Loading...
HomeMy WebLinkAboutSW3190806_2019-08-27, CY at Emerald Lake, Final Stormwater Report-As-Built-_9/11/2019A legacy of experience. A reputation for excellence. i. 301 McCullough Dr. Suite 109 Charlotte, NC 28262 Phone: 704-548-0333 Toll Free: 1-888-775-EMHT emht.com 2014-1128 N %14 SEAL 032959 41 IN A Stormwater Management Report Courtyards at Emerald Lake `--. Epcon Communities June 14, 2019 r� � 1.0 INTRODUCTION The Project is a proposed 35.3 acre single family residential subdivision with 93 lots, associated roadways and one clubhouse and pool. The site is undeveloped and is largely wooded. The site has a few defined drainage draws all conveying stormwater to the existing un-named stream along the southern property line and Lawyers Road. The site generally slopes 2% to 5% towards the un- named stream. The proposed development will be divided into two distinct watersheds. The majority of the watershed will be collected by storm sewers and conveyed to a wet pond BMP located at the northeast portion of the site. The southern portion of Avalon Place roadway and lot areas will have the stormwater runoff collected by storm sewers and conveyed to a wet pond BMP. There is 7.65 acres of off -site drainage area to the west that drains toward the southwest corner of the property and to the un-named stream. Currently, only a portion of this offsite drainage area flows across the project property. The post development grading will install a drainage swale along the west property line to effectively direct the stormwater to the un-named stream without entering the project site. Therefore, this offsite drainage area is shown on our drainage mapping, but not included in the stormwater calculations. The 0.32 acre offsite drainage area along the west property line will be collected and conveyed to the wet pond BMP. The offsite area drainage will be included in the stormwater calculations. The existing 0.36 acre and 0.63 acre drainage area to the northwest current drain from the project site to the adjacent properties. These areas will be reduced in areas that drain offsite and will remain largely undeveloped. The reduced areas will be included in the developed areas draining to the wet pond BMP; while the smaller, undeveloped areas will continue to drain offsite as they have and will have reduced stormwater runoff peak flows from the reduced areas. The 0.73 acre offsite drainage area located near the northeast portion of the site currently drains onto the project site and will continue to drain into the project and will be collected by storm sewers and conveyed to the wet pond. No change in to the existing charactoristics of the 0.73 acre area is proposed. The two on -site watersheds will have portions of the drainage areas that will be collected and conveyed to the proposed stormwater BMPs and will have portions of the drainage areas that will be left undeveloped and continue to direct discharge to the un-named stream. Each of the proposed watersheds area analyzed separately and provides water quality for the developed portions of the site and provides for a balanced overall stormwater control for the combined controlled and directly discharged portions of the developed project. See the Pre and Post Tributary Area Maps for reference. 2.0 EXISTING HYDROLOGY The existing conditions hydrology exhibited on the Pre -Development Tributary Plan within the construction plan set. The majority of the site is wooded in good hydrologic condition and is predominantly Secrest — Cid Complex (ScA), Type C soils. Smaller portions of the project site have Badin Channery Silt Loam, 2 to 8% slopes, Type B and Tarrus Gravelly Silt Loam, 2 to 8% slopes, Type B soils. Type C soils was used for calculations to be conservative. The time of concentration was calculated for each watershed and a minimum 7.5 minutes was used for the calculations, see the HydroCAD output in Appendix B. Rainfall Depths Storm Event Rainfall Depth Rainfall Distribution WQ 1.00 6-hr Type II 1-yr CPv 2.58 24-hr Type II 2 - year 2.28 6-hr Type II 10-year 3.72 6-hr Type II 25-year 1 4.38 1 6-hr Type II 50-year 1 4.92 1 6-hr Type II 3.0 PROPOSED CONDITIONS The proposed site consists of single family, 1 /4 acre lots, an amenity area, associated roadways and the two stormwater BMP structures. The rooftops, driveways, parking lots and onsite lawn areas drain to storm inlets and yard catch basins that collects and conveys the runoff to the stormwater management structures. The on -site stormwater runoff is routed through the BMP basins structures to provide the required water quality BMP as well as Channel Protection Volume (CPv) control. The less frequent storm event runoff flows are routed through the BMP structures without topping the structures. BMP water quality calculations are included in Appendix A. The stormwater routing output from the HydroCAD models are included in Appendix B. Some key elements of the calculations are as follows: 1. The Channel Protection Volume (CPv) and peak release rates and elevations are calculated for the pre -development and post development 1 yr, 24 hr Type II storm events. The storm event volume difference is the CPv volume. The CPv and WQv volumes are added together to determine the control volume and peak elevation in the BMPs to provide the appropriate WQv and CPv control. 2. The 2 through 50 year, 6 hr Type II storm occurrence stormwater runoff release rates are routed through the Wet Pond basins without topping the basins. 3. Actual percent of pervious and impervious areas were calculated for each RG watershed. 4. The travel paths for the stormwater runoff were also calculated; the minimum Time of Concentration (Tc) was 7.5 minutes for all subareas. 4.0 WEST WET BASIN DESIGN The northern 4.19 acres of proposed development stormwater runoff is collected by storm sewers and conveyed to a wet basin system to the west. See Appendix A for Wet Pond calculations. The Wet Basin will provide the Channel Protection Volume (CPv) as well as control the peak release rates for the 2 year through 50 year storm event stormwater runoff to those of the pre - development peak release rates. The CPv for this area is calculated as the difference of the post development 1 year event hydrograph runoff volume and the pre -development 1 year event hydrograph volume. The CPv is to be released over 48 hours. CPv = Post Vol (19,921 cf) - Pre Vol (15,045cf) = 4876 cf. The CPv added to the WQv of 7,595cf = 12,471 cf of volume to control the release over 48 hours; the maximum diameter outlet orifice = 1.0 inches. The Wet Basin normal water elevation is 639.28; the top of basin elevation is 643.50. The maximum storage volume available is 71,380 cf. The basin will route the WQv, CPv and the 2 year through 50 year storm event runoffs without topping the basin crest. The outlet control is a two (2) stage structure. The primary control is provided by one (1) 1.00 inch orifice with invert set at 639.28 feet. The volume provided for the water quality/ CPv is from the wet pond normal pool elevation (639.28) to the crest of the secondary outlet control. The secondary outlet control is provided by one 24.0 inch wide by 9.0 inch high slot weirs with crests set at 639.39 located on the face of the concrete control structure box. A 10 feet long emergency weir is included along the top of the detention basin; the crest of the emergency weir is set at 642.71. The top of the wet pond is 639.28. West Wet Pond Water Quality & CPv Summary Table Event Peak Inflow (cfs) Peak Discharge (cfs) Peak HWL (ft) Peak Storage (cu-ft) WQ (HydoCAD)1- 1.52 9:�2� 0.01 "�639.57 7-,67-9 7,774 CPv 0.33 638.68 12,485 West Wet Pond Routing Calculation Table Event Post-Dev Inflow (cfs) Post Dev Routed Peak (cfs) Basin Peak HWL (ft) Basin Peak Storage (cu-ft) 1 9.13 0.35 638.69 12,561 2 9.17 0.49 638.72 12,989 10 17.61 4.16 639.29 20,214 25 24.38 5.88 639.60 24,588 50 28.40 6.95 639.85 28,538 West Wet Pond Routing As -Built Table Event Post-Dev Inflow (cfs) Post Dev Routed Peak (cfs) Basin Peak HWL (ft) Basin Peak Storage (cu-ft) 1 9.27 0.27 640.50 16,082 2 9.33 0.36 640.53 16,433 10 17.92 3.69 641.08 23,570 25 1 22.06 1 5.44 1 641.35 1 27,462 50 1 25.24 1 6.46 1 641.57 1 31,014 West Watershed Combined Hydrograph Summary Table Combined Summary Table As -Built Event Pre-Dev Peak Flow (cfs) Post-Dev Inflow (cfs) Post-Dev Inflow (cfs) 1 4.16 1.39 1.36 2 3.65 1.36 1.33 10 13.20 8.05 8.47 25 20.04 12.47 12.54 50 25.19 15.67 1 15.46 5.0 EAST WET BASIN DESIGN The eastern 22.5 acres of proposed development stormwater runoff is collected by storm sewers and conveyed to a wet basin system located at the project eastern entry. The basin is comprised of two basins connected by a culvert that equalizes the basin stormwater peak elevations. The two compartment volumes are added together for routing calculations. See Appendix A for Wet Pond calculations. CPv = Post Vol (85,019cf) — Pre Vol (33,802cf) = 51,217cf. The CPv added to the WQv of 31,472 cf = 82,689 cf of volume. The WQv of 31,472 cf with a head of 1.36 feet is controlled to release over 48 hours; the maximum diameter outlet orifice = 2.00 inches. The Wet Basin normal water elevation is 634.50; the top of basin elevation is 640.00. The maximum storage volume available is 164,773 cf. The basin will route the WQv, CPv and the 2 year through 50 year storm event runoffs without topping the basin crest. The outlet control is a two (2) stage structure. The primary control is provided by one (1) 2.00 inch orifice with invert set at 634.50 feet. The volume provided for the water quality/ CPv is from the wet pond normal pool elevation (634.50) to the crest of the secondary outlet control. The secondary outlet control is provided by four (4) 24.0 inch wide by 9.0 inch high slot weirs with crests set at 637.51 located on the face of the concrete control structure box. A 10 feet long emergency weir is included along the top of the detention basin; the crest of the emergency weir is set at 639.10. The top of the wet pond is 640.00. Wet Pond Water Quality & CPv Summary Table Event Peak Inflow (cfs) Peak Discharge (cfs) Peak HWL (ft) Peak Storage (cu-ft) WQ (HydoCAD) mL6-1- 0.64 9-4-2 0.11 635.74 4 31,837 CPv 0.15 637.68 82,713 Wet Pond Routing Calculation Table Event Post-Dev Inflow (cfs) Post Dev Routed Peak (cfs) Basin Peak HWL (ft) Basin Peak Storage (cu-ft) 1 10.65 0.15 636.60 51,298 2 10.83 0.14 636.28 42,789 10 28.80 4.12 637.97 91,570 25 39.33 10.81 638.23 100,109 50 47.57 17.88 638.46 107,568 Wet Pond Routing As -Built Table Event Post-Dev Inflow (cfs) Post Dev Routed Peak (cfs) Basin Peak HWL (ft) Basin Peak Storage (cu-ft) 1 10.66 0.14 636.43 51,579 2 10.83 0.13 636.13 42,866 10 28.82 3.65 637.77 93,643 25 37.89 10.13 638.04 102,632 50 45.11 16.60 638.25 109,862 East Watershed Combined Hydrograph Summary Table Combined Summary Table As -Built Event Pre-Dev Peak Flow (cfs) Post-Dev Inflow (cfs) Post-Dev Inflow (cfs) 1 4.64 2.45 2.40 2 4.93 1.97 1.91 10 17.82 6.89 6.82 25 1 25.54 1 10.79 10.78 50 32.21 13.52 17.94 APPENDIX A: Bio-Retention Sizing Calculations Date: 7/29/2014 NCDENR BMP Manual as amended Project Name: The Courtyards at Emerald Lake - Lawyers Road, Stallings NC Bioretention Basin No. RG - 1 Rv=runoff coefficient (Runoff/Rainfall) Rv=0.05+0.009(I) Rv= Volumetric Runoff Coefficient (Runoff/Rainfall) " I' = %Impervious ("Simple Method" - Schueler, 1987) NCDENR Manual July 2007 pg 3-3 Meck. Cty. BMP Manual pg 3.2 Formula: Af = (WQv) (Df) ((k) (Hf+Df) (Tf)) RAIN GARDEN AREA Water Quality Protection Volume WQv = 1.0"RvA Uses 1" Rainfall 12 Engineers, Surveyors, Planners, Scientists Fill in Values: "I" = 50 Percent Impervious of Site "A" = 4.19 Acres 5 Acres Maximum WS A = 182,516.40 sf Rv = 0.499 Impervious Area =1 91,130.00 Isf Answer: Compute CNm WQv = 0.174 Ac.Ft. Rv = 0.499 7595.2 cf = WQv (1" storm) WQv = 0.50 inches 5696.4 75% WQv, min. volume to treat CNm = 93.92 Use to compute Qv, 3.58 cfs Peak Flow for 1" - 6 hr. storm 42.9 ft, Length of Level Spreader for 1 " deep @ 1 fps into Rain Garden 7505 cf, actual WQv provided at control elevation Cntrl EL = 641.00 Where: Af = Surface area of Rain Garden (sf) WQv = Water Quality Volume to be captured Df = Filter Bed depth (2 feet min. for grasses, 3 to 4 feet for trees) k = permeability coefficient of filter media (use 2 ft/day for amended soil mix) See NCDENR BMP Manual pg 12-15, Fig. 12.5 Hf = "Average" height of water above filter bed (Mulch) Must drain within 12 hrs. (NCDENR) (use 3 to 6 inches, which is one-half of 6 to 12" ponding depth for WQv) Tf = Design filter bed drain time in days MAXIMUM 2 days (use 1 day NCDENR, use 1.425 days Meck Cty) Fill in Values: "k" = 2 ft/day Df = 2 ft Hf = 6 inches Tf = 1 days Permeability Coefficients Soil Types k (in/hr) k (ft/day) Sand 6 12 Loamy Sand 2 4 Sandy Loam *0.5 - 1 1-2 Silty Loam 0.02 0.05 Y' * Use 1.0"/hr, 2 ft/day (NCDENR) 3t 0.50 ft/day (heck Cty) RAIN GARDEN SIZING Af = 3038.1 sf, Required media surface area, (accts for infiltration for 6hr rainfall) 3060 sf, Actual Af per plan Engineers, Surveyors, Planners, Scientists 29.8 sf, Impervious area treated per sf of Rain Garden 3.36 % of impervious site 5%-7% "Normal" range 43 ft, width Approximate size 70 ft, length Surface area can be any shape 10' x 20' Minimum Water Draw Through Rate: Darcy's Equation: Q= (0.0000232)*k*A*(H/L) Where: Q= Flow Rate, cfs (of draw) through the Bioretention Soil Q= 0.106 cfs Mulch thickness = 3 F:Iinches inches K = Hydraulic Conductivity of soil (in/hr) (Usually 1/2" / hr) Q (design) = 0.106 cfs IlDrainage Rock Thickness = Af = Surface Area of Bio-retention Area (sf) use Q design for routing H = Height of water above underdrain pipe (ft) Overall Section Thickness = 3.5 ft L =Thickness of RG Section (ft), (mulch, media & drainage rock) Assume (H/L — 1) Top of Mulch EL = 640.00 Time to Drawdown water from inudation to Saturation (from Hf to Af surface) Top of Media EL = 639.75 Hf Elevation = 640.50 Volume/Q= 28736 Sec RG Bottom EL = 636.50 8.0 Hours to saturation level, maximum 12 hrs Undrn 2feet turnup EL= 638.50 Time to drawdown Media : feet below Af surface Assume 40% Porosity Volume = Soil Depth x Area x 0.40 Vol = 2448 cf DID Media Time = 22989 seconds 6.4 h rs Total drawdown time from inudation = 14.4 hrs UNDERDRAIN SIZING As a rule of thumb, the length of underdrain is based on 10% of Af Lmin = 102.00 ft, in 3 feet wide stone bed Dia. min 1 9.2 inches, Use 6 inch dia. minimum PVC or Dbl Wall Slotted HDPE Number of Undrains req. _ Use Minimum of 2 underdrains OUTLET STRUCTURE Structure Type: Box, 36" SO, Inverts Underdrain: 6" PVC 638.50 Secondary Control: 36"x9" Slot Weir, 4 sides 641.00 Tertiary Control: APPENDIX B: Wet Pond Calculations Courtyards of Emerald Lake 6/14/2019 Stormwater Management Calculations Wet Pond Design Notes Untreated Predeveloped Calculations Wet Basin Discharge Total Area (ac) 18.85 0 18.85 acres total Existing Woods HSG C (RCN=70) 18.85 Existing Pond HSG B (RCN=98) 0.00 0.00 Open Grass / Weeds HSG B (RCN=61) 0.00 Open Space Type C (RCN=74) 0.00 Existing Impervious Area 0.00 0.00 acres of impervious area ex condition Composite RCN 70 70 RCN based on existing conditions Tc (min) 57 0 1-year Peak (cfs) 3.90 0.00 10-year Peak (cfs) 14.96 0 Post Developed Subareas Untreated Subarea Wet Basin Discharge Area (ac) 18.85 0.00 18.85 acres total % Imp 46% 100% RCN 78 98 Tc 39.1 0 1-year Peak (cfs) 10.65 0.00 undetained peak 10-year Peak (cfs) 28.80 0.00 undetained peak Allowable Release Rate Total Area within Pre Subarea 18.85 Existing Woods Type B (RCN=55) Existing Woods Type C (RCN=70) 18.85 Open Grass / Weeds HSG B (RCN=61) 0 Open Space Type C (RCN=74) 0 Existing Impervious Area 0 Composite RCN 70 Applied Existing Impervious Area 0.00 Modified RCN 70 Tc (min) 57 Total 1-year Peak (cfs) 3.90 Total 10-year Peak (cfs) 14.96 Pro -rated 1-year Allowable (cfs) 3.90 Pro -rated 10-year Allowable (cfs) 14.96 Water Quality Calculations Existing Impervious Area Treated 0.00 0.00 existing impervious area treated Impervious Area not Treated 0.00 0.00 0.00 prop impery area not treated for WQ %Imp 46 Rv 0.460 WQv (ac-ft) 0.72 18.84 ac developed WQv (cu-ft) 31472 75% WQv (cu-ft) 23604 WQv Provided 51748 - see Hydrocad Output Water Quality Storage Pipe Design Lowest Top of Casting (ft) Invert (ft) Size (in) Length (ft) Top of Pipe Elevation (ft) Water Quality Elevation (ft) static water quality elevation Invert StormFilter Out (ft) Overflow Weir Elevation (ft) Detention Pipe Design Min. Overflow Weir Width (ft) 1-year Peak Elevation (ft) 10-year Peak Elevation (ft) Invert/Normal Pool (ft) Size (in) Length (ft) Top of Pipe/Bank Elevation (ft) Available Storage (cu-ft) 1st Stage Outlet: 2nd Stage Outlet: Tailwater Control Orifice (in) Inlet Pipe Size Outlet Pipe Size 1-year Peak Elevation (ft) 10-year Peak Elevation (ft) Wet/Dry/Sand Filter Surface Storage Design wet basin Top Sand/Normal Pool (ft) 634.50 Top of Bank (ft) 640.00 2.0" orifice @ 1st Stage Outlet: 634.50 (4) 24" wide 2nd Stage Outlet: weirs @ 637.51 10' wide Trap 3rd Stage Outlet: weir @ 639.50 15" storm @ Tailwater Control Orifice (in) 632.00 Emergency Spillway Elevation (ft) 639.10 Emergency Spillway Width (ft) 10.00 1-year Peak Elevation (ft) 636.43 10-year Peak Elevation (ft) 637.77 50-year Peak Elevation (ft) 638.26 Results 1-year Peak Release (cfs) na 0.00 1-year Allowable (cfs) na 0.00 10-year Peak Release (cfs) na 0 10-year Allowable (cfs) na 0.00 Total Storage (cu-ft) na 0 10-year Storage Used (cu-ft) na 0 APPENDIX C: HydroCAD Output S EA Pre. East WS Pre. East WS to BM E2 4P East Post Prop Retention Pond 5P East 6P Prop Retention Pond E3 East Post Comb East WQ @ 635.74 East Onsite Bypass S4 Reach on L ink 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment E1: Pre. East WS Runoff = 4.64 cfs @ 12.70 hrs, Volume= 40,258 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment El -A: Pre. East WS to BM Runoff = 3.89 cfs @ 12.70 hrs, Volume= 33,802 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment E2: East Post Runoff = 10.61 cfs @ 12.39 hrs, Volume= 57,495 cf, Depth= 0.84" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 0.320 70 Woods, Good, HSG C 0.390 98 NP of ponds 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment E3: East Onsite Bypass Runoff = 2.40 cfs @ 12.01 hrs, Volume= 5,900 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 6 Summary for Pond 4P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 0.84" for 1 yr event Inflow = 10.61 cfs @ 12.39 hrs, Volume= 57,495 cf Outflow = 0.14 cfs @ 24.62 hrs, Volume= 22,453 cf, Atten= 99%, Lag= 734.1 min Primary = 0.14 cfs @ 24.62 hrs, Volume= 22,453 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 636.43' @ 24.62 hrs Surf.Area= 29,550 sf Storage= 51,578 cf Plug -Flow detention time= 1,407.0 min calculated for 22,435 cf (39% of inflow Center -of -Mass det. time= 1,261.5 min ( 2,150.6 - 889.1 ) Volume Invert Avail.Storage Storage Description #1 634.50' 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routina Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 #2 Primary 637.51' 24.0" W x 9.0" H Vert. Windows X 4.00 C= 0.600 #3 Secondary 639.10' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.14 cfs @ 24.62 hrs HW=636.43' (Free Discharge) �__2=Windows 1=WQ Orifice (Orifice Controls 0.14 cfs @ 6.54 fps) ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) L3= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Type 11 24-hr 1 yr Rainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 7 N U Pond 4P: Prop Retention Pond East Hydrograph Time (hours) ary 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 8 Summary for Pond 5P: Prop Retention Pond East WQ @ 635.74 Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Outflow = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf, Atten= 0%, Lag= 0.0 min Primary = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 635.74' Surf.Area= 27,657 sf Storage= 31,837 cf Peak Elev= 635.74' @ 0.00 hrs Surf.Area= 27,657 sf Storage= 31,837 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert #1 634.50' UMMI1 Description 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routing Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 Primary OutFlow Max=0.11 cfs @ 0.00 hrs HW=635.74' (Free Discharge) L1=WQ Orifice (Orifice Controls 0.11 cfs @ 5.18 fps) 20131483-RG1-Det-comb 6-13-19 Type 11 24-hr 1 yr Rainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 9 Pond 5P: Prop Retention Pond East WQ @ 635.74 Hydrograph ❑ Inflow ❑ Primary Time (hours) 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 10 Summary for Pond 6P: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.35" for 1 yr event Inflow = 2.40 cfs @ 12.01 hrs, Volume= 28,353 cf Primary = 2.40 cfs @ 12.01 hrs, Volume= 28,353 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs I nflow ❑ Primary N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment E1: Pre. East WS Runoff = 4.93 cfs @ 4.01 hrs, Volume= 28,901 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment El -A: Pre. East WS to BM Runoff = 4.14 cfs @ 4.01 hrs, Volume= 24,267 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 13 Summary for Subcatchment E2: East Post Runoff = 10.82 cfs @ 3.66 hrs, Volume= 44,411 cf, Depth= 0.65" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 0.320 70 Woods, Good, HSG C 0.390 98 NP of ponds 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 14 Summary for Subcatchment E3: East Onsite Bypass Runoff = 1.91 cfs @ 3.23 hrs, Volume= 4,235 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 15 Summary for Pond 4P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 0.65" for 2-yr event Inflow = 10.82 cfs @ 3.66 hrs, Volume= 44,411 cf Outflow = 0.13 cfs @ 6.93 hrs, Volume= 22,834 cf, Atten= 99%, Lag= 196.2 min Primary = 0.13 cfs @ 6.93 hrs, Volume= 22,834 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 636.13' @ 6.93 hrs Surf.Area= 28,768 sf Storage= 42,865 cf Plug -Flow detention time= 1,597.6 min calculated for 22,815 cf (51% of inflow Center -of -Mass det. time= 1,562.9 min ( 1,818.4 - 255.5 ) Volume Invert Avail.Storage Storage Description #1 634.50' 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routina Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 #2 Primary 637.51' 24.0" W x 9.0" H Vert. Windows X 4.00 C= 0.600 #3 Secondary 639.10' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.13 cfs @ 6.93 hrs HW=636.13' (Free Discharge) �__2=Windows 1=WQOrifice (Orifice Controls 0.13 cfs @ 5.99 fps) ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) L3= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 16 N U Pond 4P: Prop Retention Pond East Hydrograph Time (hours) ❑ Inflow M Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 17 Summary for Pond 5P: Prop Retention Pond East WQ @ 635.74 Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Outflow = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf, Atten= 0%, Lag= 0.0 min Primary = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 635.74' Surf.Area= 27,657 sf Storage= 31,837 cf Peak Elev= 635.74' @ 0.00 hrs Surf.Area= 27,657 sf Storage= 31,837 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert #1 634.50' UMMI1 Description 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routing Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 Primary OutFlow Max=0.11 cfs @ 0.00 hrs HW=635.74' (Free Discharge) L1=WQ Orifice (Orifice Controls 0.11 cfs @ 5.18 fps) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 18 Pond 5P: Prop Retention Pond East WQ @ 635.74 Hydrograph ❑ Inflow ❑ Primary Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 19 Summary for Pond 6P: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.34" for 2-yr event Inflow = 1.91 cfs @ 3.23 hrs, Volume= 27,070 cf Primary = 1.91 cfs @ 3.23 hrs, Volume= 27,070 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs I nflow ❑ Primary N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 20 Summary for Subcatchment E1: Pre. East WS Runoff = 17.81 cfs @ 3.92 hrs, Volume= 93,434 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total 1 1 1 1 1 1 1 1 w 1 U 3 1 0 LL Subcatchment E1: Pre. East WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 21 Summary for Subcatchment El -A: Pre. East WS to BM Runoff = 14.95 cfs @ 3.92 hrs, Volume= 78,451 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total N U 3 0 LL Subcatchment El -A: Pre. East WS to BMP Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 22 Summary for Subcatchment E2: East Post Runoff = 28.74 cfs @ 3.63 hrs, Volume= 114,031 cf, Depth= 1.67" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 0.320 70 Woods, Good, HSG C 0.390 98 NP of ponds 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Hydrograph ■ Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment E3: East Onsite Bypass Runoff = 6.80 cfs @ 3.20 hrs, Volume= 13,692 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 24 Summary for Pond 4P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 1.67" for 10-yr event Inflow = 28.74 cfs @ 3.63 hrs, Volume= 114,031 cf Outflow = 3.65 cfs @ 5.22 hrs, Volume= 58,809 cf, Atten= 87%, Lag= 95.5 min Primary = 3.65 cfs @ 5.22 hrs, Volume= 58,809 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 637.77' @ 5.22 hrs Surf.Area= 33,130 sf Storage= 93,646 cf Plug -Flow detention time= 991.3 min calculated for 58,760 cf (52% of inflow Center -of -Mass det. time= 959.8 min ( 1,207.7 - 247.9 ) Volume Invert Avail.Storage Storage Description #1 634.50' 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routina Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 #2 Primary 637.51' 24.0" W x 9.0" H Vert. Windows X 4.00 C= 0.600 #3 Secondary 639.10' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.64 cfs @ 5.22 hrs HW=637.77' (Free Discharge) �__2=Windows 1=WQOrifice (Orifice Controls 0.19 cfs @ 8.60 fps) (Orifice Controls 3.45 cfs @ 1.64 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) L3= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 25 N U Pond 4P: Prop Retention Pond East Hydrograph Time (hours) ❑ Inflow M Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 26 Summary for Pond 5P: Prop Retention Pond East WQ @ 635.74 Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Outflow = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf, Atten= 0%, Lag= 0.0 min Primary = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 635.74' Surf.Area= 27,657 sf Storage= 31,837 cf Peak Elev= 635.74' @ 0.00 hrs Surf.Area= 27,657 sf Storage= 31,837 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert #1 634.50' UMMI1 Description 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routing Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 Primary OutFlow Max=0.11 cfs @ 0.00 hrs HW=635.74' (Free Discharge) L1=WQ Orifice (Orifice Controls 0.11 cfs @ 5.18 fps) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 27 Pond 5P: Prop Retention Pond East WQ @ 635.74 Hydrograph ❑ Inflow ❑ Primary Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 28 Summary for Pond 6P: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.90" for 10-yr event Inflow = 6.82 cfs @ 3.21 hrs, Volume= 72,501 cf Primary = 6.82 cfs @ 3.21 hrs, Volume= 72,501 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs N U 3 0 LL 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) I nflow ❑ Primary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 29 Summary for Subcatchment E1: Pre. East WS Runoff = 25.51 cfs @ 3.89 hrs, Volume= 129,521 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total N U 3 0 LL Subcatchment E1: Pre. East WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ❑ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment El -A: Pre. East WS to BM Runoff = 21.42 cfs @ 3.89 hrs, Volume= 108,752 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total N U 3 0 LL Subcatchment El -A: Pre. East WS to BMP Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment E2: East Post Runoff = 39.25 cfs @ 3.61 hrs, Volume= 150,134 cf, Depth= 2.19" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 0.320 70 Woods, Good, HSG C 0.390 98 NP of ponds 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Hydrograph ■ Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment E3: East Onsite Bypass Runoff = 10.61 cfs @ 3.20 hrs, Volume= 18,981 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 33 Summary for Pond 4P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 2.19" for 25-yr event Inflow = 39.25 cfs @ 3.61 hrs, Volume= 150,134 cf Outflow = 9.99 cfs @ 4.49 hrs, Volume= 94,832 cf, Atten= 75%, Lag= 52.5 min Primary = 9.99 cfs @ 4.49 hrs, Volume= 94,832 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 638.04' @ 4.49 hrs Surf.Area= 33,848 sf Storage= 102,459 cf Plug -Flow detention time= 640.8 min calculated for 94,754 cf (63% of inflow) Center -of -Mass det. time= 614.3 min ( 860.6 - 246.3 ) Volume Invert Avail.Storage Storage Description #1 634.50' 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routina Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 #2 Primary 637.51' 24.0" W x 9.0" H Vert. Windows X 4.00 C= 0.600 #3 Secondary 639.10' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=9.97 cfs @ 4.49 hrs HW=638.04' (Free Discharge) �__2=Windows 1=WQ Orifice (Orifice Controls 0.20 cfs @ 8.95 fps) (Orifice Controls 9.77 cfs @ 2.33 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) L3= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 34 N U Pond 4P: Prop Retention Pond East Hydrograph Time (hours) ❑ Inflow M Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 35 Summary for Pond 5P: Prop Retention Pond East WQ @ 635.74 Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Outflow = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf, Atten= 0%, Lag= 0.0 min Primary = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 635.74' Surf.Area= 27,657 sf Storage= 31,837 cf Peak Elev= 635.74' @ 0.00 hrs Surf.Area= 27,657 sf Storage= 31,837 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert #1 634.50' UMMI1 Description 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routing Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 Primary OutFlow Max=0.11 cfs @ 0.00 hrs HW=635.74' (Free Discharge) L1=WQ Orifice (Orifice Controls 0.11 cfs @ 5.18 fps) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 36 Pond 5P: Prop Retention Pond East WQ @ 635.74 Hydrograph ❑ Inflow ❑ Primary Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 37 Summary for Pond 6P: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 1.42" for 25-yr event Inflow = 10.78 cfs @ 4.48 hrs, Volume= 113,814 cf Primary = 10.78 cfs @ 4.48 hrs, Volume= 113,814 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs 0 0 0 Pond 6P: East Post Comb Hydrograph V 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) Inflow ❑ Primary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment E1: Pre. East WS Runoff = 32.12 cfs @ 3.88 hrs, Volume= 161,129 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total N U 3 0 LL Subcatchment E1: Pre. East WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment El -A: Pre. East WS to BM Runoff = 26.97 cfs @ 3.88 hrs, Volume= 135,291 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total N U 3 0 LL Subcatchment El -A: Pre. East WS to BMP Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment E2: East Post Runoff = 47.46 cfs @ 3.61 hrs, Volume= 180,911 cf, Depth= 2.64" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 0.320 70 Woods, Good, HSG C 0.390 98 NP of ponds 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 41 Summary for Subcatchment E3: East Onsite Bypass Runoff = 13.28 cfs @ 3.20 hrs, Volume= 23,613 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge Subcatchment E3: East Onsite Bypass Hydrograph ■ Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 42 Summary for Pond 4P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 2.64" for 50 yr event Inflow = 47.46 cfs @ 3.61 hrs, Volume= 180,911 cf Outflow = 16.88 cfs @ 4.26 hrs, Volume= 125,572 cf, Atten= 64%, Lag= 38.8 min Primary = 16.88 cfs @ 4.26 hrs, Volume= 125,572 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 638.26' @ 4.26 hrs Surf.Area= 34,500 sf Storage= 110,172 cf Plug -Flow detention time= 497.9 min calculated for 125,572 cf (69% of inflow) Center -of -Mass det. time= 472.2 min ( 717.2 - 245.0 ) Volume Invert Avail.Storage Storage Description #1 634.50' 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routina Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 #2 Primary 637.51' 24.0" W x 9.0" H Vert. Windows X 4.00 C= 0.600 #3 Secondary 639.10' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=16.91 cfs @ 4.26 hrs HW=638.26' (Free Discharge) �__2=Windows 1=WQ Orifice (Orifice Controls 0.20 cfs @ 9.23 fps) (Orifice Controls 16.71 cfs @ 2.78 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) L3= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 43 N U Pond 4P: Prop Retention Pond East Hydrograph Time (hours) ary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 44 Summary for Pond 5P: Prop Retention Pond East WQ @ 635.74 Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Outflow = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf, Atten= 0%, Lag= 0.0 min Primary = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 635.74' Surf.Area= 27,657 sf Storage= 31,837 cf Peak Elev= 635.74' @ 0.00 hrs Surf.Area= 27,657 sf Storage= 31,837 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert #1 634.50' UMMI1 Description 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routing Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 Primary OutFlow Max=0.11 cfs @ 0.00 hrs HW=635.74' (Free Discharge) L1=WQ Orifice (Orifice Controls 0.11 cfs @ 5.18 fps) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 45 Pond 5P: Prop Retention Pond East WQ @ 635.74 Hydrograph ❑ Inflow ❑ Primary Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 46 Summary for Pond 6P: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 1.86" for 50 yr event Inflow = 17.94 cfs @ 4.25 hrs, Volume= 149,185 cf Primary = 17.94 cfs @ 4.25 hrs, Volume= 149,185 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs N U 3 0 LL Pond 6P: East Post Comb Hydrograph V 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) Inflow ❑ Primary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 47 Summary for Subcatchment E1: Pre. East WS Runoff = 0.05 cfs @ 6.16 hrs, Volume= 376 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 22.450 70 Woods, Good, HSG C 22.450 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 48 Summary for Subcatchment El -A: Pre. East WS to BM Runoff = 0.04 cfs @ 6.16 hrs, Volume= 315 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 18.850 70 Woods, Good, HSG C 18.850 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 49.7 270 0.0185 0.09 Sheet Flow, East -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 7.3 940 0.0176 2.14 Shallow Concentrated Flow, West Shallow Unpaved Kv= 16.1 fps 57.0 1,210 Total N U 3 0 LL Subcatchment El -A: Pre. East WS to BMP Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 49 Summary for Subcatchment E2: East Post Runoff = 0.64 cfs @ 3.89 hrs, Volume= 3,993 cf, Depth= 0.06" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 0.320 70 Woods, Good, HSG C 0.390 98 NP of ponds 17.410 78 Residential, 45% imp, HSG C 0.730 80 1/2 acre lots, 25% imp, HSG C 18.850 78 Weighted Average 10.443 55.40% Pervious Area 8.407 44.60% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 32.3 164 0.0200 0.08 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 6.8 1,511 0.0050 3.72 4.57 Pipe Channel, Storm Sewer 15.0" Round Area= 1.2 sf Perim= 3.9' r= 0.31' n= 0.013 39.1 1,675 Total Subcatchment E2: East Post Hydrograph ■ Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 50 Summary for Subcatchment E3: East Onsite Bypass Runoff = 0.01 cfs @ 5.90 hrs, Volume= 55 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 3.290 70 Woods, Good, HSG C 3.290 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Direct Discharge Subcatchment E3: East Onsite Bypass Hydrograph ■ Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 51 Summary for Pond 4P: Prop Retention Pond East Inflow Area = 821,106 sf, 44.60% Impervious, Inflow Depth = 0.06" for WQ event Inflow = 0.64 cfs @ 3.89 hrs, Volume= 3,993 cf Outflow = 0.03 cfs @ 6.87 hrs, Volume= 2,747 cf, Atten= 95%, Lag= 178.9 min Primary = 0.03 cfs @ 6.87 hrs, Volume= 2,747 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Peak Elev= 634.66' @ 6.87 hrs Surf.Area= 23,961 sf Storage= 3,755 cf Plug -Flow detention time= 1,202.4 min calculated for 2,747 cf (69% of inflow) Center -of -Mass det. time= 1,172.3 min ( 1,454.3 - 282.0 ) Volume Invert Avail.Storage Storage Description #1 634.50' 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routina Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 #2 Primary 637.51' 24.0" W x 9.0" H Vert. Windows X 4.00 C= 0.600 #3 Secondary 639.10' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.03 cfs @ 6.87 hrs HW=634.66' (Free Discharge) �__2=Windows 1=WQ Orifice (Orifice Controls 0.03 cfs @ 1.36 fps) ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=634.50' (Free Discharge) L3= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 52 N U Pond 4P: Prop Retention Pond East Hydrograph Time (hours) ❑ Inflow M Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 53 Summary for Pond 5P: Prop Retention Pond East WQ @ 635.74 Inflow = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Outflow = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf, Atten= 0%, Lag= 0.0 min Primary = 0.11 cfs @ 0.00 hrs, Volume= 19,622 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 635.74' Surf.Area= 27,657 sf Storage= 31,837 cf Peak Elev= 635.74' @ 0.00 hrs Surf.Area= 27,657 sf Storage= 31,837 cf Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= (not calculated: no inflow) Volume Invert #1 634.50' UMMI1 Description 164,773 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 634.50 23,258 0 0 635.00 25,467 12,181 12,181 636.00 28,426 26,947 39,128 637.00 31,044 29,735 68,863 638.00 33,745 32,395 101,257 639.00 36,635 35,190 136,447 639.75 38,899 28,325 164,773 Device Routing Invert Outlet Devices #1 Primary 634.50' 2.0" Vert. WQ Orifice C= 0.600 Primary OutFlow Max=0.11 cfs @ 0.00 hrs HW=635.74' (Free Discharge) L1=WQ Orifice (Orifice Controls 0.11 cfs @ 5.18 fps) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 54 Pond 5P: Prop Retention Pond East WQ @ 635.74 Hydrograph ❑ Inflow ❑ Primary Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 55 Summary for Pond 6P: East Post Comb Inflow Area = 964,418 sf, 37.97% Impervious, Inflow Depth > 0.03" for WQ event Inflow = 0.03 cfs @ 5.98 hrs, Volume= 2,802 cf Primary = 0.03 cfs @ 5.98 hrs, Volume= 2,802 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs N U 3 0 LL Pond 6P: East Post Comb Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) C Inflow ❑ Primary Pre. West WS OW1 Pre. West WS (3S) � 1P West Post S4 Reach on L ink West Basin West CW3 Ons to Bypass 41 3P West Out 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 2 Summary for Subcatchment 3S: West Post Runoff = 9.13 cfs @ 11.99 hrs, Volume= 19,921 cf, Depth= 1.31" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc ■ Runoff 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 3 Summary for Subcatchment W1: Pre. West WS Runoff = 4.16 cfs @ 12.12 hrs, Volume= 15,045 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 4 Summary for Subcatchment W1-A: Pre. West WS Runoff = 2.08 cfs @ 12.12 hrs, Volume= 7,514 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 5 Summary for Subcatchment W3: West Onsite Bypass Runoff = 1.33 cfs @ 12.32 hrs, Volume= 7,532 cf, Depth= 0.49" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Type II 24-hr 1 yr Rainfall=2.58" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 6 Summary for Pond 1 P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 1.31" for 1 yr event Inflow = 9.13 cfs @ 11.99 hrs, Volume= 19,921 cf Outflow = 0.27 cfs @ 14.90 hrs, Volume= 10,751 cf, Atten= 97%, Lag= 174.5 min Primary = 0.27 cfs @ 14.90 hrs, Volume= 10,751 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 639.28' Surf.Area= 9,519 sf Storage= 2,561 cf Peak Elev= 640.50' @ 14.90 hrs Surf.Area= 12,421 sf Storage= 16,082 cf (13,521 cf above start) Plug -Flow detention time= 1,012.3 min calculated for 8,190 cf (41% of inflow) Center -of -Mass det. time= 685.6 min ( 1,516.0 - 830.5 ) Volume Invert #1 639.00' UMMI1 Description 71,380 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 639.00 8,773 0 0 640.00 11,439 10,106 10,106 641.00 13,400 12,420 22,526 642.00 18,522 15,961 38,487 643.00 23,054 20,788 59,275 643.50 25,369 12,106 71,380 Device Routing Invert Outlet Devices #1 Primary 636.60' 24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.60' / 636.50' S= 0.0024 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 639.28' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 640.39' 24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 642.70' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.27 cfs @ 14.90 hrs HW=640.50' (Free Discharge) L1=Culvert (Passes 0.27 cfs of 25.16 cfs potential flow) �__3=Orifi 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.23 fps) ce/Grate (Orifice Controls 0.24 cfs @ 1.07 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=639.28' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Type 11 24-hr 1 yr Rainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 7 N U Pond 1 P: West Basin Hydrograph Time (hours) ❑ Inflow R Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Type 1124-hr 1 yrRainfall=2.58" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 8 Summary for Pond 3P: West Out Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 0.60" for 1 yr event Inflow = 1.36 cfs @ 12.32 hrs, Volume= 18,283 cf Primary = 1.36 cfs @ 12.32 hrs, Volume= 18,283 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs I nflow ❑ Primary N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 9 Summary for Subcatchment 3S: West Post Runoff = 9.17 cfs @ 3.19 hrs, Volume= 16,225 cf, Depth= 1.07" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 10 Summary for Subcatchment W1: Pre. West WS Runoff = 3.65 cfs @ 3.37 hrs, Volume= 10,801 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 11 Summary for Subcatchment W1-A: Pre. West WS Runoff = 1.82 cfs @ 3.37 hrs, Volume= 5,394 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 12 Summary for Subcatchment W3: West Onsite Bypass Runoff = 1.31 cfs @ 3.61 hrs, Volume= 5,407 cf, Depth= 0.35" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr Rainfall=2.28" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 13 Summary for Pond 1 P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 1.07" for 2-yr event Inflow = 9.17 cfs @ 3.19 hrs, Volume= 16,225 cf Outflow = 0.36 cfs @ 5.33 hrs, Volume= 8,421 cf, Atten= 96%, Lag= 128.3 min Primary = 0.36 cfs @ 5.33 hrs, Volume= 8,421 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 639.28' Surf.Area= 9,519 sf Storage= 2,561 cf Peak Elev= 640.53' @ 5.33 hrs Surf.Area= 12,477 sf Storage= 16,433 cf (13,872 cf above start) Plug -Flow detention time= 1,473.4 min calculated for 5,860 cf (36% of inflow) Center -of -Mass det. time= 1,030.6 min ( 1,248.9 - 218.2 ) Volume Invert #1 639.00' UMMI1 Description 71,380 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 639.00 8,773 0 0 640.00 11,439 10,106 10,106 641.00 13,400 12,420 22,526 642.00 18,522 15,961 38,487 643.00 23,054 20,788 59,275 643.50 25,369 12,106 71,380 Device Routing Invert Outlet Devices #1 Primary 636.60' 24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.60' / 636.50' S= 0.0024 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 639.28' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 640.39' 24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 642.70' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.36 cfs @ 5.33 hrs HW=640.53' (Free Discharge) L1=Culvert (Passes 0.36 cfs of 25.33 cfs potential flow) �__3=Orifi 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 5.29 fps) ce/Grate (Orifice Controls 0.33 cfs @ 1.20 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=639.28' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 14 N U Pond 1 P: West Basin Hydrograph Time (hours) ❑ Inflow R Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr Rainfall=2.28" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 15 Summary for Pond 3P: West Out Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 0.45" for 2-yr event Inflow = 1.33 cfs @ 3.61 hrs, Volume= 13,828 cf Primary = 1.33 cfs @ 3.61 hrs, Volume= 13,828 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs N U 3 0 LL Pond 3P: West Out Hydrograph 0 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) I nflow ❑ Primary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 16 Summary for Subcatchment 3S: West Post Runoff = 17.61 cfs @ 3.19 hrs, Volume= 34,910 cf, Depth= 2.29" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc 1 1 1 1 1 1 1 1 N 1 U 3 1 0 LL Subcatchment 3S: West Post Hydrograph Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 17 Summary for Subcatchment W1: Pre. West WS Runoff = 13.20 cfs @ 3.33 hrs, Volume= 34,918 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM N U 3 0 LL Subcatchment W1: Pre. West WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 18 Summary for Subcatchment W1-A: Pre. West WS Runoff = 6.59 cfs @ 3.33 hrs, Volume= 17,438 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 19 Summary for Subcatchment W3: West Onsite Bypass Runoff = 4.79 cfs @ 3.55 hrs, Volume= 17,480 cf, Depth= 1.15" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 10-yr Rainfall=3.72" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 20 Summary for Pond 1 P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 2.29" for 10-yr event Inflow = 17.61 cfs @ 3.19 hrs, Volume= 34,910 cf Outflow = 3.69 cfs @ 3.60 hrs, Volume= 27,053 cf, Atten= 79%, Lag= 24.6 min Primary = 3.69 cfs @ 3.60 hrs, Volume= 27,053 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 639.28' Surf.Area= 9,519 sf Storage= 2,561 cf Peak Elev= 641.08' @ 3.60 hrs Surf.Area= 13,796 sf Storage= 23,578 cf (21,017 cf above start) Plug -Flow detention time= 418.3 min calculated for 24,492 cf (70% of inflow) Center -of -Mass det. time= 357.2 min ( 569.6 - 212.4 ) Volume Invert #1 639.00' UMMI1 Description 71,380 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 639.00 8,773 0 0 640.00 11,439 10,106 10,106 641.00 13,400 12,420 22,526 642.00 18,522 15,961 38,487 643.00 23,054 20,788 59,275 643.50 25,369 12,106 71,380 Device Routing Invert Outlet Devices #1 Primary 636.60' 24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.60' / 636.50' S= 0.0024 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 639.28' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 640.39' 24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 642.70' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=3.69 cfs @ 3.60 hrs HW=641.08' (Free Discharge) L1=Culvert (Passes 3.69 cfs of 28.21 cfs potential flow) �__3=Orifi 2=Orifice/Grate (Orifice Controls 0.03 cfs @ 6.38 fps) ce/Grate (Orifice Controls 3.66 cfs @ 2.66 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=639.28' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 21 N U Pond 1 P: West Basin Hydrograph Time (hours) ❑ Inflow R Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 10-yr Rainfall=3.72" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 22 Summary for Pond 3P: West Out Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 1.46" for 10-yr event Inflow = 8.47 cfs @ 3.56 hrs, Volume= 44,533 cf Primary = 8.47 cfs @ 3.56 hrs, Volume= 44,533 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Inflow ❑ Primary N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 23 Summary for Subcatchment 3S: West Post Runoff = 24.38 cfs @ 3.19 hrs, Volume= 44,021 cf, Depth= 2.89" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc Subcatchment 3S: West Post Hydrograph ■ Runoff Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 24 Summary for Subcatchment W1: Pre. West WS Runoff = 20.04 cfs @ 3.32 hrs, Volume= 48,405 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM N U 3 0 LL Subcatchment W1: Pre. West WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 25 Summary for Subcatchment W1-A: Pre. West WS Runoff = 10.01 cfs @ 3.32 hrs, Volume= 24,173 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM ■ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 26 Summary for Subcatchment W3: West Onsite Bypass Runoff = 7.02 cfs @ 3.53 hrs, Volume= 24,231 cf, Depth= 1.59" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 27 Summary for Pond 1 P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 2.89" for 25-yr event Inflow = 24.38 cfs @ 3.19 hrs, Volume= 44,021 cf Outflow = 5.53 cfs @ 3.49 hrs, Volume= 36,151 cf, Atten= 77%, Lag= 18.1 min Primary = 5.53 cfs @ 3.49 hrs, Volume= 36,151 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 639.28' Surf.Area= 9,519 sf Storage= 2,561 cf Peak Elev= 641.37' @ 3.49 hrs Surf.Area= 15,272 sf Storage= 27,764 cf (25,203 cf above start) Plug -Flow detention time= 317.8 min calculated for 33,562 cf (76% of inflow) Center -of -Mass det. time= 277.5 min ( 488.6 - 211.1 ) Volume Invert #1 639.00' UMMI1 Description 71,380 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 639.00 8,773 0 0 640.00 11,439 10,106 10,106 641.00 13,400 12,420 22,526 642.00 18,522 15,961 38,487 643.00 23,054 20,788 59,275 643.50 25,369 12,106 71,380 Device Routing Invert Outlet Devices #1 Primary 636.60' 24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.60' / 636.50' S= 0.0024 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 639.28' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 640.39' 24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 642.70' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=5.53 cfs @ 3.49 hrs HW=641.36' (Free Discharge) L1=Culvert (Passes 5.53 cfs of 29.35 cfs potential flow) �__3=Orifi 2=Orifice/Grate (Orifice Controls 0.04 cfs @ 6.88 fps) ce/Grate (Orifice Controls 5.49 cfs @ 3.66 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=639.28' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 28 N U Pond 1 P: West Basin Hydrograph Time (hours) ❑ Inflow R Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 25-yr Rainfall=4.38" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 29 Summary for Pond 3P: West Out Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 1.98" for 25-yr event Inflow = 12.54 cfs @ 3.53 hrs, Volume= 60,382 cf Primary = 12.54 cfs @ 3.53 hrs, Volume= 60,382 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Pond 3P: West Out Hydrograph Inflow ❑ Primary V 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 30 Summary for Subcatchment 3S: West Post Runoff = 28.40 cfs @ 3.19 hrs, Volume= 51,622 cf, Depth= 3.39" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc Subcatchment 3S: West Post Hydrograph ■ Runoff Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 31 Summary for Subcatchment W1: Pre. West WS Runoff = 25.19 cfs @ 3.32 hrs, Volume= 60,217 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM N U 3 0 LL Subcatchment W1: Pre. West WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 32 Summary for Subcatchment W1-A: Pre. West WS Runoff = 12.58 cfs @ 3.32 hrs, Volume= 30,073 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM N U 3 0 LL Subcatchment W1-A: Pre. West WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 33 Summary for Subcatchment W3: West Onsite Bypass Runoff = 8.84 cfs @ 3.53 hrs, Volume= 30,144 cf, Depth= 1.98" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" ❑ Runoff N U 3 0 LL 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 34 Summary for Pond 1 P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 3.39" for 50 yr event Inflow = 28.40 cfs @ 3.19 hrs, Volume= 51,622 cf Outflow = 6.64 cfs @ 3.47 hrs, Volume= 43,745 cf, Atten= 77%, Lag= 17.3 min Primary = 6.64 cfs @ 3.47 hrs, Volume= 43,745 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 639.28' Surf.Area= 9,519 sf Storage= 2,561 cf Peak Elev= 641.61' @ 3.47 hrs Surf.Area= 16,541 sf Storage= 31,705 cf (29,144 cf above start) Plug -Flow detention time= 269.7 min calculated for 41,150 cf (80% of inflow) Center -of -Mass det. time= 237.6 min (447.6 - 210.0 ) Volume Invert #1 639.00' UV01 Description 71,380 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 639.00 8,773 0 0 640.00 11,439 10,106 10,106 641.00 13,400 12,420 22,526 642.00 18,522 15,961 38,487 643.00 23,054 20,788 59,275 643.50 25,369 12,106 71,380 Device Routing Invert Outlet Devices #1 Primary 636.60' 24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.60' / 636.50' S= 0.0024 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 639.28' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 640.39' 24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 642.70' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=6.63 cfs @ 3.47 hrs HW=641.61' (Free Discharge) L1=Culvert (Passes 6.63 cfs of 30.30 cfs potential flow) �__3=Orifi 2=Orifice/Grate (Orifice Controls 0.04 cfs @ 7.29 fps) ce/Grate (Orifice Controls 6.59 cfs @ 4.39 fps) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=639.28' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 35 N U Pond 1 P: West Basin Hydrograph Time (hours) ❑ Inflow R Outflow ❑ Primary Secondary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr 2-yr 50 yr Rainfall=4.92" Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 36 Summary for Pond 3P: West Out Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 2.43" for 50 yr event Inflow = 15.46 cfs @ 3.52 hrs, Volume= 73,890 cf Primary = 15.46 cfs @ 3.52 hrs, Volume= 73,890 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Pond 3P: West Out Hydrograph I 1 nflow ❑ Primary V 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 37 Summary for Subcatchment 3S: West Post Runoff = 1.51 cfs @ 3.22 hrs, Volume= 3,006 cf, Depth= 0.20" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 2.092 98 Paved parking, HSG C 2.100 74 >75% Grass cover, Good, HSG C 4.192 86 Weighted Average 2.100 50.10% Pervious Area 2.092 49.90% Impervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 7.5 Direct Entry, Min Tc ❑ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 38 Summary for Subcatchment W1: Pre. West WS Runoff = 0.02 cfs @ 5.98 hrs, Volume= 140 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 8.390 70 Woods, Good, HSG C 8.390 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM N U 3 0 LL Subcatchment W1: Pre. West WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 39 Summary for Subcatchment W1-A: Pre. West WS Runoff = 0.01 cfs @ 5.98 hrs, Volume= 70 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 4.190 70 Woods, Good, HSG C 4.190 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 11.6 50 0.0243 0.07 Sheet Flow, West -Sheet Woods: Light underbrush n= 0.400 P2= 3.12" 2.1 328 0.0270 2.65 Shallow Concentrated Flow, West Shallow1 Unpaved Kv= 16.1 fps 2.8 540 0.0396 3.20 Shallow Concentrated Flow, W-Shallow2 Unpaved Kv= 16.1 fps 1111.1N' 01liRM OM N U 3 0 LL Subcatchment W1-A: Pre. West WS Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) ■ Runoff 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 40 Summary for Subcatchment W3: West Onsite Bypass Runoff = 0.01 cfs @ 6.04 hrs, Volume= 70 cf, Depth= 0.00" Runoff by SCS TR-20 method, UH=SCS, Weighted-CN, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Charlotte 6-hr 2-yr WQ Rainfall=1.00" Area (ac) CN Description 4.200 70 Woods, Good, HSG C 4.200 100.00% Pervious Area Tc Length Slope Velocity Capacity Description (min) (feet) (ft/ft) (ft/sec) (cfs) 31.5 264 0.0550 0.14 Sheet Flow, Sheet Woods: Light underbrush n= 0.400 P2= 3.12" Subcatchment W3: West Onsite Bypass Hydrograph ■ Runoff 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 41 Summary for Pond 1 P: West Basin Inflow Area = 182,604 sf, 49.90% Impervious, Inflow Depth = 0.20" for WQ event Inflow = 1.51 cfs @ 3.22 hrs, Volume= 3,006 cf Outflow = 0.01 cfs @ 6.17 hrs, Volume= 2,018 cf, Atten= 99%, Lag= 177.3 min Primary = 0.01 cfs @ 6.17 hrs, Volume= 2,018 cf Secondary = 0.00 cfs @ 0.00 hrs, Volume= 0 cf Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs Starting Elev= 639.28' Surf.Area= 9,519 sf Storage= 2,561 cf Peak Elev= 639.57' @ 6.17 hrs Surf.Area= 10,295 sf Storage= 5,444 cf (2,883 cf above start) Plug -Flow detention time= (not calculated: initial storage exceeds outflow) Center -of -Mass det. time= 1,479.0 min ( 1,710.7 - 231.7 ) Volume Invert #1 639.00' UMMI1 Description 71,380 cf Custom Stage Data (Prismatic) Listed below (Recalc) Elevation Surf.Area Inc.Store Cum.Store (feet) (sq-ft) (cubic -feet) (cubic -feet) 639.00 8,773 0 0 640.00 11,439 10,106 10,106 641.00 13,400 12,420 22,526 642.00 18,522 15,961 38,487 643.00 23,054 20,788 59,275 643.50 25,369 12,106 71,380 Device Routing Invert Outlet Devices #1 Primary 636.60' 24.0" Round Culvert L= 40.9' RCP, square edge headwall, Ke= 0.500 Inlet / Outlet Invert= 636.60' / 636.50' S= 0.0024 '/' Cc= 0.900 n= 0.013, Flow Area= 3.14 sf #2 Device 1 639.28' 1.0" Vert. Orifice/Grate C= 0.600 #3 Device 1 640.39' 24.0" W x 9.0" H Vert. Orifice/Grate C= 0.600 #4 Secondary 642.70' 10.0' long x 10.0' breadth Broad -Crested Rectangular Weir Head (feet) 0.20 0.40 0.60 0.80 1.00 1.20 1.40 1.60 Coef. (English) 2.49 2.56 2.70 2.69 2.68 2.69 2.67 2.64 Primary OutFlow Max=0.01 cfs @ 6.17 hrs HW=639.57' (Free Discharge) L1=Culvert (Passes 0.01 cfs of 18.40 cfs potential flow) �__3=Orifi 2=Orifice/Grate (Orifice Controls 0.01 cfs @ 2.40 fps) ce/Grate ( Controls 0.00 cfs) Secondary OutFlow Max=0.00 cfs @ 0.00 hrs HW=639.28' (Free Discharge) L4= Broad -Crested Rectangular Weir ( Controls 0.00 cfs) 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 42 N U Pond 1 P: West Basin Hydrograph Time (hours) ary 20131483-RG1-Det-comb 6-13-19 Charlotte 6-hr2-yr WQ Rainfall= 1. 00 " Prepared by Symanetc Printed 6/13/2019 HydroCAD® 10.00-15 s/n 03828 © 2015 HydroCAD Software Solutions LLC Page 43 Summary for Pond 3P: West Out Inflow Area = 365,556 sf, 24.93% Impervious, Inflow Depth > 0.07" for WQ event Inflow = 0.02 cfs @ 6.06 hrs, Volume= 2,088 cf Primary = 0.02 cfs @ 6.06 hrs, Volume= 2,088 cf, Atten= 0%, Lag= 0.0 min Routing by Stor-Ind method, Time Span= 0.00-60.00 hrs, dt= 0.05 hrs N U 3 0 LL Pond 3P: West Out Hydrograph 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 48 50 52 54 56 58 60 Time (hours) C Inflow ❑ Primary APPENDIX D: Site Aerial Map O Z W J O O APPENDIX E: Soils Map Soil Map —Union County, North Carolina 534300 534400 534500 534600 534700 35o 8'6"N 534300 534400 534500 534600 534700 Map Scale: 1:5,110 i printed on A portrait (8.5" x 11") sheet. Meters $ N 0 50 100 200 300 Feet 0 200 400 800 1200 Map projection: Web Mercator Corner coordinates: WGS84 Edge tics: lfrM Zone 17N WGS84 US/bA_ Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey 534800 534900 534800 534900 35o 8' 6" N 535000 9/17/2014 Page 1 of 3 MAP LEGEND Area of Interest (AOI) 0 Area of Interest (AOI) Soils 0 Soil Map Unit Polygons + Soil Map Unit Lines Soil Map Unit Points Special Point Features Vo Blowout Borrow Pit Clay Spot Closed Depression Gravel Pit Gravelly Spot Landfill Lava Flow Marsh or swamp Mine or Quarry Miscellaneous Water Perennial Water 1W Rock Outcrop Saline Spot Sandy Spot Severely Eroded Spot Sinkhole Slide or Slip o Sodic Spot Soil Map —Union County, North Carolina MAP INFORMATION Spoil Area The soil surveys that comprise your AOI were mapped at 1:24,000. Stony Spot Warning: Soil Map may not be valid at this scale. Very Stony Spot Enlargement of maps beyond the scale of mapping can cause ¢ Wet Spot misunderstanding of the detail of mapping and accuracy of soil line placement. The maps do not show the small areas of contrasting 4 Other soils that could have been shown at a more detailed scale. Special Line Features Please rely on the bar scale on each map sheet for map Water Features measurements. Streams and Canals Source of Map: Natural Resources Conservation Service Transportation Web Soil Survey URL: http://websoilsurvey.nres.usda.gov 4-" Rails Coordinate System: Web Mercator (EPSG:3857) 0­0 Interstate Highways Maps from the Web Soil Survey are based on the Web Mercator US Routes projection, which preserves direction and shape but distorts distance and area. A projection that preserves area, such as the Major Roads Albers equal-area conic projection, should be used if more accurate calculations of distance or area are required. Local Roads This product is generated from the USDA-NRCS certified data as of Background the version date(s) listed below. . Aerial Photography Soil Survey Area: Union County, North Carolina Survey Area Data: Version 14, Dec 21, 2013 Soil map units are labeled (as space allows) for map scales 1:50,000 or larger. Date(s) aerial images were photographed: Feb 11, 2011—Mar 2, 2011 The orthophoto or other base map on which the soil lines were compiled and digitized probably differs from the background imagery displayed on these maps. As a result, some minor shifting of map unit boundaries may be evident. l son Natural Resources Web Soil Survey 9/17/2014 Conservation Service National Cooperative Soil Survey Page 2 of 3 Soil Map —Union County, North Carolina Map Unit Legend Union County, North Carolina (NC179) Map Unit Symbol Map Unit Name Acres in AOI Percent of AOI BaB Badin channery silt loam, 2 to 8 percent slopes 16.1 30.6% CmB Cid channery silt loam, 1 to 5 percent slopes 1.5 2.9% ScA Secrest-Cid complex, 0 to 3 percent slopes 29.5 56.3% TaB Tarrus gravelly silt loam, 2 to 8 percent slopes 5.4 10.2% Totals for Area of Interest 62.6 100.0% usoA Natural Resources Web Soil Survey 9/17/2014 4� Conservation Service National Cooperative Soil Survey Page 3 of 3 APPENDIX F: NCDENR Supplemental BMP Calculations Permit No. (to be provided by DWQ) R ),C W A TF9 p2 O� �i v? NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checkkst (Part I//) must be printed, filled out and submitted along with all of the required information. Project name Courtyards at Emerald Lake Contact person Robert Cash Phone number 704-548-0333 Date 14-Jun-19 Drainage area number Project Site Development Site Characteristics Drainage area 821,106 ft2 Impervious area, post -development 374,014 ft2 impervious 45.55 Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required 31,472 ft' Volume provided 31,684 ft' OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control ofthe lyr 24hr storm peak flow required? y (Y or N) 1-yr, 24-hr rainfall depth 2.6 in Rational C, pre -development 70.00 (unitless) Rational C, post -development 78.00 (unitless) Rainfall intensity: 1-yr, 24-hr storm 2.58 inlhr OK Pre -development 1-yr, 24-hr peak flow 3.90 ft'/sec Post -development 1-yr, 24-hr peak flow 10.65 ft'/sec Pre/Post 1-yr, 24-hr peak flow control 6.75 ft'/sec Elevations Temporary pool elevation 637.51 finsl Permanent pool elevation 634.50 finsl SHWT elevation (approx. at the perm. pool elevation) finsl Top of 10ft vegetated shelf elevation 635.00 finsl Bottom of 1 Oft vegetated shelf elevation 634.00 finsl Sediment cleanout, top elevation (bottom of pond) 627.00 finsl Sediment cleanout, bottom elevation 626.00 finsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pool? y (Y or N) Elevation ofthe top ofthe additional volume 637.5 finsl OK Surface Areas Area, temporary pool 25,573 ft2 Area REQUIRED, permanent pool 15,519 ft2 SAIDA ratio 1.89 (unitless) Area PROVIDED, permanent pool, A,_ ... 19,267 ft2 OK Area, bottom of 1 Oft vegetated shelf, Aeon ,,au 15,541 ft2 Area, sediment cleanout, top elevation (bottom of pond), Ant -pond 3,278 ft' Volumes Volume, temporary pool 31,684 ft' OK Volume, permanent pool, VP- 2 1 75,868 ft' Volume, forebay (sum of forebays if more than one forebay) 15,200 ft' Forebay % of permanent pool volume 20.0 % % OK SAIDA Table Data Design TSS removal 85 OX Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAIDA ratio 1.89 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, VP- 2 1 75,868 ft' Area provided, permanent pool, Apa„ _1 19,267 ft' Average depth calculated 6.50 ft OK Average depth used in SAIDA, d_ (Round to nearest 0.5ft) 6.5 ft OK Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, Apa„ _1 19,267 ft2 Area, bottom of 1 Oft vegetated shelf, Aeon ,,au 15,541 ft' Area, sediment cleanout, top elevation (bottom of pond), 3,278 ft2 Anm_po�a 'Depth' (distance b/w bottom of 10ft shelf and top of sediment) 7.00 ft Average depth calculated 5.50 ft OK Average depth used in SAIDA, d_ (Round to down to nearest 0.5ft, 5.5 ft OK Drawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (if circular) 2.00 in Area of orifice (if -non -circular) in2 Coefficient of discharge (Co) 0.60 (unitless) Driving head (Ho) 1.36 ft Drawdown through weir? n (Y or N) Weir type (unitless) Coefficient of discharge (CJ (unitless) Length of weir(L) ft Driving head (H) ft Pre -development 1-yr, 24-hr peak flow 3.90 ft'/sec Post -development 1-yr, 24-hr peak flow 10.65 ft'/sec Storage volume discharge rate (through discharge orifice or weir) 0.12 ft'/sec Storage volume drawdown time 2.96 days OK, draws down in 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length offlowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 1.0 ft OK Vegetated filter provided? n (Y or N) Insufficient. Vegetated filter required. Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: pump out Form SW401-Wet Detention Basin- Rev.94/18/12 Parts I. & II. Design Summary, Page 1 of 1 Permit No. (to be provided by DWQ) R ),C W A TF9 p2 O� �i v? NCDENR STORMWATER MANAGEMENT PERMIT APPLICATION FORM 401 CERTIFICATION APPLICATION FORM WET DETENTION BASIN SUPPLEMENT This form must be filled out, printed and submitted. The Required Items Checkkst (Part I//) must be printed, filled out and submitted along with all of the required information. Project name Courtyards at Emerald Lake Contact person Doug Turney Phone number 614-775-4213 Date 14-Jun-19 Drainage area number West Basin 3 Site Characteristics Drainage area 182,516 ft2 Impervious area, post -development 91,076 ft2 impervious 49.90 Design rainfall depth 1.0 in Storage Volume: Non -SA Waters Minimum volume required 7,595 ft' Volume provided 12,155 ft' OK, volume provided is equal to or in excess of volume required. Storage Volume: SA Waters 1.5" runoff volume ft3 Pre -development 1-yr, 24-hr runoff ft3 Post -development 1-yr, 24-hr runoff ft3 Minimum volume required ft3 Volume provided ft3 Peak Flow Calculations Is the pre/post control ofthe lyr 24hr storm peak flow required? y (Y or N) 1-yr, 24-hr rainfall depth 2.6 in Rational C, pre -development 70.00 (unitless) Rational C, post -development 78.00 (unitless) Rainfall intensity: 1-yr, 24-hr storm 2.58 inlhr OK Pre -development 1-yr, 24-hr peak flow 4.16 ft3lsec Post -development 1-yr, 24-hr peak flow 9.13 ft3lsec Pre/Post 1-yr, 24-hr peak flow control 4.97 ft'/sec Elevations Temporary pool elevation 640.39 finsl Permanent pool elevation 639.28 finsl SHWT elevation (approx. at the perm. pool elevation) finsl Top of 10ft vegetated shelf elevation 639.80 finsl Bottom of 1 Oft vegetated shelf elevation 638.80 finsl Sediment cleanout, top elevation (bottom of pond) 634.40 finsl Sediment cleanout, bottom elevation 633.40 finsl Sediment storage provided 1.00 ft Is there additional volume stored above the state -required temp. pool? y (Y or N) Elevation ofthe top ofthe additional volume 640.4 finsl OK Surface Areas Area, temporary pool 12,204 ft2 Area REQUIRED, permanent pool 2,957 ft2 SAIDA ratio 1.62 (unitless) Area PROVIDED, permanent pool, A,_ ... 9,519 ft2 OK Area, bottom of 1 Oft vegetated shelf, Aeon 1,au 8,353 ft2 Area, sediment cleanout, top elevation (bottom of pond), Ant -pond 3,029 ft' Volumes Volume, temporary pool 12,155 ft' OK Volume, permanent pool, VP- 2 1 27,142 ft' Volume, forebay (sum of forebays if more than one forebay) 6,132 ft' Forebay % of permanent pool volume 22.6% % Insufficient forebay volume. SAIDA Table Data Design TSS removal 85 OX Coastal SAIDA Table Used? n (Y or N) Mountain/Piedmont SAIDA Table Used? y (Y or N) SAIDA ratio 1.62 (unitless) Average depth (used in SAIDA table): Calculation option 1 used? (See Figure 10-2b) n (Y or N) Volume, permanent pool, VP- 2 1 27142 ft' Area provided, permanent pool, Apa„ _1 9,519 ft' Average depth calculated 2.85 ft Need 3 ft min. Average depth used in SAIDA, d_ (Round to nearest 0.5ft) 3.0 ft OK Calculation option 2 used? (See Figure 10-2b) y (Y or N) Area provided, permanent pool, Apa„ _1 9,519 ft2 Area, bottom of 1 Oft vegetated shelf, Aeon ,,au 8,353 ft2 Area, sediment cleanout, top elevation (bottom of pond), 3 029 ft2 Anm_pona 'Depth' (distance b/w bottom of 10ft shelf and top of sediment) 4.40 ft Average depth calculated 3.47 ft OK Average depth used in SAIDA, d_ (Round to down to nearest 0.5ft, 3.5 ft OK Drawdown Calculations Drawdown through orifice? y (Y or N) Diameter of orifice (if circular) 1.00 in Area of orifice (if -non -circular) in Coefficient of discharge (Co) 0.60 (unitless) Driving head (Ho) 1.11 ft Drawdown through weir? n (Y or N) Weir type (unitless) Coefficient of discharge (CJ (unitless) Length of weir(L) ft Driving head (H) ft Pre -development 1-yr, 24-hr peak flow 4.16 ft'/sec Post -development 1-yr, 24-hr peak flow 9.13 ft'/sec Storage volume discharge rate (through discharge orifice or weir) 0.01 ft'/sec Storage volume drawdown time 14.07 days Insufficient drawdown time. Must be within 2-5 days. Additional Information Vegetated side slopes 3 :1 OK Vegetated shelf slope 10 :1 OK Vegetated shelf width 10.0 ft OK Length offlowpath to width ratio 3 :1 OK Length to width ratio 2.0 :1 OK Trash rack for overflow & orifice? y (Y or N) OK Freeboard provided 1.9 ft OK Vegetated filter provided? n (Y or N) Insufficient. Vegetated filter required. Recorded drainage easement provided? y (Y or N) OK Capures all runoff at ultimate build -out? y (Y or N) OK Drain mechanism for maintenance or emergencies is: pump out Form SW401-Wet Detention Basin- Rev.94/18/12 Parts I. & II. Design Summary, Page 1 of 1