Loading...
HomeMy WebLinkAboutABC Storage Eastover - Permit review (2) Riddle, Rick L From:Riddle, Rick L Sent:Thursday, October 05, 2017 1:18 PM To:'grose9295@gmail.com' Subject:ABC Storage, Eastover - Permit review George, I am reviewing the plans and calculations for the infiltration basin and noticed that you are missing a Drawdown time for the infiltration pond. According to the MDC Item #5, Infiltration systems shall be designed to dewater the design volume to the bottom of the infiltration device within 72 hours or less. If you could provide me with that calculation, then the submittal should be complete. I have not noticed anything else missing at this point. Please mail two copies of stamped calculation sheet with the needed details back to NCDEQ. You can send me one via email to check. I’ll let you know if I find any other items for comment. Thanks Richard L. Riddle, Jr. Stormwater Engineer North Carolina Department Enviromental Quality North Carolina Division Energy Mineral Land Resources 919 807-6375 office rick.riddle@ncdenr.gov 512 North Salisbury Street 1612 Mail Service Center Raleigh, NC 27699-1612 Email correspondence to and from this address is subject to the North Carolina Public Records Law and may be disclosed to third parties. 1