Loading...
HomeMy WebLinkAboutSW5190201_2019-07-12 NCDEQ Storm Ditch Calculations_7/16/2019DITCH/CHANNEL CALCULATIONS SUB DA PERMISSIBLE CALCULATED STREET STATION A Q10 SLOPE V10 DEPTH LINER * SHEAR STRESS SHEAR STRESS Left (LT) 0+00 to end FROM TO (Ac) (CFS) M (FPS) (FEET) (PSF) (PSF) HOWARD COURT LT 0+00 1+00 0.14 0.32 3.00 0.85 0.16 GRASS 4.000 0.300 LT 1+00 2+00 0.35 0.81 3.00 1.28 0.25 GRASS 4.000 0.470 LT 2+00 3+00 0.66 1.52 4.00 1.94 0.30 GRASS 4.000 0.750 LT 3+00 3+50 0.86 2.11 4.00 2.22 0.35 GRASS 4.000 0.880 LT 6+50 6+00 0.15 0.60 4.00 1.30 0.19 GRASS 4.000 0.480 LT 6+00 5+00 0.37 1.28 4.00 1.81 0.28 GRASS 4.000 0.690 LT 5+00 4+00 1.05 3.11 4.00 2.60 0.42 GRASS 4.000 1.050 LT 4+00 3+55 1.65 4.65 4.00 3.05 0.51 GRASS 4.000 1.260 LT 6+50 7+00 0.34 1.23 4.00 1.78 0.27 GRASS 4.000 0.680 LT 7+00 8+00 0.64 2.13 4.00 2.23 0.35 GRASS 4.000 0.880 LT 8+00 8+30 0.68 2.36 4.00 2.33 0.37 GRASS 4.000 0.920 LT 8+30 9+00 0.17 0.59 4.00 1.29 0.19 GRASS 4.000 0.480 LT 9+00 9+75 0.36 1.20 4.00 1.76 0.27 GRASS 4.000 0.670 Pipe Discharge Swale 1 FES #16 End 1.98 5.68 2.40 2.17 0.56 GRASS 4.000 1.010 Pipe Discharge Swale 2 FES #24 End 0.67 2.17 2.00 1.34 0.39 GRASS 4.000 0.480 Road Discharge Swale 3 9+75 End 0.45 1.40 5.50 1.88 0.21 GRASS 4.000 0.710 * NAG = NORTH AMERICAN GREEN OR EQUIVALENT SEE ENCLOSED CHANNEL ANALYSIS