Loading...
HomeMy WebLinkAboutSW6190508_Supplement EZ Form_20190806SUPPLEMENT-EZ COVER PAGE LOAD SUPPLEMENT FORMS PROJECT INFORMATION 1 Project Name SOF Battalion Administration Facility 2 Project Area (ac) 9.55 3 Coastal Wetland Area (ac) N/A 4 Surface Water Area (ac) N/A 5 Is this project High or Low Density? High 6 Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided (feet) N/A 8 Will the vegetated setback remain vegetated? No 9 Is BLIA other that ns listed in 1003(4)(o d) out of the netbnnk? Yes 10 Is streambank stabilization proposed on this project? No NUMBER AND TYPE OF SCMs: 11 Infiltration System 0 12 Bioretention Cell 4 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 Sand Filter 0 17 Rainwater Harvesting (RWH) 0 18 Green koof 0 19 Level Spreader -Filter Strip (LS-FS) 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale 0 22 Dry Pond 0 23 IStormFilter 0 24 Silva Cell 0 25 Bayfilter 0 26 Filterra 0 LOAD SUPPLEMENT FORMS DESIGNER CERTIFICATION 27 Name and Title: Robert L. Day, PE Principal 28 Organization: Cyntergy ?R Street address 810 S Cinninnati Second Floor 30 City, State, Zip. Tulsa, OK 74119 31 Phone number(s): 918,877.6000 32 Email: rday@cyntergy.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. IIIII1 00" Seal Signature of t- 6(l Date BIORETENTION CELL 1 Drainage area number 1 2 3 4 2 Design volume of SCM (cu ft) 1748 cf 1544 cf 692 cf 1614 cf GENERAL MDC FROM 02H.1050 3 Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes Yes Yes 4 Is the SCM located away from contaminated soils? Yes Yes Yes Yes 5 What are the side slopes of the SCM (H:V)? 3:1 3:1 3:1 3:1 6 Does the SCM have retaining walls, gabion walls or other engineered side slopes? No No No No 7 Are the inlets, outlets, and receiving stream protected from erosion (10- year storm)? Yes Yes Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes Yes Yes 9 10 What is the method for dewaterinq the SCM for maintenance? If applicable, will the SCM be cleaned out after construction? Other Yes Other Yes Other Yes Other Yes 11 12 Does the maintenance access comply with General MDC (8)? Does the drainage easement comply with General MDC (9)? y.0 rz.a. Yes Yes Yes Yes Yes Yes Yes Yes 13 If the SCM Is on a single family lot, does (will?) the plat comply with General MDC (10)? Yes Yes Yes Yes 14 Is there an O&M Agreement that complies with General MDC (11)? Yes es Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes es Yes 16 Does the SCM follow the device specific MDC? Yes HE es Yes 17 as the M designed by an N licensed professional? es es es BIORETENTION CELL MDC FROM 02H .1052 18 SHWT elevation (fmsl) 264.50 263.00 250.00 254.00 19 Bottom of the bioretention cell (fmsl) 261.60 260.15 261.75 259.75 20 Ponding depth of the design storm (inches) gin 9 in 9 in gin 21 Surface area of the bioretention cell (square feet) 4283 sf 2947 sf 2212 sf 3421 sf 22 Design volume of the bioretention cell (cubic feet) 3212 cf 2210 cf 1659 cf 2565 cf 23 Is the bioretention cell used for peak attenuation? No No No No 24 Depth of peak attenuation over planting surface (in) in in in in 25 Height of peak attenuation outlet above the planting surface (in) in in in in 26 Infiltration rate of the in situ soil (inch/hour) 0.003 0.003 0.003 0.003 27 Diameter of the underdrain pipes (if applicable) 8 in 6 in 8 in 6 in 28 Does the design include Internal Water Storage (IWS)? Yes Yes Yes Yes 29 if so, elevation of the top of the IWS (fmsl) 258.5 256.5 257.12 255.71 30 Elevation of the planting surface (fmsl) 261.6 261 262 260 31 What type of vegetation will be planted? (grass, trees/shrubs, other)? Grass Grass Grass Grass 32 Media depth (inches) 30 in 30 in 30 in 30 in 33 Percentage of medium to coarse washed sand by volume 85% 85% 85% 85% 34 Percentage of fines (silt and clay) by volume 10% 10% 10% 10% 35 rercentogo of organic matter by volume 5% 6% 9% r,% 36 Type of organic material Engineered Fill Fame same came 37 Phosphorus Index (P-Index) of media (unitless) 10 10 10 10 38 Will compaction be avoided during construction? Yes Yes Yes Yes 39 Will cell be maintained to a one inch/hour standard? Yes Yes Yes Yes 40 41 Depth of mulch if applicable (inches) Type of mulch, if applicable N/A N/A N/A N/A N/A N/A N/A N/A 42 1 How many clean out pipes are being installed? 4 1 2 1 2 4 43 IType of pretreatment that will be use a Ii6e 44 bame I bame bame ADDITIONAL INFORMATION Please use this space to provide any additional information about the 44 bioretention cell(s): 43. Minimum 3' sod strip. All outlet headwalls to cell have rip -rap outlet protection per NCDEQ requirements. The project is located in Fort Bragg (North Carolina Army Installation). The soil media will not be mechanically compacted. All bioretention areas will be sodded. Mulch is not allowed by the user due to maintenance issues. The emergency spillway Is designed for each cell to handle the entire flow from the I00-year storm event in case of failure of the primary outfall and storage within each basin. Bioretention 1 2:15 PM 7/1/2019 Discrete SCS Curve Number Method (NCDEQ Sormwater BMP Manual 3.3.2) Location: Bioretention Area 1 Soil Group B Predevelopment BUA Area 0.07 acres Area 2,981.83 sf CN* 98 S 0.2 la 0.04 in P 1 In Q 0.79 in V 196.3 cf Predevelopment Open Area Area 1.13 acres Area 49,231.13 sf CN* 60 S 6.67 la 1.33 in P 1 in Q 0.02 in V 0 cf Area I 1.20 acres Total 1 196.30 cf Date 07/03/2019 Developed BUA Area 0.68 acres Area 29,530.22 sf CN* 98 S 0.2 la 0.04 in P 1 in 0 0.79 in V 1944.07 cf Developed Open Area Area 0.52 acres Area 22,682.74 sf CN* 69 S 4.49 la 0.9 in P 1 in Q 0 in V 0 of Area I 1.20 acres Total I 1,944.07 cf Storage Required CIF 1,747.77 Surface Area SF 4,283 Riser IN 9 Storage Provided CIF 3,212.3 Note: Runoff Depth for CN <= 60 set to 0.00 for 1.0" rainfall event. * Composite CN calculated using Army LID Planning and Cost Tool Developed by USACE Baltimore District and USACE ERDC Discrete SCS Curve Number Method (NCDEQ Sormwater BMP Manual 3.3.2) Location: Bioretention Area 2 Soil Group B Predevelopment BUA Area 0.00 acres Area 0.00 sf CN* 98 S 0.2 la 0.04 in P .. 1 in . Q 0.79 in V 0 cf Predevelopment Open Area Area 0.78 acres Area 33,986.00 sf CN* 60 S 6.67 la 1.33 in P 1 in Q 0.02 in V 0 Of Area 1 0.78 acres Total I 0.00 cf Date 07/03/2019 Developed BUA Area 0.54 acres Area 23,450.00 sf CN* 98 S 0.2 la 0.04 In P 1 in Q 0.79 in V 1543.79 cf Developed Open Area Area 0.24 acres Area 10,536.00 sf CN* 69 S 4.49 la 0.9 in P 1 in Q 0 ffl V 0 Area I 0.78 acres Total 1 1,543.79 1 cf Storage Required CF 1,543.79 Surface Area SF 2,947 Riser IN 9 Storage Provided CF 2,210.3 Note. Rurwff Depth fur CN <= 60 set to 0.00 fur 1.0" rainfall event. * Composite CN calculated using Army LID Planning and Cost Tool Developed by USACE Baltimore District and USACE ERDC Discrete SCS Curve Number Method (NCDEQ Sormwater BMP Manual 3.3.2) Location: Bioretention Area 3 Soil Group B Predevelopment BUA Area 0.07 acres Area 2,981.83 sf CN* 98 S 0.2 la 0.04 in P 1 in 0.19 in V 196.3 cf Predevelopment Open Area Area 0.53 acres Area 23,053.12 sf CN* 60 S 6.67 la 1.33 in P 1 in Q 0.02 in V 0 of Area 1 0.60 acres Total 1 196.30 cf Date 07/03/2019 Developed BUA Area 0.31 acres Area 13,486.31 sf CN* 98 S 0.2 la 0.04 In P 1 in Q 0.79 In V 887.85 cf Developed Open Area Area 0.29 acres Area 12,548.64 sf CN* 69 S 4.49 la 0.9 in P 1 in Q 0 in V 0 of Area I 0.60 acres Total 1 887.851 cf Storage Required CIF 691.55 Surface Area SF 2,212 Riser IN 9 Storage Provided CIF 1,659.0 Note. Rufiuff Depth fur CN <= 60 set to 0.00 fur 1.0" rainfall event * Composite CN calculated using Army LID Planning and Cost Tool Developed by USACE Baltimore District and USACE ERDC Discrete SCS Curve Number Method (NCDEQ Sormwater BMP Manual 3.3.2) Location: Bioretention Area 4 Soil Group B Predevelopment BUA Area 0.14 acres Area 6,020.00 sf CN* 98 S 0.2 la 0.04 In P 1 ill Q 0.79 in V 396.32 cf Predevelopment Open Area Area 1.21 acres Area 52,881.49 sf CN* 60 S 6.67 la 1.33 in P 1 in Q 0.02 in V 0 of Area I 1.35 acres Total 1 396.321 cf Date 07/03/2019 Developed BUA Area 0.70 acres Area 30,533.77 sf CN* 98 S 0.2 la 0.04 In P 1 in Q 0.79 in V 2010.14 cf Developed Open Area Area 0.65 acres Area 28,367.72 sf CN* 69 S 4.49 la 0.9 in P 1 in Q 0 in V 0 of Area 1 1.35 acres Total I 2,010.14 cf Storage Required CF 1,613.82 Surface Area SF 3,421 Riser IN 9 Storage Provided CIF 2,565.8 Note: Runoff Depth for GN <= 60 set to 0.00 for 1.0" rainfall event. * Composite CN calculated using Army LID Planning and Cost Tool Developed by USACE Baltimore District and USACE ERDC