HomeMy WebLinkAboutSW6170901 - Oak Hill Living Center (6)DRAINAGE AREA MAPS
POINT OFI ANALYSIS
DRAINAGE AREA 1
w. ,
I I
CHANNEL FLOW DIFFUSED BY
EXISTING WEIR
�% 320 /
v �m J11 J-,Jd
203 LF SHALLOW / / / DRAIN REA
CONCENTRATED FLOW I
Tff EXIST G PARKI G { II \
4 II��
1 III
=►��\\\ \�� � � /� ry � I � SII
e
/ � I �
o� POINT OF ANALYSIS
�• DRAINAGE AREA 3
16.
LS1 ING 1
DRAINAGE AREA 3 ING
LTO l 1 1\ ( \ TO EX. DRY POND
\ III
fig.
\ J 9
\ o \ \ Ja b
DRAINAGE AREA 3
BY—PASS POND
/
530 LF CHANNEL FLOW K
AVG. SLOPE 1.5%
ni b,A
x x _x_x_ _k x
\ II
\ 150 LF SHALLOW
CONCENTRATED FLOW
2% SLOPE
\ / it
780 LF CHANNEL FLOW
AVG. SLOPE 1.5%
DRAINAGE AREA 2
35 LF SHALLOW
CONCENTRATED FLOW
30 LF SHEET FLOW
AVG. SLOPE 4.0%
C
PRE -DEVELOPMENT DRAINAGE AREAS
DRAINAGE AREA 1 4.93 ACRES
DRAINAGE AREA 2 0.34 ACRES
DRAINAGE AREA 3 1.97 ACRES — TO EX. DRY POND
5.22 ACRES — BY—PASS EX. DRY POND
LEGEND
PRE—DEVELOPMENT
DRAINAGE AREA
DA1
PRE—DEVELOPMENT
Tc ROUTE
BEGINNING OF Tc
ROUTE SEGMENT
BEGIN SHALLOW
CONCENTRATED FLOW'. B
BEGIN CHANNEL
FLOW
POINT OF Tc ROUTE
DISCHARGE
PRE -DEVELOPMENT
DRAINAGE AREA MAP
0 50 100 200 300
1"=100'@11X17
OAK HILL LIVING CENTER
9767 NC 210
AN(:IFR N(1RTH CAROLINA
' project #: 1463-0479
BOBBITT DESIGN BUILD, INC
BOD G NOWN ROAD
RALEIGHNC 47807
(919
AM PM (8,8)0887-1880
DA1
FX (078)) 051-I084
®��®��
E-MAIL design@bobblV.—
WWW BOBBITT COM
FUm Dc BD -0"'
COPYRIGHT 2 2017 BOBBITT DESIGN BUILD, INC. ALL RIGHTS RESERVED.
POINT OF ANALYSIS BIORETENTI N CELL POST -DEVELOPMENT DRAINAGE AREAS
DRAINAGE AREA 1
I DRAINAGE AREA 1
TO POND 1.82 ACRES — TO POND
BY—PASS POND 3.16 ACRES — BY—PASS POND
77 „ DRAINAGE AREA 2 0.29 ACRES
DRAINAGE AREA 3 1.97 ACRES — TO EX. DRY POND
` 5.22 ACRES — BY—PASS EX. DRY POND
J �n
1
PARjMING
203 LF SHALLOW
CONCENTRATED FLOW / / DRAINAGE AREA 1
� / /� DRAI,NAGE A EA 1
CHANNEL FLOW DIFFUSED / �'� BY—PASS I TO POND
BY EXISTING WEIR
i• / / N
790 LF CHANNEL FLOW
_ I ( AVG. SLOPE 1.0%
BUI�IgiN '� h LEGEND
� J
DRAINAGE AREA 2 PRE—DEVELOPMENT
DRAINAGE AREA
POINT OF ANALYSIS \ J I PRE—DEVELOPMENT
Tc ROUTE
IIIA \ 1 DRAINAGE AREA 3 , I
( — I BEGINNING OF Tcto,,,
ROUTE SEGMENT
�_ BEGIN SHALLOW ��-�,,,
\ ,' 0 J'\ u D of BUISTIING I ALLOW CONCENTRATED FLOW B
` 35 LF SH
\ \ DRAINAGE AREA 3 CONCENTRATED FLOW BEGIN CHANNEL 4 �
TO EX. DRY POND I I FLOW
./x_
POINT OF Tc ROUTE
DISCHARGE •`J
:/X,
POST -DEVELOPMENT
DRAINAGE AREA 3 \ \ ;�� S\ b ® j11� DRAINAGE AREA MAP
BY—PASS POND319
0 50 100 200 300
530 LF CHANNEL FLOW / �o�= �, / / - 30 LF SHEET FLOW 1"=100'@11X17
AVG. SLOPE 1.5% \ AVG. SLOPE 4.0%
X X -X -X -X-%
-x x OAK HILL LIVING CENTER
\ I i 9767 NC 210
\ 150 LF SHALLOW I ANGIER, NORTH CAROLINA project#:1463-0479
CONCENTRATED FLOW BOBBIT DESIGN BUILD, INC
SLOPE 800 GERN%WOWN ROAD
°
RALEIGH NC 27807
(010)851-1980
A� ®BB®TT FX
FX (010)051-1982
E-MAIL EeWOn�@bo06iX mm
WWW BOBBITT COM
Fhm Dc °D -01B7
COPYRIGHT C 2017 BOBBITT DESIGN BUILD, INC. ALL RIGHTS RESERVED