Loading...
HomeMy WebLinkAboutAddInfoRequest - NC 102 Project, LLCEnergy, Mineral and Land Resources ENVIRONMENTAL QUALITY June 28, 2018 Mr. Onur Ozdemir DEPCOM Power, Inc. 9200 E Pima Center PKWY, Suite 180 Scottsdale, AZ 85258 Subject: Request for Additional Information Stormwater Permit No. SW3170403 NC 102 Project, LLC Cabarrus County Dear Mr. Ozdemir: ROY COOPER Governor MICHAEL S. REGAN Secretary WILLIAM E. TOBY VINSON, JR. Interim Director The Division of Energy, Mineral and Land Resources (DEMLR), received a Stormwater Management Permit Application for the subject project on June 12, 2018. A review of that information has determined that the application is not complete. The following information is needed to continue the stormwater review: 1. The project name on the application and the plans must be the same, as stated on Page 1 of the SWU-101 application form. Note that the name change of the permittee is reflected in Section III — Contact Information (Page 2) regardless of the project name. Please update and resubmit the plans or the application and supplemental form to be consistent. 2. The Applicants Certification (Section X) on Page 6 of the SWU-101 application form must be signed and notorized. 3. Provide pdfs of all revisions, 2 hardcopies of revised plan sheets (if applicable), and 1 hardcopy of other documents. Pdfs must be uploaded using the form at: hqps:Hedocs.deg.nc.gov/Forins/SW ProjectSubmittal Please note that this request for additional information is in response to a preliminary review. The requested information should be received by this Office prior to July 28, 2018, or the application will be returned as incomplete. The return of a project will necessitate resubmittal of all required items, including the application fee. Please reference the State assigned project number SW3170403 on all correspondence. If you need additional time to submit the information, please submit your request for a time extension to the Division at the contact below. The request must indicate the date by which you expect to submit the required information. The Division is allowed 90 days from the receipt of a completed application to issue the permit. The construction of any impervious surfaces, other than a construction entrance under an approved Sedimentation Erosion Control Plan, is a violation of NCGS 143-215.1 and is subject to enforcement action pursuant to NCGS 143-215.6A. If you have any questions concerning this matter please feel free to contact me at Corey. Anen(d),ncdenr. gov or (919) 807-6378. Sincerely, L&t64'— Corey Anen Environmental Engineer Stormwater Program cc: Mooresville Regional Office Edmond H. Blackwell, PE – Blackwell Engineering, PLC Nothing Compares. State of North Carolina I Environmental Quality I Energy, Mineral and Land Resources 512 N. Salisbury Street 1 1612 Maii Service Center I Raleigh, Nort hCaroiina27699-1612 919 707 9200