Loading...
HomeMy WebLinkAboutSW6190508_Supplement EZ Form (Cover)_20190822SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION 1 Project Name SOF Battalion Administration Facility 2 Project Area (ac) 9.55 3 Coastal Wetland Area (ac) N/A 4 Surface Water Area (ac) NIA 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? No 9 Is BUA other that as listed in .1003(4)(c-d) out of the setback? Yes 1 o Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMS: 11 Infiltration System 0 12 Bioretention Cell 4 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green Roof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 StormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Robert L. Day, PE Principal 28 Organization: Cyntergy 29 Street address: 810 S. Cincinnati Second Floor 30 City, State, Zip: Tulsa, OK 74119 31 Phone number(s): 918.877.6000 32 Email: rday@cyntergy.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. Signature of r► 08-6(n. Date