Loading...
HomeMy WebLinkAboutSW6190504_SuppEZ- REV19July2019_7/22/2019SUPPLEMENT-EZ COVER PAGE FORMS LOADED PROJECT INFORMATION 1 Project Name Project Area ac Hoke Coun Coop±rative Extension Office Building 2 5.4 acres 3 Coastal Wetland Area ac 0 acres 4 Surface Water Area ao 0 acres 5 Is this project High or Low Density? High 6 1 _ Does this project use an off -site SCM? No COMPLIANCE WITH 02H .1003(4) 7 Width of vegetated setbacks provided feet NA 8 Will the vegetated setback remain vegetated? Yes 9 Is BUA other that as listed in .1003 4 c-d out of the setback? Yes 10 Is streambank stabilization proposed on this project? Yes NUMBER AND TYPE OF SCMS: 11 Infiltration System 2 12 Bioretention Cell 0 13 Wet Pond 0 14 Stormwater Wetland 0 15 Permeable Pavement 0 16 _ Sand Filter 0 17 Rainwater Harvesting RWH 0 18 Green Roof 0 19 Level Spreader -Filter Strip (IS-FS 0 20 Disconnected Impervious Surface (DIS) 0 21 Treatment Swale Dry Pond StormFilter Silva Cell _ Bayfilter 0 22 0 23 0 24 0 25 _ 0 0 26 Filterra FORMS LOADED DESIGNER CERTIFICATION 27 Name and Title: Blair Pittman, PE 28 Organization: Bobbin Design Build, Inc. 29 Street address: 600 Germantown Road 30 City, State, Zip: Raleigh, NC 27607 31 Phone number(s): Email: 919 851-1980 32 bpittman@bobbitt.com Certification Statement: I certify, under penalty of law that this Supplement-EZ form and all supporting information were prepared under my direction or supervision; that the information provided in the form is, to the best of my knowledge and belief, true, accurate, and complete; and that the engineering plans, specifications, operation and maintenance agreements and other supporting information are consistent with the information provided here. 19 Date DRAINAGE AREAS 1 Is this a hi h densi roject? Yes 2 if so, number of drainage areaslSCMs 2 3 Is alUpart of this project subject to previous rule versions? No FORMSLOADED DRAINAGE AREA INFORMATION Entire Site 4 Type of SCM NA 5 Total BUA in project (sq ft 265355 sf 6 New BUA on subdivided lots (subject to permitting) ft 7permitting) New BUA outside of subdivided lots (subject to s 60755 sf 8 Offsile - total area (sq ft 9 Offske BUA (sq ft 10 Breakdown of new BUA outside subdivided lots: - Parkin ft 38590 sf Sidewalk ft 6165 sf Roof ft 16000 sf - Roadwa ft - Future ft - Other, please specify in the comment box below ft 11 New infiltrating permeable pavement on subdivided lots ft 12 New infiltrating permeable pavement outside of subdivided lots ft 13 1 Exisitng BUA that will remain (not subject to permittin ft 204600 sf 14 Existing BUA that is already permitted (sq ft 15 Existing 8UA that will be removed ft 16 Percent BUA 31% 17 Design storm inches 1 in 18 Desi n volume of SCM(Cu ft 19 Calculation method for design volume ADDITIONAL INFORMATION _ Please use this space to provide any additional information about the 20 1drainage area(s): INFILTRATION SYSTEM 1 Drainage area number 1 2 2 j Design volume of SCM (cu ft) 3724 cf 4040 cf OlNERAL MM FRUM U2M .IUSU Is the SCM sized to treat the SW from all surfaces at build -out? Yes Yes 3 4 Is the SCM located away from contaminated soils? Yes Yes 5 What are the side slopes of the SCM (H:V)? Does the SCM have retaining walls, gabion walls or other engineered side slopes? Are the inlets, outlets, and receiving stream protected from erosion (10-year storm)? 3:1 3:1 6 No No 7 Yes Yes 8 Is there an overflow or bypass for inflow volume in excess of the design volume? Yes Yes 9 What is the method for dewatering the SCM for maintenance? Pump (preferred) Pump (preferred) 10 If applicable, will the SCM be cleaned out after construction? Yes Yes 11 Does the maintenance access comply with General MDC (8)? Yes Yes 12 Does the drainage easement comply with General MDC (9)? 13 If the SCM is on a single family lot, does (will?) the plat comply with General MDC (10)? 14 Is there an O&M Agreement that complies with General MDC (11)? Yes Yes 15 Is there an O&M Plan that complies with General MDC (12)? Yes Yes 16 Does the SCM follow the device specific MDC? Yes Yes 17 Was the SCM designed by an NC licensed professional? Yes Yes RL ON SYSTEM MDC FROM 021-1.1051 18 Proposed slope of the subgrade surface (%) 0% 0% 19 Are terraces or baffles provided? No No 20 Type of pretreatment: Other Other i!!s Data Was the soil investigated in the footprint and at the elevation of the infiltration 21 system? SHWT elevation (fmsl) Depth to SHWT per soils report (in) Yes Yes 22 245.50 NONE FOUND 23 42.00 NONE FOUND 24 Ground elevation at boring in soils report (fmsl) 249.00 250.00 25 Is a detailed hydrogeologic study attached if the separation is between 1 and 2 feet? 26 Soil infiltration rate (in/hr) 2.00 2.00 27 1 Factor of safety (FS) (2 is recommended): 2.00 2.00 29 Bottom elevation (fmsl) 247.5 ft 247 It 30 IStorage elevation (fmsl) 248.5 ft 248. ft 31 1 Bypass elevation (fin 248.5 ft 248 ft For Basins only 32 Bottom surface area, ftz: 2962 ft 3172 ft 33 Storage elevation surface area (ft) 4855 ft 4977 ft %r 'trenches Only 34 35 Length (ft) Width (ft) 36 Perforated pipe diameter, if applicable (inches) 37 Number of laterals 38 Total length of perforated piping 39 Stone type, if applicable 40 Stone void ratio (%) Is stone free of fines? N4341 42 Is the stone wrapped in geotextile fabric? Has at least one infiltration port been provided? Volumes/Drawdown 44 Design volume of SCM (cu ft) 45 Time to drawdown (hours) ADDITIONAL INFORMATION ��..... Please use this space to provide any 46 system(s): Infiltration 3 1:46 PM 7/22/2019