Loading...
HomeMy WebLinkAboutSW6190604_Planset_20190627E3 ALPHIN ROAD GLEN E PAGE R 0 AD- SITE No WOOD ROAD 95 0 O n- z Q c� NORTH VICINITY MAP NOT TO SCALE EXISTING UTILITY OWr%-� IV 1l1/ATL� .z�l -1/1.0mapil YYNICR '- I Y HARNETT COUNTY DEPARTIVI 700 McKinney Parkway Lillington, North Carolina 27546 910-893-7575 Contact: Shane Cummings, PE Know what's below. Call before you dig. ENT OF PUBLIC UTILITIES W. CIVIL ENGINEER 4D SITE SOLUTIONS, INC. 409 Chicago Drive - Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Scott Brown, PE email: sbrown@4dsitesolutions.com LE SURE POOLS STORAGE YARD TE [DEVELOPMENT PLANS h._ AVERASBORO TOWNSHIP DUNN, NORTH CAROLINA COUNTY a°�°:eHARNETT 4 � an INDEX3OF DRAWINGS C1.0 - EXISTING CONDITIO C2.0 - SITE/LANDSCAPE PLANAIMMM,,.. C3.0 - GRADING AND EROSION CONTROL PLAN - SITE DETAILS C4.1 - C4.2 - EROSION CONTROL DETAILS __..�..rivit-M:_tam mile W1L-_.. OWNER/DEVELOPER PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 865-312-7469 Contact: Dan Morse email: dan.morse@leisurepoolscorporate.com X gRzS \ X SURVEYOR 4D SITE SOLUTIONS, INC. 409 Chicago Drive -Suite 112 Fayetteville, North Carolina 28306 910-426-6777 Contact: Jimmy Holland, PLS email: jholland@4dsitesolutions.com CARpi% 4 aAIL r 457 - F.,••sup .. � . ''''�1 R ilS"������ 06--20-J", b5-1b • iq �•�:�F O'•.' Q SEA ' 02 4 - OTT ��ll1I1111�� 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME LEISURE POOLS STORAGE YARD TAX I D# 1514-06-7954.000 BUD HAWKINS ROAD AVERASBORO TOWNSHIP NEAR DUNN HARNETT COUNTY NORTH CAROLINA CLIENT PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 Phone: (865) 312-7469 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1492 DRAWING SCALE SEE SHEETS DATE RELEASED MAY 20, 2019 THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED UTILITY NOTES 16. THE WATER MAIN(S), FIRE HYDRANTS, GATE VALVES, SERVICE LINES, METER SETTERS 8:00 AM - 5:00 PM MONDAY THROUGH FRIDAY. HOLIDAY AND WEEKEND WORK IS NOT SERVICE LATERAL THAT WILL BE CONNECTED TO A RESTAURANT, FOOD PROCESSING AND ASSOCIATED APPURTENANCES MUST BE RATED FOR 200 PSI AND PERMITTED BY HCDPU. FACILITY AND ANY OTHER COMMERCIAL OR INDUSTRIAL FACILITY AS REQUIRED BY THE WATER HYDROSTATICALLY PRESSURE TESTED TO 200 PSI. THE HYDROSTATIC PRESSURE 3. THE PROFESSIONAL ENGINEER (PE) SHALL PROVIDE HCDPU WITH A SET OF NCDENR HARNETT COUNTY FAT, OIL & GREASE ORDINANCE. THE GREASE TRAP MUST BE RATED 1. THE FIRE MARSHAL'S OFFICE SHALL APPROVE ALL HYDRANT TYPES AND LOCATIONS IN TEST(S) MUST BE WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. THE APPROVED PLANS MARKED "RELEASED FOR CONSTRUCTION" AT LEAST TWO DAYS PRIOR FOR A MINIMUM CAPACITY OF AT LEAST 1,000 GALLONS UNLESS OTHERWISE APPROVED NEW SUBDIVISIONS. HOWEVER, HARNETT COUNTY DEPARTMENT OF PUBLIC UTILITIES UTILITY CONTRACTOR MUST NOTIFY HCDPU WHEN THEY ARE READY TO BEGIN FILLING IN TO CONSTRUCTION COMMENCING. HCDPU WILL STAMP THE APPROVED PLANS AS IN WRITING BY THE HCDPU PRE-TREATMENT COORDINATOR. GARBAGE DISPOSALS (HCDPU) PREFERS THE CONTRACTORS TO INSTALL ONE OF THE FOLLOWING FIRE LINES AND COORDINATE WITH HARNETT COUNTY TO WITNESS ALL PRESSURE TESTING. "RELEASED FOR CONSTRUCTION" AND PROVIDE COPIES TO THE UTILITY CONTRACTOR. SHOULD NOT BE INSTALLED IN HOMES AND BUSINESSES THAT DISCHARGE WASTEWATER HYDRANTS: 17. THE UTILITY CONTRACTOR SHALL CONDUCT A PNEUMATIC PRESSURE TEST USING THE REGISTERED LAND SURVEYOR (RLS) SHALL STAKE OUT ALL LOT CORNERS AND TO THE HARNETT COUNTY SANITARY SEWER SYSTEM AS THEY ARE NOT APPROVED BY 1. MUELLER - SUPER CENTURION 250 A-423 MODEL WITH A 51/4" MAIN VALVE OPENING COMPRESSED AIR OR OTHER INERT GAS ON THE STAINLESS STEEL TAPPING SLEEVE(S) ESTABLISH GRADE STAKES FOR THE PROPOSED FINISH GRADE FOR EACH STREET AND HCDPU. THREE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE); PRIOR TO MAKING THE TAP ON THE EXISTING WATER MAIN. THIS PNEUMATIC PRESSURE SEWER LINE BEFORE THE UTILITY CONTRACTOR BEGINS CONSTRUCTION OR INSTALLATION 17. EACH SEWER LIFT STATION MUST BE PROVIDED WITH THREE PHASE POWER (AT LEAST 2. AMERICAN DARLING - MARK B-84-B MODEL WITH A 5%" MAIN VALVE OPENING TEST MUST BE WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. THE OF THE MANHOLES, SANITARY SEWER GRAVITY LINE(S), SEWER LIFT STATIONS AND/OR 480 VOLTS) AND CONSTRUCTED TO MEET THE MINIMUM REQUIREMENTS OF THE LATEST THREE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE); UTILITY CONTRACTOR SHALL USE ROMAC BRAND STAINLESS STEEL TAPPING SLEEVE(S) SANITARY SEWER FORCE MAIN(S). THE GRADE STAKES SHOULD BE SET WITH A VERSION OF THE NATIONAL ELECTRICAL CODE (NEC) AND HARNETT COUNTY STANDARD 3. WATEROUS - PACER B-67-250 MODEL WITH A 5%" MAIN VALVE OPENING THREE OR APPROVED EQUAL FOR ALL TAPS MADE IN HARNETT COUNTY. ALL NEW WATER LINE CONSISTENT OFFSET FROM THE STREET CENTERLINE SO AS NOT TO INTERFERE WITH THE SPECIFICATIONS AND DETAILS. IF THREE PHASE POWER IS NOT AVAILABLE FROM THE WAY (TWO HOSE NOZZLES AND ONE PUMPER NOZZLE) OR APPROVED EQUAL FOR EXTENSIONS MUST BEGIN WITH A RESILIENT WEDGE TYPE GATE VALVE SIZED EQUAL TO STREET GRADING OR UTILITY CONSTRUCTION. POWER COMPANY OTHER ARRANGEMENTS MUST BE APPROVED BY HCDPU ENGINEERING STANDARDIZATION. THE DIAMETER OF THE NEW WATER LINE EXTENSION IN ORDER TO PROVIDE A MEANS OF 4. THE UTILITY CONTRACTOR SHALL PROVIDE THE HCDPU UTILITY CONSTRUCTION INSPECTOR PRIOR TO THE START OF CONSTRUCTION. ISOLATION BETWEEN HARNETT COUNTY'S EXISTING WATER MAINS AND THE NEW WATER WITH MATERIAL SUBMITTALS AND SHOP DRAWINGS FOR ALL PROJECT MATERIALS PRIOR 18. WHERE A NEW SANITARY SEWER FORCE MAIN IS CONNECTED TO AN EXISTING MANHOLE 2. FIRE HYDRANTS ARE INSTALLED AT CERTAIN ELEVATIONS. ANY GRADE CHANGE IN THE LINE EXTENSIONS UNDER CONSTRUCTION. TO THE CONSTRUCTION OF ANY GRAVITY SEWER LINE(S), MANHOLE(S), SEWER LIFT IN THE HARNETT COUNTY SEWER COLLECTIONS SYSTEM, THE UTILITY CONTRACTOR MUST VICINITY OF ANY FIRE HYDRANT WHICH IMPEDES ITS OPERATION SHALL BECOME THE RESPONSIBILITY OF THE UTILITY CONTRACTOR FOR CORRECTION. CORRECTIONS WILL BE 18. ALL WATER MAINS WILL BE CONSTRUCTED WITH SDR-21 PVC PIPE OR CLASS 50 STATION(S) AND ASSOCIATED FORCE MAINS) IN HARNETT COUNTY. THE MATERIALS TO PROVIDE A PROTECTIVE COATING (COAL TAR EPDXY ) FOR THE INTERIOR SURFACES OF MONITORED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR AND THE HARNETT DUCTILE IRON PIPE RATED FOR AT LEAST 200 PSI OR GREATER. ALL PIPES MUST BE BE USED ON THE PROJECT MUST MEET THE ESTABLISHED SPECIFICATIONS OF HCDPU THE MANHOLE TO PROTECT IT AGAINST CORROSION, EROSION AND DETERIORATION FROM COUNTY FIRE MARSHAL. PROTECTED DURING LOADING, TRANSPORT, UNLOADING, STAGING, AND INSTALLATION. AND BE APPROVED BY THE ENGINEER OF RECORD PRIOR TO CONSTRUCTION. ALL THE RELEASE OF SEWER GASES SUCH AS METHANE AND HYDROGEN SULFIDE. 3. THE PROFESSIONAL ENGINEER SHALL OBTAIN AND PROVIDE THE NCDENR PVC PIPE MUST BE PROTECTED FROM EXTENDED EXPOSURE TO SUNLIGHT PRIOR TO SUBSTANDARD MATERIALS OR MATERIALS NOT APPROVED FOR USE IN HARNETT COUNTY 19. THE SEWER LIFT STATION DESIGN AND ASSOCIATED EQUIPMENT MUST MEET OR EXCEED "AUTHORIZATION TO CONSTRUCTT"" PERMIT TO THE UTILITY CONTRACTOR BEFORE THE INSTALLATION. FOUND ON THE PROJECT SITE MUST BE REMOVED IMMEDIATELY WHEN NOTIFIED BY THE THE MINIMUM REQUIREMENTS FOR HARNETT COUNTY SEWER LIFT STATIONS 2009 EDITION. CONSTRUCTION OF THE WATER LINE SHALL BEGIN. THE UTILITY CONTRACTOR MUST 19. ALL WATER MAINS WILL BE FLUSHED AND DISINFECTED IN STRICT ACCORDANCE WITH HCDPU UTILITY CONSTRUCTION INSPECTOR. EACH SANITARY SEWER LIFT STATION MUST BE CONSTRUCTED WITH AN ALL-WEATHER POST A COPY OF THE NCDENR "AUTHORIZATION TO CONSTRUCT" PERMIT ISSUED BY THE STANDARD SPECIFICATIONS OF THE HARNETT COUNTY DEPARTMENT OF PUBLIC 5. THE SANITARY SEWER LATERAL CONNECTIONS SHOULD BE INSTALLED 90` ACCESS ROAD THAT IS AT LEAST 20 FEET WIDE. THE LIFT STATION SITE MUST BE THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - UTILITIES. ALL WATER SAMPLES COLLECTED FOR BACTERIA TESTING WILL BE COLLECTED (PERPENDICULAR) TO THE SANITARY SEWER GRAVITY LINES WITH SCHEDULE 40 PVC COVERED WITH WEED BLOCKING MATERIAL AND AT LEAST SIX (6") INCHES OF # 57 DIVISION OF ENVIRONMENTAL HEALTH, PUBLIC WATER SUPPLY SECTION BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR AND TESTED IN THE HCDPU PIPE. HCDPU REQUIRES THE UTILITY CONTRACTOR TO PROVIDE THE PROFESSIONAL STONE (CRUSH AND RUN). (NCDENR-DEH,PWSS) ON SITE PRIOR TO THE START OF CONSTRUCTION. THE PERMIT LABORATORY. ENGINEER (PE) WITH ACCURATE MEASUREMENTS FOR LOCATING SANITARY SEWER 20. ONCE A SEWER LIFT STATION HAS BEEN INSTALLED, THE UTILITY CONTRACTOR IS MUST BE MAINTAINED ON SITE THROUGHOUT THE ENTIRE CONSTRUCTION PROCESS OF 20. ALL FITTINGS LARGER THAN TWO (2") INCHES DIAMETER SHALL BE DUCTILE IRON. SERVICE LATERAL AND ASSOCIATED EACH SANITARY SEWER CLEAN -OUT. THESE RESPONSIBLE TO SCHEDULE A DRAW DOWN TEST WITH HCDPU ENGINEERING AND THE PROPOSED WATER LINES THAT WILL SERVE THIS PROJECT. HCDPU REQUIRES THAT MECHANICAL JOINTS BE ASSEMBLED WITH GRIP RINGS AS MEASUREMENTS SHOULD BE TAKEN FROM THE NEAREST DOWNSTREAM MANHOLE UP COLLECTIONS STAFF, THE PROFESSIONAL ENGINEER (PE), THE ELECTRICIAN, THE 4. THE UTILITY CONTRACTOR SHALL NOTIFY HARNETT COUNTY DEPARTMENT OF PUBLIC "MEGALUG" FITTINGS ARE NOT APPROVED BY HARNETT COUNTY FOR PIPE SIZES ALONG THE SANITARY SEWER MAIN TO THE IN -LINE WYE FITTING (OR TAPPING SADDLE) ORIGINAL EQUIPMENT MANUFACTURER'S (OEM) REPRESENTATIVES [FOR BOTH THE PUMPS UTILITIES (HCDPU) AND THE PROFESSIONAL ENGINEER (PE) AT LEAST TWO DAYS PRIOR SMALLER THAN TWELVE INCHES (12") DIAMETER. PVC PIPE USED FOR WATER MAINS AND THEN ANOTHER MEASUREMENT FROM THE IN -LINE WYE FITTING (OR TAPPING AND THE GENERATOR]. THIS DRAW DOWN TEST MUST BE COMPLETED WITH POWER TO CONSTRUCTION COMMENCING. THE UTILITY CONTRACTOR MUST SCHEDULE A SHALL BE CONNECTED BY SLIP JOINT OR MECHANICAL JOINT WITH GRIP RINGS. GLUED SADDLE) TO THE 4" X 4" LONG SWEEP COMBINATION WYE FITTING AT THE BOTTOM OF SUPPLIED FROM THE ELECTRICAL UTILITY COMPANY AND WITH POWER SUPPLIED BY THE PRE -CONSTRUCTION CONFERENCE WITH MR. ALAN MOSS, HCDPU UTILITY CONSTRUCTION PIPE JOINTS ARE NOT ALLOWED ON PVC PIPE USED FOR WATER MAINS IN HARNETT THE SEWER CLEAN -OUT STACK. THESE FIELD MEASUREMENTS MUST BE PROVIDED TO EMERGENCY GENERATOR WITH SATISFACTORY RESULTS BEFORE FINAL INSPECTIONS ARE INSPECTOR AT LEAST TWO (2) DAYS BEFORE CONSTRUCTION WILL BEGIN AND THE COUNTY. THE PROFESSIONAL ENGINEER (PE) IN THE RED LINE DRAWINGS FROM THE UTILITY CONDUCTED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. UTILITY CONTRACTOR MUST COORDINATE WITH HCDPU FOR REGULAR INSPECTION 21. HCDPU REQUIRES THAT THE UTILITY CONTRACTOR INSTALL TRACER WIRE IN THE TRENCH CONTRACTOR FOR PROPER DOCUMENTATION IN THE AS -BUILT RECORD DRAWINGS 21. ONCE THE UTILITY CONTRACTOR COMPLETES THE INSTALLATION OF A SEWER LIFT VISITATIONS AND ACCEPTANCE OF THE WATER SYSTEM(S). CONSTRUCTION WORK SHALL WITH ALL WATER LINES. THE TRACER WIRE SHALL BE 12 GA. INSULATED, SOLID COPPER SUBMITTED TO HCDPU. STATION, THE PROFESSIONAL ENGINEER (PE) MUST SUBMIT THE SEWER PERMIT BE PERFORMED ONLY DURING THE NORMAL WORKING HOURS OF HCDPU WHICH IS 8:00 CONDUCTOR AND IT SHALL BE TERMINATED AT THE TOP OF THE VALVE BOXES OR 6. THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE THE NEWLY INSTALLED CERTIFICATION AND AS -BUILT RECORD DRAWINGS TO THE NORTH CAROLINA DEPARTMENT AM - PM MONDAY THROUGH FRIDAY. HOLIDAY AND WEEKEND WORK IS NOT MANHOLES. NO SPLICED WIRE CONNECTIONS SHALL BE MADE UNDERGROUND ON SANITARY SEWER GRAVITY LINE(S), SANITARY SEWER FORCE MAIN(S), SANITARY SEWER OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF WATER QUALITY PERMITTED HCDPU. TED TRACER WIRE INSTALLED IN HARNETT COUNTY. THE TRACER WIRE MAY BE SECURED WITH DUCT TAPE TO THE TOP OF THE PIPE BEFORE BACKFILLING. SERVICE LATERAL(S) AND ALL ASSOCIATED SEWER CLEAN -OUTS) IN THE PROPOSED NCDENR-DWQ) AND HCDPU FOR FINAL APPROVAL. THE UTILITY CONTRACTOR MUST 5. SI THE PROFESSIONAL ENGINEER (PE) SHALL PROVIDE HCDPU AND THE UTILITY 22• THE UTILITY CONTRACTOR WILL PROVIDE PROFESSIONAL ENGINEER (PE) AND THE HCDPU SANITARY SEWER SYSTEM FOR OTHER UTILITY COMPANIES AND THEIR CONTRACTORS SUPPLY HCDPU ENGINEERING STAFF WITH THREE ORIGINAL OPERATION &MAINTENANCE CONTRACTOR WITH A SET OF NCDENR APPROVED PLANS MARKED "RELEASED FOR UTILITY CONSTRUCTION INSPECTOR WITH A SET OF RED LINE FIELD DRAWINGS TO UNTIL THE NEWS NITARY EWER ANDASSOCIATEDANC S HAVE APPURTENANCES VL BEEN 0&M) MANUALS ALONG WITH THE ASSOCIATED PUMP CURVES AND ELECTRICAL CONSTRUCTION" AT LEAST TWO DAYS PRIOR TO CONSTRUCTION COMMENCING. THE IDENTIFY THE INSTALLED LOCATIONS OF THE WATER LINES) AND ALL ASSOCIATED AOF NMENTE CAROLINA SCHEMATICS FOR TH E ASSOCIATED SEWER LIFT STATION EQUIPMENT INCLUDING ALL REGISTERED LAND SURVEYOR (RLS) SHOULD STAKE OUT ALL LOT CORNERS AND THE SERVICES. ALL CHANGE ORDERS MUST BE PRE -APPROVED BY HCDPU AND THE RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ) AND ACCEPTED BY HCDPU. WARRANTY INFORMATION AND DOCUMENTATION. GRADE STAKES FOR THE PROPOSED FINISH GRADE FOR EACH STREET BEFORE THE PROFESSIONAL ENGINEER (PE) IN WRITING AND PROPERLY DOCUMENTED IN THE RED LINE ALL NEW SANITARY SEWER LINES MUST HAVE AT LEAST THREE (3 FT. ) FEET OF COVER 22ONCE THE UTILITY CONTRACTOR COMPLETES THE INSTALLATION A SEWER LIFT . UTILITY CONTRACTOR BEGINS CONSTRUCTION OF THE WATER LINE(S). THE GRADE FIELD DRAWINGS. AND EXTEND UNDER ALL EXISTING WATER MAIN AND STORM WATER LINES WITH A LEAST STATION, THE DEVELOPER MUST PAY HCDPU THE ESTABLISHED SYSTEM SYSTEM CONTROL AND STAKES SHOULD BE SET WITH A CONSISTENT OFFSET FROM THE STREET CENTERLINE SO 23. THE UTILITY CONTRACTOR SHALL SPOT DIG EXPOSE EACH UTILITY PIPE OR LINE 24" OF VERTICAL CLEARANCE BELOW THE BOTTOM OF THE EXISTING WATER MAIN AND DATA ACQUISITION (SCADA) FEES BEFORE THE SCADA SYSTEM WILL BE INSTALLED AT AS NOT TO INTERFERE WITH THE STREET GRADING AND UTILITY CONSTRUCTION. WHICH MAY CONFLICT WITH CONSTRUCTION OFF PROPOSED WATER LINE EXTENSIONS WELL STORM WATER LINES. THE NEW SEWER LIFT STATION. THE SCADA SYSTEM MUST BE INSTALLED AND 6. THE UTILITY CONTRACTOR SHALL PROVIDE THE HCDPU UTILITY CONSTRUCTION INSPECTOR IN ADVANCE TO VERIFY LOCATIONS OF THE EXISTING UTILITIES. THE UTILITY 7. THE SANITARY SEWER GRAVITY LINE(S), MANHOLE(S), SANITARY SEWER SERVICE OPERATIONAL BEFORE THE UTILITIES MAY BE ACCEPTED BY HCDPU AND PLACED INTO WITH MATERIAL SUBMITTALS AND SHOP DRAWINGS FOR ALL PROJECT MATERIALS PRIOR CONTRACTOR SHALL PROVIDE BOTH HORIZONTAL AND VERTICAL CLEARANCES TO THE LATERALS AND ASSOCIATED CLEAN -OUTS SHALL BE CONSTRUCTED IN STRICT ( ) ( ) OPERATION. 23. HCDPU REQUIRES THE UTILITY CONTRACTOR TO PROVIDE ALL NECESSARY EQUIPMENT TO THE CONSTRUCTION OF ANY WATER LINE EXTENSION(S), AND ASSOCIATED WATER PROFESSIONAL ENGINEER (PE) TO ALLOW THE PE TO ADJUST THE WATER LINE DESIGN IN ACCORDANCE WITH THE STANDARD SPECIFICATIONS OF THE HARNETT COUNTY AND DEVICES FOR THE TESTING AND INSPECTION OF THE SANITARY SEWER SYSTEM. SERVICES IN HARNETT COUNTY. THE MATERIALS TO BE USED ON THE PROJECT MUST ORDER TO AVOID CONFLICTS WITH EXISTING UNDERGROUND UTILITIES. THE UTILITY DEPARTMENT OF PUBLIC UTILITIES. THE SANITARY SEWER GRAVITY LINES) MUST THE EQUIPMENT AND DEVICES MAY INCLUDE BUT NOT LIMITED TO MIRRORS, MANDRELS, MEET THE ESTABLISHED SPECIFICATIONS OF HCDPU AND BE APPROVED BY THE CONTRACTOR SHALL COORDINATE WITH THE UTILITY OWNER AND BE RESPONSIBLE FOR PNEUMATICALLY PRESSURE TESTED WITH COMPRESSED AIR AT 5 PSI AND THE SANITARY SEWER BALLS, PLUGS, AIR COMPRESSORS AND ASSOCIATED COMPRESSED AIR LINES. IF ENGINEER OF RECORD PRIOR TO CONSTRUCTION. ALL SUBSTANDARD MATERIALS OR TEMPORARY RELOCATION AND/OR SECURING EXISTING UTILITY POLES, PIPES, WIRES, SEWER FORCE MAINS) MUST HYDROSTATICALLY PRESSURE TESTED WITH WATER OR AIR THE HCDPU UTILITY CONSTRUCTION INSPECTOR DEEMS THAT A CLOSED CIRCUIT VIDEO MATERIALS NOT APPROVED FOR USE IN HARNETT COUNTY FOUND ON THE PROJECT SITE CABLES, SIGNS AND/OR UTILITIES INCLUDING SERVICES IN ACCORDANCE WITH THE AT 200 PSI AND WITNESSED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR. CAMERA INSPECTION OF THE NEWLY CONSTRUCTED SEWER SYSTEM IS NECESSARY, THEN MUST BE REMOVED IMMEDIATELY WHEN NOTIFIED BY THE HCDPU UTILITY CONSTRUCTION UTILITY OWNER REQUIREMENTS DURING WATER LINE INSTALLATION, GRADING AND STREET 8. PRIOR TO ACCEPTANCE, ALL SEWER SERVICE LATERALS WILL BE INSPECTED TO INSURE ALL COSTS FOR THE CLOSED CIRCUIT CAMERA INSPECTION WILL BE THE RESPONSIBILITY INSPECTOR. CONSTRUCTION. THAT THEY ARE INSTALLED AT THE PROPER DEPTH. ALL SEWER CLEAN -OUTS MUST BE OF THE UTILITY CONTRACTOR. ALL CLOSED CIRCUIT VIDEO CAMERA INSPECTIONS MUST 7. THE WATER MAIN(S), FIRE HYDRANTS, SERVICE LINES, METER SETTERS AND ALL 24. PRIOR TO THE COMMENCEMENT OF ANY WORK WITHIN ESTABLISHED UTILITY EASEMENTS INSTALLED SO THE 4" X 4" LONG SWEEP COMBINATION WYE IS AT LEAST THREE (3') BE RECORDED ON VHS TAPES THAT WILL RELEASED TO HCDPU FOR RECORD KEEPING, ASSOCIATED APPURTENANCES SHALL BE CONSTRUCTED IN STRICT IN ACCORDANCE WITH OR NCDOT RIGHT-OF-WAYS THE UTILITY CONTRACTOR IS REQUIRED TO HAVE A SIGNED FEET BUT NO MORE THAN FOUR (4') FEET BELOW THE FINISH GRADE UNLESS OTHERWISE REVIEW AND APPROVAL OF THE SEWER SYSTEM. THE STANDARD SPECIFICATIONS OF THE HARNETT COUNTY DEPARTMENT OF PUBLIC NCDOT ENCROACHMENT AGREEMENT POSTED ON SITE AND NOTIFY ALL CONCERNED APPROVED IN WRITING BY HCDPU. THE SEWER CLEANOUTS SHALL HAVE A FOUR (4") 24. ANY USE OF SEWER PLUGS TO TEMPORARILY BLOCK HARNETT COUNTY'S EXISTING UTILITIES (HCDPU). THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE THE UTILITY COMPANIES IN ACCORDANCE WITH G.S. 87-102. THE UTILITY CONTRACTOR SCHEDULE 40 PVC PIPE STUBBED UP FROM BOTH ENDS OF THE 4" X 4" LONG SWEEP SANITARY SEWER LINES MUST BE COORDINATED WITH THE HCDPU COLLECTIONS NEWLY INSTALLED WATER MAIN(S), WATER SERVICE LINES AND ALL ASSOCIATED METER MUST CALL THE NC ONE CALL CENTER AT 811 OR COMBINATION WYE TO BE AT LEAST TWO (2') FEET ABOVE THE FINISH GRADE AND SUPERVISOR AT LEAST TWO (2) DAYS IN ADVANCE OF INSTALLING THE PLUGS. THE SETTERS AND METER BOXES FOR OTHER UTILITY COMPANIES AND THEIR CONTRACTORS (800) 632-4949 TO VERIFY THE LOCATION OF EXISTING UTILITIES PRIOR TO THE COVER EACH END WITH A FOUR (4") INCH TEMPORARY CAP TO KEEP OUT DIRT, SAND, SEWER PLUGS MUST BE REMOVED AS SOON AS POSSIBLE ONCE THE NEW SANITARY UNTIL THE NEW WATER MAINS) HAVE BEEN APPROVED BY THE NORTH CAROLINA BEGINNING OF CONSTRUCTION. EXISTING UTILITIES SHOWN IN THESE PLANS ARE TAKEN ROCKS, WATER AND CONSTRUCTION DEBRIS. THE VERTICAL STACK ON EACH SEWER LINES HAVE BEEN INSPECTED, PRESSURE TESTED, MANDREL TESTED, APPROVED DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF FROM MAPS FURNISHED BY VARIOUS UTILITY COMPANIES AND HAVE NOT BEEN CLEAN -OUT MUST BE PROVIDED WITH A CONCRETE DONUT FOR PROTECTION. BY THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - ENVIRONMENTAL HEALTH, PUBLIC WATER SUPPLY SECTION (NCDENR-DEH, PWSS)AND PHYSICALLY LOCATED OR VERIFIED BY THE P.E. (I.E. TELEPHONE, CABLE, WATER, SEWER, g• ONCE THE SANITARY SEWER GRAVITY LINES) HAVE BEEN INSTALLED, PNEUMATICALLY DIVISION OF WATER QUALITY (NCDENR-DWQ) AND ACCEPTED BY HCDPU TO ALLOW THE ACCEPTED BY HCDPU. ELECTRICAL POWER, FIBER OPTIC, NATURAL GAS, ETC.). THE UTILITY CONTRACTOR WILL PRESSURE TESTED AND IN PLACE FOR AT LEAST 30 DAYS, THE UTILITY CONTRACTOR SEWER TO FLOW AS DESIGNED IN HARNETT COUNTY'S EXISTING SANITARY SEWER LINES 8. PRIOR TO ACCEPTANCE, ALL SERVICES WILL BE INSPECTED TO INSURE THAT THEY ARE BE RESPONSIBLE TO REPAIR ANY AND ALL DAMAGES TO THE SATISFACTION OF THE MUST CONTACT THE HCDPU UTILITY CONSTRUCTION INSPECTOR TO WITNESS THE OR WHEN SO ORDERED BY THE HCDPU COLLECTIONS SUPERVISOR TO LIMIT INSTALLED AT THE PROPER DEPTH. ALL METER BOXES MUST BE FLUSH WITH THE RELATED UTILITY COMPANY. MANDREL TEST ON EACH PVC SANITARY SEWER GRAVITY LINE. THE UTILITY INTERRUPTIONS TO THE NORMAL FLOW OF THE SANITARY SEWER COLLECTION SYSTEM(S). GROUND LEVEL AT FINISH GRADE AND THE METER SETTERS MUST BE A MINIMUM OF 8" 25. THE UTILITY CONTRACTOR SHALL PROVIDE HCDPU WITH AT LEAST ONE (1) FIRE CONTRACTOR WILL NOTIFY HCDPU TO SCHEDULE THE MANDREL TESTING. THE MANDREL THE UTILITY CONTRACTOR MUST PROVIDE THE PUMPS HOSES AND NECESSARY BELOW THE METER BOX LID. METER SETTERS SHALL BE CENTERED IN THE METER BOX AND SUPPORTED BY BRICK, BLOCK OR STONE. HYDRANT WRENCH AND ONE (1) BREAK -AWAY FLANGE KIT FOR EVERY SUBDIVISION WITH AND PROVING RING MUST BE SUPPLIED BY THE UTILITY CONTRACTOR. CLOSED CIRCUIT CONNECTORS FOR A TEMPORARY PUMP AROUND SETUP IF REQUIRED BY THE HCDPU 9. THE UTILITY CONTRACTOR SHALL PROVIDE THE PROFESSIONAL ENGINEER (PE) AND FIRE HYDRANTS DEVELOPED IN HARNETT COUNTY. THESE ITEMS MUST BE PROVIDED TO VIDEO CAMERA INSPECTIONS (AT THE UTILITY CONTRACTOR'S EXPENSE) MAY BE COLLECTIONS SUPERVISOR. MR. CURTIS SPEARS, HCDPU COLLECTIONS SUPERVISOR MAY HCDPU BEFORE THE FINAL INSPECTION WILL BE SCHEDULED BY THE HCDPU UTILITY REQUIRED BY THE HCDPU UTILITY CONSTRUCTION INSPECTOR IF THE MANDREL TESTING BE CONTACTED BETWEEN 8:00 AM AND 5:00 PM MONDAY THROUGH FRIDAY AT (910) HCDPU UTILITY CONSTRUCTION INSPECTOR WITH A SET OF RED LINE DRAWINGS CONSTRUCTION INSPECTOR. IN ADDITION, THE UTILITY CONTRACTOR SHALL INSTALL A CANNOT BE COMPLETED WITH SATISFACTORY RESULTS. THE SANITARY SEWER LINES 893-7575 EXTENSION 3243. IDENTIFYING THE COMPLETE WATER SYSTEM INSTALLED FOR EACH PROJECT. THE RED 4" X 4" CONCRETE VALVE MARKER AT THE EDGE OF THE RIGHT-OF-WAY TO IDENTIFY SHOULD BE FLUSHED CLEAN USING A SEWER BALL OF THE PROPER DIAMETER BEFORE 25. THE UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO LINE DRAWINGS SHOULD IDENTIFY THE MATERIALS, PIPE SIZES AND APPROXIMATE THE LOCATION OF EACH GATE VALVE INSTALLED IN THE NEW WATER SYSTEM WITH THE ANY MANDREL TESTING CAN BE PERFORMED. THE UTILITY CONTRACTOR IS RESPONSIBLE LEAKAGE OR DAMAGE RESULTING FROM POOR WORKMANSHIP DURING THE ONE (1) YEAR DEPTHS OF THE WATER LINES AS WELL AS THE GATE VALVES, FIRE HYDRANTS, METER EXCEPTION OF THE FIRE HYDRANT ISOLATION VALVES. THE CONTRACTOR SHALL TO REMOVE ALL DIRT, SAND, SILT, GRAVEL, MUD AND DEBRIS FROM THE NEWLY WARRANTY PERIOD ONCE THE SEWER SYSTEM IMPROVEMENTS HAVE BEEN APPROVED BY SETTERS, BLOW OFF ASSEMBLIES AND ALL ASSOCIATED APPURTENANCES FOR ALL MEASURE THE DISTANCE FROM THE CENTER OF THE CONCRETE MARKER TO THE CENTER CONSTRUCTED SEWER LINES EXERCISING CARE TO KEEP THE HARNETT COUNTY'S THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - WATER ER LINES) CONSTRUCTED IN HARNETT COUNTY. THE RED LINE DRAWINGS SHOULD OF THE VALVE BOX. THIS DISTANCE (IN LINEAR FEET) SHALL BE STAMPED ON THE EXISTING SANITARY SEWER SYSTEMS CLEAN. SANITARY SEWER FORCE MAINS) SHALL DIVISION OF WATER QUALITY (NCDENR-DWQ) AND ACCEPTED BY HCDPU. THE UTILITY CLEARLY IDENTIFY ANY DEVIATIONS FROM THE NCDENR APPROVED PLANS. ALL CHANGE ALL BRASS PLATE LOCATED ON THE TOP OF THE CONCRETE VALVE MARKER. IN LIEU OF BE PRESSURE TESTED TO 200 PSI FOR AT LEAST 2 HOURS LIKE WATER LINES. CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO DAMAGES ORDERS MUST BE APPROVED BY HCDPU AND THE PROFESSIONAL ENGINEER ( ) IN INSTALLING THE CONCRETE VALVE MARKERS, THE UTILITY CONTRACTOR MAY PROVIDE AT 10. THE UTILITY CONTRACTOR SHALL BE RESPONSIBLE TO LOCATE THE NEWLY INSTALLED RESULTING FROM FAILURE TO LOCATE THE NEW SANITARY SEWER LINES AND WRITING AND PROPERLY DOCUMENTED IN THE RED LINE FIELD DRAWINGS. LEAST TWO MEASUREMENTS FROM TWO INDEPENDENT PERMANENT ABOVE GROUND SANITARY SEWER SYSTEM(S) FOR OTHER UTILITY COMPANIES AND THEIR CONTRACTORS ASSOCIATED APPURTENANCES FOR OTHER UTILITIES AND THEIR CONTRACTORS UNTIL THE 10. POTABLE WATER MAINS CROSSING OTHER UTILITIES AND NON -POTABLE WATER LINES STRUCTURES TO THE PROFESSIONAL ENGINEER (PE) IN THE RED LINE DRAWINGS TO UNTIL THE NEW SANITARY SEWER SYSTEM(S) HAVE BEEN APPROVED BY THE NORTH SANITARY SEWER LINES HAVE BEEN APPROVED BY NCDENR AND ACCEPTED BY HCDPU. (SANITARY SEWER, STORM SEWER, RCP, ETC.) SHALL BE LAID TO PROVIDE A MINIMUM IDENTIFY THE VALVE LOCATIONS. THE PROFESSIONAL ENGINEER (PE) MUST INCLUDE CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF HCDPU WILL PROVIDE MAINTENANCE AND WARRANTY REPAIRS IF NECESSARY DUE TO VERTICAL DISTANCE OF TWENTY-FOUR (24") INCHES BETWEEN THE POTABLE WATER THESE MEASUREMENTS IN THE AS -BUILT RECORD DRAWINGS SUBMITTED TO HCDPU. WATER QUALITY (NCDENR-DWQ)AND ACCEPTED BY HCDPU. LACK OF RESPONSE WITHIN 48 HOURS OF NOTIFICATION OF WARRANTY WORK. HCDPU MAIN AND ALL OTHER UTILITIES. NCDOT REQUIRES THE NEW WATER MAINS TO BE 26. THE UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO 11. HCDPU REQUIRES THAT THE UTILITY CONTRACTOR INSTALL TRACER WIRE IN THE TRENCH WILL INVOICE THE DEVELOPER AND/OR UTILITY CONTRACTOR FOR MATERIALS AND LABOR INSTALLED UNDER THE STORM WATER LINES. THE POTABLE WATER MAIN SHALL BE LEAKAGE DAMAGE FROM POOR WORKMANSHIP DURING THE ONE (1) YEAR WARRANTY WITH ALL SANITARY SEWER FORCE MAINS. THE TRACER WIRE SHALL BE 12 GA. IN SUCH CASES. INSTALLED WITH TWENTY-FOUR 24" INCHES OF VERTICAL SEPARATION AND WITH ( ) PERIOD ONCE THE WATER SYSTEM IMPROVEMENTS HAVE BEEN ACCEPTED BY HARNETT INSULATED, SOLID COPPER CONDUCTOR AND IT SHALL BE TERMINATED AT THE TOP OF 26. IN DEVELOPMENTS AND PROJECTS THAT REQUIRE UTILITY EASEMENTS TO BE DUCTILE IRON PIPE WHEN DESIGNED TO BE PLACED UNDER A NON -POTABLE WATER LINE COUNTY. HARNETT COUNTY WILL PROVIDE MAINTENANCE AND REPAIRS WHEN THE VALVE BOXES OR MANHOLES. NO SPLICED WIRE CONNECTIONS SHALL BE MADE ESTABLISHED FOR FUTURE HCDPU RIGHT-OF-WAY, THE REGISTERED LAND SURVEYOR SUCH AS SANITARY SEWER OR STORM SEWER LINES. IF THESE SEPARATIONS CANNOT REQUESTED AND BILL THE DEVELOPER AND/OR UTILITY CONTRACTOR IF NECESSARY DUE UNDERGROUND ON TRACER WIRE INSTALLED IN HARNETT COUNTY. THE TRACER WIRE (RLS) MUST PROVIDE THE HCDPU RIGHT-OF-WAY AGENT WITH AN OFFICIAL COPY OF BE MAINTAINED THEN THE WATER MAIN SHALL BE INSTALLED WITH DUCTILE IRON PIPE. TO LACK OF RESPONSE WITHIN 48 HOURS OF NOTIFICATION OF WARRANTY WORK. THE MAY BE SECURED WITH DUCT TAPE TO THE TOP OF THE PIPE BEFORE BACKFILLING. THE RECORDED PLAT AND LEGAL DESCRIPTION OF THE SAID EASEMENT AS RECORDED BOTH THE POTABLE WATER MAIN AND THE NON -POTABLE WATER LINE MUST BE CAST UTILITY CONTRACTOR WILL BE RESPONSIBLE FOR ANY AND ALL REPAIRS DUE TO THE TRACER WIRE IS NOT REQUIRED FOR THE GRAVITY SEWER LINES) BETWEEN WITH THE HARNETT COUNTY REGISTER OF DEEDS. THE RECORDED DOCUMENTS MUST BE IRON OR DUCTILE IRON PIPE (DIP) IF THE STATE MINIMUM SEPARATIONS CANNOT BE DAMAGES RESULTING FROM FAILURE TO LOCATE THE NEW WATER LINES AND MANHOLES. PROVIDED TO THE HCDPU RIGHT-OF-WAY AGENT BEFORE THE UTILITY IMPROVEMENTS MAINTAINED. THE DUCTILE IRON PIPE MUST BE LAID SO THE MECHANICAL JOINTS ARE ASSOCIATED APPURTENANCES FOR OTHER UTILITIES AND THEIR CONTRACTORS UNTIL THE 12. THE UTILITY CONTRACTOR SHALL PROVIDE THE PROFESSIONAL ENGINEER (PE) AND WITHIN THE SAID EASEMENT CAN BE PLACED INTO OPERATION. ANY AND ALL AT LEAST (10') FEET FROM THE POINT WHERE THE POTABLE WATER MAIN CROSSES THE WATER LINES HAVE BEEN APPROVED BY NCDENR AND ACCEPTED BY HCDPU. THE FINAL HCDPU UTILITY CONSTRUCTION INSPECTOR WITH A SET OF RED LINE DRAWINGS EASEMENTS THAT MUST BE OBTAINED FROM ADJOINING PROPERTY OWNERS MUST BE NON -POTABLE WATER LINE. INSPECTION OF WATER SYSTEM IMPROVEMENTS CANNOT BE SCHEDULED WITH HCDPU IDENTIFYING THE COMPLETE SEWER SYSTEM INSTALLED FOR EACH PROJECT. THE RED PROVIDED TO HCDPU BY THE DEVELOPER AT NO COST TO HARNETT COUNTY. THE 11. POTABLE WATER MAINS INSTALLED PARALLEL TO NON -POTABLE WATER LINES (SANITARY UNTIL THE STREETS HAVE BEEN PAVED, THE RIGHTS -OF -WAY AND UTILITY EASEMENTS LINE DRAWINGS SHOULD IDENTIFY THE MATERIALS, PIPE SIZES AND APPROXIMATE FINAL INSPECTION OF ALL SANITARY SEWER SYSTEM IMPROVEMENTS CANNOT BE SEWER, STORM SEWER, RCP, ETC.) SHALL BE LAID TO PROVIDE A MINIMUM HORIZONTAL HAVE BEEN SEEDED AND STABILIZED WITH AN ADEQUATE STAND OF GRASS IN PLACE TO DEPTHS OF THE SEWER LINES AS WELL AS THE INSTALLED LOCATIONS OF THE SCHEDULED WITH HCDPU UNTIL THE STREETS HAVE BEEN PAVED, THE RIGHTS -OF -WAY DISTANCE OF TEN (10') FEET BETWEEN THE POTABLE WATER MAIN AND SANITARY SEWER PREVENT EROSION ISSUES ON SITE. MANHOLE(S), SANITARY SEWER GRAVITY LINE(S), SANITARY SEWER SERVICE LATERALS, AND UTILITY EASEMENTS HAVE BEEN SEEDED AND STABILIZED WITH AN ADEQUATE MAINS, SEWER LATERALS AND SERVICES. THE HORIZONTAL SEPARATION BETWEEN THE 27. THE ENGINEER OF RECORD IS RESPONSIBLE TO INSURE THAT CONSTRUCTION IS, AT ALL CLEAN -OUTS, SEWER LIFT STATIONS) AND ASSOCIATED FORCE MAIN(S). THE RED LINE STAND OF GRASS IN PLACE TO PREVENT EROSION ISSUES ON SITE. POTABLE WATER MAIN AND ANY OTHER UTILITY OR STORM SEWER SHALL NOT BE LESS TIMES, IN COMPLIANCE WITH ACCEPTED SANITARY ENGINEERING PRACTICES AND 27. THE ENGINEER OF RECORD IS RESPONSIBLE TO INSURE THAT CONSTRUCTION IS, AT ALL THAN FIVE (5') FEET. THE POTABLE WATER MAIN MUST BE DUCTILE IRON PIPE IF THIS APPROVED PLANS AND SPECIFICATIONS. NO FIELD CHANGES TO THE APPROVED PLANS DRAWINGS SHOULD CLEARLY IDENTIFY ANY DEVIATIONS FROM THE NCDENR APPROVED TIMES, IN COMPLIANCE WITH ACCEPTED SANITARY ENGINEERING PRACTICES AND HORIZONTAL SEPARATION OF TEN (10') FEET CANNOT BE MAINTAINED. THE DUCTILE ARE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL BY HCDPU. A COPY OF EACH PLANSALL CHANGE ORDERS MUST BE APPROVED BY HCDPU AND THE PROFESSIONAL . APPROVED PLANS AND SPECIFICATIONS. NO FIELD CHANGES TO THE APPROVED PLANS IRON PIPE SHALL EXTEND AT LEAST TEN (10') FEET BEYOND THE POINT WHERE THE ENGINEER'S FIELD REPORT IS TO BE SUBMITTED TO HCDPU AS EACH SUCH INSPECTION ENGINEER (PE) IN WRITING AND PROPERLY DOCUMENTED IN THE RED LINE FIELD ARE ALLOWED WITHOUT PRIOR WRITTEN APPROVAL BY HCDPU. A COPY OF EACH IS MADE ON SYSTEM IMPROVEMENTS OR TESTING IS PERFORMED BY THE CONTRACTOR. DRAWINGS. ENGINEER'S FIELD REPORT IS TO BE SUBMITTED TO HCDPU AS EACH SUCH INSPECTION MINIMUM REQUIRED HORIZONTAL SEPARATION OF TEN (10') FEET CAN BE WATER AND SEWER INFRASTRUCTURE MUST PASS ALL TESTS REQUIRED BY HCDPU 13. PRIOR TO THE COMMENCEMENT OF ANY WORK WITHIN ESTABLISHED UTILITY EASEMENTS IS MADE ON SYSTEM IMPROVEMENTS OR TESTING IS PERFORMED BY THE CONTRACTOR. RE-ESTABLISHED. SPECIFICATIONS AND THOSE OF ALL APPLICABLE REGULATORY AGENCIES. THESE TESTS OR NCDOT RIGHT-OF-WAYS THE UTILITY CONTRACTOR IS REQUIRED TO NOTIFY ALL WATER AND SEWER INFRASTRUCTURE MUST PASS ALL TESTS REQUIRED BY HCDPU 12. METER SETTERS SHALL BE INSTALLED IN PAIRS ON EVERY OTHER LOT LINE WHERE INCLUDE, BUT ARE NOT LIMITED T0: AIR TEST, VACUUM TEST, MANDREL TEST, VISUAL CONCERNED UTILITY COMPANIES IN ACCORDANCE WITH G.S. 87-102. THE UTILITY SPECIFICATIONS AND THOSE OF ALL APPLICABLE REGULATORY AGENCIES. THESE TESTS POSSIBLE TO LEAVE ADEQUATE SPACE FOR OTHER UTILITIES TO BE INSTALLED AT A TEST, PRESSURE TEST, BACTERIOLOGICAL TEST, ETC. A HCDPU INSPECTOR MUST BE CONTRACTOR MUST CALL THE NC ONE CALL CENTER AT 811 OR (800) 632-4949 TO INCLUDE, BUT ARE NOT LIMITED T0: AIR TEST, VACUUM TEST, MANDREL TEST, VISUAL LATER TIME. THE METER SETTERS SHALL BE INSTALLED AT LEAST ONE (1') FOOT PRESENT DURING TESTING AND ALL TEST RESULTS SHALL BE SUBMITTED TO HCDPU. VERIFY THE LOCATION OF EXISTING UTILITIES PRIOR TO THE BEGINNING OF TEST, PRESSURE TEST, BACTERIOLOGICAL TEST, ETC. A HCDPU INSPECTOR MUST BE INSIDE THE RIGHT-OF-WAY AND AT LEAST THREE (3') TO FIVE (5') FEET FROM THE ALL TESTS MUST BE SATISFIED BEFORE THE FINAL INSPECTION WILL BE SCHEDULED WITH CONSTRUCTION. EXISTING UTILITIES SHOWN IN THESE PLANS ARE TAKEN FROM MAPS PRESENT DURING TESTING AND ALL TEST RESULTS SHALL BE SUBMITTED TO HCDPU. PROPERTY LINE BETWEEN THE LOTS. THE HCDPU INSPECTOR. THE ENGINEER OF RECORD MUST REQUEST IN WRITING TO FURNISHED BY VARIOUS UTILITY COMPANIES AND HAVE NOT BEEN PHYSICALLY LOCATED ALL TESTS MUST BE SATISFIED BEFORE THE FINAL INSPECTION WILL BE SCHEDULED WITH 13. HCDPU REQUIRES THAT METER BOXES FOR 3/4" SERVICES SHALL BE 12" WIDE X 17" SCHEDULE THE FINAL INSPECTION ONCE ALL CONSTRUCTION IS COMPLETE. THE BY THE P.E. (I.E. TELEPHONE, CABLE, WATER, SEWER, ELECTRICAL POWER, FIBER OPTIC, THE HCDPU INSPECTOR. THE ENGINEER OF RECORD MUST REQUEST IN WRITING TO LONG ABS PLASTIC BOXES AT LEAST 18" IN HEIGHT WITH CAST IRON LIDS/COVERS. DEVELOPER'S ENGINEER OF RECORD AND THE HCDPU UTILITY CONSTRUCTION INSPECTOR NATURAL GAS, ETC.). SCHEDULE THE FINAL INSPECTION ONCE ALL CONSTRUCTION IS COMPLETE. THE METER BOXES FOR 1" SERVICES SHALL BE 17" WIDE X 21" LONG ABS PLASTIC BOXES SHALL PREPARE A WRITTEN PUNCH LIST OF ANY DEFECTS OR DEFICIENCIES NOTED 14. THE UTILITY CONTRACTOR SHALL SPOT DIG TO EXPOSE EACH EXISTING UTILITY PIPE OR DEVELOPER'S ENGINEER OF RECORD AND THE HCDPU UTILITY CONSTRUCTION INSPECTOR AT LEAST 18" IN HEIGHT WITH PLASTIC LIDS AND CAST IRON FLIP COVERS IN THE DURING THE FINAL INSPECTION, SHOULD ANY EXIST. UPON COMPLETION OF THE PUNCH LINE WHICH MAY CONFLICT WITH CONSTRUCTION OF PROPOSED SANITARY SEWER LINE SHALL PREPARE A WRITTEN PUNCH LIST OF ANY DEFECTS OR DEFICIENCIES NOTED CENTER OF THE LIDS. METER BOXES FOR 2" SERVICES SHALL BE 20" WIDE X 32" LONG LIST, THE DEVELOPER'S ENGINEER OF RECORD WILL SCHEDULE ANOTHER INSPECTION. IN EXTENSIONS WELL IN ADVANCE TO VERIFY LOCATIONS OF THE EXISTING UTILITIES. THE DURING THE FINAL INSPECTION, SHOULD ANY EXIST. UPON COMPLETION OF THE PUNCH ABS PLASTIC BOXES AT LEAST 20" IN HEIGHT WITH PLASTIC LIDS AND CAST IRON FLIP THE EVENT THE NUMBER OF INSPECTIONS PERFORMED BY THE HCDPU EXCEEDS TWO, UTILITY CONTRACTOR SHALL PROVIDE BOTH HORIZONTAL AND VERTICAL CLEARANCES TO LIST, THE DEVELOPER'S ENGINEER OF RECORD WILL SCHEDULE ANOTHER INSPECTION. IN COVERS IN THE CENTER OF THE LIDS. ADDITIONAL FEES MAY BE ACCESSED TO THE DEVELOPER. THE PROFESSIONAL ENGINEER (PE) TO ALLOW THE PE TO ADJUST THE SANITARY SEWER THE EVENT THE NUMBER OF INSPECTIONS PERFORMED BY THE HCDPU EXCEEDS TWO, 14. MASTER METERS MUST BE INSTALLED IN CONCRETE VAULTS SIZED FOR THE METER LINE DESIGN IN ORDER TO AVOID CONFLICTS WITH EXISTING UNDERGROUND UTILITIES. ADDITIONAL FEES MAY BE ACCESSED TO THE DEVELOPER. ASSEMBLY AND ASSOCIATED APPURTENANCES SO AS TO PROVIDE AT LEAST EIGHTEEN THE UTILITY CONTRACTOR SHALL COORDINATE WITH THE UTILITY OWNER AND BE (18") INCHES OF CLEARANCE BETWEEN THE BOTTOM OF THE CONCRETE VAULT AND THE SANITARY SEWER RESPONSIBLE FOR TEMPORARY RELOCATION OF EXISTING UTILITIES AND/OR SECURING BOTTOM OF THE METER SETTER. THE MASTER METER MUST BE PROVIDED TEST PORTS 1. THE PROFESSIONAL ENGINEER (PE) SHALL OBTAIN AND SUPPLY A COPY OF THE SEWER EXISTING UTILITY POLES, PIPES, WIRES, CABLES, SIGNS AND/OR UTILITIES INCLUDING IF THE METER IS NOT EQUIPPED WITH TEST PORTS FROM THE MANUFACTURER IN PERMIT FOR THE CONSTRUCTION AND OPERATION OF THE WASTEWATER COLLECTION SERVICES IN ACCORDANCE WITH THE UTILITY OWNER'S REQUIREMENTS DURING SANITARY ACCORDANCE WITH THE HCDPU ESTABLISHED STANDARD SPECIFICATIONS AND DETAILS. SYSTEM TO THE UTILITY CONTRACTOR BEFORE THE CONSTRUCTION OF THE SANITARY SEWER LINE INSTALLATION, GRADING AND STREET CONSTRUCTION. DUCTILE IRON PIPE MUST BE USED FOR THE MASTER METER VAULT PIPING AND VALVE SEWER LINE, SEWER LIFT STATION AND ASSOCIATED FORCE MAIN SHALL BEGIN. THE 15. WHEN MAKING A TAP ON AN EXISTING SEWER FORCE MAIN, THE UTILITY CONTRACTOR VAULT PIPING. THE UTILITY CONTRACTOR MUST PROVIDE SHOP DRAWINGS FOR THE UTILITY CONTRACTOR MUST POST A COPY OF THE SEWER PERMIT ISSUED BY THE NORTH MUST HAVE A PERMIT FROM THE NORTH CAROLINA DEPARTMENT OF ENVIRONMENT AND METER VAULTS TO HCDPU PRIOR TO ORDERING THE CONCRETE VAULTS. CAROLINA DEPARTMENT OF ENVIRONMENT AND NATURAL RESOURCES - DIVISION OF NATURAL RESOURCES - DIVISION OF WATER QUALITY (NCDENR-DWQ) PRIOR TO BEGIN 15. THE UTILITY CONTRACTOR WILL INSTALL POLYETHYLENE SDR-9 WATER SERVICE LINES WATER QUALITY (NCDENR-DWQ) ON SITE PRIOR TO THE START OF CONSTRUCTION. THE THE TAP WORK. THE UTILITY CONTRACTOR SHALL CONDUCT A PNEUMATIC PRESSURE THAT CROSS UNDER THE PAVEMENT INSIDE A SCHEDULE 40 PVC CONDUIT TO ALLOW PERMIT MUST BE MAINTAINED ON SITE DURING THE CONSTRUCTION OF THE SEWER TEST USING COMPRESSED AIR OR OTHER INERT GAS ON THE STAINLESS STEEL TAPPING FOR REMOVAL AND REPLACEMENT IN THE FUTURE. TWO (2) INDEPENDENT 3/4" WATER SYSTEM IMPROVEMENTS. SLEEVE AND GATE VALVE PRIOR TO MAKING THE TAP ON AN EXISTING SANITARY SEWER SERVICE LINES MAY BE INSTALLED INSIDE ONE (1) - TWO (2") INCH SCHEDULE 40 PVC 2. THE UTILITY CONTRACTOR SHALL NOTIFY HARNETT COUNTY DEPARTMENT OF PUBLIC FORCE MAIN. THIS PNEUMATIC PRESSURE TEST MUST BE WITNESSED BY THE HCDPU CONDUIT OR TWO (2) INDEPENDENT 1" WATER SERVICE LINES MAY BE INSTALLED INSIDE UTILITIES (HCDPU) AND THE PROFESSIONAL ENGINEER (PE) AT LEAST TWO DAYS PRIOR UTILITY CONSTRUCTION INSPECTOR. THE UTILITY CONTRACTOR SHALL USE ROMAC ONE (1) - THREE (3") INCH SCHEDULE 40 PVC CONDUIT, BUT EACH WATER SERVICE TO CONSTRUCTION COMMENCING. THE UTILITY CONTRACTOR MUST SCHEDULE A BRAND STAINLESS STEEL TAPPING SLEEVE(S) OR APPROVED EQUAL FOR ALL TAPS MADE SHALL BE TAPPED DIRECTLY TO THE WATER MAIN. SPLIT SERVICES ARE NOT ALLOWED PRE -CONSTRUCTION CONFERENCE WITH MR. ALAN MOSS, HCDPU UTILITY CONSTRUCTION ON SANITARY SEWER FORCE MAINS IN HARNETT COUNTY. THE UTILITY CONTRACTOR BY HCDPU. INSPECTOR AT LEAST TWO (2) DAYS BEFORE CONSTRUCTION WILL BEGIN AND THE SHALL USE ROMAC BRAND STYLE "CB" SEWER SADDLES WITH STAINLESS STEEL BANDS UTILITY CONTRACTOR MUST COORDINATE WITH HCDPU FOR REGULAR INSPECTION OR APPROVED EQUAL FOR ALL TAPS MADE ON EXISTING SANITARY SEWER GRAVITY VISITATIONS AND ACCEPTANCE OF THE WASTEWATER SYSTEM(S). CONSTRUCTION WORK LINES IN HARNETT COUNTY. SHALL BE PERFORMED ONLY DURING THE NORMAL WORKING HOURS OF HCDPU WHICH IS 16. THE UTILITY CONTRACTOR SHALL PROVIDE A GREASE TRAP FOR EACH SANITARY SEWER 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME LEISURE POOLS STORAGE YARD PROJECT NOTES CLIENT PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 Phone: (865) 312-7469 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1492 DRAWING SCALE SEE SHEETS DATE RELEASED MAY 20, 2019 SHEET NUMBER G-1 nO VICINITY MAP NOT TO SCALE LEGEND: Z�, DOT DISK "'Z ECM —EXISTING CONCRETE MONUMENT EPKO EPK—EXISTING PK NAIL ENO ENL—EXISTING NAIL ERBO ERB—EXISTING REBAR N/F — NOW OR FORMERLY R/W — RIGHT OF WAY PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE RIGHT—OF—WAY so STORM DRAINAGE OVERHEAD UTILITY PERMANENT EASEMENT X FENCE LINE TREE LINE 160 MAJOR CONTOUR 158 MINOR CONTOUR x 208.47' SPOT ELEVATION BENCHMARK EEE SIGN M� MAILBOX - HVAC UNIT PP. UTILITY POLE C GUY WIRE 0 TELEPHONE PEDESTAL D4 WATER VALVE ❑❑ WATER METER HARDWOOD TREE PINE TREE GRAVEL ASPHALT CONCRETE BUILDINGS NOTES: 1. ALL DISTANCES SHOWN ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED. 2. COMBINED SCALE FACTOR: 0.9998760 LOCALIZATION POINT N: 546,978.708 E: 2,110,999.480 CONTROL ESTABLISHED VIA NORTH CAROLINA GEODETIC SURVE VIRTUAL REFERENCE SYSTEM. 3. THE HORIZONTAL AND VERTICAL CONTROL FOR THIS SURVEY WERE ESTABLISHED USING THE NORTH CAROLINA GEODETIC SURVEY VIRTUAL REFERENCE SYSTEM. 4. LINES NOT SURVEYED ARE SHOWN AS DASHED LINES FROM INFORMATION REFERENCED ON THE FACE OF THIS MAP. 5. NONCONFORMING STRUCTURES HAVE NOT BEEN CREATED BY THIS SURVEY. 6. THIS SURVEY WAS DONE WITHOUT BENEFIT OF A TITLE SEARCH AND IS BASED ON REFERENCED INFORMATION SHOWN HERE ON OTHER DOCUMENTS OF RECORD MAY EXIST WHICH COULD AFFECT THIS PROPERTY. NO RESPONSIBILITY IS ASSUMED BY THIS SURVEYOR FOR ANY CONDITIONS WHICH MAY PRESENTLY EXIST BUT ARE UNKNOWN OR REFERENCED HERE ON, SUCH A BUT NOT LIMITED TO HAZARDOUS WASTE MATERIALS, EASEMENTS, CEMETERIES, AND FLOOD AREAS. 7. LOCATIONS OF ALL UNDERGROUND UTILITIES LYING WITHIN THIS MAPPED AREA MAY NOT BE SHOWN ON THIS PLAN. DEVELOPERS OR CONTRACTORS SHOULD NOT ONLY MAKE SUBSURFACE INVESTIGATIONS BUT SHOULD ALSO ALLOW FOR CONTINGENCIES WHICH MIGHT ARISE BY REASON OF ENCOUNTERING UNRECORDED LINES OR OF LINES BEING IN DIFFERENT LOCATIONS THAN INDICATED ON THIS SURVEY. 8. THIS PROPERTY LIES WITHIN FLOOD ZONE "X"ACCORDING TO MAP# 3720150400K OF THE FLOOD INSURANCE RATE, DATED JANUARY 5, 2007. I, SEAN R. SEEVER, CERTIFY THAT THIS SURVEY IS OF AN EXISTING PARCEL OR PARCELS OF LAND OR ONE OR MORE EXISTING EASEMENTS AND DOES NOT CREATE A NEW STREET OR CHANGE AN EXISTING STREET. PROFESSIONAL LAND SURVEYOR — L-4571 I, SEAN R. SEEVER, CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION (DEED DESCRIPTION RECORDED IN BOOK SHOWN. PAGE HEREON OR OTHER REFERENCE SOURCE ); THAT THE BOUNDARIES NOT SURVEYED ARE INDICATED AS DRAWN FROM INFORMATION IN BOOK , PAGE OR OTHER REFERENCE SOURCE ---- --------- • THAT THE RATIO OF PRECISION OR POSITIONAL ACCURACY IS 1:10,000+; AND THAT THIS MAP MEETS THE REQUIREMENTS OF THE STANDARDS OF PRACTICE FOR LAND SURVEYING IN NORTH CAROLINA (21 NCAC 56. 1600). WITNESS MY HAND AND SEAL THIS 20 DAY OF MAY, 2019. PROFESSIJNAiLCLXNE67SURVEYOR — L-4571 AREA: (BY COORDINATE COMPUTATION) 407,847 SF (9.36 AC) INCLUDING R/W PIN N0: 1514-06-7954.000 35' FRONT 0' SIDE 25' REAR SOURCE OF TITLE DB 313, PG 107 PB 2004, PG 696 HARNETT COUNTY REGISTER OF DEEDS NCDOT DISK I NCDOT , DISK I I I I I I I I I I I I NCDOT DISK I NCDOT DISK NCDOT , DISK NCDOT • DISK NCDOT NCDOT DISK DISK NCDOT DISK 1 1 I 1 1 1 1 Y I 1 1 I 1 1 I 1 1 S I 1 1 NCDOT DISK NCDOT DISK NCDO DISK NCDOT • DISK NCDOT DISK �01111 ARNI, �-\ ........ z V/�� ••FESS Q � AL � L p57 U /'/4' R i lSt! bs •2b • I°1 I, SEAN R. SEEVER, CERTIFY THAT THE CONTROL FOR THIS SURVEY WAS ESTABLISHED FROM AN ACTUAL GPS SURVEY UNDER MY SUPERVISION. THIS GPS SURVEY WAS PERFORMED TO C-211 FGCC SPECIFICATIONS RTK GPS WITH VRS FIELD PROCEDURES WERE USED. THE COORDINATES WERE OBTAINED THROUGH A GRID TO GROUND ADJUSTMENT USING THE COMBINED SCALE FACTOR SHOWN HEREON. THIS SURVEY WAS PERFORMED ON MARCH 12, 2019 USING TWO TRIMBLE 5700 RECEIVERS. �R Ajv�- PROFESSI NAL LAND SURVEYOR — L-4571 O I, SEAN R. SEEVER, CERTIFY THAT THIS CLASS "C" TOPOGRAPHIC MAP WAS DRAWN FROM AN ACTUAL SURVEY PERFORMED UNDER MY DIRECT SUPERVISION AND THAT IT MEETS OR EXCEEDS THE NORTH CAROLINA ADMINISTRATIVE CODE 21.56.1605 AND 21.56.1606. WITNESS MY HAND AND SEAL THIS 20 DAY OF MAY, A.D., 2019. PROFESSI NAL LAND SURVEYOR — L-4571 N /F SHAUN W. SEWELL & WIFE, CANDACE SEWELL DB 3644, PG 258 PC—F, SLIDE 765A TB M 4D DISK #1 N 546,978.708 E 2,110,999.480 ELEV 156.51 NC GRID NAD 83 (2011) XNAVD 88 w0 k p�eO'ow pqp Nc CRID NAD 83 r2p��J EPPK k N /F MAGDALENE BENNETT WOOD DB 11 E, PG 544 DB 1591, PG 49 PB 9, PG 60 GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com `�\\►I I I I11//�� CARO �i/// OFESS /� `9 �AL _ ;:•• ;•SURD J<CiC i" IV R �ISe Z� ' bs•2.b• Iq REVISIONS PROJECT NAME LEISURE POOLS STORAGE YARD EXISTING CONDITIONS CLIENT PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 Phone: (865) 312-7469 PROJECT INFORMATION SURVEYED BY: MIKE DRAWN BY: SEAN CHECKED BY: JIMMY PROJECT NUMBER: 1492 DRAWING SCALE HORIZONTAL: 1 "=50' DATE SURVEYED MARCH 12, 2019 SHEET NUMBER C-1 00 VICINITY MAP NOT TO SCALE LEGEND: Z�, DOT DISK 'CMZ ECM -EXISTING CONCRETE MONUMENT EPKO EPK-EXISTING PK NAIL ENLO ENL-EXISTING NAIL ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE — oPL — — — OLD PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE A So STORM DRAINAGE OVERHEAD UTILITY PERMANENT EASEMENT X FENCE LINE TREE LINE 160 MAJOR CONTOUR 158 MINOR CONTOUR x 208.47' SPOT ELEVATION -J�- BENCHMARK SIGN SIGN M� MAILBOX - HVAC UNIT pp UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL D4 WATER VALVE ❑❑ WATER METER G� HARDWOOD TREE PINE TREE GRAVEL ASPHALT CONCRETE BUILDINGS SITE NOTES 1. EXISTING UNDERGROUND UTILITIES ARE SHOWN ONLY WHERE EVIDENCE COULD BE FOUND TO VERIFY LOCATION. PRIOR TO CONSTRUCTION OR EXCAVATION OF THE SITE, THE GENERAL CONTRACTOR SHALL VERIFY ALL UTILITY COMPANIES TO VERIFY THE LOCATION OF THEIR RESPECTIVE UTILITIES. ALL DAMAGE INCURRED TO EXISTING UTILITIES DURING CONSTRUCTION SHALL BE REPAIRED AT THE GENERAL CONTRACTOR'S EXPENSE. 2. ASPHALT AND BASE TYPE SHALL BE PER THE DETAILS. 3. HANDICAP RAMPS, SIGNAGE AND PARKING SPACES SHALL BE PROVIDED BY THE CONTRACTOR AND INSTALLED PER FEDERAL ADA AND LOCAL REQUIREMENTS. 4. ALL DIMENSIONS ARE TO THE BACK OF CURB OR TO THE FACE OF SIDEWALK UNLESS OTHERWISE NOTED. 5. ALL RADII ARE 5' UNLESS OTHERWISE NOTED. 6. PARKING STALLS MUST BE STRIPED WITH A 4 INCH CONTRASTING STRIPE (YELLOW ON CONCRETE AND YELLOW OR WHITE ON ASPHALT PARKING LOT). 7. HANDICAP PARKING SPACES ARE TO BE DESIGNATED BY BLUE STRIPING AND EITHER A BLUE SYMBOL ON A WHITE BACKGROUND OR A WHITE SYMBOL ON A BLUE BACKGROUND. ALL HANDICAP PARKING STALLS REQUIRE THE INSTALLATION OF THE PROPER SIGNAGE. 8. ALL PARKING SPACES ARE TO BE LAID OUT IN ACCORDANCE WITH THE SITE PLAN DIMENSIONS. 9. ALL WASTE MATERIAL SHALL BE DISPOSED OF OFF -SITE IN ACCORDANCE WITH STATE AND LOCAL LAWS AND REGULATIONS. 10. ALL SITE IMPROVEMENTS SHALL BE INSTALLED PER HARNETT COUNTY AND STATE REGULATIONS. NCDOT DISK I NCDOT DISK I I I I I I � **MOBILE OFFICE TO CONNECT TO EXISTING WATER/ SEWER ISERVICES FROM EXISTING DWELLING I I I I Ncoor DISK I NCDOT DISK NCDOT DISK NCDOT • DISK NCDOT F NCDOT DISK DISK NCDOT DISK 1 1 I 1 1 1 1 1 1 1 1 I 1 1 I 1 1 Ncoor DISK NCDOT DISK NCDOT DISK NCDOT DISK NCDOT DISK SITE DATA DEVELOPER LEISURE POOLS & SPAS MANUFACTORING MAILING ADRESS 2901 LEISURE ISLAND WAY CITY, STATE KNOXVILLE, TENNESSEE 37914 PIN NUMBER 1514-06-7954.000 TOTAL LOT AREA 429,699 SF (9.86 AC) AREA TO BE DEVELOPED 429,699 SF (9.86 AC) ZONING COMM EXISTING USE AGRICULTURAL/ UNDEVELOPED PROPOSED USE OUTSIDE STORAGE DISTURBED/DENUDED AREA 4.56 AC SETBACKS REQUIRED: FRONT 35 FT SIDE 20 FT ADJACENT TO RESIDENTIAL ZONED LOT CORNER SIDE 20 FT/ 15 FT ADJACENT TO ACCESS EASEMENT OR PRIVATE STREET REAR 25 FT EXISTING IMPERVIOUS AREA (TO BE REMOVED) 6,902 SF PROPOSED IMPERVIOUS AREA 70,779 SF FUTURE IMPERVIOUS AREA 17,521 SF TOTAL IMPERVIOUS AREA 88,300 SF TOTAL SITE AREA 369,839 SF PERCENT IMPERVIOUS 23.9% 00 w 11, Cn I 0 '-, Q 0_ � 0�1 m Z I Y01 Q CD 2 I � Im INV 157.50 1 EPK QTY. TYPE PLANTING SIZE MIN. HEIGHT SCIENTIFIC NAME CANOPY TREES *777 WILLOW OAK 2" CALIPER 6' QUERCUS PHELLOS LANDSCAPING NOTES 1. HEIGHT AND SPREAD OF TREE SPECIMEN SHALL MEET REQUIREMENTS OF THE AMERICAN ASSOCIATION OF NURSERYMEN, AMERICAN STANDARD FOR NURSERY STOCK. 2. EACH TREE SHALL BE PLANTED SUCH THAT THE ROOT FLARE IS VISIBLE AT THE TOP OF THE ROOT BALL. TREES WHERE THE ROOT FLARE IS NOT VISIBLE SHALL BE REJECTED. DO NOT COVER THE ROOT FLARE WITH MULCH. 3. DO NOT PLACE MULCH IN CONTACT WITH THE TREE TRUNK. KEEP MULCH A MINIMUM OF 4 INCHES AWAY FROM THE TRUNK BASE. *THIS LANDSCAPING PLAN IS THE MINIMUM REQUIRED TO MEET WITH THE HARNETT COUNTY LIDO. THE OWNER OR DEVELOPER IS ENCOURAGED TO CONSULT WITH A LANDSCAPE ARCHITECT IN ORDER TO DEVELOP A PLAN THAT IS MORE IN DEPTH THAN THE MINIMUM REQUIREMENTS. THIS PLAN IS FOR PERMITTING PURPOSES ONLY. X X 34 S�°E EPK X 3.49' S10°54'26"E 125.46' TB M 4D DISK #1 N 546,978.708 E 2,110,999.480 ELEV 156.51 S08° NC GRID NAD 83 22'31"E 113.11' EPK _ (2011) \ NAVD 88 ECM `X_� 02 29'S � V NCDOT 9'E 110.84' PUeoOo RD - _ DISK EX/STING R/W EPK �— VAR/FS BUILDINGS 8c _ _` SG3°72• �!!t-IVEWAY TO' REMOVED _� `�\��Bg w 10, BEX ���R/W \ PAVED PARKING Ncoor NEW NCDOT \ EPK k _�� DISK Q 15' TYPE D� 7 04 -I' BUFFER NCDOT 33' EPK POOL STORAGE ` \ AREA T � `` S7J-7 LOADING AREA 7 s3 \ FFICE . � \ \ ` EPK 6' OPAQUE SK Ncoor ` FENCE �8, \ ` 3° \ ` POOL STORAGE INV GRAVEL DRIVE AREA�`a\s'RCA INV OT 148.74 NCDOT Nc GRID NAD 83 r2p7jJ N /F MAGDALENE BENNETT WOOD DB 11 E, PG 544 DB 1591, PG 49 PB 9, PG 60 2 1 N /F SHAUN W. SEWELL & WIFE, CANDACE SEWELL / \ DB 3644, PG 258 PC-F, SLIDE 765A Q GRAPHIC SCALE 50 0 25 50 100 200 ( IN FEET ) I inch = 50 ft. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com "01111 MINI .•••• ••. •4 SEA • 027 0 REVISIONS PROJECT NAME LEISURE POOLS STORAGE YARD SITE PLAN CLIENT PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 Phone: (865) 312-7469 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1492 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED MAY 20, 2019 SHEET NUMBER C-200 VICINITY MAP NOT TO SCALE LEGEND: Z�, DOT DISK "'Z ECM -EXISTING CONCRETE MONUMENT EPKO EPK-EXISTING PK NAIL ENLO ENL-EXISTING NAIL ERBO ERB-EXISTING REBAR N/F - NOW OR FORMERLY R/W - RIGHT OF WAY PROPERTY LINE - OPL - - - OLD PROPERTY LINE ADJACENT PROPERTY LINE TIE LINE A So STORM DRAINAGE OVERHEAD UTILITY PERMANENT EASEMENT X FENCE LINE TREE LINE 160 MAJOR CONTOUR 158 MINOR CONTOUR x 208.47' SPOT ELEVATION -J�- BENCHMARK SIGN SIGN M� MAILBOX - HVAC UNIT PP UTILITY POLE C GUY WIRE ❑T TELEPHONE PEDESTAL N WATER VALVE ❑❑ WATER METER G� HARDWOOD TREE PINE TREE GRAVEL ASPHALT CONCRETE BUILDINGS GRADING NOTES 1. ALL ELEVATIONS SHOWN ARE IN REFERENCE TO THE BENCHMARK AND MUST BE VERIFIED BY THE GENERAL CONTRACTOR.ALL SPOT ELEVATIONS ARE TO THE FINISHED GRADE OF THE CURB, UNLESS OTHERWISE NOTED. 2. ALL SIDEWALKS AND PEDESTRIAN WALKING SURFACES SHALL HAVE A CROSS SLOPE NO STEEPER THAN 2% AND LONGITUDINAL SLOPE NO STEEPER THAN 5%. 3. THE CONTRACTOR SHALL ASSUME RESPONSIBILITY FOR ALL LAND DISTURBING ACTIVITIES AND ENSURE COMPLIANCE WITH THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN. THE CONTRACTOR SHALL INSPECT AND MAINTAIN ALL EROSION CONTROL DEVICES AND CLEAR ANY DEBRIS LEAVING THE SITE ON NEIGHBORING ROADS. 4. EXISTING GROUND UPON WHICH FILL OR BASE IS TO BE PLACED SHALL BE CLEARED OF WEEDS, DEBRIS, TOPSOIL, AND ALL OTHER DELETERIOUS MATERIALS; NO FILL SHALL BE PLACED UNTIL PREPARATION OF THE EXISTING GROUND HAS BEEN COMPLETED 5. PROTECTIVE MEASURES SHALL BE TAKEN BY THE CONTRACTOR AND THE OWNER TO PROTECT ADJACENT PROPERTY, THE PUBLIC AND UTILITIES DURING GRADING OPERATIONS. THE CONTRACTOR ASSUMES ALL LIABILITY FOR THE UNDERGROUND UTILITY PIPES, CONDUITS, OR STRUCTURES, WHETHER SHOWN OR NOT ON THE PLAN 6. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE LOCATION OF ALL UTILITIES OR STRUCTURES ABOVE AND BELOW GROUND, SHOWN OR NOT SHOWN ON THESE PLANS. THEY WILL BE HELD RESPONSIBLE FOR ALL DAMAGE TO ANY UTILITIES OR STRUCTURES CAUSED BY HIS OPERATION. 7. ALL CUT AND FILL SLOPES SHOULD BE INVESTIGATED BOTH DURING AND AFTER GRADING BY THE CONTRACTOR TO DETERMINE IF ANY SLOPE STABILITY PROBLEMS EXIST. IF IT IS DETERMINED THAT THERE IS A SLOPE STABILITY PROBLEM THE ENGINEER OF RECORD SHOULD BE NOTIFIED. 8. STOCKPILE AREAS THAT WILL EXCEED 10' IN HEIGHT SHOULD BE GRADED WITH 3:1 SLOPES AND SURROUNDED BY SILT FENCE. 9. APPROVED COPIES OF THE GRADING AND EROSION CONTROL PLANS SHALL BE ON THE PERMITTED SITE WHILE WORK IS IN PROGRESS. 10. ALL EXISTING DRAINAGE COURSES THROUGH THIS SITE SHALL REMAIN IN A CONDITION SUCH THAT THEY CAN TRANSPORT THE NATURAL DRAINAGE UNTIL FACILITIES TO HANDLE THE STORM WATER ARE CONSTRUCTED. THE CONTRACTOR SHALL BE RESPONSIBLE FOR ANY DAMAGE DUE TO OBSTRUCTING NATURAL DRAINAGE PATTERNS. 11. ANY DEVIATION FROM THE APPROVED GRADING PLAN SHOULD BE REPORTED TO THE ENGINEER OF RECORD PRIOR TO IMPLEMENTATION OF THE CHANGE. 12. ALL SLOPES 3:1 OR STEEPER THAT EXTEND TEN FEET OR MORE SHALL BE LINED WITH NORTH AMERICAN GREEN S75 TEMPORARY EROSION CONTROL BLANKET OR EQUAL SUBSTITUTE. GROUND STABILIZATION CHART SITE AREA STABILIZATION STABILIZATION TIME DESCRIPTION TIME FRAME FRAME EXCEPTIONS PERIMETER DIKES, SWALES, DITHCES 7 DAYS NONE AND SLOPES HIGH QUALITY WATER (HQW) 7 DAYS NONE ZONES IF SLOPES ARE 10' OR SLOPES STEEPER 7 DAYS LESS IN LENGTH AND ARE THAN 3:1 NOT STEEPER THAN 2: 1, 14 DAYS ARE ALLOWED SLOPES 3:1 OR 7-DAYS FOR SLOPES FLATTER 14 DAYS GREATER THAN 50 FEET IN LENGTH NONE ALL OTHER AREAS (EXCEPT FOR WITH SLOPES FLATTER 14 DAYS PERIMETERS AND THAN 4:1 HQW ZONES) NCDOT DISK I NCDOT DISK I I I I I I I I I I I I NCDOT DISK I NCDOT DISK NCDOT DISK NCDOT DISK NCDOT F NCDOT DISK DISK NCDOT DISK 1 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 I 1 1 Ncoor DISK NCDOT DISK NCDOT DISK NCDOT • DISK NCDOT DISK . EPK II I I I II I �I I II I ENTRANCE NOT TO BE USED AS CONSTRUCTION ENTRANCE l co I ` � III Cn IQ oCn l I � J I m Z_ Y 0 I QI = I � I � I I INLET I PROTECTION (TYP) I II I � I 72.00 LF @ 1.39% 15' CLASS IV RCP TEMPORARY CONSTRUCTION ENTRANCE I I I I I EPP INV 157.501 II I I PP 1 CONSTRUCTION SEQUENCE 1. OBTAIN ALL NECESSARY PERMITS AND APPROVALS AND HOLD PRE CONSTRUCTION CONFERENCE. 2. INSTALL STONE CONSTRUCTION ENTRANCE, TEMPORARY SILT FENCE, AND DIVERSION BERMS WHERE SPECIFIED. 3. CONSTRUCT TEMPORARY SKIMMER BASIN. 4. CLEAR AND GRUB THE SITE AS NEEDED. 5. ROUGH GRADE THE SITE AND APPLY TEMPORARY SEEDING TO AREAS TO REMAIN GRASSED. 6. INSTALL UTILITIES. 7. INSTALL INLET PROTECTION ON ALL NEW STORM WATER INLETS. 8. PERFORM FINE GRADING. 9. INSTALL AND PREPARE BASE COURSE. 10. PAVE ROADWAYS AND PARKING LOTS. 11. FERTILIZE, SEED AND MULCH ALL REMAINING DISTURBED AREAS. 12. UPON SITE STABILIZATION, SEEK NCDEQ APPROVAL TO REMOVE ALL TEMPORARY MEASURES. 13. ALL EROSION CONTROL MEASURES SHALL BE MAINTAINED AS OUTLINED IN THE DETAILS WITHIN THE PLANS AND ACCORDING TO THE NCDEQ EROSION CONTROL MANUAL. L76, 161,b2 EPK \ \EPK X \ EPKX-� X- NOTIFICATION OF COMBINED SELF -MONITORING AND SELF -INSPECTION FORM: THE SEDIMENTATION POLLUTION CONTROL ACT WAS AMENDED IN 2006 TO REQUIRE THAT PERSONS RESPONSIBLE FOR LAND -DISTURBING ACTIVITIES INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. RULES DETAILING THE DOCUMENTATION OF THESE INSPECTIONS TOOK EFFECT OCTOBER 1, 2010. TO SIMPLIFY DOCUMENTATION OF SELF -INSPECTION REPORTS AND NPDES SELF -MONITORING REPORTS, DWQ AND DEMLR DEVELOPED A COMBINED FORM. THE SELF -INSPECTION PROGRAM IS SEPARATE FROM THE WEEKLY SELF -MONITORING PROGRAM OF THE NPDES STORMWATER PERMIT FOR CONSTRUCTION ACTIVITIES. THE FOCUS OF THE SELF -INSPECTION REPORT IS THE INSTALLATION AND MAINTENANCE OF EROSION AND SEDIMENTATION CONTROL MEASURES ACCORDING TO THE APPROVED PLAN. THE INSPECTIONS SHOULD BE CONDUCTED AFTER EACH PHASE OF THE PROJECT, AND CONTINUED UNTIL PERMANENT GROUND COVER IS ESTABLISHED. THE FORM CAN BE ACCESSED AT: HTTP: //PORTAL.NCDENR.ORG/WEB/LR/EROSION IF YOU HAVE QUESTIONS OR CANNOT ACCESS THE FORM, PLEASE CONTACT THE FAYETTEVILLE REGIONAL OFFICE AT (910) 433-3300. TB M 4D DISK #1 X N 546,978.708 X E 2,110,999.480 EPK X ELEV 156.51 EROSION CONTROL NOTES 1. ALL INLET/OUTLET PROTECTION WILL BE CHECKED FOR MAINTENANCE AND FAILURE EACH ACTIVE DAY ON SITE. SEDIMENT WILL BE REMOVED FROM THE SEDIMENT TRAP AND INLET PROTECTION DEVICES WHEN THE STORAGE CAPACITY HAS BEEN APPROXIMATELY 50% FILLED. GRAVEL WILL BE CLEANED OR REPLACED WHEN THE SEDIMENT POOL NO LONGER DRAINS PROPERLY. SEDIMENT WILL BE REMOVED FROM BEHIND THE SEDIMENT FENCE WHEN IT BECOMES ABOUT 0.5' DEEP AT THE FENCE. THE SEDIMENT FENCE WILL BE REPAIRED AS NEEDED TO MAINTAIN A PROPER BARRIER. 2. TEMPORARY EROSION CONTROL FACILITIES AND/OR PERMANENT FACILITIES INTENDED TO CONTROL EROSION OF AND EARTH DISTURBANCE OPERATION SHALL BE INSTALLED BEFORE ANY EARTH DISTURBANCE OPERATIONS TAKE PLACE OR AT THE EARLIEST POSSIBLE POINT DURING CONSTRUCTION. 3. TEMPORARY & PERMANENT EROSION CONTROL MEASURES SHALL BE CONSTRUCTED PER THE DETAILS HEREIN, OR SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE NORTH CAROLINA EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL. 4. THE CONTRACTOR MUST NOTIFY THE APPROPRIATE NCDEQ OFFICE A MINIMUM OF 48 HOURS PRIOR TO BEGINNING ANY LAND DISTURBING ACTIVITIES. 910-433-3300 5. REMOVE ALL SOILS AND SEDIMENTS TRACKED OR OTHERWISE DEPOSITED ONTO PUBLIC AND PRIVATE PAVEMENT AREAS. REMOVAL SHALL BE ON A DAILY BASIS WHEN TRACKING OCCURS. 6. LOCATE SOIL STOCKPILES NO LESS THAN TWENTY-FIVE (25) FEET FROM ANY PUBLIC OR PRIVATE ROADWAY OR DRAINAGE CHANNEL. IF REMAINING FOR MORE THAN SEVEN DAYS, STABILIZE THE STOCKPILES BY VEGETATIVE COVER, TARPS, OR OTHER MEANS. CONTROL EROSION FROM ALL STOCKPILES BY PLACING SILT BARRIERS AROUND THE PILES. TEMPORARY STOCKPILES LOCATED ON PAVED SURFACES MUST BE NO LESS THAN FIVE FEET FROM THE DRAINAGE/GUTTER LINE AND SHALL BE COVERED IF LEFT MORE THAN 24 HOURS. 7. MAINTAIN ALL TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES IN PLACE UNTIL THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED. INSPECT TEMPORARY EROSION AND SEDIMENT CONTROL DEVICES ON A DAILY BASIS AND REPLACE DETERIORATED, DAMAGED, OR ROTTED EROSION CONTROL DEVICES IMMEDIATELY AGAINST EROSION DUE TO RAIN, WIND AND RUNNING WATER WITHIN 14 DAYS. USE SEEDING AND MULCHING, EROSION CONTROL MATTING, AND/OR SODDING AND STAKING IN GREEN SPACE AREAS AND OTHERWISE APPROPRIATE MEASURES. USE EARLY APPLICATION OF GRAVEL BASE ON AREAS TO BE PAVED. 9. DO NOT REMOVE ANY EROSION AND SEDIMENT CONTROL DEVICES AFTER THE PROTECTED AREA HAS UNDERGONE FINAL STABILIZATION AND PERMANENT VEGETATION HAS BEEN ESTABLISHED, IT IS RECOMMENDED THAT NCDEQ APPROVE THE ACTION PRIOR TO REMOVAL. 10. THE CONSTRUCTION ENTRANCE SHALL BE INSTALLED CONCURRENTLY WITH THE INITIATION OF CONSTRUCTION ACTIVITY. 11. THE INSTALLATION OF EROSION CONTROL MEASURES SHALL TAKE PRECEDENCE OVER ALL OTHER CONSTRUCTION ACTIVITIES. 12. THE PERMITTEE SHALL BE HELD RESPONSIBLE FOR THE ACTIONS AND PERFORMANCE OF ANY OTHER PARTIES PERFORMING WORK ON THIS PROJECT. 13. ALL EROSION AND SEDIMENT CONTROL PRACTICES WILL BE CHECKED FOR STABILITY AND OPERATION FOLLOWING EVERY RUNOFF -PRODUCING RAINFALL BUT IN NO CASE LESS THAN ONCE EVERY WEEK. ANY NEEDED REPAIRS WILL BE MADE IMMEDIATELY TO MAINTAIN ALL PRACTICES AS DESIGNED. 14. PURSUANT TO G.S. 113A-57(2), THE ANGLE FOR GRADED SLOPES AND FILLS SHALL BE NO GREATER THAN THE ANGLE THAT CAN BE RETAINED BY VEGETATIVE COVER OR OTHER ADEQUATE EROSION CONTROL DEVICES OR STRUCTURES. IN ANY EVENT, SLOPES LEFT EXPOSED WILL, WITHIN 7 OR 14 CALENDAR DAYS OF COMPLETION OF ANY PHASE OF GRADING, BE PLANTED OR OTHERWISE PROVIDED WITH TEMPORARY OR PERMANENT GROUND COVER, DEVICES OR STRUCTURES SUFFICIENT TO RESTRAIN EROSION. PURSUANT TO G.S. 113A-57(3), PROVISIONS FOR PERMANENT GROUND COVER SUFFICIENT TO RETAIN EROSION MUST BE ACCOMPLISHED FOR ALL DISTURBED AREAS WITHIN 14 WORKING DAYS OR 90 CALENDAR DAYS (WHICHEVER IS SHORTER) FOLLOWING COMPLETION OF CONSTRUCTION DEVELOPMENT. 15. CONTRACTOR IS RESPONSIBLE FOR INSTALLING ALL EROSION CONTROL MEASURES SHOWN AND ANY ADDITIONAL MEASURES REQUIRED TO CONTROL THE SEDIMENT DURING THE COURSE OF CONSTRUCTION. 16. ALL SEEDED AREAS WILL BE FERTILIZED, RESEEDED AS NECESSARY, AND MULCHED ACCORDING TO THE DETAILS HEREIN I X NC GRID NAD 83 8, TEMPORARILY OR PERMANENTLY STABILIZE ALL DENUDED 17. THE CONTACT PERSON FOR EROSION CONTROL ISSUES THAT BLDG 0ZL AREAS WHICH HAVE BEEN FINISH GRADED, AND ALL ARISE ON SITE IS KENT CARPENTER. CONTACT FFE COP -4. - _ EPK NAVD 88 162.o1 ECM _ _ _ DENUDED AREAS IN WHICH GRADING OR SITE BUILDING 865-968-8985. 157 - --6., � 000 CONSTRUCTION OPERATIONS ARE NOT ACTIVELY UNDERWAY NCDOT _ q0 POSSIBLE DISK �� - _ \� \\ EPK C R/(y L LOOC�� _ \\ 155 _ X -C�L� 2 STORY NCDOT DWELLING 161.62 LOG\ -L�� ` _ NCD �\ \\\ \ EPK I FFE 165.27 w w L0C t@� DISK \ \ \ �' w DISK \ \ ox \ LOC / L6� L � �\ \ 51.8 6 . �° �\ 7, \ LOC DO NOT NCDOT L `� ` \ \ LO 0� \ EPK k 161.79 160.0 16 .0 C\ LOC DISTURB LO 161.13 \ 162 1 07 \00j 7S9 LOG\ NCDOT\ )Ol 1 1.77 161.55 160.42 �O \C0� LOG` C < LO �C � \007 LO \ �0 � ` � �s3 O� / ^/ \C07 \ .7s LOG\ LOC C \� \ \ 8 \ CO \ � \ EPK \ ` 0 160.55 160 159.67 7 \OO `LOG` C �or\ wv \\C07 \ 7S, LO \ LOC SK OC \\\ 146.79 D -4' a Job COC15Z3.00, 0� \C0� \ `LOC135.92\\�\ LOC 007 � (0 \ L0C\ LO INV DO NOT \007 \s� c \` \;15 32, M EPK 159.31 158.94 C0\ DISTURB O7 15 9 \ \ 1 R� v LOC 307 <� \ � A INV / 159 \ LOC \ INV 148.54 DO NOT 158.137 158 9�\O0I \ \ LOC \v Ncoor s.7al �s2\ O� NCDOT DISTURB v / OOP \ \ LOC 0 15 87 D0� \ \ LOC � \ DISK 158.54 307 \ LO / II 0 NCDOT ISK 158P44 \D07 \ 158 C\ LOC� 154.16 T54.96 NCDO V 001 h� \ ISK r ` 0 DO7 \D0 \ L0C\ 154.77 154.76 o NTOOT �\ < 7 LOCo LOC SK 0C' \00� \ \ LOC pG 15188LOC 7.14 DO NOT DO 159 �- �- I 1�.59 / I \ �' �'� \ LO DISTURB \DOS 156.87 155.22 0 ` o o /' \ ` C\ CO \� V 153.93 r J n ` CONSTRUCTION LOC 158 00154.18 n 157.48 \LOG\ L \ 154.0 L /I (4.5 AC) /\DI 0C 155.8 5 / / r U /Ov �r \ ` LO � 15 O / G p j Yf ` /r � SF V L C \DI \ C\ L 156 44 �' 0 n I INV 1 OC LOT iODI 157.47 �2 6 1 8.6 00 i i T58.6 157.: �.� EI IL cNV1I56.80-^Go0 nviv RIP RAP DISSIPATER ENL (�HL=7.5' W=3.75'/8.8' Dw--8" DYA,r12" 1 CLASS B 18" THICK ®I O 157.4 L C \DI VC 156.46 154.01 155P.70 LOC \ C 15 _T7 LOC 156. 3 / I p `` 157.19 LOC DI1� LOC LOC L[�C 15a / \ 157.15 C\D/� \ 15, 156.55 156.43 �C\DI '157.1 I 153.57 /o o CO) / /l �C\ (�57.1 p �0 GTEMPORARYC p�C D�C p I-V p F p 156.56 I RIP RAP DISSIPATER DO NOT FOCOC FOC_DI 153.29 r/ L=3' W=1 /3' �- DISTURB DIVERSION BERM � F� 153.17 OPT TEMPORARY D�=8" DYA1�12" f i TYP � ( ) SILT FENCE z..:.:..:::.::.: /G OPL °p<OC-DI [� \ O �� CLASS B 18" THICK FF ' ;::::;::'...;::. N/F ...... MAGDALENE BENNETT WOOD L C i DB 11 E, PG 544 0164 - - - OPL - - - OPL - - -SF0 -..... i LOC8„�. DB 1591, PG 49 - OP - - ` F C� _ - C SLOC�`2j� rERB / PB 9, PG 60 - OPL -0 N89°02'47"E --- - - L n I "1 -20.01' S15°54'11 "E 888.36' 2 1 N/F SHAUN W. SEWELL & WIFE, CANDACE SEWELL DB 3644, PG 258 PC-F, SLIDE 765A Know what's below. Call before you dig. TEMPORARY SKIMMER BASIN #1 L=80', W=45', D=3' SIDE SLOPES= 2:1 TOP OF BASIN: 154.00' BOTTOM OF BASIN: 151.00' 10' EMERGENCY SPILLWAY: 153.00' INVERT OF SKIMMER: 151.00' SIDE SLOPES OF BASIN ARE TO BE SEEDED WITHIN SEVEN DAYS. "ATTACH A 1.5" FAIRCLOTH SKIMMER (OR EQUAL) WITH 1.5" ORIFICE FOR DEWATERING THE SEDIMENT BASIN DURING CONSTRUCTION. Nc GRID NAD 83 r2p7jJ 50 GRAPHIC SCALE 0 25 50 100 ( IN FEET ) I inch = 50 ft. 200 ■ sl e solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, INC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME LEISURE POOLS STORAGE YARD GRADING AND EROSION CONTROL PLAN CLIENT PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 Phone: (865) 312-7469 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1492 DRAWING SCALE HORIZONTAL: 1 "=50' DATE RELEASED MAY 20, 2019 SHEET NUMBER THE CONTRACTOR MUST CONTACT NORTH CAROLINA ONE CALL CENTER AT 1-800-632-4949 A MINIMUM OF 72 HOURS PRIOR TO DIGGING IN ORDER TO HAVE THE EXISTING UTILITIES LOCATED C-3mO 1 FINISH GRADE /_ S9.5B COMPACTED SUBGRADE CARRY BASE COURSE 6" BEYOND SURFACE COURSE AT LOCATIONS WITHOUT CURB AND GUTTER ASPHALT PAVEMENT SUBGRADE GRAVEL DRIVE 6" COMPACTED ABC NTS I COMPACTED C NTS ACCESSIBLE PARKING REQUIREMENTS TOTAL PARKING SPACES MINIMUM NUMBER MINIMUM NUMBER OF PROVIDED OF ACCESSIBLE SPACES ACCESSIBLE SPACES REQUIRED SPACES REQUIRED TO BE VAN ACCESSIBLE 1 TO 25 1 1 26 TO 50 2 1 51 TO 75 3 1 76 TO 100 4 1 101 TO 150 5 1 151 TO 200 6 1 201 TO 300 7 1 301 TO 400 8 1 401 TO 500 9 2 501 TO 1000 2% OF TOTAL 1 IN EVERY 8 ACCESSIBLE SPACES 1001 AND OVER 20 PLUS 1 FOR 1 IN EVERY 8 EACH 100 OVER 1000 ACCESSIBLE SPACES SECTION 4.1.2 (5) OF THE AMERICANS WITH DISABILITIES ACT (ADA). SEE 4.1,2,(5) (d) FOR MEDICAL CARE FACILITIES NOTES: 1. ALL 12"x18" ACCESSIBLE SIGNS (R7-8 & R7-1) SHALL BE MOUNTED AT 7 FEET FROM GRADE TO BOTTOM EDGE OF SIGN FACE (MUTCD). MOUNTING HEIGHT CAN BE REDUCED TO 5 FEET IF PLACED IN AN AREA BETWEEN SIDEWALK AND BUILDING FACE IN WHICH PEDESTRIANS ARE NOT EXPECTED TO USE. 2. REFER TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES, (MUTCD) U.S. DEPARTMENT OF TRANSPORTATION AND NORTH CAROLINA DEPARTMENT OF TRANSPORTATION SUPPLEMENT. 3. IF ACCESSIBLE ROUTE IS A RAISED SIDEWALK AREA, THEN RAMPS ARE REQUIRED AT LOADING ZONE AREA 4. ALL DIMENSIONS, PAVEMENT MARKINGS AND SIGNAGE SHALL COMPLY WITH CURRENT ADA REQUIREMENTS. RESERVED RESERVED PARKING �0 PARKING MUTCD PARKING MUTCD R7-1 R7-8 12"xl8" ^ 12"xl8" DISABLED MUTCD R7-8 PASSENGER 12"x18" LOADING ONLY V A N R7-8a R7-8D ACCESSIBLE 12"x6" REQUIRED ACCESSIBLE MAXIMIUM 12"x9" RESERVED PARKING SIGN PENALTY $ 250 MAXIMIUM PENALTY R7-81) $ 2sD 12"xs" ACCESSIBLE ROUTE 0 © © © © (SEE NOTE 3) 8" 8" 8" 8" 5" 8 VAN ACCESSIBLE (MINIMUM DIMENSIONS) SPACE ONE OUT OF EVERY EIGHT (8) ACCESSIBLE SPACES, BUT NOT LESS THAN ONE, IS REQUIRED TO BE VAN ACCESSIBLE. PARKING SPACE PAVEMENT MARKINGS 2 HANDICAP SIGNAGE AND PAVEMENT MARKINGS NTS 3 NOTES: 1. REMOVE ALL TREATED OR PLASTIC BURLAP FROM PLANT BALL. 2. INSTALL TOP OF PLANT BALL UP T( 3"-4" ABOVE EXISTING GRADE. 3. SOAK PLANT BALL AND PIT IMMEDIA AFTER INSTALLATION. 4. REMOVE ALL STRING OR WIRE FROfv BASE OF TREE 5. KEEP MULCH 2" AWAY FROM TREE TRUNK BASE. FINISHED G " SAUCER l —MINIMUM LIMIT OF MULCH TOPSOIL REMOVED FROM HOLE TREE PLANTING =R OF MULCH CER BERM TO WATER. TOP 1/3 OF FROM BALL REMOVED FROM HOLE IRBED GROUND UNDER BALL TO MINIMIZE SETTLEMENT NTS 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com §���'(N 11CARp Zz//i .•••• ••. •4 SEA • 027 O REVISIONS PROJECT NAME LEISURE POOLS STORAGE YARD SITE DETAILS CLIENT PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 Phone: (865) 312-7469 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1492 DRAWING SCALE NOT TO SCALE DATE RELEASED MAY 20, 2019 SHEET NUMBER C-400 DESIGN CRITERIA AGGREGATE SIZE - USE 2-3 INCH WASHED STONE DIMENSION OF GRAVEL PAD GRAVEL ENTRANCE SHALL BE 50 FEET THICKNESS -6 INCHES MINIMUM IN LENGTH AND 12 FEET IN WIDTH WITH 20 FOOT RADIUS AT EXISTING WIDTH - 12 FT. MINIMUM OR FULL WIDTH AT ACCESS ROADWAY POINTS OF THE VEHICULAR ENTRANCE AND EXIT 36'-0" MIN 4'-0" W-0" AREA, WHICHEVER IS GREATER 6"� LENGTH- 50 FT. MINIMUM. 1. UNLESS OTHERWISE INDICATED, ALL VEGETATIVE AND 7. ALL DISTURBED AREAS ARE TO DRAIN TO APPROVED SEDIMENT STRUCTURAL EROSION AND SEDIMENT CONTROL MEASURES SHALL CONTROL MEASURES AT ALL TIMES DURING LAND DISTURBING LOCATION - LOCATE CONSTRUCTION ENTRANCES AND BE CONSTRUCTED AND MAINTAINED IN ACCORDANCE WITH THE ACTIVITIES AND DURING SITE DEVELOPMENT UNTIL FINAL q 1111111 Ii EXITS TO LIMIT SEDIMENT FROM LEAVING THE SITE MINIMUM STANDARDS AND SPECIFICATIONS OF THE NORTH STABILIZATION IS ACHIEVED. AND PROVIDE FOR MAXIMUM UTILITY BY ALL FILTER FABRIC CONSTT RUCTION VEHICLES. AVOID STEEP GRADES CAROLINA EROSION AND SEDIMENT CONTROL HANDBOOK. 2-3" WASHED STONE AND ENTRANCES AT CURVES IN PUBLIC ROADS. 8. ALL AREAS DISTURBED BY CONSTRUCTION UNLESS OTHERWISE CONTRACTOR SHALL INSTALL ADDITIONAL GRAVEL SEEDING SPECIFICATIONS 2. THE CONTRACTOR SHALL NOTIFY PLAN APPROVING AUTHORITY IMPROVED SHALL BE SODDED OR SEEDED AS INDICATED AND GRAVEL CONSTRUCTION ENTRANCE CONSTRUCTION ENTRANCES NOT INDICATED ON THE PLANS ONE WEEK PRIOR TO THE PRECONSTRUCTION CONFERENCE, ONE STABILIZED. REQUIRED FOR STAGING AND/OR BORROW AREAS AND WEEK PRIOR TO THE COMMENCEMENT OF LAND DISTURBING MAINTAIN AT NO ADDITIONAL EXPENSE TO THE OWNER. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR LATE WINTER AND EARLY SPRING) SEEDING MIXTURES: ACTIVITY, AND ONE WEEK PRIOR TO FINAL INSPECTION. 9. DURING DEWATERING OPERATIONS, WATER SHALL BE PUMPED CONTRACTOR SHALL SUPPLEMENT AND MAINTAIN GRAVEL SEEDING MIXTURE: INTO AN APPROVED FILTERING DEVICE PRIOR TO DISCHARGE TO CONSTRUCTION ENTRANCES AT HIS EXPENSE UNTIL FINAL ACCEPTANCE. SPECIES RATE (LB./ACRE) SPECIES RATE (LBS.IACRE) 3. IF POSSIBLE ALL EROSION AND SEDIMENT CONTROL MEASURES RECEIVING OUTLET. ARE TO BE PLACED PRIOR TO CLEARING AND/OR LAND DISTURBANCE. Q RYE (GRAIN) 120 TALL FESCUE 80 10. THE CONTRACTOR SHALL INSPECT ALL EROSION CONTROL Q,OP / ANNUAL KOBE LESPEDEZA 50 PENSACOLA BAHIAGRASS 50 4. A COPY OF THE APPROVED EROSION AND SEDIMENT CONTROL MEASURES WEEKLY AND AFTER EACH RUNOFF -PRODUCING EVENT. ��j MAINTENANCE OMIT ANNUAL LESPEDEZA WHEN DURATION OF TEMPORARY COVER IS NOT EXTEND BEYOND JUNE. SERICEA LESPEDEZA 30 PLAN AND PERMIT SHALL BE MAINTAINED ON THE SITE AT ALL TIMES. ANY NECESSARY REPAIRS OR CLEANUP TO MAINTAIN THE JQj� KOBE LESPEDEZA 10 EFFECTIVENESS OF THE EROSION CONTROL DEVICES SHALL BE Q MAINTAIN THE GRAVEL PAD INBA CONDITION TO PREVENT MUD OR SEEDING DATES: 5. PRIOR TO COMMENCING LAND DISTURBING ACTIVITIES IN AREAS MADE IMMEDIATELY. SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY JAN UARY 1 -MAY 1 SEEDING NOTES: OTHER THAN INDICATED ON THESE PLANS (INCLUDING, BUT NOT so,m/n REQUIRE PERIODIC TOPDRESSING WITH 2-INCH STONE. AFTER EACH 1. FROM SEPT. 1 TO MAR. 1 USE UNSCARIFIED SERICEA SEED. LIMITED TO OFF -SITE BORROW OR WASTE AREAS STAGING OR 11. ALL TEMPORARY EROSION CONTROL MEASURES SHALL BE STORAGE AREAS), THE CONTRACTOR SHALL PREPARE AND SUBMIT REMOVED BY CONTRACTOR ONCE STABILIZATION OR A SUFFICIENT RAINFALL INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL SOIL AMENDMENTS: 2. ON POORLY DRAINED SITES OMIT SERICEA AND INCREASE KOBE TO 30 LB./ACRE. A SUPPLEMENTARY EROSION CONTROL PLAN TO THE OWNER FOR GROUND COVER HAS BEEN ESTABLISHED OR AS DIRECTED BY THE OBJECTIONABLE MATERIALS SPILLED, WASHED OR TRACKED ONTO / FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 3. WHERE A NEAT APPEARANCE IS DESIRED, OMIT SERICEA AND INCREASE KOBE TO 40 LB./ACRE. REVIEW AND TO NCDENR REGIONAL OFFICE FOR APPROVAL. ENGINEER. NCDENR'S FINAL APPROVAL IS REQUIRED. PUBLIC ROADWAYS. LB./ACRE 10-10-10 FERTILIZER. CONTRACTOR SHALL PAY ALL FEES REQUIRED AND SHALL INSTALL NURSE PLANTS: NECESSARY MEASURES AT NO SEPARATE PAYMENT. THE 12. TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SHALL BE MULCH: BETWEEN APRIL 15 AND AUG. 15, ADD 10 LB./ACRE OF GERMAN MILLET OR 15 LB./ACRE SUDANGRASS. PRIOR TO MAY 1 CONTRACTOR SHALL PROVIDE THE OWNER AND THE ENGINEER A REQUIRED AT ALL CONSTRUCTION STAGING AREA ENTRANCES AND APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. OR AFTER AUG. 15, ADD 25 LB./ACRE RYE (GRAIN). COPY OF THE AMENDED PERMIT. ALL CONSTRUCTION ACCESS LOCATIONS INTO NON -PAVED AREA. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 6. THE CONTRACTOR IS RESPONSIBLE FOR INSTALLATION OF ANY 13. WHEN CROSSING CREEK OR DRAINAGE -WAY, THE CONTRACTOR SEEDING DATES: ADDITIONAL EROSION CONTROL MEASURES NECESSARY TO PREVENT SHALL RIP -RAP WITH FABRIC DISTURBED BANKS AND CHANNEL AND AGGREGATE MAINTENANCE: BEST POSSIBLE EROSION AND SEDIMENTATION AS DETERMINED BY EITHER NCDENR RESTORE SLOPES TO ORIGINAL CONTOURS, BUT NOT STEEPER THAN N 6" MIN. THICKNESS REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING EARLY SPRING: FEB. 15 - MAR. 20 FEB. 15 - APR. 30 OR THE ENGINEER. 2:1 MAXIMUM. DISTURBED CREEK AREA SHALL BE STABILIZED EROSION OR OTHER DAMAGE. FALL: SEPT. 1 - SEPT. 30 SEPT. 1 - OCT. 31 IMMEDIATELY. 2-3" COURSE TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR SUMMER) SOIL AMENDMENTS: SEEDING MIXTURE: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 - 5,000 LB./ACRE GROUND AGRICULTURAL SPECIES RATE (LB./ACRE) LIMESTONE (USE THE LOWER RATE ON SANDY SOILS) AND 1,000 LB./ACRE 10-10-10 FERTILIZER. NTS GERMAN MILLET 40 MULCH: APPLY 4,000 LB./ACRE GRAIN STRAW OR EQUIVALENT COVER OF ANOTHER SUITABLE MULCH. ANCHOR STRAW BY A SMALL -STEMMED SUDANGRASS MAY BE SUBSTITUTED AT A RATE OF 50 LB./ACRE. TACKING WITH ASPHALT, NETTING, OR ROVING OR BY CRIMPING WITH A MULCH ANCHORING TOOL. A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. 3 GENERAL EROSION AND SEDIMENT CONTROL NOTES 4 TEMPORARY GRAVEL CONSTRUCTION ENTRANCE SEEDING DATES: MAY 1 - AUGUST 15 MAINTENANCE: IF GROWTH IS LESS THAN FULLY ADEQUATE, REFERTILIZE IN THE SECOND YEAR, ACCORDING TO THE SOIL TESTS OR DRIVE STEEL POSTS 18" INTO THE GROUND ATTACH WIRE FENCE TO POSTS AND EXTEND NOTES: SOIL AMENDMENTS: TOP DRESS WITH 500 LB./ACRE 10-10-10 FERTILIZER. MOW AS NEEDED WHEN SERICEA IS OMITTED FROM THE MIXTURE. Aa" x 8" THE BorroM of THE FENCE a° wro THE MAXIMUM 6' Q.C. AND G THE LINE TRENCH UPHILL ALONG THE LINE OF EXCAVATED TRENCH AND TURNED OUT FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND 750 RESEED, FERTILIZE, AND MULCH DAMAGED AREAS IMMEDIATELY. POSTS. 4" IN THE TRENCH. 1. WIRE SHALL BE A MINIMUM of 32INCHES IN WIDTH AND LB./ACRE 10-10-10 FERTILIZER. TOP & BOTTOM STRAND SHALL HAVE A MINIMUM OF 6 WIRES WITH 12" STAY SPACING. MULCH: NATURAL GROUND MAX. SLOPE (TYP) MIN . 10 GA. WIRE 2. FILTER FABRIC SHALL BE A MINIMUM OF 36" IN WIDTH AND STEEL POSTS STAY WIRES SHALL BE FASTENED ADEQUATELY TO THE WIRE WITH #9 WIRE STAPLES 1-112" LONG. FABRIC THAT DETERIORATES TO SUCH SEEDING SPECIFICATIONS APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. SEEDING MIXTURE: MIN. 12-1/2 GA EXTENT THAT ITS EFFECTIVENESS IS REDUCED SHALL BE A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. LINE WIRES REPLACED BY CONTRACTOR AT CONTRACTOR'S EXPENSE. MIN.12-1/2 GA. MAINTENANCE: SPECIES RATE (LB./ACRE) 3. STEEL POSTS SHALL BE A MIN. OF T HEIGHT AND SHALL BE REFERTILIZE IF GROWTH IS NOT FULLY ADEQUATE. RESEED, REFERTILIZE AND MULCH IMMEDIATELY FOLLOWING COMMON BERMUDAGRASS 40-80(1-2 LB./1,000 FTC) 2,6 2.5 THE SELF FASTENER ANGLE STEEL TYPE. EROSION OR OTHER DAMAGE. IN. �1 1 / 4. CONTRACTOR SHALL REVIEW SILT FENCE ONCE PER WEEK AND AFTER EACH RAINFALL OCCURRENCE. ANY NECESSARY SEEDING DATES: NATURAL GROUND ? / REPAIRS OR CLEAN-UP TO MAINTAIN THE EFFECTIVENESS OF COASTAL PLAIN: APR. - JULY 2.S / THE DEVICE SHALL BE MADE IMMEDIATELY. TEMPORARY SEEDING/MULCHING SPECIFICATIONS (FOR FALL) 1� no 5. REMOVE DEPOSITED SEDIMENT ALONG THE FENCE TO SEEDING MIXTURE: % PROVIDE ADEQUATE STORAGE VOLUME AND TO REDUCE SPECIES RATE (LB./ACRE) SOIL AMENDMENTS: APPLY LIME AND FERTILIZER ACCORDING TO SOIL TEST, OR APPLY 3,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE j PRESSURE ON THE FENCE AS NEEDED. AND 500 LB./ACRE 10-10-10 FERTILIZER. 'STEP 1 STEP 2 5. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE RYE (GRAIN) 120 CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN NCDENR MULCH: ATTACH THE FILTER FABRIC TO THE WIRE FENCE, BACKFILL THE TRENCH AND COMPACT THE SOIL REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE EXTEND THE BOTTOM OF THE FABRIC 8" INTO THE FIRMLY TO ANCHOR THE BOTTOM OF THE SILT SEEDING DATES: USE JUTE, EXCELSIOR MATTING, OR OTHER EFFECTIVE CHANNEL LINING MATERIAL TO COVER THE BOTTOM OF COMPACTED SOIL CONTRIBUTING DRAINAGE AREA IS STABLE. TRENCH AND TURNED OUT4" IN THE TRENCH. FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. AUGUST 15 - DECEMBER 30 CHANNELS AND DITCHES. THE LINING SHOULD EXTEND ABOVE THE HIGHEST CALCULATED DEPTH OF FLOW. ON CHANNEL SIDE SLOPES ABOVE THIS HEIGHT, AND IN DRAINAGES NOT REQUIRING TEMPORARY LININGS, APPLY 4,000 *** WHEN A GRAVEL DIVERSION BERM IS REQUIRED, THE HEIGHT SOIL AMENDMENTS: LB./ACRE GRAIN STRAW AND ANCHOR STRAW BY STAPLING NETTING OVER THE TOP. SHALL BE REDUCED TO 12 INCHES AND THE TOP WIDTH TO 6", POSTS MAX 8' O.C. FOLLOW RECOMMENDATIONS OF SOIL TESTS OR APPLY 2,000 LB./ACRE GROUND AGRICULTURAL LIMESTONE AND ALL OTHER REQUIREMENTS SHALL REMAIN THE SAME. WIRE FENCE "HOG WIRE' 1,000 LB./ACRE 10-10-10 FERTILIZER. MULCH AND ANCHORING MATERIALS MUST NOT BE ALLOWED TO WASH DOWN SLOPES WHERE THEY CAN CLOG TEMPORARY DIVERSION KEY NOTES: A FILTER FABRIC DRAINAGE DEVICES.::::...::: MULCH: ::?:::::..>.. ;:: ..::::<.::.:.,�:.:::::....... .:....... ���:� .�.; ;:.:;; ¢ #9 WIRE STAPLES 1-1/2" LONG APPLY 4,000 LB./ACRE STRAW. ANCHOR STRAW BY TACKING WITH ASPHALT, NETTING, OR A MULCH ANCHORING TOOL. MAINTENANCE::.,...::.:.:; 1. CLEAR THE ARE UNDER THE BERM AND STRIP THE ROOTS/OTHER ORGANICS. 2. COMPACT THE SIDE SLOPES PREFERABLY WITH A TRACKED VEHICLE TO SLOW RUNOFF VELOCITIES. •:. "`fis;;r�:::t:::>:. - >:::: ?'";;::: <.,: ;::##::: ;:a :+�.:.::::::::. ::>::. .::::: 1.>:<:..;i`:'.:.::.::.::::.::.:.::::::. BOTTOM of WIRE FENCE AND ..:....:.>...:: y ..:.. �::" :��>:�::;�.;::...��::.>:. x .. .>.:.:::::::.:::.:..: EE: ::E; �:.:s:::�::: """''+ii:':::: A DISK WITH BLADES SET NEARLY STRAIGHT CAN BE USED AS A MULCH ANCHORING TOOL. A MINIMUM OF 3 WEEKS IS REQUIRED FOR ESTABLISHMENT. INSPECTION AND REPAIR MULCH FREQUENTLY. 3. VEGITATE THE RIDGE OF THE BERM IMMEDIATELY AFTER CONSTRUCTION UNLESS THE BERM WILL REMAIN IN PLACE �.:::. ...: �.> .:....:.. FILTER FABRIC BURIED 8" IN """ " ""�� ::�;..: ��.�..�::.::-.:;:tt:: ���:�:��:>`?.^-:x:��: '�"'��:. �::;:::::<:::':� :::.::>����..���:: ��::.. � EXCAVATED TRENCH &TURNED `:?£tiEi:.. REFERTILIZE THE FOLLOWING APR. WITH 50 LB./ACRE NITROGEN. FOR LE THAN DAY O SS 30 S. � "`�i: _ OUT 4" IN THE TRENCH MAINTENANCE: SLOW REPAIR AND REFERTILIZE DAMAGED AREAS IMMEDIATELY. TOP DRESS WITH 50 LB./ACRE OF NITROGEN IN MARCH. IF IT IS NECESSARY TO EXTEND TEMPORARY COVER BEYOND JUNE 15, OVERSEED WITH 50 LB./ACRE KOBE LESPEDEZA �,�24" IN LATE OR EARLY MARCH. j STEEL POST DRIVEN INTO GROUND MAINTENANCE: a STEP 3 STEP 4 SECTION A -A MAINTENANCE INSPECT TEMPORARY DIVERSIONS ONCE A WEEK AND AFTER EVERY RAINFALL. IMMEDIATELY REMOVE SEDIMENT FROM THE FLOW AREA AND REPAIR THE DIVERSION RIDGE. CAREFULLY CHECK OUTLETS 1. INSPECT SEDIMENT FENCES AT LEAST ONCE A WEEK AND AFTER EACH RAINFALL. MAKE ANY REQUIRED REPAIRS IMMEDIATELY. AND MAKE TIMELY REPAIRS AS NEEDED. 2. SHOULD THE FABRIC OF A SEDIMENT FENCE COLLAPSE, TEAR, DECOMPOSE OR BECOME INEFFECTIVE, REPLACE IT PROMPTLY. 3. REMOVE SEDIMENT DEPOSITS AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR THE NEXT RAIN AND TO REDUCE NTS PRESSURE ON THE FENCE. TAKE CARE TO AVOID UNDERMINING THE FENCE DURING CLEANOUT. NTS 4. REMOVE ALL FENCING MATERIALS AND UNSTABLE SEDIMENT DEPOSITS AND BRING THE AREA TO GRADE AND STABILIZE AFTER THE CONTRIBUTING DRAINAGE AREA HAS BEEN PROPERLY STABILIZED AND NCDENR APPROVES REMOVAL. 1 TEMPORARY SEEDING SPECIFICATIONS 2 PERMANENT SEEDING SPECIFICATIONS 5 TEMPORARY DIVERSION BERM E SILT FENCE PLAN VIEW NOTES: MAINTENANCE 1. GRADE THE BASIN SUCH THAT THE BOTTOM IS LEVEL PIPE OUTLET TO 1. INSPECT THE OUTLET PROTECTION WELL-DEFINED CHANNEL DRIVE POSTS 24" INTO THE GROUND ATTACH WIRE FENCE TO POSTS AND EXTEND 2. INSTALL THE BAFFLES AS SHOWN ON THE GRADING PLAN. \` AFTER EACH RAINFALL BUT IN NO MAXIMUM 4' O.C. AND EXCAVATE A 4" X 8" THE BOTTOM OF THE FENCE 8" INTO THE BAFFLES SHALL EXTEND THE FULL WIDTH OF THE BASIN. CASE LESS THAN ONCE PER WEEK. TRENCH UPHILL ALONG THE LINE OF EXCAVATED TRENCH AND TURNED OUT 4" IN _ H A A ANY STONES THAT THAT HAVE BEEN POSTS. THE TRENCH. SUPPORT WIRE OR 3. DO NOT SPLICE THE FABRIC, USE A CONTINUOUS PIECE W '� i DISLODGED SHOULD BE REPLACED ROPE ACCROSS THE BASIN OR TRAP. INFLOW AND ANY EROSION AROUND THE STEEL POST STRUCTURE - a OUTLET SHOULD BE REPAIRED. STEEL POSTS 4. POSTS FOR THE BAFFLES SHALL BE 4' OC. EARTH BERM �QV w % MAINTENANCE i 1. INSPECT THE BAFFLES EACH ACTIVE DAY ON SITE BUT IN OI NO CASE LESS THAN ONCE PER WEEK AND AFTER EACH !t> RAINFALL EVENT. MAKE ANY REPAIRS IMMEDIATELY. BOTTOM ANCHORED WITH STAPLES PLAN 2. REMOVE SEDIMENT DEPOSITS WHEN THE MEASURE MMER SKIMMER SKI GRAVEL OR FABRIC REACHES HALF FULL. TAKE CARE TO AVOID DAMAGING THE --- DEW G BAFFLES WHEN THE SEDIMENT IS REMOVED. DEVICE EMERGENCY ON SINGE L 3. TEMPORARY MEASURE SHALL NOT BE REMOVED BY THE 5 SPILLWAY CONTRACTOR UNTIL THIS ACTION IS APPROVED BY AN MIN 8" NCDENR REPRESENTATIVE. THE ACTION WILL BE APPROVED WHEN THE CONTRIBUTING DRAINAGE AREA IS INLET ZONE STEP 1 STEP 2 STABLE. 35% OF SURFACE AREA TTT _ I_� D ATTACH THE JUTE NETTING OR OTHER FABRIC APPROVED BY THE ENGINEER TO THE STAY WIRE 4. PLACEMENT OF BAFFLES: INLET ZONE- 35 % OF LENGTH FROM ENTRY POINT FIRST CELL - 25 % OF LENGTH FROM INLET ZONE FIRST CHAMBER BACKFILL THE TRENCH AND COMPACT THE SOIL FIRMLY TO ANCHOR THE BOTTOM OF THE SILT BAFFLES EMBANKMENT I I I I I J AND POSTS, EXTEND THE BOTTOM OF THE FABRIC FENCE. BURIED FABRIC SHALL NOT BE VISIBLE. SECOND CELL- 25 % OF LENGTH FROM FIRST CELL 25% OF SURFACE AREA INFLOW 1' FREEBOARD -JJ TAT 8" INTO THE TRENCH AND TURNED OUT 4" IN THE THE TOP OF THE FABRIC SHALL BE 6" HIGHER OUTLET ZONE - 15 % OF LENGTH FROM SECOND CELL Sf TRUUCTURE BAFFLES III -III I II I I TRENCH OR USE 8" EROSION CONTROL MATTING STAPLES. THAN THE WEIR. 25� OF SURFACE AREA I -I FILTER LAYER GRAVEL OR FABRIC Posrs Max 4' o.c. OUTLET ZONE TOP STAY WIRE OR ROPE 15% OF SURFACE AREA 6" MIN. INVE T ELEVATION OF SECTION A -A a _ JUTE NETTING OR EQUIVILENT DEWATERING EMERGENCY SPILLWAY x OF FABRIC BURIED 8" ZONE EMERGENCY NOTES < IN EXCAVATED TRENCH & SPILLWAY 1. LA IS THE LENGTH OF THE RIPRAP 3. IN AWELL-DEFINED CHANNEL EXTEND FBOTTOM F TURNED OUT4" IN THE PERSPECTIVE VIEW (D TRENCH, OR PINNED WITH 8" FILTER FABRIC/ STONE BEDDING APRON.(SEE EC PLAN) THE APRON THE REQUIRED 4' WIDTH = EROSION CONTROL MATTING OR UP TO THE TOP OF THE CHANNEL STAPLES. 2. D = 1.5 TIMES THE MAXIMUM BANKS, WHICHEVER IS LESS. _FLOW SEDIMENT STONE DIAMETER BUT NOT LESS 1�_V STORAGE ZONE THAN 6". 4. A FILTER FABRIC OR BLANKET SHOULD BE INSTALLED BETWEEN THE RIPRAP STEEL POST DRIVEN CROSS-SECTION VIEW AND SOIL FOUNDATION. 24"INTO GROUND CONSTRUCTION SPECIFICATIONS A STEP 3 STEP 4 SECTION A -A 1. CLEAR, GRUB & STRIP TOPSOIL FROM AREAS UNDER THE EMBANKMENT TO REMOVE TREES, VEGETATION, ROOTS AND OTHER OBJECTIONABLE MATERIAL. NTS NTS PLACE TEMPORARY SEDIMENT CONTROLS BELOW THE BASIN AS NEEDED. 2. ENSURE THAT FILL MATERIAL FOR THE EMBANKMENT IS FREE OF ROOTS, INLET WOOD VEGETATION, ORGANIC MATTER AND OTHER OBJECTIONABLE MATERIAL. PLACE THE FILL LIFTS NOT TO EXCEED 9 INCHES AND MACHINE COMPACT IT. PVC VENT PIPE Q 8 TYPICAL RIP RAP APRON 9 POROUS BAFFLES OVER FILL THE EMBANKMENT BANKMENT 6 INCHES TO ALLOW FOR SETTLEMENT. 3. SHAPE THE BASIN TO THE SPECIFIED DIMENSIONS. PREVENT THE SKIMMING DEVICE FROM SETTLING INTO THE MUD BY EXCAVATING A SHALLOW PIT UNDER THE SKIMMER OR PROVIDING A LOW SUPPORT UNDER THE SKIMMER OF STONE OR TIMBER. 4. PLACE THE BARREL ON A FIRM, SMOOTH FOUNDATION OF IMPERVIOUS SOIL. PLACE THE FILL MATERIAL AROUND THE PIPE SPILLWAY IN 4 INCH LAYERS AND Ol / LASS 1 RIP RAP COMPACT IT UNDER AND THE PIPE TO AT LEAST THE SAME DENSITY AS (SEE SECTION THRU BASIN BELOW) PD LACE A MINIMUM OF 2 FEET OF COMPACTED ooOpQO THE ADJACENT EMBANKMENT. BACKFILL OVER THE PIPE SPILLWAY BEFORE CROSSING IT WITH CONSTRUCTION EQUIPMENT. \\\\\\ / FLEXIBLE HOSE 5. ASSEMBLE THE SKIMMER FOLLOWING THE MANUFACTURER'S INSTRUCTIONS. \ \\\ LASS 1 RIP RAP HEADWALL 6. LAY THE ASSEMBLED SKIMMER ON THE BOTTOM OF THE BASIN WITH THE 5 FLEXIBLE JOINT AT THE INLET OF THE BARREL PIPE. ATTACHED THE FLEXIBLE JOINT TO THE BARREL PIPE AND POSITION THE SKIMMER OVER THE EXCAVATED PIT. ATTACH A ROPE TO THE SKIMMER AND ANCHOR IT TO THE SIDE OF THE BASIN. SCH 40 PVC "SKIMMER CAN BE PURCHASED FROM J.W. FAIRCLOTH & SON INC.\\� PIPE SKIMMER CHOSEN SHALL BE EQUAL TO THE FAIRCLOTH SKIMMER. #57 WASHED STONE / I \ \\ 1' THICK X THIGH MIN. / 7. INSTALL THE SPILLWAY IN UNDISTURBED SOIL TO THE GREATEST EXTEND POSSIBLE. THE SPILLWAY SHOULD BE LINED WITH LAMINATED PLASTIC OR SKIMMER SEDIMENT STORAGE AREA IMPERMEABLE GEOTEXTILE FABRIC. THE FABRIC MUST BE WIDE AND LONG ENOUGH TO COVER THE BOTTOM AND SIDES AND EXTEND ONTO THE TOP OF PERSPECTIVE VIEW THE DAM FOR ANCHORING IN A TRENCH. THE EDGES MAY BE SECURED WITH 8 NOT TO SCALE INCH STAPLES. THE FABRIC MUST BE LONG ENOUGH TO EXTEND DOWN THE SLOPE AND EXIT ONTO STABLE GROUND. THE WIDTH OF THE FABRIC MUST BE ONE PIECE. IF MULTIPLE SECTIONS AREA REQUIRED, THE UPPER SECTION FL STORAGE NATURAL GROUND SHOULD OVERLAP THE LOWER SECTION SO THAT WATER CANNOT FLOW UNDER ZONE 1' 2' RIP RAP HEADWALL THE FABRIC. MAINTENANCE __1ICI 8. DISCHARGE WATER INTO THE BASIN TO PREVENT EROSION. USE TEMPORARY INSPECT SKIMMER SEDIMENT BASINS WEEKLY AND AFTER EACH PERIOD OF SEDIMENT 1 --1' STORAGE 1.5'� SLOPE DRAINS OR DIVERSIONS WITH OUTLET PROTECTION TO DIVERT SEDIMENT SIGNIFICANT RAINFALL. REMOVE SEDIMENT AND RESTORE TRAP TO ITS ORIGINAL FLOW LADEN WATER TO THE UPPER END OF THE POOL AREA TO IMPROVE BASIN TRAP DIMENSIONS WHEN THE SEDIMENT HAS ACCUMULATED TO ONE-HALF THE HEIGHT FLOLV-� 1.5---PIPE INVERT EFFICIENCY. OF THE FIRST BAFFLE. EXCAVATE SEDIMENT FROM THE ENTIRE BASIN. MAKE SURE 57 FILTER FABRIC VEGETATION GROWING IN THE BOTTOM OF THE BASIN DOES NOT HOLD DOWN THE 9. CONSTRUCT THE STRUCTURE SO THAT THE DISTURBED AREA IS MINIMIZED. SKIMMER. PLACE THE SEDIMENT THAT IS REMOVED IN AN AREA WITH SEDIMENT WASHED CLASS 1 RIP -RAP MAX. SEDIMENT DEPT CONSTRUCTION SPECIFICATIONS: STONE DIVERT SURFACE WATER AWAY FROM BARE AREAS. COMPLETE THE CONTROLS. (CLEAN OUT POINT) EMBANKMENT BEFORE THE AREA IS CLEARED. 1. CLEAR THE AREA OF ALL DEBRIS. REPAIR THE BAFFLES IF THEY ARE DAMAGED. RE -ANCHOR THE BAFFLES IF WATER 2. INSTALL THE CLASS B OR CLASS I RIPRAP IN A SEMI -CIRCLE AROUND SECTION THRU BASIN, FILTER, & CULVERT PIPE 10. INSTALL POROUS BAFFLES AS SPECIFIED. IS FLOWING UNDERNEATH OR AROUND THEM. THE PIPE INLET. NOT TO SCALE 3. A 1 FOOT THICK LAYER OF NCDOT 45 OR 457 STONE SHOULD BE 11. AFTER ALL SEDIMENT PRODUCING AREAS HAVE BEEN STABILIZED, REMOVE UNCLOGGED THE SKIMMER AS NEEDED. CHECK TO MAKE SURE ORIFICE INSIDE OF MAINTENANCE: PLACED ON THE OUTSIDE SLOPE OF THE RIPRAP. THE STRUCTURE AND ALL THE UNSTABLE SEDIMENT. SMOOTH THE AREA TO THE SKIMMER IS NOT CLOGGED; IF SO, REMOVE THE DEBRIS. IF SKIMMER ARM OR 4. SEDIMENT STORAGE AREA SHOULD BE EXCAVATED AROUND THE BLEND WITH THE ADJOINING AREAS AND STABILIZE PROPERLY. BARREL IS CLOGGED, REMOVE THE ORIFICE AND CLEAR THE DEBRIS. INSPECT ROCK PIPE INLET PROTECTION AT LEAST WEEKLY AND AFTER OUTSIDE OF THE STONE HORSESHOE 18" BELOW NATURAL GRADE. EACH SIGNIFICANT (1 /2" OR GREATER) RAINFALL EVENT AND REPAIR 5. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN STABILIZED, FILL CHECK THE FABRIC LINED SPILLWAY FOR DAMAGE AND MAKE ANY REQUIRED IMMEDIATELY. REMOVE SEDIMENT AND RESTORE THE SEDIMENT DEPRESSION AND ESTABLISH FINAL GRADING ELEVATIONS, COMPACT, REPAIRS WITH FABRIC THAT SPANS THE FULL WIDTH OF THE SPILLWAY. CHECK STORAGE AREA TO ITS ORIGINAL DIMENSIONS WHEN THE SEDIMENT HAS AND STABILIZE WITH GROUND COVER. THE EMBANKMENT, SPILLWAYS AND OUTLET FOR EROSION DAMAGE. MAKE ALL ACCUMULATED TO 1/2 THE DESIGN DEPTH OF THE TRAP. PLACE THE NECESSARY REPAIRS IMMEDIATELY. REMOVE TRASH AND DEBRIS FROM THE SEDIMENT THAT IS REMOVED IN THE DESIGNATED DISPOSAL AREA AND SKIMMER AND POOL AREAS. REPLACE THE CONTAMINATED PART OF THE GRAVEL FACING. NTSTHE CHECK THE STRUCTURE FOR DAMAGE. ANY RIPRAP DISPLACED FROM STONE HORSESHOE MUST BE REPLACED IMMEDIATELY. NTS 7 TEMPORARY SKIMMER BASIN 10 ROCK PIPE INLET PROTECTION 4 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1 910-426-6777 fax 1 910-426-5777 license number I C-2354 wwwAD site solutions.com REVISIONS PROJECT NAME LEISURE POOLS STORAGE YARD EROSION CONTROL DETAILS CLIENT PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 Phone: (865) 312-7469 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1492 DRAWING SCALE NOT TO SCALE DATE RELEASED MAY 20, 2019 SHEET NUMBER C-401 GROUND STABILIZATION AND MATERIALS HANDLING PRACTICES FOR COMPLIANCE WITH THE NCG01 CONSTRUCTION GENERAL PERMIT Implementing the details and specifications on this plan sheet will result in the construction activity being considered compliant with the Ground Stabilization and Materials Handling sections of the NCG01 Construction General Permit (Sections E and F, respectively). The permittee shall comply with the Erosion and Sediment Control plan approved by the delegated authority having jurisdiction. All details and specifications shown on this sheet may not apply depending on site conditions and the delegated authority having jurisdiction. SECTION E: GROUND STABILIZATION Required Ground Stabilization Timeframes Stabilize within this Site Area Description many calendar Timeframe variations days after ceasing land disturbance (a) Perimeter dikes, swales, ditches, and 7 None perimeter slopes (b) High Quality Water 7 None (HQW) Zones (c) Slopes steeper than If slopes are 10' or less in length and are 3:1 7 not steeper than 2:1, 14 days are allowed -7 days for slopes greater than 50' in length and with slopes steeper than 4:1 -7 days for perimeter dikes, swales, (d) Slopes 3:1 to 4:1 14 ditches, perimeter slopes and HQW Zones -10 days for Falls Lake Watershed -7 days for perimeter dikes, swales, (e) Areas with slopes ditches, perimeter slopes and HQW Zones flatter than 4:1 14 -10 days for Falls Lake Watershed unless there is zero slope Note: After the permanent cessation of construction activities, any areas with temporary ground stabilization shall be converted to permanent ground stabilization as soon as practicable but in no case longer than 90 calendar days after the last land disturbing activity. Temporary ground stabilization shall be maintained in a manner to render the surface stable against accelerated erosion until permanent ground stabilization is achieved. GROUND STABILIZATION SPECIFICATION Stabilize the ground sufficiently so that rain will not dislodge the soil. Use one of the techniques in the table below: Temporary Stabilization Permanent Stabilization • Temporary grass seed covered with straw or • Permanent grass seed covered with straw or other mulches and tackifiers other mulches and tackifiers • Hydroseeding • Geotextile fabrics such as permanent soil • Rolled erosion control products with or reinforcement matting without temporary grass seed • Hydroseeding • Appropriately applied straw or other mulch • Shrubs or other permanent plantings covered • Plastic sheeting with mulch • Uniform and evenly distributed ground cover sufficient to restrain erosion • Structural methods such as concrete, asphalt or retaining walls • Rolled erosion control products with grass seed POLYACRYLAMIDES (PAMS) AND FLOCCULANTS 1. Select flocculants that are appropriate for the soils being exposed during construction, selecting from the NC DWR List of Approved PAMS/Flocculants. 2. Apply flocculants at or before the inlets to Erosion and Sediment Control Measures. 3. Apply flocculants at the concentrations specified in the NC DWR List of Approved PAMS/Flocculants and in accordance with the manufacturer's instructions. 4. Provide ponding area for containment of treated Stormwater before discharging offsite. 5. Store flocculants in leak -proof containers that are kept under storm -resistant cover or surrounded by secondary containment structures. EQUIPMENT AND VEHICLE MAINTENANCE 1. Maintain vehicles and equipment to prevent discharge of fluids. 2. Provide drip pans under any stored equipment. 3. Identify leaks and repair as soon as feasible, or remove leaking equipment from the project. 4. Collect all spent fluids, store in separate containers and properly dispose as hazardous waste (recycle when possible). 5. Remove leaking vehicles and construction equipment from service until the problem has been corrected. 6. Bring used fuels, lubricants, coolants, hydraulic fluids and other petroleum products to a recycling or disposal center that handles these materials. LITTER, BUILDING MATERIAL AND LAND CLEARING WASTE 1. Never bury or burn waste. Place litter and debris in approved waste containers. 2. Provide a sufficient number and size of waste containers (e.g dumpster, trash receptacle) on site to contain construction and domestic wastes. 3. Locate waste containers at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 4. Locate waste containers on areas that do not receive substantial amounts of runoff from upland areas and does not drain directly to a storm drain, stream or wetland. 5. Cover waste containers at the end of each workday and before storm events or provide secondary containment. Repair or replace damaged waste containers. 6. Anchor all lightweight items in waste containers during times of high winds. 7. Empty waste containers as needed to prevent overflow. Clean up immediately if containers overflow. 8. Dispose waste off -site at an approved disposal facility. 9. On business days, clean up and dispose of waste in designated waste containers. PAINT AND OTHER LIQUID WASTE 1. Do not dump paint and other liquid waste into storm drains, streams or wetlands. 2. Locate paint washouts at least 50 feet away from storm drain inlets and surface waters unless no other alternatives are reasonably available. 3. Contain liquid wastes in a controlled area. 4. Containment must be labeled, sized and placed appropriately for the needs of site. 5. Prevent the discharge of soaps, solvents, detergents and other liquid wastes from construction sites. PORTABLE TOILETS 1. Install portable toilets on level ground, at least 50 feet away from storm drains, streams or wetlands unless there is no alternative reasonably available. If 50 foot offset is not attainable, provide relocation of portable toilet behind silt fence or place on a gravel pad and surround with sand bags. 2. Provide staking or anchoring of portable toilets during periods of high winds or in high foot traffic areas. 3. Monitor portable toilets for leaking and properly dispose of any leaked material. Utilize a licensed sanitary waste hauler to remove leaking portable toilets and replace with properly operating unit. EARTHEN STOCKPILE MANAGEMENT 1. Show stockpile locations on plans. Locate earthen -material stockpile areas at least 50 feet away from storm drain inlets, sediment basins, perimeter sediment controls and surface waters unless it can be shown no other alternatives are reasonably available. 2. Protect stockpile with silt fence installed along toe of slope with a minimum offset of five feet from the toe of stockpile. 3. Provide stable stone access point when feasible. 4. Stabilize stockpile within the timeframes provided on this sheet and in accordance with the approved plan and any additional requirements. Soil stabilization is defined as vegetative, physical or chemical coverage techniques that will restrain accelerated erosion on disturbed soils for temporary or permanent control needs. �; ,,�" NORTH CAROLINA 5 : Environmental Quality ONSITE CONCRETE WASHOUT STRUCTURE WITH LINER W b--i- MT m IMOAE mw !€ 0 B � 1� 1p rEVAE IW Ot t' ru" ILGIOI EtYNta M I�Ml�frrW'Tfgll/ LTMOI ETWO®M imD N71LY EVC'�E tlCINI E M 01dE1E VNMR el•ET•O •al E IIE1r•9O E nc made v.•wr a•E�ws ••u M �mio •m�oe aaa E IMMM➢ED mer M Wum ••/m E/Oat ]Sf V M a•ICII� >R v nc aeucneEs c�en m nw•e •®xrz ELAN ILLn• Wr/�IT vm1 . Ea1M amaxrz v.•arr snneme: Ern m E PlBlL u Eaee s i1Rf011LL ar•rr i••m wrx mwr 101➢fi Eva. BELOW GRADE WASHOUT STRUCTURE ABOVE GRADE WASHOUT STRUCTURE CONCRETE WASHOUTS 1. Do not discharge concrete or cement slurry from the site. 2. Dispose of, or recycle settled, hardened concrete residue in accordance with local and state solid waste regulations and at an approved facility. 3. Manage washout from mortar mixers in accordance with the above item and in addition place the mixer and associated materials on impervious barrier and within lot perimeter silt fence. 4. Install temporary concrete washouts per local requirements, where applicable. If an alternate method or product is to be used, contact your approval authority for review and approval. If local standard details are not available, use one of the two types of temporary concrete washouts provided on this detail. 5. Do not use concrete washouts for dewatering or storing defective curb or sidewalk sections. Stormwater accumulated within the washout may not be pumped into or discharged to the storm drain system or receiving surface waters. Liquid waste must be pumped out and removed from project. 6. Locate washouts at least 50 feet from storm drain inlets and surface waters unless it can be shown that no other alternatives are reasonably available. At a minimum, install protection of storm drain inlets) closest to the washout which could receive spills or overflow. 7. Locate washouts in an easily accessible area, on level ground and install a stone entrance pad in front of the washout. Additional controls may be required by the approving authority. 8. Install at least one sign directing concrete trucks to the washout within the project limits. Post signage on the washout itself to identify this location. 9. Remove leavings from the washout when at approximately 75% capacity to limit overflow events. Replace the tarp, sand bags or other temporary structural components when no longer functional. When utilizing alternative or proprietary products, follow manufacturer's instructions. 10. At the completion of the concrete work, remove remaining leavings and dispose of in an approved disposal facility. Fill pit, if applicable, and stabilize any disturbance caused by removal of washout. HERBICIDES, PESTICIDES AND RODENTICIDES 1. Store and apply herbicides, pesticides and rodenticides in accordance with label restrictions. 2. Store herbicides, pesticides and rodenticides in their original containers with the label, which lists directions for use, ingredients and first aid steps in case of accidental poisoning. 3. Do not store herbicides, pesticides and rodenticides in areas where flooding is possible or where they may spill or leak into wells, stormwater drains, ground water or surface water. If a spill occurs, clean area immediately. 4. Do not stockpile these materials onsite. HAZARDOUS AND TOXIC WASTE 1. Create designated hazardous waste collection areas on -site. 2. Place hazardous waste containers under cover or in secondary containment. 3. Do not store hazardous chemicals, drums or bagged materials directly on the ground. NCGO1 GROUND STABILIZATION AND MATERIALS HANDLING PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION A: SELF -INSPECTION Self -inspections are required during normal business hours in accordance with the table below. When adverse weather or site conditions would cause the safety of the inspection personnel to be in jeopardy, the inspection may be delayed until the next business day on which it is safe to perform the inspection. In addition, when a storm event of equal to or greater than 1.0 inch occurs outside of normal business hours, the self -inspection shall be performed upon the commencement of the next business day. Any time when inspections were delayed shall be noted in the Inspection Record. Frequency Inspect (during normal Inspection records must include: business hours) (1) Rain gauge Daily Daily rainfall amounts. maintained in If no daily rain gauge observations are made during weekend or good working holiday periods, and no individual -day rainfall information is order available, record the cumulative rain measurement for those un- attended days (and this will determine if a site inspection is needed). Days on which no rainfall occurred shall be recorded as "zero." The permittee may use another rain -monitoring device approved bythe Division, (2) E&SC At least once per 1. Identification of the measures inspected, Measures 7 calendar days 2. Date and time of the inspection, and within 24 3. Name of the person performing the inspection, hours of a rain 4. Indication of whether the measures were operating event > 1.0 inch in properly, 24 hours 5. Description of maintenance needs for the measure, 6. Description, evidence, and date of corrective actions taken. (3) Stormwater At least once per 1. Identification of the discharge outfalls inspected, discharge 7 calendar days 2. Date and time ofthe inspection, outfalls (SDOs) and within 24 3. Name of the person performing the inspection, hours of a rain 4. Evidence of indicators of stormwater pollution such as oil event> 1.0 inch in sheen, floating or suspended solids or discoloration, 24 hours 5. Indication of visible sediment leaving the site, 6. Description, evidence, and date of corrective actions taken. (4) Perimeter of At least once per If visible sedimentation is found outside site limits, then a record site 7 calendar days of the following shall be made: and within 24 1. Actions taken to clean up or stabilize the sediment that has left hours of a rain the site limits, event> 1.0 inch in 2. Description, evidence, and date of corrective actions taken, and 24 hours 3. An explanation as to the actions taken to control future releases. (5) Streams or At least once per If the stream or wetland has increased visible sedimentation or a wetlands onsite 7 calendar days stream has visible increased turbidity from the construction or offsite and within 24 activity, then a record of the following shall be made: (where hours of a rain 1. Description, evidence and date of corrective actions taken, and accessible) event> 1.0 inch in 2. Records of the required reports to the appropriate Division 24 hours Regional Office per Part III, Section C, Item (2)(a) of this permit of this permit. (G) Ground After each phase 1. The phase of grading (installation of perimeter E&SC stabilization of grading measures, clearing and grubbing, installation of storm measures drainage facilities, completion of all land -disturbing activity, construction or redevelopment, permanent ground cover). 2. Documentation that the required ground stabilization measures have been provided within the required timeframe or an assurance that they will be provided as soon as possible. NOTE: The rain inspection resets the required 7 calendar day inspection requirement. (r''1 NORTH CAROLINA Environmental Quality PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION B: RECORDKEEPING 1. E&SC Plan Documentation The approved E&SC plan as well as any approved deviation shall be kept on the site. The approved E&SC plan must be kept up-to-date throughout the coverage under this permit. The following items pertaining to the E&SC plan shall be documented in the manner described: Item to Document Documentation Requirements (a) Each E&SC Measure has been installed Initial and date each E&SC Measure on a copy and does not significantly deviate from the of the approved E&SC Plan or complete, date locations, dimensions and relative elevations and sign an inspection report that lists each shown on the approved E&SC Plan. E&SC Measure shown on the approved E&SC Plan. This documentation is required upon the initial installation of the E&SC Measures or if the E&SC Measures are modified after initial installation. (b) A phase ofgrading has been completed. Initial and date a copy of the approved E&SC Plan or complete, date and sign an inspection report to indicate completion of the construction phase. (c) Ground cover is located and installed Initial and date a copy of the approved E&SC in accordance with the approved E&SC Plan or complete, date and sign an inspection Plan. report to indicate compliance with approved ground cover specifications. (d) The maintenance and repair Complete, date and sign an inspection report. requirements for all E&SC Measures have been performed. (e) Corrective actions have been taken Initial and date a copy of the approved E&SC to E&SC Measures. Plan or complete, date and sign an inspection report to indicate the completion of the corrective action. 2. Additional Documentation In addition to the E&SC Plan documents above, the following items shall be kept on the site and available for agency inspectors at all times during normal business hours, unless the Division provides a site -specific exemption based on unique site conditions that make this requirement not practical: (a) This general permit as well as the certificate of coverage, after it is received. (b) Records of inspections made during the previous 30 days. The permittee shall record the required observations on the Inspection Record Form provided by the Division or a similar inspection form that includes all the required elements. Use of electronically -available records in lieu of the required paper copies will be allowed if shown to provide equal access and utility as the hard -copy records. (c) All data used to complete the Notice of Intent and older inspection records shall be maintained for a period of three years after project completion and made available upon request. [40 CFR 122.41] EFFECTIVE: 04/01 / 19 PART III SELF -INSPECTION, RECORDKEEPING AND REPORTING SECTION C: REPORTING 1. Occurrences that must be reported Permittees shall report the following occurrences: (a) Visible sediment deposition in a stream or wetland. (b) Oil spills if: • They are 25 gallons or more, • They are less than 25 gallons but cannot be cleaned up within 24 hours, • They cause sheen on surface waters (regardless of volume), or • They are within 100 feet of surface waters (regardless of volume). (a) Releases of hazardous substances in excess of reportable quantities under Section 311 of the Clean Water Act (Ref: 40 CFR 110.3 and 40 CFR 117.3) or Section 102 of CERCLA (Ref: 40 CFR 302.4) or G.S. 143-215.85. (b) Anticipated bypasses and unanticipated bypasses. (c) Noncompliance with the conditions of this permit that may endanger health or the environment. 2. Reporting Timeframes and Other Requirements After a permittee becomes aware of an occurrence that must be reported, he shall contact the appropriate Division regional office within the timeframes and in accordance with the other requirements listed below. Occurrences outside normal business hours may also be reported to the Division's Emergency Response personnel at (800) 662-7956, (800) 858-0368 or (919) 733-3300. Occurrence Reporting Timeframes (After Discovery) and Other Requirements (a) Visible sediment • Within 24 hours, an oral or electronic notification. deposition in a • Within 7 calendar days, a report that contains a description of the stream or wetland sediment and actions taken to address the cause of the deposition. Division staff may waive the requirement for a written report on a case -by -case basis. • If the stream is named on the NC 303(d) list as impaired for sediment - related causes, the permittee may be required to perform additional monitoring, inspections or apply more stringent practices if staff determine that additional requirements are needed to assure compliance with the federal or state impaired -waters conditions. (b) Oil spills and • Within 24 hours, an oral or electronic notification. The notification release of shall include information about the date, time, nature, volume and hazardous location of the spill or release. substances per Item 1(b)-(c) above (c) Anticipated • A report at least ten days before the date of the bypass, if possible. bypasses [40 CFR The report shall include an evaluation of the anticipated quality and 122.41(m)(3)] effect of the bypass. (d) Unanticipated • Within 24 hours, an oral or electronic notification. bypasses [40 CFR • Within 7calendar days, a report that includes an evaluation of the 122.41(m)(3)] quality and effect of the bypass. (e) Noncompliance • Within 24 hours, an oral or electronic notification. with the conditions • Within 7 calendar days, a report that contains a description of the of this permit that noncompliance, and its causes; the period of noncompliance, may endanger including exact dates and times, and if the noncompliance has not health or the been corrected, the anticipated time noncompliance is expected to environment[40 continue; and steps taken or planned to reduce, eliminate, and CFR 122.41(1)(7)] prevent reoccurrence of the noncompliance. [40 CFR 122.41(I)(6). • Division staff may waive the requirement for a written report on a case -by -case basis. 4Dsite solutions civil engineering I land surveying 409 Chicago Drive, Suite 112, Fayetteville, NC 28306 office 1910-426-6777 fax 1910-426-5777 license number I C-2354 wwwAD site solutions.com •4 SEA • 027 ' REVISIONS PROJECT NAME LEISURE POOLS STORAGE YARD EROSION CONTROL DETAILS CLIENT PF GLOBAL PROPERTY GROUP (DUNN), INC. 2901 Leisure Island Way Knoxville, Tennessee 37914 Phone: (865) 312-7469 PROJECT INFORMATION DESIGNED BY: SCOTT DRAWN BY: SCOTT CHECKED BY: CHRIS PROJECT NUMBER: 1492 DRAWING SCALE NOT TO SCALE DATE RELEASED MAY 20, 2019 SHEET NUMBER NCGO1 SELF -INSPECTION, RECORDKEEPING AND REPORTING EFFECTIVE: 04/01 / 19 C-402