Loading...
HomeMy WebLinkAboutProposed DaVita Dialysis Center - NCR172042 - Davita Bunn© 2017 HERE © 2017 Microsoft Corporation SHEET INDEX SHEET TITLE SHEET NUMBER COVER SHEET C-1.0 GENERAL NOTES C-1.1 ALTA SURVEY -- DEMOLITION PLAN C-2.0 SITE PLAN C-3.0 GRADING & DRAINAGE PLAN C-4.0 UTILITY PLAN C-5.0 EROSION & SEDIMENT CONTROL PHASE 1 C-6.0 EROSION AND SEDIMENT CONTROL PHASE 2 C-6.1 LANDSCAPE PLAN C-7.0 LIGHTING PLAN C-8.0 CONSTRUCTION DETAILS 1 D-1.0 CONSTRUCTION DETAILS 2 D-1.1 EROSION AND SEDIMENT CONTROL DETAILS D-2.0 LANDSCAPE DETAILS D-3.0 CONTACT INFORMATION SCALE: N.T.S. LOCATION OF SITE 565 SOUTH MAIN STREET, TOWN OF BUNN PARCEL PIN: 008330 FRANKLIN COUNTY, NORTH CAROLINA LOCATION MAP CONTACT: WYATT BONE (WBONE@BOHLERENG.COM) REFERENCES BOUNDARY & TOPOGRAPHIC/ALTA SURVEY: "ALTA/NSPS LAND TITLE SURVEY FOR DAVITA" PREPARED BY: BOHLER ENGINEERING PROJECT NO. NSR172042 DATED: 7/15/17 GEOTECHNICAL INVESTIGATION REPORT: "GEOTECHICAL ENGINEERING REPORT: BUNN DIALYSIS SITE" PREPARED BY: ECS SOUTHEAST, LLP PROJECT NO. 06:23602 DATED:8/11/17 ENVIROMENTAL SITE ASSESSMENT REPORT: "PHASE 1 ENVIRONMENTAL SITE ASSESSMENT REPORT, BUNN DIALYSIS, 565 MAIN STREET, BUNN, FRANKLIN COUNTY, NORTH CAROLINA 27508" PREPARED BY: ECS SOUTH EAST, LLP PROJECT NO. 49-4855 DATED:7/26/17 GOVERNING AGENCIES TOWN OF BUNN 601 MAIN STREET PO BOX 398 BUNN, NC 27508 (919) 496-2992 (P) KERR TAR COG MICHAEL KELLY 1724 GRAHAM AVE. HENDERSON, NC 27536 (252) 436-2040 (P) OWNER JACQUELINE K. WESTER, THOMAS G. WESTER & JANICE J. WHITFORD 3713 MARWICK CT. WENDELL, NC 27591 DEVELOPER DAVITA, INC. 2000 16TH STREET DENVER, COLORADO JAKE HERTZ JACOB.HERTZ@DAVITA.COM FOR DAVITA ¨ ¨ PRELIMINARY SITE PLANS GENERAL NOTE: IT IS THE RESPONSIBILITY OF THE CONTRACTOR TO REVIEW ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THIS PROJECT WORK SCOPE PRIOR TO THE INITIATION OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT WITH THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR APPLICABLE CODES, IT IS THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD IN WRITING PRIOR TO THE START OF CONSTRUCTION. FAILURE BY THE CONTRACTOR TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE ACCEPTANCE OF FULL RESPONSIBILITY BY THE CONTRACTOR TO COMPLETE THE SCOPE OF THE WORK AS DEFINED BY THE DRAWINGS AND IN FULL CONFORMANCE WITH LOCAL REGULATIONS AND CODES. PREPARED BY NCBELS P-1132 4130 PARKLAKE AVE., SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.com TM CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SD0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:14 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 N/A SD0 C-1.0 COVER SHEET ¨ ¨ ¨ GENERAL NOTES: CONTRACTOR IS RESPONSIBLE FOR COMPLIANCE WITH THE NOTES AND SPECIFICATIONS CONTAINED HEREIN. CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL SUBCONTRACTORS FULLY AND COMPLETELY CONFORM TO AND COMPLY WITH THESE REQUIREMENTS. 1.THE FOLLOWING DOCUMENTS ARE INCORPORATED BY REFERENCE AS PART OF THIS SITE PLAN: ·SURVEY - "ALTA/NSPS LAND TITLE SURVEY FOR DAVITA" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: NSR172042 DATED: 7/15/17 ·“GEOTECHNICAL REPORT - "GEOTECHNICAL ENGINEERING REPORT: BUNN DIALYSIS SITE PREPARED BY: ECS SOUTHEAST, LLP PROJECT NUMBER: 06:23602 DATED: 8/11/17 PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST VERIFY THAT HE/SHE HAS THE LATEST EDITION OF THE DOCUMENTS REFERENCED ABOVE. THIS IS CONTRACTOR'S RESPONSIBILITY. 2.ALL ACCESSIBLE (A/K/A ADA) PARKING SPACES MUST BE CONSTRUCTED TO MEET, AT A MINIMUM, THE MORE STRINGENT OF THE REQUIREMENTS OF THE “AMERICANS WITH DISABILITIES ACT” (ADA) CODE (42 U.S.C. § 12101 et seq. AND 42 U.S.C. § 4151 et seq.) OR THE REQUIREMENTS OF THE JURISDICTION WHERE THE PROJECT IS TO BE CONSTRUCTED, AND ANY AND ALL AMENDMENTS TO BOTH WHICH ARE IN EFFECT WHEN THESE PLANS ARE COMPLETED. 3.PRIOR TO STARTING CONSTRUCTION, THE CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL REQUIRED PERMITS AND APPROVALS HAVE BEEN OBTAINED. NO CONSTRUCTION OR FABRICATION SHALL BEGIN UNTIL THE CONTRACTOR HAS RECEIVED AND THOROUGHLY REVIEWED THE COMMENTS TO ALL PLANS AND OTHER DOCUMENTS REVIEWED AND APPROVED BY THE PERMITTING AUTHORITIES AND CONFIRMED THAT ALL NECESSARY OR REQUIRED PERMITS HAVE BEEN OBTAINED. CONTRACTOR MUST HAVE COPIES OF ALL PERMITS AND APPROVALS ON SITE AT ALL TIMES. 4.THE OWNER/CONTRACTOR MUST BE FAMILIAR WITH AND RESPONSIBLE FOR THE PROCUREMENT OF ANY AND ALL CERTIFICATIONS REQUIRED FOR THE ISSUANCE OF A CERTIFICATE OF OCCUPANCY. 5.ALL WORK MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND CONDITIONS OF APPROVAL, AND ALL APPLICABLE REQUIREMENTS, RULES, REGULATIONS, STATUTORY REQUIREMENTS, CODES, LAWS AND STANDARDS OF ALL GOVERNMENTAL ENTITIES WITH JURISDICTION OVER THIS PROJECT. 6.THE GEOTECHNICAL REPORT AND RECOMMENDATIONS SET FORTH HEREIN ARE A PART OF THE REQUIRED CONSTRUCTION DOCUMENTS AND, IN CASE OF CONFLICT, DISCREPANCY OR AMBIGUITY, THE MORE STRINGENT REQUIREMENTS AND/OR RECOMMENDATIONS CONTAINED IN THE PLANS AND THE GEOTECHNICAL REPORT AND RECOMMENDATIONS SHALL TAKE PRECEDENCE UNLESS SPECIFICALLY NOTED OTHERWISE ON THE PLANS. THE CONTRACTOR MUST NOTIFY THE ENGINEER, IN WRITING, OF ANY SUCH CONFLICT, DISCREPANCY OR AMBIGUITY BETWEEN THE GEOTECHNICAL REPORTS AND PLANS AND SPECIFICATIONS PRIOR TO PROCEEDING WITH ANY FURTHER WORK. 7.THESE PLANS ARE BASED ON INFORMATION PROVIDED TO BOHLER ENGINEERING BY THE OWNER AND OTHERS PRIOR TO THE TIME OF PLAN PREPARATION. CONTRACTOR MUST FIELD VERIFY EXISTING CONDITIONS AND NOTIFY BOHLER ENGINEERING, IN WRITING, IMMEDIATELY IF ACTUAL SITE CONDITIONS DIFFER FROM THOSE SHOWN ON THE PLAN, OR IF THE PROPOSED WORK CONFLICTS WITH ANY OTHER SITE FEATURES. 8.ALL DIMENSIONS SHOWN ON THE PLANS MUST BE FIELD VERIFIED BY THE CONTRACTOR PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, IF ANY CONFLICTS, DISCREPANCIES, OR AMBIGUITIES EXIST PRIOR TO PROCEEDING WITH CONSTRUCTION. NO EXTRA COMPENSATION WILL BE PAID TO THE CONTRACTOR FOR WORK WHICH HAS TO BE REDONE OR REPAIRED DUE TO DIMENSIONS OR GRADES SHOWN INCORRECTLY ON THESE PLANS PRIOR TO CONTRACTOR GIVING ENGINEER WRITTEN NOTIFICATION OF SAME AND ENGINEER, THEREAFTER, PROVIDING CONTRACTOR WITH WRITTEN AUTHORIZATION TO PROCEED WITH SUCH ADDITIONAL WORK. 9.CONTRACTOR MUST REFER TO THE ARCHITECTURAL/BUILDING PLANS “OF RECORD” FOR EXACT LOCATIONS AND DIMENSIONS OF ENTRY/EXIT POINTS, ELEVATIONS, PRECISE BUILDING DIMENSIONS, AND EXACT BUILDING UTILITY LOCATIONS. 10.PRIOR TO THE START OF CONSTRUCTION, THE CONTRACTOR MUST COORDINATE THE BUILDING LAYOUT BY CAREFUL REVIEW OF THE ENTIRE SITE PLAN AND THE LATEST ARCHITECTURAL PLANS (INCLUDING, BUT NOT LIMITED TO, STRUCTURAL, MECHANICAL, ELECTRICAL, PLUMBING AND FIRE SUPPRESSION PLAN, WHERE APPLICABLE). CONTRACTOR MUST IMMEDIATELY NOTIFY OWNER, ARCHITECT AND SITE ENGINEER, IN WRITING, OF ANY CONFLICTS, DISCREPANCIES OR AMBIGUITIES WHICH EXIST. 11.DEBRIS MUST NOT BE BURIED ON THE SUBJECT SITE AND ALL UNSUITABLE EXCAVATED MATERIAL AND DEBRIS (SOLID WASTE) MUST BE DISPOSED OF IN ACCORDANCE WITH THE REQUIREMENTS OF ANY AND ALL GOVERNMENTAL AUTHORITIES WHICH HAVE JURISDICTION OVER THIS PROJECT OR OVER CONTRACTOR. 12.THE CONTRACTOR IS RESPONSIBLE FOR IDENTIFYING WHEN SHORING IS REQUIRED AND FOR INSTALLING ALL SHORING REQUIRED DURING EXCAVATION (TO BE PERFORMED IN ACCORDANCE WITH CURRENT OSHA STANDARDS) AND ANY ADDITIONAL PRECAUTIONS TO BE TAKEN TO ASSURE THE STABILITY OF ADJACENT, NEARBY AND CONTIGUOUS STRUCTURES AND PROPERTIES. 13.THE CONTRACTOR IS TO EXERCISE EXTREME CARE WHEN PERFORMING ANY WORK ACTIVITIES ADJACENT TO PAVEMENT, STRUCTURES, ETC. WHICH ARE TO REMAIN EITHER FOR AN INITIAL PHASE OF THE PROJECT OR AS PART OF THE FINAL CONDITION. CONTRACTOR IS RESPONSIBLE FOR TAKING ALL APPROPRIATE MEASURES REQUIRED TO ENSURE THE STRUCTURAL STABILITY OF SIDEWALKS AND PAVEMENT, UTILITIES, BUILDINGS, AND INFRASTRUCTURE WHICH ARE TO REMAIN, AND TO PROVIDE A SAFE WORK AREA FOR THIRD PARTIES, PEDESTRIANS AND ANYONE INVOLVED WITH THE PROJECT. 14.THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ANY DAMAGE DONE TO ANY NEW OR EXISTING CONSTRUCTION OR PROPERTY DURING THE COURSE OF CONSTRUCTION, INCLUDING BUT NOT LIMITED TO DRAINAGE, UTILITIES, PAVEMENT, STRIPING, CURB, ETC. AND SHALL BEAR ALL COSTS ASSOCIATED WITH SAME TO INCLUDE, BUT NOT BE LIMITED TO, REDESIGN, RE-SURVEY, RE-PERMITTING AND CONSTRUCTION. THE CONTRACTOR IS RESPONSIBLE FOR AND MUST REPLACE ALL SIGNAL INTERCONNECTION CABLE, WIRING CONDUITS, AND ANY UNDERGROUND ACCESSORY EQUIPMENT DAMAGED DURING CONSTRUCTION AND MUST BEAR ALL COSTS ASSOCIATED WITH SAME. THE REPAIR OF ANY SUCH NEW OR EXISTING CONSTRUCTION OR PROPERTY MUST RESTORE SUCH CONSTRUCTION OR PROPERTY TO A CONDITION EQUIVALENT TO OR BETTER THAN THE CONDITIONS PRIOR TO COMMENCEMENT OF THE CONSTRUCTION, AND IN CONFORMANCE WITH APPLICABLE CODES, LAWS RULES, REGULATIONS, STATUTORY REQUIREMENTS AND STATUTES. CONTRACTOR MUST BEAR ALL COSTS ASSOCIATED WITH SAME. CONTRACTOR IS RESPONSIBLE TO DOCUMENT ALL EXISTING DAMAGE AND TO NOTIFY THE OWNER AND THE CONSTRUCTION MANAGER PRIOR TO THE START OF CONSTRUCTION. 15.ALL CONCRETE MUST BE AIR ENTRAINED AND HAVE THE MINIMUM COMPRESSIVE STRENGTH OF 4,000 PSI AT 28 DAYS UNLESS OTHERWISE NOTED ON THE PLANS, DETAILS AND/OR GEOTECHNICAL REPORT. 16.THE ENGINEER IS NOT RESPONSIBLE FOR CONSTRUCTION METHODS, MEANS, TECHNIQUES OR PROCEDURES, GENERALLY OR FOR THE CONSTRUCTION MEANs, METHODS, TECHNIQUES OR PROCEDURES FOR COMPLETION OF THE WORK DEPICTED BOTH ON THESE PLANS, AND FOR ANY CONFLICTS/SCOPE REVISIONS WHICH RESULT FROM SAME. CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE METHODS/MEANS FOR COMPLETION OF THE WORK PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 17.THE ENGINEER OF RECORD IS NOT RESPONSIBLE FOR JOB SITE SAFETY. THE ENGINEER OF RECORD HAS NOT BEEN RETAINED TO PERFORM OR BE RESPONSIBLE FOR JOB SITE SAFETY, SAME BEING WHOLLY OUTSIDE OF ENGINEER'S SERVICES AS RELATED TO THE PROJECT. THE ENGINEER OF RECORD IS NOT RESPONSIBLE TO IDENTIFY OR REPORT ANY JOB SITE SAFETY ISSUES, AT ANY TIME. 18.ALL CONTRACTORS MUST CARRY THE SPECIFIED STATUTORY WORKER'S COMPENSATION INSURANCE, EMPLOYER'S LIABILITY INSURANCE AND LIMITS OF COMMERCIAL GENERAL LIABILITY INSURANCE (CGL). ALL CONTRACTORS MUST HAVE THEIR CGL POLICIES ENDORSED TO NAME BOHLER ENGINEERING, AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AS ADDITIONAL NAMED INSURED AND TO PROVIDE CONTRACTUAL LIABILITY COVERAGE SUFFICIENT TO INSURE THIS HOLD HARMLESS AND INDEMNITY OBLIGATIONS ASSUMED BY THE CONTRACTORS. ALL CONTRACTORS MUST FURNISH BOHLER ENGINEERING WITH CERTIFICATIONS OF INSURANCE AS EVIDENCE OF THE REQUIRED INSURANCE PRIOR TO COMMENCING WORK AND UPON RENEWAL OF EACH POLICY DURING THE ENTIRE PERIOD OF CONSTRUCTION AND FOR ONE YEAR AFTER THE COMPLETION OF CONSTRUCTION. IN ADDITION, ALL CONTRACTORS WILL, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, INDEMNIFY, DEFEND AND HOLD HARMLESS BOHLER ENGINEERING AND ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS FROM AND AGAINST ANY DAMAGES, INJURIES, CLAIMS, ACTIONS, PENALTIES, EXPENSES, PUNITIVE DAMAGES, TORT DAMAGES, STATUTORY CLAIMS, STATUTORY CAUSES OF ACTION, LOSSES, CAUSES OF ACTION, LIABILITIES OR COSTS, INCLUDING, BUT NOT LIMITED TO, REASONABLE ATTORNEYS' FEES AND DEFENSE COSTS, ARISING OUT OF OR IN ANY WAY CONNECTED WITH OR TO THE PROJECT, INCLUDING ALL CLAIMS BY EMPLOYEES OF THE CONTRACTORS, ALL CLAIMS BY THIRD PARTIES AND ALL CLAIMS RELATED TO THE PROJECT. CONTRACTOR MUST NOTIFY ENGINEER, IN WRITING, AT LEAST THIRTY (30) DAYS PRIOR TO ANY TERMINATION, SUSPENSION OR CHANGE OF ITS INSURANCE HEREUNDER. 19.BOHLER ENGINEERING WILL REVIEW OR TAKE OTHER APPROPRIATE ACTION ON THE CONTRACTOR SUBMITTALS, SUCH AS SHOP DRAWINGS, PRODUCT DATA, SAMPLES, AND OTHER DATA, WHICH THE CONTRACTOR IS REQUIRED TO SUBMIT, BUT ONLY FOR THE LIMITED PURPOSE OF CHECKING FOR CONFORMANCE WITH THE DESIGN INTENT AND THE INFORMATION SHOWN IN THE CONSTRUCTION CONTRACT DOCUMENTS. CONSTRUCTION MEANS AND/OR METHODS AND/OR TECHNIQUES OR PROCEDURES, COORDINATION OF THE WORK WITH OTHER TRADES, AND CONSTRUCTION SAFETY PRECAUTIONS ARE THE SOLE RESPONSIBILITY OF THE CONTRACTOR AND BOHLER HAS NO RESPONSIBILITY OR LIABILITY FOR SAME HEREUNDER. BOHLER ENGINEERING'S SHOP DRAWING REVIEW WILL BE CONDUCTED WITH REASONABLE PROMPTNESS WHILE ALLOWING SUFFICIENT TIME TO PERMIT ADEQUATE REVIEW. REVIEW OF A SPECIFIC ITEM MUST NOT INDICATE THAT BOHLER ENGINEERING HAS REVIEWED THE ENTIRE ASSEMBLY OF WHICH THE ITEM IS A COMPONENT. BOHLER ENGINEERING WILL NOT BE RESPONSIBLE FOR ANY DEVIATIONS FROM THE CONSTRUCTION DOCUMENTS NOT PROMPTLY AND IMMEDIATELY BROUGHT TO ITS ATTENTION, IN WRITING, BY THE CONTRACTOR. BOHLER ENGINEERING WILL NOT BE REQUIRED TO REVIEW PARTIAL SUBMISSIONS OR THOSE FOR WHICH SUBMISSIONS OF CORRELATED ITEMS HAVE NOT BEEN RECEIVED. 20.NEITHER THE PROFESSIONAL ACTIVITIES OF BOHLER ENGINEERING, NOR THE PRESENCE OF BOHLER ENGINEERING AND/OR ITS PAST, PRESENT AND FUTURE OWNERS, OFFICERS, DIRECTORS, PARTNERS, SHAREHOLDERS, MEMBERS, PRINCIPALS, COMMISSIONERS, AGENTS, SERVANTS, EMPLOYEES, AFFILIATES, SUBSIDIARIES, AND RELATED ENTITIES, AND ITS SUBCONTRACTORS AND SUBCONSULTANTS AT A CONSTRUCTION/PROJECT SITE, SHALL RELIEVE THE GENERAL CONTRACTOR OF ITS OBLIGATIONS, DUTIES AND RESPONSIBILITIES INCLUDING, BUT NOT LIMITED TO, CONSTRUCTION MEANS, METHODS, SEQUENCE, TECHNIQUES OR PROCEDURES NECESSARY FOR PERFORMING, OVERSEEING, SUPERINTENDING AND COORDINATING THE WORK IN ACCORDANCE WITH THE CONTRACT DOCUMENTS AND COMPLIANCE ANY HEALTH OR SAFETY PRECAUTIONS REQUIRED BY ANY REGULATORY AGENCIES WITH JURISDICTION OVER THE PROJECT AND/OR PROPERTY. BOHLER ENGINEERING AND ITS PERSONNEL HAVE NO AUTHORITY TO EXERCISE ANY CONTROL OVER ANY CONSTRUCTION CONTRACTOR OR ITS EMPLOYEES IN CONNECTION WITH THEIR WORK OR ANY HEALTH OR SAFETY PROGRAMS OR PROCEDURES. THE GENERAL CONTRACTOR IS SOLELY RESPONSIBLE FOR JOB SITE SAFETY. BOHLER ENGINEERING SHALL BE INDEMNIFIED BY THE GENERAL CONTRACTOR AND MUST BE NAMED AN ADDITIONAL INSURED UNDER THE GENERAL CONTRACTOR'S POLICIES OF GENERAL LIABILITY INSURANCE AS DESCRIBED ABOVE IN NOTE 19 FOR JOB SITE SAFETY. 21.IF THE CONTRACTOR DEVIATES FROM THE PLANS AND SPECIFICATIONS, INCLUDING THE NOTES CONTAINED HEREIN, WITHOUT FIRST OBTAINING THE PRIOR WRITTEN AUTHORIZATION OF THE ENGINEER FOR SUCH DEVIATIONS, THE CONTRACTOR IS SOLELY RESPONSIBLE FOR THE PAYMENT OF ALL COSTS INCURRED IN CORRECTING ANY WORK DONE WHICH DEVIATES FROM THE PLANS, ALL FINES AND/OR PENALTIES ASSESSED WITH RESPECT THERETO AND ALL COMPENSATORY OR PUNITIVE DAMAGES RESULTING THEREFROM AND, FURTHER, SHALL DEFEND, INDEMNIFY AND HOLD HARMLESS THE ENGINEER, TO THE FULLEST EXTENT PERMITTED UNDER THE LAW, IN ACCORDANCE WITH PARAGRAPH 19 HEREIN, FOR AND FROM ALL FEES, ATTORNEYS' FEES, DAMAGES, COSTS, JUDGMENTS, PENALTIES AND THE LIKE RELATED TO SAME. 22.CONTRACTOR IS RESPONSIBLE FOR MAINTENANCE AND PROTECTION OF TRAFFIC PLAN FOR ALL WORK THAT AFFECTS PUBLIC TRAVEL EITHER IN THE R.O.W. OR ON SITE. THE COST FOR THIS ITEM MUST BE INCLUDED IN THE CONTRACTOR'S PRICE. 23.ALL SIGNING AND PAVEMENT STRIPING MUST CONFORM TO MANUAL ON UNIFORM TRAFFIC CONTROL DEVICES OR LOCALLY APPROVED SUPPLEMENT. 24.ENGINEER IS NOT RESPONSIBLE FOR ANY INJURY OR DAMAGES RESULTING FROM CONTRACTOR'S FAILURE TO BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH THE APPROVED PLANS. IF CONTRACTOR AND/OR OWNER FAIL BUILD OR CONSTRUCT IN STRICT ACCORDANCE WITH APPROVED PLANS, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS. 25.OWNER MUST MAINTAIN AND PRESERVE ALL PHYSICAL SITE FEATURES AND DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, IN STRICT ACCORDANCE WITH THE APPROVED PLAN(S) AND DESIGN AND, FURTHER ENGINEER IS NOT RESPONSIBLE FOR ANY FAILURE TO SO MAINTAIN OR PRESERVE SITE AND/OR DESIGN FEATURES. IF OWNER FAILS TO MAINTAIN AND/OR PRESERVE ALL PHYSICAL SITE FEATURES AND/OR DESIGN FEATURES DEPICTED ON THE PLANS AND RELATED DOCUMENTS, OWNER AGREES TO INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT OF SAID FAILURE. 26.ALL DIMENSIONS MUST BE TO FACE OF CURB, EDGE OF PAVEMENT, OR EDGE OF BUILDING, UNLESS NOTED OTHERWISE. 27.ALL CONSTRUCTION AND MATERIALS MUST COMPLY WITH AND CONFORM TO APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, LAWS, ORDINANCES, RULES AND CODES, AND ALL APPLICABLE OSHA REQUIREMENTS. 28.CONTRACTOR AND OWNER MUST INSTALL ALL ELEMENTS AND COMPONENTS IN STRICT COMPLIANCE WITH AND ACCORDANCE WITH MANUFACTURER'S STANDARDS AND RECOMMENDED INSTALLATION CRITERIA AND SPECIFICATIONS. IF CONTRACTOR AND/OR OWNER FAIL TO DO SO, THEY AGREE TO JOINTLY AND SEVERALLY INDEMNIFY AND HOLD ENGINEER HARMLESS FOR ALL INJURIES AND DAMAGES THAT ENGINEER SUFFERS AND COSTS THAT ENGINEER INCURS AS A RESULT OF SAID FAILURE. 29.CONTRACTOR IS RESPONSIBLE TO MAINTAIN ON-SITE STORMWATER POLLUTION PREVENTION PLAN (SWPPP) IN COMPLIANCE WITH EPA REQUIREMENTS FOR SITES WHERE ONE (1) ACRE OR MORE (UNLESS THE LOCAL JURISDICTION REQUIRES FEWER) IS DISTURBED BY CONSTRUCTION ACTIVITIES. CONTRACTOR IS RESPONSIBLE TO ENSURE THAT ALL ACTIVITIES, INCLUDING THOSE OF SUBCONTRACTORS, ARE IN COMPLIANCE WITH THE SWPPP, INCLUDING BUT NOT LIMITED TO LOGGING ACTIVITIES (MINIMUM ONCE PER WEEK AND AFTER RAINFALL EVENTS) AND CORRECTIVE MEASURES, AS APPROPRIATE. 30.AS CONTAINED IN THESE DRAWINGS AND ASSOCIATED APPLICATION DOCUMENTS PREPARED BY THE SIGNATORY PROFESSIONAL ENGINEER, THE USE OF THE WORDS CERTIFY OR CERTIFICATION CONSTITUTES AN EXPRESSION OF “PROFESSIONAL OPINION” REGARDING THE INFORMATION WHICH IS THE SUBJECT OF THE UNDERSIGNED PROFESSIONAL KNOWLEDGE OR BELIEF AND IN ACCORDANCE WITH COMMON ACCEPTED PROCEDURE CONSISTENT WITH THE APPLICABLE STANDARDS OF PRACTICE, AND DOES NOT CONSTITUTE A WARRANTY OR GUARANTEE, EITHER EXPRESSED OR IMPLIED. GENERAL DEMOLITION NOTES: 1.THIS PLAN REFERENCES DOCUMENTS AND INFORMATION BY: "ALTA/NSPS LAND TITLE SURVEY FOR DAVITA" PREPARED BY: BOHLER ENGINEERING PROJECT NUMBER: NSR172042 DATED: 7/15/17 2.CONTRACTOR SHALL PERFORM ALL WORK IN ACCORDANCE WITH THE REQUIREMENTS OF THE OCCUPATIONAL SAFETY AND HEALTH ACT OF 1970, (29 U.S.C. 651 et seq.), AS AMENDED AND ANY MODIFICATIONS, AMENDMENTS OR REVISIONS TO SAME. 3.BOHLER ENGINEERING HAS NO CONTRACTUAL, LEGAL, OR OTHER RESPONSIBILITY FOR JOB SITE SAFETY OR JOB SITE SUPERVISION, OR ANYTHING RELATED TO SAME. 4.THE DEMOLITION PLAN IS INTENDED TO PROVIDE GENERAL INFORMATION, ONLY, REGARDING ITEMS TO BE DEMOLISHED AND/OR REMOVED. THE CONTRACTOR MUST ALSO REVIEW THE OTHER SITE PLAN DRAWINGS AND INCLUDE IN DEMOLITION ACTIVITIES ALL INCIDENTAL WORK NECESSARY FOR THE CONSTRUCTION OF THE NEW SITE IMPROVEMENTS. 5.CONTRACTOR MUST RAISE ANY QUESTIONS CONCERNING THE ACCURACY OR INTENT OF THESE PLANS OR SPECIFICATIONS, CONCERNS REGARDING THE APPLICABLE SAFETY STANDARDS, OR THE SAFETY OF THE CONTRACTOR OR THIRD PARTIES IN PERFORMING THE WORK ON THIS PROJECT, WITH BOHLER ENGINEERING, IN WRITING, AND RESPONDED TO BY BOHLER, IN WRITING, PRIOR TO THE INITIATION OF ANY SITE ACTIVITY AND ANY DEMOLITION ACTIVITY. ALL DEMOLITION ACTIVITIES MUST BE PERFORMED IN ACCORDANCE WITH THE REQUIREMENTS OF THESE PLANS AND SPECIFICATIONS AND ALL APPLICABLE FEDERAL, STATE AND LOCAL REGULATIONS, RULES, REQUIREMENTS, STATUTES, ORDINANCES AND CODES. 6.PRIOR TO STARTING ANY DEMOLITION, CONTRACTOR IS RESPONSIBLE FOR/TO: A.OBTAINING ALL REQUIRED PERMITS AND MAINTAINING THE SAME ON SITE FOR REVIEW BY THE ENGINEER AND OTHER PUBLIC AGENCIES HAVING JURISDICTION THROUGHOUT THE DURATION OF THE PROJECT, SITE WORK AND DEMOLITION WORK. GENERAL GRADING & UTILITY NOTES 1.LOCATIONS OF ALL EXISTING AND PROPOSED SERVICES ARE APPROXIMATE AND MUST BE INDEPENDENTLY CONFIRMED WITH LOCAL UTILITY COMPANIES PRIOR TO COMMENCEMENT OF ANY CONSTRUCTION OR EXCAVATION. SANITARY SEWER AND ALL OTHER UTILITY SERVICE CONNECTION POINTS MUST BE INDEPENDENTLY CONFIRMED BY THE CONTRACTOR IN THE FIELD PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. ALL DISCREPANCIES MUST IMMEDIATELY BE REPORTED, IN WRITING, TO THE ENGINEER. CONSTRUCTION MUST COMMENCE BEGINNING AT THE LOWEST INVERT (POINT OF CONNECTION) AND PROGRESS UP GRADIENT. PROPOSED INTERFACE POINTS (CROSSINGS) WITH EXISTING UNDERGROUND UTILITIES SHALL BE FIELD VERIFIED BY TEST PIT PRIOR TO COMMENCEMENT OF CONSTRUCTION. 2.CONTRACTOR MUST VERTICALLY AND HORIZONTALLY LOCATE ALL UTILITIES AND SERVICES INCLUDING, BUT NOT LIMITED TO, GAS, WATER, ELECTRIC, SANITARY AND STORM SEWER, TELEPHONE, CABLE, FIBER OPTIC CABLE, ETC. WITHIN THE LIMITS OF DISTURBANCE OR WORK SPACE, WHICHEVER IS GREATER. THE CONTRACTOR MUST USE, REFER TO, AND COMPLY WITH THE REQUIREMENTS OF THE APPLICABLE UTILITY NOTIFICATION SYSTEM TO LOCATE ALL THE UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR REPAIRING ALL DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION, AT NO COST TO THE OWNER. CONTRACTOR SHALL BEAR ALL COSTS ASSOCIATED WITH DAMAGE TO ANY EXISTING UTILITIES DURING CONSTRUCTION. 3.IT IS THE CONTRACTOR'S RESPONSIBILITY TO REVIEW ALL CONSTRUCTION CONTRACT DOCUMENTS INCLUDING, BUT NOT LIMITED TO, ALL OF THE DRAWINGS AND SPECIFICATIONS ASSOCIATED WITH THE PROJECT WORK SCOPE PRIOR TO THE INITIATION AND COMMENCEMENT OF CONSTRUCTION. SHOULD THE CONTRACTOR FIND A CONFLICT AND/OR DISCREPANCY BETWEEN THE DOCUMENTS RELATIVE TO THE SPECIFICATIONS OR THE RELATIVE OR APPLICABLE CODES, REGULATIONS, LAWS, RULES, STATUTES AND/OR ORDINANCES, IT IS THE CONTRACTOR'S SOLE RESPONSIBILITY TO NOTIFY THE PROJECT ENGINEER OF RECORD, IN WRITING, OF SAID CONFLICT AND/OR DISCREPANCY PRIOR TO THE START OF CONSTRUCTION. CONTRACTOR'S FAILURE TO NOTIFY THE PROJECT ENGINEER SHALL CONSTITUTE CONTRACTOR'S FULL AND COMPLETE ACCEPTANCE OF ALL RESPONSIBILITY TO COMPLETE THE SCOPE OF WORK AS DEFINED BY THE DRAWINGS AND IN FULL COMPLIANCE WITH ALL FEDERAL, STATE AND LOCAL REGULATIONS, LAWS, STATUTES, ORDINANCES AND CODES AND, FURTHER, CONTRACTOR SHALL BE RESPONSIBLE FOR ALL COSTS ASSOCIATED WITH SAME. 4.THE CONTRACTOR MUST LOCATE AND CLEARLY AND UNAMBIGUOUSLY DEFINE VERTICALLY AND HORIZONTALLY ALL ACTIVE AND INACTIVE UTILITY AND/OR SERVICE SYSTEMS THAT ARE TO BE REMOVED. THE CONTRACTOR IS RESPONSIBLE TO PROTECT AND MAINTAIN ALL ACTIVE AND INACTIVE SYSTEMS THAT ARE NOT BEING REMOVED/RELOCATED DURING SITE ACTIVITY. 5.THE CONTRACTOR MUST FAMILIARIZE ITSELF WITH THE APPLICABLE UTILITY SERVICE PROVIDER REQUIREMENTS AND IS RESPONSIBLE FOR ALL COORDINATION REGARDING UTILITY DEMOLITION AS IDENTIFIED OR REQUIRED FOR THE PROJECT. THE CONTRACTOR MUST PROVIDE THE OWNER WITH WRITTEN NOTIFICATION THAT THE EXISTING UTILITIES AND SERVICES HAVE BEEN TERMINATED AND ABANDONED IN ACCORDANCE WITH THE JURISDICTION AND UTILITY COMPANY REQUIREMENTS AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. 6.THE CONTRACTOR MUST INSTALL ALL STORM SEWER AND SANITARY SEWER COMPONENTS WHICH FUNCTION BY GRAVITY PRIOR TO THE INSTALLATION OF ALL OTHER UTILITIES. 7.CONTRACTOR IS RESPONSIBLE FOR COORDINATION OF SITE PLAN DOCUMENTS AND ARCHITECTURAL DESIGN FOR EXACT BUILDING UTILITY CONNECTION LOCATIONS, GREASE TRAP REQUIREMENTS/DETAILS, DOOR ACCESS, AND EXTERIOR GRADING. THE ARCHITECT WILL DETERMINE THE UTILITY SERVICE SIZES. THE CONTRACTOR MUST COORDINATE INSTALLATION OF UTILITIES/SERVICES WITH THE INDIVIDUAL COMPANIES, TO AVOID CONFLICTS AND TO ENSURE THAT PROPER DEPTHS ARE ACHIEVED. THE CONTRACTOR IS RESPONSIBLE FOR ENSURING THAT INSTALLATION OF ALL IMPROVEMENTS COMPLIES WITH ALL UTILITY REQUIREMENTS WITH JURISDICTION AND/OR CONTROL OF THE SITE, AND ALL OTHER APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES AND, FURTHER, IS RESPONSIBLE FOR COORDINATING THE UTILITY TIE-INS/CONNECTIONS PRIOR TO CONNECTING TO THE EXISTING UTILITY/SERVICE. WHERE A CONFLICT(S) EXISTS BETWEEN THESE SITE PLANS AND THE ARCHITECTURAL PLANS, OR WHERE ARCHITECTURAL PLAN UTILITY CONNECTION POINTS DIFFER, THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER, IN WRITING, AND PRIOR TO CONSTRUCTION, RESOLVE SAME. 8.WATER SERVICE MATERIALS, BURIAL DEPTH, AND COVER REQUIREMENTS MUST BE SPECIFIED BY THE LOCAL UTILITY COMPANY. CONTRACTOR'S PRICE FOR WATER SERVICE MUST INCLUDE ALL FEES, COSTS AND APPURTENANCES REQUIRED BY THE UTILITY TO PROVIDE FULL AND COMPLETE WORKING SERVICE. CONTRACTOR MUST CONTACT THE APPLICABLE MUNICIPALITY TO CONFIRM THE PROPER WATER METER AND VAULT, PRIOR TO COMMENCING CONSTRUCTION. 9.ALL NEW UTILITIES/SERVICES, INCLUDING ELECTRIC, TELEPHONE, CABLE TV, ETC. ARE TO BE INSTALLED UNDERGROUND. ALL NEW UTILITIES/SERVICES MUST BE INSTALLED IN ACCORDANCE WITH THE UTILITY/SERVICE PROVIDER INSTALLATION SPECIFICATIONS AND STANDARDS. 10.SITE GRADING MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS AND SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT REFERENCED IN THIS PLAN SET. THE CONTRACTOR IS RESPONSIBLE FOR REMOVING AND REPLACING UNSUITABLE MATERIALS WITH SUITABLE MATERIALS AS SPECIFIED IN THE GEOTECHNICAL REPORT. ALL EXCAVATED OR FILLED AREAS MUST BE COMPACTED AS OUTLINED IN THE GEOTECHNICAL REPORT. MOISTURE CONTENT AT TIME OF PLACEMENT MUST BE SUBMITTED IN A COMPACTION REPORT PREPARED BY A QUALIFIED GEOTECHNICAL ENGINEER, REGISTERED WITH THE STATE WHERE THE WORK IS PERFORMED, VERIFYING THAT ALL FILLED AREAS AND SUBGRADE AREAS WITHIN THE BUILDING PAD AREA AND AREAS TO BE PAVED HAVE BEEN COMPACTED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS AND THE RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. SUBBASE MATERIAL FOR SIDEWALKS, CURB, OR ASPHALT MUST BE FREE OF ORGANICS AND OTHER UNSUITABLE MATERIALS. SHOULD SUBBASE BE DEEMED UNSUITABLE BY OWNER/DEVELOPER, OR OWNER/DEVELOPER'S REPRESENTATIVE, SUBBASE IS TO BE REMOVED AND FILLED WITH APPROVED FILL MATERIAL COMPACTED AS DIRECTED BY THE GEOTECHNICAL REPORT. EARTHWORK ACTIVITIES INCLUDING, BUT NOT LIMITED TO, EXCAVATION, BACKFILL, AND COMPACTING MUST COMPLY WITH THE RECOMMENDATIONS IN THE GEOTECHNICAL REPORT AND ALL APPLICABLE REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. EARTHWORK ACTIVITIES MUST COMPLY WITH THE STANDARD STATE DOT SPECIFICATIONS FOR ROADWAY CONSTRUCTION (LATEST EDITION) AND ANY AMENDMENTS OR REVISIONS THERETO. 11.ALL FILL, COMPACTION, AND BACKFILL MATERIALS REQUIRED FOR UTILITY INSTALLATION MUST BE AS PER THE RECOMMENDATIONS PROVIDED IN THE GEOTECHNICAL REPORT AND MUST BE COORDINATED WITH THE APPLICABLE UTILITY COMPANY SPECIFICATIONS. WHEN THE PROJECT DOES NOT HAVE GEOTECHNICAL RECOMMENDATIONS, FILL AND COMPACTION MUST, AT A MINIMUM, COMPLY WITH THE STATE DOT REQUIREMENTS AND SPECIFICATIONS AND CONSULTANT SHALL HAVE NO LIABILITY OR RESPONSIBILITY FOR OR AS RELATED TO FILL, COMPACTION AND BACKFILL. FURTHER, CONTRACTOR IS FULLY RESPONSIBLE FOR EARTHWORK BALANCE. 12.THE CONTRACTOR MUST COMPLY, TO THE FULLEST EXTENT, WITH THE LATEST OSHA STANDARDS AND REGULATIONS, AND/OR ANY OTHER AGENCY WITH JURISDICTION FOR EXCAVATION AND TRENCHING PROCEDURES. THE CONTRACTOR IS RESPONSIBLE FOR DETERMINING THE “MEANS AND METHODS” REQUIRED TO MEET THE INTENT AND PERFORMANCE CRITERIA OF OSHA, AS WELL AS ANY OTHER ENTITY THAT HAS JURISDICTION FOR EXCAVATION AND/OR TRENCHING PROCEDURES AND CONSULTANT SHALL HAVE NO RESPONSIBILITY FOR OR AS RELATED FOR OR AS RELATED TO EXCAVATION AND TRENCHING PROCEDURES. 13.PAVEMENT MUST BE SAW CUT IN STRAIGHT LINES, AND EXCEPT FOR EDGE OF BUTT JOINTS, MUST EXTEND TO THE FULL DEPTH OF THE EXISTING PAVEMENT. ALL DEBRIS FROM REMOVAL OPERATIONS MUST BE REMOVED FROM THE SITE AT THE TIME OF EXCAVATION. STOCKPILING OF DEBRIS WILL NOT BE PERMITTED. 14.THE TOPS OF EXISTING MANHOLES, INLET STRUCTURES, AND SANITARY CLEANOUT TOPS MUST BE ADJUSTED, AS NECESSARY, TO MATCH PROPOSED GRADES IN ACCORDANCE WITH ALL APPLICABLE STANDARDS, REQUIREMENTS, RULES, STATUTES, LAWS, ORDINANCES AND CODES. 15.DURING THE INSTALLATION OF SANITARY SEWER, STORM SEWER, AND ALL UTILITIES, THE CONTRACTOR MUST MAINTAIN A CONTEMPORANEOUS AND THOROUGH RECORD OF CONSTRUCTION TO IDENTIFY THE AS-INSTALLED LOCATIONS OF ALL UNDERGROUND INFRASTRUCTURE. THE CONTRACTOR MUST CAREFULLY NOTE ANY INSTALLATIONS THAT DEVIATE FROM THE INFORMATION CONTAINED IN THE UTILITY PLAN. THIS RECORD MUST BE KEPT ON A CLEAN COPY OF THE SITE PLAN, WHICH CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER AT THE COMPLETION OF WORK. 16.WHEN THE SITE IMPROVEMENT PLANS INVOLVE MULTIPLE BUILDINGS, SOME OF WHICH MAY BE BUILT AT A LATER DATE, THE CONTRACTOR MUST EXTEND ALL LINES, INCLUDING BUT NOT LIMITED TO STORM SEWER, SANITARY SEWER, UTILITIES, AND IRRIGATION LINE, TO A POINT AT LEAST FIVE (5) FEET BEYOND THE PAVED AREAS FOR WHICH THE CONTRACTOR IS RESPONSIBLE. CONTRACTOR MUST CAP ENDS AS APPROPRIATE, MARK LOCATIONS WITH A 2X4, AND MUST NOTE THE LOCATION OF ALL OF THE ABOVE ON A CLEAN COPY OF THE SITE PLAN, WHICH CONTRACTOR MUST PROMPTLY PROVIDE TO THE OWNER UPON COMPLETION OF THE WORK. 17.THE CONTRACTOR IS FULLY RESPONSIBLE FOR VERIFICATION OF EXISTING TOPOGRAPHIC INFORMATION AND UTILITY INVERT ELEVATIONS PRIOR TO COMMENCING ANY CONSTRUCTION. CONTRACTOR MUST CONFIRM AND ENSURE 0.75% MINIMUM SLOPE AGAINST ALL ISLANDS, GUTTERS, AND CURBS; 1.0% ON ALL CONCRETE SURFACES; AND 1.5% MINIMUM ON ASPHALT (EXCEPT WHERE ADA REQUIREMENTS LIMIT GRADES), TO PREVENT PONDING. CONTRACTOR MUST IMMEDIATELY IDENTIFY, IN WRITING TO THE ENGINEER, ANY DISCREPANCIES THAT MAY OR COULD AFFECT THE PUBLIC SAFETY, HEALTH OR GENERAL WELFARE, OR PROJECT COST. IF CONTRACTOR PROCEEDS WITH CONSTRUCTION WITHOUT PROVIDING PROPER NOTIFICATION, MUST BE AT THE CONTRACTOR'S OWN RISK AND, FURTHER, CONTRACTOR SHALL INDEMNIFY, DEFEND AND HOLD HARMLESS THE DESIGN ENGINEER FOR ANY DAMAGES, COSTS, INJURIES, ATTORNEY'S FEES AND THE LIKE WHICH RESULT FROM SAME. 18.PROPOSED TOP OF CURB ELEVATIONS ARE GENERALLY 6” ABOVE EXISTING LOCAL ASPHALT GRADE UNLESS OTHERWISE NOTED. FIELD ADJUST TO CREATE A MINIMUM OF 0.75% GUTTER GRADE ALONG CURB FACE. IT IS CONTRACTOR'S OBLIGATION TO ENSURE THAT DESIGN ENGINEER APPROVES FINAL CURBING CUT SHEETS PRIOR TO INSTALLATION OF SAME. 19.REFER TO SITE PLAN FOR ADDITIONAL NOTES. 20.IN THE EVENT OF DISCREPANCIES AND/OR CONFLICTS BETWEEN PLANS OR RELATIVE TO OTHER PLANS, THE SITE PLAN WILL TAKE PRECEDENCE AND CONTROL. CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER, IN WRITING, OF ANY DISCREPANCIES AND/OR CONFLICTS. 21.CONTRACTOR IS REQUIRED TO SECURE ALL NECESSARY AND/OR REQUIRED PERMITS AND APPROVALS FOR ALL OFF SITE MATERIAL SOURCES AND DISPOSAL FACILITIES. CONTRACTOR MUST SUPPLY A COPY OF APPROVALS TO ENGINEER AND OWNER PRIOR TO INITIATING WORK. 22.WHERE RETAINING WALLS (WHETHER OR NOT THEY MEET THE JURISDICTIONAL DEFINITION) ARE IDENTIFIED ON PLANS, ELEVATIONS IDENTIFIED ARE FOR THE EXPOSED PORTION OF THE WALL. WALL FOOTINGS/FOUNDATION ELEVATIONS ARE NOT IDENTIFIED HEREIN AND ARE TO BE SET/DETERMINED BY THE CONTRACTOR BASED ON FINAL STRUCTURAL DESIGN SHOP DRAWINGS PREPARED BY THE APPROPRIATE PROFESSIONAL LICENSEE IN THE STATE WHERE THE CONSTRUCTION OCCURS. 23.STORM DRAINAGE PIPE: UNLESS INDICATED OTHERWISE, ALL STORM SEWER PIPE MUST BE REINFORCED CONCRETE PIPE (RCP) CLASS III WITH SILT TIGHT JOINTS. WHEN HIGH-DENSITY POLYETHYLENE PIPE (HDPE) IS CALLED FOR ON THE PLANS, IT MUST CONFORM TO AASHTO M294 AND TYPE S (SMOOTH INTERIOR WITH ANGULAR CORRUGATIONS) WITH GASKET FOR SILT TIGHT JOINT. PVC PIPE FOR ROOF DRAIN CONNECTION MUST BE SDR 26 OR SCHEDULE 40 UNLESS INDICATED OTHERWISE. 24.SANITARY SEWER PIPE MUST BE POLYVINYL CHLORIDE (PVC) SDR 35 EXCEPT WHERE INDICATED OTHERWISE. SANITARY LATERAL MUST BE PVC SCHEDULE 40 OR PVC SDR 26 UNLESS INDICATED, IN WRITING, OTHERWISE. 25.STORM AND SANITARY SEWER PIPE LENGTHS INDICATED ARE NOMINAL AND MEASURED CENTER OF INLET AND/OR MANHOLES STRUCTURE TO CENTER OF STRUCTURE. 26.STORMWATER ROOF DRAIN LOCATIONS ARE BASED ON PRELIMINARY ARCHITECTURAL PLANS. CONTRACTOR IS RESPONSIBLE TO AND FOR VERIFYING LOCATIONS OF SAME BASED ON FINAL ARCHITECTURAL PLANS. 27.SEWERS CROSSING STREAMS AND/OR LOCATION WITHIN 10 FEET OF THE STREAM EMBANKMENT, OR WHERE SITE CONDITIONS SO INDICATE, MUST BE CONSTRUCTED OF STEEL, REINFORCED CONCRETE, DUCTILE IRON OR OTHER SUITABLE MATERIAL. 28.SEWERS CONVEYING SANITARY FLOW, COMBINED SANITARY AND STORMWATER FLOW, OR INDUSTRIAL FLOW MUST BE SEPARATED FROM WATER MAINS BY A DISTANCE OF AT LEAST 10 FEET HORIZONTALLY. IF SUCH LATERAL SEPARATION IS NOT POSSIBLE, THE PIPES MUST BE IN SEPARATE TRENCHES WITH THE SEWER AT LEAST 18 INCHES BELOW THE BOTTOM OF THE WATER MAIN, OR SUCH OTHER SEPARATION AS APPROVED BY THE GOVERNMENT AGENCY WITH JURISDICTION OVER SAME. ·WHERE APPROPRIATE SEPARATION FROM A WATER MAIN IS NOT POSSIBLE, THE SEWER MUST BE ENCASED IN CONCRETE, OR CONSTRUCTED OF DUCTILE IRON PIPE USING MECHANICAL OR SLIP-ON JOINTS FOR A DISTANCE OF AT LEAST 10 FEET ON EITHER SIDE OF THE CROSSING. IN ADDITION, ONE FULL LENGTH OF SEWER PIPE SHOULD BE LOCATED SO BOTH JOINTS WILL BE AS FAR FROM THE WATER LINE AS POSSIBLE. WHERE A WATER MAIN CROSSES UNDER A SEWER, ADEQUATE STRUCTURAL SUPPORT FOR THE SEWER MUST BE PROVIDED. 29.WATER MAIN PIPING MUST BE INSTALLED IN ACCORDANCE WITH THE REQUIREMENTS AND SPECIFICATIONS OF THE LOCAL WATER PURVEYOR. IN THE ABSENCE OF SUCH REQUIREMENTS, WATER MAIN PIPING MUST BE CEMENT-LINED DUCTILE IRON (DIP) MINIMUM CLASS 52 THICKNESS. ALL PIPE AND APPURTENANCES MUST COMPLY WITH THE APPLICABLE AWWA STANDARDS IN EFFECT AT THE TIME OF APPLICATION. 30.CONTRACTOR MUST ENSURE THAT ALL UTILITY TRENCHES LOCATED IN EXISTING PAVED ROADWAYS INCLUDING SEWER, WATER AND STORM SYSTEMS, MUST BE REPAIRED IN ACCORDANCE WITH REFERENCED MUNICIPAL, COUNTY AND/OR STATE DETAILS AS APPLICABLE. CONTRACTOR MUST COORDINATE INSPECTION AND APPROVAL OF COMPLETED WORK WITH THE AGENCY WITH JURISDICTION OVER SAME. 31.WHERE BASEMENTS ARE TO BE PROVIDED FOR PROPOSED DWELLING UNITS, THE DEVELOPER SHALL, BY BORING OR BY TEST PIT, DETERMINE THE DEPTH TO GROUNDWATER AT THE LOCATION OF THE PROPOSED DWELLINGS. WHERE GROUNDWATER IS ENCOUNTERED IN THE BASEMENT AREA, BASEMENTS WILL NOT BE INSTALLED UNLESS SPECIAL CONSTRUCTION METHODS ARE UTILIZED, TO BE REVIEWED AND APPROVED BY THE MUNICIPAL CONSTRUCTION CODE OFFICIAL. IF AND WHERE SUMP PUMPS ARE INSTALLED, ALL DISCHARGES MUST BE CONNECTED TO THE STORM SEWER. A CLEANOUT MUST BE PROVIDED PRIOR TO THE CONNECTION TO THE STORM DRAIN IN ORDER THAT BLOCKAGES CAN BE ADDRESSED. 32.LOCATION OF PROPOSED UTILITY POLE RELOCATION IS AT THE SOLE DISCRETION OF UTILITY COMPANY. 33.CONSULTANT IS NEITHER LIABLE NOR RESPONSIBLE FOR ANY SUBSURFACE CONDITIONS AND FURTHER, SHALL HAVE NO LIABILITY FOR ANY HAZARDOUS MATERIALS, HAZARDOUS SUBSTANCES, OR POLLUTANTS ON, ABOUT OR UNDER THE PROPERTY. ADA INSTRUCTIONS TO CONTRACTOR CONTRACTORS SHALL EXERCISE APPROPRIATE CARE AND PRECISION IN CONSTRUCTION OF ADA (HANDICAP) ACCESSIBLE COMPONENTS AND ACCESS ROUTES FOR THE SITE. THESE COMPONENTS, AS CONSTRUCTED, MUST COMPLY WITH THE CURRENT ADA STANDARDS AND REGULATIONS' BARRIER FREE ACCESS AND ANY MODIFICATIONS, REVISIONS OR UPDATES TO SAME. FINISHED SURFACES ALONG THE ACCESSIBLE ROUTE OF TRAVEL FROM PARKING SPACE, PUBLIC TRANSPORTATION, PEDESTRIAN ACCESS, INTER-BUILDING ACCESS, TO POINTS OF ACCESSIBLE BUILDING ENTRANCE/EXIT, MUST COMPLY WITH THESE ADA CODE REQUIREMENTS. THESE INCLUDE, BUT ARE NOT LIMITED TO THE FOLLOWING: ·PARKING SPACES AND PARKING AISLES - SLOPE SHALL NOT EXCEED 1:50 (2.0%) IN ANY DIRECTION. ·CURB RAMPS - SLOPE SHALL NOT EXCEED 1:12 (8.3%) FOR A MAXIMUM OF SIX (6) FEET. ·LANDINGS - SHALL BE PROVIDED AT EACH END OF RAMPS, MUST PROVIDE POSITIVE DRAINAGE, AND MUST NOT EXCEED 1:50 (2.0%) IN ANY DIRECTION. ·PATH OF TRAVEL ALONG ACCESSIBLE ROUTE - MUST PROVIDE A 36-INCH OR GREATER UNOBSTRUCTED WIDTH OF TRAVEL (CAR OVERHANGS AND/OR HANDRAILS CANNOT REDUCE THIS MINIMUM WIDTH). THE SLOPE MUST BE NO GREATER THAN 1:20 (5.0%) IN THE DIRECTION OF TRAVEL, AND MUST NOT EXCEED 1:50 (2.0%) IN CROSS SLOPE. WHERE PATH OF TRAVEL WILL BE GREATER THAN 1:20 (5.0%), ADA RAMP REQUIREMENTS MUST BE ADHERED TO. A MAXIMUM SLOPE OF 1:12 (8.3%), FOR A MAXIMUM RISE OF 2.5 FEET, SHALL BE PROVIDED. THE RAMP MUST HAVE ADA HAND RAILS AND "LEVEL" LANDINGS ON EACH END THAT ARE CROSS SLOPED NO MORE THAN 1:50 (2.0%) IN ANY DIRECTION 2.0% FOR POSITIVE DRAINAGE. ·DOORWAYS - MUST HAVE A “LEVEL” LANDING AREA ON THE EXTERIOR SIDE OF THE DOOR THAT IS SLOPED AWAY FROM THE DOOR NO MORE THAN 1:50 (2.0%) FOR POSITIVE DRAINAGE. THIS LANDING AREA MUST BE NO LESS THAN 60 INCHES (5 FEET) LONG, EXCEPT WHERE OTHERWISE PERMITTED BY ADA STANDARDS FOR ALTERNATIVE DOORWAY OPENING CONDITIONS. (SEE ICC/ANSI A117.1-2009 AND OTHER REFERENCED INCORPORATED BY COD.) ·WHEN THE PROPOSED CONSTRUCTION INVOLVES RECONSTRUCTION, MODIFICATION, REVISION OR EXTENSION OF OR TO ADA COMPONENTS FROM EXISTING DOORWAYS OR SURFACES, CONTRACTOR MUST VERIFY EXISTING ELEVATIONS SHOWN ON THE PLAN. NOTE THAT TABLE 405.2 OF THE DEPARTMENT OF JUSTICE'S ADA STANDARDS FOR ACCESSIBLE DESIGN ALLOWS FOR STEEPER RAMP SLOPES, IN RARE CIRCUMSTANCES. THE CONTRACTOR MUST IMMEDIATELY NOTIFY THE DESIGN ENGINEER OF ANY DISCREPANCIES AND/OR FIELD CONDITIONS THAT DIFFER IN ANY WAY OR ANY RESPECT FROM WHAT IS SHOWN ON THE PLANS, IN WRITING, BEFORE COMMENCEMENT OF WORK. CONSTRUCTED IMPROVEMENTS MUST FALL WITHIN THE MAXIMUM AND MINIMUM LIMITATIONS IMPOSED BY THE BARRIER FREE REGULATIONS AND THE ADA REQUIREMENTS. ·THE CONTRACTOR MUST VERIFY THE SLOPES OF CONTRACTOR'S FORMS PRIOR TO POURING CONCRETE. IF ANY NON-CONFORMANCE IS OBSERVED OR EXISTS, CONTRACTOR MUST IMMEDIATELY NOTIFY THE ENGINEER PRIOR TO POURING CONCRETE. CONTRACTOR IS RESPONSIBLE FOR ALL COSTS TO REMOVE, REPAIR AND REPLACE NON-CONFORMING CONCRETE. IT IS STRONGLY RECOMMENDED THAT THE CONTRACTOR REVIEW THE INTENDED CONSTRUCTION WITH THE LOCAL BUILDING CODE PRIOR TO COMMENCEMENT OF CONSTRUCTION. CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SD0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:14 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 N/A SD0 C-1.1 GENERAL NOTES MAIN STREETNC HIGHWAY 39JACQUELINE K WESTERAND HUSBANDTHOMAS G. WESTERANDJANICE J. WHITFORDDB 1811, PG 755AREA= 71,221 SF OR1.635 ACRESNC GRID(NAD 83-NSRS 2011)N54°42'50"E 28.54'S03°32'17"W 185.00' S 5 3 ° 5 9 ' 5 9 "W 3 9 0 . 2 7 'N42°27'18"W 150.17'N5 4 ° 4 2 ' 5 0 " E 5 2 4 . 9 6 ' N03°38'46"E 64.81'S53°59'59"W28.73'BOHLER ENGINEERING- ALL RIGHTS RESERVED.THE PURPOSE ORIGINALLY INTENDED, WITHOUT THE WRITTEN PERMISSION OF BOHLER ENGINEERING, IS PROHIBITED.THE COPYING OR REUSE OF THIS DOCUMENT, OR PORTIONS THEREOF, FOR OTHER THAN THE ORIGINAL PROJECT OR 1"=30'15'30'0'30'SITELOCATION MAPCOPYRIGHT 2013DELORME STREET ATLAS USA 2013SCALE: 1"=2000'DATETHOMAS E. TEABO, PLSNORTH CAROLINA PROFESSIONAL LAND SURVEYOR NO. L-3920FIELD DATEFILE NO.DATEDWG. NO.CREW CHIEFAPPROVEDSCALE1" = 30'OFREVIEWEDDRAWNALTA/NSPS LAND TITLE SURVEYwww.bohlerengineering.comBOSTON, MANEW YORK METROWARREN, NJPHILADELPHIA/SOUTHERN NJLEHIGH VALLEY, PAUPSTATE NEW YORK4130 PARKLAKE AVENUERALEIGH, NORTH CAROLINA 27612919.578.9000 - 919.703.2665 FAXSOUTHEASTERN PASOUTHERN MARYLANDNORTHERN VIRGINIAWASHINGTON, DCBALTIMORE, MDCENTRAL VIRGINIACHARLOTTE, NCRALEIGH, NCTM SUITE 130NCBELS: P-1132DAVITATOWN OF BUNNDUNN TOWNSHIPFRANKLIN COUNTY, NORTH CAROLINANSR17203207/18/1707/15/17NKTETNK / TETTET11THIS CERTIFICATION IS MADE TO ONLY NAMED PARTIES FOR PURCHASE AND/OR MORTGAGE OF HEREIN DELINEATED PROPERTYBY THE NAMED PURCHASER. NO RESPONSIBILITY OR LIABILITY IS ASSUMED BY SURVEYOR FOR THE USE OF SURVEY FOR ANYOTHER PURPOSE INCLUDING, BUT NOT LIMITED TO, USE OF SURVEY AFFIDAVIT, RESALE OF PROPERTY, OR TO ANY OTHERPERSON NOT LISTED IN CERTIFICATION, EITHER DIRECTLY OR INDIRECTLY.TO:RHH INVESTORS, LLC AND INVESTORS TITLE INSURANCE COMPANYTHIS IS TO CERTIFY THAT THIS MAP OR PLAT AND THE SURVEY ON WHICH IT IS BASED WEREMADE IN ACCORDANCE WITH THE 2016 MINIMUM STANDARD DETAIL REQUIREMENTS FORALTA/NSPS LAND TITLE SURVEYS, JOINTLY ESTABLISHED AND ADOPTED BY ALTA AND NSPS,AND INCLUDES ITEMS 1, 2, 3, 4, 6(A), 6(B), 7(A), 8, 9, 10(A), 13, & 19 OF TABLE A THEREOF. THEFIELD WORK WAS COMPLETED ON JUNE 16, 2017.PRELIMINARY - NOT FOR RECORDATION, SALES OR CONVEYANCESI, THOMAS E. TEABO, PLS, HEREBY CERTIFY THAT THIS PLAT WAS DRAWN UNDER MYSUPERVISION FROM AN ACTUAL SURVEY MADE UNDER MY SUPERVISION, FROM DEED ANDMAP REFERENCES AS NOTED ON SAID MAP;THAT THE ERROR OF CLOSURE AS CALCULATED BY LATITUDES AND DEPARTURES IS 1:10,000+, THAT THE BOUNDARIES NOT SURVEYED ARE SHOWN AS BROKEN LINES PLOTTEDFROM INFORMATION OF RECORD; THAT THIS MAP WAS PREPARED IN ACCORDANCE WITHTITLE 21, CHAPTER 56, NCAC, AS AMENDED.I HEREBY CERTIFY THAT THIS MAP WAS DRAWN UNDER MY SUPERVISION FROM AN ACTUALGPS SURVEY MADE UNDER MY SUPERVISION AND THE FOLLOWING INFORMATION WAS USEDTO PERFORM THE SURVEY:(1)CLASS OF SURVEY: "CLASS A"(2)POSITIONAL ACCURACY: 0.04'(3)TYPE OF GPS FIELD PROCEDURE: REAL-TIME KINEMATIC NETWORKS-NCVRS(4)DATES OF SURVEY: MAY 12, 2017 - JULY 15, 2017(5)DATUM/EPOCH: NAD 83 (2011) EPOCH 2010.00(6)PUBLISHED/FIXED-CONTROL USE: NCVRS(7)GEOID MODEL: 2012 (CONUS)(8)COMBINED GRID FACTOR(S): 1.000302767(9)UNITS: US SURVEY FEETTHAT THE SURVEY IS OF AN EXISTING PARCEL OR PARCELS OF LAND ANDDOES NOT CREATE A NEW STREET OR CHANGE AN EXISTING STREET;WITNESS MY HAND AND SEAL THIS 22ND DAY OF JUNE, A.D., 2017.NC L-3920SURVEYORSURVEYOR CERTIFICATIONNOTES:1) TITLE REPORT FURNISHED BY XXXXXXXX COMPANY,POLICY NUMBER XXXXXX, DATED JULY XX, 2017 AT 8:00 AM. .2) AREAS COMPUTED BY COORDINATE METHOD.3) PROPERTY SHOWN HEREON IS SUBJECT TO ALL RIGHTS-OF-WAY, EASEMENTS AND RESTRICTIONS OF RECORD.4) ALL DISTANCES SHOWN ON SURVEY ARE HORIZONTAL GROUND DISTANCES UNLESS OTHERWISE NOTED.5) THIS SURVEY DOES NOT REPRESENT A TITLE SEARCH OR COMPLETE BOUNDARY SURVEY BY THIS FIRM. BOUNDARY INFORMATION IS BASED ON DEEDS AND MAPS OF RECORD, AND IN PART BY A FIELD SURVEY BY THIS FIRM.6)RIGHTS-OF-WAY INFORMATION IS BASED ON DEEDS AND MAPS OF RECORD.7) NC GRID COORDINATES (NAD83) OBTAINED BY USING GPS, PRE THE NCVRS NETWORK.8)BASIS OF BEARING SHOWN HEREON IS NC GRID (NAD 83 NSRS 2011).9)VERTICAL DATUM SHOWN HEREON IS NAVD88.10) WETLANDS WERE NOT INVESTIGATED OR NOTED ON THIS SITE.11)THE PROPERTY SHOWN HEREON IS LOCATED IN FLOODZONE "ZONE X", AREA OF MINIMAL FLOODING,PER FIRM PANEL 3720282000K, EFFECTIVE DATE 4/16/2013.REFERENCES:DB 1811, PG 755DB 908, PG 102DB 1757, PG 444FORXXXLEGENDWMGMWVEXISTING CONTOUREXISTING SPOT ELEVATIONEXIST. TOP OF CURB ELEVATIONEXIST. GUTTER ELEVATIONWATER VALVEOVERHEAD WIRESAPPROX. LOC. UNDERGROUND SAN. SEWER LINE PER UTILITY MARKOUTAPPROX. LOC. UNDERGROUND WATER LINE PER UTILITY MARKOUTUTILITY POLESANITARY MANHOLEWATER MANHOLESTORM DRAIN MANHOLEWATER METERGAS METERSIGNMAIL BOXBOLLARDFENCEAREA LIGHTCLEAN OUTBENCHMARKGUY WIREPROP. CORNER TO BE SETTITLE REPORT EXCEPTIONIPSIRON PIPE SETIPFIRON PIPE FOUNDIRFIRON REBAR FOUND JACQUELINE K WESTER AND HUSBAND THOMAS G. WESTER AND JANICE J. WHITFORD DB 1811, PG 755 AREA= 71,221 SF OR 1.635 ACRESNC HIGHWAY 39(S. MAIN ST.)LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODTREES (TBR) (TYP.) CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SS0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:14 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN SS0 C-2.0 DEMOLITION PLAN DEMOLITION/REMOVAL NOTE D S C SL W E OH T OR 516.4TC 516.4 TYPICAL NOTE TEXT DEMOLITION/REMOVAL LEGEND SAN # EASEMENT LINE CONCRETE CURB & GUTTER UTILITY POLE TYPICAL LIGHT TYPICAL SIGN SPOT ELEVATIONS SANITARY LABEL SANITARY SEWER LATERAL UNDERGROUND WATER LINE UNDERGROUND ELECTRIC LINE OVERHEAD WIRE UNDERGROUND TELEPHONE LINE UNDERGROUND CABLE LINE STORM SEWER SANITARY SEWER MAIN HYDRANT SANITARY MANHOLE STORM MANHOLE WATER METER WATER VALVE S WV WM 1"=20' 0 2051020 NC HIGHWAY 39(S. MAIN ST.)LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLOD8'14 1319'19'9' 25' BASIN #28' PROP. BLDG. 8,500 SF 100'85'18'27.5'PROP. 2' WIDE CURB CUT (TYP.) PROP. TRASH ENCLOSURE 9'9'9' 20' BASIN #14'R4'R4' R 4'R4'R4'R4'R4' R 8'R8'R8'R8'R20 ' R 40'R7' R 5'R10'R4 5 ' R 5'R 3'R28'R 50'R 50'R 48'16'12'30'25'25'19'PROP. BENCH PROP. RIP-RAP (TYP.) PROP. RELOCATED FIRE HYDRANT PROP. CLEANOUT (TYP.) PROP. CLEANOUT (TYP.) FF= 284.86 CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SS0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:14 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN SS0 C-3.0 SITE PLAN SITE PLAN & ZONING NOTES: 1.THIS PLAN REFERENCE DOCUMENTS AND INFORMATION BY: "ALTA/NSPS LAND TITLE SURVEY FOR DAVITA" PREPARED BY BOHLER ENGINEERING. 4130 PARK LAKE AVE. STE. 130 RALEIGH, NC 27612 DATED 7/15/17 2.OWNER:JACQUELINE K. WESTER, THOMAS G. WESTER & JANICE J. WHITFORD 3.APPLICANT:DAVITA, INC. 2000 16TH ST. DENVER COLORADO CONTACT: JAKE HERTZ PHONE: 720-257-1583 4.PARCEL(S): 2820-23-9402 FRANKLIN COUNTY, NORTH CAROLINA 5.ZONE:EXISTING ZONING: DOWNTOWN COMMERCIAL (C-1) PROPOSED USE: CLINIC SERVICE 6.EXISTING SITE INFORMATION: 7.IMPERVIOUS AREA SUMMARY EXISTING IMPERVIOUS AREA: 0.005 ACRES (215 SF) PROPOSED IMPERVIOUS AREA: 0.93 ACRES (40,531 SF) 8.PARKING SUMMARY: NUMBER OF PARKING SPACES REQUIRED: NUMBER OF ACCESSIBLE SPACES REQUIRED: 9.DISTURBED AREA: ±1.50 AC (±65,575.93 SF) 10.SEE SHEET C-1.1 - GENERAL NOTES FOR ALL GENERAL NOTES. PIN #AREA 2820-23-9402 71,221 SF (1.635 AC.) BUILDING TYPE PARKING REQUIRMENT PROPOSED PARKING DIALYSIS CENTER MEDICAL OFFICES AND CLINICS 6 SPACES PER EACH DOCTOR PLUS 1 SPACE PER EACH EMPLOYEE. 27 PARKING SPOTS BUILDING ADA REQUIREMENT PROPOSED ACCESSIBLE PARKING SPOTS DIALYSIS CENTER 26 - 50 PARKING SPACES = MIN. 2 ACCESSIBLE PARKING SPACES 2 ACCESSIBLE PARKING SPACES (1 VAN) 1"=20' 0 2051020 (*) CONCRETE JOINTING AND FILLERS TO BE COMPLETED PER DETAIL AND SPECIFICATIONS. PAVEMENT LEGEND - PROP. HEAVY DUTY ASPHALT PAVEMENT - PROPOSED CONCRETE SIDEWALK - PROPOSED HEAVY DUTY CONCRETE PAVEMENT* - PROPOSED STANDARD DUTY ASPHALT PAVEMENT NC HIGHWAY 39(S. MAIN ST.)LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSL28 3 284 284 STM 101 STM 103 STM 104 STM R2 BASIN #2 PROP. BLDG. 8,500 SF W W W W W W W W WW WW WWW W W W W W W WWWWWF F F F F F F F F F F FFFF F F F F F F FFFFFFE E E E E E E E EEEEEE E E E E E E E EEEEEEPROP. RIDGE (TYP.)PROP. DRAINAGE DITCH W/ 6" D-50 LINING PROP. DRAINAGE DITCH W/ SOD LINING BASIN #1W PROP. RIP-RAP (TYP.) STM 106 STM 107 STM R1 FF= 284.86 G 282.18 G 281.06 TC 283.12 TC 284.33 TC 284.21TC 284.21 TC 283.31TC 283.31 TC 284.69 TC 284.37 TC 284.69 TC 284.95 TC 285.56 TC 284.95 TC 282.93 TC 283.04 TC 283.58 TC 282.71 TC 282.41 TC 282.18 TC 281.88 TC 281.71 TC 283.78 TC 283.94 TC 284.10 TC 284.01 TC 282.94 HP - TC 284.41 TC 284.76HP - G 284.05 TC 284.36 TC 284.22 TC 284.01 TC 283.92TC 283.92 TC 283.40TC 283.40 HP - TC 284.55 HP - TC 284.36 HP - TC 283.29 HP - TC 282.98 HP - TC 284.03 HP - TC 283.65 283 282 281 281 284282281282 281 280281282 282 281 2832 8 2 2 82 G 283.36 G 283.49 G 283.63 G 283.19 TC 284.03 G 282.6+/- MATCH EX. G 282.3+/- MATCH EX. G 281.69 G 282.92 G 283.90 G 284.28 G 284.61 G 284.71 G 284.71 G 284.21 G 284.03 G 284.70 G 284.70 G 284.54 G 283.32 G 283.96 G 282.09 G 283.46 G 283.20 G 283.34 G 283.35 G 284.65 G 284.63 TC 284.78 G 284.52 G 284.34 G 284.44 G 284.47 G 283.40G 283.29283283283284 284284 282-1 . 4 1 %-3.35% -2.12%-2.45%-2.25%-2.94%-3.00%-2.49%-2.29%-2.46% -2.80% HP - G 283.74 HP - G 283.15 G 283.66 G 283.53 G 283.13 G 283.59 G 283.78 G 283.88 G 283.69 G 282.80 G 282.80 G 282.80 G 282.80 G 280.80 G 280.80 G 280.80 G 280.80 G 279.80 G 281.31 G 281.30 G 279.80G 279.80 G 281.30 G 281.31 G 279.80 280 281283 -1. 9 4 %283282 281G 282.7+/- MATCH EX. G 282.7+/- MATCH EX. G 283.24 G 283.30 STM 201 STM 202 STORM STRUCTURE SCHEDULE NAME 101 103 104 106 107 201 202 R1 R2 TYPE PROP. MANHOLE PROP. MANHOLE PROP. MANHOLE PROP. HEADWALL PROP. HEADWALL PIPE OUTLET PROP. CLEANOUT PROP. RISER PROP. RISER RIM ELEV. (FT.) 283.63' 283.01' 282.78' 282.43' 281.84' 281.51' 284.80' 280.01' 281.21' INVERTS INV IN = 279.10' (18") INV OUT = 279.10' (18") INV IN = 278.52' (18") INV IN = 278.25' (18") INV OUT = 278.25' (18") INV IN = 278.20' (18") INV IN = 278.50' (18") INV IN = 278.25' (18") INV OUT = 279.00' (18") INV OUT = 280.13' (18") INV IN = 280.80' (8") INV IN = 281.01' (8") INV IN = 281.01' (8") INV OUT = 281.01' (8") INV IN = 276.74' (6") INV OUT = 278.30' (18") INV OUT = 279.30' (18") INV OUT = 276.98' (6") STORM SEWER PIPE SCHEDULE TO 201 104 104 104 103 103 101 FROM 202 107 106 103 R1 101 R2 TO INV 280.80' 278.25' 278.50' 278.20' 278.25' 278.52' 279.10' FROM INV 281.01' 280.13' 279.00' 278.25' 278.30' 279.10' 279.30' PIPE LENGTH 71.16' 83.63' 9.87' 35.72' 107.89' 293.10' 98.68' SLOPE (%) 0.30% 2.25% 5.07% 0.13% 0.05% 0.20% 0.20% DIAMETER (IN.) 8" 18" 18" 18" 18" 18" 18" MATERIAL HDPE RCP RCP RCP RCP RCP RCP EXISTING NOTE D PROPOSED NOTE OR OR 516.4TC 516.4 OR TC BC 516.00 515.55 516.00TC TYPICAL NOTE TEXT GRADING LEGEND 120 STM # STM # 120 CONTOUR LINE SPOT ELEVATIONS STORM LABEL STORM SEWER STORM MANHOLE TYPICAL END SECTION HEADWALL OR ENDWALL BENCHMARK D 125 125 CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SS0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 1"=20' 0 2051020 AS SHOWN SS0 C-4.0 GRADING & DRAINAGE PLAN SANITARY PIPE SCHEDULE TO A4 A3 A2 A1 FROM BLDG A4 A3 A2 TO INV 279.26' 278.68' 277.36' 275.00' FROM INV 279.36' 279.26' 278.68' 277.36' PIPE LENGTH 10.00' 58.24' 132.27' 66.08' SLOPE (%) 1.00% 1.00% 1.00% 3.57% DIAMETER (IN.) 6" 6" 6" 6" MATERIAL PVC PVC PVC PVC SANITARY STRUCTURE SCHEDULE NAME A1 A2 A3 A4 BLDG TYPE PROP. SADDLE CONNECTION PROP. CLEANOUT PROP. CLEANOUT PROP. CLEANOUT BLDG RIM ELEV. (FT.) 275.90' 282.92' 283.82' 284.69' 284.86' INVERTS INV IN = 275.00' (6") INV IN = 275.00' (10") INV OUT = 275.00' (10") INV IN = 277.36' (6") INV OUT = 277.36' (6") INV IN = 278.68' (6") INV OUT = 278.68' (6") INV IN = 279.26' (6") INV OUT = 279.26' (6") INV OUT = 279.36' (6")NC HIGHWAY 39(S. MAIN ST.)LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSAN A2 SAN BLDG SAN BLDG SAN A2 SAN BLDG SAN A2 SAN BLDG SAN A2 SAN BLDG SAN BLDG SAN BLDG SAN A3 SAN A4 BASIN #2 PROP. BLDG. 8,500 SF W W W W W W W W WW WW WWW W W W W W W WWWWWF F F F F F F F F F F FFFF F F F F F F FFFFFFE E E E E E E E EEEEEE E E E E E E E EEEEEEBASIN #1W (4) PROP. 45° BEND (4) PROP. 45° BEND (4) PROP. 45° BEND2" DOMESTIC SERVICE 6" FIRE SERVICE SEE CONNECTION DETAIL PROP. RIP-RAP (TYP.) PROP. 6" TAPPING SLEEVE PROP. RELOCATED FIRE HYDRANT (4) PROP. 45° BEND PROP. CONDUIT FOR HOTBOX SAN BLDG FF= 284.86 SAN A1 8" PVCLODLODWW W W F F F E E EWWWWPROP. TAPPING SLEEVE (2) PROP. 6" GATE VALVES PROP. WATER METER PROP. 2" SADDLE (2) PROP. 45° BENDS (2) PROP. 2" GATE VALVES 6" WATER LINE (2) PROP. BACKFLOW PREVENTER IN HOTBOX 2" DOMESTIC SERVICE 6" FIRE SERVICE PROP. GATE VALVE E E CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SS0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN SS0 C-5.0 UTILITY PLAN 1"=20' 0 2051020 EXISTING NOTE D S PROPOSED NOTE C SL W E OH T OR C SL W E OH T OR TYPICAL NOTE TEXT UTILITY LEGEND SAN # SAN # SANITARY LABEL SANITARY SEWER LATERAL UNDERGROUND WATER LINE UNDERGROUND ELECTRIC LINE OVERHEAD WIRE UNDERGROUND TELEPHONE LINE UNDERGROUND CABLE LINE STORM SEWER SANITARY SEWER MAIN HYDRANT SANITARY MANHOLE STORM MANHOLE WATER METER WATER VALVE TYPICAL END SECTION HEADWALL OR ENDWALL CLEAN OUT S D S S WV WM WATER CONNECTION DETAIL SCALE: 1" = 5' N/A NC HIGHWAY 39(S. MAIN ST.)LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODTREES (TBR) (TYP.) SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSF SF SF SF SF SFSFCONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042OP0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN OP0 C-6.0 EROSION & SEDIMENT CONTROL PHASE 1 1"=20' 0 2051020 EROSION CONTROL LEGEND SILT FENCE LIMITS OF DISTURBANCE SF SF SF LOD LOD LOD PROP. 24' X 50' CONST. ENTRANCE CONCRETE WASH TEMPORARY SOIL STOCKPILE DC DUST CONTROL SILT FENCE OUTLET INLET PROTECTION PHASE I EROSION CONTROL CONSTRUCTION SEQUENCE: NCDEQ EROSION AND SEDIMENT CONTROL NOTES 1.ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION SHOWN ON THIS PLAN IS SUBJECT TO A FINE. 2.GRADING 1 ACRE OR MORE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND SUBJECT TO A FINE. 3.GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1, AND GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS ON OTHER AREAS. 4.BASIN OUTLET STRUCTURES WITH DRAINAGE AREAS EQUAL OR GREATER THAN ONE ACRES MUST WITHDRAW WATER FROM THE SURFACE. 5.ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY THE NCDEQ EROSION CONTROL INSPECTOR. 6.ALL ELEVATIONS ARE IN REFERENCE TO THE SURVEYORS BENCHMARK WHICH MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 7.ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, AND ANY APPLICABLE LOCAL LAWS AND CODES. 8.PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION SHOULD BE CONSTRUCTED AT 2:1(HORIZONTAL TO VERTICAL) OR FLATTER. PERMANENT SLOPES OF 3:1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND AS INDICATED. IF FILL MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTE MATERIAL IS HAULED FROM THE PROPERTY THEN THE CONTRACTOR SHALL DISCLOSE THE LOCATION OF ANY ON-SITE AND/OR OFF-SITE BARROW LOCATION AND/OR WASTE BURIAL LOCATION TO THE EROSION CONTROL INSPECTOR. 9.LIMITS OF CLEARING SHOWN ARE BASED ON CUT AND FILL SLOPES OR OTHER GRADING REQUIREMENTS. 11. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES AS INDICATED PRIOR TO GRADING OPERATIONS. NO DEVICE MAY BE REMOVED WITHOUT APPROVAL OF EROSION CONTROL COORDINATOR. 10.CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY WITH EXISTING CONTOURS. 11.ALL DISTANCES ARE HORIZONTAL GROUND. 12.ANCHOR SILT FENCE WITH COMPACTED BACKFILL ON TREE PROTECTION ZONES. DO NOT BURY. 13.ALL EROSION CONTROL DEVICES SHOULD BE CHECKED PERIODICALLY AND AFTER EVERY MAJOR STORM EVENT. IF ANY FAILURES ARE FOUND, THEY SHOULD BE REPAIRED AS SOON AS POSSIBLE. 14.ANY ASSOCIATED DEMOLITION PERMITS AND METHODS OF DEMOLITION ARE TO BE OBTAINED AND ARRANGED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 15.SEDIMENT TRAPS AND BASINS NEED TO BE STABILIZED IMMEDIATELY AFTER INSTALLATION. 16.STONE OUTLETS SHOULD BE INSTALLED AT LOW POINTS OF THE SILT FENCING, BASED ON FIELD CONDITIONS. 17.EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. SELF-INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF-INSPECTION REPORT, AS WELL AS DETAILS OF THE SELF-INSPECTION PROGRAM, CAN BE FOUND ON THE LAND QUALITY WEBSITE (HTTP://PORTAL.NCDEQ.ORG/WEB/LR/EROSION). IF YOU HAVE QUESTIONS OF THE SELF-INSPECTION PROGRAM, PLEASE CONTACT (877) 623-6748. 18.A LAND DISTURBANCE PRE-CONSTRUCTION MEETING IS REQUIRED PRIOR TO ANY DISTURBANCE ON THE SITE. 19.ALL CONSTRUCTION SHALL COMPLY WITH NCDEQ STANDARDS AND SPECIFICATIONS. 20.LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN FROM THE BEST AVAILABLE RECORDS AND FROM A SURVEY OF ABOVE GROUND FEATURES. ALL EXISTING UTILITY LOCATIONS MUST BE INDEPENDENTLY CONFIRMED BY THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 21.SITE GRADING AND EXCAVATION MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS, AND RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT REFERENCED IN THIS PLAN SET, EXCAVATION AND EARTH MOVING OPERATIONS MUST BE PERFORMED UNDER THE SUPERVISION OF THE OWNER'S GEOTECHNICAL ENGINEER. 22.FOOTING EXCAVATIONS SHALL BE CONTINUOUSLY DEWATERED DURING CONSTRUCTION TO PREVENT SETTLEMENT AND SEDIMENT DEPOSIT. 23.ALL TEMPORARY DIVERSIONS MUST BE INSTALLED WITH POSITIVE DRAINAGE AND SHALL OPPOSE EXISTING GRADE WHEN NECESSARY TO PROVIDE A MINIMUM OF 0.3% LONGITUDINAL SLOPE. 24.ALL ADJACENT ROADWAYS TO THE SITE ARE TO BE SWEPT (NOT WASHED) AT THE END OF EACH WORK DAY TO REMOVE SEDIMENT FROM THE ROAD SURFACE. 25.ALL EROSION CONTROL MEASURES MUST BE INSPECTED AND PROPERLY MAINTAINED AT THE END OF EACH WEEK AND AFTER EVERY RAINFALL EVENT. 26.INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED TO PREVENT SEDIMENT FROM LEAVING THE SITE. 29. CONTRACTOR SHALL PERFORM PRACTICES AND PROCEDURES WHICH MINIMIZE AND PREVENT AIRBORNE DUST OR OTHER PARTICLES FROM OCCURRING. PARTICLES WHICH CAN BE PICKED UP AND CARRIED BY WIND SHOULD BE PROTECTED WITH A TEMPORARY COVER OR KEPT UNDER CONTROL WITH WATER TO PREVENT PARTICLES FROM BECOMING AIRBORNE AND FROM EXISTING THE SITE PERIMETER. WATER TRUCKS OR OTHER DUST CONTROL AGENTS SHALL BE USED AS NEEDED DURING CONSTRUCTION TO MINIMIZE DUST GENERATE ON THE SITE. DUST CONTROL MUST BE PROVIDED BY THE CONTRACTOR TO A DEGREE THAT IS IN COMPLIANCE WITH FEDERAL, LOCAL, AND STATE DUST CONTROL REGULATIONS. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 30. EROSION CONTROL FEATURES SHOULD BE CHECKED DAILY AND ADJUSTED AND/OR REPAIRED TO FULLY CONTAIN AND CONTROL SEDIMENTATION ON THIS SITE BY CONTRACTOR. PERIMETER CONTROLS ARE TO REMAIN FUNCTIONING FOR THE DURATION OF THE PROJECT. THE MONITORING AND INSPECTING OF EROSION CONTROL MEASURES SHOULD FOLLOW THE GUIDELINES OF THE NPDES PERMIT (GENERAL PERMIT NCG 010000). 31. INSPECT TEMPORARY DIVERSION CHANNELS AFTER RAINSTORMS TO CHECK FOR MOVEMENT OF STRAW, NETTING OR EROSION OF CHANNEL. IF WASHOUT, BREAKAGE, OR EROSION OCCURS, REPAIR SURFACE, RESEED, RE-STRAW, AND INSTALL NEW NETTING. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. 1.POST REQUIRED DOCUMENTS NEAR THE PLANNED CONSTRUCTION ENTRANCE AND WITHIN EASY ACCESS TO THE GENERAL PUBLIC. 2.STAKE/FLAG THE LOD (WHERE STAKING IS NOT POSSIBLE/PRACTICAL, THE LOD MUST BE CONSPICUOUSLY AND PROMINENTLY MARKED TO DENOTE THE BOUNDARY). LOD MUST REMAIN CONSPICUOUSLY MARKED THROUGHOUT THE ENTIRE CONSTRUCTION PROJECT. 4.INSTALL STABILIZED CONSTRUCTION ENTRANCE AND SET THE PROJECT OFFICE TRAILER. 5.INSTALL SILT FENCE. CLEAR ONLY THE MINIMUM AREA ABSOLUTELY NECESSARY TO INSTALL THESE PERIMETER CONTROL BMPS. 6.DEMOLISH EXISTING BUILDINGS AND STRUCTURES. ABANDON EXISTING WATER WELL AND SEPTIC FIELD. 7.COMPLETE DEMOLITION OF SITE FEATURES (STONE DRIVEWAY, SHEDS, ETC.) 8.RELOCATED/DEMOLISH OVERHEAD UTILITY LINES. 9.BEGIN STRIPPING THE SITE. (PHASE CLEARING AND GRUBBING TO THE EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA DISTURBED AT ANY POINT IN TIME) NOTE:THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION-RELATED ACTIVITIES CONCURRENTLY, ONLY IF ALL PRECEDING BMPS AND STABILIZATION ACTIVITIES HAVE BEEN COMPLETELY INSTALLED. THE CEC MUST APPROVE, IN WRITING, ANY CHANGES IN THE ABOVE IMPLEMENTATION SEQUENCE, BEFORE THEIR IMPLEMENTATION BEGINS. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR. BASIN #2 PROP. BLDG. 8,500 SF W W W W W W W W WW WW WWW W W W W W W WWWWWF F F F F F F F F F F FFFF F F F F F F FFFFFFE E E E E E E E EEEEEE E E E E E E E EEEEEEBASIN #1W PROP. RIP-RAP (TYP.)NC HIGHWAY 39(S. MAIN ST.)LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODSF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SF SFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSFSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSLSAN BLDG SAN A4 SAN A3 SAN A2 SAN EX-1 SAN EX-2 SAN A1 STM 101 STM 103 STM 104 STM 106 STM 107 STM R2 STM R1 CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042OP0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN OP0 C-6.1 EROSION AND SEDIMENT CONTROL PHASE 2 1"=20' 0 2051020 PHASE II EROSION CONTROL CONSTRUCTION SEQUENCE: 1.CONTINUE CLEARING, GRUBBING, AND STRIPPING THE SITE. (PHASE CLEARING AND GRUBBING TO THE EXTENT PRACTICAL TO MINIMIZE THE AMOUNT OF AREA DISTURBED AT ANY POINT IN TIME) 2.CONTINUE GRADING THE SITE. 3.START CONSTRUCTION OF BUILDING SLAB, FOUNDATIONS, AND STRUCTURES. 4.TEMPORARILY STABILIZE, THROUGHOUT CONSTRUCTION IMMEDIATELY FOLLOWING THE COMPLETION OF THE MOST RECENT LAND DISTURBING/GRADING ACTIVITY, ANY DISTURBED AREAS, INCLUDING MATERIAL STOCKPILES THAT ARE SCHEDULED OR LIKELY TO REMAIN INACTIVE FOR 7 DAYS OR MORE. 5.IMMEDIATELY PERMANENTLY STABILIZE AREAS TO BE VEGETATED AS THEY ARE BROUGHT TO FINAL GRADE. 6.INSTALL UTILITIES, STORM SEWERS, CURBS AND GUTTERS. INSTALL SANITARY SEWER PIPE AND ASSOCIATED STRUCTURES. CONNECT SANITARY SEWER PIPE TO BUILDING. JACK AND BORE THE PROPOSED SEWER TO CONNECTION POINT. INSTALL WATER PIPE AND ASSOCIATED STRUCTURES. RELOCATED EXISTING FIRE HYDRANT. 7.INSTALL BASINS 1 & 2 (BIO RETENTION AREAS). NOTE: BIO-RETENTION MEDIA SHALL BE PROTECTED AT ALL TIMES AND NOT COMPACTED. NO WATER SHALL BE DIRECTED TO THE BIO-RETENTION AREA UNTIL THE UPSTREAM AREAS ARE STABILIZED. 8.PREPARE SITE FOR PAVING. . 9.PAVE SITE. 10.COMPLETE GRADING AND INSTALLATION OF PERMANENT STABILIZATION OVER ALL AREAS. 11.OBTAIN CONCURRENCE FROM THE OWNER THAT THE SITE HAS BEEN FULLY STABILIZED, SEDIMENT HAS BEEN REMOVED FROM STORM INLETS, AND ALL CONSTRUCTION HAS BEEN COMPLETED, THEN: a.REMOVE ALL REMAINING TEMPORARY EROSION AND SEDIMENT CONTROL BEST MANAGEMENT PRACTICES (BMPS), b.STABILIZE ANY AREAS DISTURBED BY THE REMOVAL OF TEMPORARY BMPS. 12. DEMOBILIZE FROM SITE- CONTRACTOR SHALL NOT DEMOBILIZE UNTIL ENTIRE SITE HAS BEEN FULLY STABILIZED. . NOTE: THE GENERAL CONTRACTOR MAY COMPLETE CONSTRUCTION-RELATED ACTIVITIES CONCURRENTLY, ONLY IF ALL PRECEDING BMPS AND STABILIZATION ACTIVITIES HAVE BEEN COMPLETELY INSTALLED. THE CEC MUST APPROVE, IN WRITING, ANY CHANGES IN THE ABOVE IMPLEMENTATION SEQUENCE, BEFORE THEIR IMPLEMENTATION BEGINS. THE ESTIMATED DATES OF IMPLEMENTATION OF POLLUTION CONTROL MEASURES SHALL BE DOCUMENTED BY THE CONTRACTOR. 1.ANY GRADING BEYOND THE LIMITS OF CONSTRUCTION SHOWN ON THIS PLAN IS SUBJECT TO A FINE. 2.GRADING 1 ACRE OR MORE WITHOUT AN APPROVED EROSION CONTROL PLAN IS A VIOLATION AND SUBJECT TO A FINE. 3.GROUND STABILIZATION MUST OCCUR WITHIN 7 DAYS ON PERIMETER AREAS AND SLOPES GREATER THAN 3:1, AND GROUND STABILIZATION MUST OCCUR WITHIN 14 DAYS ON OTHER AREAS. 4.BASIN OUTLET STRUCTURES WITH DRAINAGE AREAS EQUAL OR GREATER THAN ONE ACRES MUST WITHDRAW WATER FROM THE SURFACE. 5.ADDITIONAL MEASURES TO CONTROL EROSION AND SEDIMENT MAY BE REQUIRED BY THE NCDEQ EROSION CONTROL INSPECTOR. 6.ALL ELEVATIONS ARE IN REFERENCE TO THE SURVEYORS BENCHMARK WHICH MUST BE VERIFIED BY THE GENERAL CONTRACTOR PRIOR TO GROUND BREAKING. 7.ALL EROSION CONTROL MEASURES SHALL BE CONSTRUCTED IN ACCORDANCE WITH THE N.C. EROSION AND SEDIMENT CONTROL PLANNING AND DESIGN MANUAL, U.S. DEPT. OF AGRICULTURE, AND ANY APPLICABLE LOCAL LAWS AND CODES. 8.PERMANENT CUT AND FILL SLOPES PLACED ON A SUITABLE FOUNDATION SHOULD BE CONSTRUCTED AT 2:1(HORIZONTAL TO VERTICAL) OR FLATTER. PERMANENT SLOPES OF 3:1 SHOULD BE CONSTRUCTED WHERE MOWING IS DESIRABLE AND AS INDICATED. IF FILL MATERIAL IS BROUGHT ONTO THE PROPERTY OR IF WASTE MATERIAL IS HAULED FROM THE PROPERTY THEN THE CONTRACTOR SHALL DISCLOSE THE LOCATION OF ANY ON-SITE AND/OR OFF-SITE BARROW LOCATION AND/OR WASTE BURIAL LOCATION TO THE EROSION CONTROL INSPECTOR. 9.LIMITS OF CLEARING SHOWN ARE BASED ON CUT AND FILL SLOPES OR OTHER GRADING REQUIREMENTS. 11. CONTRACTOR SHALL INSTALL ALL EROSION CONTROL MEASURES AS INDICATED PRIOR TO GRADING OPERATIONS. NO DEVICE MAY BE REMOVED WITHOUT APPROVAL OF EROSION CONTROL COORDINATOR. 10.CONTRACTOR SHALL BLEND NEW EARTHWORK SMOOTHLY WITH EXISTING CONTOURS. 11.ALL DISTANCES ARE HORIZONTAL GROUND. 12.ANCHOR SILT FENCE WITH COMPACTED BACKFILL ON TREE PROTECTION ZONES. DO NOT BURY. 13.ALL EROSION CONTROL DEVICES SHOULD BE CHECKED PERIODICALLY AND AFTER EVERY MAJOR STORM EVENT. IF ANY FAILURES ARE FOUND, THEY SHOULD BE REPAIRED AS SOON AS POSSIBLE. 14.ANY ASSOCIATED DEMOLITION PERMITS AND METHODS OF DEMOLITION ARE TO BE OBTAINED AND ARRANGED BY THE CONTRACTOR PRIOR TO CONSTRUCTION. 15.SEDIMENT TRAPS AND BASINS NEED TO BE STABILIZED IMMEDIATELY AFTER INSTALLATION. 16.STONE OUTLETS SHOULD BE INSTALLED AT LOW POINTS OF THE SILT FENCING, BASED ON FIELD CONDITIONS. 17.EFFECTIVE OCTOBER 1, 2010, PERSONS RESPONSIBLE FOR LAND DISTURBING ACTIVITIES MUST INSPECT A PROJECT AFTER EACH PHASE OF THE PROJECT TO MAKE SURE THAT THE APPROVED EROSION AND SEDIMENTATION CONTROL PLAN IS BEING FOLLOWED. SELF-INSPECTION REPORTS ARE REQUIRED. A SAMPLE SELF-INSPECTION REPORT, AS WELL AS DETAILS OF THE SELF-INSPECTION PROGRAM, CAN BE FOUND ON THE LAND QUALITY WEBSITE (HTTP://PORTAL.NCDEQ.ORG/WEB/LR/EROSION). IF YOU HAVE QUESTIONS OF THE SELF-INSPECTION PROGRAM, PLEASE CONTACT (877) 623-6748. 18.A LAND DISTURBANCE PRE-CONSTRUCTION MEETING IS REQUIRED PRIOR TO ANY DISTURBANCE ON THE SITE. 19.ALL CONSTRUCTION SHALL COMPLY WITH NCDEQ STANDARDS AND SPECIFICATIONS. 20.LOCATIONS OF ALL EXISTING UNDERGROUND UTILITIES ARE SHOWN FROM THE BEST AVAILABLE RECORDS AND FROM A SURVEY OF ABOVE GROUND FEATURES. ALL EXISTING UTILITY LOCATIONS MUST BE INDEPENDENTLY CONFIRMED BY THE CONTRACTOR PRIOR TO THE COMMENCEMENT OF CONSTRUCTION. 21.SITE GRADING AND EXCAVATION MUST BE PERFORMED IN ACCORDANCE WITH THESE PLANS, SPECIFICATIONS, AND RECOMMENDATIONS SET FORTH IN THE GEOTECHNICAL REPORT REFERENCED IN THIS PLAN SET, EXCAVATION AND EARTH MOVING OPERATIONS MUST BE PERFORMED UNDER THE SUPERVISION OF THE OWNER'S GEOTECHNICAL ENGINEER. 22.FOOTING EXCAVATIONS SHALL BE CONTINUOUSLY DEWATERED DURING CONSTRUCTION TO PREVENT SETTLEMENT AND SEDIMENT DEPOSIT. 23.ALL TEMPORARY DIVERSIONS MUST BE INSTALLED WITH POSITIVE DRAINAGE AND SHALL OPPOSE EXISTING GRADE WHEN NECESSARY TO PROVIDE A MINIMUM OF 0.3% LONGITUDINAL SLOPE. 24.ALL ADJACENT ROADWAYS TO THE SITE ARE TO BE SWEPT (NOT WASHED) AT THE END OF EACH WORK DAY TO REMOVE SEDIMENT FROM THE ROAD SURFACE. 25.ALL EROSION CONTROL MEASURES MUST BE INSPECTED AND PROPERLY MAINTAINED AT THE END OF EACH WEEK AND AFTER EVERY RAINFALL EVENT. 26.INSTALL ADDITIONAL EROSION CONTROL MEASURES AS REQUIRED TO PREVENT SEDIMENT FROM LEAVING THE SITE. 29. CONTRACTOR SHALL PERFORM PRACTICES AND PROCEDURES WHICH MINIMIZE AND PREVENT AIRBORNE DUST OR OTHER PARTICLES FROM OCCURRING. PARTICLES WHICH CAN BE PICKED UP AND CARRIED BY WIND SHOULD BE PROTECTED WITH A TEMPORARY COVER OR KEPT UNDER CONTROL WITH WATER TO PREVENT PARTICLES FROM BECOMING AIRBORNE AND FROM EXISTING THE SITE PERIMETER. WATER TRUCKS OR OTHER DUST CONTROL AGENTS SHALL BE USED AS NEEDED DURING CONSTRUCTION TO MINIMIZE DUST GENERATE ON THE SITE. DUST CONTROL MUST BE PROVIDED BY THE CONTRACTOR TO A DEGREE THAT IS IN COMPLIANCE WITH FEDERAL, LOCAL, AND STATE DUST CONTROL REGULATIONS. THE USE OF MOTOR OILS AND OTHER PETROLEUM BASED OR TOXIC LIQUIDS FOR DUST SUPPRESSION OPERATIONS IS PROHIBITED. 30. EROSION CONTROL FEATURES SHOULD BE CHECKED DAILY AND ADJUSTED AND/OR REPAIRED TO FULLY CONTAIN AND CONTROL SEDIMENTATION ON THIS SITE BY CONTRACTOR. PERIMETER CONTROLS ARE TO REMAIN FUNCTIONING FOR THE DURATION OF THE PROJECT. THE MONITORING AND INSPECTING OF EROSION CONTROL MEASURES SHOULD FOLLOW THE GUIDELINES OF THE NPDES PERMIT (GENERAL PERMIT NCG 010000). 31. INSPECT TEMPORARY DIVERSION CHANNELS AFTER RAINSTORMS TO CHECK FOR MOVEMENT OF STRAW, NETTING OR EROSION OF CHANNEL. IF WASHOUT, BREAKAGE, OR EROSION OCCURS, REPAIR SURFACE, RESEED, RE-STRAW, AND INSTALL NEW NETTING. CONTINUE INSPECTIONS UNTIL VEGETATION IS FIRMLY ESTABLISHED. EROSION CONTROL LEGEND SILT FENCE LIMITS OF DISTURBANCE SF SF SF LOD LOD LOD PROP. 24' X 50' CONST. ENTRANCE CONCRETE WASH TEMPORARY SOIL STOCKPILE DC DUST CONTROL SILT FENCE OUTLET INLET PROTECTION NCDEQ EROSION AND SEDIMENT CONTROL NOTES BASIN #2 PROP. BLDG. 8,500 SF 100'85'BASIN #1 PROP. BENCH PROP. RIP-RAP (TYP.)NC HIGHWAY 39(S. MAIN ST.)QUPH QUPH CCFP QUPH 2 CCFP 10 RXEN 10 IVSD 8 RXEN 9 MUCA 10 LMBB 23 RXEN SODSOD SOD 8 ILAS SOD SOD CCFP 15 LMBB 19 LMBB CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042LP0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 1"=30' 0 307.51530 AS SHOWN LP0 C-7.0 LANDSCAPE PLAN LANDSCAPE SCHEDULE KEY QTY.BOTANICAL NAME COMMON NAME CAL.CONT.SIZE Remarks QUPH 3 Quercus phellos 'Hightower''Hightower' Willow oak 2.5" CAL B+B 12-14' HT Full, Central Leader CCFP 4 Cercis canadensis 'Forest Pansy'Forest Pansy Redbud 2" CAL B+B 8-10' HT Full ILAS 8 Ilex x attenuata 'Savannah'Savannah Holly 2" CAL.B+B 8' HT Full IVSD 10 Ilex vomitoria 'Stokes Dwarf'Stoke Dwarf Yaupon Holly N/A 3 GAL 12-18" HT Full RXEN 48 Rhododendron x 'Encore'Encore Azalea Variety N/A 5 GAL 32" HT Full LMBB 44 Lirope muscari 'Big Blue'Big Blue' Lirope N/A 1 GAL 12" HT Full MUCA 9 Muhlenbergia capillaris Pink Muhly Grass N/A 1 GAL 18" HT Full 1.ALL NEW DEVELOPMENT FALLING UNDER THE REQUIREMENTS OF THIS ARTICLE SHALL PROVIDE A LANDSCAPE BUFFER ALONG THE PERIMETER OF THE LOT THAT ADJOINS ANOTHER LOT EXCEPT AT PERMITTED ACCESS WAYS. NO BUFFER REQUIRED FOR C1 PROPOSED USED ADJACENT TO C1 EXISTING USE. 2.THERE SHALL BE A LANDSCAPE AREA THAT IS A MINIMUM OF FOUR (4) FEET BETWEEN ALL PARKING AREAS AND STREET RIGHTS-OF-WAY EXCEPT AT PERMITTED ACCESS WAYS. NONLIVING LANDSCAPE MATERIALS SHALL NOT EXCEED 50 PERCENT OF THE TOTAL LANDSCAPED AREA. 3.ALL DUMPSTER AREAS SHALL BE SCREENED FROM PUBLIC VIEW BY AN OPAQUE FENCE OF OTHER LANDSCAPE MATERIALS. 1.ALL LANDSCAPED AND LAWN AREAS ARE TO RECEIVE A MINIMUM OF 4" OF TOPSOIL. 2.ALL PLANT MATERIAL SHALL BE HEALTHY, VIGOROUS, AND FREE OF PESTS AND DISEASE. 3.ALL PLANT MATERIAL SHALL BE CONTAINER GROWN OR BALLED AND BURLAPPED AS INDICATED IN THE PLANT LIST. 4.ALL TREES SHALL HAVE A STRAIGHT TRUNK AND FULL HEAD AND MEET ALL REQUIREMENTS SPECIFIED. 5.ALL LAWN AREAS TO BE SODDED SHALL USE LOCALLY GROWN COMMERCIAL FESCUE SOD MEETING LATEST NORTH CAROLINA AGRICULTURE STANDARDS FOR SEED AND PLANT CERTIFICATION. 6.ALL MATERIALS ARE SUBJECT TO THE APPROVAL OF THE LANDSCAPE ARCHITECT BEFORE, DURING, AND AFTER INSTALLATION. 7.PRIOR TO CONSTRUCTION, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING ALL UNDERGROUND UTILITIES AND SHALL AVOID DAMAGE TO ALL UTILITIES DURING THE COURSE OF THE WORK. LOCATIONS OF EXISTING BURIED UTILITY LINES SHOWN ON THE PLANS ARE BASED UPON BEST AVAILABLE INFORMATION AND ARE TO BE CONSIDERED APPROXIMATE. IT SHALL BE THE RESPONSIBILITY OF THE CONTRACTOR 1) TO VERIFY THE LOCATIONS OF UTILITY LINES AND ADJACENT TO THE WORK AREA 2) TO PROTECT OF ALL UTILITY LINES DURING THE CONSTRUCTION PERIOD 3) TO REPAIR ANY AND ALL DAMAGE TO UTILITIES, STRUCTURES, SITE APPURTENANCES, ETC. WHICH OCCURS AS A RESULT OF THE CONSTRUCTION. 8.THE CONTRACTOR SHALL BE RESPONSIBLE FOR VERIFYING ALL QUANTITIES SHOWN ON THESE PLANS BEFORE PRICING THE WORK. 9.CONTRACTOR SHALL BE RESPONSIBLE FOR DELIVERY SCHEDULE AND PROTECTION BETWEEN DELIVERY AND PLANTING PER SPECIFICATIONS TO MAINTAIN HEALTHY PLANT CONDITIONS. 10.THE CONTRACTOR SHALL COMPLETELY GUARANTEE AND BE RESPONSIBLE FOR FULLY MAINTAINING (INCLUDING BUT NOT LIMITED TO: WATERING, SPRAYING, MULCHING, FERTILIZING, ETC.) ALL OF THE PLANT MATERIALS AND LAWN FOR A ONE YEAR GROWING PERIOD. 11.ANY PLANT MATERIAL WHICH IS DISEASED, DISTRESSED, DEAD, OR REJECTED (PRIOR TO SUBSTANTIAL COMPLETION) SHALL BE PROMPTLY REMOVED FROM THE SITE AND REPLACED WITH MATERIAL OF THE SAME SPECIES, QUANTITY, AND SIZE AND MEETING ALL PLANT LIST SPECIFICATIONS. 12.STANDARDS SET FORTH IN "AMERICAN STANDARD FOR NURSERY STOCK" REPRESENT GUIDELINE SPECIFICATIONS ONLY AND SHALL CONSTITUTE MINIMUM QUALITY REQUIREMENTS FOR PLANT MATERIAL. 13.WHERE SHOWN ON THE PLANS AND DETAILS, PLANTING BEDS ARE TO BE COMPLETELY COVERED WITH A MINIMUM 3" DEPTH OF TRIPLE SHRED HARDWOOD MULCH FROM A LOCAL MULCH SOURCE HARVESTED IN A SUSTAINABLE MANNER. 14.BIODEGRADABLE WEED MATTING (ALL-PRO WEED MAT OR APPROVED EQUAL) SHALL BE REQUIRED IN SHRUB BEDS AT BUILDING FACADE. 15.ALL PLANT MATERIAL QUANTITIES SHOWN ARE APPROXIMATE. CONTRACTOR SHALL BE RESPONSIBLE FOR COMPLETE COVERAGE OF ALL PLANTING BEDS AT SPACING SHOWN. 16.THE CONTRACTOR IS ENCOURAGED TO COMPLETE TEMPORARY OR PERMANENT SEEDING IN STAGES FOR SOIL STABILIZATION AS AREAS ARE COMPLETED AFTER GRADING. 17.THIS PLAN DOES NOT PRESENT ANY TEMPORARY STABILIZATION REQUIRED AS PART OF SWPPP PLAN. REQUIREMENT PLANTING NOTES: LANDSCAPE COMPLIANCE CHART SECTION SECTION 6 - LANDSCAPE REQUIREMENTS FOR NEW DEVELOPMENT BUNN, NC COMPLIES 1.YES. 2.YES. 3.YES. NC HIGHWAY 39(S. MAIN ST.)LODLODLODLODLODLODLODLOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD LOD L O D L O D L O D LODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODLODBASIN #2 PROP. BLDG. 8,500 SF W W W W W W W W WW WW WWW W W W W W W WWWWWF F F F F F F F F F F FFFF F F F F F F FFFFFFE E E E E E E E EEEEEE E E E E E E E EEEEEEBASIN #1W PROP. RIP-RAP (TYP.)3.13.02.73.13.43.73.94.34.34.34.34.03.83.63.32.93.23.53.43.33.02.72.42.11.81.51.31.11.01.01.01.11.31.51.82.02.32.62.93.13.33.53.53.22.93.23.43.41.11.41.72.02.32.73.03.33.53.53.33.03.43.84.04.34.74.84.84.74.44.24.03.73.23.43.63.53.43.12.82.52.32.01.71.51.31.21.11.21.31.41.72.02.22.52.83.13.43.63.73.73.53.33.73.84.04.24.34.24.01.61.92.22.42.62.72.62.52.93.23.43.74.04.24.24.13.83.53.33.02.52.62.72.62.52.32.01.71.41.21.00.90.70.60.60.70.81.01.21.51.82.12.42.73.13.33.63.73.73.63.94.54.74.95.25.35.35.25.04.94.74.33.93.93.93.73.53.32.92.62.42.11.81.61.41.31.21.31.41.51.82.02.32.62.93.23.43.73.94.04.04.04.44.54.54.64.84.84.74.41.51.82.12.42.62.82.82.83.03.53.63.94.24.34.44.24.03.73.53.32.82.82.82.72.52.21.91.61.41.21.00.80.70.60.60.70.81.01.31.61.92.22.52.83.23.53.73.94.04.24.54.95.25.35.45.55.55.55.45.25.04.64.44.14.03.83.63.43.02.72.52.22.01.71.61.41.41.41.41.61.82.12.32.62.93.23.43.63.84.14.34.54.85.15.25.25.35.25.04.74.23.91.61.92.22.52.83.03.03.03.13.53.63.84.04.24.24.13.93.73.53.23.03.03.02.92.62.32.01.71.41.21.00.80.70.60.60.70.91.11.31.72.02.22.62.93.23.53.73.94.14.34.64.85.05.25.45.45.45.45.25.14.84.64.44.23.93.73.53.33.02.72.52.22.01.81.61.51.51.41.51.61.82.12.32.62.93.13.33.63.84.04.34.54.85.15.35.45.55.55.45.24.84.54.01.72.02.42.73.03.13.23.13.13.63.94.14.24.44.44.34.13.93.73.23.13.23.23.02.82.52.11.81.51.21.00.90.80.70.70.80.91.11.41.71.92.22.52.83.13.33.63.84.04.24.44.74.95.05.05.15.15.04.94.94.74.54.34.03.83.63.43.22.92.62.42.22.01.81.71.61.51.51.61.71.92.12.42.62.83.03.23.53.74.04.24.54.74.95.15.35.45.55.45.35.24.94.43.93.81.82.22.52.83.03.23.33.43.53.74.14.54.74.84.94.74.64.23.83.63.43.33.23.12.92.62.31.91.61.41.11.00.80.80.70.80.91.11.31.61.82.12.42.74.64.54.54.54.44.23.93.73.53.23.02.82.52.32.11.91.81.61.61.51.61.71.82.02.22.42.62.82.93.13.43.73.94.24.44.64.74.85.05.15.25.25.15.04.84.64.34.03.93.71.92.22.52.72.93.13.33.53.73.94.14.34.44.44.54.44.34.24.03.83.53.43.23.02.82.62.32.01.71.41.21.00.90.80.80.80.91.01.21.41.72.01.81.71.61.61.61.71.81.92.02.22.42.62.72.83.03.33.63.84.04.14.24.24.34.54.64.74.84.84.84.64.44.24.03.83.63.43.21.82.12.42.62.83.03.23.53.74.04.24.34.44.44.54.44.34.34.13.83.63.33.12.92.72.42.22.01.71.41.21.10.90.80.80.80.81.01.11.31.51.81.61.61.61.71.92.02.12.22.32.52.62.62.73.03.33.53.73.73.73.84.04.24.34.34.34.44.54.44.24.03.83.73.53.33.02.72.42.11.81.51.20.90.71.82.02.22.42.72.93.23.43.74.04.24.24.24.34.34.24.24.24.03.83.53.23.02.82.52.32.11.91.61.41.21.10.90.80.80.70.80.91.01.11.31.61.71.82.02.12.22.22.32.42.42.22.32.62.83.03.13.23.33.43.63.83.93.93.94.04.24.24.13.83.73.53.33.12.92.62.32.11.81.51.20.90.71.61.82.12.32.52.83.03.33.63.83.93.93.94.04.03.93.93.93.83.63.43.12.92.62.42.21.91.71.51.31.21.00.90.80.70.70.70.80.91.01.11.82.02.12.22.32.32.42.42.21.81.72.02.12.32.42.52.72.93.23.33.53.53.53.63.83.93.83.73.53.23.12.92.72.42.11.91.71.41.10.90.61.51.71.92.22.42.62.93.23.43.53.63.53.53.63.63.53.53.63.63.43.23.02.72.52.32.01.81.61.41.31.11.00.90.80.70.70.60.70.70.80.92.12.32.42.42.42.42.52.11.51.21.41.51.61.71.92.12.32.52.82.82.93.03.13.33.53.53.43.23.02.82.62.42.21.91.71.51.31.00.80.61.41.61.92.12.32.52.83.03.13.23.23.13.13.23.23.13.13.23.23.23.02.82.62.42.22.01.71.51.41.21.10.90.80.70.70.60.60.60.60.70.72.32.42.62.62.62.62.52.11.20.80.91.01.01.11.41.61.82.02.22.52.72.82.92.92.92.82.82.82.92.82.82.92.92.92.92.72.52.32.11.91.71.51.31.21.00.90.80.70.60.60.50.50.50.50.52.72.82.82.82.72.72.11.00.50.60.60.71.41.61.82.02.22.42.62.72.82.72.62.62.62.62.72.62.62.62.72.82.72.62.52.32.11.91.71.51.31.11.00.90.80.70.60.50.50.40.40.40.42.93.03.13.13.02.92.30.90.40.40.41.31.51.72.02.22.42.52.62.62.62.52.42.42.52.62.42.42.52.52.62.62.62.52.32.11.91.71.51.31.11.00.90.80.70.60.50.40.40.30.30.33.33.43.43.33.22.50.90.30.31.31.51.71.92.22.42.52.62.62.52.52.42.42.42.62.42.42.42.52.62.62.62.52.32.11.91.71.51.31.11.00.80.70.60.60.50.40.30.30.30.33.53.63.63.53.42.70.90.31.31.51.71.92.22.42.52.62.72.62.52.52.52.52.62.52.52.52.62.72.72.62.52.32.11.91.71.51.31.11.00.90.70.60.50.40.40.30.30.20.23.73.83.83.63.61.31.51.72.02.22.42.62.72.82.82.72.72.72.72.82.72.72.72.82.82.82.72.52.32.11.91.71.51.31.11.00.90.70.60.50.40.40.30.30.20.23.94.04.03.73.61.41.61.82.02.22.42.72.83.03.03.02.92.93.03.03.02.93.03.03.03.02.82.62.42.22.01.71.51.31.21.00.90.70.60.50.40.30.30.20.20.24.14.24.03.63.31.41.61.82.12.32.52.83.03.23.33.33.33.33.33.43.33.33.33.43.33.23.02.72.52.22.01.81.61.41.21.10.90.80.60.50.40.30.30.20.20.24.44.44.13.43.01.51.71.92.22.42.62.93.23.43.63.73.73.73.73.73.73.73.73.73.63.43.12.82.62.42.11.91.71.51.31.10.90.80.60.50.40.30.30.20.24.64.74.53.93.51.61.82.12.32.52.83.03.33.63.84.04.14.04.14.04.14.04.14.03.83.53.23.02.72.52.22.01.81.61.41.21.00.80.70.50.40.30.20.20.24.84.94.94.23.71.72.02.22.42.72.93.13.43.73.94.24.34.34.34.34.34.34.34.13.93.63.33.12.92.62.42.21.91.71.41.21.00.80.70.50.40.30.20.25.25.14.54.01.82.12.42.62.83.03.23.43.73.94.14.34.44.44.34.44.44.34.13.83.63.43.23.02.72.52.32.01.71.41.21.00.80.60.50.30.20.25.45.24.74.21.82.12.52.72.93.13.33.43.63.84.04.24.44.64.64.54.44.23.93.83.63.43.23.12.92.72.42.01.71.41.20.90.80.60.40.30.25.55.45.04.61.72.02.42.73.03.23.23.33.43.54.04.44.54.74.74.64.54.33.93.53.33.23.23.12.92.72.31.91.61.31.10.90.75.65.55.14.61.51.92.22.62.93.03.13.13.03.43.73.84.04.24.24.14.03.83.63.33.03.13.13.02.82.52.11.81.51.21.00.80.65.55.55.14.61.51.82.12.42.72.92.92.93.03.53.63.84.04.24.34.24.03.83.63.42.92.92.92.82.62.32.01.71.41.21.00.80.65.45.34.94.51.51.82.12.32.62.72.72.72.83.43.53.84.04.34.34.34.03.83.53.32.72.72.72.72.52.32.01.71.41.21.00.80.65.35.24.64.11.51.82.12.32.52.62.52.42.63.03.23.53.84.14.14.03.73.43.12.92.52.52.62.62.52.32.01.71.41.21.00.80.65.15.14.43.94.84.84.23.64.64.33.73.34.34.03.42.94.13.93.53.33.93.83.63.51"=20' 0 2051020 CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042IP0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN IP0 C-8.0 LIGHTING PLAN NOT TO SCALE TRAFFIC RATED CLEANOUT DETAIL 3000 P.S.I. CONCRETE SAND CUSHION 4" SEWER CLEANOUT CAP 6" PVC ENCASEMENT PIPE ASPHALT OR CONCRETE AS DETERMINED BY TRAFFIC SURFACE 3,000 P.S.I CONCRETE TRAFFIC RATED CLEANOUT COVER 2" ASPHALT OR CONCRETE FINISHED GRADE 18" SQUARE CONCRETE ENCASEMENT (3000 P.S.I CONCRETE)4" MAX.18"S TEST PIT (TO BE HAND DUG) FINISHED GRADE 1.5' MIN. CLEARANCE UTILITY CONFLICT 1. CONTRACTOR TO COORDINATE WATERLINE ADJUSTMENT WITH APPROPRIATE INSPECTOR, BASED UPON LOCAL JURISDICTIONAL REQUIREMENTS AND FIELD CONDITIONS. 2. CONTRACTOR TO HAND DIG TEST PIT AT ANTICIPATED CROSSING LOCATION TO DETERMINE EXISTING WATERLINE DEPTH, TOTAL WATERLINE DEFLECTION REQUIRED, AND BEST METHOD FOR WATERLINE ADJUSTMENT. 3. VERTICAL BENDS (INSTALLED PER LOCAL STANDARDS) AS REQUIRED. 4. PIPE DEFLECTION AT JOINTS (PER LOCAL STANDARDS) WATERLINE ADJUSTMENT USING FITTINGS (VERTICAL BENDS) (SEE NOTE 3) WATERLINE ADJUSTMENT USING DEFLECTION AT PIPE JOINTS (SEE NOTE 4) EX. MAIN SEE NOTE 4 ADJUSTMENT TO EXTEND BEYOND LIMITS OF CONFLICTS (3' MIN., EACH SIDE, CHECK LOCAL STANDARDS). NOT TO SCALE WATERLINE ADJUSTMENT DETAIL NOTES: NOT TO SCALE BOLLARD MOUNTED ADA PARKING SIGN DETAIL ONE AT EACH ADA SPACE. WHERE ADA SPACES FACE EACH OTHER WITHOUT WALKWAY, THERE SHALL BE ONE POST WITH SIGNS MOUNTED BOTH SIDES3'-0"7'-0" TO BOTTOM OFLOWEST REQUIRED SIGN1'-6"2'-0"18"12"6"NOTE: REFLECTIVE ALUMINUM LEGEND AND BORDER - GREEN WHITE SYMBOL ON BLUE BACKGROUND BACKGROUND - WHITE TYPICAL AT ALL ADA SPACES THIS SIGN TYPICAL AT ALL "VAN ACCESSIBLE" PARKING SPACES PENALTY SIGN WITH WORDING AS REQUIRED BY STATE OR LOCAL LAW GALVANIZED "U" CHANNEL POST 4" DIA. SCH. 40 GALVANIZED STEEL PIPE BOLLARD PAINTED OSHA YELLOW FILLED WITH CONCRETE PAINT CONCRETE BLACK AFTER CURING AT ASPHALT LOCATIONS 4000 PSI CONCRETE NOT TO SCALE EXAMPLE ONE NOT TO SCALE EXAMPLE TWO 0.50% MIN LIMITS OF PROP PVMT (SEE NOTE 4)1.0% MI N 1. 0 % M I N 0.50% MIN NOT TO SCALE EXAMPLE THREE FLUME (SEE NOTE 5) EXAMPLE 3 NOTES: 1. CONTRACTOR TO INSTALL CURB AND GUTTER AT ELEVATION OF EXISTING PAVEMENT (ELEVATION AT EDGE OF GUTTER PAN MATCHES ELEVATION AT EXISTING PAVEMENT, UNLESS PLANS AND/OR SCHEMATICS INDICATE DIFFERENTLY. 2. CONTRACTOR TO PROVIDE GUTTER PANS (COLLECTOR/SPILL) PER GRADING PLAN. SHADED GUTTER PAN REPRESENTS FULL SPILL SECTION, NON-SHADED IS COLLECTOR. CONTRACTOR TO PROVIDE 3 FOOT TRANSITIONS BETWEEN SPILL AND COLLECTOR SECTIONS. 3. PLAN INTENT IS TO PROVIDE A MINIMUM SLOPE OF 0.50% ALONG COLLECTOR CURB. IF FIELD CONDITIONS AND/OR PLAN REPRESENTATION DOES NOT PROVIDE MINIMUM SLOPE REQUIREMENTS, CONTRACTOR IS TO CONTACT ENGINEER PRIOR TO POURING CURB AND GUTTER. BOHLER ENGINEERING SHALL BE HELD HARMLESS FOR ANY CURB AND GUTTER POURED THAT DOES NOT MEET MINIMUM REQUIREMENTS. 4. IN THOSE SITUATIONS WHERE RE-GRADING OF PARKING AND PAVEMENT REMOVAL IS NECESSARY (SEE EXAMPLE 2), THE CONTRACTOR IS TO VERIFY THAT THE RESULTANT GRADIENT AT THE HIGH SIDE OF THE ISLAND PROVIDES 1% PAVEMENT SLOPE, PER PLAN INTENT. 5. IN ISLANDS WHERE FLUMES ARE INDICATED, THE CONTRACTOR SHALL PROVIDE A FLAT BOTTOMED FLUME AT THE SPECIFIED WIDTH. MINIMUM FLUME SLOPE SHALL BE 0.50%. CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SD0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN SD0 D-1.0 CONSTRUCTION DETAILS 1 NOT TO SCALE HEAVY DUTY ASPHALT PAVEMENT SECTION 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 4 PER GEOTECHNICAL REPORT PREPARED BY ECS SOUTHEAST, LLP, ENTITLED GEOTECHNICAL ENGINEERING REPORT. BUNN DIALYSIS SITE, DATED 8/11/17 (PROJECT #06:23602). FINAL DESIGN TO BE PROVIDED ONCE FINAL CBR'S ARE AVAILABLE ON COMPACTED SUB-BASE.. NOTE: 3" ASPHALT SURFACE COURSE (SFA9.5A) 8" COMPACTED STONE BASE COMPACTED SUBGRADE (PER GEOTECHNICAL REPORT) NOT TO SCALE STANDARD DUTY ASPHALT PAVEMENT SECTION 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 4 PER GEOTECHNICAL REPORT PREPARED BY ECS SOUTHEAST, LLP, ENTITLED GEOTECHNICAL ENGINEERING REPORT. BUNN DIALYSIS SITE, DATED 8/11/17 (PROJECT #06:23602). FINAL DESIGN TO BE PROVIDED ONCE FINAL CBR'S ARE AVAILABLE ON COMPACTED SUB-BASE. NOTE: 2" ASPHALT SURFACE COURSE (SF9.5A) 6" COMPACTED STONE BASE COMPACTED SUBGRADE (PER GEOTECHNICAL REPORT) NOT TO SCALE CONCRETE-TO-ASPHALT DETAIL TACK COAT (APPLIED AT A RATE OF 0.2 GALLONS/S.Y.) PAVEMENT SURFACE (SEE PAVEMENT DETAIL) CONCRETE PAVEMENT SECTION NOT TO SCALE CONCRETE SIDEWALK DETAIL VARIES 3:1 MAX. 3 : 1 M A X . 3 : 1 M A X .3:1 MAX. 1. EXPANSION JOINTS 1/2" WIDE PREMOLDED BIT. MATERIAL SHALL BE INSTALLED AT 30' INTERVALS, CRACK CONTROL JOINTS TO BE SPACED AT INTERVALS EQUAL TO SIDEWALK WIDTH. 2% MAX. CROSS SLOPE NOTE: COMPACTED SUBGRADE (PER GEOTECHNICAL REPORT)4" THICK, COMPACTED STONE BASE (TYPE 2a) 4" CLASS A CONCRETE (3000 P.S.I. @ 28 DAYS) 2' MIN. CLEAR ZONE (TYP., LT. & RT.) NOT TO SCALE CURB BREAK DETAIL 3' TAPER _' CURB BREAK 3' TAPER GUTTER PAN 3' RIP-RAP PAD 3' TAPER _' CURB BREAK 3' TAPER ELEVATION PLAN PAVED SURFACE/ CONC. PAD STD. CURB (PER SITE PLAN) 1" RADIUS NOT TO SCALE HEAVY DUTY CONCRETE SECTION 1. SECTION SHOWN IS BASED ON AN ANTICIPATED CBR OF 4 PER GEOTECHNICAL REPORT PREPARED BY ECS SOUTHEAST, LLP, ENTITLED GEOTECHNICAL ENGINEERING REPORT. BUNN DIALYSIS SITE, DATED 8/11/17 (PROJECT #06:23602). FINAL DESIGN TO BE PROVIDED ONCE FINAL CBR'S ARE AVAILABLE ON COMPACTED SUB-BASE. NOTE: 6x6 WWM (10 GA.) 6" CONCRETE 6" COMPACTED STONE BASE COMPACTED SUBGRADE (PER GEOTECHNICAL REPORT) 12:1 MAX. SLOPE 5'-0" MIN. 12:1 MAX. SLOPE NOT TO SCALE ADA ACCESSIBLE RAMP DETAIL ADA ACCESSIBLE RAMP CONSTRUCTION SHALL CONFORM TO CURRENT ADA ACCESSIBLE GUIDELINES. NOTE: TRUNCATED DOME PATTERN EDGE OF CURB 1:1 2 SL O P E 1:12 SLOPE 3' MI N . NOT TO SCALE ADA ACCESSIBLE RAMP DETAIL 1. ADA ACCESSIBLE RAMP CONSTRUCTION SHALL CONFORM TO CURRENT ADA ACCESSIBLE GUIDELINES. 3' MI N. NOTE: TRUNCATED DOME PATTERN MAX 1:12 SLOPE MA X MAX FLUSH CURB SEE SITE PLAN FOR DIMENSION MAX 2% IN ANY DIRECTION AT LANDING NOT TO SCALE CONCRETE CURB & GUTTER DETAIL 2'-0" 6"1"6"1"PAVEMENT DIMENSION(S) ON PLAN VIEW REFER TO FACE OF CURB 1. CONCRETE FOR CURBING SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 3,000 P.S.I. @ 28 DAYS. 2. CONSTRUCTION STAKING FOR CURB INSTALLATION SHALL BE REFERENCED (CUT OR FILL) TO THE TOP OF CURB. 3. AT CONTRACTOR'S OPTION, THE GUTTER THICKNESS MAY BE INCREASED AT THE EDGE OF PAVEMENT TO MAKE BOTTOM OF GUTTER CONTIGUOUS WITH BOTTOM OF ASPHALT PAVEMENT. 4. CONTRACTION JOINTS SHALL BE PLACED @ 10'-0" O.C. TOOLED 1/4" (±1/16") WIDE, 1" DEEP. EXPANSION JOINTS SHALL BE PLACED @ 40'-0" INTERVALS, MAXIMUM, AND ALL P.C.'S. 5. GUTTER PAN SLOPE TO BE ADJUSTED WITHIN ACCESSIBLE PARKING SPACES TO MATCH SLOPE BETWEEN SPOT ELEVATIONS. 2'-0" 6" 1"1"6"1"SPILL CURB & GUTTER COLLECTOR CURB & GUTTER6"PAVEMENT DIMENSION(S) ON PLAN VIEW REFER TO FACE OF CURB 5"NOTES: 1-1/2"R 1-1/2"R 1 1 2% MAX. SLOPE17"5" 1.CONCRETE TO BE 4000 P.S.I. @ 28 DAYS. NOTE: 4" COMPACTED 21-A STONE 4" CONCRETE WALK W/6x6 WWM (10 GA) PROPOSED PAVEMENT (SEE PAVEMENT DETAIL) TACK COAT (APPLIED @ 0.2 GALLONS/S.Y.) NOT TO SCALE MONOLITHIC CURB & FLUSH SIDEWALK DETAIL CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SD0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN SD0 D-1.1 CONSTRUCTION DETAILS 2 3 1 3 1 OUTLET PIPE (SEE TABLE BELOW) RISER RIM SOD SIDESLOPES SOD SIDESLOPES 3' FILL SOIL MEDIA MIX: 75-85% MEDIUM TO COARS WASHED SAND 8-10% FINES 5-10% ORGANIC MATTER BASIN BOTTOM OF BASIN ELEV. RISER STRUCTURE 2 R-2 280.80' 4" WASHED SAND 6" #57 STONE CLEANOUT (SEE PLAN FOR APPROX. LOCATION) 4" PVC PERFORATED UNDERDRAIN (SEE PLAN FOR LAYOUT AND INVERTS) TOP OF EMBANKMENT 282.80' TOP OF EMBANKMENT 1 R-1 279.80'281.30' TYPICAL BIORETENTION CROSS-SECTION FILTER FABRIC 2.00' MIN. EL 281.89 (10-YR) SECTION B-B NOTES: 1. RISER TO BE PRE-CAST CONCRETE STRUCTURE. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL. 18" OUTLET PIPE PEAKED ROOF TRASH RACK EL 281.84 (2-YEAR) EL 282.30' (TOP OF RISER) A B B A SECTION A-A TRASH RACK (REMOVED FOR CLARITY)6"EL 281.97 (100-YR) 6" PVC TEE 18"ELBOWS WITH PIPE STUB AS NEEDED TO REACH ELEV : 280.30'4.0'3.0'3.0'4.0'FROM MOSTUPSTREAMCLEANOUTRISER 2 2.00' MIN. EL 280.88 (10-YR) SECTION B-B NOTES: 1. RISER TO BE PRE-CAST CONCRETE STRUCTURE. CONTRACTOR TO SUBMIT SHOP DRAWINGS FOR APPROVAL. 18" OUTLET PIPE PEAKED ROOF TRASH RACK EL 280.85(2-YEAR) EL 280.80 (TOP OF RISER) A B B A SECTION A-A TRASH RACK (REMOVED FOR CLARITY)6"EL 280.96 (100-YR) 6" PVC TEE 18"ELBOWS WITH PIPE STUB AS NEEDED TO REACH ELEV : 278.30'4.0'3.0'3.0'4.0'FROM MOSTUPSTREAMCLEANOUTRISER 1 OUTLET PIPE (DIA) 18" 18" CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042SD0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:15 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN SD0 D-2.0 EROSION AND SEDIMENT CONTROL DETAILS 3' FILTER FABRIC ON GROUND STEEL FENCE POST WIRE FENCE HARDWARE CLOTH FILTER OF #57 WASHED STONE BURY 6" OF UPPER EDGE OF FILTER FABRIC IN TRENCH TOP OF SILT FENCE MUST BE AT LEAST 1' ABOVE THE TOP OF THE WASHED STONE SILT FENCE FRONT VIEW SECTION VIEW STEEL FENCE POST SET MAX 2' APART MIN. 18" INTO SOLID GROUND BURY WIRE FENCE, FILTER FABRIC, AND HARDWARE CLOTH IN TRENCH 4' MIN. NOTES: 1.REMOVE SEDIMENT WHEN HALF OF STONE OUTLET IS COVERED. 2.REPLACE STONE AS NEEDED TO ENSURE DEWATERING. NOT TO SCALE SILT FENCE OUTLET ON THIS SHEET)10' (MAX.)3 1 (MAX SIDE SLOPE TYP.) CONSTRUCT SILT FENCE AROUND PERIMETER OF STOCKPILE (SEE DETAIL STABILIZATION NOTES IN ACCORDANCE WITH TEMPORARY MAINTAIN STOCK PILE SURFACE TEMPORARY STOCKPILE DETAIL NOTES: 1.CONCRETE WASTE MANAGEMENT PERTAINS TO WASTE FROM CONCRETE READY-MIX TRUCKS, MASONRY OPERATIONS, AND SIMILAR WASTE. 2.CONCRETE MATERIALS ONSITE, INCLUDING EXCESS CONCRETE, SHALL BE CONTROLLED AND MANAGED TO AVOID CONTACT WITH SURFACE WATERS, WETLANDS OR BUFFERS. NO CONCRETE OR CEMENT SLURRY SHALL BE DISCHARGED FROM THE SITE. ANY HARDENED CONCRETE RESIDUE WILL BE DISPOSED OF, OR RECYCLED ON SITE, IN ACCORDANCE WITH LOCAL AND STATE SOLID WASTE REGULATIONS. 3.DISCHARGE OF EXCESS OR WASTE CONCRETE AND/OR WASH WATER FROM CONCRETE TRUCKS IS ALLOWED AT THE CONSTRUCTION SITE. ONLY COMMERCIALLY AVAILABLE ABOVE GROUND PORTABLE CONCRETE WASHOUT CONTAINERS ARE ALLOWED AND SHALL BE PROTECTED FROM VEHICLE TRAFFIC AND CLEARLY IDENTIFIED BY LEGIBLE SIGNAGE, AND SHALL BE LOCATED OUTSIDE OF VEGETATED BUFFERS AND AS FAR AS PRACTICABLE FROM STORMWATER CONVEYANCES AND IMPOUNDMENTS AND WATER BODIES. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL CONTAIN AND/OR ACTIVELY MANAGE BOTH, SOLID AND FLUID, COMPONENTS OF THE MIX. CONCRETE WASHOUT CONTAINERS SHALL BE CLEANED OR EXCHANGED WHEN THE REMAINING VOLUME IS REDUCED BY 85% TO PREVENT ANY POTENTIAL OVERFLOW IN A STORM EVENT. 4.ALTERNATIVELY, WASTE CONCRETE CAN BE PLACED INTO FORMS TO MAKE RIP RAP AND/OR OTHER USEFUL CONCRETE PRODUCTS. PORTABLE CONCRETE WASHOUT CONTAINERS SHALL BE DISPOSED IN ACCORDANCE WITH APPLICABLE LOCAL, STATE AND FEDERAL REGULATIONS. THE GC IS RESPONSIBLE FOR ASSURING THAT THESE PROCEDURES, APPLICABLE LAWS, AND ENVIRONMENTAL REGULATIONS ARE FOLLOWED. THE LOCATION OF CONCRETE WASHOUT CONTAINERS SHALL BE SHOWN ON THE SITE MAPS. CEMENT AND CONCRETE WASHOUT FILTERED WIRE MESH CONCRETE BLOCKS PLAN SECTION AGGREGATE FINISHED GRADE RUNOFF SEE NOTE 2 GRATED INLET WATER NOTES: 1.PLACE CONCRETE BLOCKS IN A SINGLE ROW AROUND PERIMETER OF INLET ON THEIR SIDES, WITH ENDS OF ADJACENT BLOCKS ABUTTING. 2.HEIGHT OF BARRIER VARIES. USE STACKS OF 4", 8", OR 12" BLOCKS. MIN. HEIGHT OF BARRIER SHALL BE 12" AND MAX. HEIGHT SHALL BE 24". 3.PLACE HARDWARE CLOTH/WIRE MESH W/ MAX. 1/2" OPENINGS OVER VERTICAL FACE OF CONCRETE BLOCKS. 4.THE AGGREGATE SHALL BE 3/4"-2" ANGULAR CLEAN STONE, WHICH WILL SLOW THE FLOW OF THE WATER AND ALLOW IT TO FILTER THROUGH AND OVER THE MATERIAL BEFORE ENTERING THE INLET. MIRAFI 140 N GEOTEXTILE FABRIC CONCRETE BLOCKS GRATED INLET AGGREGATE WIRE MESH MIRAFI 140 N GEOTEXTILE FABRIC MAINTENANCE NOTES: 1.INLET PROTECTION DEVICES MUST BE INSPECTED FOR SEDIMENT ACCUMULATION WITHIN THE CATCH BASIN (IF USING INSERT-TYPE DEVICE) OR UPGRADIENT OF THE INLET. 2.REMOVAL OF SEDIMENT ACCUMULATED IN OR ADJACENT TO A STORM DRAIN INLET MUST BEGIN IMMEDIATELY UPON DISCOVERY, WITH COMPLETION OF THE ACTIVITY OCCURRING NO LATER THAN THE END OF THE FOLLOWING BUSINESS DAY. 3.INLET PROTECTION DEVICES SHALL BE INSPECTED FOR UNINTENDED BYPASS OR IMPROPER FLOW-RATES THAT MAY CAUSE DOWNSTREAM FLOODING. 4.CONTACT THE CEC FOR ALTERNATE INLET PROTECTION IF THE DESIGNED PROTECTION MAY IMPACT DOWNSTREAM BMPS, ADJACENT SLOPES, ETC., DUE TO PONDING ISSUES. ENSURE THAT NO UNDERMINING OF INLET PROTECTION DEVICES HAS OCCURRED. 5.INLET PROTECTION DEVICES AND BARRIERS SHALL BE REPAIRED OR REPLACED IF THEY SHOW SIGNS OF UNDERMINING OR DETERIORATION. NOT TO SCALE NCDENR MAINTENANCE NOTE: TEMPORARY BLOCK AND GRAVEL DROP INLET PROTECTION - INSPECT THE BARRIER AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (112 INCH OR GREATER) RAINFALL AND MAKE REPAIRS AS NEEDED. REMOVE SEDIMENT AS NECESSARY TO PROVIDE ADEQUATE STORAGE VOLUME FOR SUBSEQUENT RAINS. WHEN THE CONTRIBUTING DRAINAGE AREA HAS BEEN ADEQUATELY STABILIZED, REMOVE ALL MATERIALS AND ANY UNSTABLE SOIL, AND EITHER SALVAGE OR DISPOSE OF IT PROPERLY. BRING THE DISTURBED AREA TO PROPER GRADE, THEN SMOOTH AND COMPACT IT. APPROPRIATELY STABILIZE ALL BARE AREAS AROUND THE INLET. IPBLOCK AND AGGREGATE INLET PROTECTION PLAN VIEW STANDARD CONSTRUCTION ENTRANCE NOTES: 1. PUT SILT FENCE OR TREE PROTECTION FENCE UP TO ENSURE CONSTRUCTION ENTRANCE IS USED. 2. IF CONSTRUCTION ON THE SITES ARE SUCH THAT THE MUD IS NOT REMOVED BY THE VEHICLE TRAVELING OVER THE STONE, THEN THE TIRES OF THE VEHICLES MUST BE WASHED BEFORE ENTERING THE PUBLIC ROAD. 3. IF A PROJECT CONTINUES TO PULL MUD AND DEBRIS ON TO THE PUBLIC ROAD, THE TOWN WILL CLEAN THE AREA AND INVOICE THE FINANCIALLY RESPONSIBLE PERSON AS INDICATED ON THE FINANCIAL RESPONSIBILITY FORM. BUT SUFFICIENT TO KEEP SEDIMENT ON SITE EXISTING ROADWAY 2"-3" STONE TO BE USED (SURGE STONE OR RAILROAD BALLAST) 15' OR WIDTH OF PROPOSED STREET, WHICHEVER IS GREATER. NEW CONSTRUCTION 50' EXISTING ROADWAY GEOTEXTILE FABRIC UNDER STONE 6" MIN. 50' NOT TO SCALE NCDENR MAINTENANCE NOTE: TEMPORARY GRAVEL CONSTRUCTION ENTRANCE- MAINTAIN THE GRAVEL PAD IN A CONDITION TO PREVENT MUD OR SEDIMENT FROM LEAVING THE CONSTRUCTION SITE. THIS MAY REQUIRE PERIODIC TOP DRESSING WITH 2-INCH STONE. AFTER EACH RAINFALL, INSPECT ANY STRUCTURE USED TO TRAP SEDIMENT AND CLEAN IT OUT AS NECESSARY. IMMEDIATELY REMOVE ALL OBJECTIONABLE MATERIALS SPILLED, WASHED, OR TRACKED ONTO PUBLIC ROADWAYS. CROSS SECTION NOT TO SCALE 6. PLACE STAPLES/STAKES PER MANUFACTURER'S RECOMMENDATION FOR THE APPROPRIATE SLOPE BEING APPLIED. IN APPROPRIATE LOCATIONS AS PER MANUFACTURES RECOMMENDATION. STAPLES/STAKES SPACED APPROXIMATELY 12" APART ACROSS THE WIDTH OF THE BLANKET. PORTION OF BLANKET BACK OVER SEED AND COMPACTED SOIL. SECURE BLANKET OVER COMPACTED SOIL WITH A ROW OF BACKFILL AND COMPACT THE TRENCH AFTER STAPLING. APPLY SEED TO COMPACTED SOIL AND FOLD REMAINING 12" DETAIL 2. ANCHOR THE BLANKET WITH A ROW OF STAPLES/STAKES APPROXIMATELY 12" APART IN THE BOTTOM OF THE TRENCH. WITH APPROXIMATELY 12" OF BLANKET EXTENDED BEYOND THE UP-SLOPE PORTION OF THE TRENCH AS SHOWN IN 2. BEGIN AT THE TOP OF THE SLOPE BY ANCHORING THE BLANKET IN A 6" DEEP X 6" WIDE TRENCH 5. CONSECUTIVE BLANKETS SPLICED DOWN THE SLOPE MUST BE PLACED END OVER END (SHINGLE STYLE) WITH AN APPROXIMATE PLACE THE EDGE OF THE OVERLAPPING BLANKET (BLANKET BEING INSTALLED ON TOP) EVEN WITH THE SEAM STITCH 4. THE EDGES OF PARALLEL BLANKETS MUST BE STAPLED WITH MINIMUM 6" OVERLAP. TO ENSURE PROPER SEAM ALIGNMENT, 3. ROLL THE BLANKETS (A.) DOWN OR (B.) HORIZONTALLY ACROSS THE SLOPE. BLANKETS WILL UNROLL WITH APPROPRIATE SIDE ON THE PREVIOUSLY INSTALLED BLANKET. 3" OVERLAP. STAPLE THROUGH OVERLAPPED AREA, APPROXIMATELY 12" APART ACROSS ENTIRE AGAINST THE SOIL SURFACE. ALL BLANKETS MUST BE SECURELY FASTENED TO SOIL SURFACE BY PLACING STAPLES/STAKES 1. PREPARE SOIL BEFORE INSTALLING BLANKETS, INCLUDING ANY NECESSARY APPLICATION OF LIME, FERTILIZER, AND SEED. 1. IN LOOSE SOIL CONDITIONS, THE USE OF STAPLE OR STAKE LENGTHS GREATER THAN 6" MAY BE NECESSARY TO 1. PROPERLY SECURE THE BLANKETS. NOTES: BLANKET WIDTH. 3B. 3A. 4"-6" 4. 3" 5. 6" 12" 2. 6" 2. FOLLOW EROSION CONTROL TECHNOLOGY COUNCIL SPECIFICATION FOR PRODUCT SELECTION. MAINTENANCE NOTES: 1.INSPECT ROLLED EROSION CONTROL PRODUCTS AT LEAST WEEKLY AND AFTER EACH SIGNIFICANT (1/2 INCH OR GREATER) RAINFALL EVENT REPAIR IMMEDIATELY. 2.GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND EROSION MUST NOT OCCUR BENEATH THE RECP. 3.ANY AREAS OF THE RECP THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED. 4.IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED. 5.MONITOR AND REPAIR THE RECP AS NECESSARY UNTIL GROUND COVER IS ESTABLISHED. EROSION CONTROL BLANKET (SLOPE INSTALLATION) CONSTRUCTION NOT APPROVED FOR REVISIONS REV DATE COMMENT BY LOCATION OF SITE FOR PROJECT No.: DRAWN BY: CHECKED BY: DATE: SCALE: CAD I.D.: SHEET NUMBER: SHEET TITLE: PROJECT: H:\2017\NCR172042\DRAWINGS\PLAN SETS\NCR172042LP0.DWG PRINTED BY: WSWARINGEN 10.31.17 @ 5:16 PM LAST SAVED BY: WSWARINGEN NCR172042 WES WLB 10/27/17 PRELIMINARY SITE PLAN DAVITA, INC. 565 S. MAIN ST. BUNN, NC 27508 FRANKLIN COUNTY KNOW WHAT'S BELOW ALWAYS CALL 811 BEFORE YOU DIG It's fast. It's free. It's the law. TM NCBELS P-1132 4130 PARKLAKE AVENUE, SUITE 130 RALEIGH, NC 27612 Phone:(919) 578-9000 NC@BohlerEng.comTM THE INFORMATION, DESIGN AND CONTENT OF THIS PLAN ARE PROPRIETARY AND SHALL NOT BE COPIED OR USED FOR ANY PURPOSE WITHOUT PRIOR WRITTEN AUTHORIZATIONFROM BOHLER ENGINEERING. ONLY APPROVED, SIGNED AND SEALED PLANS SHALL BE UTILIZED FOR CONSTRUCTION PURPOSES©NEW ENGLANDUPSTATE NEW YORKNEW YORK, NYPHILADELPHIA, PALEHIGH VALLEY, PABALTIMORE, MDREHOBOTH BEACH, DEWASHINGTON, DCNORTHERN VIRGINIARALEIGH, NCCENTRAL VIRGINIASOUTHERN MARYLANDNORTHERN NEW JERSEYSOUTHEASTERN, PACHARLOTTE, NCBOSTON, MASOUTHERN NEW JERSEYNEW YORK METROTAMPA, FLSOUTH FLORIDADALLAS, TXATLANTA, GAPITTSBURGH, PATMSUSTAINABLE DESIGNLANDSCAPE ARCHITECTURESITE CIVIL AND CONSULTING ENGINEERINGLAND SURVEYINGPROGRAM MANAGEMENTPERMITTING SERVICESTRANSPORTATION SERVICES2017 BOHLER ENGINEERINGSEAL 040241 WYA TT L . B O N EE NGI N E E RPRO F E SS IO N ALNOR T H CAROLI NA10/31/17 AS SHOWN LP0 D-3.0 LANDSCAPE DETAILS LANDSCAPE SPECIFICATIONS 1. SCOPE OF WORK: THE LANDSCAPE CONTRACTOR SHALL BE REQUIRED TO PERFORM ALL CLEARING, FINISHED GRADING, SOIL PREPARATION, PERMANENT SEEDING OR SODDING, PLANTING AND MULCHING INCLUDING ALL LABOR, MATERIALS, TOOLS AND EQUIPMENT NECESSARY FOR THE COMPLETION OF THIS PROJECT, UNLESS OTHERWISE CONTRACTED BY THE GENERAL CONTRACTOR. 2. MATERIALS A.GENERAL - ALL HARDSCAPE MATERIALS SHALL MEET OR EXCEED SPECIFICATIONS AS OUTLINED IN THE STATE DEPARTMENT OF TRANSPORTATION'S SPECIFICATIONS. B.TOPSOIL - NATURAL, FRIABLE, LOAMY SILT SOIL HAVING AN ORGANIC CONTENT NOT LESS THAN 5%, A PH RANGE BETWEEN 4.5-7.0. IT SHALL BE FREE OF DEBRIS, ROCKS LARGER THAN ONE INCH (1"), WOOD, ROOTS, VEGETABLE MATTER AND CLAY CLODS. C.LAWN - ALL DISTURBED AREAS ARE TO BE TREATED WITH A MINIMUM SIX INCH (6") THICK LAYER OF TOPSOIL, OR AS DIRECTED BY THE LOCAL ORDINANCE OR CLIENT, AND SEEDED OR SODDED IN ACCORDANCE WITH THE PERMANENT STABILIZATION METHODS INDICATED WITHIN THE SOIL EROSION AND SEDIMENT CONTROL NOTES. 1.1.LAWN SEED MIXTURE SHALL BE FRESH, CLEAN NEW CROP SEED. 1.2.SOD SHALL BE STRONGLY ROOTED, WEED AND DISEASE/PEST FREE WITH A UNIFORM THICKNESS. 1.3.SOD INSTALLED ON SLOPES GREATER THAN 4:1 SHALL BE PEGGED TO HOLD SOD IN PLACE. D.MULCH - THE MULCH AROUND THE PERIMETER OF THE BUILDING SHALL BE A 3" LAYER OF DOUBLE SHREDDED BLACK CEDAR MULCH ONLY. ALL OTHER AREAS SHALL BE MULCHED WITH A 3" LAYER OF DOUBLE SHREDDED DARK BROWN HARDWOOD BARK MULCH, UNLESS OTHERWISE STATED ON THE LANDSCAPE PLAN. E.FERTILIZER 1.1.FERTILIZER SHALL BE DELIVERED TO THE SITE MIXED AS SPECIFIED IN THE ORIGINAL UNOPENED STANDARD BAGS SHOWING WEIGHT, ANALYSIS AND NAME OF MANUFACTURER. FERTILIZER SHALL BE STORED IN A WEATHERPROOF PLACE SO THAT IT CAN BE KEPT DRY PRIOR TO USE. 1.2.FOR THE PURPOSE OF BIDDING, ASSUME THAT FERTILIZER SHALL BE 10% NITROGEN, 6% PHOSPHORUS AND 4% POTASSIUM BY WEIGHT. A FERTILIZER SHOULD NOT BE SELECTED WITHOUT A SOIL TEST PERFORMED BY A CERTIFIED SOIL LABORATORY. F.PLANT MATERIAL 1.1.ALL PLANTS SHALL IN ALL CASES CONFORM TO THE REQUIREMENTS OF THE "AMERICAN STANDARD FOR NURSERY STOCK" (ANSI Z60.1), LATEST EDITION, AS PUBLISHED BY THE AMERICAN NURSERY & LANDSCAPE ASSOCIATION. 1.2.IN ALL CASES, BOTANICAL NAMES SHALL TAKE PRECEDENCE OVER COMMON NAMES FOR ANY AND ALL PLANT MATERIAL. 1.3.PLANTS SHALL BE LEGIBLY TAGGED WITH THE PROPER NAME AND SIZE. TAGS ARE TO REMAIN ON AT LEAST ONE PLANT OF EACH SPECIES FOR VERIFICATION PURPOSES DURING THE FINAL INSPECTION. 1.4.TREES WITH ABRASION OF THE BARK, SUN SCALDS, DISFIGURATION OR FRESH CUTS OF LIMBS OVER 1¼", WHICH HAVE NOT BEEN COMPLETELY CALLUSED, SHALL BE REJECTED.PLANTS SHALL NOT BE BOUND WITH WIRE OR ROPE AT ANY TIME SO AS TO DAMAGE THE BARK OR BREAK BRANCHES. 1.5.ALL PLANTS SHALL BE TYPICAL OF THEIR SPECIES OR VARIETY AND SHALL HAVE A NORMAL HABIT OF GROWTH: WELL DEVELOPED BRANCHES, DENSELY FOLIATED, VIGOROUS ROOT SYSTEMS AND BE FREE OF DISEASE, INSECTS, PESTS, EGGS OR LARVAE. 1.6.CALIPER MEASUREMENTS OF NURSERY GROWN TREES SHALL BE TAKEN AT A POINT ON THE TRUNK SIX INCHES (6") ABOVE THE NATURAL GRADE FOR TREES UP TO AND INCLUDING A FOUR INCH (4") CALIPER SIZE. IF THE CALIPER AT SIX INCHES (6") ABOVE THE GROUND EXCEEDS FOUR INCHES (4") IN CALIPER, THE CALIPER SHOULD BE MEASURED AT A POINT 12" ABOVE THE NATURAL GRADE. 1.7.SHRUBS SHALL BE MEASURED TO THE AVERAGE HEIGHT OR SPREAD OF THE SHRUB, AND NOT TO THE LONGEST BRANCH. 1.8.TREES AND SHRUBS SHALL BE HANDLED WITH CARE BY THE ROOT BALL. 3. GENERAL WORK PROCEDURES A.CONTRACTOR TO UTILIZE WORKMANLIKE INDUSTRY STANDARDS IN PERFORMING ALL LANDSCAPE CONSTRUCTION. THE SITE IS TO BE LEFT IN A CLEAN STATE AT THE END OF EACH WORKDAY. ALL DEBRIS, MATERIALS AND TOOLS SHALL BE PROPERLY STORED, STOCKPILED OR DISPOSED OF. B.WASTE MATERIALS AND DEBRIS SHALL BE COMPLETELY DISPOSED OF AT THE CONTRACTOR'S EXPENSE. DEBRIS SHALL NOT BE BURIED, INCLUDING ORGANIC MATERIALS, BUT SHALL BE REMOVED COMPLETELY FROM THE SITE. 4. SITE PREPARATIONS A.BEFORE AND DURING PRELIMINARY GRADING AND FINISHED GRADING, ALL WEEDS AND GRASSES SHALL BE DUG OUT BY THE ROOTS AND DISPOSED OF IN ACCORDANCE WITH GENERAL WORK PROCEDURES OUTLINED HEREIN. B.ALL EXISTING TREES TO REMAIN SHALL BE PRUNED TO REMOVE ANY DAMAGED BRANCHES. THE ENTIRE LIMB OF ANY DAMAGED BRANCH SHALL BE CUT OFF AT THE TRUNK. CONTRACTOR SHALL ENSURE THAT CUTS ARE SMOOTH AND STRAIGHT. ANY EXPOSED ROOTS SHALL BE CUT BACK WITH CLEAN, SHARP TOOLS AND TOPSOIL SHALL BE PLACED AROUND THE REMAINDER OF THE ROOTS. EXISTING TREES SHALL BE MONITORED ON A REGULAR BASIS FOR ADDITIONAL ROOT OR BRANCH DAMAGE AS A RESULT OF CONSTRUCTION. ROOTS SHALL NOT BE LEFT EXPOSED FOR MORE THAN ONE (1) DAY. CONTRACTOR SHALL WATER EXISTING TREES AS NEEDED TO PREVENT SHOCK OR DECLINE. C.CONTRACTOR SHALL ARRANGE TO HAVE A UTILITY STAKE-OUT TO LOCATE ALL UNDERGROUND UTILITIES PRIOR TO INSTALLATION OF ANY LANDSCAPE MATERIAL. UTILITY COMPANIES SHALL BE CONTACTED THREE (3) DAYS PRIOR TO THE BEGINNING OF WORK. 5. TREE PROTECTION A.CONTRACTOR SHALL BE RESPONSIBLE FOR THE PROTECTION OF ALL EXISTING TREES TO REMAIN. A TREE PROTECTION ZONE SHALL BE ESTABLISHED AT THE DRIP LINE OR 15 FEET FROM THE TRUNK OR AT THE LIMIT OF CONSTRUCTION DISTURBANCE, WHICHEVER IS GREATER. LOCAL STANDARDS THAT MAY REQUIRE A MORE STRICT TREE PROTECTION ZONE SHALL BE HONORED. B.A FORTY-EIGHT INCH (48") HIGH WOODEN SNOW FENCE OR ORANGE COLORED HIGH-DENSITY 'VISI-FENCE', OR APPROVED EQUAL, MOUNTED ON STEEL POSTS SHALL BE PLACED ALONG THE BOUNDARY OF THE TREE PROTECTION ZONE. POSTS SHALL BE LOCATED AT A MAXIMUM OF EIGHT FEET (8') ON CENTER OR AS INDICATED WITHIN THE TREE PROTECTION DETAIL. C.WHEN THE TREE PROTECTION FENCING HAS BEEN INSTALLED, IT SHALL BE INSPECTED BY THE APPROVING AGENCY PRIOR TO DEMOLITION, GRADING, TREE CLEARING OR ANY OTHER CONSTRUCTION. THE FENCING ALONG THE TREE PROTECTION ZONE SHALL BE REGULARLY INSPECTED BY THE LANDSCAPE CONTRACTOR AND MAINTAINED UNTIL ALL CONSTRUCTION ACTIVITY HAS BEEN COMPLETED. D.AT NO TIME SHALL MACHINERY, DEBRIS, FALLEN TREES OR OTHER MATERIALS BE PLACED, STOCKPILED OR LEFT STANDING IN THE TREE PROTECTION ZONE. 6. SOIL MODIFICATIONS A.CONTRACTOR SHALL ATTAIN A SOIL TEST FOR ALL AREAS OF THE SITE PRIOR TO CONDUCTING ANY PLANTING. SOIL TESTS SHALL BE PERFORMED BY A CERTIFIED SOIL LABORATORY. B.LANDSCAPE CONTRACTOR SHALL REPORT ANY SOIL OR DRAINAGE CONDITIONS CONSIDERED DETRIMENTAL TO THE GROWTH OF PLANT MATERIAL. SOIL MODIFICATIONS, AS SPECIFIED HEREIN, MAY NEED TO BE CONDUCTED BY THE LANDSCAPE CONTRACTOR DEPENDING ON SITE CONDITIONS. C.THE FOLLOWING AMENDMENTS AND QUANTITIES ARE APPROXIMATE AND ARE FOR BIDDING PURPOSES ONLY. COMPOSITION OF AMENDMENTS SHOULD BE REVISED DEPENDING ON THE OUTCOME OF A TOPSOIL ANALYSIS PERFORMED BY A CERTIFIED SOIL LABORATORY. 1.1.TO INCREASE A SANDY SOIL'S ABILITY TO RETAIN WATER AND NUTRIENTS, THOROUGHLY TILL ORGANIC MATTER INTO THE TOP 6-12". USE COMPOSTED BARK, COMPOSTED LEAF MULCH OR PEAT MOSS. ALL PRODUCTS SHOULD BE COMPOSTED TO A DARK COLOR AND BE FREE OF PIECES WITH IDENTIFIABLE LEAF OR WOOD STRUCTURE. AVOID MATERIAL WITH A PH HIGHER THAN 7.5. 1.2.TO INCREASE DRAINAGE, MODIFY HEAVY CLAY OR SILT (MORE THAN 40% CLAY OR SILT) BY ADDING COMPOSTED PINE BARK (UP TO 30% BY VOLUME) AND/OR AGRICULTURAL GYPSUM. COARSE SAND MAY BE USED IF ENOUGH IS ADDED TO BRING THE SAND CONTENT TO MORE THAN 60% OF THE TOTAL MIX. SUBSURFACE DRAINAGE LINES MAY NEED TO BE ADDED TO INCREASE DRAINAGE. 1.3.MODIFY EXTREMELY SANDY SOILS (MORE THAN 85%) BY ADDING ORGANIC MATTER AND/OR DRY, SHREDDED CLAY LOAM UP TO 30% OF THE TOTAL MIX. 7. FINISHED GRADING A.UNLESS OTHERWISE CONTRACTED, THE LANDSCAPE CONTRACTOR SHALL BE RESPONSIBLE FOR THE INSTALLATION OF TOPSOIL AND THE ESTABLISHMENT OF FINE-GRADING WITHIN THE DISTURBANCE AREA OF THE SITE. B.LANDSCAPE CONTRACTOR SHALL VERIFY THAT SUBGRADE FOR INSTALLATION OF TOPSOIL HAS BEEN ESTABLISHED. THE SUBGRADE OF THE SITE MUST MEET THE FINISHED GRADE LESS THE REQUIRED TOPSOIL THICKNESS (1"±). C.ALL LAWN AND PLANTING AREAS SHALL BE GRADED TO A SMOOTH, EVEN AND UNIFORM PLANE WITH NO ABRUPT CHANGE OF SURFACE AS DEPICTED WITHIN THIS SET OF CONSTRUCTION PLANS, UNLESS OTHERWISE DIRECTED BY THE PROJECT ENGINEER OR LANDSCAPE ARCHITECT. D.ALL PLANTING AREAS SHALL BE GRADED AND MAINTAINED TO ALLOW FREE FLOW OF SURFACE WATER IN AND AROUND THE PLANTING BEDS. STANDING WATER SHALL NOT BE PERMITTED IN PLANTING BEDS. 8. TOPSOILING A.CONTRACTOR SHALL PROVIDE A FOUR INCH (4") THICK MINIMUM LAYER OF TOPSOIL, OR AS DIRECTED BY THE LOCAL ORDINANCE OR CLIENT, IN ALL PLANTING AREAS. TOPSOIL SHOULD BE SPREAD OVER A PREPARED SURFACE IN A UNIFORM LAYER TO ACHIEVE THE DESIRED COMPACTED THICKNESS. B.ON-SITE TOPSOIL MAY BE USED TO SUPPLEMENT THE TOTAL AMOUNT REQUIRED. TOPSOIL FROM THE SITE MAY BE REJECTED IF IT HAS NOT BEEN PROPERLY REMOVED, STORED AND PROTECTED PRIOR TO CONSTRUCTION. C.CONTRACTOR SHALL FURNISH TO THE APPROVING AGENCY AN ANALYSIS OF BOTH IMPORTED AND ON-SITE TOPSOIL TO BE UTILIZED IN ALL PLANTING AREAS. THE PH AND NUTRIENT LEVELS MAY NEED TO BE ADJUSTED THROUGH SOIL MODIFICATIONS AS NEEDED TO ACHIEVE THE REQUIRED LEVELS AS SPECIFIED IN THE MATERIALS SECTION ABOVE. D.ALL PLANTING AND LAWN AREAS ARE TO BE CULTIVATED TO A DEPTH OF SIX INCHES (6"). ALL DEBRIS EXPOSED FROM EXCAVATION AND CULTIVATION SHALL BE DISPOSED OF IN ACCORDANCE WITH GENERAL WORK PROCEDURES SECTION ABOVE. THE FOLLOWING SHALL BE TILLED INTO THE TOP FOUR INCHES (4") IN TWO DIRECTIONS (QUANTITIES BASED ON A 1,000 SQUARE FOOT AREA): 1.1.20 POUNDS 'GROW POWER' OR APPROVED EQUAL 1.2.20 POUNDS NITRO-FORM (COURSE) 38-0-0 BLUE CHIP E.THE SPREADING OF TOPSOIL SHALL NOT BE CONDUCTED UNDER MUDDY OR FROZEN CONDITIONS. 9. PLANTING A.INSOFAR THAT IT IS FEASIBLE, PLANT MATERIAL SHALL BE PLANTED ON THE DAY OF DELIVERY. IN THE EVENT THAT THIS IS NOT POSSIBLE, LANDSCAPE CONTRACTOR SHALL PROTECT UNINSTALLED PLANT MATERIAL. PLANTS SHALL NOT REMAIN UNPLANTED FOR LONGER THAN A THREE DAY PERIOD AFTER DELIVERY. PLANTS THAT WILL NOT BE PLANTED FOR A PERIOD OF TIME GREATER THAN THREE DAYS SHALL BE HEALED IN WITH TOPSOIL OR MULCH TO HELP PRESERVE ROOT MOISTURE. B.PLANTING OPERATIONS SHALL BE PERFORMED DURING PERIODS WITHIN THE PLANTING SEASON WHEN WEATHER AND SOIL CONDITIONS ARE SUITABLE AND IN ACCORDANCE WITH ACCEPTED LOCAL PRACTICE. PLANTS SHALL NOT BE INSTALLED IN TOPSOIL THAT IS IN A MUDDY OR FROZEN CONDITION. C.ANY INJURED ROOTS OR BRANCHES SHALL BE PRUNED TO MAKE CLEAN-CUT ENDS PRIOR TO PLANTING UTILIZING CLEAN, SHARP TOOLS. ONLY INJURED OR DISEASED BRANCHING SHALL BE REMOVED. D.ALL PLANTING CONTAINERS AND NON-BIODEGRADABLE MATERIALS SHALL BE REMOVED FROM ROOT BALLS DURING PLANTING. NATURAL FIBER BURLAP MUST BE CUT FROM AROUND THE TRUNK OF THE TREE AND FOLDED DOWN AGAINST THE ROOT BALL PRIOR TO BACKFILLING. E.POSITION TREES AND SHRUBS AT THEIR INTENDED LOCATIONS AS PER THE PLANS AND SECURE THE APPROVAL OF THE LANDSCAPE ARCHITECT PRIOR TO EXCAVATING PITS, MAKING NECESSARY ADJUSTMENTS AS DIRECTED. F.PRIOR TO THE ISSUANCE OF ANY CERTIFICATE OF OCCUPANCY, THE PROPOSED LANDSCAPE, AS SHOWN ON THE APPROVED LANDSCAPE PLAN, MUST BE INSTALLED, INSPECTED AND APPROVED BY THE APPROVING AGENCY. THE APPROVING AGENCY SHALL TAKE INTO ACCOUNT SEASONAL CONSIDERATIONS IN THIS REGARD AS FOLLOWS. THE PLANTING OF TREES, SHRUBS, VINES OR GROUND COVER SHALL OCCUR ONLY DURING THE FOLLOWING PLANTING SEASONS: 1.1.PLANTS: MARCH 15 TO DECEMBER 15 1.2.LAWN: MARCH 15 TO JUNE 15 OR SEPT. 1 TO DECEMBER 1 G.PLANTINGS REQUIRED FOR A CERTIFICATE OF OCCUPANCY SHALL BE PROVIDED DURING THE NEXT APPROPRIATE SEASON AT THE MUNICIPALITY'S DISCRETION. CONTRACTOR SHOULD CONTACT APPROVING AGENCY FOR POTENTIAL SUBSTITUTIONS. H.FURTHERMORE, THE FOLLOWING TREE VARIETIES ARE UNUSUALLY SUSCEPTIBLE TO WINTER DAMAGE. WITH TRANSPLANT SHOCK AND THE SEASONAL LACK OF NITROGEN AVAILABILITY, THE RISK OF PLANT DEATH IS GREATLY INCREASED. IT IS NOT RECOMMENDED THAT THESE SPECIES BE PLANTED DURING THE FALL PLANTING SEASON: ACER RUBRUM PLATANUS X ACERIFOLIA BETULA VARIETIES POPULOUS VARIETIES CARPINUS VARIETIES PRUNUS VARIETIES CRATAEGUS VARIETIES PYRUS VARIETIES KOELREUTERIA QUERCUS VARIETIES LIQUIDAMBER STYRACIFLUA TILIA TOMENTOSA LIRIODENDRON TULIPIFERA ZELKOVA VARIETIES I.PLANTING PITS SHALL BE DUG WITH LEVEL BOTTOMS, WITH THE WIDTH TWICE THE DIAMETER OF ROOT BALL. THE ROOT BALL SHALL REST ON UNDISTURBED GRADE. EACH PLANT PIT SHALL BE BACKFILLED IN LAYERS WITH THE FOLLOWING PREPARED SOIL MIXED THOROUGHLY: ·1 PART PEAT MOSS ·1 PART COMPOSTED COW MANURE BY VOLUME ·3 PARTS TOPSOIL BY VOLUME ·21 GRAMS 'AGRIFORM' PLANTING TABLETS (OR APPROVED EQUAL) AS FOLLOWS: A) 2 TABLETS PER 1 GALLON PLANT B) 3 TABLETS PER 5 GALLON PLANT C) 4 TABLETS PER 15 GALLON PLANT D) LARGER PLANTS: 2 TABLETS PER ½" CALIPER OF TRUNK J.FILL PREPARED SOIL AROUND BALL OF PLANT HALF-WAY AND INSERT PLANT TABLETS. COMPLETE BACKFILL AND WATER THOROUGHLY. K.ALL PLANTS SHALL BE PLANTED SO THAT THE TOP OF THE ROOT BALL, THE POINT AT WHICH THE ROOT FLARE BEGINS, IS SET AT GROUND LEVEL AND IN THE CENTER OF THE PIT. NO SOIL IS TO BE PLACED DIRECTLY ON TOP OF THE ROOT BALL. L.ALL PROPOSED TREES DIRECTLY ADJACENT TO WALKWAYS OR DRIVEWAYS SHALL BE PRUNED AND MAINTAINED TO A MINIMUM BRANCHING HEIGHT OF 7' FROM GRADE. M.GROUND COVER AREAS SHALL RECEIVE A ¼" LAYER OF HUMUS RAKED INTO THE TOP 1" OF PREPARED SOIL PRIOR TO PLANTING. ALL GROUND COVER AREAS SHALL BE WEEDED AND TREATED WITH A PRE-EMERGENT CHEMICAL AS PER MANUFACTURER'S RECOMMENDATION. N.NO PLANT, EXCEPT GROUND COVERS, GRASSES OR VINES, SHALL BE PLANTED LESS THAN TWO FEET (2') FROM EXISTING STRUCTURES AND SIDEWALKS. O.ALL PLANTING AREAS AND PLANTING PITS SHALL BE MULCHED AS SPECIFIED HEREIN TO FILL THE ENTIRE BED AREA OR SAUCER. NO MULCH IS TO TOUCH THE TRUNK OF THE TREE OR SHRUB. P.ALL PLANTING AREAS SHALL BE WATERED IMMEDIATELY UPON INSTALLATION IN ACCORDANCE WITH THE WATERING SPECIFICATIONS AS LISTED HEREIN. 10. TRANSPLANTING (WHEN REQUIRED) A.ALL TRANSPLANTS SHALL BE DUG WITH INTACT ROOT BALLS CAPABLE OF SUSTAINING THE PLANT. B.IF PLANTS ARE TO BE STOCKPILED BEFORE REPLANTING, THEY SHALL BE HEALED IN WITH MULCH OR SOIL, ADEQUATELY WATERED AND PROTECTED FROM EXTREME HEAT, SUN AND WIND. C.PLANTS SHALL NOT BE DUG FOR TRANSPLANTING BETWEEN APRIL 10 AND JUNE 30. D.UPON REPLANTING, BACKFILL SOIL SHALL BE AMENDED WITH FERTILIZER AND ROOT GROWTH HORMONE. E.TRANSPLANTS SHALL BE GUARANTEED FOR THE LENGTH OF THE GUARANTEE PERIOD SPECIFIED HEREIN. F.IF TRANSPLANTS DIE, SHRUBS AND TREES LESS THAN SIX INCHES (6") DBH SHALL BE REPLACED IN KIND. TREES GREATER THAN SIX INCHES (6") DBH MAY BE REQUIRED TO BE REPLACED IN ACCORDANCE WITH THE MUNICIPALITY'S TREE REPLACEMENT GUIDELINES. 11. WATERING A.NEW PLANTINGS OR LAWN AREAS SHALL BE ADEQUATELY IRRIGATED BEGINNING IMMEDIATELY AFTER PLANTING. WATER SHALL BE APPLIED TO EACH TREE AND SHRUB IN SUCH MANNER AS NOT TO DISTURB BACKFILL AND TO THE EXTENT THAT ALL MATERIALS IN THE PLANTING HOLE ARE THOROUGHLY SATURATED. WATERING SHALL CONTINUE AT LEAST UNTIL PLANTS ARE ESTABLISHED. B.SITE OWNER SHALL PROVIDE WATER IF AVAILABLE ON SITE AT TIME OF PLANTING. IF WATER IS NOT AVAILABLE ON SITE, CONTRACTOR SHALL SUPPLY ALL NECESSARY WATER. THE USE OF WATERING BAGS IS RECOMMENDED FOR ALL NEWLY PLANTED TREES. C.IF AN IRRIGATION SYSTEM HAS BEEN INSTALLED ON THE SITE, IT SHALL BE USED TO WATER PROPOSED PLANT MATERIAL, BUT ANY FAILURE OF THE SYSTEM DOES NOT ELIMINATE THE CONTRACTOR'S RESPONSIBILITY OF MAINTAINING THE DESIRED MOISTURE LEVEL FOR VIGOROUS, HEALTHY GROWTH. 12. GUARANTEE A.THE LANDSCAPE CONTRACTOR SHALL GUARANTEE ALL PLANTS FOR A PERIOD OF ONE (1) YEAR FROM APPROVAL OF LANDSCAPE INSTALLATION BY THE APPROVING AGENCY. CONTRACTOR SHALL SUPPLY THE OWNER WITH A MAINTENANCE BOND FOR TEN PERCENT (10%) OF THE VALUE OF THE LANDSCAPE INSTALLATION WHICH WILL BE RELEASED AT THE CONCLUSION OF THE GUARANTEE PERIOD AND WHEN A FINAL INSPECTION HAS BEEN COMPLETED AND APPROVED BY THE OWNER OR AUTHORIZED REPRESENTATIVE. B.ANY DEAD OR DYING PLANT MATERIAL SHALL BE REPLACED FOR THE LENGTH OF THE GUARANTEE PERIOD. REPLACEMENT OF PLANT MATERIAL SHALL BE CONDUCTED AT THE FIRST SUCCEEDING PLANTING SEASON. ANY DEBRIS SHALL BE DISPOSED OF OFF-SITE, WITHOUT EXCEPTION. C.TREES AND SHRUBS SHALL BE MAINTAINED BY THE CONTRACTOR DURING CONSTRUCTION AND THROUGHOUT THE 90 DAY MAINTENANCE PERIOD AS SPECIFIED HEREIN. CULTIVATION, WEEDING, WATERING AND THE PREVENTATIVE TREATMENTS SHALL BE PERFORMED AS NECESSARY TO KEEP PLANT MATERIAL IN GOOD CONDITION AND FREE OF INSECTS AND DISEASE. D.LAWNS SHALL BE MAINTAINED THROUGH WATERING, FERTILIZING, WEEDING, MOWING, TRIMMING AND OTHER OPERATIONS SUCH AS ROLLING, REGARDING AND REPLANTING AS REQUIRED TO ESTABLISH A SMOOTH, ACCEPTABLE LAWN, FREE OF ERODED OR BARE AREAS. 13. CLEANUP A.UPON THE COMPLETION OF ALL LANDSCAPE INSTALLATION AND BEFORE THE FINAL ACCEPTANCE, THE CONTRACTOR SHALL REMOVE ALL UNUSED MATERIALS, EQUIPMENT AND DEBRIS FROM THE SITE. ALL PAVED AREAS ARE TO BE CLEANED. B.THE SITE SHALL BE CLEANED AND LEFT IN A NEAT AND ACCEPTABLE CONDITION AS APPROVED BY THE OWNER OR AUTHORIZED REPRESENTATIVE. B&B CONTAINER FINISHED GRADE NOT TO SCALE 8-12" 24" MINIMUM DECIDUOUS AND EVERGREEN SHRUB PLANTING DETAIL 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH PLANT SHALL BE TRANSPLANTED AT THE SAME GRADE AS IT BORE IN THE NURSERY PLOT PRIOR TO BALLING AND BURLAPPING. FOR CONTAINER-GROWN SHRUBS, USE FINGER OR SMALL HAND TOOLS TO PULL THE ROOTS OUT OF THE OUTER LAYER OF POTTING SOIL; THEN CUT OR PULL APART ANY ROOTS THAT CIRCLE THE PERIMETER OF THE CONTAINER PLANTING MIX: 1 PART PEAT MOSS 1 PART COW MANURE 3 PARTS TOPSOIL PLANTING MIXTURE WILL CHANGE WITH SOIL CONDITIONS BEFORE PLANTING, ADD 3 TO 4" OF WELL-COMPOSTED LEAVES AND RECYCLED YARD WASTE TO BED AND TILL INTO TOP 6" OF PREPARED SOIL PLACE SHRUB ON FIRM SOIL IN BOTTOM OF HOLE. UNDISTURBED SUBGRADE SOIL SURFACE ROUGHENED TO BIND WITH NEW SOIL. REMOVE THE TOP 1/3 OF THE WIRE BASKET IF PRESENT. ANY AND ALL TWINE SHALL BE REMOVED FROM THE SHRUB BEFORE BACKFILLING. BURLAP SHALL BE FOLDED BACK INTO PLANTING HOLE NOT TO SCALE EXISTING SUBSOILMINIMUM 6" TOPSOIL FINISHED GRADE PERENNIAL/GROUND COVER PLANTING DETAIL 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH D DD TYPICAL PERENNIAL AND GROUND COVER SPACING & LAYOUT PLANT MATERIAL SPACED AS SPECIFIED. SEE LANDSCAPE SCHEDULE FOR PROPOSED SPACING. INCORPORATE 2" OF PEAT INTO 6" OF PLANTING MIXTURE, AS SPECIFIED D= PROPOSED ON CENTER (O.C.) SPACING SEE LANDSCAPE SCHEDULE FOR FOR REQUIRED SPACING TYPICAL PERENNIAL AND GROUND COVER PLANTING EVERGREEN TREE PLANTING DETAIL NOT TO SCALE REFERENCE: ARCHITECTURAL GRAPHIC STANDARDS 1998 CUMULATIVE SUPPLEMENT. 4" BUILT-UP EARTH SAUCER 4-6" DEEPER THAN ROOT BALL BEFORE PLANTING ADD 3 TO 4" OF WELL-COMPOSTED LEAVES OR RECYCLED YARD WASTE TO BED AND TILL INTO TOP 6" OF PREPARED SOIL. SET ROOT BALL FLUSH TO GRADE OR SEVERAL INCHES HIGHER IN POORLY DRAINING SOILS. SET ROOT BALL ON FIRM PAD IN BOTTOM OF HOLE 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH ONLY TREES WITH ONE MAIN LEADER SHALL BE PURCHASED. DO NOT PRUNE TREE AT PLANTING UNLESS DIRECTED TO BY PROJECT LANDSCAPE ARCHITECT FOLD BURLAP AWAY FROM TOP OF ROOT BALL PREPARE WIDTH OF PLANTING HOLE 6 FT OR TWICE THE WIDTH OF THE ROOT BALL; WHICHEVER IS GREATER PREPARED SOIL FOR TREES 1 PART PEAT MOSS 1 PART COW MANURE 3 PARTS TOPSOIL UNDISTURBED SUBGRADE DIG WIDE, SHALLOW HOLE WITH TAMPED SIDES TAMP SOIL SOLIDLY AROUND BASE OF ROOT BALL DO NOT STAKE OR WRAP TRUNK REMOVE THE TOP 1/3 OF THE WIRE BASKET IF PRESENT. ANY AND ALL TWINE SHALL BE REMOVED FROM THE TREE BEFORE BACKFILLING. BURLAP SHALL BE FOLDED BACK INTO PLANTING HOLE DECIDUOUS TREE PLANTING DETAIL 4" BUILT-UP EARTH SAUCER BEFORE PLANTING ADD 3 TO 4" OF WELL-COMPOSTED LEAVES OR RECYCLED YARD WASTE TO BED AND TILL INTO TOP 6" OF PREPARED SOIL. 4-6" DEEPER THAN ROOT BALL REFERENCE: ARCHITECTURAL GRAPHIC STANDARDS 1998 CUMULATIVE SUPPLEMENT. NOT TO SCALE 3" THICK LAYER OF DARK BROWN DOUBLE SHREDDED HARDWOOD MULCH TAMP SOIL SOLIDLY AROUND BASE OF ROOT BALL DIG WIDE, SHALLOW HOLE WITH TAMPED SIDES ONLY TREES WITH ONE MAIN LEADER SHALL BE PURCHASED. DO NOT PRUNE TREE AT PLANTING UNLESS DIRECTED TO BY PROJECT LANDSCAPE ARCHITECT SET ROOT BALL FLUSH TO GRADE OR SEVERAL INCHES HIGHER IN POORLY DRAINING SOILS. FOLD BURLAP AWAY FROM TOP OF ROOT BALL SET ROOT BALL ON FIRM PAD IN BOTTOM OF HOLE REMOVE THE TOP 1/3 OF THE WIRE BASKET IF PRESENT. ANY AND ALL TWINE SHALL BE REMOVED FROM THE TREE BEFORE BACKFILLING. BURLAP SHALL BE FOLDED BACK INTO PLANTING HOLE DO NOT STAKE OR WRAP TRUNK PREPARED SOIL FOR TREES 1 PART PEAT MOSS 1 PART COW MANURE 3 PARTS TOPSOIL UNDISTURBED SUBGRADE PREPARE WIDTH OF PLANTING HOLE 6 FT OR TWICE THE WIDTH OF THE ROOT BALL; WHICHEVER IS GREATER