound the barrel of principal spillway conduits. 8 inehc v or larger in diameter. Loewe the anti -weep collar aiightly downstrew u fr(mt the dam center line- A properly desiped drainage diaphragm hastalled around the barrel maybe used insreskl of an anti-s pa C�)llar xviten it is approprime. EMBOKMENf Provide min. two (2) 7.5' x 7.5' anti -seep collars assume 6" thickness on pipe barrel and min. 1.5 feet projection around barrel (thickness may vary depending on barrel type) Table 7: Piedmont and Mounfain SAIDA Table (Adapted from Drisco;), 1986) 10% 0,51 0.43 0.37 0.30 0.27 0.25 20% 0,A4 0 89 0.61 0.51 0.44 0.40 30% 1.17 0.94 Q.�14 0.72 0.1�1 0-56 40% 1.51 1.24 1.419 F1.91 U.7B U_71 50% 1.79 1.51 1.31 1.13 0.95 0.87 60% 2.09 1.77 1.49 1.31 1.12 1_01 70% 2.51 2 09 1,b4 1.56 1.34 1.17 "% 2,Ia2 2-41 2.07 1,82 1.62 1AO 90% 3.25 2.04 2.31 2.04 1.84 1.59 1001% 3.55 2.79 2-52 2.34 2.04 1.75 Equation 3. Average depth when the shelfis submerged and the shell is being excluded from the avarage depth -calculation rip-VSftelf Dgyg Abottomo f r el f Where: D,4p - Average depth in feet VHP = Total volume of permanent pool {fa e[3) §nor = Volume over the shelf only (feet) - see below At..m. flr:nru = Area of wet pond al the ba horn of the shelf (feel-2) VSMII = 0.5 * Depth+m,vershe I-r Perimw#iprp rm pao, * Width Pere of eher Where: DmeK DWrelleir = Depth of water at the deep side of the shelf as measured at permanent pool (feet) PerimeterpR"i nra wd = Perimeter of permanent pool all. the bottom of the shelf (feet) Widths bF ,rwd pat F hLgF Width from the deep side to the dry side of the shelf as measured at permanent pool (fact) C-3. Wet pond 8 RL%vised' 4-18-2017 Channel Report Hydraflow Express Extension for Autodesk0 AutoCADO Civil 3D0 by Autodesk, Inc. Emergency Spillway Channel Trapezoidal Bottom Width (ft) = 4.00 Side Slopes (z:1) = 2.00, 2.00 Total Depth (ft) = 2.00 Invert Elev (ft) = 874.00 Slope (%) = 16.00 N-Value = 0.025 Calculations Compute by: Known Q Known Q (cfs) = 124.63 Highlighted Depth (ft) Q (cfs) Area (sqft) Velocity (ft/s) Wetted Perim (ft) Crit Depth, Yc (ft) Top Width (ft) EGL (ft) Thursday, Mar 7 2019 = 1.06 = 124.63 = 6.49 = 19.21 = 8.74 = 2.00 = 8.24 = 6.80 Elev (ft) Section Depth (ft) 877.00 3.00 876.50 876.00 2.50 2.00 875.50 875.00 1.50 1.00 Ot It SZ 874.50 874.00 A71 y^ 0.50 0.00 0 50 2 4 6 8 Reach (ft) 10 12 14 16 WETPOND #1 HYDROGRAPHS Watershed Model Schematic Hydraflow Hydrographs Extension for AutodeskOCivil 3DO2019 byAutodesk, Inc. v2020 1 -Pre Drainage Area CD 3 - Post DA to Wetpond #1 2 -Post Drainage Area ED Project: Wetpond #1.gpw Monday, 03 / 4 / 2019 Pond No. 1 - Wet Pond #1 Hydraflow Hydrographs Extension for Autodesk®Civil 3D@2019 byAutodesk, Inc. v2020 Pond Report 0 Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Pond No. 1 - Wet Pond #1 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation = 883.50 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sqft) Incr. Storage (cuft) Total storage (cuft) 0.00 883.50 32,819 0 0 0.50 884.00 35,504 17,075 17,075 1.50 885.00 37,786 36,635 53,710 2.50 886.00 40,107 38,937 92,647 3.50 887.00 42,467 41,277 133,924 4.50 888.00 44,866 43,657 177,581 5.50 889.00 47,305 46,076 223,656 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) = 42.00 4.00 6.00 0.00 Crest Len (ft) = 24.00 17.00 0.00 0.00 Span (in) = 42.00 4.00 48.00 0.00 Crest El. (ft) = 886.50 887.50 0.00 0.00 No. Barrels = 1 1 4 0 Weir Coeff. = 3.33 2.60 3.33 3.33 Invert El. (ft) = 875.56 883.50 885.50 0.00 Weir Type = 1 Broad --- --- Length (ft) = 56.00 0.00 0.00 0.00 Multi -Stage = Yes No No No Slope (%) = 1.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culvert/Orifice outflows are analyzed under inlet (ic) and outlet (oc) control. Weir risers checked for orifice conditions (ic) and submergence (s). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrfRsr Wr A Wr B Wr C Wr D Exfil User Total ft cuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 883.50 0.00 0.00 0.00 --- 0.00 0.00 --- --- --- --- 0.000 0.50 17,075 884.00 115.24 is 0.24 is 0.00 --- 0.00 0.00 --- --- --- --- 0.243 1.50 53,710 885.00 115.24 is 0.49 is 0.00 --- 0.00 0.00 --- --- --- --- 0.485 2.50 92,647 886.00 115.24 is 0.64 is 19.26 is --- 0.00 0.00 --- --- --- --- 19.90 3.50 133,924 887.00 115.24 is 0.77 is 43.07 is --- 28.26 0.00 --- --- --- --- 72.09 4.50 177,581 888.00 142.45 is 0.87 is 57.78 is --- 142.45 s 15.63 --- --- --- --- 216.73 5.50 223.656 889.00 156.49 is 0.97 is 69.44 is --- 156.47 s 81.20 --- --- --- --- 308.09 Hydrograph Summary Repo rtHydraflowHydrographsExtension for AutodeskO Civil 3DO2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 27.77 2 718 57,433 ------ ------ ------ Pre Drainage Area 2 SCS Runoff 69.70 2 716 141,680 ------ ------ ------ Post Drainage Area 3 Reservoir 4.840 2 754 137,788 2 885.68 80,195 Post DA to Wetpond #1 Wetpond #1.gpw Return Period: 1 Year Thursday, 03 / 7 / 2019 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 1 Pre Drainage Area Hydrograph type = SCS Runoff Peak discharge = 27.77 cfs Storm frequency = 1 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 57,433 cuft Drainage area = 24.540 ac Curve number = 69.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 20.00 16.00 12.00 0.00 1 0 2 4 — Hyd No. 1 6 8 Pre Drainage Area Hyd. No. 1 -- 1 Year Q (cfs) 28.00 24.00 20.00 16.00 12.00 4.00 10 12 14 16 18 20 22 24 26 Time (hrs) 4 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 2 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 69.70 cfs Storm frequency = 1 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 141,680 cuft Drainage area = 24.540 ac Curve number = 86.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 2.96 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Drainage Area Q (cfs) Hyd. No. 2 -- 1 Year Q (cfs) 70.00 70.00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 — Hyd No. 2 Time (hrs) 5 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 3 Post DA to Wetpond #1 Hydrograph type = Reservoir Peak discharge = 4.840 cfs Storm frequency = 1 yrs Time to peak = 12.57 hrs Time interval = 2 min Hyd. volume = 137,788 cuft Inflow hyd. No. = 2 - Post Drainage Area Max. Elevation = 885.68 ft Reservoir name = Wet Pond #1 Max. Storage = 80,195 cuft Storage Indication method used. Q (cfs) 70.00 -1 •• 40.00 20.00 10.00 Q (cfs) 70.00 •• •11 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 8 16 24 32 40 48 56 64 72 80 88 96 Time (hrs) — Hyd No. 3 Hyd No. 2 Total storage used = 80,195 cult Hydrograph Summary Repo rtHydraflowHydrographsExtension for AutodeskO Civil 3DO2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 43.88 2 718 88,395 ------ ------ ------ Pre Drainage Area 2 SCS Runoff 91.79 2 716 188,309 ------ ------ ------ Post Drainage Area 3 Reservoir 20.53 2 724 184,401 2 886.02 93,381 Post DA to Wetpond #1 Wetpond #1.gpw Return Period: 2 Year Thursday, 03 / 7 / 2019 8 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 1 Pre Drainage Area Hydrograph type = SCS Runoff Peak discharge = 43.88 cfs Storm frequency = 2 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 88,395 cuft Drainage area = 24.540 ac Curve number = 69.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 20.00 10.00 0.00 ---L 0 2 4 — Hyd No. 1 Pre Drainage Area Hyd. No. 1 -- 2 Year 6 8 10 12 14 Q (cfs) 50.00 40.00 30.00 20.00 10.00 ' ' 0.00 16 18 20 22 24 26 Time (hrs) Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 2 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 91.79 cfs Storm frequency = 2 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 188,309 cuft Drainage area = 24.540 ac Curve number = 86.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.59 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 20.00 10.00 0.00 0.0 2.0 4.0 6.0 8.0 Hyd No. 2 Post Drainage Area Hyd. No. 2 -- 2 Year Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 3 Post DA to Wetpond #1 Hydrograph type = Reservoir Peak discharge = 20.53 cfs Storm frequency = 2 yrs Time to peak = 12.07 hrs Time interval = 2 min Hyd. volume = 184,401 cuft Inflow hyd. No. = 2 - Post Drainage Area Max. Elevation = 886.02 ft Reservoir name = Wet Pond #1 Max. Storage = 93,381 cuft Storage Indication method used. Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 20.00 I 6 12 Hyd No. 3 18 24 30 Hyd No. 2 36 42 48 54 60 66 Total storage used = 93,381 cuft Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 72 Time (hrs) 11 Hydrograph Summary Repo rtHydraflowHydrographsExtension for AutodeskO Civil 3DO2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 93.81 2 718 188,157 ------ ------ ------ Pre Drainage Area 2 SCS Runoff 152.34 2 716 320,715 ------ ------ ------ Post Drainage Area 3 Reservoir 82.87 2 722 316,776 2 887.12 138,364 Post DA to Wetpond #1 Wetpond #1.gpw Return Period: 10 Year Thursday, 03 / 7 / 2019 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 1 Pre Drainage Area Hydrograph type = SCS Runoff Peak discharge = 93.81 cfs Storm frequency = 10 yrs Time to peak = 11.97 hrs Time interval = 2 min Hyd. volume = 188,157 cuft Drainage area = 24.540 ac Curve number = 69.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.30 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 100.00 90.00 80.00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 2 4 6 8 10 12 14 Hyd No. 1 13 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 2 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 152.34 cfs Storm frequency = 10 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 320,715 cuft Drainage area = 24.540 ac Curve number = 86.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.30 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Drainage Area Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 160.00 140.00 120.00 100.00 80.00 60.00 40.00 20.00 0 00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 - Hyd No. 2 Time (hrs) 14 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 3 Post DA to Wetpond #1 Hydrograph type = Reservoir Peak discharge = 82.87 cfs Storm frequency = 10 yrs Time to peak = 12.03 hrs Time interval = 2 min Hyd. volume = 316,776 cuft Inflow hyd. No. = 2 - Post Drainage Area Max. Elevation = 887.12 ft Reservoir name = Wet Pond #1 Max. Storage = 138,364 cuft Storage Indication method used. Post DA to Wetpond #1 15 Hydrograph Summary Repo rtHydraflowHydrographsExtension for AutodeskO Civil 3DO2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 154.51 2 716 312,433 ------ ------ ------ Pre Drainage Area 2 SCS Runoff 217.94 2 716 469,563 ------ ------ ------ Post Drainage Area 3 Reservoir 167.03 2 720 465,601 2 887.72 165,309 Post DA to Wetpond #1 Wetpond #1.gpw Return Period: 50 Year Thursday, 03 / 7 / 2019 16 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 1 Pre Drainage Area Hydrograph type = SCS Runoff Peak discharge = 154.51 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 312,433 cuft Drainage area = 24.540 ac Curve number = 69.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.16 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Drainage Area 17 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 2 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 217.94 cfs Storm frequency = 50 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 469,563 cuft Drainage area = 24.540 ac Curve number = 86.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.16 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Drainage Area Q (cfs) Hyd. No. 2 -- 50 Year Q (cfs) 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0 00 240.00 210.00 180.00 150.00 120.00 90.00 60.00 30.00 0 00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 - Hyd No. 2 Time (hrs) 18 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 3 Post DA to Wetpond #1 Hydrograph type = Reservoir Peak discharge = 167.03 cfs Storm frequency = 50 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 465,601 cuft Inflow hyd. No. = 2 - Post Drainage Area Max. Elevation = 887.72 ft Reservoir name = Wet Pond #1 Max. Storage = 165,309 cuft Storage Indication method used. Post DA to Wetpond #1 19 Hydrograph Summary Repo rtHydraflowHydrographsExtension for AutodeskO Civil 3DO2019byAutodesk,Inc. v202O Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 183.67 2 716 372,583 ------ ------ ------ Pre Drainage Area 2 SCS Runoff 247.72 2 716 538,457 ------ ------ ------ Post Drainage Area 3 Reservoir 200.57 2 720 534,486 2 887.92 173,147 Post DA to Wetpond #1 Wetpond #1.gpw Return Period: 100 Year Thursday, 03 / 7 / 2019 20 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 1 Pre Drainage Area Hydrograph type = SCS Runoff Peak discharge = 183.67 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 372,583 cuft Drainage area = 24.540 ac Curve number = 69.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Pre Drainage Area Q (cfs) Hyd. No. 1 -- 100 Year Q (cfs) 210.00 210.00 180.00 180.00 150.00 150.00 120.00 120.00 90.00 90.00 60.00 60.00 30.00 30.00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 — Hyd No. 1 Time (hrs) 21 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 2 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 247.72 cfs Storm frequency = 100 yrs Time to peak = 11.93 hrs Time interval = 2 min Hyd. volume = 538,457 cuft Drainage area = 24.540 ac Curve number = 86.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 8.01 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Drainage Area Q (cfs) Hyd. No. 2 -- 100 Year Q (cfs) 280.00 280.00 240.00 240.00 200.00 200.00 160.00 160.00 120.00 120.00 80.00 80.00 40.00 40.00 0.00 0.00 0.0 2.0 4.0 6.0 8.0 10.0 12.0 14.0 16.0 18.0 20.0 - Hyd No. 2 Time (hrs) 22 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Thursday, 03 / 7 / 2019 Hyd. No. 3 Post DA to Wetpond #1 Hydrograph type = Reservoir Peak discharge = 200.57 cfs Storm frequency = 100 yrs Time to peak = 12.00 hrs Time interval = 2 min Hyd. volume = 534,486 cuft Inflow hyd. No. = 2 - Post Drainage Area Max. Elevation = 887.92 ft Reservoir name = Wet Pond #1 Max. Storage = 173,147 cuft Storage Indication method used. Post DA to Wetpond #1