Loading...
HomeMy WebLinkAboutSW5190201_AddInfo_20190514ROY COOPER Governor MICHAEL S. REGAN Secretary S. DANIEL SMITH Interim Director Mr. David H. Blevins, PE Development Engineering, Inc. 244 W. Millbrook Road Raleigh, NC 27609 NORTH CAROLINA Environmental Quality May 14, 2019 Subject: Request for Additional Information Stormwater Permit No. SW5190201 Cambridge Southeast Estates Chatham County Dear Mr. Blevins: The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on February 28, 2019. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. In Section 10 of the application, the proposed impervious area in the two tables don't match. The first table states that the proposed impervious area is 71,560 sf and the second states that it is 76,830 (excluding existing). If the actual impervious surface is 76,830 sf, the total BUA will be over 7% and will trigger local peak flow requirements according to the stormwater narrative. 2. The narrative states that no local peak flow requirements apply. State regulations do not require mitigation of peak flows and the low density regulations promote diffuse flow and vegetated conveyances. Therefore, the dry ponds are not necessary, unless the actual proposed BUA exceeds 7% as a result of the previous comment. 3. If the dry ponds are to remain on the plan, the maintenance agreement must be signed and notarized. 4. Please complete all applicable sections of the low density supplement and provide calculations for the swales showing that they will not erode during the 10-year storm. 5. Please provide calculations for any outlet showing that the rip rap apron is designed to prevent erosion during the 10-year storm. DNorth Carolina Department of Environmental Quality I Division of Energy, Mineral and Land Resources E Q�� _ 512 North Salisbury Street 1 1612 Mail Service Center I Raleigh, North Carolina 27699-1612 NORTH CAROLINA Department or Emironmeatal mail� 919.707.9200 6. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets, and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: hqps:Hedocs.deg.nc.gov/Forins/SW ProjectSubmittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to June 13, 2019, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW5190201 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey.Anen&ncdenr.gov or (919) 707-3649. Sincerely, Corey Anen Environmental Engineer Stormwater Program cc: Raleigh Regional Office