Loading...
HomeMy WebLinkAboutSW000021 Fast Track Checklist_attempt 1_ 2018 03_21Fast Track ATC Review Checklist ATC Number: SWp 21 Accepted Date: Project Name: Aubert Landing County: Permit Type : Fx New New -Replacing ATC or SW8 Transfer Existing # (SW_ or SWA): Applicable 2017 Rule: Phase II Union Density (HD/ LD): HD Total Property / Project Area, sf: 944,250 15A NCAC 02H.1043 - Fast Track ATC Permitting Process (1) Applicability: n The project is new or a major modification of an existing permit All off the MDC will be met and the project is not proposing an alternative design x (a) The project is not claiming an exemption from the MDC na (b) Modifications to existing projects will meet the 2017 rules, including MDC x (c) The project is not out of compliance with an existing stormwater permit x (2) Eligibility. Licensed professional has signed and sealed the application Design Professional / Registration Number: Gallard Carter III 16835 (3) Submittal requirements: x Application Fee ($505) x Using current version of the application 2 hard copies and 1 electronic copy of the following: x (a) Completed and signed Fast -Track Application, including the following: x (i) Project name - current and previous (if applicable) x (ii) Project location (iii) Previous stormwater project number (if applicable) x (iv) Applicability of other state and federal permits x (v) Applicant name, address, and contact info x (vi) Owner name, address, and contact info Hx x Supporting documentation: Copy of the most current property deed (vii) Certification of financially responsible owner (b) When the applicant is a corporation or LLC: e (i) Documentation that applicant is active and in good standing with NCSOS (ii) Documentation from NCSOS or other official documentation supporting the titles / positions held by person(s) signing the application pursuant to Rule .1040(1) .1040(1) Original signatures by one of the following unless accompanied by a letter of authorization: (a) Corporation: by a vice president LLC: by manager or company official as defined in G.S. 57D (b) Partnership: by a general partner or managing partner Limited Partnership: by a general partner x (c) Sole proprietorship: by the proprietor (d) Municipal, state, or other public entity: by a principal executive officer, ranking official, or other authorized employee (c) When the applicant is not the property owner, a copy of lease agreements, affidavits, or other legal documents showing that the applicant has the legal rights to apply for a stormwater permit within the proposed project area Fx (d) Guaranty signed and notarized by the applicant and sealed by the licensed professional in accordance with Item (2) of this Rule attesting to the following: x (i) The design is in accordance with the MDC (.1050-.1062) x (ii) The design meets the MDC and that the % of BUA that is the basis for the design shall not be exceeded (iii) A licensed professional of record must be maintained for the duration of the project x (e) USGS map identifying the project location x GPS coordinates for the project Areas subject to SA, HQW or ORW waters shown on the USGS map x (f) Site plan depicting the following: x Boundary of the project or phase Locations of the SCMs x Locations of surface waters, wetlands, and setbacks x 1 (g) Construction Sequence that discusses how any future development may be phased Reviewer: RLR Date: 3/22/2018 Result of Review: Project not qualified per .1043(1)ATC Issued RRATC Additional information necessary Denied per .1040(5)