Loading...
HomeMy WebLinkAboutDurham Tech Facilities Building - 2018.07.24 STORMSTUDY-1707-Nut's PostLOADING DOCK PROJECT AREA = 25.09 ACRES RIPARIAN BUFFER = 225,372 SF FOREST = 752,049 SF ROOF = 13,241 SF SIDEWALK = 2,560 SF PARKING LOT = 47,948 SF OPEN/LANDSCAPE = 51,882 SF