HomeMy WebLinkAboutSW3190804_2712-Design Book_Signed_01.08.2019_8/20/2019Storm Drain/Erosion Control Project Report for Pine Forest II Iredell County, North Carolina Date: November 16, 2018 Client: The Johnson Group, Inc. 323 Walnut Street Statesville, North Carolina 28677 Engineer: R. Joe Hams & Associates. Inc. Engineering • Surveying • Planning • NLanagement 127 BEN CASEY DRIVE, SUITE 101 FORT MILL, SC 29708 - Report - Initial Submittal to City of Statesville & Iredell County Pine Forest 11 Storm Drain/Erosion Control Project Report SECTION I: Project Summary • Project Summary SECTION II: Project Information • Vicinity Map • Soil Classification Map • USGS Topographic Map • FEMA Map • Rainfall Data SECTION III: Storm Drain Calculations • Storm System 100 o Plan View e Inlet Spread — 10-year Storm Event o Pipe Design — 10-year Rational Method o Inlet Sump Calculations o Rip -Rap Apron Calculations • Storm System 200 o Plan View o Inlet Spread — 10-year Storm Event o Pipe Design — 10-year Rational Method o Inlet Sump Calculations o Rip -Rap Apron Calculations SECTION IV: Erosion & Sediment Control • Initial Phase Erosion Control Basins Calculations o Sediment Basin #100 o Sediment Basin #200 • Initial Phase Erosion Control Pipe Slope Drains Calculations • Final Phase Erosion Control Basins Calculations o Sediment Basin #100 o Sediment Basin 9200 SECTION V: Pre & Post Analysis • Pre & Post -Development Summary • Pre & Post -Development Curve Numbers • 2, 10,50 & 100-year Storm Event Hydrograph Analysis Table of Contents Pine Forest II Storm Drain/Erosion Control Project Report SECTION VI: BMP Analysis • Sand Filter Pond #100 o BIVIP Curve Number Calculations o Water Quality Calculations o Hydrograph Analysis • Sand Filter Pond 9200 o BMP Curve Number Calculations o Water Quality Calculations c Hydrograph Analysis SECTION VII: Appendix A • Pre -Development Drainage Area Map • Post -Development Drainage Area Map • Storm Drainage Area Map • BMP Drainage Area Map Table of Contents Pine Forest II Storm Drain/Erosion Control Project Report Section 1: Project Information Project Summary Pine Forest II Storm Drain/Erosion Control Project Report A. PROJECT DESCRIPTION Summary The Pine Forest II Subdivision project is a Planned Development located west of Interstate 77 off of Amity Hill Road in Iredell County, North Carolina. This development consists of approximately 29.36 Ac. This project will consist of 70 single family residential lots. This property has a Tax Parcel Number of 4742-58-9712, Deed Book Number of 2470 and Deed Book Page Number of 1971. The predominant soil types within the proposed limits of construction are Cecil sandy clay loam and Hiwassee fine sandy loam; all of which belong to the Soil Hydraulic Group B (as taken from the Web Soil Survey 2.1— National Cooperative Soil Survey by NRCS). The disturbance for the site will encompass roughly 23.88 acres. The site will encounter two phases of erosion and sediment control management, beginning with an initial phase. Initial clearing, grading and infrastructure placement will occur during this phase. The last phase (stabilization or final phase) will include paving and stabilization of the site. Given the amount of grading work that will take place, the majority of the erosion control is best managed through the use of sediment basins; with temporary diversion ditches to help channel flow to the aforementioned basins. Accessory features such as inlet protection, silt fence, and concentration outlets will also be used to assist with the bypass areas and smaller areas of concentrated flow. Two proposed sediment basins (Basin #100 and Basin #200) have been specified for the initial phase erosion control. Sediment Basin #100 and Sediment Basin #200 will remain active during the final phase of erosion control and sediment management. All storm drainage systems will be installed per plans with no stubbed pipes or temporary pipes. B. STORMWATER MANAGEMENT Pre and Post development flows were analyzed to determine if storm water detention would be necessary for the higher level storm events. The pre -development analysis point was conducted along the existing creek which runs west/east on the south side of the area. The Post development analysis was analyzed at the same location which includes BMP #100 and BMP #200. Pre and Post Development runoff summaries can be found in Section V of this project report and in summary for the 2-year, 10-year, 50-year and 100-year Storm Events. C. WATER QUALITY There are 2 main drainage areas that make up the combined flow for Pine Forest II. The 2 main drainage areas make up the developed areas of the site. The larger of the 2 collects approximately 559/0 of the total runoff of the site. This runoff will drain to BMP #100. The 2nd drainage area is primarily flow from the remaining 45% of the development. This runoff will drain to BMP #200. Pine Forest II Storm Drain/Erosion Control Project Report Project Summa Both of these drainage areas have been designed to collect the bulk of the sites impervious runoff and treat it before releasing downstream. The BMP water quality design can be found in Section VI of the report booklet. D. STORM DRAINAGE SYSTEM An analysis of both receiving storm drainage systems within the Pine Forest II site was conducted to verify the drainage systems would not surcharge or be beyond capacity due to the drainage areas and the storm water runoff from the site for the 10-year, 24-hour rainfall intensity, and all yard inlets have been evaluated for sump capacity using the 10-year, 24-hour rainfall intensity. For the analysis of the infrastructure, RJH utilized a combination of Aerial topography for the area and proposed lot/road grading to evaluate each of the storm drain systems. Storm systems #100 and #200 are new systems within the limits of the Pine Forest II project site. These storm systems function with the design parameters set forth by the City of Statesville, Iredell County and NCDOT for both pipe design and inlet spared capacity. All systems have been fitted with a properly sized riprap apron at the outflow for energy dissipation. All proposed storm drain profiles have been designed to limit the hydraulic gradient line (HGL) to no closer than 0.5` below the weir/rim elevation. End Report Pine Forest11 Storm Drain/Erosion Control Project Section 2; Project Information Overall Project Information 3 Hydrologic Soil Group—Imdell County, North Carolina 3 (2712) 35° 46 N 35°q 4'N 511M 511✓ M 511930 51N10 513D0 3 -,� Map Saale: 1:3,180 if prirtad m A portrait (8.5' x 11") sheet. N __._ Metss 0 45 90 180 270 A 0 150 300 650 9 Feet Map projection: Web Mentor C� coordinates: WGS84 Edge tim. lfrM Zone 17N WGSa4 UsDk Natural Resources Web Soil Survey Conservation Service National Cooperative Soil Survey R 35° 44 N M 35°4C 4°N 512m 51ZLA 3 6/12/2018 Page 1 of 4 O @ N E m @a H Ec r vi o _s,E � E U W@ m doa@i ❑ rN r 3 mm O O U O O @ O @ « (J O C N N0 E T O. E Ea ON m n ma K a H Q a V O O @ @@ @ N d E O @ N > ~ O a md' a mQ 0 —. a Ul L @ E m oto « 3a Q 10 m apN' fOO 0 0 O op''dO NEdy o@ O >U)9 N@� m O m@ p N EO E (�U Q L o i $Ea w m >@ c m T a O C m U t @ m m m m O o a° U U O Z } in p m - O 2 m om >m m m m L o 0 C Q N N d c 6 T mm Q 0< a m m U o Z m< a m m u 0 o zp m< a m m a c c c E ■/ ■/ *r ■r aj 0 1 1 1 A i a 0 Q M m� Z Hydrologic Soil Group—Iredell County, North Carolina 2712 Hydrologic Soil Group Map unit symbol Map unit name Rating Acres in AOI Percent of AOI CeB2 !, Cecil sandy clay loam, 2 B', 4.5 15.2%' to 6 percent slopes, moderately eroded li CeC2 Cecil sandy clay loam, 6 B Ali 8.2 27.9% to 10 percent slopes,i, moderately eroded CgC Cecil -Urban land B 0.7 2.5% complex, 2 to 10 !, percent slopes ChA Chewacla loam, 0 to 2 B/D 4.7 16.0% percent slopes, frequently flooded HwC Hiwassee fine sandy B 2.1 7.1 % loam, 6 to 10 percent slopes HwD Hiwassee fine sandy B 4.6 15.6% loam, 10 to 15 percent slopes PcD2 Pacolet sandy clay B 2.3 7.8% loam, 10 to 15 percent slopes, moderately eroded PcE2 Pacolet sandy clay B 2.3 7.9% loam, 15 to 25 percent slopes, moderately eroded Totals for Area of Interest _ _ _. 29.4 100.0% USDA Natural Resources Web Soil Survey 6/12/2018 A" Conservation Service National Cooperative Soil Survey Page 3 of 4 Hydrologic Soil Group—Iredell County, North Carolina 2712 Description Hydrologic soil groups are based on estimates of runoff potential. Soils are assigned to one of four groups according to the rate of water infiltration when the soils are not protected by vegetation, are thoroughly wet, and receive precipitation from long -duration storms. The soils in the United States are assigned to four groups (A, B, C, and D) and three dual classes (A/D, B/D, and C/D). The groups are defined as follows: Group A. Soils having a high infiltration rate (low runoff potential) when thoroughly wet. These consist mainly of deep, well drained to excessively drained sands or gravelly sands. These soils have a high rate of water transmission. Group B. Soils having a moderate infiltration rate when thoroughly wet. These consist chiefly of moderately deep or deep, moderately well drained or well drained soils that have moderately fine texture to moderately coarse texture. These soils have a moderate rate of water transmission. Group C. Soils having a slow infiltration rate when thoroughly wet. These consist chiefly of soils having a layer that impedes the downward movement of water or soils of moderately fine texture or fine texture. These soils have a slow rate of water transmission. Group D. Soils having a very slow infiltration rate (high runoff potential) when thoroughly wet. These consist chiefly of clays that have a high shrink -swell potential, soils that have a high water table, soils that have a claypan or clay layer at or near the surface, and soils that are shallow over nearly impervious material. These soils have a very slow rate of water transmission. If a soil is assigned to a dual hydrologic group (A/D, B/D, or C/D), the first letter is for drained areas and the second is for undrained areas. Only the soils that in their natural condition are in group D are assigned to dual classes. Rating Options Aggregation Method: Dominant Condition Component Percent Cutoff., None Specified Tie -break Rule: Higher USDA Natural Resources Web Soil Survey 6/12/2018 ri conservation service National Cooperative Soil Survey Page 4 of 4 MUSGS .,.ceoa ou E EC USS Topu w,axAP GLE 4 X, SITE r u ' x .. w a >n ps he mur i 1 ..mm x `y,. MOORGSVILLE/9 , S. v tl/ . s.nry yy ,24wo �zw..m • MV 1EPPS. x[ �'3 FLOOD HAZARD INFORMATION IN- 1111 xunxo.w.s p`y\ °, —.A o��Mwn a.e xrn..... IS - LRI SUN EMS IN., NOTES TO USERS 1 h BE, NSR 3' 0 0 F E NATURAL EDON NUVRAND, LROURS. OIREm CANODHA NLLONNiYTND AND INCO AND HPOP41ED AR AflEAS M" wd U 4742 " 4893 �k SN .v w 00 0 —S nn LL we °w w C MAR NUMBER .�S 9/18/2018 Precipitation Frequency Data Server NOAA Atlas 14, Volume 2, Version 3 Location name: Statesville, North Carolina, USA',,.' Latitude: 35.73910, Longitude:-80.8684° Elevation: 852.99 ft** `source: ESRI Maps "ZEN n **source USGS POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonniq D. Martin, B. Lin, T Parzybok, M Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in lira )1 Average recurrence interval (years) Duration' 00 10F 25 1 100 200 500 1000 0.377 0.446 0.523 0.578 0.644 0.689 0.731 0.770 0.815 0.847 5-min (03480410)I (0.412-0.486)�(0.481-0.570) (0.531-0.629) (0.587-0.699) (0.624-0.749)j (0.657-0.797) (0.686-0.84= 0.716-0.897).. (0.736-0.937) 0.602 0. 113 0.835 0.925 1.03 1.10 1.16 1.22 1.29 1313 10-min(05560654)(0658-.778)i(0.770-0-912) (0.848-1.01) (0.935-1.11)� (0.994-1.19) (1.05-1.27) (1.09-1.33) ii, (1.13-1.42) (1.16-1.48) _- 0.896 1.06 1.17 1.3o 1.39 1.47 1.54 1.62 1.68 15-min (0694-0.818) (0.827-0.977) (0.974-1.15) 1 (1.07-1.27) 1 (1.19-1.41) 1 (1.26-1.51) 1 (1.32-1.60) 1 (137-1.68) 1 (1.43-1.79) 1 (IA6-1.85) -0.75� 1.03 1.24 1.51 1.70 1.93 2.09 2.25 2.40 2.58 2.71 30-mini (0.952-1.12) (1.14-1.35) (1.39-1.64) (1.56-1.84) (1.76-2.09) (1.90-2.28) (2.02-2.45 (2.14-2.62) ��� (2.27-2.84) (2.36-3.00) 1.29 1.55 1.93 2. 11 2.56 2.83 'i, 3.10 IF 3.36 3.70 3.96 60-min (1,19-1.40) ( 1 (1.43-1.69) 1 (1.78-2.10) 1 (2.03-2 40) 1 (2.34-2.79) 1 (2.57-3 08) (279-3.38) 1 (3.00-3.68) (3.26-4.08) (3.44-4.38) 1.49 1.81 2.26 2.61 3.06 F 3.42 3.77 T4.12 4.60 4.96 2-hr (1.37-1.62) 1 (1.66-1.97) 1 (2.08-2.46) 1 (2.38-2.84) 1 (2.79-3,33) 1 (3.08-3.72) (3.37-4.12) 1 (3.65-4.52) ',, (4,02-5.07) (4,28-5.50) 1.60 1.93 2.43 ( 2.81 3.33 3.74 4.15 7F 4.58 5.16 5.62 3-hr (1.48-1 74) (1,78-2.11) (2.23-2.65) (2.57-3 06) (3.03-3.63) (3.38.4.08) (3.72-4 54) (4.05-5.02) (4.49-5.70) 1 (4.83-6.24) 197 2.37 2.97 3.44 4.09 4.60 5.12 5.66 6.417F 6.99 6-hr (1,822.13) (2.19-2.58) (2.74-3.23) (3.17-3 74) (3.73-4.43) (4,17-4.99) (4.60-5.57) (5.03-6.16) ( 5,59-7.00) (6.02-7.67) 236 2.85 3.57 4.15 4.95 5.58 6.24 6. 22 7.86 8.61 12-hr (2A8-2.56) 1 (2.64-3.10) 1 (3,31-3.89) 11 (3.82-4.50) 1 (4.52-5.35) 1 (5.06-6.0$) 1 (5.60-6.74) 1 (6.14-7.48) 1 (6.86-8.51) (7.40-9.34) 2.82 3.41 4.32 5.02 6.00 6.77 7.57 8.39 9.51 10.4 24•hr (2.62-3.05) 1 (3.17-3.69) 1 (4.00-4.67) 1 (4.64-5 43) 1 (5.52-6.48) 1 (6.21-7.32) 1 (6.92-8.18) 1 (7.64-9.08) 1 (8.62-10.3) 1 (9.38-11.3) 3.32 4.00 5.01 5.80 6.86 7.70 8.56 9.43 10.6 11.6 - 2-day (308-3.58) (3.72-4.33) (4.65-5.42) 1 (5.37-6.26) 1 (6.33-7.41) 1 (7.09-8.32) (7.85425) 1 (8.62-10.2) 1 (9.66-11.5) 1 (10.5-12.5) 3.53 4.24 5.28 6.09 7.19 8.06 8.94 9.84 11.1 12.0 lll3-day i (3.28-3 80) (3.95-4.58) (4 91-5.70) 1, (5 65-6.57) (6.64-7.75) (7.43-8.69) (8.22-9 65) (9.02-10.6) 1 (10.1-12.0) (10 9-13 0) 3.74 4.49 5.56 '; 6.39 7.52 8.41 9.32 10.3 11.5 12.5 4-day (3.48-4.01) 1 (4,194.83) 1 (5.18-5.98) 1 (5 94-6.88) 1 (6.96-8.10) 1 (7.77-9.06) 1 (8.59-10.1) 1 (9.41-11.1) 1 (10.5-12.4) ) 4.30 5.15 6.27 7.14 8.30 9.22 10.1 11.1 12.3 13.3 7-day I (4.04-4.61) (4.83-5.51) (5.88-6.70) , (6.68-7.63) (7.75-8.88) (8.59-9.87) ( (9.41-10.9) 1 (10.3-11.9) 1 (11.4-13.3) 1 (12.2-14.3) 4.94 5.88 7.06 7.97 7 F 9.17 10.1 11.0 12.0 13.2 14.2 10-da (4.66-5.26) 1 (5.54-6.26) 1 (6.66-T52) 11 (7.50-8.48) 1 (8.60-9.76) 1 (9.46-10,8) 1 (10.3-11.8) 1 (11.2-12.8) 1 (12.3-14.1) 1 (13.1-15.1) 6.62 7.83 9.24 10.3 11.8 12.9 14.1 55.2 1 17.9 20-day (6.29-6.98) (7.43-8.25) (8.76-9.74) (9.79-10.9) (11.1-12.4) (12.2-13.6) (13.2-14.8) (142-16.1) .7 (15.6-17.7) (16.6-19.0) 8.20 9.64 17.1 12.3 13.7 14.8 15.8 16.9 18.2 19.3 30-day (7.83-8.59) (9.21-10.1) (10.6-11.7) (11.7-12.8) (13.0-14.4) (14.1-15.5) (15A-16.6) (16.0-17.7) (17.2-19.2) 1 (18.2-20.3) 10.3 12.1 13.7 14.9 16.5 17.6 18.7 19.8 21.7 22.2 45-day (9.90-10.8) (11.6-12.6) (13.1-14.3) 1 (14.3-15.6) 1 (15.7-17.2) 1 (16.8-18.4) 1 (17.8-19.6) 1 (18.8-20.7) 1 (20.1-22.2) (21.0-23.3) 12.3 143 16.1 F 17.5 F 19.2 F 20.4 IF 21.6 F 22.8 F 24.3 25.4 60-day (1 L8-12.8) (13.8-14.9) (15.5-16.8) (16.8-18 2) (18.4-20.0) (19.6-21.3) (20.7-22.6) (21.8-23.8) (23.2-25.4) (24.2-26 6 ) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7391 &Ion=-80.8684&data=depth&units=english&series=pds 1 /4 9/18/2018 Precipitation Frequency Data Server PF graphical PDS-based depth -duration -frequency (DDF) curves Latitude- 35.73910, Longitude:-80.86W 30 25 . _:... ......:... - 20 a -o c 15 ....:....:....:.....:..._i..: _...:— —... ._: . I I I I l Zd 10 a` 0 £ E E £ E A a as a a s as A ry Q' v N Duration N 30 25 c t 20 5 .- ... ...... - __.._ .... _...'.. .. r 01 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NQAA Atlas 14. Volume 2, Version 3 Created (GMT): Tue Sep 18 12:47:35 2018 Back to Top Maps & aerials Small scale terrain Average recurrence interval (Years) - i — 2 — 5 to — 25 5o 100 200 500 1000 Duration — 5-min — 2-day — i0-min — 3-day — I"in — 4-day — W-min — 7-day — 6"m — l aday — 2-hr — 20-day — 3fir — 30-day - "f - 45-day — 12-hr — 60-day — 244V https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7391 &Ion=-80.8684&data=depth&units=english&series=pds 2/4 9/18/2018 Precipitation Frequency Data Server vlan"- '`fir% biaTeSYIII I' " a Barium Springs. Jtman Large scale terrain n9sport• Bristol � w >hnson Ciry• Q Winston-Salem ty, • • Dudiam �^ Greensboro s r, rnl raa,-nal � � F Asheville NORITH CAROLINA Q +', •Charlotte Fayett;� �s Large scale map Kin rJ,prxt E:rrl41 Johnson City A:.hwillz Charlotte + F Cxeenvillz - - I--1 �100km fi0mi � 1 Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7391 &Ion=-80.8684&data=depth&units=english&series=pds 3/4 9/18/2018 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer hftps://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7391 &Ion=-80.8684&data=depth&units=english&series=pds 4/4 9/18/2018 Precipitation Frequency Data Server 9 NOAA Atlas 14, Volume 2, Version 3 Location name: Statesville, North Carolina, USA' Latitude: 35. s 14, Longitude: Version 3 e a Elevation; 852.99 ft- a " source'. ESRI Maps " source. USGS"'"" ^`¢ POINT PRECIPITATION FREQUENCY ESTIMATES G.M. Bonnin, D. Martin, B. Lin, T. Parzybok, M Yekta, and D. Riley NOAA, National Weather Service, Silver Spring, Maryland PF tabular I PF graphical I Maps & aerials PF tabular PDS-based point precipitation frequency estimates with 90% confidence intervals (in inches/hour)1 Average recurrence interval (years) Duration' 4.52 5.35 6 28 6.94 25 7 73 50 8 27 I 100 8.77 200 9.24 F 5 00 9.78 1000 10.2 $-into (4.18-4.92) (4.94-5.83) (5.77-6.84) (6,37-7 55 ( 7.04-8.39) l 7,49-8.99 ( ) f11 (7.88-9.56) � (8.23-10.1) 11 (8.69-10.8) i (8.83-11.2) 3.61 , 4.28 5.03 5.55 6.16 6.58 6.97 7.32 7.73 t 8.00 10-into (3.34-3-92) 3.01 (3.95-4.67) 3.58 (4.62-5.47) (5.09-6.04) 4.24 4.68 (5.61 6.68) 5.20 (5.96-7.16) t 5.56 (6.27-780) 5.88 (6.63-8.00) _- 6.16 (6.80-8.61) 6.49 1 (6.96$-85) 6.70 15-min (278-3.27) 1 (3.31-3.91) (3.90-4.62) 1 (4,29-5.09) (4.74-5.65) ( (5.03-6.04) !, (5.28-6.40) i (5.49-6.74) (5.70-7.14) (5.82-7.41) 2.06 2.48 3.01 3 39 3.85 4. 88 4.50 499 5.16 5 42 30-min (1.90-2.24) (2.29-2.70) (2.77-3.28) (3.11-3.69) (3.51-4,18) (3.79-4.55) (405-4.90) . (4.27-5.24) (4-54-5.68) ' (4.71-6.00) 1.29 ! 1.55 1. 33 2.21 2.56 2.83 3.10 3.36 3.70 3.96 60-min (1.19-1.40) 11 (1.43-1.69) 1 (1,78-2.10) `' (2.03-2.40) 1 (2.34-279) (2.57-3.08)) (2.79-3.38) { (3.00-3.68) 1 (3.26-4.08) 1 (144-4.38) 0.746 0.904 1.13 1.30 1.53 1.71 1.88 2.06 2.30 2.48 �2-hr (0.8860.811) (0.832-0.988(i (1.041,23) 1 (1.19-1.42) 1 (1.39-1.67) � (1,541.86) I1 (1.89-2.06) (1.832.26) (2.012.53) 1 (2.14-2.75) 0.532 0.644 0.809 0.935 1.11 1.25 1.38 1.52 1.72 ! 1.87 3-hr (0.491-0.580)�(0,594-0.704)�(0.744-0.883)� (0,857-1.02) _ 1 (1.01-1.21) 1 (1.12-1.36) 1 (1.24-L51) I (1.35-1.67) j1 (1.50-1.90) ! (1,61-2.08) 6-hr i( 0.328 0 303-0.357)I 0.396 (0.366-0.431) 0.496 �( 0.575 ) (0.458-0 540)j 0 529-0 625 ( 0.682 0 623-0.740) 0.768 (0.696-0 833), 0.855 (0.768-0.930) 0.945 (0.840-1 03), 1.07 (0.934-1.17) 1.77 (1.00-1 28) 0.196 0.236 0.297 0.345 0.410 0.463 0.518 ! 0.574 0.653 0.715 12-hr i (0.181-0.212) (0.219-0.257), (0.274-0.323) (0.317-0.374) (0375-0.40.4) (0 420 0 600) 1, (0.465-0.559) (0509-0-621) (0.569-0.706) (0.614-0.775) 0.117 0.142 0.180 0 209 0.250 0.282 0.315 0.349 0.396 0.433 24-hr (0.109-0.127)) (0 132-0-154) :0 167-0.195)� (0.193-0.226) (0 230 0 270)' (0 259 0 305) (0.288-0.341)I (0.318-0.378). (0.359-0-430) (0.391-0.471) Ili 2-day 0 6 -0 075 ! 0.077--0 090 0.097-0l13 0 1102 0 130 0 iffi-0354 0 148 00173 0 163-0893 0 180-021.3_ 0 201Z0 240 0.2018-0 26>J 0 049 0.059 0.073 0.085 0.100 0.112 0.124 0.137 0.154 0.167 3-day f (0 046 0 053)'. (0 055 0 064)I, (0.068-0.079)i (0 079 0 091) (0.092-0,108) (0.103-0.121) 1 (0.114-0.134) ((0.125-0 148) (0.1400.166)'. (0.152-0.181) 4-day 0.039 (0 036 0 042)I 0.047 ! (0.044-0.050) 0.058 0.067 (0.054-0.062) (0.062-0.072) 0.0 88 ! (0.073-0.084) 0.088 (0.081-0.094)I 0097 (0.089-0.105)� 0.107 (0.098-0.115)! 0.120 (0.110-0.130)! 0.130 (0.119-0.141) 7-day 0.026 7 (0.024-0.027)! F 0.031 (0.029-0.033)I 0.037 0.042 (0.035-0.040)1 (0.040-0.045) 0.049 (0.046-0.053) 0,055 (0051-0.059j 0.060 (0.056-0,065) 0.066 (0.061-0.01)', 0.073 ! (068-0.079)j 0.079 (0.073-0.085) 10-day 0.021 (0.019-0022)i(0.023-0.026) 0.024 'i, 0.029 0.033 (0.028-2031) (0.031-0.035) 0.038 (0.036-0.041) 0.042 (0.039-0.045)j(0.043-0D49) 0.046 0.050 lI (0046-2053)I(0.051-0.059)`(0.055-0.063) 0.055 j 0.059 20-da 0.014 (0.013-0015) 0.016 (0.015-0.017)�(0018-0.020)�(0.020-0.023) 0.019 0.022 0.025 (0.0230,026),,L.025-0.028y,(0.028-0.031)i F 0.027 0.0297F0.032 (0.0300.033),(0.033-0.037) F 0.035 0.037 (0.035-0.040) 0.011 IF 0.013 0.015 0.017 0.019 0.021 F0.022 jF 0.023 0.025 0.027 30-day (0011-0.012)I(0.013-0-014) (0.015-0.016) (0.016-0018).(0-018-0.020) (0.020-0.022) (0.021-0.023)1(0.022-0.025) (0024-0.027)I(0-025-0.028) 0.010 iF 0.0 11 IF 0.013 0.014 ' 0"015 0. 116 0.017 0. 118 0.020 0.021 45-da � (0.009-0.010) (0.011-0.012), (0.012-0.013) (0.013-0.014) (0.015-0.016) (0.016-0.017) (0.017-0.018) (0.017-0.019)I, (0.019-0.021)I,, (0.019-0022) 0.009 0.010 0.011 0.012 0.013 0.014 ! 0.015 ! 0.016 0.0 77 0.016 60-day I (0.008-0.009) (0.010-0.010) (0.011-0.012)� (0.012-0.013) (0.013-0.014) (0.014-0.015) (0.014-0.016)i .. (0.015-0.017)! (0.016-0018)j (0.017-0.018) 1 Precipitation frequency (PF) estimates in this table are based on frequency analysis of partial duration series (PDS). Numbers in parenthesis are PF estimates at lower and upper bounds of the 90% confidence interval. The probability that precipitation frequency estimates (for a given duration and average recurrence interval) will be greater than the upper bound (or less than the lower bound) is 5%. Estimates at upper bounds are not checked against probable maximum precipitation (PMP) estimates and may be higher than currently valid PMP values. Please refer to NOAA Atlas 14 document for more information. Back to Top https //hdscnws. noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7391 &Ion=-80.8684&data=intensity&units=english&series=pds 1/4 9/18/2018 Precipitation Frequency Data Server PF graphical 3 I 100-000 PDS-based intensity -duration -frequency (IDF) curves Latitude: 35.73916, Longitude: -80 86W Duration 1 2 5 10 25 50 100 200 500 1000 Average recurrence interval (years) NDAA Atlas 14, Volume 2, Version 3 Created (GMT): Tue Sep 18 12:50:00 2018 Back to Tap Maps & aerials Small scale terrain mtenail (years) — 1 —x 10 — 2s so 100 200 Sao 1000 Duration — 5-min — 2-day — 10-m1n — 3-day — 15-min — 4-day — 30-min — 7-day — 60-min — 10-day — 2-41r — 20-day — 3 hr — 30-day — "r — 45-day — 12-hr — Wday — 244Y https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7391 &Ion=-80.8684&data=intensity&units=english&series=pds 2/4 9/18/2018 Precipitation Frequency Data Server �arne 6agr21 i1 f m to o,r a4 Safis4TurY Barium ..�. Spring,, —� u4nan Large scale terrain � C ngsport• Bristol u Ansoncity' Winston-Salem • . Durham Greensboro •Asheville NORITH CAROLINA Charlotte Fayet + Large scale map JSingsport.-. {f%}- - inston311em Greei North Q t Carolina otte .. - Gr_ ale 100km mi Large scale aerial https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7391 &Ion=-80.8684&data=intensity&units=english&series=pds 3/4 9/18/2018 Precipitation Frequency Data Server Back to Top US Department of Commerce National Oceanic and Atmospheric Administration National Weather Service National Water Center 1325 East West Highway Silver Spring, MD 20910 Questions?: HDSC.Questions@noaa.gov Disclaimer https://hdsc.nws.noaa.gov/hdsc/pfds/pfds_printpage.html?lat=35.7391 &Ion=-80.8684&data=intensity&units=english&series=pds 4/4 Pine Forest II Storm Drain/Erosion Control Project Report Section 3: Storm Drain Calculations Storm System Analysis Storm Pine Forest TI Storm Drain/Erosion Control Project Report Section 3: Storm Drain Calculations Storm System 100 Analysis Storm 100 v m J Z a .., 0 0 0 0 0 0 0 0 0 0 0 o a o 0 0 0 0 0 0 0 0 0 d o r r r r t .- r - - r .- r - r - - m 9 O S M V M ((.�II M CM N pp rtrt OO o tp N Ip N W Ot Y O O m C O O V N r y ch- N N N N O O O R O O O O OO OO p C G OO OO b O ❑ C J O S M N N m N N N C Otl', m S m �a O O Ih ry N I(j t0 iA N V to h n n O OJ N V) 10 'C N O O M M M M M M M O O O O O O O O O O d O O O O O O O O O O O = O O O O O O O O O O O d O O O O O O O O O O O M R w d O O O O O O 0 p p O O O O O )S O O a O O O OO O Gi O O O o O o O d O d O a d 6 O o O O G C o = A N� Gi O O U z � 0 O 0 O 0 O o O b o o S o 0 0 0 0 0 0 0 0 0 o p o o m O O N C O O O O O O O O O O O O p O O O d N N N N N N N N N N N N N N N N N N N N G M pl QI M O M p M M. N (7 N M N NT1 t+J Y1 N N Cf (9 (p Y 9 ry R o O O O O d O O O O O O O C d d d N N O O O O O p O O O O O O O O O O O O O O O O p N U O a O O O O O O O O O O O O O O O O O O O O O O N N. N N N N NN N N N N N N N N N N N N N = O OO p CO1O O Oth O O O OO O OO OO C� J Z' doO C M M OO M C OO OO n " M M M h m OOO m M OO 7 ] }N a N U R,X O O o O O O o 0 0 o O O O O O O O o O o o O O II O O O O p O o 0 0 o O O a Q m o o c6 0 0 0 0 0 0 0 0 0 R a O o O O O O 0 o O O O 0 Q a o O o 0 0 0 0 o O O o O O o 0 0 o d o o O o 0 0 0 0 o O 3 N J � O O t•1 th M (h Ci C"l C7 t"l M ('1 M M t7 C) th CI M t�l C) (h C'i N C � (O co (D 6 (O (O [O 10 (O (O t0 (D 6 6 (O (D W c a = = E E E E E E E E E E E E E E E E E E E E E F U J U U U U U CJ U U U U U U U U U U U U U O N N m s M b o <o m to v co h o p o W E O O O O O V M N O O f0 (D h O M N O O O (� m f3 O O O O O O O O O OO O O O O O O O O O O p N C N pp C h N O t0 IO M N N O O N O V h O h d' h Iw. � p O O O CO O N l0 (9 V O c N N 1 m f. Z' N O O N V C O O O M O c0 O CJ (O Q S O 0 0 O ('j U WW1 O O O O O d o O O O C) O O O O [p N N O p O O b d O O O N M G N 0 a O In O 1{y O N In O O CO N N Q1 O M N lfJ h h = N O O O N N O O .- O � r O O CS (V IV O d' dU N o O R II N O 0 O O O C G cG — ❑ n m m m m m m m 0 m m 0 0 0 m m m m d = 0 0 0 0 m r br f0 r W A O N N OZ J Z w m h of O cM- N d N rn CL am all n n p: m L O � Q O N N 7 ry N N O O O O O O O O ❑ ❑ � C C M n R m M O M M O O = g O O O y O O O O O O O � C O O O o p o O O M C i N� O O O O O OO O OO p � o o 0 0 � G a 00000000 o Z� o O o o O o CY C $ pp �i M N M N� N 4 N O ry o o m y5 N U I M a S o O o S S S o C } O � O O O O O O N fD O cp O t0 O O ft) O '� O o O 0 O 0 O o O O O O S Q E o C f � m o � E E r 5 o U ate. a U 0 U U ❑ fi w S of to c a w o o (q o r in o ro " n O O O O W O T M C N W M M fV M O � 4 O II O � O 7 C N C? In C7 m In = ❑ U ❑ U ❑ U U ❑ jy, N N A y o „ O N N N N N N n0'1 M d ZU JZ v m w L m E E A W h t0 n o m m 4 io m m O { W O O m V m q m 0 0 ry m 0 m O N M m M ? N N m r O f0 r n V7 M m M m N W e � o ai ri d v n cc N� ui r co ni �n cp d c'i of a6 0 r W m m m m m m W m m m m m m m OOOJJJ m m m m m m O N M m M Y 10 N m r O t0 n r try m s� W m '^ N m W J _ Lh n r W N n m m W N M O r V O m at O m W m O m 4 n of N N r tq 41 O O N lq O n m m m m m N m N m N N W N m N m M m M M m M m M m M m M W lt> m W m m M N N m m m m r A J M r m m W O r N W ro M O m 4 O n M m m O 0 N O M M l0 m M m G V W N '�I' N n m (V V t` m (V C) C 2 to O O N N N N N M M M M M V N NW mm a Wpp W m m m CO W m m m m m m 00 p O N N N O M O M C'+ M M V V d' � y� N •0 m (0 . G w m m m w m m m m m W m m m m m m W m m m m m (0 m N N N N N N N N N N N N M N N O N N N N N O N r o m V VN N N � M m W P M r O o J dm' O Lq �- CWWl M M M M M M M M M M M M M M M M M M M M M M M ry c C U U U U U U U U U U U U U U U U U U U U U U U n J F Z 0 yy C tl C p N p M O N N C N W W m LP m` W c P Lo r w W J N7 J � � O N O V N M M O M M l0 h M W O) O m O V N m N M t+l y .- M V N d' m O n KY OI O h M M V m W m R > j x o of cxi Nj of r o m v is o M M m N a m M 0 M M M M M M W W m W m m m m W m m t. o o N O V M W O M M m N IX1 m Q) m O m cp O W m D) m 01 6 O C N N N N N N U C V N o tT m O N4 9 (O r 4 O! m m m M N C m N N O W N m U 10 LL U N P ym CO NLo N 0 r W f� N I: ` a7 d' N r ro U CY LNO V � x u m KY �➢ ep m m N m m m V c0 tp O m M N N T ` ` co M c� O W O m r l0 N O O O O � 11 no O O T O m N 17 m O W M O G` m O O 0 V O N N M N ^ '- rN el' N' W N N M O O O '� q Q O O O O O 0 4 O O O O O O 4 O O O O O O O O O d C L Q O O O O O O O m .T (n G 01 N 01 N M N O N m N pY N W N Ql N p) N p) N O M O M M M M M M M M M M N C'1 w (O 0 � o a o o r r m �- �n r� r r m m m r r n r• �i r r n o G o U d o 0 0 0 0 o 0 0 0 0 0 0 0 0 6 0 o d o 0 0 0 o E r O O y SG-� O tp M O W 40 C m V N r V O m n (D V O M O N G 0I M N O V m m m O m m m 6 m kq V W O W r O 'F 0 V M 4 th ill W N 0 J V V O m N r r M V N V m O V N tf1 m m V N V �0 N m' E O N O O O e� O O O O O O O N M ` m r m O O N N 61 ry G _ — c ^ D m m m m m m m m m m N n m E F O w'1 z � r N M LLS m n m ni O - N M � - N � M ^ n c- m — O N N N N m y O 0 C LL W y N M V �Y rD r m 07 O N M V ^ m O N M 0 F- C O - — — — N N N N O �Z J Z d ! / / !! 2 § )k « \ \ \ \ \ \ \ \ k j \ \ \ \ \ m a m !! !:o ) \ \ } \ \ ]] ] / \ ® j co/ j:f : /® \ Inlet Report Hydraflow Express Extension for Autodesk®AutoCAD® CMI 800 by Autodesk, Inc. DG #123 Drop Grate Inlet Calculations Location = Sag Compute by: Curb Length (ft) = -0- Q (cfs) Throat Height (in) = -0- Grate Area (sgft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at Inlet (in) Slope, Sw (ft/ft) = 0.021 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (in) = -0- Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = -0- Bypass Depth (in) Gutter n-value = -0- AN dimansians in fort Wednesday, Sep 19 2018 Known Q = 0.02 = 0.02 = 0.02 —,-0- = 0.09 = 100 = 2.73 _ -0- -0- -0- Inlet Report Hyd raflow Express Extension for AUtodesk®AutoCADO Civil 3DO by Autodesk, Inc, Wednesday, Sep 19 2018 DG #124 Drop Grate Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = -0- Q (cfs) = 0.89 Throat Height (in) = -0- Grate Area (sgft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 0.89 Grate Length (ft) = 3.00 Q Capt (cfs) = 0.89 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 1.15 Slope, Sw (ft/ft) = 0.021 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 11.12 Local Depr (in) = -0- Gutter Vel (ft/s) = -0- Gutter Width (ft) = 2,00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- All dimensions in fed �i Inlet Report Hydraflow Express Extension for Autodesk® AutoCADE) Civil 3D® by Autodesk, Inc. DG #130 Drop Grate Inlet Calculations Location = Sag Compute by: Curb Length (ft) = -0- Q (cfs) Throat Height (in) = -0- Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) Grate Length (ft) = 3.00 Q Capt (cfs) Q Bypass (cfs) Gutter Depth at inlet (in) Slope, SW (ft/ft) = 0.021 Efficiency (%) Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) Local Depr (ir) = -0- Gutter Vel (ft/s) Gutter Width (ft) = 2.00 Bypass Spread (ft) Gutter Slope (%) = -0- Bypass Depth (in) Gutter n-value = -0- .411 di €naps o ns in led Wednesday, Sep 19 2018 Known Q = 2.14 = 2.14 = 2.14 _ -0- = 2.06 = 100 = 18.37 _ -0- -0- -0- Inlet Report Hydraflow Express Extenslon for Autodesk® AutoCAD® Civil 3D® by Autodesk, Inc. Wednesday, Sep 19 2018 DG #131 Drop Grate Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = -0- Q (cfs) = 3.69 Throat Height (in) = -0- Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2,00 Q Total (cfs) = 3,69 Grate Length (ft) = 3.00 Q Capt (cfs) = 3.69 Q Bypass (cfs) = -()- Gutter Depth at Inlet (in) = 2.97 Slope, Sw (ft/ft) = 0,021 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 25.54 Local Depr (in) = -0- Gutter Vel (ft/s) = -()- Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = All d m an, ions in Ymf (;I) azIS deldiH 09P fl 4 II II Ina c pi N Pine Forest II Storm Drain/Erosion Control Project Report Section 3: Storm Drain Calculations Storm System 200 Analysis Storm 200 a a m ,J z n rn o uJ m m wo 0 0 0 o p o 0 0 0 o O o Q o o a p o 0 m 9 m V o m O M Q @ O O O n l0 M Vim' M N N n N T NM i O 10 O M m N N d' T C r OI m m tD 7 N c N 7 7 ry O O O OO O O OO OO O o O O o O O q o O OO a � � c 3 9 M n o o r m � � Di M O O m 0 O m C _ _ N O O O O p O O O O O p O O O O O 6 O O O N O M M M M M M M M M M O M M T O O YIJ O O O O O O O O O O O O O O S O O c o O O C) O O O o o O C a 0 o 0 0 6 d o O O N S N N N N N N N N N N N N N N N N N N N C o O o o O O Q o O d o O O O Q o o O o o ,O O O O O p C O o O O O O O O o o O O O 6 6 tA� o 0 o Q 0 o 0 d o 0 0 0 o Q d ti o o d o Z 'pp O O 00 O S S O S S O O O O O p O O O O (p O O O O O O o O O O O N N (V N N (V N N N IV (V N N (V (V N C d Lb O m o O O O d' QY eF N m n m m M M N m o q o a o 0 0 OI @ o o v v O O O O O O O O O p O O O m C D O Q O O O O O O O O O O O O O O O O O y J� O � O M O th O M O M O t+] O (•i O M O �) O M O ri O M q Nl p M O C� O M O cn O of Q Ci O M E2 Y Q A t) @ O O O O O O O O Q O O O O O O O 6 O O O II y 6 O O O O O p O O t? O O O O O O O O O O O B Q� O m cp O OO O O O O O O O O O O O O t0 p O N Q O O O O O O O O p O 6 O O O O O p O O O E O O O O O O O O CS O 6 O O O O O O O O O 3 Ih M M (h M M M t�l (7 l7 M M M M M (YI O 47 th N K O O 0 0 0 O O O 0 O ' o co co co id 6 cp co cd ca co co fo i6 o fo ro a a a a a a a a a a a a a a a a r a a o c a = E E E E E E E c E E E E E E E E E E 9 T O O O U O b O O O O O O O O U O � 6 O N i + O O O O O I(J N O O m O O O O O N O O O l0 O O m O M O O O O O O O O O O C S m O O N M S O o N O O n O O O aNJ n O O c p m o 0 0 ^o T M c N N m II Q w O o V O CV N Q B G p @ I I O Q � O o E j = tlI O � N M V 1p O) m (p r Z C '� ON h01 N N N N N pN N N N N N N N N N N N N N ❑ fD CO (➢ m m m m m m m m m m M m m U' m m w U U U U U U U U U U U U U U U U ❑ U � W @ C M M M M n m O Q V v O r O J (M+l M M M V V V V V V dn' C V N t[5 d O 2 iJ" n N fD O a � � M O M m a N M M P O� N N O M m r a m O m m m r m m m w W a m N N N 0 N J m N (O O N P m M a M 0 N YJ O M h m r m m w 9 m m m Nm m 0� C m m a I w �_ Oe 0 m tO m N m 0 a O OI M M1 m (D l Q m 0 m m m m E r a N m N m N a 0 i(l r N M M M 0 p O ^ m m w m O m m p, 4 O (0 4t a W W fD O W. m N (M� pW} M a a V i0(J h V cN•l N N C W m W W W m W W CO W W W m m m m m m m m m c� M1 N N m N N 0 NN N N N N N N N N O M O C O O yNJ 01 O h N P V O O O O O ,j ii O V O O l!! a N 9' C 6 O O O O O 6 O O O O O O O O O O O O O O ' O G O J Z ry N N W m m w m m m C N C ^ J N m® O m O 0 0 V O m d' 6 a c m O N a r q e o ae a m m O 0 4 f0 m m O m O N � M m7m M N 0 N �- �0p C rl O h N 0 m W m 0 M r O O O M M m m 6) L O tU m r it 0 f� 0 N N o m a 0 a a 0 a N O 6 M m N L[i m I� N CM a' N F r m M u U qaro O m m OJ O N (O M V N a; m M M r V' O N M a a M N a M a Ma U m m m O m M co m a' N N N N N O� m O O N O h O N, CO r O m W m N N W 61 Nr,'.- � I N N - p aa C M ma I(l N o N <O m 0 M0 .W. _ .0 dam' 'd tNll Iq (P m m n O OMi N N u� ei m ui m ui ui s m m ui ui ui co m m <d o <o <o s I O m m M m N N <P m m 01 O O M m O 01 M M Ol m Oe U O m m m m r r (0 (D m r m m Uf m .) O O O O P O O O O O O P O O O O O O O O < fY � fl r O O O V o V (6 h o o m C O N O O O O m O m O tf O O N m O nj J N a V 0 Qf (O IfJ V N LV C) a [h a a a O M a N N O � N N N N N N N N N N N N N N N N N N N N D c = p S CO Ill 0] 0] m m m m m m 0] 0] e— g u U U a U 0 U U U U U U U U U U p o y r � II Z J 0 m c LL N W L M M M M CJ M OO M M a a V a V V a a a a m «1 Q O J Z 0_ Z Inlet Report Hydraflow Express Extension for AutodeskO AutoCADO Civil 3D® by Autodesk, Inc. Wednesday, Sep 192018 DG #218 Drop Grate Inlet Calculations Location = Sag Compute by: Known Q Curb Length (ft) = -0- Q (cfs) = 1.98 Throat Height (in) = -0- Grate Area (sqft) = 6.00 Highlighted Grate Width (ft) = 2.00 Q Total (cfs) = 1.98 Grate Length (ft) = 3.00 Q Capt (cfs) = 1.98 Q Bypass (cfs) = -0- Gutter Depth at Inlet (in) = 1.96 Slope, Sw (ft/ft) = 0.021 Efficiency (%) = 100 Slope, Sx (ft/ft) = 0.021 Gutter Spread (ft) = 17.54 Local Depr (in) = -0- Gutter Vel (ft/s) = -0- Gutter Width (ft) = 2.00 Bypass Spread (ft) = -0- Gutter Slope (%) = -0- Bypass Depth (in) = -0- Gutter n-value = -0- AJ dImens ans to fast in u 45 (4) az,g Chw!y OSp M C O � b a h � .u. x 7 O � i C A � A rn C aPi i II a II u o � o Pine Forest TT Storm Drain/Erosion Control Project Report Section 4, Sediment & Erosion Control Erosion Control Calculations Initial Basins Calcs Pine forest II Storm Drain/Erosion Control Project Report Section 4. Sediment & Erosion Control Initial Phase Erosion Control Basin Calculations Initial Basins Calcs Pine Forest II Iredell County, North Carolina Project Number: 2712 August 7,2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #100 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 12.06 ac. Paved Roads/Sidewalk/Structures 0.03 ac. Wooded Area C = 0.95 C = 0.25 4.76 ac. Good Grass(>75% coverage) 6.83 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Initial Basin 100) 0.29 0.44 ac. PROJECT: Pine Forest II DATE: 7-Aug-18 PROJECT REF: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Initial Sediment Basin 0100 ENGINEER: PLM POND STORAGE VOLUME: D,ESC. CONTOUR ELEVATION. INCREMENTAL INCREMENTAL MXUM.. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT:) _ (S:F.) (FT'.') C.F.) C,F.) Bottom 790.00 8,968 W) 0 0 791,,00 10,456 U 9.651 9,651 792.00 12,043 2.0 11240 20,891 793.00 13,860 3.0 12,941 33,832 794.00 15,677 4.0 f4.760 48,592 795,00 17,733 5.0 16,695 65.287 Weir 796.00 19,789 6.0 1 18,751 1 84,038 Spillway 797.00 22,344 7.0 21.054 105,092 Top 798.00 24,900 8.0 23,611 128,702 Type of Basin: Riser & Barrel Drainage Area: 12.06 Acres Denuded Area: 0.44 Acres Req. Volume: 21,706 Cubic Feet Provided Volume: 84,038 Cubic Feet( @796-Top of Riser Weir) OK Emergency Spillway Length: 20.0 Feet (As Designed for Detention Pond) Top of Basin/Berm: 798.00 Riser: 2'X21 I.D. Box Spillway Elevation: 797.00 Barrel: 24" RCP ® 2.22% Riser Weir Elevation: 796.00 * Barrel designed to carry 2yr. flow Cleanout Elevation: 793.00 Bottom of Basin: 790.00 "C" Value: 0,29 Q2=(12.06Acres)(5.34 inlhr)(0.29) Q2= 18,86 efs Q10 =(12,06Acres)(6.95 in/hr)(0.29) Q10= 24,55 efs SA = (Q10)*(435) SA= 10,680 sq.ft. SA @ Design storage at Principal Spillway elevation= 19,789 sq.ft. SA Design Storage greater than SA required Storage OK * Baffles are required in basin. "Skimmers are required in basin PROJECT: Pine Forest 11 DATE: 07-Aug-18 PROJECT REF: Project Number: 2712 DESIGNER: LAB DESCRIPTION: Initial Sediment Basin #100 ENGINEER: PLM POND STORAGE VOLUME: CONTOUR ELEVATION INCREMENTAL ACCUM; C EfiETA,. AREA DIFFERENTIAL VOLtM'EVOLUME 790.00 8,868 0.0 0 0 791.00 1.0,456 1.0 9,651 9,651 792.00 12,043 2.0 L1340 20,891 793.00 13,860 3.0 12,941, 33,832 794,00 15,677 4.0 14 760 4M92 795,00 17,733 5.0 16,695 6577 796,00 19,789 6.0 18,751 84,038 797.00 22,344 TO 21,054 105,092 79800 24,900 8.0 23.611 128.702 ORIFICE FLOW DATA: ORIFICE' ITxA. AREA (S.F.) = Ci -` INVERT - ELEV (ET) CENTR LTV T�.I •;:, �, D $CI�TLON i '. .�,+` .� . WEIR FLOW DATA: SPILLWAY FLOW DATA: 1 l:1tb51 CLb V. _ /V/.UU WIDTH = 20 Z = 4 'C' = vvzms PROJECT, Pine Forest II DATE: 07-Aug-18 PROJECT REF: Project Number:2712 DESIGNER: LAB DESCRIPTION: Initial Sediment Basin #100 ENGINEER: PLM COMBINED FLOW: ELET; ORIFICES,, WETILS SPILLW C1 Q2 Q3 QS TOTAL ,: FLOW .: - Q1EI Q� Q� .' C,C+.Sa' 790.00 0,00 0.00 000 0.00 0.00 0.00 0.00 0.00 791,00 0,00 0.00 0.00 0.00 0.00 0,00 0,00 0.00 792.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 793.00 0.00 0.00 0.00 0.00 0.00 0,00 0.00 0,00 794.00 0.00 0.00 0,00 0.00 0.00 0,00 0.00 0.00 795.00 0.00 0,00 0.00 0.00 0.00 0.00 0.00 0,00 796.00 0.00 0.00 0.00 0.00 0.00 0100 0,00 0.00 797.00 0.00 0.00 0.00 3996 0.00 0.00 0.00 39,96 798.00 0.00 0,00 0.00 113M 0.00 0.00 65,72 178.74 FINAL RESULTS: STAGE-1 1 REVERSE Q DISCHARGE (FT.} r:. ,C:1�.R5A �1C:F S) 7 790M 0 0.00 791.00 189J27 2.19 792,00 179.585 2.,:8 793,00 169,507 196 794.00 158,790 1.84 795M 147,292 1.70 796,00 134,825 L56 197.00 121,076 4136 798,00 1.05,552 179.96 Contour Area (Acres): 790.00 0.2036 791.00 0.2400 792.00 0.2765 793.00 0.3182 794.00 0.3599 795.00 0.4071 796.00 0.4543 797.00 0.5130 798.00 0.5716 (1i) aziS di?jaikil osp I N if 11 11 if HV`vc Project Name: Pine Forest II Ballast Red Design: RJH Ref #2712 Riser Size (3'x3' O.D.): Riser Size (2'x2' I.D.): Barrel Size: Top of Basin: Bottom of Basin: Principle .4iew Weir: Top of Riser Structure: Bottom of Riser Structure: Spillway Height from top of Basin: Bottom of Barrel ki,ii,pllm- W.mrrtw—Yn. =swr emu mmm ens"mrmrtm,t— `unll.1t.m'—` tlW tart Wa¢nwrlw+ne.oa eopnln M 10,ae o, raiomaft Uplift at Peak Elavation: Peak Elevation -71)0 It - 788.5 ft Pine Forest II Initial Sediment Basin.4100 9 fF 797' Spillway Elev. 4 fl" 796' Riser Weir 24 in ' 798 ft. 790 ft, 790 ft. 796 ft, 788.5 ft. 7.5' 1@ 788.5 ft, 790' Bottom of Basin 7ti aoftorn at Rlepr $tmctura IM 0zmm ersrm=i 60, Peak Elevation= 7SR. tlpIIR Force= (62A Ib/fl')(75')(Sft') Uplift Force= 4212 to Volume of Concrete Required to Stabilize Riser: 4212 be X 1/150 lbs/ftl= 2B.08 ft' Volume of Concrete Within Riser: Weight of Concrete 'Within Riser, [(3'x3'x7.5')-(2'x2'x7.5';, (3'x3'x0'-0.5')lxl50 Ibsi 4950 Ib Volume of Concrete'Wthin Riser: 49501be X 1/150 lbs/fP= 33.00 ft' 30" O.D. RCP X 8"= -2.45 f' 4"x6^x6"= -0.08 ft' 2 X'2.0r, O.D. X 6"= -0.02 ft' Total volume of concrete in aer = 30,44 ft' Volume of additional ballast needed = -2.36 fit, Ballast Pad Dimensions: Volume of Concrete Within Ballast Pad: 4'x 4'xV 16ft Weight of Concrete'A thin Balast Pad: 12.2501s a 1501b/f0= 2400 lb Buoyancy of Ballast Pad : 52,4Ib/@° x 12.25 f'= 998.4 Ib Total Weight of Concrete in Riser Incld, Ballast = 6966 lb Total Weight Required to Prevent Uplift = 5210A Ib Factor of safely = 1.34 V Spillway Height 3'x3' DD Box stone Berri 24 In, RCP Pmimo 1" eewl,ItluGetl%I mltlerygVa rW IO M—a �5n,m=xm. o, aiW asapao. Outlet barrel connection Weir at 796.00arrr,mo�rnmem=na."mnmw ws."im'mIm Orifice at 790.00 =28.08 ft' -30.44 ft' am,n. ynlmmn owr onrmprem ��. memmr Weis oeoyma W-1 mli.d me ea"WW -« ,�rii—m wrmmi _ (30.44W + 1(ft') x 150'..b/ft' (42121a + 998.4) 8.3 0' PROJECT: Pine Forest II DATE: 7-Aug-18 PROJECT #: Project Number; 2712 DESIGNER: IAB DESCRIPTION: Initial Sediment Basin #100 ENGINEER: PLM Initial Sediment Basin 100 Actual Volume ft3 * Values from RJHA Sediment Basin Actual Surface Area ft` Worksheet Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Skimmer Size (inches) Head on Skimmer (feet) Orifice Size (114 inch increments) Dewatering Time (days) Suggest about 3 days Spreadsheet for sizing slimmers taken from NCDENR Land Quality Section Website. Visit http://portal.nedenr.orZ/webilr/lini(s for download or more information Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1,00 Of These Sizes 1,25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 8.00 Shimmer Sizes as Manufactured by Faireloth (Standard Sizes) Skimmer size should be a min. I -pipe size bigger than orifice Orifice size shall equal skimmer arm size (arm connects to outlet pipe) Pine Forest II Iredell County, North Carolina Project Number: 2712 August 7, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #200 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total drainage Area = 9.28 ac. Paved Roads/Sidewalk/Structures 0.00 ac. C = 0.95 Wooded Area C = 0.25 2.84 ac. Good Grass (>75% coverage) 5.78 so. Newly Graded C = 0.3 1ff Composite C (Initial Basin 200) 0.31 PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Initial Sediment Basin #200 DATE: 7-Aug48 DESIGNER: IAB ENGINEER: PLM POND STORAGE VOLUME: DESC. CONTOUR ELEVATION INCREMENTAL' ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME FT.) : (S.F.) .. (FT.);, C.F.). (C.F.) Bottom 788.00 8,380 0.0 0 0 789,00 9.637 1.0 9,002 9,002 790.00 10,895 2.0 10,260 t9,261 791,00 11291 3.0 11,586 30,847 792,00 13,68E 4,0 12,983 43,83t 793,00 15,617 5.0 14,642 58,473 Weir 794.00 17,546 6.0 16,572 75,045 Spillway 793.00 19,180 7.0 13,357 93,402 Top 796,00 20,814 8.0 1.9,992 113,393 Type of Basin: Riser & Barrel Drainage Area: 9.28 Acres Denuded Area: 0.66 Acres Req. Volume: 16,704 Cubic Feet Provided Volume: 75,045 Cubic Feet ( A794-Top of Riser Weir) Emergency Spillway Length: 20.0 Feet (As Designed for Detention Pond) Top of Basin/Berm: 796.00 Spillway Elevation: 795.00 Riser Weir Elevation: 794.00 Cleanout Elevation: 791.00 Bottom of Basin: 798.00 "CN" Value: 0.31 Q2=(9.28Acres)(5.34 in/hr)(0.31) Q2= 15.16 cfs Q10=(9.28Acres)(6.95 in/hr)(0.31) Q10= 19.73 cfs SA = (Q10)*(435) . SA= 8,582 sq.ft. SA @ Design storage at Principal Spillway elevation= SA Design Storage greater than SA required Storage * Baffles are required in basin. *Skimmers are required in basin Riser: 2'Y2' I.D. Box Barrel: 18" RCP Cn7 2.21% '0 Barrel designed to carry 2yr. flow 17,546 sq.ft. OK OK PROJECT: Pine Forest U DATE: 07-Aug-18 PROJECT REF: Project Number:2712 DESIGNER: IAB DESCRIPTION: Initial Sediment Basin #200 ENGINEER: PLM POND STORAGE VOLUME: CON,TOI7R ELEVAMN INCREMENTAL ACCUM. -- ELEV. AREA DIFFER IVTIAL VOLUME VOLVME: (FT.) (C.F) 738.00 8,380 0.0 0 0 789M 9,637 1.0 9,002 9,002 790.00 10,895 2.0 10,260 19,261 791.00 12,291 3.0 11,586 30,847 792.00 13,688 4.0 12,983 43,831 793,00 15,617 5.0 14,642 58,473 794,00 17,546 6.0 16,572 75,045 795.00 19,180 7.0 18,357 93,402 796,00 20,814 8.0 19,992 113393 ORIFICE FLOW DATA: WEIR FLOW DATA: SPILLWAY FLOW DATA: PROJECT: PROJECT REF: DESCRIPTION: COMBINED FLOW: Pine Forest II DATE: 07-Aug-18 Project Number: 2712 DESIGNER: TAB Initial Sediment Basin ##200 ENGINEER: PLAT 788.00 1 0.00 1 0.00 0.00 0.0i) 0.00 0.00 0.00 0.00 799,00 no 0.00 0.00 0.00 0.00 0.00 0.00 0.00 790.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0,00 791.00 0.00 0.00 0.00 Mo 0.00 0.00 0.00 0.00 792.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 793.00 0.00 0.30 10.1)0 0.00 0.00 0.00 0.00 0.00 194,00 0.00 0.00 0.130 0.00 0.00 0.00 0.00 0.00 795,00 0.00 0.00 0.00 33.30 0.00 0.00 0.00 33.30 796.00 0.00 0.00 0.00 94.19 0.00 0.00 1 65.72 159.90 FINAL RESULTS: STAGE-` REjtSE` ,; ,DgSCHARGE 788.00 0 0.00 789.00 189,127 2.19 790.00 179,585 2.08 791.00 169,507 L96 792.00 158.790 1.84 793.00 147,292 L70 794.00 134,825 1 56 795.00 12t,076 34.70 796.00 105,352 161.12 Contour Area (acres): 788.00 0.1924 789.00 0.2212 790.00 0.2501 791.00 0.2822 792.00 0.3142 793.00 0.3585 794.00 0.4028 795.00 0.4403 796.00 0.4778 G ((11) azis da,tlia 09P 0,3 C q .✓ ti y < A, r Y N ti S �. Ingm T � 53x�^iG b�A Yep�s 7A edgy � �-i 1 I 0 0 0 Project Name: Pine Forest II Ballast Pad Design: Initial Sediment Basin #200 RJH Ref#2712 Riser Size (TxS0,0,)', 9R' 795' Riser Slze (2'x2' 10 J', 4 11 Barret Ste: 18 In Top of Basin: 796 R. Bottom of Basin: 788 It. Principle Riser Weir: 794 1 Top of Riser Structure: 794 3, Bottom of Riser Structure: 786,5 R Spillway Height from top of Basin: 1 ft, Bottom of Barrel 786,5 R. 788' Bottom of Basin xumoucne 766.5' Bakam mmr alov.o[vm ar mmu Wllpnam[ew„w"e`r. or Rleer Structure 'Un111V[I9111 c(«n[.......v r. nncwmre l Yawl OCaeal v 111'mrmv—e""n [nrrtirm"m md. m [wwmw. Uplift at Peak Elevation: Peak Elevation=794 R. -786.5 ft. Peak=Ieveticn - 7.511. Uplift Forca= (62.4 lbrit')(7.5n(9ft') l:pllft Fcrce= 4212 lb Volume of Concrete Required to Stabilize Riser: 4212 lbs X 1/1501bs/8°= 28.08 V Volume of Concrete Within Riser: Weight of Concrete Within Riser ((3'x3'x7.5)-(2'x2'X7.5')+(3'x3'x0'-0.5')IX1501bs/33= 4950 Ib Volume of Concrete Within Floor: 4050 Ise X 1/150 bsifP= 23.30 ft' 23" O.D. RCP X 5"= -1.44 ft° 4"xall x 61,= -0.08 a' 2 X 2,0" O.D. X 5"= -0.02 a' Total volume of concrete in riser = 31,45 R' Volume of additional ballast needed = -3,37 R' Ballast Pad Dimensions: Volume of ConCl'9ts Within Ballast Pad: 4' x 4' x 1' 16 R' Weight of Concrete Within Ballast Pad: 10 fP x'1501btfP= 2400Is Buoyancy of Ballast Pad'. 02.4 IMF x'5 ft'= 998.41b Ballast Pad 1' Spillway Height 1 I 3'X3'OD 11 Box Stone Sodding I-. 11— mowWaIn p-. rlwr a wide M. M is w[anova in. RCP Outist barrel connection Aull', 1 n 0 Aire„.z .o. Wer at 794.00 nu:ummmlr lrosmmm wrwlmpnl w"eal.vn Orifice at 790.00 =28.08 ft'-31.45W '[ w 11111 or mdma'—,.,IIn, 4g or Mlleel pM R n ili I—-1ll11...[ y In. —'mrn,vrnlloalt. ema Imeo Total Weight of Concrete In Riser mold. Ballast= 7118 Ib = (31.46W + 161,1) x 150 16lft° Tota Weight Required to Prevent Uplift = 5210A is = (42121b+ 998.4) Factor of afety = 1.37 8.5' 110 PROJECT: Pine Forest II DATE: 7-Aug-18 PROJECT #: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Initial Sediment Basin #200 ENGINEER: PLM Initial Sediment Basin 200 Actual Volume fts * Actual Surface Area ft` Values from RJHA Sediment Basin Worksheet Use Spillway Capacity Sheet to Size primary and Emergency Spillways Skimmer Size (inches) Head on Skimmer (feet) Orifice Size (1/4 inch increments) Dewatering Time (days) Suggest about 3 days Volume and surface area is half the actual basin values due to there being two skimmers and orifices that split the amount water captured by each. Spreadsheet for sizing skimmers taken from'NCDENR Land Quality Section Website, Visit http://portal.nedem• oxe/wob/lr9fnks for dowrload or more information Standard SCH 4C PVC Pipe Sizes (Inches) 0.50 Orifice Size Shall 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1,50 2.00 2.50 3.00 4.00 5.00 6.00 8.00 Skimmer Sizes as Manufactured by Faircloth (Standard Sizes) Skimmer size should be a min. 1-pipe size bigger than orifice Orifice size shall eeual skimmer arm size (arm connects to outlet pipe) Pine Forest IS Storm Drain/Erosion Control Project Report Section 4. Sediment & Erosion Control Initial Erosion Control Pipe Slope Drain Calculations Pipe` Slope Drains Pine Forest II Iredell County, North Carolina Project Number: 2712 August 10, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #100 West Slope Drain Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam . HSG 'B" Total Drainage Area = 10.65 ac. Paved Roads/Sidewalk/Structures 0.00 ac. C = 0,95 Wooded Area C = 0.25 3.77 ac. Good Grass (>75% coverage) 6.88 ac. C = 0.3 Newly Graded Composite C (Initial Basin 100) 0.28 0.00 ac. Pine Forest II Iredell County, North Carolina Project Number: 2712 August 10, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #100 East Slope Drain Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG 'B" Total Drainage Area = 0.31 ac. Paved Roads/Sidewalk/Structures 0.00 ac. C = 0.95 Wooded Area C = 0.25 0.31 ac. Good Grass (>75% coverage) 0.00 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Initial Basin 100) 0.25 0.00 ac. Pine Forest II Iredell County, North Carolina Project Number: 2712 August 10, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #200 West Slope Drain Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 0,61 ac, Paved Roads/Sidewalk/Structures 0.00 ac. C = 0.95 Wooded Area C = 0.25 0.59 ac. Good Grass (>75% coverage) 0.02 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Initial Basin 200) 0.25 0.00 ac. Pine Forest II Iredell County, North Carolina Project Number: 2712 August 10, 2018 Rational "C" Values 24 Hour Storm Event Initial Sediment Basin #200 East Slope Drain Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 6,88 ac. Paved Roads/Sidewalk/Structures 0.00 ac. Wooded Area C = 0.95 C = 0.25 1.50 ac. Good Grass(>75% coverage) 5.38 ac. C = 0.3 Newly Graded C = 0.6 Composite C (Initial Basin 200) 0.29 0.00 ac. Hydrograph Summary Report Hydrallow Hydrographs Extension for AutoCADO Civil 3D®2018 by Autodesk, Inc. v12 Hyd. No. Hydrograph type (origin) Peak flow (efs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) . Hydrograph Description 1 Rational 8.346 1 20 11,215 ----- ------ ------ Basin#100 West Slope Drain 2 Rational 0.413 1 5 124 ---- ------ ------ Basin#100 East Slope Drain 3 Rational 0.814 1 5 244 ----- --••-• ------ Basin #200 West Slope Drain 4 Rational 6.253 i 1 i 20 I 7,504 ------ i •--•- i -- Basin #200 East Slope Drain Slope Drains.gpw Return Period: 2 Year Tuesday, 09/25/2018 Hydrograph Report F Hydr0cw Hydrographs Extension for AutoCAD® Civil 31D® 2018 by Autodesk, Inc. 02 Hyd. No. 1 Basin #100 West Slope Drain Hydrograph type = Rational Peak discharge Storm frequency = 2 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 10.650 ac Runoff coeff, Intensity = 3.134 Whir Tc by User OF Curve = Iredell.IDF Asc/Rec limb fact Q (cfs) 10.00 . ►► 4.00 2.00 Basin #100 West Slope Drain Hyd. No. 1 -- 2 Year Tuesday, 09 125 12018 = 9.346 cfs = 20 min = 11,215 cult = 0.28 = 20.00 min = 1/1 Q (cfs) 10.00 . ►► M 4.00 2,00 0.00 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Hyd No. 1 Time (min) Hydrograph Report 3 Hydraflow Hydrographs Extension For AutoCAD®CIV! I 3D® 2018 by Autodesk, Inc. 02 Tuesday, 09 / 2512018 Hyd, No, 2 Basin #100 East Slope Drain Hydrograph type = Rational Peak discharge = 0.413 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 124 cuft Drainage area = 0.310 ac Runcffcoeff. = 0.25 Intensity = 5.335 in/hr Tc by User = 5.00 min OF Curve = IredeII.IDF Asc/Rec limb fact = 1/1 Q (cfs) 0.50 0.45 0.40 0,35 0.30 0.25 0.20 0,15 0.10 - 0.05 0.00 0 1 — Hyd No, 2 Basin #100 East Slope Drain Hyd. No. 2 -- 2 Year Q (cfs) 0.50 0.45 0.40 0.35 0.30 0,25 0.20 0.15 0.10 0.05 000 2 3 4 5 8 7 8 9 10 Time (min) Hydrograph Report 4 Hydrallow Hydregraphs Extension for AUtoCAD® Civil MD 2018 by Autodesk, Inc. v12 Tuesday, 09 / 25 12018 Hyd. No. 3 Basin #200 West Slope Drain Hydrograph type = Rational Peak discharge = 0.814 cfs Storm frequency = 2 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 244 cuft Drainage area = 0.610 ac Runoff coeff. = 0.25 Intensity = 5.335 in/hr Tc by User = 5.00 min OF Curve = Iredell.IDF Asc/Rec limb fact = 1/1 Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 — 0.30 0.20 0.10 0.00 Basin #200 West Slope Drain Hyd. No. 3 -- 2 Year 0 1 2 3 4 5 6 7 8 Hyd No. 3 Q (Cfs) 1.00 0.90 0.80 0.70 0.60 0,50 0.40 0.30 0.20 0.10 0.00 9 10 Time (min) 5 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® CMI 3D®2018 by Autodesk, Inc. 02 Hyd. No. 4 Basin #200 East Slope Drain Hydrograph type = Rational Storm frequency = 2 yrs Time interval = 1 min Drainage area = 6.880 ac Intensity = 3.134 in/hr IDF Curve = Iredell.IDF Q (Cfs) 7.00 M 5.00 4.00 WOW 2.00 1.00 Peak discharge Time to peak Hyd. volume Runoff. coeff. Tc by User Asc/Rec limb fact Basin #200 East Slope Drain Hyd. No. 4 -- 2 Year Tuesday, 00 / 25 / 2018 = 6.253 cfs = 20 min = 7,504 tuft = 0.29 = 20.00 min = 1/1 Q (cfs) 7.00 M 5.00 E96111 3.00 2.00 1.00 0,00 -W I I I I I i i I I i I I I I I I I I " 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Hyd No, 4 Time (min) 0 Hydrograph Summary Report Hydraflow Hydrographs Extension for AutoCAD® CMI 31)(e7 2018 by Autodesk, Inc. v12 Hyd. No, Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 Rational 12.56 1 20 15,068 ---•-- ----- ---- Basin #100 West Slope Drain 2 Rational 0.537 1 5 161 •--•-- ---- ----- Basin #100 East Slope Drain 3 Rational 1.057 1 5 317 •---- --- ------ Basin #200 West Slope Drain 4 Rational i 8.401 1 20 10,081 ----•- i ---- i -----• Basin #200 East Slope Drain Slope Drairis.gpw Return Period: 10 Year Tuesday, 09 / 25 / 2018 Hydrograph Report Hydraflow Hydrographs Extension for AutoCACOa Civil 31D® 2013 by Autodesk, Inc. 02 Hyd. No. 1 Basin #100 West Slope Drain Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 10.650 ac Intensity = 4.211 in/hr OF Curve = Iredell.IDF Q (cfs) 14.00 12.00 10.00 M1 . M 4.00 2,00 Peak discharge Time to peak Hyd. volume Runoff coeff. Tc by User Asc/Rec limb fact Basin #100 West Slope Drain Hyd. No. t -- 10 Year 7 Tuesday, 09 / 25 / 2018 = 12.56 cfs = 20 min = 15,068 cuft = 0.28 = 20.00 min = 1/1 Q (cfs) 14.00 12.00 10.00 901011 "fill 4.00 2.00 0.00 g I I I I I I I I I I I I I I I I I I N- 0.00 0 2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Hyd No. 1 Time (min) 8 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAC® Civil 31D® 2018 by Autodesk, Inc. V12 Tuesday, 09 125 / 2018 Hyd. No. 2 Basin #100 East Slope Drain Hydrograph type = Rational Peak discharge = 0.537 cfs Storm frequency = 10 yrs Time to peak = 5 min Time interval = 1 min Hyd. volume = 161 cuft Drainage area = 0.310 ac Runoff coeff. = 0.25 Intensity = 6.933 Whir To by User = 5.00 min OF Curve = lredell.IDF Asc/Rec limb fact = 1/1 Q (cfs) 1.00 0.90 0.80 0,70 0.60 0.50 0.40 0.30 0.20 0.10 0 00 0 1 Hyd No. 2 Basin #100 East Slope Drain Hyd. No, 2 -- 10 Year Q (cfs) 1.00 0.90 0.80 0.70 0.60 0.50 0.40 0.30 0.20 0.10 000 2 3 4 5 6 7 8 9 10 Time (min) Hydrograph Report Hydrallow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Inc. v12 Hyd. No. 3 Basin #200 West Slope Drain Hydrograph type = Rational Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 1 min Hyd. volume Drainage area = 0.610 ac Runoff coeff. Intensity = 6.933 in/hr Tc by User OF Curve = Iredell.IDF Asc/Rec limb fact Q (cfs) 2.00 i[ed Basin #200 West Slope Drain Hyd, No. 3 -- 10 Year 0 Tuesday, 00125 / 2018 = 1.057 cfs = 5 min = 317 cuft = 0,25 = 5.00 min = 1/1 0.00 0 1 2 3 4 5 6 7 8 9 Hyd No. 3 Q (cfs) 2.00 1.00 -x 0.00 10 Time (min) 10 Hydrograph Report Hydraflow Hydrographs Extension for AutoCAD® Civil 3D® 2018 by Autodesk, Ino. v12 Hyd. No. 4 Basin #200 East Slope Drain Hydrograph type = Rational Storm frequency = 10 yrs Time interval = 1 min Drainage area = 6.880 ac Intensity = 4.211 in/hr OF Curve = Iredeil.lDF Q (cfs) 10.00 8.00 6.00 4.00 2.00 0.00 rI ' 0 2 4 6 8 Hyd No. 4 Peak discharge Time to peak Hyd, volume Runoff coeff. Tc by User Asc/Rec limb fact Basin #200 East Slope Drain Hyd. No. 4 — 10 Year Tuesday, 09 / 25 / 2018 = 8.401 cfs = 20 min = 10,081 cuft = 0.29 = 20.00 min = Ill Q (cfs) 10.00 M# 911 ai M 2.00 _I I I I I I I I I I I 1 11 11 11 N 0.00 1C 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 Time (min) Pine Forest II Storm Drain/Erosion Control Project Report Section 4. Sediment & Erosion Control Final Phase Erosion Control Basin Calculations Final Basins Calcs Pine Forest II Iredell County, North Carolina Project Number: 2712 August 7, 2018 Rational "C" Values 24 Hour Storm Event Final Sediment Basin #100 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 12.02 ac. Paved Roads/Sidevvialk/Structures 2.35 ac. C = 0.95 Wooded Area C = 0.25 0.00 ac. Good Grass (>75% coverage) 9.67 ac. Newly Graded C = 0.3 C = 0.6 Composite C (Final Basin 100) 0.43 0.00 ac. PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Final Sediment Basin #100 DATE: 7-Aug-18 DESIGNER: IAB ENGINEER: PLM POND STORAGE VOLUME: ESC. CONTOUR ELEVATION INCREMENTAL ACCUM:- ELEV. AREA DIFFERENTIAL'' ,.VOLUME VOLUME - /,,(FT.) (S'Z) (FT.) (C.F.) (C.F) Bottom 790.00 5,310 0.0 0 0 791,00 6,887 1.0 6,08L 6,081 792.00 8,464 2.0 7,662 13,743 793.00 10,302 3.0 9,368 23,11I 794.00 12,139 4.0 LL,208 34,319 795.00 14,245 5.0 13,173 47,497 Weir 796.00 16,350 6.0 15,235 62,782 Spillway 797.00 18,714 7.0 17,518 80,300 Top 798.00 21.077 8.0 19,884 100J84 Type of Basin: Riser & Barrel Drainage Area: 12.02 Acres Denuded Area: 11.85 Acres Req. Volume: 21,330 Cubic Feet Provided Volume: 62,782 Cubic Feet (n 796-Top of Riser Weir) Emergency Spillway Length: 20.0 Feet (As Designed for Detention Pond) Top of Basin/Berm: 798.00 Spillway Elevation: 797.00 Riser Weir Elevation: 796.00 Cleanout Elevation: 793.00 Bottom of Basin: 790.00 "C" Value: 0.43 Q2=(12.02Acres)(5.34 ituhr)(0.43) Q2= 27.42 efs Q10=(12.02Acres)(6.95 in(1n')(0.43) Q10= 35.69 efs SA = (Q10)*(435) SA= 15,525 sq.ft. SA C Design storage at Principal Spillway elevation= SA Design Storage greater than SA required Storage * Baffles are required in basin. *Skimmers are required in basin Riser: 2'X2' I.D. Box Barrel: 24" RCP @ 2.22% * Barrel designed to carry 2yr. flow 16,350 sq.ft. OI{ PROJECT: Pine Forest II DATE: 07-Aug-18 PROJECT REF: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Final Sediment Basin #100 ENGINEER: PLM POND STORAGE VOLUME: CONTOL`R ELEVATION, INCREMENTAL ACCUM; ELMAREA: DIFFERENTYAL. VOLUME VOLUME (SX.) ! }(FT.) C.F:) - (C.F,) 790.00 5,310 0.0 0 0 791.00 6,887 1.0 6,081 6,081 792.00 8,464 2.0 7,662 13,743 793.00 10,302 3.0 9,368 23,I t 1 794.00 12,139 4.0 11,208 34319 795.00 14,245 5.0 13,118 7497 796.00 16,350 6.0 15 285 62,782 797.00 18,714 7.0 17,518 80,300 798.00 21,077 8.0 19,884 100,184 ORIFICE FLOW DATA: WEIR FLOW DATA: SPILLWAY FLOW DATA: CREST ELEV. = 797.00 WIDTH 20 z = 4 'C, = VARIES PROJECT: PROTECT REF: DESCRIPTION: COMBINED FLOW: Pine Forest 11 Project Number: 2712 Final Sediment Basin #100 DATE: 07-Aug-18 DESIGNER: IAB ENGINEER: PLM ORIFICES WEIRS SPILLW , )' ELEV. Q1 Qx Q3 QI . ; Q2 Q3 Ql 790.00 1 0.00 1 0.00 0.00 1 0.00 0.00 0.00 0.00 0.00 791.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0,00 792.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 793.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 794.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 795,00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 796.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 797.00 0.00 0.00 0.00 39.96 0.00 0.00 0.00 39.96 798.00 0.00 0.00 0.00 113.02 0.00 0.00 65.72 178.74 FINAL RESULTS: $,TA,GE REVERSEQ DISCHARGE AllAi� 790.00 p 0.00 791.00 189,127 2.19 792,00 179,385 2.09 793.00 169,507 1.96 794,00 15&'790 1.8-1 795.00 147,292 1.70 796.00 134.825 1.56 797.00 12L076 4136 98.00 105,552 179.96 Contour Area (Acres): 790.00 0,1219 791.00 0.1581 792.00 0.1943 793.00 0.2365 794.00 0.2787 795.00 0.3270 796.00 0,3753 797.00 0.4296 798.00 0.4839 t4) oz;S dia:did Osp m G '7 w O t W F A O w �. � , r Shpp � 4'^ 'his N u N II II I II II O O v 9 Q Project Name: Pine Forest II Ballast Pad Design: Final Sediment Basin'#100 RJH Ref #2712 Riser Slao(3'x3' O.D.). 9 1' 797' Riser 8¢e (2'x2' LID): 4 IF Barrel Size 24 In Top of Basin. 798 1. Bottom of Basin: 790 1. Prino pie Riser Weir 796 ft. Top of Riser Structure: 796 1. Bottom of Riser Structure: 788.5 ft. Spillway Height from top of Basin: 1 1. Bottom of Barrel 788.5 ft. 790' Bottom of Basin w 788.5' Bottom of glser Structure iQe����rn.rraannw muom>mo seen arumure. -wuwaym ormnvmum iw Iur, nngmna waiwi a neeer weans a ioe elm w,"a yusuone "a I"ouae m �m"mrm"_ Uplift at Peak Elevation: Peak Elevation=790ff. • 786.5 R Peak Elevation = 7.51. Uplift Force=(82.414/1°)(7.Sq(91') Uplift Force= 4212 It, Volume of Concrete Required to Stabilize Riser: 42121bs X 1/1501bs/ft'= 28.08 ff Volume of Concrete Within Riser: 'Neigh of Concrete Within Riser. [(3'x3'x7.5',-(2'x2'x7.5')+(3'x3'x0'-0.5)jx1501bs/fP= 4950 It, Volume of Concrete Within Riser: 49501be X 1/150 lbs/fP= 33.00 Ra 30" CAD. RCP X 6"= -2.45 ft' 4"x8"x6"_ -0.08 W 2 X'2.0"OfLXS"= -0.02 ft' Total'rolume of concrete in riser = 30,44 it' Volume of additloral bailast needed = -2.36 ft' Ballast Pad Dimensions: Volume of Concrete Wrhln Ballast Pad: 4'x 4'xV 16 ft' `Nelght of Concrete Within Ballast Pad '.6 ft'x 150 Ib/1'=� 2400 lb Bceyancy of Ballast Pad : 62, 416(ft' x 16 fN = 998.4 Ib of Basin 1' Spillway Height I 3'x3DD Box Ballast Pad Stone Bedding 24 In. RCP Outlet barrel connection x'�=r�''o.amnaa a000. Weir at 796.00 N* a.•amu Orifice at 790.00 = 28.08 V , 30.44 ft' a—w %aOtQ(q,'I wm crllopmg eaeee"rnmmeywe 11 11I 1lnl0 m.."m+wlraa awe n..Wm="w rreio.w.a apu Total 'Neight of Concrete in Riser cap. Ballast = 6966 Ib = (30A4ft' t IWO) x 1501b/fP Total Weight Required to Prevent Uplll= 5210.4 is =(42121b+9g8.4) Factor of safety = 1.34 8.5' 0' PROJECT: Pine Forest If DATE: 7-Aug-18 PROJECT#: Project Number!2712 DESIGNER: IAB DESCRIPTION: Final Sediment Basin #100 ENGINEER: PLM Final Sediment Basin 100 Actual Volume il3 * Values from RJHA Sediment Basin Actual Surface Area fit" Worksheet Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Skimmer Size (inches) Mead on Skimmer (feet) Orifice Size (1/4 inch increments) Dewatering Time (days) Suggest about 3 days Spreadsheet for sizing skimmer taken from NCDENR Land Quality Section Website. Visit http://Vortal.nedenr.or¢lnveb/Ir,'links for download or more information Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shalt 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 &00 Stdmmer Sizes as Manufactured by Faircloth (Standard Sizes) Skimmer size should be a min. I -pipe size bigger than orifice Orifice size shall equal skimmer arm size (= connects to outlet pipe) Pine Forest II Iredell County, North Carolina Project Number: 2712 August 7, 2018 Rational "C" Values 24 Hour Storm Event Final Sediment Basin #200 Sol[ Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam • HSG "B" Total Drainage Area = 8.21 ac. Paved Roads/Sidewalk/Structures 1.49 ac. Wooded Area C = 0.95 C = 0.25 0.00 ac. Good Grass (>75% coverage) 6.72 'ac. Newly Graded C = 0.3 C = 0.6 Composite C (Final Basin 200) 0.42 0.00 ac. PROJECT: Pine Forest II PROJECT REF: Project Number: 2712 DESCRIPTION: Final Sediment Basin #200 DATE: 7-Ang-18 DESIGNER: IAB ENGINEER: PLM POND STORAGE VOLUME: DESC, CONTOUR ELEVATION INCREMENTALACCUM,' ELEV. AREA DIVE ERE NTIAL VOLUME VOLUME (FT.) ( (SX.) T.) Bottom J 788.00 8,380 0.0 0 0 789.00 9.538 H 9,001 9,001 790.00 10,895 2.0 10,260 19,261 791.00 12,292 3,0 11,536 30,847 792.00 '13,688 4,0 12,983 43,831. 793.00 15,227 5.0 14,450 58,281 Weir 794.00 .5,765 6.0 1 15990 74,271 Spillway 795.00 1K445 7.0 17,598 9L869 Top 796.00 20,124 8,0 19278 111,147 Type of Basin: Riser & Barrel Drainage Area: 8.21 Acres Denuded Area: 7.90 Acres Req, Volume: 14,215 Cubic Feet Provided Volume; 74,271 Cubic Feet ( @794-Top of Riser Weir) Emergency Spillway Length: 20.0 Feet (As Designed for Detention Pond) Top of Basim'Berm: 796.00 Spillway Elevation: 795.00 Riser Weir Elevation: 794.00 Cleanout Elevation: 791.00 Bottom of Basin: 788.00 "C" Value: 0.42 Q2=(8.21Acres)(5.34 in/hr)(0.42) Q2= 18.31 efs Q10=(8.21Acres)(6.95 in/hr)(0.42) Q10= 23.83 efs SA = (Q10)'*(435) S A= 10,364 sq.ft. SA @ Design storage at Principal Spillway elevation-7 SA Design Storage greater than SA required Storage * Baffles are required In basin. *Skimmers are required in basin Riser: 2'X2' I,D. Box Barrel; 18" RCP @ 2.21% * Barrel designed to carry 2yr, flow 16,765 sq.ft. OK OK PROJECT: Pine Forest R DATE: 07-Aug-18 PROJECT REF: Project Number: 2712 DESIGNER: IAB DESCRIPTION: Final Sediment Basin #200 ENGINEER: PLM POND STORAGE VOLUME: CONTOUR ELEVATION INCRFNIENTAL ACCUr*L EC EV. AREA DIFFERENTIAL ✓, VOLUME VOLUME (FT.) ! (S.F-) (FT0 (C.F. C.F. 788,00 8,380 0.0 0 0 789,00 9.638 1.0 9,001 9,001 790,00 10,895 2.0 1U60 19,261 791,00 12,292 3.0 11586 30,847 792.00 13,688 4.0 12,983 43,831 793.00 15?_11 1 5,0 14,450 58,281 794.00 16,765 6.0 15.990 74,271 795.00 18,445 7,0 17,598 91,869 796.00 20,124 8.0 19,278 111,l47 ORIFICE FLOW DATA: WEIR FLOW DATA: SPILLWAY FLOW DATA: CREST ELEV. = 795.00 WIDTH = 20 Z = 4 'C, = VARIES PROJECT; PROJECT REF: DESCRIPTION: COMBINED FLOW: a Pine Forest II Project Number: 2712 Final Sediment Basin #200 DATE: 07-Aug-18 DESIGNER: IAB ENGINEER: PLM It�ra��awll��ni•t�x�ni•��x���ixw�rxw��unliii 78900 0.00 0.00 0.00 0.00 0.00 0,00 1 0.00 0.00 790.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 0.00 791,00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 792.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 793,00 000 0.00 0.00 0,00 0.00 0.00 0,00 0.00 794.00 0.00 0.00 0.00 0.00 0,00 0.00 0.00 0.00 795,00 0.00 0.00 0.00 33.30 0.00 0.00 0.00 33.30 796.00 0.00 0,00 0.00 94.19 0.00 0.00 65.72 159.90 FINAL RESULTS: STAGE _ `REYTRSEQ `'DISCH GK (PT.y .' (G-F.,DAY) 788.00 0 0.00 789,00 189,127 2,19 19000 179,585 2.08 791.00 169,507 ;.96 792.00 158,790 1..84 793.00 147,292 1 1 1.70 794,00 134,825 1.56 795.00 121,076 34.70 796.00 105,552 161.12 Contour Area (Acres): 788.00 0.1924 799.00 0,2212 790,00 0.2501 791,00 0.2822 792.00 0.3142 793.00 0.3496 794.00 0.3849 795.00 0.4234 796.00 0.4620 fU) az!S md1b 09P 9� m �.fq STa' 71 Project Name: Pine Forest II Ballast Pad Design: Final Sediment Basin 4200 RJH Raf 42712 Riser Size (3'x3' O.D,): 0 fP 79T Riser Size (2'x2' 1.0,)', 4 W Barrel Size, 18 In Top of Basin: 796 fl. Bottom of Basin: 788 ft, Principle Riser Weir: 794 ft. Top of Riser Structure: 794 ft, Bottom of Riser Structure: 786.5 ft, Spillway Height from top of Basin: 1 ft. Bottom of Barrel 786.5 ft. 788' Bottom of Basin ^B""^01cns 71Ie.a' Bottom 'Wem hmyv bottom o11M10 bepA alavolum. of Rieor startnre IMtludg lypvvlb Aveol flo,'. o in we®Al vfvvnoase e11601h111' ' WalgM of I ial b BW 1111111111 IA:RCWdllen. Uplift at Peak Elevation's Peak Elevation =794 t. - 786,5 ft, peak Elevation = 7, 5ft, Uplift Force= (61 Ib/R')(7.6')(9fl Uplift Force= 4212 Ib Volume of Concrete Required to Stabilize Riser: 4212lbs X 1/1501hs/I 28.08 ft" Volume of Concrete Within Riser: Weight of Concrete Within Risen [(3'x3'x7 5')-(2'x2x7.5')+(3'x3'x0' 0.5')lxl501bsIII 4950 lb Volume of Concrete' Within Riser: 49-01be X 1./160 fl s/I 33.00 ft' 23" O.G. RCP X tl -1.44 fN 4" x 6" x 6" = -0. 98 fP 2X270.D.X6"= -9.32 ft' Total voiume of concrete in riser = 31.45 fP Volume of additional hailret needed = -3.37 fl' Ballast Pad Dimensions: Volume of Concrete Within Ballast Pad: 4'x 4'xV 16 fP Weacht of Concrete Within Ballast Pad: 16 Y a 150Ib/I = 24C0 lb Buoyancy of Ballast Pad : 62.4 lb,W x'16 fl'= 998.41b Total Weight of Concrete in Riser I ncld. Ba,aat= 7119 lb Total Weight Required to Prevent Uplift = 5210.4 lb Factor of safety = 1.37 of Basin 1' Spillaeay Height 3'x3' OD Box Ballast Pad Stone Bedding 181n. RCP a.eume emw 111a1a a I., a«�m nor a wide owe vn m m 1.1a.m Cutlet barrel connection maeMea-i o.pre ne. oa on. Weir at 794.00 'seemly— naonl vole mna1n,,I..r"mom." Orifice at 788.00 = 28,08 ft' - 31,45 V 'A--.11iu.1—r—Irulvy yyrstl6vl3v[.v zIel,1Ale 'neodmv belay red bm bymv""a rar.em, non u vea mt,".al = (31.45W • 161t) x 1501b/fft = (42121b + 998.4) 8.5' 0 PROJECT: Pine Forest 11 DATE: 7-Aug-18 PROJECT#: Project Number:2712 DESIGNER: IAB DESCRIPTION: Final Sediment Basin #200 ENGINEER: PLM Final Sediment Basin 200 Actual Volume fts* Actual Surface Area ftz Values from RJHA Sediment Basin Worksheet Use Spillway Capacity Sheet to Size Primary and Emergency Spillways Skimmer Size (inches) Sldmmer Sizes as Manufactured ,"(-,I Head on Skimmer (feat) by Faircloth ('Standard Sizes) Orifice Size (1/4 inch increments) 'Q Dewatering Time days) Skimmer size should be a min. 1-pipe Suggest about 3 days size bigger than orifice Flow Through Skimmer q = 4620.00 ft /day q = 0.05 ft3/sec Spreadsheet' for sizingskimmers taken from NCDENR Land Quality Section Website. Visit http://portal.nedear.orE�web/Ir/links for download or more information Standard SCH 40 PVC Pipe Sizes (Inches) 0.50 Orifice Size Shah 0.75 Be Equal to One 1.00 Of These Sizes 1.25 1.50 2.00 2.50 3.00 4.00 5.00 6.00 8.00 Orifice size shall equal skimmer arm size (arm connects to outlet. pipe) Pine Forest II Storm Drain/Erosion Control Project Report Section 5: Pre & Post Analysis Pre & Post -Development Summary Summary Pine Forest If Iredell County, North Carolina Project No.: 2712 September 24, 2018 STREAM SIDE POINT OF DISCHARGE — SOUTH/EAST SIDE OF PROPERTY Pre -Development Flow (cfs) Post -Development Flow (cfs) (Post Sand Filter #100, Post Sand Filter #200 and No System). Pre vs Post Hydrology Area 2 YR 10 YR 50YR 100 YR (Acres) 26.23 7.57 24,52 47.53 59.38 26.55 13.43 31A2 51.65 83.05 Pine Forest11 Storm Drain/Erosion Control Project Report Section 5: Pre & Post Analysis Pre & Post -Development Curve Numbers Curve Numbers Pine Forest II Statesville, North Carolina Project Number: 2712 September 21, 2018 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Pre Development Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "S" Total Drainage Area = 26.23 ac. Paved Roads/Sidewalk/Structures 015 ac. C = 98 Wooded Area C = 60 12,15 ac. Good Grass (>75% coverage) 13.93 ac. Newly Graded C = 61 C = 86 Composite CN (Sand Filter) 60.7 0.00 ac. Pine Forest II Statesville, North Carolina Project Number: 2712 September 21, 2018 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development #100 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 9.76 ac. Paved Roads/Sidewalk/Structures 4.67 ac. C = 98 Wooded Area C = 60 0.00 so. Good Grass (>75% coverage) 5.09 ac. C= 61 Newly Graded Composite CN (Pre Area Bypass; 78.7 0.00 ac. Pine Forest II Statesville, North Carolina Project Number; 2712 September 21, 2018 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development #200 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 8.27 ac. Paved Roads/Sidewalk/Structures 3.13 ac. C = 98 Wooded Area C = 60 0.00 ac. Good Grass (>75% coverage) 5,15 ac. C= 61 Newly Graded C = 86 Composite CN (Pre SF#100) 75.0 0.00 ac. Pine Forestll Statesville, North Carolina Project Number: 2712 September 21, 2018 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Development No System Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG " B" Total Drainage Area = 8.52 ac. Paved Road s/SidewalklStructures 1.58 ac. C = 98 Wooded Area 0.00 ac. Good Grass (>75% coverage) 6.94 ac. C= 61 Newly Graded Composite CN (Pre SF#100) 67.9 0.00 ac. Pine Forest II Storm Drain/Erosion Control Project Report Section 5: Pre & Post Analysis Pre & Post -Development Time of Concentrations TC K Z 2 P F-0 coo s so coo b bo d o0 EBB a o8 Obo 0 a 00 o0 doo $ So O OOOMNnOb LflbN V pj�NOo�tl; p y. dry W� d:6 W b t4 ulN O N O {M nn000i0 4 0 @ 0 0 i d Plyy 0 0 � V'N n �p i n �➢N04]00 y' Nin �mnoo n,o VS 9d E WZWEp�QF Ectw�Z,w kp 3 zJA0 z C Q O¢ J tl Z Z g p W ¢kx3»zZ za Ka w QpwwQw W UOl afgQ�2 LL W W U Q� b b O O D O O O O O O O O O O p p O O p O O O O O O O O aoo 0 00 oao 000 0 0 00 00 o ao 0 0 0 0 i O O O O O U $ O o I O O P Soo 0 00 ti o O O O O O O O O O O O O o O O 0 O o O O o O O O O O K U �p"L(>9 W U W O�Ett12->? E0Fwz W Sr, wUU' zz(/l ul>O waLL.ao<wdowz�w Z� F Q W K�> a z z g O r Ow>W Ww / Th \� P � §§! 4 §§ § 2 \!! : §§ 2) §� !,4 � y§ :� I v sss 00o s G ss oc 0 0 0 g O O O O O p O O SO O O O O O Q O O pO O O b o C O 000l O O O 0 O O g oS O O O O O C NO-20-1- LLriO O LL h zCQ rcO a I� '�E Q U > qh Wa •i>y FK LL z Z z 61 OZIY-ppZ W��F>w Uz C OW h> W Z O yryzZ�GO 6 Wham? W U6ZZ�OWO S v O C J W..-.�aJZZZyy>O W ZWJ,OWO WZ w>> C �Q3:Do<o J I:. w C O 2�y�aOW ¢Z J� aw,o' Q Q F rL Z Z w O w =< wuz� LL >> x�Ow`�a�w J I- >> 1ow�wV:>>Zz>- w y g {V IL W ,_ h y y W W S Q h U y Q F GGOO b GO O O O b bCJ O O O OO O O O 6 O O O O O O O 66. O O O O O O O N N N N y 0 0 yO O g moo H OO�G O `0 `nm brnmmrom� r".. �v o'�mobomo m m`ooc�io y `�Mr ry IM uniO vOj �yjp nl��00P0 a00C O10 a U= =LL_ FFrFi-- �aFa W �z ❑ O d O W U0. FF--E �?S=O WZ I r.LL woo 0 Z y y> O Jh Ed = �J�w0 w0_�.y ODwaO W Z(9LL �FQKpp�JOZZwO S O w K W> J 2 Q> 2 OF U Q�2u_ W w U� QF IS .z U� m OmiW- a:��in Z 1 A �Er>Lz O w ix°>z z O NNZz� 00 ao2 z< S Q�3:JJm� tl iaF-m��F z ouwix>zuwi�cz U WO ~U'Zz�>O 3wwo,u a0U O UJmmm U'u C �Qs ddd o o ao bb 0 0� P O O O O C O O O 4 O O O 00 Oro P p N W C O N 0 N{h nr0000 40009 ttplN�p' N m,�� 9Nn c o a o o bgoamroor mo N C Oiro `nN000(00 JOJ0000 ' i N a i1 0000 0 00 p p O P i p O P p O O O o ao 000 O O O 0 O 00 O O O pO pO O O O O O O O O O 000 doo 0 0 00 00 o dd `Ooa naq`�are pmp W M1 O O N O Ux w'^ U= w" E�yW CE �IQ-- IFW➢o�wCi, UZ Uz OJ z Qa OjF^d' z fL�>ZO.CO2 z > O u w� w o o, w W¢O_OjWa3: p> O �u �yW J >� syz_v! WW2Q2Q 2O�Q�WJ24?� ZZ WaO Q F U 1�1- K Ux LL� FEr° LL H 3x gQ�pOuw.pw O 0 x> z O c J O J �: S 0 O J w Z ZZ0 ZwZ �r`v¢Oi m �waOwZ�O O O w w Q Z w 0 x Ow�JYJJJ2Q>g 0 mm¢�xLLwwo�¢r O O 6 O 000 O O O O O O 00 O O O O O O p O O O O O O O O O O O O O O O O O O O O O O O OO O O O O O O O O O O O O O O O O tm- po: LL W 0 F C W U W �o LL. o��°z $Qw ..°0a��aowz� Pine Forest II Storm Drain/Erosion Control Project Report Section 5: Pre & Post Anaiysis 2, 10, 50, & 100-year Storm Event Hydrograph Analysis Hydrograph Hydrograph Summary Repo rtHydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) 7uwd Hydrograph Description 1 ISCS Runoff 7.566 2 740 53,336 ------ --•--- ----- Pre Area 2 SOS Runoff 25.54 2 718 51,324 ------ -•---- --- Post Area SF#100 3 SOS Runoff 18.32 2 718 36,638 ------ •••-•- --•••• Post Area SF#200 4 Reservoir 0.859 2 842 51,305 2 793.58 29,464 Post SF#100 5 Reservoir 0.561 2 890 35,842 3 790.21 21,178 Post SF#200 6 SOS Runoff 12.73 2 718 25,982 •----- ----•- ------ Post Area No SF 7 Combine 13.08 2 718 i 113,828 i 4, 5,6 -•••-• ------ Post Area Total Pre vs Post.gpw Return Period: 2 Year I Tuesday, 10 / 1612018 2 Hyrdrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 18 / 2018 Hyd. No. 1 Pre Area Hydrograph type = SCS Runoff Peak discharge = 7.566 cfs Storm frequency = 2 yrs Time to peak = 740 min Time interval = 2 min Hyd. volume = 53,336 cuft Drainage area = 26.230 ac Curve number = 60.7 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 38.40 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 8,00 6.00 • m 2.00 0.00 0 120 240 Hyd No. 1 Pre Area Hyd. No. 1 -- 2 Year 360 480 600 720 840 Q (cfs) 8.00 M - KO 2.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 3 Hydraflow Hydrographs Extension for AUtodeskV Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 2 Past Area SF#100 Hydrograph type = SCS Runoff Peak discharge = 25.54 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd, volume = 51,324 cuft Drainage area = 9.760 ac Curve number = 78.7 Basin Slope = 0,0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs 28.00 .M 20.00 16.00 12.00 min •M Post Area SF#100 Hyd. No, 2 -- 2 Year Q (cfs) 28.00 24.00 20.00 16.00 IPX#Tfl M M 0,00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 2 Time (min) 4 Hydrograph Report Hydraflow Hydrographs Extenslon for Autodesk® Clvil 3DV 2019 by Autodesk, Inc. v2020 Tuesday, 10118 / 2018 Hyd. No. 3 Post Area SF#200 Hydrograph type = SCS Runoff Peak discharge = 18.32 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd, volume = 36,638 cuft Drainage area = 8.270 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 21.00 18.00 15.00 12.00 9.00 6.00 3.00 0.00 Post Area SF#200 Hyd. No. 3 -- 2 Year Q (cfs) 21.00 15.00 12.00 M IKItell] Iwo 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 3 Time (min) Hydrograph Report 5 Hydraaflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 1612018 Hyd. No. 4 Post SF#100 Hydrograph type = Reservoir Peak discharge = 0.859 cfs Storm frequency = 2 yrs Time to peak = 842 min Time interval = 2 min Hyd. volume = 51,305 cuft Inflow hyd. No. = 2 -Post Area SF#100 Max. Elevation = 793,58 ft Reservoir name = SF #100 Max. Storage = 29,464 cuft Storage Indication method used Post SF#100 Q (Cfs) Hyd. No. 4 -- 2 Year Q (cfs) 28.00 28.00 _ f 24,00 24.00 20.00 — 20.00 16.00 _ T mm 16,00 12.00 12.00 8.00 8.00 0.00 0.00 0 360 720 1080 1440 1800 2160 2520 2380 3240 3600 3960 Time (min) Hyd No. 4 —Hyd No. 2 lL1I..I�..T:.➢ Total storage used = 29,464 cult Pond Report 6 Hydraflow Hydrographs Extension for Autodeske Civil 3D® 2019 by Autodesk, Inc, v2020 Tuesday, 10 ( 16 / 2018 Pond No, 1 - SF #100 Pond Data Contours -User-denned contour areas. Conic method used for volume calculation. Begining Elevation = 790.00 ft Stage 1 Storage Table Stage (ft) Elevation (ft) Contour area {sgft) Incr. Storage (cuft) Total storage (cult) 0.00 790.00 5,310 0 0 0.50 790.50 6,099 2,850 2,850 1.00 791.00 6,887 3,244 5,094 1,50 791.50 7,676 3,639 9,732 2.00 792.00 8,464 4,033 13,765 2.50 792.50 9,383 4,459 18,225 3.00 793,00 10,302 4,919 23,144 3.50 793,50 11,220 5,378 28,522 4.00 794.00 12,139 5,838 34,360 4.50 794.50 13,192 8,330 40,690 5.00 795.00 14,245 6,857 47,547 5.50 795.50 15,297 7,383 54,930 6.00 796.00 16,360 7,910 82,840 6.50 796.50 16,509 8,214 71,054 7.00 797.00 16,669 8,294 79,347 7.50 797.50 16,828 8,373 87,721 8.00 798.00 16,987 8,453 96,173 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsr] [A] [B] [C] [D] Rise (in) - 0.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type --- Length (ft) = 0,00 0.00 0.00 0.00 Mull = No No No No Slope (%) = 0.00 0.00 0.00 n/a N-Value = .013 .013 .013 n/a Orifice Coeff. = 0.60 0.80 0.30 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = rl No No No TW Elev. (fill = 0,00 Note: CWvcwGdflce outflows are analyzed under Inlet rc) and cutlet (cc) control. weir neem checked for orifice conditions do) and submergence (a), Stage I Storage / Discharge Table Stage Storage Elevation CIvA CIvB CIvC PrfRsr WrA WrS WrC WrD Exfil User Total ft cuft it of$ eta cis cfs cfs oft cfs cfs cfs efs cfs 0.00 0 790.00 --- --- --- --- --- -- --- --- --- --- 0.000 0,50 2,85C 790,50 --- --- --- --- --- -- --- --- --- 0.150 0.150 1.00 6,094 791.00 --- -- --- -- --- -- .-- --- --- 0.180 0.130 1.50 9,732 791.50 --- -- --- --- --- -- --- --- --- 0.200 0.200 2.00 13,765 792.00 --- -- --- -- --- --- --- --- --- 0.220 0.220 2.50 18,225 792.50 --- --- --- -- --- -- --- --- --- 0.240 0.240 3.00 23,144 793.00 -- -- --- -- --- --- --- --- -- 0.580 0.580 3.50 28,522 793.50 --- --- --- -- --- -- .-- --- --- 0,830 0.830 4.00 34,360 794.00 --• -- .-• --- --- 1.010 1.010 4.50 40,690 794,50 --- --- --- -- --- --- --- --- --- 1.160 1.160 5.00 47,547 795.00 -- --- --- --- --- -- --- --- --- 1.300 1.300 5.50 54,930 795.50 -- --- --- --- --- -- --- --- --- 1.420 1.420 6.00 62,840 790.00 --- --- -- --- --- -- --- --- --- 1.530 1.530 6.50 71,054 796.50 --- --- -- --- •-- -- --- --- --- 11.06 11.06 7.00 79,347 797.00 --- --- -- --- --- -- --- --- --- 44.10 44.10 7,50 87,721 797.50 --- -- -- --- --- -- --- --- --- 66.69 66.59 8.00 96,173 798.00 --- -•• --- --- --- -- --- --- --- '106.62 106.62 Hydrograph Report 7 Hydraflow Hydrographs Extension for AutodeskO Civll 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 10I 16l 2018 Hyd. No, 5 Post SF#200 Hydrograph type = Reservoir Peak discharge = 0.561 cfs Storm frequency = 2 yrs Time to peak = 890 min Time interval = 2 min Hyd. volume = 36,542 tuft Inflow hyd. No. = 3 - Post Area SF#200 Max. Elevation = 790.21 ft Reservoir name = SF #200 Max. Storage = 21,178 cult Storage Indication method used Post SF#200 Q (cfs) Hyd. No. 5 -- 2 Year Q (cfs) 21.00 21.00 I 18.00 18.00 15.00 15.00 12.00 12.00 9.00 9.00 6.00 6.00 3.00 3.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) Hyd No. 5 --- Hyd No. 3 fl,11]11 Total storage used = 21,178 cult Pond Report 8 Hydragaw Hydrographs Extension for Autodesk® Civil 3DV 2019 by Autodesk, Inc. v2020 Tuesday, 10l 16 / 2018 Pond No. 2 - SF #200 Pond Data Contours -User-deflned contour areas. Conic method used forvolunne calculation. Beglning Elevation = 788.00 It Stage / Storage Table Stage (ft) Elevation (ft) Contour area (sgft) Incr. Storage (cult) Total storage (cuft) 0.00 788.00 8,202 0 0 0.50 788.50 8.317 4,253 4,253 1.00 789.00 9,431 4,561 8,814 1.50 789.60 10,046 4,868 13,682 2.00 79000 10,660 5,175 18,857 2.50 790,50 11,344 5,500 24,357 3.00 791.00 12,029 5,342 30,199 3.50 791.50 12,713 5,184 36,383 4.00 792.00 13,397 8,526 42,909 4.50 79250 14,155 6,886 49,795 5.00 793.00 14,913 7,265 57,061 5.50 793.60 15,671 7,644 64,705 6.00 794.00 16,429 8,023 72,729 6.50 794.50 17,244 8,417 81,145 7.00 795.00 18,058 8,824 89,969 7.50 795.50 16,873 9,231 W,200 8.00 796,00 19,687 9,638 108,838 Culvert ( Orifice Structures Weir Structures (Al (8] (C] [PrFRsr] [A] [131 [C] [D] Rise (in) = 0.00 0,00 0.00 0.00 Crest Len (ft) = 0.00 0100 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert EL (ft) = 0.00 0,00 0.00 Ma Weir Type = -•• -- --- - Length (ft) = 0.00 0.00 0.00 O.CO Multi -Stage = No No No No Slope (%) = 0.00 0.00 0.00 n/a WValue = C13 .013 013 n/a Orifice Coeff. = 160 0.60 0.60 0.60 Exfil.(in/hr) = 0.000 (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: Culveruorines outflows are analyzed under inlet-ic) andoutlet(oc) control. Weir rlaem checked fo(oflace wndWY na tic) and submergence (a). Stage / Storage / Discharge Table Stage Storage Elevation Clv A Clv B Clv C PrtRsr Wr A Wr B Wr C Wr 0 Exffl User Total ft cuft ft cfs cfs eta cfs cfs cfs cfs cfs cfs cfs cfs 0.00 0 788.00 --- --- --- --- •-- --- -- - - 0.000 0.50 4,253 78850 --- --- --- --- --- --- --- -- - 0.100 0.100 1.00 3.814 789,00 --- --- --- --- --- --- --- -- - 0.110 0.110 1.50 13,882 789.50 --- ----- --- --- -- --- -- - 0.130 0.130 2.00 18,857 790.00 --- --- -- -- --- -- --- --- - 0,460 0.460 2.50 24,357 790.50 --- --- --- -- --- -- --- -- - 0.700 0.700 3.00 30,199 791.00 --- --- -- --- --- -- --- -- - 0,870 0,370 3.50 36,363 791.50 -- --- -- -- --- - --- -- - 1.020 1.020 4.00 42,909 792.00 --- --- -- -- --- -- --- -- - 1,140 1.140 4.50 49,795 792,50 --- --- --- -- -- --- -- - 1.260 1,260 5.00 57,061 793.00 --- --- --- --- --- -- --- -- - 1.360 1.360 5.50 64,705 793.50 --- --- --- --- --- -- --- - - - 1.460 1.460 6.00 72,729 794-0 --- --- -- --- --- --- -- -- - 1.550 1.550 6.50 81,145 794.50 --- --- --- --- --- --- --- --- - 11.06 11.00 7.00 89,969 795.00 --- --- --- --- --- --- - 24.81 24.81 7.50 99,200 795,50 --- --- --- --- --- --- --- - 46.74 46.74 8.00 108,838 79600 --- -- --- --- -- --- --- --- --- 86.23 86.23 9 Hydrograph Report HydrafloW Hydrographs Extension for Autodesk® Civil 3D02019 by Autodesk, Inc. v2020 Tuesday, 10 / 1612018 Hyd. No. 6 Post Area No SF Hydrograph type = SCS Runoff Peak discharge = 12.73 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 25,982 cuft Drainage area = 8.520 ac Curve number = 67.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Area No SF Q (cfs) Hyd. No. 6 -- 2 Year Q (cfs) 14.00 12.00 10.00 8.00 6.00 4.00 2.00 000 14.00 12.00 10.00 8.00 6,00 4.00 2.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report 10 Hydraflow Hydrographs Extensior for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 18 12018 Hyd. No. 7 Post Area Total Hydrograph type = Combine Peak discharge = 13.08 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 113,828 cult Inflow hyds. = 4, 5, 6 Contrib, drain. area = 8.520 ac 12.00 10.00 MID 4.00 2.00 0.00 ` 0 360 Hyd No. 7 Post Area Total Hyd. No. 7 -- 2 Year Q (cfs) 14.00 12.00 10.00 M 6.00 4.00 2.00 0.00 720 1080 1440 1800 2160 2520 2880 3240 Time (min) -- Hyd No. 4 —Hyd No. 5 — Hyd No. 6 11 Hydrograph Summary Re po rtHydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow lots) Time Interval (min) Time to Peak (min) Hyd, volume (cult) inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 2452 2 738 134,111 ----- ------ ----- Pre Area 2 SCS Runoff 46.82 2 716 95,009 --- ----- ----- Post Area SF#100 3 SCS Runoff 35.27 2 716 71,221 ----- ----- ------ Post Area SF#200 4 Reservoir 1,453 2 842 94,990 2 795.65 57,327 Post SF#100 5 Reservoir 1.126 2 844 71,070 3 791.04 42,150 Post SF#200 6 SCS Runoff 28,17 2 718 56,343 ------ ------ ----- Post Area No SF 7 I i i i Combine 29.94 I 2 718 i 222,403 i 4, 5,6 ------ I i --- Post Area Total Pre pis Post.gpw Return Period: 10 Year Tuesday, 10 / 16 / 2018 Hydrograph Report 12 Hydraflow Hydrographs Extension for Autorl Civil 3D® 2019 by Aulodesk, Inc. v2020 Hyd. No. 1 Pre Area Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 26.230 ac Curve number Basin Slope = 0.0 % Hydraulic length To method = User Time of conc. (To) Total precip. = 5.10 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 28.00 24.00 20.00 16.00 12.00 M 4.00 Pre Area Hyd, No. 1 -- 10 Year Tuesday, 10 / 16 l 2018 = 24.52 cfs = 738 min = 134,111 cuft = 60.7 = Oft = 38.40 min = Type II = 484 Q (cfs) 28.00 24.00 20.00 16.00 "XiIIIII, 400 MID � � i —� 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) _� Hyd No. 1 13 Hydrograph Report '-lydraflow Hydrographs Extension for Aulodask® Civil 3DO 2019 by Autodesk. Inc. v2020 Tuesday, 10 116I2018 Hyd. No. 2 Post Area SF#100 Hydrograph type = SCS Runoff Peak discharge = 46.82 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 95,009 tuft Drainage area = 9.760 ac Curve number = 78.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 40.00 30.00 MIX&I 10.00 0.00 - 0 120 240 Hyd No. 2 Post Area SF#100 Hyd. No. 2 --10 Year 360 480 600 720 840 Q (cfs) 50.00 30.00 20.00 10.00 0.00 960 1080 1200 1320 1440 Time (min) Hydrograph Report 14 Hydraflow Hydrographs Extension for AutodeskQ Civil 300 2019 by Autodesk, Inc, v2020 Hyd. No. 3 Post Area S F#200 Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.270 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.10 in Distribution Storm duration = 24. hrs Shape factor Post Area SF#200 Tuesday, 10116/2018 = 35.27 cfs = 716 min = 71,221 cuft = 75 = 0 ft = 5.00 min = Type II = 484 Q (cfs) Hyd. No. 3 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10,00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 3 15 Hydrograph Report Hydra flow Hydrographs Extension for AutodeskO Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 12018 Hyd. No. 4 Post SF#1 00 Hydrograph type = Reservoir Peak discharge = 1.453 efs Storm frequency = 10yrs Time to peak = 842 min Time interval = 2 min Hyd. volume = 94,990 cult Inflow hyd. No. = 2 - Post Area S F#1 00 Max. Elevation = 795.65 fit Reservoir name = SF #100 Max, Storage = 57,327 tuft Storage Indicatlon method used Post SF#1 00 Q (Cfs) Hyd. No. 4 — 10 Year Q (Cfs) 50.00 50.00 40.00 40.00 30.00 30.00 20,00 20.00 1 10.00 0.00 0 0.00 .00 0 360 720 1 D80 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) — Hyd No. 4 — Hyd No. 2 Total storage used= 57,327 tuft Hydrograph Report 16 HydraFlow Hydrographs Extension for Aufodesk® Civil 3D® 2019 by Aulodesk, Inc. v2020 Tuesday, 10116l 2018 Hyd. No. 6 Post SF#200 Hydrograph type = Reservoir Peak discharge = 1.126 cfs Storm frequency = 10 yrs Time to peak = 844 min Time interval = 2 min Hyd. volume = 71,070 cuft Inflow hyd. No. = 3 - Post Area SF#200 Max, Elevation = 791,94 ft Reservoir name = SF #200 Max. Storage = 42,150 cuft Storage Indication method used PostSF#200 Q (cfs) Hyd. No. 5 -- 10 Year Q (Cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Hyd No. 5 — Hyd No. 3 9 Time (min) TI=.IrL Total stora a used = 42,150 cuft 17 Hydrograph Report Hydraflow Hydrographs Extension for AUtodeskS Civil 30® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd, No. 6 Post Area No SF Hydrograph type = SCS Runoff Peak discharge = 28.17 cfs Storm frequency = 10 yrs Time to peak = 718 min Time Interval = 2 min Hyd, volume = 56,343 cuft Drainage area = 8.520 ac Curve number = 67.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (Cfs) 30.00 25.00 20.00 15.00 10.00 5.00 0,00 6 0 120 240 Hyd No, 6 Post Area No SF Hyd, No. 6 -- 10 Year 360 480 600 720 840 Q (cfs) 30.00 f' VIN 20.00 15.00 10.00 5.00 960 1080 1200 1320 1440 1560 Time (min) Hydrograph Report 18 Hydraflow Hydrographs Extension for Autodeske Civil 306 2010 by Autodesk, Inc. v2020 Tuesday, 10 l 1612018 Hyd. No. 7 Post Area Total Hydrograph type = Combine Peak discharge = 29.94 cfs Storm frequency = 10 yrs Time to peak = 718 min Time interval = 2 min Hyd, volume = 222,403 tuft Inflow hyds. = 4, 5, 6 Contrib. drain. area = 8.520 ac Post Area Total Q (cfs) Q (cfs) Hyd. No. 7 -- 10 Year 30.00 30.00 25.00 _ 25,00 20.00 20.00 15.00 � 15.00 10.00 10.00 5.00 5.00 0.00� 0.00 0 240 480 720 960 1200 1440 1680 1920 2160 2400 2640 2880 Time (min) Hyd No. 7 -- Hyd No. 4 —Hyd No. 5 —Hyd No. 6 19 Hydrograph Summary Repo rtHydieflow Hydrographs Extension for Autodesk@ Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No, Hydrograph type (origtn) Peak flow (cfs) Time Interval {min) Timeto Peak (min) Hyd. volume (cuff) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 47.53 2 738 240,877 ----- ----- ----- Pre Area 2 SCS Runoff 70.52 2 716 145,123 ---- ---- ------ Post Area SF#100 3 SCS Runoff 54.93 2 716 111,835 ------ ---- ---- Post Area SF#200 4 Reservoir 15.31 2 726 145,105 2 796.58 72,121 Post SF#100 5 Reservoir 1,520 2 870 111,580 3 793,83 70,036 Post SF#200 6 SCS Runoff 46.52 2 716 93,913 ------ -- --- -- Post Area No SF 7 Combine 49.13 2 718 350,604 i 4, 5,6 I ------ --- Post Area Total Pre vs Post.gpw Return Period: 50 Year Tuesday, 10116 / 2018 20 Hydrograph Report Hydreflow Hydrographs Extenslon for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10116 12018 Hyd. No. 1 Pre Area Hydrograph type = SCS Runoff Peak discharge = 47.53 cfs Storm frequency = 50 yrs Time to peak = 738 min Time interval = 2 min Hyd. volume = 240,877 cuft Drainage area = 26,230 ac Curve number = 60.7 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 38.40 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 + ++ 30.00 20.00 10.00 Pre Area Hyd. No. 1 -- 50 Year Q (cfs) 50.00 10.00 20,00 10.00 000 -- 0.00 0 120 240 360 480 600 720 B40 960 1080 1200 1320 1440 1560 Time (min) — Hyd No. 1 21 Hydrograph Report Hydraflow Hydrographs Extension for AutodeskO Civil MV 2019 by Autodesk, Ino, v2020 Tuesday, 10 / 18 / 2018 Hyd. No. 2 Post Area SF#100 Hydrograph type = SCS Runoff Peak discharge = 70.52 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 145,123 cuft Drainage area = 9.760 ac Curve number = 78.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cony (Tc) = 5,00 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 0 (cfs) 80,00 70.00 60.00 50.00 40.00 30.00 20.00 im Post Area SF#100 Hyd, No. 2 -- 50 Year 0 (cfs) 80.00 70.00 60.00 40.00 30.00 20.00 10,00 0.00 a — 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Time (min) Hyd No. 2 Hydrograph report Hydraflow Hydrographs Extension for Autodesk® Civil 3D8 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 18 / 2018 Hyd. No. 3 Post Area SF#200 Hydrograph type = SCS Runoff Peak discharge = 54.93 cfs Storm frequency = 50 yrs Time to peak = 715 min Time interval = 2 min Hyd. volume = 111,835 cuft Drainage area = 8.270 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.DC 10,00 Post Area SF#200 Hyd. No. 3 -- 50 Yaar Q (cfs) 60.00 50.00 40,00 30.00 20.00 `r+xliol 0.00 MO 0 120 240 380 480 600 720 840 960 1080 1200 1320 1440 Hyd Na. 3 Time (min) 23 Hydrograph Report HydraFlow Hydrographs Extension for Autodeake Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 4 Post SF#100 Hydrograph type = Reservoir Peak discharge = 15.31 cfs Storm frequency = 50 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 145,105 cult Inflow hyd. No. = 2 - Post Area SF#100 Max. Elevation = 796.58 ft Reservoir name = SF #100 Max. Storage = 72,121 cuft Storage Indication method used. Q (cfs) 80.00 70,00 ,m 50.00 40.00 30,00 20.00 10.00 Post SF#100 Hyd. No. 4 -- 50 Year Q (cfs) 80.00 70.00 60.00 50.00 WM 30.00 9M 10,00 0.00 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 Time (min) Hyd No. 4 ---� Hyd No. 2 T1I1_Ia _ Total storage used = 72,121 cult Hydrograph Report 24 Hydraflow Hydrogra ph s Extension for AutodeskO Civil 3D@ 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 6 Post SF#200 Hydrograph type = Reservoir Peak discharge = 1.520 cfs Storm frequency = 50 yrs Time to peak = 870 min Time interval = 2 min Hyd. volume = 111,586 cuft Inflow hyd. No. = 3 - Post Area SIF#200 Max. Elevation = 793.83 ft Reservoir name = SF #200 Max. Storage = 70,036 cuft Storage Indication method used Post SIF#200 Q (Cfs) Hyd, No. 5 50 Year Q (Cfs) 60.00 - 60.00 50.00 - 50.00 40.00 µ 40.00 30,00 30.00 20.00 T 20.00 10.00 10.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 — ime (min) Hyd No. 5 — Hyd Na.No3 1.111f I] Total storage used 70,036 cuft 25 Hydrograph Report Hydraflow Hydrographs Extension for Autodeek) Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 6 Post Area No SF Hydrograph type = SCS Runoff Peak discharge = 46.52 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 93,913 cuft Drainage area = 8.520 ac Curve number = 67.9 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 50.00 TiKIIOI 20.00 10.00 Post Area No SF Hyd. No, 6 -- 50 Year Q (cfs) 50.00 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 6 Time (min) Hydrograph Report 26 Hydraflow Hydrographs Extension for Autodesk®Civil M8 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 7 Post Area Total Hydrograph type = Combine Peak discharge = 49.13 cfs Storm frequency = 50 yrs Time to peak = 718 min Time interval = 2 min Hyd, volume = 350,604 cuft Inflow hyds. = 4, 5, 6 Contrib. drain. area = 8,520 ac Q (cfs) 50.00 0.00 0 240 Hyd No. 7 Post Area Total Hyd. No. 7 -- 50 Year 480 720 960 — Hyd No. 4 1200 1440 16du lazu zruu ----- Hyd No. 5 — Hyd No. 6 Q (cfs) 50.00 40.00 20.00 10.00 0.00 2400 Time (min) 4A Hydrograph Summary Report ydraflow Hydrographs Extension for Autodesk®Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 59.38 2 738 296,192 ------ ------ ---- Pre Area 2 SCS Runoff 81.78 2 T�.6 169,472 ------ ...-_ --_ Post Area SF#100 3 SCS Runoff 64.38 2 716 131,777 --- ---- ---- Post Area SF#200 4 Reservoir 39.33 2 722 169,453 2 796,93 78,150 Post SF9100 5 Reservoir 4.467 2 754 131,504 3 794.16 75,310 Post SF#200 6 SCS Runoff 55.82 2 716 112,805 ------ ------ ----- Post Area No SF 7 Combine , 77.88 2 720 413,762 4, 5,6 ...... i ----- Post Area Total Pre vs Post.gpw Return Period: 100 Year Tuesday, 10 / 16 / 2018 M, Hydrograph Report Hydraflow Hydrographs Extenslon for Autodeskl)Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10116 / 2018 Hyd. No. 1 Pre Area Hydrograph type = SGS Runoff Peak discharge = 59.38 cfs Storm frequency = 100 yrs Time to peak = 738 min Time interval = 2 min Hyd, volume = 296,192 cuft Drainage area = 26.230 ac Curve number = 60.7 Basin Slope = 0.0 % Hydraulic length = 0 ft To method = User Time of conc. (To) = 38.40 min Total precip. = 7.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 60.00 50.00 40.00 30.00 20.00 `ttxlIc Pre Area Hyd. No. 1 -- 100 Year 50.00 40.00 B111I41 20.00 511x i61 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Time (min) Hyd No. 1 29 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 10 / 2018 Hyd. No. 2 Post Area SF#100 Hydrograph type = SOS Runoff Peak discharge = 81.78 cfs Storm frequency = 100 yrs Time to peak Hyd, volume = 716 min = 169,472 cuft Time interval Drainage area = 2 min = 9.760 ac Curve number = 78.7 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 7.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 90.00 80.00 70.00 60.00 50.00 40.00 30.00 2000, 10.00 Post Area SF#100 Hyd. No. 2 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50A0 40.00 30.00 20.00 10.00 0.00 — — r - 0.00 0 120 240 360 480 600 720 840 960 108Q 1200 1320 Time (min) Hyd No. 2 all Hydrograph Report Hydraflow Hydroyriphs Extension for Autodesk6 Civil 3D® 2019'oy Autodesk, Inc. v2020 Hyd. No. 3 Post Area SF#200 Hydrograph type = SCS Runoff Storm frequency = 100 yrs Time interval = 2 min Drainage area = = 8.270 ac 0.0 Basin Slope = User Tc method = 7.60 in Total precip. = 24 hrs Storm duration Q (Cfs) 70.00 ME 50,00 40.00 30.0( RM 10.0 0.. 120 240 360 �a� - 0 Time (min Peak discharge Time to peak Hyd. volume Curve number Hydraulic length Time of conc. (Tc) Distribution Shape factor Post Area SF#200 N„rl No. 3 -- 100 year Tuesday, 10116 12018 = 64.38 cfs = 716 min = 131,777 cuft = 75 = 0 ft = 5.00 min = Type II = 434 Q (cfs) , nn Hyd No. 3 31 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3DO 2019 by Autodesk, Inc. v2020 Tuesday, 10116 12018 Hyd. No. 4 Post SF#100 Hydrograph type = Reservoir Peak discharge = 39.33 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd, volume = 169,453 tuft Inflow hyd. No. = 2 - Post Area SF#100 Max. Elevation = 796.93 ft Reservoir name = SF #100 Max. Storage = 78,150 cuft Storage Indication method used. Q (Cfs) 90.00 80.00 70,00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 0 240 Hyd No. 4 480 720 960 - Hyd No. 2 Post SF#100 Hyd. No. 4 -- 100 Year Q (cfs) 90.00 80.00 70,00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 1200 1440 1680 1920 2160 II1l.I::t:;11 Total storage used = 78,150 cuff Time (min) 32 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk@1 Civil 31DO 2019 by Autod ask, Inc. v2020 Tuesday, 10 113 12018 Hyd. No. S Post SF#200 Hydrograph type = Reservoir Peak discharge = 4.467 cfs Storm frequency = 100 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 131,504 cuft Inflow hyd. No. = 3 - Post Area SF#200 Max. Elevation = 794,15 ft Reservoir name = SF #200 Max. Storage = 75,310 cuft Storage Indication method used. Q (cfs 70.00 50.00 40.00 30.00 20.00 10.00 Post SF#200 Hyd. No. 5 -- 100 Year Q (cfs) 70,00 . R OR 50.00 Im 30,00 118210191 i E# 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 Time (min) Hyd No. 5 ---- Hyd No. 3 [FLL[f]11 Total storage used = 75,310 cult Hydrograph Report 33 HydfafloW Hydrographs Extension for Autodesk� Clvil 3�® 2019 by AUtodesk, Inc. v2020 Tuesday, 10116/2018 Hyd, No. 6 Post Area No SF Hydrograph type = SCS Runoff Peakdischarge T Pea = 55,82 min Storm frequency = 100 yrs Hyd. volume = 112,805 cuft Time interval = 2 min = 8.520 ac Curve number = 67.9 Drainage area Basin Slope = 0.0 % Hydraulic length = Oft To method = User Time of conc. (To) = 5.00 min = Type II Total precip. = 7.60 in Distribution Shape factor = 484 Storm duration = 24 hrs 50.00 40.00 30.00 20.00 10.0c 0.01 Post Area No SF Hyd. No. 6 -- 100 Year 0 120 240 360 46U bVU rcu o4u Hyd No. 6 Q (cfs) 60.00 WE 10.00 ci M elm 10.00 0,00 ,ion Inan 1560 Time (min) Hydrograph Report HydraFlow Hydrographs Extenslon for AutodeskOCMA 3D® 2019 by Aulodesk, Inc. v2020 Hyd. No. 7 Post Area Total Hydrograph type = combine Storm frequency = 100 yrs Time interval = 2 min Inflow hyds. = 4, 5, 6 Q (cfs) 80,00 MOO 60.00 50.00 40.00 30.0( 20.0 10.0 0.� 0 240 480 flu Hyd No. 7 ---- Hyd No. 4 ® Hyd No. 5 34 Tuesday, 1011812018 Peak discharge = 77.68 cfs Time to peak = 720 min Hyd. volume = 413,762 cuft Contrib. drain. area = 8.520 ac Post Area Total Hvd. No. 7 -- 100 Year Q (cfs) or) no ).00 0.00 i0.00 W.00 30.00 20.00 10.00 0.00 0 Time (min) ® Hyd No. 6 Pine Forest II Storm Drain/Erosion Control Project Report Water Quality Calculations Section 6: Water Quality Volume Calculations Pine Forest II Storm Drain/Erasion Control Project Report Sand Filter Pond 100 Analysis Section 6: Water Quality BMP 100 Pine Forest II Statesville, Iredell County, North Carolina Project Number: 2712 August 14, 2018 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Sand Filter #100 Soil Type: Cecil Sandy Clay Loam & Hlwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 9.76 ac. Paved Roads/SidewalklStructures 4.67 ac. C = 98 Wooded Area C = 60 Good Grass (>75% coverage) 5,09 ac. C = 61 Newly Graded Composite CN (Sand Filter) 78.7 t1a0Iflum Project;. `Pine Forest II - Engineer: R- Joe Harris & Associates, Inc. Locatiom F Statesville, North Carolina :Date: August 17, 2018 Client: ' True Homes, LLD -' By: Jordan Vavrina BMPTVpei: Surface.. Sand Filter4100 Required Background Information: 1.0 Drainage Area Size (Area in SF Draining to BMP) n ,4 1/a SF tf"n7'1d SF 2.0 Impervious Area (Area in SF Draining to BMP) _ 3.0 %Impervious Area (Impervious Area/DA) _ % Compute Water Quality volume (WQv) 1.0 Compute Runoff Coefficient (Rv) using Schueler's Method Rv BMP Equation Rv = 0.05+0.009(I) Where T' Is % Impervious (in percent, not decimal) 2.0 Compute Water Quality Volume (WQv) using Schueler's Method WQv BMP Equation WQv 1.CRvA/12 Where "A" Is Area Draining to BMP in Acres ac-ft =NONE= cu.ft. 3.0 Convert Water Quality Volume (WQv) into inches of Runoff WQv = 1.0(Rv) = 11MIRNM inches Compute Water Quality Peak Flow (WQp): WQv BMP Equation 1.0 Compute Modified SCS Curve Number (CN) CN BMP Equation CN = 1_000/[10+5P+1OWQv-1O(WQv^2+ 1.25QQVP)AO.S] "P" is precipitation= 1.0 = M A. If in Charlotte or Mecklenburg Ccunty, run pre and post hydrologic model using 1-inch, 6-hour storm in HEC-1 model output using SCS method B. If in Huntersville, skip this section Channel Protection Volume 1.0 Compute Maximum Soil Retention (S) asing SCS Methods (CN is Standard Value - Not Modified CN Value) S = 10W}CN-1C 1W CN Value (Post) inches 2.0 Compute Total Runoff for the 1-year, 24-hour -storm Event (Statesville Requirements) Qd = (P-0.2S)^2 / (P+O,SS) For Statesville P = Precipitation 4y. inches For Char-Meck 2.58 P=1-yr, 24-hr For Statesville 3.02 P = 1-yr, 24-hr 3.0 Compute Watershed Runoff (CPv) * ( 12inches) Area = In Acres of DA _ CPv..... _. Qd Area 1ft/ ac fr Convert to cubic feet CPv(ac-ft) * 43560 sflacre Compute Release Rates for Water Quality Control (WQv) and Channel Protection Volume (CPv) These are average release rates (estimates) based on Static Method and should be used as "targets" for routing calculations. 1.0 Compute Release Rate for Water Quality Control (WQv) Rate = (WQv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = NAMISM cfs 2.0 Compute Release Rate for Channel Protection Volume (CPv) Rate = (CPv aaft * 43560 sf/ac)/(Duratlon * 360C sec/hr) = Monism= cfs 1.0 Compute Release Rate for Water Quality Control ()AiQv) Rate = (4VQv ac-ft * 43560 sf/ac)/(Duration * 3600 Sec/hr) = MENISM cfs 2.0 Compute Release Rate for Channel Protection Volume (CPv) Rate = (CPv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = 111MIJIM cfs Compute Sedimentation Chamber Volume 1.0 Compute Sediment Chamber Volume (20% of Water Quality Volume) SCvol - (WQv)(43,560 sf/ac)(0.20) = MONMEMcu.ft. Compute Surface Sand Filter Area and Volume to Treat Water Quality Volume (WQv) Duration: 2.0 days (48 hrs) +3 hours s " hrs Duration: 1.0 days (24 hrs) + 12 hours hrs Where CPv = WQv ac-ft -CPv ac-ft = ac-ft Duration: 2.0 days (48 hrs) + 3 hours hrs Duration: 1.0 days (24 hrs) + 12 hours '" hrs Where CPv = WQv ac-ft -CPv ac-ft = HUMBEMac-ft 1.0 Check Surface Sand Filter Area based on Darcy's Equation (assumed value of 1.75 in,/hr for the design coefficient of permeability for the sand filter media) Af = (WQv)(df)/[(k)(h,+df)(tf)] =KINNOM sci t. Surface Area Used = Sand Filter Dims.@ Filter Media = Msq. ft. Width. (ft) Length (ft) (1.5 Minimum) k - �'4 ft/dy permeability coeff. hf - � �. , ft avg. height of water tr -.u- :�: days.. filter bed drain time Develop Stage -Discharge for Bioretention Filter Media & BMP Outlet Structure Outflow computed using following equations, Af = (WQv)(df) / [(k)(hf + df)(tf)] Q. = W Qv / tf Q. _ [(Ar)(k)(hf+df)]/df Where: Af = surface area of filter bed (sq.ft.) (Required Surface Area) _ NIMS= sf df = filter bed depth (ft) k = coefficient of permeability of filter media (ft/day) hr = avg. height of water above filter bed (ft) • 1 1 1 1 1 1 11 f:t ®�� 1 1 11 3.j1 M 8 = • 1 1 � 1 1 O a '�' 3'�t 0sx�i���_��_� PROJECT: Pine Forest 11 DATE: 17-Aug-18 PROJECT#: 2712 DESIGNER: J.J.V. DESCRIPTION: Sand Filter #100 ENGINEER: P.L.M. POND STORAGE VOLUME: CONTOUR ELEVATION INCREMENTAL ACCUM. ELEV. AREA DIFFERENTIAL VOLUME VOLUME (FT,� MF,) : (FT.) (C.F.) (C.F.) 790.00 5310 0.0 0 0 790.50 6,099 0.5 2,352 7'552 791.00 6,387 1.0 3,240 6,099 791.50 7,676 15 3,641 9,739 792.00 8,464 2.0 4,035 13,774 792.50 930 25 4,462 18,236 793.00 10,302 3.0 4,921 23.157 793.50 ?20 3.5 5.380 28,537 794.00 12, 39 4.0 5,840 34,377 794.50 13J92 4.5 6333 40710 795.00 14,245 5.0 6,859 47,569 795.50 15'97 5.5 7.385 54,954 796.00 10-150 6.0 1 7,912 62,866 796.50 16,509 6.5 1 8,2 I S 7 L081 797.00 16,669 7.0 1 8,294 79375 797.50 16,828 75 8,374 1 37.749 798.00 16,997 8.0 8,454 96.203 ORIFICE FLOW DATA: WEIR FLOW DATA: SPILLWAY FLOW DATA: PROJECT: PROJECT #: DESCRIPTION: Pine Forest II DATE; 17-Aug-18 2712 DESIGNER: J.J.V. Sand Filter #100 ENGINEER: P.L.M. COMBIAiED FLOW: ELEV. (FT.) :ORIFICES' :WEIRS '- SPILLWAY Q1 (C.F:SI.) --TOTAL.. FLOW (C.F.S.) '. QI (C.F.S.) Q2 -(C.F.S.) Q3 'C.F.SJ Ql (C.F'.S.) Q2 C.F.S. Q3 ( C.F.S.) 790.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 790S0 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 79 L00 0,00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 791.50 (MM 0.00 0.00 0.00 0.00 0.00 0.00 0.00 792,00 0.00 o.00 0.00 6.00 0.00 0.00 0,00 0.00 792.50 0.00 0,00 0,00 0.00 0.00 0.00 0.00 OM 793.00 0.32 Mo 0.00 0.00 0.00 0.00 0.00 0.32 793.50 0.55 9.00 0.00 0.00 0.00 0.00 0.00 0.55 794.00 0.70 U)o 0.00 0.00 0.00 0.00 0.00 0.70 794.50 0.83 d.00 O.00 O.00 0,00 abo 0.00 0.83 795,00 0.95 0.00 0.00 0.00 0.00 0.00 0.00 0.95 795.50 1.04 0.00 0,00 0.00 0,00 0.M 0.00 1,04 796.00 1.14 0.00 0.00 o.o0 0.00 0,)0 0.00 1..14 796.50 1.22 0.00 0.00 0.00 0.00 0.00 0.00 1.22 797.00 1.30 0.00 0.00 0.00 (1.00 0.00 0.00 130 797.50 137 0.00 0.00 0.00 0,00 0.00 0.00 137 798.00 t.44 0,00 0.00 0.00 0.00 0.00 0.00 1.44 FINAL RESULTS: STAGE-, STORAGE"Ia1$CYI.RGE 1, 790.50 2,852 G.0C1 79L00 6,099 0.00 791.50 9,739 Mr 192.00 13,774 0,00 792.50 18.236 0.00 793.00 23,157 0.32 793,50 23,53? 0.i5 794,00 34,377 0.70 794sO 40,710 0.S3 795,00 47,569 0.95 795,50 54,954 1.04 796,00 62.856 1.14 7965O 71,o81 1.22 797,')0 79.375 t.30 797.50 87.749 137 798.00 96,203 1.44 )reject: > Pine Forest II Engineers- R. Joe Harris & Associates, Inc .ocation: Statesville, North Carolina - Date: - August 17,: 207.E Alent: True Homes, LLC By: - Jordan Vavrina 3MPType: Surface Sand Filter#100, Verify Diameter of BMP Outlet Pipe (Barrel) Equation for Submerged Orifice = C * A * (2g*h)^0.5 Where: C = 0.6 A= see beiow g = 32.2 ft/s^2 h = headwater over orifice Inputs: Dia. of Pope < y inches convert to area In SF = sq.ft. Principal Weir � �,0&�4($,MSL (from Surface Sand Filter Design) Media filter i';tuN sg 0£ MSL (from Surface Sand Filter Design) Sot. of Media f` s xiN l a� M6L (from Surface Sand Filter Design) Results for Submerged Orifice: (Max Q out of BMP Structure) Orifice Dia= Barrel Discharge Results in US Discharge noted as "BMP Out" (see table below) c I� jaiBottom-of S •r r :: r r so ": `- k 1NINE n •795.50 �� PrincipalWeir 798.00 Final Stage -Discharge Results -If BPI' Out value is <0an combined flow of Soil Media + Walr, use BMP Out Value for Pond Discharge (BMP Structure outflow through Riser& Barrel) Project: Pine Forest II Engineer: R. Joe Harris & Associates, Inc, Location: Statesville, North Carolina Date: Statesville, North Caroline Client: True Homes, LLC - By: - -Jordan Vavrina 3MP Type: - Surface Sand -Filter #100 - Size Underdrains for Surface Sand Filter _ The calculations utilized are taken from the Charlotte-Meddenburg BMP Design Manual (July 1, 2010 ed.) for sizing of underdrains for bioretention ponds/rain gardens. 1.0 Compute perforation capacity of underdrain pipe. Minimum requirements or guidance as follows: - min, pipe diameter equals6" ` - underdrains shall be centered 10' max, on center (10' o.c.) - min. slope on underdrain shall be 0.50% assume 4 rows of perforation In pipe (3/8" perforations) - reduce perforated pipe length by V for each fitting (deanouts, tees, wyes) - assume 50% of perforations will become dogged and be ineffective Input Data: Total Length of Underdrain Pipe (If) sy 2 r z 115, Total Number of Fittings (ea) Diameter of Pipe (inches) Number of Perforations = (Length of Pipe- F1ttings)*(4 rows/ft)*(4 holes/row) perforations Actual Perforations Active = Number of Performations * 0.5C (50%) MMIM perforations Capacity of One Hole = C*A*(2g*h)A6.5 where: C = 0.6 cfs(hole A = 0.000767 (sf) g = 32.2 ft/sA2 ft h"Yess.;'r.E Capacity of Active Perfs. = No. Active Performations'" Capacity of One Hole cfs (ok if > than filter media capacity) cfs (soil media capacity at 05 from biorentention design) - if Capacity of Active Performations < Soil Media at 0.50' headwater depth, add additional pipe lenghth project: Rine forest ll - Engineer:: - -R., Joe Ha rris &Associates, Inc, .oration: Statesville, North Carolina Date:. August 17,: 2018 Client: True Homes, LLC ;By, Jordan Vavrina am Type: Surface.Sanl Filter410D Verify Sediment Forebay Storage Volume From Sand Filter Design Worksheet, Req, Sediment ForebayVolume = 20%of Water Quality Volume SCvol (WQv)(43,560sf/ac)(0.20) IM cu,ft. Elevation Contour Area{5F) Depth (Incr.)(ft) Volume (cf) Incr. Accum. 0.0 01 0 791.0j','r. t'#,,,y`�+ 1.0 804 804 1,0 1399 1 2202 793,0 1,0 2 502 4704 Storage Volume Water Elevation = Principal Weir Equalized Storage from Sediment Forebay Added to H&H Calculations (added to Sand Filter Volumes) project: ' . ' . Pine Forest ll - - Engineer: - R. Joe.Harris & Associates, Inc ocation: Statesville, North Carolina Dater ' August 17, 201, lientr True Homes, LLC - By: Jordan Vavrin MPType: Surface sand Filter#100 Water Quality Volume(WQV) 110d Wcu.ft. POND STORAGE VOLUME: LOCATION ", CONTOUR -: : ELEVATION INCREMENTAL ACCUM.. ELEV. AREA OIFFERENTLAL VOLUME �` VOLUME (FT.) ` '(S.F.)-;-(ET.). (C€.) Top of Soll Medla/Bottom of Pond 79o.00 5,310 0 3 0 0 790.30 6C99 05 21852 2,852 791.90 6,887 05 3,246 6.099 79L.30 7,675 p5 31541 9,739 792.00 8,464 0.5 4,035 13.774 Water Quallt Volume .42.A ':r a. .. ,-'% _ `.�,? `�" ` .ssso v3 x WN� 792.50 91383 0,1 653 18,272 793.00 10,302 0.5 4,921 23,193 793.50 1 1 1-1,220 0.5 j 3, 380 23.314 794,00 11,139 05 3,340 34,413 794.50 13,192 0.5 6,333 40,746 795.00 14.245 0.5 5,859 47,505 795.50 15,29] 0.5 7,385 S'391 Principal Weir 796.00 16,350 05 7,912 62,902 796.50 16,509 0,5 3,215 71,117 Emergency Spillway 797,00 16,669 05 8,294 79,412 75750 16,328 05 8,374 87,786 Top of Berm 798.00 161987 as ( 8,454 96,239 I 9MP REQUIRED PROVIDED ELEVATION SAND FILTER 1,420 SF 1,625 SF 790.00 WQv 17,607 CF 17,619 CF 792.43 PEAK CONTROL POST -DEVELOPMENT POST ROUTING STORM EVENT RUNOFF RUNOFF ELEVATION 2YR-24HR 17,29 CFS 0.918 CFS 793.74 10YR-24HR 32.42CFS 1.510CPS 795.91 50 YR - 24HR 49.30 CFS 21.13 C55 796.66 100 YR-24HR 5735 CFS 35.42 CFS 796.87 Hydrograph Summary Report, ydraflow Hydrographs Extension for AutodeskO Civil 30® 2019 by Autadesk, Inc. v2020 Hyd. No, Hydrograph type (origin) Peak flow (cfs) Time interval (min) Timeto Peak iminJ Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 25.54 2 718 51,324 ----- ---- --••-• Post Drainage Area 2 Reservoir 0,859 I I i I i i 2 842 51,305 1 793.58 i i j 29,454 BMP#100 BMP ##100.gpw Return Period: 2 Year Tuesday, 10 / 16 / 2018 PA Hydrograph Report Hydra flow Hydrographs Extenslon for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 12018 Hyd, No. 1 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 25.54 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 51,324 cuft Drainage area = 9,760 ac Curve number = 78.7 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3,50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 28.00 24.00 11-VIl7 IPAIIIII 8.00 4.00 Post Drainage Area Hyd. No. 1 -- 2 Year Q (cfs) 28.00 24.00 20.00 12.00 M •M 0.00 -- 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) 3 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No. 2 BMP #100 Hydrograph type = Reservoir Peak discharge = 0.859 cfs Storm frequency = 2 yrs Time to peak = 842 min Time interval = 2 min Hyd. volume = 51,305 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 793.58 ft Reservoir name = BMP #130 Max. Storage = 29,464 cuft Storage Indication method used Q (cfs 28.00 24.00 20.00 16,00 12.00 - O BMP #100 Hyd. No. 2 -- 2 Year ,_,— EF Q (cfs) 28.00 O wo 20.00 16,00 12.00 -m 0.00 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 2 — Hyd No. 1 1.I -1 Total storage used = 29,464 cuft Pond Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3002019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 12018 Pond No. 1 - BMP €#100 Pond Data Contours -User-defined contour areas. Conic method used forvolume calculation. Begining Elevation -790.00 ft Stage / Storage Table Stage (ft) Elevation (fq Contour area (sqft) Inor. Storage (cuft) Total storage (cuft) 0,00 790.00 5,310 0 0 0.50 790.50 6,099 2,860 2,850 1.00 791.00 8,887 3,244 6,094 1.50 791,50 7,676 3,639 9,732 2.00 792.00 8,464 4,033 13,765 2.50 792.50 9,383 4,459 18,225 3.00 793.00 10,302 4,919 23,144 3.50 793.50 11,220 5,378 28,522 4,00 794.00 12,139 5,838 34,360 4.50 794,50 13.192 8,330 40,690 5.00 795.00 14,245 6,857 47,547 5.50 796.50 16,297 7,383 54,930 6.00 790.00 16,350 7,910 62,840 6.50 796.60 16,509 8,214 71,054 7.00 797.00 16,669 8,294 79,347 7.50 797.50 16,828 8,373 87,721 8.00 798.00 16,987 8,453 96, 173 Culvert / Orifice Structures Weir Structures [A] [B] [C] [PrfRsrl [A] 1131 [C] [D] Rise (in) = C.00 0.00 0.00 0.00 Crest Len (ft) = 0.00 0.00 0.00 0.00 Span (in) = 0.00 0.00 0,00 0.00 Crest Eh (ft} = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 0.00 0.00 0.00 0.00 Invert El. (ft) = 0.00 0.00 0.00 0.00 Weir Type = --- -- --- - Length (ft) = O.CC 0.00 0.00 0.00 Multi-Stago = No No No No Slope 1%) = 0.00 0.00 0.00 n/a N-Value = .000 .000 .000 n/a Orifice Coeff. = 0.00 0.00 0.00 0.00 Exfil.(ialhr) = 0.000 (by Wet area) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note, CulverVOririce outflows are analyzed under inlet Cie) and outlet led) control. Weir risers checked for orit conditlons(to) and submergance(a), Stage / Storage I Discharge Table Stage Storage Elevation CIvA CIvB ch,G PrfRsr WrA WrB WrC WrD Exfll User Total ft cuft ft cis cfs cfs cfs cfs cis cfs cfs cfs cfs cfs 0.00 0 790.00 --- --- -- --- - - - -- --- --- 0.000 0,50 2,850 790.50 -- --- --- --- --- -- -- -- --- --- 0.150 MID 6,094 791.00 -- --- -- -- --- --- 0.180 1.50 9,732 791.50 -- --- --- --- -- -- -- -- --- -- 0.200 2.00 13,765 792.00 --- --- -- ••- - -- -- -- --- --- 0.220 2.50 18,226 792.50 -•- --- -•- --- - -- - -- --- -- 0.240 3.00 23,144 793.00 -- --- --- --- - --- - -- -•- -- 0.580 3.50 28,522 793.50 -- --- --- --- - --• -- -- --- - 0.830 4.00 34,360 794.00 -- --- --- --- - --- -- - --- - 1.010 4.50 40,690 794.50 -- --- --- --- - -•- -- - --- - 1.160 5.00 47,547 795.00 -- --- --- --- - --- -- -- -- - 1.300 5.50 54,930 795.5C -- --- --- --- - --- -- -- -- - 1.420 0.00 62,840 796.00 -- --- --- --- - --- -- - -- - 1.530 6.50 71,054 796.5C -- --- --- --- -- --- -- -- - -- 11.06 7.00 79,347 797.CO - --- --- --- --- --- --- -- - --- 44.10 7.50 $7,721 797.50 --- --- --- --- --- --- --- --- - --- 66.50 8.00 96,173 798.00 -- --- --- --- •-- ••- •-- --- - --- 106.62 5 Hydrograph Summary Report ydraflow Hydrographs Extension for Autodesk® Clvll 3DCO2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation 00 Total strge used (cuft) Hydrograph Description 1 SCS Runoff 46.82 2 716 95,009 ...... ------ ------ Post Drainage Area 2 Reservoir i 1.463 I i I 2 I I 842 94,990 I I 1 795.65 57,327 BMP #100 BMP #100.gpw Return Period: 10 Year Tuesday, 10 / 16 / 2018 1.9 Hydrograph Report Hydraflow Hydrographs Exdenslon for Autodesk(DClvll W9 2019 by Autodesk. Inc. v2020 Hyd. No. 1 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 9.760 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 5.10 in Distribution Storm duration = 24 hrs Shape factor Post Drainage Area Q (cfs) Hyd. No. 1 -- 10 Year 50.00 40.00 30.00 20.00 a$xlzoll No I E4 Tuesday. 10 / 16 12018 = 46.82 cfs = 716 min = 95,009 cuft = 78.7 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 50.00 40.00 30.00 POOR RAW 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 Time (min) Hyd No. 1 7 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 2 BMP #100 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation Reservoir name = BMP #100 Max. Storage Storage Indication method used. IMM Tuesday, 10 / 16 / 2018 = 1.453 cfs = 842 min = 94,990 tuft = 795.65 ft = 57,327 cuft Q (cfs) Hyd. No. 2 -- 10 Year Q (cfs) 50,00 50.00 40.00 40.00 30.00 30,00 20.00 20.00 10.00 10.00 0.00� 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 3960 Time (min) Hyd No. 2 —� Hyd No. 1 iLL1L.C.I::J Total storage used = 57,327 cult Hydrograph Summary Re porklydraflow Hydrographs Extension for Autodesk®Civil 3D®2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow lots) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Descrtptlon 1 SCS Runoff 70.52 2 716 145,123 •----• ----- ------ Post Drainage Area 2 i Reservoir I 15.31 2 i 726 i i 145,105 1 796.58 72,121 BMP#100 BMP #100.gpw Return Period: 50 Year Tuesday, 10 116 / 2018 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk® CIA 3D® 2010 by Autodesk, Inc. v2020 Tuesday, 10 / 16 12018 Hyd. No. 1 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 70.52 cfs Storm frequency = 50 yrs Time to peak = 716 min Time interval = 2 min Hyd, volume = 145,123 cuft Drainage area = 9,760 ac Curve number = 78.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 6.80 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 80.00 70.00 50.00 30.00 20.00 10.00 Post Drainage Area Hyd. No. 1 -- 50 Year Q (cfs) 80.00 70.00 50.00 Ezexozll 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 -- Hyd No. 1 Time (min) 10 Hydrograph Report HydreflowHydrog rap hs Extension for AQtodeskOCM I 3D(O 2019 by Autodeak, Inc. v2020 Tuesday, 10 / 1612018 Hyd, No. 2 BMP#100 Hydrograph type = Reservoir Peak discharge = 15.31 cfs Storm frequency = 50 yrs Time to peak = 726 min Time interval = 2 min Hyd. volume = 145,105 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 796.58 ft Reservoir name = BMP#100 Max. Storage = 72,121 cuft Storage Indication method used, Q (Cfs) 80.00 Q (cis) 80.00 70.00 70.00 E 60.00 E60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0,00 0.00 0 360 720 1080 1440 1800 2160 2520 2880 3240 3600 — Time (min) Hyd No. 2 Hyd No. 1 rj_j�[_[j U] Total storage used = 72,121 cuft BMP#100 Hyd. No. 2 -- 50 Year 11 Hydrograph Summary Report ydraflow Hydrographs Exfenslon for Autodesk® Civil 3D02019 by AutndesK, Inc. v2020 Hyd. No, Hydrograph type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SOS Runoff 81.78 2 716 169,472 ------ •--- ---- Post Drainage Area 2 Reservoir 39.33 i 2 722 I I 169,453 i 1 798.93 I I 78,150 BMP #100 BMP #100.gpw Return Period: 100 Year Tuesday, 10 / 16 / 2018 12 Hydrograph Report Hydraflow Hydrographs Extension for Autodesk®CINI 3D@ 2019 by Autodesk, Inc. v2020 Tuesday, 10116 / 2018 Hyd. No. 1 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 81.78 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd, volume = 169,472 cuft Drainage area = 9.760 ac Curve number = 78.7 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 7.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 90.00 80.00 70.00 60,00 50.00 40.00 30.00 20.00 10.00 Post Drainage Area Hyd, No, 1 -- 100 Year Q (cfs) 90.00 80,00 70.00 60.00 50.00 40.00 30.00 20.00 10.00 0.00 _...._...._, 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 1 Time (min) 13 Hydrograph Report Hydraflow Hydrographe Extension for Autodesk® Civil 3M 2019 6y Aulodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd. No, 2 BMP #100 Hydrograph type = Reservoir Peak discharge = 39.33 cfs Storm frequency = 100 yrs Time to peak = 722 min Time interval = 2 min Hyd. volume = 169,453 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 796.93 ft Reservoir name = BMP #100 Max. Storage = 78,150 cuft Storage Indication method used Q (Cfs) 90.00 80.00 7C.00 60,00 50.00 40.00 30.00 20.00 10.00 0.00 0 240 Hyd No. 2 480 720 960 --- Hyd No. 1 BMP #100 Hyd. No. 2 -- 100 Year Q (cfs) 90.00 80.00 70.00 60.00 50,00 40.00 30.00 20,00 10.00 000 1200 1440 1680 1920 2160 'I.a.1,a..L..IJ Total storage used = 78,150 cult Time (min) Pine Forest II Storm Drain/Erosion Control Project Report Sand Filter Fond 200 Analysis Section 6; Water Quality BMP 200 Pine Forest II Statesville, Iredell County, North Carolina Project Number: 2712 August 14, 2018 COMPOSITE SCS RUNOFF CURVE NUMBERS 24 Hour Storm Event Post Sand Filter #200 Soil Type: Cecil Sandy Clay Loam & Hiwassee Fine Sandy Loam - HSG "B" Total Drainage Area = 8.27 ac. Paved Roads/Sidewalk/Structures 3.13 ac. C = 98 Wooded Area C = 60 0.00 ac. Good Grass (>75% coverage) 5.15 ac. C= 61 Newly Graded C = 86 Composite CN (Sand Filter) 75.0 0,00 ac. Project: Pine. Forest ll _ Engineer: R, Joe: Harris& Associates,Inc, Location: StateBaille, North Carolina Date: August 17, 2018. Client: True Homes, LLC - ` By: Jordan Vavrina -- ' BNIP Type.: Surface Sand Filter #200 Required Background Information: 1.0 Drainage Area Size (Area in SF Draining to BMP) 2.0 Impervious Area (Area in SF Draining to BMP) 3.0 % Impervious Area (Imperious Area/DA) Compute Water quality Volume (WQv) " 3603'27. SF 1,360tki SF _ 1.0 Compute Runoff" Coefficient (Rv) using Schueler's Method Rv BMP Equation Rv = 0.05+0.009(I) Where "I" is %Impervious (in percent, not decimal) 2.0 Compute Water Quality Volume (WQv) using Schueler's Method WQv BMP Equation WQv = 1.0RvA/12 Where "A" is Area Draining to BMP in Acres ac-ft =MENEM cu.ft. 3.0 Convert Water Quality Volume (WQv) into Inches of Runoff WQv BMP Equation WQv = 1.0(Rv) = Onsomm inches Compute Water Quality Peak Flow (WQp) 1.0 Compute Modified SCS Curve Number (CN) CN BMP Equation CN = 1000/[10+SP+10WQv-10(WQv^2+1.25QQvP)^0.5] P" is precipitation = 1.0 A. If in Charlotte or Mecklenburg County, run pre and post hydrologic model using 1-inch, 6-hour storm in HEC-1 model output using SCS method B. If In Huntersville, slap tnis section Channel Protection Volume 1.0 Compute Maximum Soil Retention (S) using SCS Methods (CN is Standard Value - Not Modified CN Value) S = 1000{CN-1C . a z v CN Value (Posy) = 10INNATMInches 2.0 Compute Total Runoff for the 1-year, 24-hour Storm Event (Statesville Requirements) Qd = (P-0.2S)12 / (P+0.8S) For Statesville Alt P = Precipitation _ a inches For Char -Meek 2.58 P=1-yr, 24-hr For Statesville 3.02 P = 1-yr, 24-hr 3.0 Compute Watershed Runoff (CPv) CPv = Qd * Area * (1ft/121nches) Area = In Acres of DA Convert to cubic feet = CPv(ac-ft) * 43560 sf/acre Compute Release Rates for Water Quality Control (WQv) and Channel Protection Volume (CPv) These are average release rates (estimates) based on Static Method and should be used as "targets" for routing calculations. 1.0 Compute Release Rate for Water Quality Control {WQv) Rate = (WQv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) _ 11011EM cfs 2.0 Compute Release .Rate for Channel Protection Volume (CPv) Rate = (CPv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = INNERMcfs 1.0 Compute Release Rate for Water Quality Control (WQv) Rate = (WQv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = 51110mcfs 2.0 Compute Release Rate for Channel Protection Volume (CPv) Rate = (CPv ac-ft * 43560 sf/ac)/(Duration * 3600 sec/hr) = 111311M cfs Sedimentation Chamber Volume 1.0 Compute Sediment Chamber Volume (20%af Water Quality Volume) SCvol = (WQv)(43,560 sf/ac;!(0.20) = INNEEMCU.ft. Compute Surface Sand filter Area and Volume to Treat Water Quality Volume (WQv) Duration: 2.0 days (48 hrs) + 3 hours Duration: 1.0 days (24 hrs) + 12 hours +'!,@ hrs :.a Where CPv = WQv ac-ft -CPv ac-ft ac-Ft Duration: 2.0 days (48 hrs) + 3 hours U'; hrs Duration: 1.0 days (24 hrs) + 12 hours 'f= hrs Where CPv = WQvac-ft- CPvac-ft 1.0 Check Surface Sand rllter Area based on Ca rcy's Equation (assumed valus of 1.75 m/hr for the design coefficient cf permeability for the sand filter media) Af = (\MQ,d(dr)/[(k)(hr+df)(tf)] «««««« = INERIMM sq.ft. Surface Area Used = t. sq.ft. Sand Filter Dims @Filter Media - ..�... � Width {ft) Length (ft) filter bed depth (1.5 Minimum) permeability coeff. hf .I`�N,,ft avg. height of water tr-' days filter bed dram time Develop Stage -Discharge for Bioretention Filter Media & BMP Outlet Structure Outflow computed using following equations: Af = (WQv)(df)/[(k)(hr+df)(tf)) Qa = WQv / if Q. = [(Af)(k)(hf+df)]/df Where: Af = surface area of filter bed (sq.ft.)(Required Surface Area) _III&M amsf df = filter bed depth (ft) k = coefficient of permeability of filter media(ft/day) hf = avg. height of water above filter bed (ft) Elevation Contour Area (SF) Depth (Incr.)(ft) Volume (cf) Discharge (cfs) ,:,k .` (l Incr. i Accum. (Filter Media) Comments 786.50 787.S0 ,.rr 4,[F'z..=: 0.0 0 0 788.oO 010 0 0 788.50 `..-$8i7- - 0.5 4255 4255 . 789.00 3431 0.5 4562 8817 13686 789.50 1C046 0.5 4869 790.00 10560 -;.z 0.5 5175 18862 790.50 I 'i344 � 0.5 5501 24363 791.00 I;>....... .2022 '"' 0.5 S843 30206 791.50 127L3 0.5 6185 36392 792.00 33-7, 0.5 6527 42919 792.50 1C' 55 - `- 0,5 6888 49807 793.00 'xa.J`3- 0.5 7267 57074 793.50 7646 64720 72745 Principal Welr 81163 794.00 .Yg¢'29 0.5 8025 794.50 " VF?.44 0.5 8418 795.00 1805E 0.5 8825 89989 Emergency Spillway 795.50 188"'> 0.5 9233 99221 108861 Top of Berm 796.00 .„z I9687 0.5 9640 8. Weir Discharge (cfs) �. Coeff (Cw) (Qj Comments/Notes Stage Elev. Weir Elev. Length (L) Head (H) 788.0 _� 8 0.0c "^ Sides of Weir = 4 EA 788.5 794.00 8 0,0 3.33 Length of Weir= k„ ;,?r ;;�. LF 789.0 794.00 8 0.0 3.33 Length (L) = LF 789.5 794.00 8 0.0 3.33 790.0 794.00 8 0.0 3.33 Cw= Sharp -Crested 3.33 790.5 794.00 8 0.0 3.33 3.33 Broad Crested 3.00 791.0 794.00 8 0.0 791.5 794.00 8 0.0 3.33 792.0 794.00 8 010 3.33 792.5 794.00 8 0.0 3.33 793.0 794.00 8 O.D 0.0 3.33 3.33 793.5 794.00 8 794.0 794.00 8 0.0 3.33 794.5 794.00 8 0.5 3.33 795.0 794.00 8 1.0 3.33 795.5 794.00 8 1.5 3.33 3.33 796.0 794.00 8 2.0 Weir Equation »»> Q=Cw*L*HAE �Imwwwww gm 11 1 1 1 1 rglr-� Sharp -Crested •® ® 1 1 ® qA R34,rXn"r'Tt lot PROJECT: Pine Forest II DATE: 17-Aug-18 PROJECT#: 2712 DESIGNER: J.J.V. DESCRIPTION: Sand Filter#200 ENGINEER: P.L.M. POND STORAGE VOLUME: (CONTOUR' -. -ELEVATION -.INCREMENTAL-- iACCUM.-.'. ELEV. AREA DIFFERENTIAL VOLUME VOLUME FT.) (S.F,) (FT.) (C.F.) (C.F.) 788.00 8.202 0.0 0 0 788.50 8,817 0 5 4.255 4,255 789.00 9,431 1.0 4,562 8,817 789.50 10.046 1.5 4.969 13,686 790,00 M660 2.0 5.176 1U62 790.50 11,344 2.5 5,501 24,363 79LCU 12,029 3.0 5,843 30,206 791.50 12,713 3.5 6,185 36,392 792.00 13,397 4.0 6,527 42,919 792,50 14,155 4.5 6,988 49,807 M.00 14,913 5.0 7,267 57,074 793.50 15.671 5.5 7.646 64,720 794.00 16,429 6.0 8,025 72,745 794.50 17,244 6.5 8.418 81,163 795.00 13,058 7.0 8.825 89989 795.50 13,873 7.5 9,233 99.221 796.00 19,687 8.0 9,640 108,861 ORIFICE FLOW DATA: WEIR FLOW DATA: SPILLWAY FLOW DATA: PROJECT: PROJECT #: DESCRIPTION: Pine Forest It DATE: 17-Aug-18 2712 DESIGNER: J.J.V, Sand Filter #200 ENGINEER: P.L.M. COMBINED FLOW: ELEV. (FT.) ORIFICES WEIRS SPILLWAY Q1 J, C.F,S: TOTAL FLOW C:F.S.) .'. 01. (C.F.S. Q2 (C.F.S.) Q3 (C.F.S.) Q1 (C.F.S.) Q2; (C.F.S.) Q3 (C.F.S.) 788.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 788.5U 0.00 0.00 0.90 0.00 0.00 0.00 0.00 0.00 789.00 0.00 0.00 U0 0.00 0.00 0.00 0,00 0.0O 789.50 0.00 O00 0.00 0.00 0.00 0.00 0.00 0,00 790.00 0,32 0.00 0.00 0.00 0.00 0.05 0.00 0.32 79050 M5 0.00 UX) 0.00 0.00 0.(10 0,00 0.55 791.00 0.70 0,00 0,00 0.00 0.00 0.00 0.00 0.70 791.50 0,83 0.(10 0.00 500 0.00 0.00 0.00 0.83 792.00 0.95 Mi.) 0.00 (WO 0.00 0.00 0.00 0.95 792.50 L04 0,00 0.00 0.00 0.00 0.00 O.(N) LU4 793.00 1,14 fi.0C 0.00 0.00 0.00 0.00 0.00 1.14 793.50 1.22 0.00 0.00 0.00 0.00 0.00 0.00 L22 794.00 1.30 0,00 0.00 0.00 0.00 0.00 0,00 1.30 794.50 1.37 0,00 0.00 0.00 0.00 0.00 0.00 1,37 795.00 1.44 0.00 000 0.00 0.00 0A(l 0.00 1.44 795.50 1.51 0.00 0.00 0.00 0.00 0.00 0.00 L51 796A0 '..58 0.00 0.N) 0.00 0.00 0.00 0.00 1.53 FLiTAL RESULTS: STAGE STORAGE ➢IMyy ,y�jQE In 7B 50 4,255 0.00 799,00 8.817 000 789.50 13,686 0,00 790.0O 18.862 0.32 79O.50 24.363 055 791.00 30,206 0.10 79150 36,392 M3 792.00 42,919 0.95 792.50 49,807 L(i4 793.00 57,074 1,14 793.50 64,720 1.22 794,00 72,745 1.3i) 79450 81,163 1.37 795,00 89,989 1,44 795,5C 99,22( 1,51 796.OL1 i08.861 1,5,1 "ojectr Pine Forest II Engineer:. R.'Joe Harris. & Associates, Inc ovation: Statesville, North Carolina bate: August 17, 201 lient: - True Homes, LLCBy;. Jordan Vavrin MPTypec Surface Sand Filter#200 Verify Diameter of BMP Outlet Pipe (Barrel) Equation for Submerged Orifice = C * A * (2g*h)^0.5 Where: C = U A= see below g= 32.2 ft/s^2 h = headwater over orifice Inputs: Die. of Pipe B'` p ' inches as x2a convert to area In SF = sq.ft. Prindpal Welr GFr MSL (from Surface Sand Filter Design) Media Filter r. B$ti3fi' MSL TVQ, (from Surface Sand Filter Design) got, of Media �a 4 M S L (from Surface Sand Filter Design) Results for Submerged Orifice: (Max Q out of BMP Structure) Orifice Dia = Barrel Discharge Results In CFS Discharge noted as "BMP Out" (see table below) 787�50 tl 00�� h?.zrc rtPj�. rr®.=0 M --- - --RB- Final Stage -Discharge Results If BMP Out value is <than combined flow of Soil Media + Weir, use BMP Out Value for Pond Discharge (BMP Structure Outflow through Riser & Barrel) Project: Pine Forest.11 Engineer:.. R. Jae Harris &Associates, Inc. Location:. Statesville, North. Carolina Date:. .Statesville, North Carolina Client: - .True Homes,: LLC By, Jordan Vavr n,a BMP Type: Surface Sand '.Filter #200'. Size Underdrains for Surface Sand Filter The calculations utilized are taken from the Charlotte -Mecklenburg BMP Design Manual (July 1, 2010 ad,) for sizing of underdrains for bioretention ponds/rain gardens. 1.0 Compute perforation capacity of underdrain pipe, Minimum requirements or guidance as follows; min. pipe diameter equals 6" - underdrains shall be centered 10' max. on center (10' o.c.) - min. slope on underdrain shall be 0.50% assume 4 rows of perforation in pipe (3/8" perforations) reduce perforated pipe length by V for each fitting (cleanouts, tees, wyes) assume 50%of nerforatlons will become clogged and be ineffective Input Data; Total Length of Underdrain Pipe (If) ryr��e °4 Total Number of Fittings (ea);�'��^ Diameter of Pipe (Inches)ASU " Number of Perforations = (Length of Pipe - Fittings)*(4 rows/ft)*(4 holes/row) perforations Actual Perforations Active = Number of Performations * 0.50 (50%) perforations Capacity of One Hole = C*A*(2g*h)AC.5 Where: C= 0.5 _ cts/hole A= 0.000767 (sf) g = 32.2 ft/sA2 L In eft Capacity of Active Perfs. = No. Active Performations * Capacity of One Hole cis (ok if 5 than filter media capacity) cfs (sail media capacity at 0.5' from biorentention design) - if Capacity of Active Performations < Soil Media at 0.50' headwater depth, add additional pipe lenghth Project: Pine Forest 11 Engineer:. R.:loe Harris & Associates, Inc. Location:. ' Statesville, North Carolina bate: August 17, 201E Client: True Homes, LLC F3yr Jordan Vavrinz 6MPType: Surface Sand Filter#200 Verify Sediment Forebay Storage Volume From Sand Filter Design Worksheet, Req. Sediment Forebay Volume = 20V of Water Quality Volume SCvol = (WQv)(43,560sf/ac)(0.20) ME curft. Elevation Contour Area (SF) Depth (Incr.)(ft) Volume(cf) Incr. T Accum. �Yi M: % 0.0 0 0 78&0 1.0 1002 1002 790.0 �' 1.0 1405 2407 791.0 1.0 "871 4278 Storage Volume Water Elevation = Principal Weir Equalized Storage from Sediment Forebay Added to H&H Calculations (added to Sand Filter Volumes) Project: , Pire Forest ll Engineer:. R. Joe Harris & Associates, tnt, Location: r Statesville, North Carolina Date:. August 17, 21013 Client:: True Homes, LLC By: .. Jordan Vavrina eMP Type: :Surface Sand Filter 4200 Water Qualityyolume(WQV) �11716;86,', cu$. POND STORAGE VOLUME: LOCATION' --CONTOUR ELEVATION INCREMENTAL APCUM!- ELEV. .AREA DIFFERENTfAL + VOLUMEVOLUME (S.F.) -: -(FT.I '. IC.F:P-.' ;' (C.F.f Top of 5oll Media/Bottom of Pond 768,00 0 0 788.50 O 4,255 4,255 5 799,00 4,562 8,317 Water Quality Volume W9af A11.34403 Z0 L.+gi 789,50 OS 4,869 13,686 79000 0.7 3,176 16,973 790.50 . 5,501 22,474 791.00 us 3,343 28,317 791.30 12,713 D5 6,185 3 503 792,00 13,357 D3 6,527 41,030 792.50 L435 a5 6,388 47,918 793.00 14,913 0.5 7,267 55,185 793.50 15,671 -05 7,646 62,331 PYIncinal Weir 7, 4.00 16,429 0.5 3,025 70,256 794.50 17,244 05 8,418 79,274 Emergency Spillway 795.00 is,058 0.5 8,825 88,100 795.50 18,873 0.5 91233 97,332 Top of Berm 796,00 19,687 0.5 9,640 1 1 106.971 WIN REQUIRED PROVIDED ELEVATION $AND FILTER 945 SF 1,050 SF 7SS.00 WQV 11,717 CF 11,797 CF 789.31 PEAK CONTROL POST -DEVELOPMENT POST ROUTING STORM EVENT RUNOFF RUNOFF ELEVATION 2YR-24HR 11.13 CFS 0.630 CIS 790.35 10 YR - 24HR 22.27 CFS 1.193 CFS 792.22 50 YR - 24HR 35.17 CFS 2.574 CFS 794.05 IOOYR-24HR 41.41 CFS 7.176 CFS 794.30 Hydrograph Summary RepmrtH ydraflow Hydrographs Extension for AUtodeak®Civil 3DO 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph type (origin) Peak flow (cfs) Time mtervaf (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description SCS Runoff 18.32 2 718 36,538 ---- ------ --•— Post Drainage Area 2 .Reservoir 0.561 2 i I 390 36,542 I i 1 790.21 21,178 i BMP#200 BMP #200,gpw Return Period: 2 Year Tuesday, 10 116 / 2018 Hydrograph Report pq Hydraflow Hydrographs Extension for Autodesk® Civil 30® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 12018 Hyd. No, 1 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 18.32 cfs Storm frequency = 2 yrs Time to peak = 718 min Time interval = 2 min Hyd. volume = 36,638 cult Drainage area = 8.270 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip. = 3.50 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs 21.00 18,00 15.00 12.00 9,00 6.00 3.00 Post Drainage Area Hyd. No. 1 -- 2 Year i Q (cfs) 21,00 18.00 15.00 12.00 • 11 3.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 3 Hydraflow Hydrographs Extena!an for Autodesk® Civil 30® 2019 by Autodesk, Inc. v2020 Tuesday, 10 / 16 / 2018 Hyd, No. 2 BMP #200 Hydrograph type = Reservoir Peak discharge = 0.561 cfs Storm frequency = 2 yrs Time to peak = 890 min Time interval = 2 min Hyd. volume = 36,542 cuft Inflow hyd. No. = 1 - Post Drainage Area Max. Elevation = 790.21 ft Reservoir name = BMP #200 Max. Storage = 21,178 cuff Storage Indication method used Q (cfs) 18.00 15.00 12.00 . 11 W16111 BiVIP #200 Hyd. No. 2 -- 2 Year Q (cfs) 21.00 18.00 15.00 12.00 M M 3.00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4800 5280 Time (min) - «Hyd No. 2 --- Hyd No. 1 Tll..[__f"r Total storage used = 21,178 cuft Pond Report 4 Hydraflow Hydrographs Extension for Autodesk® Civil 3D®2019 by Autodesk, Inc. v2020 Tuesday, 10l 16 / 2018 Pond No. 1 - EIMP #200 Pond Data Contours -User-defined contour areas. Conic method used for volume calculation. Begining Elevation - 788.00 ft Stage / Storage Table Stage (ft) Elevation (ft) Contour area (scift) Incr. Storage (tuft) Total storage (tuft) 0-00 788.00 8,202 0 0 0.50 738.50 8,817 4,253 4,253 1.00 789,00 9,431 4,561 8,814 1.50 789.50 10,046 4,868 13,682 2.00 790.00 10,660 5,175 18,857 2.50 790.50 11,344 5,500 24,367 3.00 791.00 12,029 5,842 30,199 3.50 791.50 12,713 6,184 36,383 4.00 792.00 13,397 6,526 42,909 4.50 79250 14,155 6,886 49,795 5.00 793,00 14,913 7,265 57,061 5.50 793.50 15,671 7,644 64,705 6.00 794.00 18,429 8,023 72,729 6.50 794.50 17,244 8,417 81,145 7.00 795.00 18,058 8,324 89,969 7.50 795.50 16.873 9,231 99,200 8.00 796.00 19,687 9,638 108,839 Culvert / Orifice Structures Weir Structures [A] [Ell CC] [PrfRsr] [A] [B] [C] [D] Rise (in) = 0.00 0.00 0.00 0.00 Crest Len (fit) = O.Co 0.00 0.00 0.00 Span (in) = 0.00 0.00 0.00 0.00 Crest El. (ft) = 0.00 0.00 0.00 0.00 No. Barrels = 0 0 0 0 Weir Coeff. = 3.33 3.33 3.33 3.33 Invert El. (ft) = Me ON 0.00 0,00 Weir Type = 1 -- -- --- Length (ft) = 0,00 1.00 0.00 0,00 Multi -Stage = Yes No No No Slope (%) = 0.00 0.00 0.00 Na N-Voluo = .013 .013 .013 n/a Orifice Coeff, = 0.60 0.60 0.60 0,60 Exfil.(in/hr) = MOO (by Contour) Multi -Stage = n/a No No No TW Elev. (ft) = 0.00 Note: auPreNOrifice outflows are snaiyzed under inlet(Ia) a0d outlat(cc) corhoi. Weir risers checked far orifice conditions (is) and submergenea(s). Stage / Storage I Discharge Table Stage Storage Elevation CIvA CIv5 CIvC PrfRsr WrA WrB WrC WrD Exfil User Total ft tuft ft cfs cfs cfs cfs cfs cfs cfs cfs cfs cfs cis 0.00 0 788.00 -- --- --- - --- --- --- -- --- - 0-000 0.50 4,253 788,50 -- --- --- -- --- --- --- -- --• 0.100 0.100 1.00 8,814 789.00 --- _-- -- --- --- --- -- .._ __ 0.110 0.110 1.50 13,682 789.50 --- --- --- -- -__ _._ _. 0.130 0.130 2.00 18,857 790.00 --- -- --- --- --- -- --- --- -- 0.460 0.460 2.5C 24,357 79050 -- -- --- --- --- .._ -- .-- -- 0.700 0.700 3.00 30,199 791.00 --- -- --- _-_ -_- ... -- _-- - 0.870 0.870 150 36,383 791.50 --- --- _•• .-_ -_. _-- -- --- -- 1.020 1.020 4.00 42, 909 792.00 --- --- --- .-. --- ___ --- - 1.140 1A40 4.50 49,795 792,50 --- --- --- --- ... _-_ -- _-- -- 1.260 1.260 5.00 57.061 793.00 --- --- --- ___ ... ___ __ ___ 1.360 1,$60 5.50 64,705 793.50 --- --- --- .- --- --- -- 1.460 1.460 6.00 -2,729 794.00 --- --- --- -- --- --- -- -.- -- 1.550 1.550 6.50 81,145 794.50 --- --- -- --- --- --- -- --- --- 11.06 11.06 7.00 89,969 795.00 --. --- -- --- --- --- -- --- - 24,81 24.81 7.50 99,200 795.60 --• --- - --- --- --- -- --- - 46.74 46.74 8.00 '108,839 796,00 --- --- -- --- .-- -_ -- --- -- 86.23 86.23 Hydrograph Summary Re po l lydraflow Hydrographs Extenslon for Autodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. Hydrograph typo (origin) Peak flow lots) Time interval (min) Time to Peak (min) Hyd. volume (tuft) Inflow hyd(s) Maximum elevation (ft) Total strge used (tuft) Hydrograph Description 1 SCS Runoff 35.27 2 716 71,221 ----- ------ ------ Post Drainage Area 2 Reservoir i 1.126 2 i 844 71,070 I 1 791.94 42,160 BMP#200 BMP #200.gpw Return Period: 10 Year Tuesday, 10 / 1612018 Hydrograph Report 6 Hydraflow Hydrographs Extension for Autodesk@ Civil 3M 2019 by Autodesk, Inc, v2020 Tuesday, 10 / 18 / 2018 Hyd. No. 1 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 35.27 cfs Storm frequency = 10 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 71,221 cult Drainage area = 8.270 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = Oft Tc method = User Time of cone. (Tc) = 5.00 min Total precip. = 5.10 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Post Drainage Area Q (cfs) Hyd. No. 1 -- 10 Year Q (cfs) 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 1560 Hyd No. 1 Time (min) Hydrograph Report 7 Hydraflow Hydrographs Extension for AutodeskV Civil 3D@ 2019 by Autodeak, Inc. v2020 Hyd. No. 2 BMP #200 Hydrograph type = Reservoir Peak discharge Storm frequency = 10 yrs Time to peak Time interval = 2 min Hyd. volume Inflow hyd. No. = I —Post Drainage Area Max. Elevation Reservoir name = BMP #200 Max. Storage Storage Indication method used. BIVIIP #200 Tuesday, 10 / 1812018 = 1.126 efs = 844 min = 71,070 cuft = 791.94 ft = 42,150 cuft Q (Cfs) Hyd. No. 2 10 Year Q (of$) 40.00 40.00 30.00 30.00 20.0C 20.00 4- 10.00 10.00 0,00 0.00 0 480 960 1440 1920 2400 2830 3360 3840 4320 4800 5280 — ime (min) Hyd Na.No2 —Hyd No. 1 1111A ,11Total storage used 42,150 cuft H yd rog ra p h Summary Repo rt ydraflow Hydrographs Extension for Autodesk® Civil 300 2019 by Autodesk, Inc. v2020 Hyd. No. 1,Hydt,,Yop h type (origin) Peak flow (cfs) Time interval (min) Time to Peak (min) Hyd. volume (cult) Inflow hyd(s) Maximum elevation (ft) Total strge used (cuft) Hydrograph Description 1 SCS Runoff 54.93 2 716 111,835 ------ -- ---- Post Drainage Area 2 i Reservoir i i 1.820 i 2 870 f 111,386 1 793.83 70,036 BMP#200 BMP #200.gpw Return Period: 50 Year Tuesday, 10 / 16 12018 Hydrograph Report M Hydraflow Hydrographs Extension for Aulodesk® Civil 3D® 2019 by Autodesk, Inc. v2020 Hyd. No. 1 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge Storm frequency = 50 yrs Time to peak Time interval = 2 min Hyd. volume Drainage area = 8.270 ac Curve number Basin Slope = 0.0 % Hydraulic length Tc method = User Time of conc. (Tc) Total precip. = 6.80 in Distribution Storm duration = 24 hrs Shape factor Q (cfs) 60.00 50.00 40.00 30.00 20,00 10.00 Post Drainage Area Hyd. No. 1 -- 50 Year Tuesday, 10 / 16 / 2018 = 54.93 cfs = 716 min = 111,835 cuft = 75 = 0 ft = 5.00 min = Type II = 484 Q (cfs) 60.00 , 30.00 20.00 10.00 0.00 0.00 0 120 240 360 480 600 720 840 960 1080 1200 1320 1440 — Hyd No. 1 Time (min) Hydrograph Report 10 Hydraflow Hydrographs Extension for AutodeskQ)C I vII 3D@ 2019 byAutodesk, Inc. v2020 Tuesday, 10 / 16 12018 Hyd. No. 2 BMP #200 Hydrograph type = Reservoir Peak discharge = 1.520 efs Storm frequency = 50 yrs Time to peak = 870 min Time interval = 2 min Hyd. volume = 111,586cuft Inflow hyd. No. = 1 - Post Drainage Area Max, Elevation = 79183 ft Reservoir name = BUIP #200 Max. Storage = 70,036 cult Storage Indication meftil used BIVIP #200 Hyd, No. 2 -- 50 Year 60.00 50.00 40.00 3C.00 20.00 10.00 0.00 Q (cfs) 60.00 &1111#101 40,00 30.00 20.00 10.00 j 4bU utju 1440 1920 2400, 2880 3360 3840 4320 4800 5280 — Time (min) Hyd No. 2 — Hyd No. 1 ETTHLI 11 Total storage used = 70,036 cult 11 H yd ro g ra p h Summary Re port ydreflow Hydrographs Extension for Autodesk® Civil 3DO2019 by Autodesk, Inc. v2020 Hyd. No, Hydrograph type (orlom) Peak flow (afs) Time interval (min) Time to Peak (min) Hyd. volume (cuff) Inflow .hyd(s) Maximum elevation A Total strge used (tuft) Hydrograph Description 1 SCS Runoff 64.38 2 715 131,777 ... ...... ------ Post Drainage Area 2 Reservoir 4.467 I 2 754 131,504 i 1 794,15 I 75,310 BMP#200 BMP #200.gpw Return Period: 100 Year Tuesday, 10 / 16 / 2018 Hydrograph Report 12 Hydraflow Hydrographs Extension for AutodeskO CMI 300 2019 by Autodesk. Inc. v2020 Tuesday, 10116 12018 Hyd. No. 1 Post Drainage Area Hydrograph type = SCS Runoff Peak discharge = 64.38 cfs Storm frequency = 100 yrs Time to peak = 716 min Time interval = 2 min Hyd. volume = 131,777 cuft Drainage area = 8.270 ac Curve number = 75 Basin Slope = 0.0 % Hydraulic length = 0 ft Tc method = User Time of conc. (Tc) = 5.00 min Total precip, = 7.60 in Distribution = Type II Storm duration = 24 hrs Shape factor = 484 Q (cfs) 70,00 50.00 30.00 20.00 10.00 Post Drainage Area Hyd. No. 1 --100 Year Q (cfs) 70.00 50.00 40.00 30.00 20.00 10.00 0.00 0.00 0 12C 240 360 480 600 720 840 960 1080 1200 1320 Hyd No. 1 Time (min) Hydrograph Report 13 Hydraflow Hydrographs Extension for Autodesk(IDCNII 3D@ 2019 by AutodesK, Inc. v2020 Tuesday, 10 / 16 12018 Hyd. No. 2 BMP #200 Hydrograph type = Reservoir Peak discharge = 4.467 ofs Storm frequency = 100 yrs Time to peak = 754 min Time interval = 2 min Hyd. volume = 131,504 cult Inflow hyd. No. = I - Post Drainage Area Max. Elevation = 794.15 ft Reservoir name = BMP#200 Max. Storage = 75,310 tuft Storage Indication method used BIVIP #200 Q (Cfs) Hyd. No. 2 100 Year Q (Cfa) 70.00 70,00 60.00 60.00 50.00 50.00 40.00 40.00 30.00 30.00 20.00 20.00 10.00 10,00 0.00 0.00 0 480 960 1440 1920 2400 2880 3360 3840 4320 4300 � Time (min) Hyd No. 2 — Hyd No. 1 Tj I I-fr� Total storage used = 75,310 cuff